Chapter 4 Future Prospects iiNgEMSIIi EEIst- Surabaya-Malang Highway. With its remarkable economic growth, faces a large number of issues requiring immediate attention such supply and development of sewer and road networks. (1996) Surabaya as water

Upload: others

Post on 29-Sep-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Chapter 4 Future Prospects - JICA · CHAPTER 4 1. Future Directions in DeveEopment (1) Assistance policy of the Japanese government The Japanese government is following a policy of

Chapter 4

Future Prospects

iiNgEMSIIi EEIst-

Surabaya-Malang Highway. With its remarkable economic growth,faces a large number of issues requiring immediate attention suchsupply and development of sewer and road networks. (1996)

Surabayaas water

Page 2: Chapter 4 Future Prospects - JICA · CHAPTER 4 1. Future Directions in DeveEopment (1) Assistance policy of the Japanese government The Japanese government is following a policy of

CHAPTER 4

1. Future Directions in DeveEopment

(1) Assistance policy of the Japanese government

The Japanese government is following a policy of continued assistance to Indonesia. The

reasons for this include: Indonesia is important politically and ecomically as one ofJapan's

neighboring countries; Indonesia shoulders an important role in international terms; and

there is expected to be a great deal of aid requested in the future to make the economy

sustainable. The primary areas for assistance are as listed below. (Basic Materials for

Economic Cooperation, April 1996, Economic Cooperation Bureau, Ministry of Foreign

Affairs)

1) Assurance of nondisparity (balanced development of the entire nation)

. Eradicationofpoverty

. Assistance to fundamental livelihood sectors (Basic Human Need [BHN])

. Population and family planning including measures against AIDS

. Development ofEast Indonesia (correction ofregional disparity)

2) Assistance to sectors related to human development and education (Improvement

of educational standards and development of human resources to support

sustainable growth)

. Improvedprimaryandsecondaryeducation

. Higherqualityofteachers

. Improved education for engineers and technicians

. Environmental preservation (measures for environmental issues that emerge

with rapid development efforts)

3) Assistance with reorganization ofindustrial structure

. Assistancewithmanagementofmacroeconomy . PromotionofIower-endindustries

. Promotion of agriculture (diversification of agricultural products, production

of crops with high added vaiue)

4) Development of infrastructure (creating an environment for sustainable

introduction of investment)

. Electricity

. Waterresources

. Transportation

. Communications

- 149 -

Page 3: Chapter 4 Future Prospects - JICA · CHAPTER 4 1. Future Directions in DeveEopment (1) Assistance policy of the Japanese government The Japanese government is following a policy of

CHAPTER 4

(2) Development policy of lndonesian government

The Indonesian government launched the second 25-year long-term development plan in

1994 along with the sixth 5-year development plan. Below are the three principles of

development inherent in them:

1) Developmentofhumanresources

2) Improvementoflivelihood

3) Correction of economic disparity and eradication of poverty (balanced

development, emphasized investment on un- and low-developed regions outside

of Java Island)

The objectives of economic policies are also established in a specific manner as

follows:

1) To achieve a no-loan economy by 2019 when the 25-year long term development

plan ends.

2) To promote privatization and private participation (Funds for public works and

infrastructure development projects to be increased by 759o with private money

by 2019.)

Based on the above policies, the Indonesian government is currently concentrating on

the development of East Indonesia (east of Nusa Tenggara) as a regional policy, by

promoting the privatization of state-run enterprises and the development of public

infrastructure with public funds (based on BOT or BOO method).

(3) Future direction of the Brantas River Basin Development

Based on the basic principles of the two governments described earlier and the approach of

the Brantas Project so far, also taking local needs into consideration, this section examines

the future direction of the Brantas River Basin Development from the following viewpoints:

(a) balanced development, (b) establishment of an operation and maintenance system, (c)

education and training of engineers, (d) development in consideration of improved water

environment, (e) privatization, (b water resources development, (g) review of the master

plan.

(a) Balanced development Brantas projects have been implemented one after another based on the master plan

which was reviewed once every decade, as explained earlier. After examining the

economic disparity developing within the basin, the third master plan has proposed

balanced development. Agricultural and jrrigational developments have been pursued as

- 150 -

Page 4: Chapter 4 Future Prospects - JICA · CHAPTER 4 1. Future Directions in DeveEopment (1) Assistance policy of the Japanese government The Japanese government is following a policy of

CHAPTER 4

target sectors in the Brantas Basin. The basin has now reached an average planting rate of

1809o with the highest planting rate for one area within Brantas Basin reaching 2309o. In

comparison, the upper reaches of Lesti, those of Ngrowo, Widas basin, and surrounding

areas are all below 1309o. The income of the farming households in these regions is little

more than one third of the average income of the entire Brantas Basin. The third master

plan stipulates the following development projects for these regions:

1) Lestiregion

Construction of Genteng Dam, Lesti Dam, and small-scale dams; irrigation

planning and volcanic disaster prevention planning (The Brantas Office

embarked on the preparation work for the Lesti Dam construction, but has not

entered into the construction work yet.)

2) Ngroworegion Construction of Wonorejo Dam and small-scale dams, and irrigation planning

(The Wonorejo Dam is under construction, mainly intended for city water supply

to the Surabaya area.)

3) Widasregion Construction of upper reach small-scale dams, irrigation planning, and flood

control planning (River improvement work and artificial retarding basin

construction work are now in progress as part of the flood control plans.)

There is still potential for irrigation development in these regions, and further needs

including industrial development of cities, education for and transfer of residents. In fact

migration of the residents from the Ngrowo basin has begun to occur as Tulungagung and

Kediri are making progress in industrialization, which is helping to reduce income

disparity.

