Page 1: Chapter 4 OPERATIONAL INFRASTRUCTURE [ENTER FACILITATOR’S NAME AND CONTACT INFORMATION] Developed by Troutman Sanders LLP Developed for the Virginia Department

Ch

apte

r 4

OPERATIONAL INFRASTRUCTURE

[ENTER FACILITATOR’S NAME AND CONTACT INFORMATION]

Developed by Troutman Sanders LLPDeveloped for the Virginia Department of Health

Funded by Centers for Disease Control and Prevention

Page 2: Chapter 4 OPERATIONAL INFRASTRUCTURE [ENTER FACILITATOR’S NAME AND CONTACT INFORMATION] Developed by Troutman Sanders LLP Developed for the Virginia Department

2Operational Infrastructure

Page 3: Chapter 4 OPERATIONAL INFRASTRUCTURE [ENTER FACILITATOR’S NAME AND CONTACT INFORMATION] Developed by Troutman Sanders LLP Developed for the Virginia Department

3Operational Infrastructure

Toolkit Presentations Instructions for Use

Toolkit Presentations are intended to be a companion to the Hospital Implementation Guide and should not be used in isolation.

The Presentations are intended to serve as a starting point for the facilitator. The facilitator should thoroughly review the Presentation prior to use in Implementation Team, CRAG or Subcommittee meetings and customize the Presentation to meet the unique needs of the meeting participants.

Pay particular to attention to the information provided in brackets ([ ]), which must be completed by the facilitator prior to use.

Included in the “Notes” section of each slide are the following types of information:

• Slide Type, which indicates whether the slide is for information or discussion, serves as a placeholder, or is some combination thereof

• Planning Guide Section(s), which will direct the facilitator to the corresponding sections of the Planning Guide and Hospital Implementation Guide for further information

• Special Instructions, which provides directions for the facilitator to customize the slide for the intended audience

• Speaker’s Notes, which provides more detailed information to supplement the material on the slide

Refer to the Hospital Implementation Guide for further guidance and helpful hints on effectively completing the process described in the Planning Guide.

Page 4: Chapter 4 OPERATIONAL INFRASTRUCTURE [ENTER FACILITATOR’S NAME AND CONTACT INFORMATION] Developed by Troutman Sanders LLP Developed for the Virginia Department

4Operational Infrastructure

CRAG Members

[Enter names and departments of each CRAG member]

Page 5: Chapter 4 OPERATIONAL INFRASTRUCTURE [ENTER FACILITATOR’S NAME AND CONTACT INFORMATION] Developed by Troutman Sanders LLP Developed for the Virginia Department

5Operational Infrastructure

Add slides from Altered Standards Overview and/or Chapter 1 presentation, as needed, to re-introduce the CRAG to the concept of altered standards and critical resource shortage response planning, especially if new members are involved.

Page 6: Chapter 4 OPERATIONAL INFRASTRUCTURE [ENTER FACILITATOR’S NAME AND CONTACT INFORMATION] Developed by Troutman Sanders LLP Developed for the Virginia Department

6Operational Infrastructure

Introduction

Page 7: Chapter 4 OPERATIONAL INFRASTRUCTURE [ENTER FACILITATOR’S NAME AND CONTACT INFORMATION] Developed by Troutman Sanders LLP Developed for the Virginia Department

7Operational Infrastructure

Why do we need an Operational Infrastructure?

Many hospitals already have an emergency response infrastructure

Most hospitals do NOT have the type of infrastructure that will be needed to respond to a critical resource shortage event

An overall operational infrastructure will provide consistency to Protocol development, implementation, and operationalization

Page 8: Chapter 4 OPERATIONAL INFRASTRUCTURE [ENTER FACILITATOR’S NAME AND CONTACT INFORMATION] Developed by Troutman Sanders LLP Developed for the Virginia Department

8Operational Infrastructure

Chapter Overview

Determine process for activation and termination of the CRSRP

Determine process for activation and termination of each Protocol

Develop structure for making resource allocation decisions

Develop infrastructure for reviewing and revising CRSRP during a CRSE

Define “essential documentation”

Page 9: Chapter 4 OPERATIONAL INFRASTRUCTURE [ENTER FACILITATOR’S NAME AND CONTACT INFORMATION] Developed by Troutman Sanders LLP Developed for the Virginia Department

9Operational Infrastructure

Chapter Overview cont.

