Hunters Point Site Project Advisory Committee Meeting
October 27, 2015
1
2
Agenda
• Welcome and Introductions
• Safety Moment
• Project Status
• Upcoming/Current Work
• NOW Hunters Point/Interim Uses
• Local Hiring
• Continued Communications
• Q&A
2
3
Introductions
• Project Advisory Committee Members
• PG&E
‐ Rob Saur, Remediation Project Manager
‐ Andrea Gooden, Manager, Stakeholder Engagement
‐ Susana Razo, Communications Lead
• Contractors
‐ JBR Partners – James Bryant (Community Outreach)
‐ ERM – John Cavanaugh (Remediation Contractor)
‐ ERM – Rob Dyer (Remediation Contractor)
‐ envelope a+d – Nathan John (Architect)
‐ envelope a+d – Allegra Madsen (Program Designer)
3
4
Committed to Safety
4
• Room Safety
• Site Safety
• Public Safety
Temporary walkway provides pedestrian safety during Area J work
Hunters Point Site
5
6
Project Status
6
• Groundwater cleanup work: Completed. Monitoring and polishing work ongoing
• Area J Retaining Wall Area: Cleanup underway. Complete early 2016.
• Shoreline Area: Awaiting final permits
• Interim use events: Ongoing
Groundwater Treatment Program
7
• Treatment of the off-site area (White Cap and Jennings) completed at the end of 2014
• Polishing work ongoing • Periodic monitoring and sampling to
confirm treatments are effective
•DTSC oversight and confirmation
Groundwater Monitoring Area
Off-Site Groundwater Remediation Area
8
Area J – Retaining Wall Area Cleanup
8
• Majority of Area J soil cleanup completed in 2011
• Excavating soil near the retaining
wall and installing a durable cover
• Air monitoring and dust control during soil disturbing work
• Anticipated completion: early 2016
9
Area J Cleanup Pedestrian/Auto Safety
9
10
Air Monitoring and Dust Control
• Air monitoring and dust control during soil disturbing work
- Perimeter misters - Manual misters - Air monitors - Covered stockpiles and trucks
• Targeted mindful use of water;
misters with specialized nozzles • Air monitoring results reported to
BAAQMD, uploaded to www.pge.com/hunterspoint
10
Area J – Streetscape Improvements
•New pedestrian plaza at the corner of Evans Ave. and Jennings St.
•Neighborhood public space
•New plaza will serve as overlook to Site and Bay
11
12
Area J – Streetscape Improvements
13
Shoreline Area Cleanup
13
• Cleanup to address impacted soils in
parts of the Shoreline Area • Restoration to follow Cleanup • Performed over two construction
seasons (September 1 - January 31) • Permitting with USACE, Regional
Board, BCDC, and other agencies
• DTSC Work Notice to be distributed before work begins
Shoreline Area Cleanup: Soil Removal
• Planning to begin soil removal in November, pending receipt of permits
• Removal of top two feet of accessible soil (in six
areas)
• Off-site soil disposal, covered trucks using established truck routes
• Clean soil or rock placed where impacted soil is removed
• Air monitoring, dust control and soil management
14
Shoreline Area Cleanup: Restoration
• Begin in Fall 2016 • Enhanced public path and
other features
15
Interim Uses: NOW Hunters Point
16
• Launched in 2013
• Local youth + labor (APRI / JBR)
• 29 events to date
• First evening events, job
training, health activities
• Over 4,000 participants Learn more: www.nowhunterspoint.org
16
17
Local Hiring
• Local Hiring Goal: 30 percent • Use of local contractors when
possible • Coordinate local hires with SF
CityBuild program (415-701-4889)
• PG&E worker requirements:
www.pge.com/hunterspoint - Go to Local Jobs tab
18
Ongoing Communications
• Email updates
• PAC Meetings + Follow-Up
• Newsletters • PGE.com/hunterspoint • Project Hotline/Email
June 2015 PAC Meeting
19
For More Information (Cleanup):
• Environmental Remediation Response Line: 1-866-247-0581
• Project Email: [email protected]
• Project Website: www.pge.com/hunterspoint
Interim Use Team:
• NOW Hunters Point: (415) 644-5883; [email protected]
• Website: www.nowhunterspoint.org
California Department of Toxic Substances Control Contacts:
• Robert (Bob) Boggs: (510) 540-3751; [email protected]
• Wayne Hagen: (510) 540-3911; [email protected]
Contacts
20
• Customer Service: 1-800-743-5000 (1-800-PGE-5000)
• Electric Outage Information: 1-800-743-5002
• IF YOU SMELL NATURAL GAS, see downed power lines, or suspect another emergency situation, leave the area immediately and then call 9-1-1 and PG&E at 1-800-743-5000.
PG&E Contacts
21
Thank You!