(b) Establishment of project operation and maintenance systems

Typically, development projects are executed with foreign aid funds until completion,

followed by post-completion operation and maintenance being carried out by the local

authorities concerned. There are however several projects that have failed to produce the

initially intended effects due to either financial or technical problems of the recipient

countrles.

In the case of the Brantas Basin, the execution body of a project continues on to the

operation and maintenance phases after completion, as well as when starting a new project,

enabling the post-completion operation to progress smoothly.

The Public Water Service Corporation (Perum Jasa Tirta) evolved from the Brantas

Office in 1990 is now engaged in the post-completion operation and maintenance.

Although Perum Jasa Tirta seems to be operating fairly efficiently, the Indonesian

government is considering the transfer or division of some functions of the company

-151-

Page 5: Chapter 4 Future Prospects - JICA · CHAPTER 4 1. Future Directions in DeveEopment (1) Assistance policy of the Japanese government The Japanese government is following a policy of

CHAPTER 4

because of the large number of completed projects and the government's private

participation promotion. The present situation requires that this company be strengthened.

(c) Education and training of engineers

As stated earlier, the Brantas Project was implemented on the basis of foreign

contractors in the first phase, then shifted to government-run work in the second phase, and

is now under way through mostly local contract work. It is recognized that the first phase

of the Project was the era of basic training of local engineers; the second, that of on-site

training marked by their participation in construction work for experience; and the current

phase is one of execution on their own. In fact, recent years have seen an increase in the

number of local contractors joining projects, although the numbers vary with the difficulty

of the project.

That the Brantas Project adopted a government-run work method for a fixed time,

turned out to be beneficial in the efficient training of Indonesian engineers. Engineers

involved in such assignments were dispatched to other river basin projects in Indonesia,

bringing about the effective utilization of engineering resources. This can be said to have

been an indirect but very important effect of the Brantas Project.

Today, engineers engaged in the Brantas Project are active in development projects

nationwide. Engineer training and education are still urged since an increased number of

engineers are needed for the government to launch full scale development projects

throughout the nation. This is the reason some government officials prefer to execute other

government-run work through the Brantas Project or any suitable project. To date, the

technology transfer has focused on design and construction management, and as a result the

transfer of what is generally called software is lagging behind. Staff trained in such areas

as planning, organization, and system and post-completion maintenance are needed in the

field.

- 152 -

Page 6: Chapter 4 Future Prospects - JICA · CHAPTER 4 1. Future Directions in DeveEopment (1) Assistance policy of the Japanese government The Japanese government is following a policy of

CHAPTER 4

Repair shop in Karangkates Dam

(d) Development aimed at improved water environment The Brantas Project has been persistent to date towards the goal of developing basic

infrastructure, which in turn leads to economic growth. In the early phases of the Brantas

Project, infrastructure was provided for water, power, irrigation, and traffic networks

rather than for water demand itself. Later, based on the infrastructure thus established, the

local economy accelerated. Following this, additional projects were continually

implemented prioritizing flood control and inigation.

The Brantas Basin is enjoying remarkable economic growth as a center for food

supply to the entire country of Indonesia along with the rapid industrialization of urban

Surabaya and in-basin regional cities resulting from the developing infrastructure. With

this progress, however, the water quality of the Brantas River, especially Surabaya River

and its branches, is deteriorating and environmental improvement is needed. Accordingly,

Brantas River Basin Development was required to include considerations of water

environment such as water amount, water quality, watershed, and protection of the

ecosystem.

Currently, water purification efforts are being undertaken in Surabaya municipality

using river maintenance flow to dilute the river water, but the situation calls for more than

dilution, the pollutants need to be reduced. What is needed is the construction of domestic

and industrial wastewater treatment facilities and sewers.

- 153 -

Page 7: Chapter 4 Future Prospects - JICA · CHAPTER 4 1. Future Directions in DeveEopment (1) Assistance policy of the Japanese government The Japanese government is following a policy of

CHAPTER 4

How to achieve sustainable growth and at the same time maintain harmony with the

environment is also an issue to be addressed. This is currently a popular development

concept worldwide. Future development should take into consideration "protection of the

ecosystem," and "compatible, harmonious development concerning water," as President

Director Rusfandi Usman of the current Public Water Service Corporation pointed out.

This type of river development can be seen in the Netherlands, the former suzerain state of

Indonesia. Amid the Brantas Basin, with the residents experiencing higher income, public

welfare, and improved living environment and standard, further efforts should be made for

water improvement. These efforts should be directed toward development focusing on

health improvement and compatibility, or harmony with water.

(e) Privatization

The Indonesian government is pushing forward privatization and private participation

aimed at the establishment of a self-supporting economy as previously mentioned. Based

on this fundamental policy, private participation efforts in the sectors of electricity,

telecommunications, and transportation are under way. Like efforts are also being

expended on water resources development and water supply projects.

Against this backdrop, the government plans to privatize the Public Water Service

Corporation for water and river management, and is likely to do so sooner or later, as some

Western nations have already privatized their counterparts. Challenges to be addressed

towards this effort are listed as follows:

1) Is it appropriate to transfer water supply projects, indispensable to people's

livelihood, to profit-oriented private companies? Required are the establishment

of a legal system to define the responsibilities of companies in charge and a

management system consisting of the government, and qualified engineers and

management staff .

2) Can companies collect water charges? A governmental subsidy system should be

established in light of people's ability to pay.

3) Currently water resources development projects are conducted by the Brantas

Office, with post-completion maintenance and operation being handled by the

Public Water Service Corporation. How will the operations be shared between

them? Establishment of a legal system is needed to clearly define the operations

to be shared after privatization.