Develop process for responding to non-compliance

Identify resources for psychological and emotional support

Develop a communication plan Develop strategy for providing palliative care

during a critical resource shortage event• Determine goal• Develop standard definition• Identify mechanisms for providing palliative care

Page 10: Chapter 4 OPERATIONAL INFRASTRUCTURE [ENTER FACILITATOR’S NAME AND CONTACT INFORMATION] Developed by Troutman Sanders LLP Developed for the Virginia Department

10Operational Infrastructure

Review of Ethical Framework

Page 11: Chapter 4 OPERATIONAL INFRASTRUCTURE [ENTER FACILITATOR’S NAME AND CONTACT INFORMATION] Developed by Troutman Sanders LLP Developed for the Virginia Department

11Operational Infrastructure

Strong Foundation

Ethical Framework

Operational Infrastructure

Education & Communication

Building the CRSRP

Protocol

Protocol

Protocol

Protocol

Protocol

Protocol

Protocol

Protocol

Ad Hoc

Page 12: Chapter 4 OPERATIONAL INFRASTRUCTURE [ENTER FACILITATOR’S NAME AND CONTACT INFORMATION] Developed by Troutman Sanders LLP Developed for the Virginia Department

12Operational Infrastructure

[HIGH PRIORITY [HIGH PRIORITY ETHICAL VALUE]ETHICAL VALUE]

[HIGH PRIORITY [HIGH PRIORITY ETHICAL VALUE]ETHICAL VALUE]

[HIGH PRIORITY [HIGH PRIORITY ETHICAL VALUE]ETHICAL VALUE]

[HIGH PRIORITY [HIGH PRIORITY ETHICAL VALUE]ETHICAL VALUE]

[MEDIUM PRIORITY [MEDIUM PRIORITY ETHICAL VALUE]ETHICAL VALUE]

[MEDIUM PRIORITY [MEDIUM PRIORITY ETHICAL VALUE]ETHICAL VALUE]

[MEDIUM PRIORITY [MEDIUM PRIORITY ETHICAL VALUE]ETHICAL VALUE]

[MEDIUM PRIORITY [MEDIUM PRIORITY ETHICAL VALUE]ETHICAL VALUE]

[MEDIUM PRIORITY [MEDIUM PRIORITY ETHICAL VALUE]ETHICAL VALUE]

[LOW PRIORITY [LOW PRIORITY ETHICAL VALUE]ETHICAL VALUE]

[LOW PRIORITY [LOW PRIORITY ETHICAL VALUE]ETHICAL VALUE]

[LOW PRIORITY [LOW PRIORITY ETHICAL VALUE]ETHICAL VALUE]

[LOW PRIORITY [LOW PRIORITY ETHICAL VALUE]ETHICAL VALUE]

[LOW PRIORITY [LOW PRIORITY ETHICAL VALUE]ETHICAL VALUE]

[Withdrawal/Withholding] [Withdrawal/Withholding] of Resourcesof Resources [Exclusion Criteria][Exclusion Criteria]

[INSERT GOAL DEVELOPED IN [INSERT GOAL DEVELOPED IN SECTION 3.2]SECTION 3.2]

Ethical FrameworkOperational Infrastructure

Ethical Framework

Page 13: Chapter 4 OPERATIONAL INFRASTRUCTURE [ENTER FACILITATOR’S NAME AND CONTACT INFORMATION] Developed by Troutman Sanders LLP Developed for the Virginia Department

13Operational Infrastructure

What’s Next?

