change to project title project manager project team members
TRANSCRIPT
![Page 1: Change to Project Title Project Manager Project Team Members](https://reader035.vdocuments.site/reader035/viewer/2022072013/56649e4a5503460f94b3e017/html5/thumbnails/1.jpg)
Change to Project Title
Project ManagerProject Team Members
![Page 2: Change to Project Title Project Manager Project Team Members](https://reader035.vdocuments.site/reader035/viewer/2022072013/56649e4a5503460f94b3e017/html5/thumbnails/2.jpg)
2
Project Development
• Describe the process used to identify the issue(s)– Summarize the results of the EHS Risk
Assessment
![Page 3: Change to Project Title Project Manager Project Team Members](https://reader035.vdocuments.site/reader035/viewer/2022072013/56649e4a5503460f94b3e017/html5/thumbnails/3.jpg)
3
Objectives
![Page 4: Change to Project Title Project Manager Project Team Members](https://reader035.vdocuments.site/reader035/viewer/2022072013/56649e4a5503460f94b3e017/html5/thumbnails/4.jpg)
4
EHS Strategy MapKey EHS
Opportunities
StakeholderInvolvement
Learning &Growth
EffectiveProcesses
Reduce personal nickel exposure to less than 50% of the OSHA Permissible Exposure Limit in the metal sintering process by December 2007.
Process Engineering / Maintenance
• Install ventilation system improvements by Dec. 2006
• Develop PM program by March 2007.
Process Engineering / Maintenance
• Q1 Assign and engineer
• Q2 Hire consultant
• Q3 Design controls
• Q7 Build and install
• Q8 Test / Balance / PM program
Process Engineering / Maintenance
• Q1 Attend ventilation course
• Q3 Benchmark industry leaders
• Q7 Work with ventilation equipment manufacturer
• Q8 Train mechanics
Sintering Process Employees
• Inspect, maintain and use required PPE between May 2005 and project completion
Sintering Process Employees
• Q1 Daily respirator inspections - 100%
• Q1Replace used or damaged PPE - 100%
• Q1 Dispose used equipment properly - 100%
Sintering Process Employees
• Q1 PPE / Respiratory protection training
• Q1 Medical screening
• Q7 Ventilation system training
EHS
• Implement / manage PPE program in May 2005
• Facilitate new equipment acceptance in 2006
• Complete air monitoring in between Jan 2006 and May 2007
EHS• Q1 Develop PPE program
• Q1 Complete PPE Assessments
• Q1 Develop PPE training program
• Q5 Develop new equipment checklist and approval procedure.
• Q1 Purchase IH equipment
• Q1 and Q8 Exposure assessments
• Q4 Evaluate air permit requirements
EHS• Q3 Attend OSHA 40 hour course
• Q4 Benchmark with industry leader
• Q3 Attend a toxicology course
• Q1 Attend an IH sampling course
Technical Engineering
• Conduct quarterly product quality control audits until project completion and report at management status meetings.
Technical Engineering
• Q1 Non destructive testing methods
• Q3 Customer feedback survey added to website
• Q2 Medical professional Q&A
literature
Technical Engineering
• Q2 Benchmark with product certified doctors
Management
• Enforce PPE rules between May 2005 and project completion.
• Facilitate quarterly project meetings between May 2005 and project completion.
Management• Q2 PPE audits.
• Q1 Schedule meeting room
• Q1 Develop presentation format
• Q1-Q8 Manage follow up action list.
Management• Q3 Attend OSHA 40 hour course.
• Q3 Participate in industry leader benchmarking trips
![Page 5: Change to Project Title Project Manager Project Team Members](https://reader035.vdocuments.site/reader035/viewer/2022072013/56649e4a5503460f94b3e017/html5/thumbnails/5.jpg)
5
Project Benefits
• Tangible • Intangible
![Page 6: Change to Project Title Project Manager Project Team Members](https://reader035.vdocuments.site/reader035/viewer/2022072013/56649e4a5503460f94b3e017/html5/thumbnails/6.jpg)
6
Estimated Project Costs
Cost ItemsYear 1 Year 2 Year 3
Item 1
Total 0 0 0
Costs
![Page 7: Change to Project Title Project Manager Project Team Members](https://reader035.vdocuments.site/reader035/viewer/2022072013/56649e4a5503460f94b3e017/html5/thumbnails/7.jpg)
7
Estimated Savings
ItemsYear 1 Year 2 Year 3
Item 1
Total 0 0 0
Savings
![Page 8: Change to Project Title Project Manager Project Team Members](https://reader035.vdocuments.site/reader035/viewer/2022072013/56649e4a5503460f94b3e017/html5/thumbnails/8.jpg)
8
Financial Analysis
Present Value of Savings: PV(Savings)
Net Present Value of Savings: NPV(Savings)
Payback Period:
ROI (x Years):
Internal Rate of Return(x Years):
![Page 9: Change to Project Title Project Manager Project Team Members](https://reader035.vdocuments.site/reader035/viewer/2022072013/56649e4a5503460f94b3e017/html5/thumbnails/9.jpg)
9
Conclusions and Recommendations
• Ask for the money!!!