- 154 -

Page 8: Chapter 4 Future Prospects - JICA · CHAPTER 4 1. Future Directions in DeveEopment (1) Assistance policy of the Japanese government The Japanese government is following a policy of

CHAPTER 4

(f) Water resources development The Wonorejo Dam, under construction and scheduled for completion in 1999, is

intended primarily for water supply to the rapidly expanding industrial urban area of

Surabaya. The plan to develop Madura Island, across the Madura Strait to the east of

Surabaya, also needs a water supply for its executioR. (There is a plan underway to erect a

bridge connecting Java to Madura.) Therefore further water resources development of the

Brantas River is urged.

The total dry season water requirement for the year 2000 is estimated at1,870,OOO,OOO m3 (for the six months between June and November) while the present

available water supply is 830,OOO,OOO m3 in a drought year, usually occurring once a

decade. Inevitably the year 2000 will face a water shortage. The Wonorejo Dam will create

a water reserve of 1 10,OOO,OOO m3 when completed but this amount still falls short of the

expected requirement. Therefore it is necessary to continually construct dams according to

the water demands as listed in Table 4-1 of the third master plan which recommends dam

projects for mainly water supply purposes.

In Indonesia, which is a characterized by a clear distinction between dry and rainy

seasons, the active storage capacity of a dam reservoir contributes significantly to the

increase in dry season flow rate. Other than dam solutions, there is groundwater

development potential in Umbulan located east of the Brantas Basin. The third master plan

includes many proposals such as allowing water from the Ngrowo to flow back into the

Braritas River.

The Beng Dam is planned especially for seasonal adjustment to pump up water

flowing in the Brantas main stream in the rainy season for storage and subsequent use in

the dry season. Future development methods of this kind are likely to be required in the

Brantas Basin.

The hydroelectric power developed to date accounts for only 279o of the potential

water power, leaving considerable potential for future development. It should be reviewed

for implemeRtation according to demand on the third master plan projects including

irrigation, water supply, flood control, watershed management, water system management,

project maintenance systems for maintained and furthered project effects, environmental

project proposals, and others.

Table 4-1 Dams for suggested feasibility studies

Plannedproject Activestoragecapacity(1mil.m3) Dampoint

GentengDam1Selorejoll

BengDam

70

63

147

TheLestibranch

TheKonto

TheBeng

- 155 -

Page 9: Chapter 4 Future Prospects - JICA · CHAPTER 4 1. Future Directions in DeveEopment (1) Assistance policy of the Japanese government The Japanese government is following a policy of

CHAPTER 4

(g) Measures against sediments at existing dams

It has been 25 years since the completion of Karangkates and Selorejo dams; Wlingi,

18 years; and Sengguruh, 8 years. Sediment removal has been carried out several times for

Wlingi Dam, which is intended for volcanic disaster prevention as well as water supply.

Other dams are also in advanced stages of sedimentation, marking a noticeable decline in

practical storage capacity. Especially Sengguruh and Karangkates, both critical to water

supply, are in need of prompt survey and examination to cope with sedirnent. The plan to

construct the Lodoyo drainage canal for future flood control countermeasures has already

been described. The first master plan proposed equipping the canal with a discharge

function. It is among our suggestions to review in detail the implementation of this

proposal along with the dredging of reservoirs.

(h) Review of the master plan Ten years have passed since the formulation of the third master plan in 1985. Many

projects worked out in the plan are yet to be implemented, seemingly because the

Indonesian government's development efforts emphasize undeveloped regions (particularly

Eastern Indonesia outside of Java). The review should consider the above items from (a) to

(g). Among others, a surge in water demand urges new water resources development.

With the advancement of industrialization in the municipality of Surabaya and in the

Regency of Sidoarjo, there is land use conversion taking place from irrigated areas to

industrial sites in the Brantas Delta. Newly created water demands by this conversion

should also be considered.

- 156 -

Page 10: Chapter 4 Future Prospects - JICA · CHAPTER 4 1. Future Directions in DeveEopment (1) Assistance policy of the Japanese government The Japanese government is following a policy of

CHAPTER 4

2. Comprehensive Plan for Water Resources Management

(1) The JICA Study in 1997 - 1998

Recognizing the importance of the emerging problems pointed out in the preceding section,

the Government of Indonesia requested the Government of Japan to carry out the Study on

the Comprehensive Plan for the Water Resources Management in the Brantas River Basin

(hereinafter referred to as "the Study") in September 1996. After the signing of the Scope

of Works between the two governments, JICA ( the Japanese International Cooperation

Agency) being entrusted by the Government of Japan had started the Study in February

1997.

Based on the understanding that the Brantas river is currently on the way from the

stage of development to that of management, the JICA Study has focussed on the

managerial aspects covering such areas as institutional, organizational and managerial

aspects, human resources development and community and beneficjaries participation

activities. While such technical fields as watershed management, flood control

management, water supply management, water quality management and river environment

management were studied as well.

The water demand in the Brantas basin in the target year of 2020 was secured to be

met through the new water resources development projects including the Beng Dam

Projects and through water saving measures including the lining of irrigation canals, the

efficiency raising of industrial water use and so on. While such organizational reforms as

the establishment of the administrative line of the Ministry of Public Works in the Brantas,

the consolidation of three government agencies in the Brantas basin and the limited liability

cooperation wholly owned by government of the Perum Jasa Tirta were proposed in the

Study.

The draft final report of the Study was submitted to the Government of Indonesia in

March 1998 and the seminar on the said report is scheduled to be held in Jakarta and

Surabaya in May 1998.