Ethical Framework

Operational Infrastructure

Development of the operational infrastructure

Page 14: Chapter 4 OPERATIONAL INFRASTRUCTURE [ENTER FACILITATOR’S NAME AND CONTACT INFORMATION] Developed by Troutman Sanders LLP Developed for the Virginia Department

14Operational Infrastructure

Operational Infrastructure

Page 15: Chapter 4 OPERATIONAL INFRASTRUCTURE [ENTER FACILITATOR’S NAME AND CONTACT INFORMATION] Developed by Troutman Sanders LLP Developed for the Virginia Department

15Operational Infrastructure

CRSRP Process

Termination

Maintenance

Implementation

Activation

Page 16: Chapter 4 OPERATIONAL INFRASTRUCTURE [ENTER FACILITATOR’S NAME AND CONTACT INFORMATION] Developed by Troutman Sanders LLP Developed for the Virginia Department

16Operational Infrastructure

CRSRP ACTIVATION AND

TERMINATION

Page 17: Chapter 4 OPERATIONAL INFRASTRUCTURE [ENTER FACILITATOR’S NAME AND CONTACT INFORMATION] Developed by Troutman Sanders LLP Developed for the Virginia Department

17Operational Infrastructure

Activation of CRSRP

Supply of Critical Resources

Page 18: Chapter 4 OPERATIONAL INFRASTRUCTURE [ENTER FACILITATOR’S NAME AND CONTACT INFORMATION] Developed by Troutman Sanders LLP Developed for the Virginia Department

18Operational Infrastructure

Activation Flow Chart

Event Occurs

Identify Critical Resource Shortage

Event

Report Critical Resource Shortage

Event

Declare Critical Resource Shortage

EventActivate CRSRP

Who is responsible for each step in the activation process?

Resource levelsbegin to diminish &demand increases

Page 19: Chapter 4 OPERATIONAL INFRASTRUCTURE [ENTER FACILITATOR’S NAME AND CONTACT INFORMATION] Developed by Troutman Sanders LLP Developed for the Virginia Department

19Operational Infrastructure

Hospital Incident

CommandStructure

Page 20: Chapter 4 OPERATIONAL INFRASTRUCTURE [ENTER FACILITATOR’S NAME AND CONTACT INFORMATION] Developed by Troutman Sanders LLP Developed for the Virginia Department

20Operational Infrastructure

Identifying a Critical Resource Shortage Event

STATUS

Does demand exceed supply?

FORECAST

When will demand exceed supply if it doesn’t already?

DURATION

For how long will demand exceed

supply?

MAGNITUDE

To what extent does or will demand exceed supply?

MITIGATION

Options for obtaining additional supplies of

the resource.

Page 21: Chapter 4 OPERATIONAL INFRASTRUCTURE [ENTER FACILITATOR’S NAME AND CONTACT INFORMATION] Developed by Troutman Sanders LLP Developed for the Virginia Department

21Operational Infrastructure

Declaration and Activation

Supply of the Resource

Who will declare the CRSE?

Who will activate the CRSRP?

Page 22: Chapter 4 OPERATIONAL INFRASTRUCTURE [ENTER FACILITATOR’S NAME AND CONTACT INFORMATION] Developed by Troutman Sanders LLP Developed for the Virginia Department

22Operational Infrastructure

Governmental Emergency Declarations

How will federal, state or local emergency declarations be identified?

Who will find, read and summarize the declaration(s)?

What is the role of legal counsel?

