chapter 5 engine removal and installation

Upload: wrvond

Post on 30-May-2018

242 views

Category:

Documents


0 download

TRANSCRIPT

  • 8/9/2019 Chapter 5 Engine Removal and Installation

    1/8

    ENGINE REMOVAL/INSTALLATION ~HOND.ACB1000C

    ~- 35-45 NmCO (3.5-4.5 kg-m,

    25-33 ft-I b)

    I~20-24 Nm(2.0-2.4 kg-m,14-17 ft-Ib)

    5-0 76

    35-45 Nm(3.5-4.5 kg-m,25-33 ft-Ib)

    (J20-24 Nm(2.0-2.4 kg-m,

    Date of Issue: Sept., 1982 HONDA MOTOR CO., LTD.

  • 8/9/2019 Chapter 5 Engine Removal and Installation

    2/8

    ~HONDACB1000C 5. ENGINE REMOVAL/INSTALLATION

    SERVICE INFORMATION

    ENGINE REMOVAL

    ENGINE INSTALLATION

    SERVICE INFORMATION

    5-1

    5-2

    5-6

    GENERAL

    eThe following parts or components can be serviced with the engine installed in the frame:e Clutch - Alternator

    - Gear shift linkage - Starter motore Camshaft - Carburetor

    SPECI FICATIONS

    Engine dry weight

    Oil capacity

    TORQUE VALUES

    Engine hanger bolts8 mm bolt10 mm bolt

    Rear axle nut

    Final gear case nutsExhaust pipe joint nutsMuffler hanger set ting boltsExhaust pipe mounting under boltsExhaust pipe joint band bolts

    106 kg (234 Ib)

    4.5 lit (4.7 US qt) at engine assembly3.5 lit (3.7 US qt) at change

    20-24 Nm (2.0-2.4 kg-m, 14-17 ft-Ib)35-45 Nm (3.5-4.5 kg-m, 25-33 ft-Ib)80-100 Nm (8.0-10.0 kg-m, 58-72 ft-Ib)35-45 Nm (3.5-4.5 kg-m, 25-33 ft-Ib) Apply oil to threads.

    30-35 Nm (3.0-3.5 kg-m, 22-25 ft-Ib) i5-45 Nm (3.5-4.5 kg-m, 25-33 ft-Ib) ..35-45 N.m (3.5-4.5 kg-m, 25-33 ft-Ib) Tightening sequence, seepage 5-7.20-24 Nm (2.0-2.4 kg-m, 14-17 ft-Ib)

    Date of Issue: Sept., 1982 HONDA MOTOR CO., LTD. 77 5-1

  • 8/9/2019 Chapter 5 Engine Removal and Installation

    3/8

  • 8/9/2019 Chapter 5 Engine Removal and Installation

    4/8

    ~HONDACB1000C

    V Disconnect the oil cooler hoses from the engine.

    Remove the air cleaner and carburetor.

    Disconnect the tachometer cable and spark plug

    caps.

    Date of Issue: Sept., 1982 HONDA MOTOR CO., LTD. 79

    ENGINE REMOVAL/INSTALLATION

    Oil COOLER HOSES

    CARBURETOR

    AIR CLEANER

    TACHOMETERCABLE

    5-3

  • 8/9/2019 Chapter 5 Engine Removal and Installation

    5/8

    ENGINE REMOVAL/INSTALLATION

    Disconnect the starter motor cable, alternator andpulse generator couplers.

    r:::i!J\aoNDACB1000C

    STARTER CABLE

    Disconnect the battery negative cable.

    ALTERNATOR

    COUPLER

    PULSE GENERATOR

    COUPLER

    Remove the brake pedal, brake pedal bracket lowermounting bolt and loosen the upper bolt.

    Disconnect the clutch cable and remove the clutchcable holder.

    5-4 80

    NEGATIVE

    CABLE

    CLUTCH

    CABLE HOLDER

    BRAKE PEDAL BRACKET

    Date of Issue: Sept., 1982 HONDA MOTOR CO., LTD.

  • 8/9/2019 Chapter 5 Engine Removal and Installation

    6/8

    r:::iJJ\HONDACB1000C

    Remove the rear wheel (page 15-2).Remove the final drive gear.Pull the swing arm boot back and disengage thedrive shaft from the engine.

    Use a jack to support the engine.Remove the engine mounting bolts and right enginehanger bracket.

    Remove the rear engine hanger bracket.Remove the left side sub-frame.

    Remove the engine from the left side.

    ENGINE REMOVAL/INSTALLf\TION

    UNIVERSAL JOINT

    BOOT

    RIGHT ENGINEHANGER BRACKET

    REAR ENGINEHANGER BRACKET

    LEFT SIDE UNDER FRAME

    Date of Issue: Sept., 1982 HONDA MOTOR CO., LTD. 81 5-5

  • 8/9/2019 Chapter 5 Engine Removal and Installation

    7/8

    ENGINE REMOVAL/INSTAllATION

    ENGINE INSTALLATION

    Check the engine mount rubbers for damage andrepl ace if necessary.

    Install the engine mount rubbers.

    ~HONDACB1000C

    MOUNT RUBBERS

    Install the engine in the reverse order of removal.

    NOTE,----- Route the wires and cables properly (page

    1-9). Fill the crankcase to the proper level with

    the recommended oil (page 2-3). Perform the following inspection and ad

    justments:Th rottle operation (page 3-5)Clutch (page 3-19)

    10 mm BOLTS

    35-45 Nm(3.5-4.5 kg-m, 25-33 ft-Ib)

    8 mm BOLTS20-24 Nm(2.0-2.4 kg-m, 14-17 ft-Ib)

    EXHAUSTPIPEINSTAllATIONInstall a new exhaust pipe joint gasket.

    Assemble the left and right exhaust pipes.

    Tighten the exhaust pipe band loosely.

    8 mm BOLTS20-24 Nm(2.0-2.4 kg-m, 14-17 ft-Ib)

    10 mm BOLTS35-45 Nm(3.5-4.5 kg-m, 25-33 ft-Ib)

    (bJ

    /~~GASKET EXHAUST PIPE

    JOINT BAND

    5-6 82 Date of Issue: Sept., 1982 HONDA MOTOR CO., LTD.

  • 8/9/2019 Chapter 5 Engine Removal and Installation

    8/8

    ~HONDACB1000C

    ~ Install the exhaust pipes.

    Loosenly install all bolts and nuts, then tightenthem in the following order:

    ENGINE REMOVAl/INSTALLATION

    1. Exhaustpipe joint nuts.G TORQUE: 30-35 Nm(3.0-3.5 kg-m, 22-25 ft-Ib)

    2. Exhaust pipe mounting under bolts.TORQUE: 35-45 Nm

    (3.5-4.5 kg-m, 25-33 ft-Ib)~ 3. Rearmuffler hanger setting bolts.

    TORQUE: 35-45 Nm(3.5-4.5 kg-m, 25-33 ft-Ib)

    4. Exhaustpipe joint bandbolt.

    TORQUE: 20-24 Nm(2.0-2.4 kg-m, 14-17 ft-Ib)

    Date of Issue:Sept., 1982

    JOINTNUTS

    UNDER BOLT

    HANGERSETTI NG BOLT

    5 7