- 157 -

Page 11: Chapter 4 Future Prospects - JICA · CHAPTER 4 1. Future Directions in DeveEopment (1) Assistance policy of the Japanese government The Japanese government is following a policy of

CHAPTER 4

(2) The Master Plan

1) Purpose of the Study

The Brantas functions as the most important source of water supply in the East Java

Province. Currently, almost all the water of the Brantas has been utilized and some

measures for enhancing water supply becomes indispensable to meet the increasing water

demand. Meanwhile, the quality of river water has been deteriorating these years due to

the urbanization and industrialization being emerged centering around Surabaya district.

Under these situations, the strengthening of water resources management system

aiming at either an efficient use of water or an appropriate water resources management is

urgently required. Thus the JICA study pursues the following:

(a) To prepare the master plan for the comprehensive water resources

management in the Brantas river basin

(b) To transfer the technology to counterpart staffs

2) Basic Concept of the Water Resources Management

The basic concept of water resources management is understood in this study as

stated hereunder. The target year is set at the year 2020.

(a) Purpose and scope of water resources management The purpose of the water resources management lies in supporting the sustainable

society building. For this purpose, it is required for the responsible agency to supply

water in time to meet the demand. The following covers the scope of water resources

management:

(i) Watershedmanagement

(ii) Floodmanagement

(ili) Water supply management

(iv) Water quality management

(v) Riverenvironmentmanagement

(b) Basic Principles of Water Resources Management The following constitutes the basic principles of the water resources management

in this study:

(i) Principle of "one river, one plan and one management"

(ii) Full-costrecoveryprinciple

(lii) Polluters-payprinciple

- 158 -

Page 12: Chapter 4 Future Prospects - JICA · CHAPTER 4 1. Future Directions in DeveEopment (1) Assistance policy of the Japanese government The Japanese government is following a policy of

CHAPTER 4

(iv) Service to receive principle

(c) Socio-economic Framework in 2020 The socio-economic framework in 2020 was set up for this study on the basis of

the Second 25-year Development Plan and the Sixth REPELITA having started in

1994/95 both of which were prepared by the Government of Indonesia. The major

indices of the framework is shown below, which was applied for water demand

projection and other planning in this study:

. GRDP growth rate : 7.69o per annum

. Population : 17.7mi11ion . Per capita GRDP : US$ 5,700

3) Master Plan

the Brantas

for the Comprehensive

River Basin

Water Resources Management in

The master plan for the comprehensive water resources management in the Brantas

river basin is proposed as shown hereunder and the following is recomniended for its

implementation.

(a) Recommendation for Overall Water Resources Management(i) Clarification of definition of the basin water resources management:

The water resources management is defined as all the water related

management including (i) watershed management, (ii) flood management,

(iii) water supply management, (iv) water quality management and (v) river

envlronment management.

(ii) Understanding and consensus of the basic concept and principles of water

resources management

(lii) Clarification of the necessity of the maintenance/management of river

facilities

(b) Recommendationon Managerial Aspects

a) Strengthening of water resources management system(i) The Ministry of Public Works(MPW) shall be primarily responsible for

supervising the water resources management in the Brantas river basin

while PJT shal1 be responsible for its implementation.

(ii) The Basin Water Resources Management Committee shall be newly

established.

- 159 -

Page 13: Chapter 4 Future Prospects - JICA · CHAPTER 4 1. Future Directions in DeveEopment (1) Assistance policy of the Japanese government The Japanese government is following a policy of

CHAPTER 4

(iii) The New PJT shall be established through consolidating PKB, PGKS and

PJT.

b) Development of organization/management of PJT (i) The New PJT shall be established in 2002.

(ii) The New PJT which will be still Perum status shall be transformed to

Persero Jasa Tirta in 2005.

(c) Master Plan

the Brantas

for the Comprehensive Water Resources

River Basin

Management in

a) Projects Incorporated in the Master Plan(cf. Figure S.1)

The projects to be implemented towards 2020 as components of the master plan

are recommended as follows:

(i) Dam construction for water supply

. Beng dam

. Gentengldam

. Kedungwarakdam (ii) Countermeasures for sedimentation in the existing dams

. Dredging works in Wlingi and Lodoyo dams

. Extensionoftheexistingby-passchannel

(iii) Watersavingmeasures

. Improvemefit of existing inigation channel(Concrete lining of channels)

. Re--cyclinguseofindustrialwater

(iv) Floodcontrol

. Implementation ofproposed Widas flood control project

. ConstructionofLodoyodiversionchannel

. Improvement of the existing FFWS

(v) Watershedconservation

. ExperimentalResearch

(vi) Sabo

e Sabo works for Mt.Kelud eruption

. Sabo works in Lesti and Upper Brantas river basins

(vii) Monitoring ofwater quality

(viii) Improvementofriverenvironment

(ix) lntroduction ofthe inter-agency information system

(x) lmplementationofhumanresourcesdevelopment

- 160 -

Page 14: Chapter 4 Future Prospects - JICA · CHAPTER 4 1. Future Directions in DeveEopment (1) Assistance policy of the Japanese government The Japanese government is following a policy of

CHAPTER 4

b) Investment Cost of the Master Plan The total investment amount for the master plan between 1999 and 2020 is about

2,800 billion Rupiah including VAT(US$1.14 billion equivalent), while about 4,200

billion Rupiah including VAT(US$1.72 billion equivalent).

c) Implementation Schedule of the Master Plan Implementation schedule of the projects in the master plan is presented in Figure

S.1. Implementation schedule of the Pre-consolidation 3-year Program and Action

Plan towards 2020 is shown in Figure S.2.