Page 23: Chapter 4 OPERATIONAL INFRASTRUCTURE [ENTER FACILITATOR’S NAME AND CONTACT INFORMATION] Developed by Troutman Sanders LLP Developed for the Virginia Department

23Operational Infrastructure

CRSRP Termination

Too soon

Not soon enough

Page 24: Chapter 4 OPERATIONAL INFRASTRUCTURE [ENTER FACILITATOR’S NAME AND CONTACT INFORMATION] Developed by Troutman Sanders LLP Developed for the Virginia Department

24Operational Infrastructure

BREAK

Page 25: Chapter 4 OPERATIONAL INFRASTRUCTURE [ENTER FACILITATOR’S NAME AND CONTACT INFORMATION] Developed by Troutman Sanders LLP Developed for the Virginia Department

25Operational Infrastructure

PROTOCOL ACTIVATION AND

TERMINATION

Page 26: Chapter 4 OPERATIONAL INFRASTRUCTURE [ENTER FACILITATOR’S NAME AND CONTACT INFORMATION] Developed by Troutman Sanders LLP Developed for the Virginia Department

26Operational Infrastructure

Activation of Protocols

Supply of Critical Resources

Page 27: Chapter 4 OPERATIONAL INFRASTRUCTURE [ENTER FACILITATOR’S NAME AND CONTACT INFORMATION] Developed by Troutman Sanders LLP Developed for the Virginia Department

27Operational Infrastructure

Simultaneous Activation

Supply of Critical Resources

Page 28: Chapter 4 OPERATIONAL INFRASTRUCTURE [ENTER FACILITATOR’S NAME AND CONTACT INFORMATION] Developed by Troutman Sanders LLP Developed for the Virginia Department

28Operational Infrastructure

Asynchronous Activation

Supply of Critical Resources

Page 29: Chapter 4 OPERATIONAL INFRASTRUCTURE [ENTER FACILITATOR’S NAME AND CONTACT INFORMATION] Developed by Troutman Sanders LLP Developed for the Virginia Department

29Operational Infrastructure

Protocol Termination Options

Simultaneous

Asynchronous• Who will terminate the Protocols? • Will the decision vary by Protocol?• What information is required?

Termination by Tier

Page 30: Chapter 4 OPERATIONAL INFRASTRUCTURE [ENTER FACILITATOR’S NAME AND CONTACT INFORMATION] Developed by Troutman Sanders LLP Developed for the Virginia Department

30Operational Infrastructure

BREAK

Page 31: Chapter 4 OPERATIONAL INFRASTRUCTURE [ENTER FACILITATOR’S NAME AND CONTACT INFORMATION] Developed by Troutman Sanders LLP Developed for the Virginia Department

31Operational Infrastructure

AllocationInfrastructure

Page 32: Chapter 4 OPERATIONAL INFRASTRUCTURE [ENTER FACILITATOR’S NAME AND CONTACT INFORMATION] Developed by Troutman Sanders LLP Developed for the Virginia Department

32Operational Infrastructure

Model 1 – Treating Physicians

Page 33: Chapter 4 OPERATIONAL INFRASTRUCTURE [ENTER FACILITATOR’S NAME AND CONTACT INFORMATION] Developed by Troutman Sanders LLP Developed for the Virginia Department

33Operational Infrastructure

Model 2 – Triage Officer

Page 34: Chapter 4 OPERATIONAL INFRASTRUCTURE [ENTER FACILITATOR’S NAME AND CONTACT INFORMATION] Developed by Troutman Sanders LLP Developed for the Virginia Department

34Operational Infrastructure

Model 3 – Triage Committee

Page 35: Chapter 4 OPERATIONAL INFRASTRUCTURE [ENTER FACILITATOR’S NAME AND CONTACT INFORMATION] Developed by Troutman Sanders LLP Developed for the Virginia Department

35Operational Infrastructure

ED

Inpatients

Direct Admits

ELIGIBLE

INELIGIBLE

Model 4Model 4Triage Triage

Officer and Officer and Triage Triage

CommitteeCommitteeResource #1

Resource #2

INE

LIG

IBLE

Page 36: Chapter 4 OPERATIONAL INFRASTRUCTURE [ENTER FACILITATOR’S NAME AND CONTACT INFORMATION] Developed by Troutman Sanders LLP Developed for the Virginia Department

36Operational Infrastructure

Which model should we adopt?