4) Pre-consolidation 3-year Program

The establishment of New PJT through consolidating PKB, PGKS and PJT is

proposed in 2002 in this study. For its smooth realization, the "Pre-consolidation 3-year

Program" is recommended hereunder covering the preparation in both managerial and

technical aspects.

(a) Managerial Aspects . Detailed study on organization ofPKB, PGKS and PJT

. Confirmation of the tasks of water resources management

. Clarification ofthe responsibility and authority ofthe related agencies

. Coordination of works among member agencies of Basin Water Resources

Management Committee

. Preparation of the prospectus for New PJT

. Institutional preparation for the establishment of New PJT

. Training and education ofNew PJT staffs

(b) Technical Aspects . Preparation of master plan for watershed management and water quality control

. Conducting the feasibility study on water resources development plan

. Preparation of the river inventory and establishment of a rule for sharing the

management responsibility for river structures

. Planning ofthe inter-agency information system

The program will be completed within three(3) years starting from the beginning

of 1999 and completing in 2oo2. Some specialists andior consultants will be employed

for the implementation considering both its wide scope and short period. The scope of

works to be done by the specialists/consultants will include the following.

- 161 -

Page 15: Chapter 4 Future Prospects - JICA · CHAPTER 4 1. Future Directions in DeveEopment (1) Assistance policy of the Japanese government The Japanese government is following a policy of

CHAPTER 4

(i)

(ii)

(iii)

(iv)

(v)

(vi)

Preparation of the implementation program for the Pre-consolidation 3-year

Program

Detailed study of the current organization of PKB, PGKS and PJT

Support of preparing the brief paper for establishing the New PJT

Support of amending the institution and legislation

Support of preparing the specifications for technical related matters

Support of preparing the internal regulations in administrative sectors

- 162 -

Page 16: Chapter 4 Future Prospects - JICA · CHAPTER 4 1. Future Directions in DeveEopment (1) Assistance policy of the Japanese government The Japanese government is following a policy of

,

-aol

Figure S.1 Implementation Schedule of Water Resources Management Master Plan for the Brantas River Basin

.Project 19992000 2001 2002 2003 2004 2005 2006 20072008 2009 2010 2011 2012 2013 2014 20152016 20172018 2019 2020

4---- ------------t--------t-----

-l-----"--------

DamsBengKedungwarakGentengIExtensionofsedimentbypasschannelWlingidredgingLodoyodredgingSengguruhdredging

-t---It---

FloodcontroVFFWSImprovementofFFWSWidasRiverBasin

.".....-.11111 11111 11111 11111 11111 11111 IIIII lllltllllll llllll llllll tlllll 111111 Illll lllll 11111 11111 lllll lllll

Lodoyodiversiontunnel {Wid s+Lo erUlo iver) (Kuncir iver) (Upp rUlo ver) ------ --

WatershedmanagementlSabolR&DSabo

Experimenta1research11IllIIIII

1111I11111

11111IIIII

(Emergencymeasuresfor2005eruption)}-----------------!---- 11111 11111 -1111 lllll 111II 1IIIIIIIIIIII '1111111111tl 11111 Illll lllll ltlll lllll

WaterqualityNewlaboratoryofPJT

RiverenvironmentBiologioaldiversitymonitoringandlaboratoryCreationofwetlandandfishpondsRecreationdevelopmentprogram

lllll 111IlIIIII11111Illll1111Illllnlllll Illlll llllllllllll 1111Il llllll IIIIII 11111 11111Others

Inter-agencyinformationsystemIrrigationcanatlining

Humanresourcedevelopment-----------

eatenvesen{1)WastewatertreatmentReforestationandterracing

: Feasibiljty : Detailed : ConstructionAnstallation

Page 17: Chapter 4 Future Prospects - JICA · CHAPTER 4 1. Future Directions in DeveEopment (1) Assistance policy of the Japanese government The Japanese government is following a policy of

Figure S.2 Implementation Schedule of Pre-consolidation 3-year Program and Action Plan

1999 2000 2001 2002 2003 2004 2005llll;IISI'I[[l'l'I'l'i'Iilil:il'Il[g"l'Kl'l'gl'its','.jllil:l'lii'i:l'l'Il.l.ll.ii.

ActionPlen

EstablishmentefNewPJT ----------------------i----4----------------- ------r------t ---tt--

PJTrverumtoPersero) 1-1---=-=------------- ---------+"-----T---------t-1-------1---1-1

3MEARPRoGle41idr

EstablislmentofWaterResourcesManagementSystem

EstablishrnentofMPW1ine

ClarifTicationofsectorresponsibility

EstablishnentofBWRMCPreparationofConsolidation

DevelopmentofCorporateManagement

Waterchargesystern

Assetsrnanagement

MISimprovernent

Reformoforganization

HurnanResourcesDeveloprnent

Preparationofhurnanresourcesdevelopmentprogrrn

lmplementationoftrainingprogram

StaffselectionandplacementforestablislmentofNewPJT

MasterPlanForrnulationonWatershedManagernentandSabo

WaterQualityControlPrograrn

EstablislmentofnewlaboratoryinMalang

)vfasterplanformulationonwaterqualityimprovement

WaterResourcesDevelopment

PreliminarysurveyferBengdamconstmction

Pre-feasibilitystudyon3damprojectsandFISforBengdam

MaintenanceofExistingRiverFacilities

Ledgersoftherivers(includingriverfacilitiesandwaterright)and

OIMworkdernarcation

Establishnentofinter-agencyinformationSystem

Preparationofsystemintroduction

ACTIONPLAN

PreparationforPersero

WateshedConservation,Sabo,FloodControl

Surveyandmonitoringofillegalsandrnining

Flooddamagesurvey

Prepa:ationoffioodcontrolrnanua1

Preparationoffioodhazardmap

WaterQualityControl

Establislmentofwaterqualitycontrolsystem

InstitutionalarrangementbasedontheMasterPlan

Preparationofwastewatertreatmentmap

Pilotprojectof"(}appeiJokaso"

WaterResourcesDevelopment

SurveyforBengDamProject

SelectionofconsultantDetaileddesignetc.forBengdamproject

OperationandMaintenanceofRiverFacilities

Stipulationofoperationruleforallriverfacilities

EstablishmentofauthorizedmethodofOMRbudgetestimate

ConsensusarnongbeneficizriesaboutOMRcostallocation

EffectiveOperationofWaterResources

TentativeOperationRuleforWonorejodarnProjectFacilities

LowflowforecastingsystemiricludngSutarniandWonorejodams

MonitoringandlnformationSystem

introductionofinter-agencyinformationsystem

- 164 -

Page 18: Chapter 4 Future Prospects - JICA · CHAPTER 4 1. Future Directions in DeveEopment (1) Assistance policy of the Japanese government The Japanese government is following a policy of

ATTACHMENT 1

Locations of Meteorologiat and hydrological stations in Brantas Basin

Madura Strait

-*9. \Yi9anRnk59M9'8,•2'

"JLas BNver Gunungsari DaN..

"divVo.

o.•e

z <f-q>-eMlirip

-)ii

Mojokerto

pm Tapent

> 1 IoKabum '>, J

t 1 L XI 1 ) ;h l N N k ) I l 1

.D PorongNL

xNN

N

Mt.

r.-eXcoTampung

[iN<iAliTEewLengkongDa

"s .--L-Mt.Semeru ,e,.:,n:;.k"s".m(:X,i8..,iiN,,NS(,D,.,,,

sing6/sariat eTangkji XilaL}u,-/f('KaY"il't.",P.gr,aO,nn2EII.{iliiilla,,n,g.B.O/,g,Ondi,"gieg'

XBatL Pujon L

Kepanjen

Tl..)-l<ll6sekar

Mojoagungs

BlimbingSD O

Selorejo Dam

Sengguruh

X D,050 4

Pohgajih

"

ri

1l

arangkates DamKesambenoi

2simOanBax'atkKSoee/Eugil)i{illid wiintJ

o•tOl[1 wao/efisreltllll<(llngaBtlitar KLaOuSoOnYO

Menang Kandat K.O Xs

Birowo

rpaKandangan

Jombang

Kertosonore</ Lengkong

ljenggowar lt}ilJBolakmoJgsO-N,Jati

Wlingi Dam

.1 Kademangan /tl tu4' `t QEt". XK"b Si N

lndian Ocean

Jongbiru[Kediri fl) Gandekari

Ngudikan

NganjukS"kO'S.MrSp6asu,gC,e.n

E!KEiAJeli foKbas

i

NL

Bening DaNS--.-eJ-s

l:

k-X Mt wilisABesuklf

9awahan /'"Y')), /Bendo /ss- h-- "---i N XxOBendungan xlx. L-JS..-) < x N NX Lxs

ScaleO 5 10 15 20km

Tuiungagung

LegendRain gauge station

Meteorological station

Water level gauge station

Basin boundaryGauging stations mentioned in text

OBoyolangu

;li ott: Besole :, c;) x

Campurda'rat

'- "X Kam9ak'J

l}E(ni.Kl-rh'Kg'hn

iJ L-..-.lt

o a A

[=I]

- 165 -

Page 19: Chapter 4 Future Prospects - JICA · CHAPTER 4 1. Future Directions in DeveEopment (1) Assistance policy of the Japanese government The Japanese government is following a policy of

ATTACHMENT 2

Major river facilities on Brantas River

"H.

o

LegendsBasin boundaryRailway

DamWater gateWater intakeCity

N

/ '/ ! t[l]

i ..o" ' <tN4 !So5ty>,

w/>x

.-.'x ...v.K.- ' -.-- Ploso [ill] 621112 7 6s

ttNdtffeStxi;6i3isi4

Mas River)ob-,'-'--sg,i,-.,tlrJelde'fo

/- tv- 1 K .x ( , N Parit RayaTulungagung --N.Power Station

Nganjuk t'tssgl.411...ow

"eÅë 2o.ML Wilis

f'))L:'fulungagul{gl.

Parit

Kertosono 18o 19 it

si•".e.bte.

Surabaya=to ---

fd blo .S.>L OhKediri

N

• Mt.Kelud[P}li

z

Mojokerto Porong L..eb..g

S .Sq-- / Ae /' NL)mpmu/Arjun&

x ---f' sGt/-ijiVMiis,H':.k,.X

s

3421@ . ..tsÅëk

<INL >bK os / "

'MaduraStrait

/lrnJ'NMt. Bromo• ..i7

/ ,

.Agung DawirRiver [5].-.t-.N.M.f'X.s-A' --' x 'y...-'N".vrp.s..--

,72] Lesti River

Scale

10

Mt. Semeru;i,

/ 1-"'-'" ~./i

20 30 km

5rs

- lndianOcean

Notes:

Dam[] Sengguruh[2] Karangkates[ll] Lahor

[i] WIingi

@ Lodoyo[6] Selorejo

M Bening[g] Wonorejo

Water gate and barrage

El] TulungagungN MricanBarrage[[i] JatimlerekRubberDarn

@ MenturusRubberDamR NewLengkongtw Gunungsarias Jagirto Wonokromo

Water intake

1 2 VoorCanal '3 Jatikulon4 Mlirip5 Losari6 Gedek7 Sotowuluh8 Kedungsari9 Watespinggir10 Keboan11 Bebekan