Page 37: Chapter 4 OPERATIONAL INFRASTRUCTURE [ENTER FACILITATOR’S NAME AND CONTACT INFORMATION] Developed by Troutman Sanders LLP Developed for the Virginia Department

37Operational Infrastructure

Triage Officer Powers

AUTHORITY YES NO

Recommend resource allocation

Withdraw resources from patients and re-allocate

Research/monitor outcomes

Situational Awareness

Re-assess and modify Protocols

Require physicians and staff to provide care according to Protocol

Reprimand non-compliant providers

Other?

Page 38: Chapter 4 OPERATIONAL INFRASTRUCTURE [ENTER FACILITATOR’S NAME AND CONTACT INFORMATION] Developed by Troutman Sanders LLP Developed for the Virginia Department

38Operational Infrastructure

Triage Committee Powers

AUTHORITY YES NO

Recommend resource allocation

Withdraw resources from patients and re-allocate

Research/monitor outcomes

Situational Awareness

Re-assess and modify Protocols

Require physicians and staff to provide care according to Protocol

Reprimand non-compliant providers

Other?

Page 39: Chapter 4 OPERATIONAL INFRASTRUCTURE [ENTER FACILITATOR’S NAME AND CONTACT INFORMATION] Developed by Troutman Sanders LLP Developed for the Virginia Department

39Operational Infrastructure

BREAK

Page 40: Chapter 4 OPERATIONAL INFRASTRUCTURE [ENTER FACILITATOR’S NAME AND CONTACT INFORMATION] Developed by Troutman Sanders LLP Developed for the Virginia Department

40Operational Infrastructure

Re-assessment of CRSRP during the

CRSE

Page 41: Chapter 4 OPERATIONAL INFRASTRUCTURE [ENTER FACILITATOR’S NAME AND CONTACT INFORMATION] Developed by Troutman Sanders LLP Developed for the Virginia Department

41Operational Infrastructure

Reassessment of CRSRP

Implementation of CRSRP

Re-assessment of situational

factors

Revisionof CRSRP

Disseminationof CRSRP

Page 42: Chapter 4 OPERATIONAL INFRASTRUCTURE [ENTER FACILITATOR’S NAME AND CONTACT INFORMATION] Developed by Troutman Sanders LLP Developed for the Virginia Department

42Operational Infrastructure

Documenting CRSRP Modifications

Re-assessment of situational

factors

Revisionof CRSRP

Page 43: Chapter 4 OPERATIONAL INFRASTRUCTURE [ENTER FACILITATOR’S NAME AND CONTACT INFORMATION] Developed by Troutman Sanders LLP Developed for the Virginia Department

43Operational Infrastructure

BREAK

Page 44: Chapter 4 OPERATIONAL INFRASTRUCTURE [ENTER FACILITATOR’S NAME AND CONTACT INFORMATION] Developed by Troutman Sanders LLP Developed for the Virginia Department

44Operational Infrastructure

Additional Operational

Issues

Page 45: Chapter 4 OPERATIONAL INFRASTRUCTURE [ENTER FACILITATOR’S NAME AND CONTACT INFORMATION] Developed by Troutman Sanders LLP Developed for the Virginia Department

45Operational Infrastructure

Primary Functions of Documentation During a CRSE

Care and safety of patients Support Protocols Quality assessment Obtain timely reimbursement

How will you ensure the completion of “essential documentation”?

Essential DocumentationEssential Documentation

Page 46: Chapter 4 OPERATIONAL INFRASTRUCTURE [ENTER FACILITATOR’S NAME AND CONTACT INFORMATION] Developed by Troutman Sanders LLP Developed for the Virginia Department

46Operational Infrastructure

Reasons for Non-Compliance

That is outside my

scope of practice.