121314151617,181920

GottanJatimlerek

TunggoronoTuripinggir

PengkolKedungkudiBesukBanjarsari

Mrican

- 166 -

Page 20: Chapter 4 Future Prospects - JICA · CHAPTER 4 1. Future Directions in DeveEopment (1) Assistance policy of the Japanese government The Japanese government is following a policy of

ATTACHMENT 3

lrrigation Area in Brantas Basin

49• 1//

t t , N t 7 j

gL'vyltsslXill,/

,/,/ ,N.Å~

fTu]ungagupg

tÅ~

V'N. '-'

-- ...N. -' 'V/ N ttkdNffeSt'

i--A- 'x.-'---tPloSO. ,. 1. s,ttli•,'ii•,,l,,,l•• 1• •,,•,,•,,•

C41•

t-,l

X.r,

(-

NganjukKertosono

/ ,1'2.1/i.

tt tt •7

'7

'rV rlY

tt

't'•1

Kediri

. Jombang' ' i) Mojoagung

OOIo

.9.L &h ,

- --. -.I -.-wgnoki,i,,,ll.,.j,fi/,,,,l.,.,,,,.,ii,,,.,,..//,//,,:,;//f//:/;/•

--

•.,/C"'iy6" 11,,•

i ••',','•1iS•''li'11iil"•'li•111•i'ili',ii -:,i,,•,[•ii•l'I•ill,:ii,il•ii,,,..,.,.,i•

tt..VZ'..,o,"..,,''""

S't.or" \tQq...o"///

.J'IMx

. I.Surabayai

9 --

Mt. Wilis

t]

Sidoarjol MaduraStrait

•• .Å~

e

oPare

Mt. Keludllli')J})

OvBlitar Jo

N

c" MXtYZAiFj[th1,,,r'irt(s

-x.-t A ' Mt, Kawi fi (( [

Mt. Butak V Malang o

r ,]Kepanjen o

xl

Y

. .N./'-N.--n..h.

IndiaAb'i6ean-

LegendBasin boundaryRaitwaycity

o@@@@@@@@

j "-

lio

gii])>e'a-'-ta;R:'e"v.gZR:'S,girtK

0 10 20 3D km i

Lodoyo-Tulungagung

Mrican-Warujayeng-Kertosono

Papar-Peterongan

Turi-Tunggorono

Jatimlerek-Bunder

Mojokerto-Gottan-Losari

Jatikulon

Brantas Delta (Porong-mangetan)

Simowau ' '

A'x

(ZMil illt Bromo

3M'S, semeru

,j S--.

Avr'1

- 167 -

Page 21: Chapter 4 Future Prospects - JICA · CHAPTER 4 1. Future Directions in DeveEopment (1) Assistance policy of the Japanese government The Japanese government is following a policy of

ATTACHMENT 4

Cofiguration of Irrigation Areas Irrigated by The Brantas River Main Stream

Sea Sea5IIII,""surabayi

1469 ha"[Gbh-uhb--'i

'San dam ,

Sldoarlo

28440 ha

,Delta Brantas 27362 ha

Surabaya rtver

Porong nver

Molokerto31545 ha

LNe-vat.4eoqlsqaq -d-a-m- j

Brantas rtver

n"nkS nMMn

Malang 15801 ha

t

Jatikulon

619 hat

Brantas Atas 1239 ha

"

.

Menturus 3392 ha (Losari, Kedungsart,Wates-pmggir)

A

tÅ}

,

'

'

LT..--

;

Jatimlerek

1716 ha(Bebekan/

Keboan, Gottan,Jatimlerek )

t

MoJoagung23579 ha

v:l' M"u"nlu"r"u",""

lrubber dam :l-"nnnT ff ft "" "t

"

Bunder 1

159 ha

Jombang23595 ha

t

iJa"trmie"re"R""":

lrubberdam lultiSrrr-reTTrrrb"'ti"

Las

>geq

-os

eas

Lm

Bunder 11

175 ha

AeÅë

o'

c9oaoc-=Å}

=-=-

o99

-co

o-s!.

ca

atoavco

=stncoorco=ca

yca9LE

Brantas

Bawah1407 ha

KepanJen27216 ha

r----a-vv-F:F!o.b-o- d- em :

Molek3984 ha

u-"

Pare19772 ha ds

l2.

sco

Kedin30287 ha

Blitar

32950 ha

:

P-"-""----L uv!,.n.aL dapa.

"

:li

"t-

")

r--------"'-': Mrican barrage

Mncan Kin(WaruJayeng- Kertosono> 12570 ha

'1

:

h

Tulungagung 23404 ha

. ;

Brantas Kin Kedin (Besuk, Kedung Kudi, Pengkol> 534 ha

.

t

t

ca

=rovncvT-

mc=aco

ovoJ

.

.:

t

..

t

h

t

t

'

;

s

.

..--)

Nganjuk38668 ha

Trenggalek 12373 ha

NganJUk Name of Water Resources Branch Office (Caban Dinas Pengairan) 38668 ha - - - andttscommandmgarea LOdoagung Name of representative irngation system taking irrigation water from Brantas main stream 12321 ha

i Mncian barrage i NaMe Of rePreSentatiVe intake structure on the Brantas main stem

1.--..----------I

, Daftar Penetapan Baku Sawah Tahun 1996 Dinas PekerJaan Umum Pengairan Daerah Proptnsi Daerah Tingkat 1 Jawa Timur

111ustrated by JICA Study Team

- 168 -

h

t

Lav

Note,

Source

Page 22: Chapter 4 Future Prospects - JICA · CHAPTER 4 1. Future Directions in DeveEopment (1) Assistance policy of the Japanese government The Japanese government is following a policy of