I don’t have the knowledge or

skills to successfully

complete this task.

My patient deserves to receive the resource.

The triage committee used the Protocol incorrectly.

My patient,my

responsibility,my decision.

I won’t do that because I don’t want to get sued.

Page 47: Chapter 4 OPERATIONAL INFRASTRUCTURE [ENTER FACILITATOR’S NAME AND CONTACT INFORMATION] Developed by Troutman Sanders LLP Developed for the Virginia Department

47Operational Infrastructure

Non-Compliant ProvidersHow will you respond?

Ignore Terminate employment/

revoke privileges

Assume controlof patient

Counseling/Persuasion

Directive Restrict/suspend

privileges

Page 48: Chapter 4 OPERATIONAL INFRASTRUCTURE [ENTER FACILITATOR’S NAME AND CONTACT INFORMATION] Developed by Troutman Sanders LLP Developed for the Virginia Department

48Operational Infrastructure

Psychological and Emotional Support

Page 49: Chapter 4 OPERATIONAL INFRASTRUCTURE [ENTER FACILITATOR’S NAME AND CONTACT INFORMATION] Developed by Troutman Sanders LLP Developed for the Virginia Department

49Operational Infrastructure

Updating Staff

Page 50: Chapter 4 OPERATIONAL INFRASTRUCTURE [ENTER FACILITATOR’S NAME AND CONTACT INFORMATION] Developed by Troutman Sanders LLP Developed for the Virginia Department

50Operational Infrastructure

BREAK

Page 51: Chapter 4 OPERATIONAL INFRASTRUCTURE [ENTER FACILITATOR’S NAME AND CONTACT INFORMATION] Developed by Troutman Sanders LLP Developed for the Virginia Department

51Operational Infrastructure

Palliative Care

Page 52: Chapter 4 OPERATIONAL INFRASTRUCTURE [ENTER FACILITATOR’S NAME AND CONTACT INFORMATION] Developed by Troutman Sanders LLP Developed for the Virginia Department

52Operational Infrastructure

Palliative Care “Normal” v. Disaster

“Normal” Times End-of-life care

Performed by select group of providers

Patient choice

CRSE Patients who in “normal” times would have received regular care Providers who are not used to this type of care Little, if any, patient choice

Page 53: Chapter 4 OPERATIONAL INFRASTRUCTURE [ENTER FACILITATOR’S NAME AND CONTACT INFORMATION] Developed by Troutman Sanders LLP Developed for the Virginia Department

53Operational Infrastructure

Potential GoalsTo relieve painTo manage symptoms without use of the

critical resourceTo ensure that patients are not abandoned

or ignoredTo minimize the physical/psychological

suffering of those not provided the critical resource

Others?

Page 54: Chapter 4 OPERATIONAL INFRASTRUCTURE [ENTER FACILITATOR’S NAME AND CONTACT INFORMATION] Developed by Troutman Sanders LLP Developed for the Virginia Department

54Operational Infrastructure

Define Palliative Care

Definition is important for consistency and understanding

Will be informed by the goals established in this meeting

No existing definition really captures palliative/comfort care in the disaster context

Page 55: Chapter 4 OPERATIONAL INFRASTRUCTURE [ENTER FACILITATOR’S NAME AND CONTACT INFORMATION] Developed by Troutman Sanders LLP Developed for the Virginia Department

55Operational Infrastructure

Providing Palliative Care

Who will provide palliative care?Can we partner with existing local

palliative care organizations?What training will be needed?Can palliative care be provided in

alternate care facilities?How will psychological/emotional support

be provided to palliative caregivers?

Page 56: Chapter 4 OPERATIONAL INFRASTRUCTURE [ENTER FACILITATOR’S NAME AND CONTACT INFORMATION] Developed by Troutman Sanders LLP Developed for the Virginia Department

56Operational Infrastructure

Questions?Questions?