ATTACHMENT 5

Time distribution of storm rainfall at Karangkates

Dateof

occurrence

Feb,3,lg7o

Nov.15,1970

Apr.30,1973

Nov,5,lg74

Nov.7,1974

Jan.26,lg75

Sep.5,lg75

Jan.18,

19nJan,31,

19nMay29,

tg77Average

Timeofoocurrenoe

1O:oo 11:co 15:oo 13:oo 14:oo 16:co 15:oo 14:co 24:oo 14:oo

Ol or ng ss ng as 21 i4 18 ee so 43.3

1-2 2 as es 17 4 6 ng 24 $ so 2B,9

2B 1 3 5 sa o M ee sa 3 l4.8

su 2 t 9 av es 10 2 8,7Rainta11

ratioby

hour(elo)

45 9 3 5 4,3

ss 10 7

67 5 3

78 1

&9

Totalamountotrainiall

<mm)

85.3 74,2 69.2 116 75.5 99.5 96.5 gg,4 os,o 68.5

- 169 -

Page 23: Chapter 4 Future Prospects - JICA · CHAPTER 4 1. Future Directions in DeveEopment (1) Assistance policy of the Japanese government The Japanese government is following a policy of

ATTACHMENT 6

Hydrologic network ot flood warnlng and prediction system

N

pt

iN'j

,

AS "fMt. W"islk'

- ------------ .-/!/ljli',lii/',skM,9/,:eK

.--'- N . Ploso

'fo b-o •St>L o-Mrican BarfageKediri N.

Mas River Gunungsari D'am Surabaya fiiver `N- [11oio--te'rt'Poell7e(IZw' LengKongDar"

urabaya

Tampung "ePtOrO09I?tver porong

,}-: b -fp.bny" "etltS.)diL.-//'--

setoDr.e

.Jo&tt971)Alttbu'g:`,:lllXliilx

,

MaduraStrait

. Wilis Wates /•-./'/batseloi6)N< T,1,ngaguV,6 staM/l6nKelUdllB'

fti .< iJ]IBI'ie"Åénndgoag""og ereote,g,..,S"ffb,ervr:g,"g?g

K•x.xTttti:u.nLgigg-un..g.-iltN.kgggtEg•YxOd.OIILO.,R9Ms...

.

- lndianOcean

w`' g2gth,bn

g,/tLStlllllllllll61111Illll,L,':kaB,g,x,,//2k$sall'iilllllllllg,kkns.o:.3•///•;,:x,;<<[a.il•,A'uil•iio

Karangkates DamxnyiL'.St"S!Eff==liEliE!...v.e,•

o

.

v

v

A

@

o

a

LegendBasin boundarycity

Rain gauge station

Water Ievel and overflow gauging station

Water level gauging station

Relay station

Monitoring station

lntegration and control station

Sub integration and control station

Radio communication network

x

/t{(se"of Dampitasil2

N"-`. !)'Le.--N.-/.7'

Scale 'o le 2o 3o km

- 170 -

Page 24: Chapter 4 Future Prospects - JICA · CHAPTER 4 1. Future Directions in DeveEopment (1) Assistance policy of the Japanese government The Japanese government is following a policy of

ATTACHMENT 7

Annual variations in water quality at Gunungsari Dam

2

1

o

10

8

6

4

2

o

2.0

1.0

o

2.0

1.0

o

Nitrogen(mg/e)

Dissolvedoxygen(mg/e)

Manganese(mg/e)

Ammonia(mgle)

Dec. Jan. Feb. Man Apr. May Jvn. Jul. Aug, Sep. oct. Nov.

1982 t983

-171-

Page 25: Chapter 4 Future Prospects - JICA · CHAPTER 4 1. Future Directions in DeveEopment (1) Assistance policy of the Japanese government The Japanese government is following a policy of

ATTACHMENT 8

Relationship between water quality and flow rate (1983)

2.0

1.5

A.g".t 1.oaEK=z

O.5

OJO

e

. e FlowrateatJabonttttttt

'

o FlowrateatMIirip

e o

ee ooo. oo

ee ooee ooee oa o

eee ooo

ee oooeee oooooee . oo.

. . o eeeee ee oeoo o ooee eo o o •e

o 50 1OO 150

Flow rate at Jabon <m3/sec)

200 250

o 10 20Flow rate at Mlirip (m3/sec)

30 40

-172-

Page 26: Chapter 4 Future Prospects - JICA · CHAPTER 4 1. Future Directions in DeveEopment (1) Assistance policy of the Japanese government The Japanese government is following a policy of

ATTACHMENT 9

Water quality of Brantas and Surabaya

AtyaEvaom

1OO

90

80

70

60

40

30

20

10

(D234s

111le

Max.

Mean

Min.

Malang

608 9 1OCi) 12 13@15 16 17 18@ 20 21 •apA 23 24 qA926@ 28 29 30 31@33@

samBiing 1 point Ploso Bridge

Karangkates

DamMiirip

IGate1Gunungsari

Kediri DamWlingi Dam

Lodoyo Dam PerningJagi

BrantasRiver 'SurabayaRiver

Jagir Dam

- 173 -

Page 27: Chapter 4 Future Prospects - JICA · CHAPTER 4 1. Future Directions in DeveEopment (1) Assistance policy of the Japanese government The Japanese government is following a policy of

ATTACHMENT 1O

Flood hydrograph

Mar. 2-5, 1984

1,200

800

400

o

400

o

400

Karangkates

Gtep

9•

-O'

gL o

800

400

o

800

400

o

Kediri

Porong

Mar. 2 Mar. 3 Mar. 4 Mar. 5

Source: Master Plan ll

- 174 -