Page 1: CGE Profile
Page 2: CGE Profile

Contents

Introduction Scope of business Vision & Mission Core Values Work in Hand Work Done Organization Setup Project Management List of Equipment and Machines QA / QC Plan Safety Policy ISO, OHSAS, GST, SRB Certification

Page 3: CGE Profile

Creators Group of Engineering is an engineering concern established in 1995 and specialized in the field of Mechanical, Electrical, and HVAC & Trading works. The company has a proven track of completing major project in Oil & Gas, Power Projects, Armed Forces, Residential high rise building. Creators Group of Engineering is an ISO: 9001, ISO: 14001 and OSHAS: 18001 Certified Company Creators Group of Engineering has endeavored in the construction industry and not only established a name in the engineering field but also provided satisfactory and quality works for their client. The company’s growth has been mainly due to its development of technical skills with the application of the modern techniques used in the industry. The company has a team of technical skilled individuals having vast experience in the relevant fields of the Engineering and Technology. They are contributing their due shares in completion of the projects within schedule and to the entire satisfaction of the clients. Creators Group of Engineering commits to become one of the emergent integrated Mechanical, Electrical, HVAC & Trading Company in this Pakistan with our stable slogan “Safety, Quality and Schedule”

INTRODUCTION

Page 4: CGE Profile

Engineering Solutions for a Better World …

Creators Group of Engineering provides to their reputable client’s 24-hour standby operation and maintenance services. The company offers job-by-job and annual service/maintenance contracts.

(Trunkey based Projects) Design, Drawing, Installation & Commissioning

Service inspection and preventative maintenance

Breakdowns 24 Hour Callout

Changing Demands

Training and system operation

Creators Group of Engineering is specialized in providing Consultancy, Designing, Supplying,

Surveying, Trading and Installing of Mechanical, Electrical, HVAC system. MECHANICAL WORKS

Fire-Fighting System

Compressed Air System

Plumbing & Sanitary System

Process and Utility Piping

Steel Structure

ELECTRICAL WORKS

Sub Station (HV& LV) System

Lighting, Lightning Protector System

Grounding System

Telephone, Communication System

HVAC

SCOPE OF BUSINESS

Page 5: CGE Profile

Central Air Conditioning & Ventilation

Heating Oven & Paint Booth

Cooling Water System

Refrigeration Units

Cold storage and Freezers Unit

Mobile AC and Refrigeration Unit Lab safety Equipment:

Manufacturing of Laminar flow Station for OT & Pharma

Fume Hood, Laminar , Safety Cabinet

HEPA Housing and Filters

Sampling Booths

TRADING Creators Group of Engineering Trading Division provides reliable distributorship solutions and brand management of international recognized products from around the world. We have been providing Products to our customer since 1996 regarding all technical supplies as per user requirement and General orders. Some of our customers are listed below.

1. BHP Petroleum 2. OMV Maurice Energy. Ltd. 3. Hinopak Motor Pvt. Ltd. 4. Hascol Petroleum 5. Pak-Arab Refinery Company (PARCO) 6. Child Aid Association 7. Jaffer Agro Services

Major Product for Trading:

All Types of Refurbished Equipment from Europe.

Mechanical process equipment and their parts.

Electrical & controls

Safety Equipment and PPEs.

Industrial Fans (Ceiling/Cycle/Wall/Stand Types)

Pipes and Fittings (MS, Seamless, GI, HDPE, PPRC, UPVC all class)

Different Processing Valves (Gate, Check, Balancing, Foot, Float, Globe)

Page 6: CGE Profile

Insulation Material

Supply Chain Management Process:

CGE develop optimized supply chain integrated solutions that directly contribute to bottom-line

results by providing reliability, responsiveness and agility within your organization. CGE has the

expertise to optimize your supply chain with tools that can help strengthen supplier relationships,

reduce costs, balance inventory, improve customer service, and mitigate risk, thus delivering

sustainable competitive advantage.

CGE provides highly specialized advanced multi-echelon planning skills so that clients can focus

on their core business.

Received Query from our valuable customers

Analysis all term of query including specification, cost, stock availability and etc.

Reducing the risk of potential supply chain disruption through early

Provide best quotation to customer will all aspect & specification

integration for easy order transmission

Received Order from customer including terms and conditions.

Observe item order and quantity

Query Query Mature QuotationOrder

Acceptance

P.O RoutingStockProcuermentMaunufacture/

Import

Shipment Planning

Order Dispatch

Page 7: CGE Profile

Manage stock of related and repeatedly item for customer convenience.

Reduce Order Lead time by stock of major items

Manual data capture of P.O. details

Order to vendors via web or email(Local & Import if necessary)

Online order receipt and acceptance from vendors

Order revision management

Compliance to pre-defined order milestones

Configurable vendor performance criteria and reporting

Reducing information delays by using 24/7 service for Customer

Visibility to purchase orders in transit

Role-specific views of orders and inventory movements

Measure lead time consistency (promise to actual variance)

Supplier document and regulatory compliance

Received Order from Supplier and mature it with Customer Order

Dispatch Order to Customer at their Location or by any reliable source

Page 8: CGE Profile

VISION: Ensure value to every customer through quality craftsmanship and lasting solutions delivered by skilled professionals.

Mission:

"To help customers increase the return on their building investment."

Safety: Creators Group of Engineering pledges to create a safe working environment for all employees, customers and community. Quality: We support our customers to maximize their benefits by providing good quality services and products, on time with our professional design and construction solutions. Integrity: We conduct our business with honesty, ethical and honorable manner. Innovation: Improving constantly the management system, operation system and applying new technology is foundation for Creators Group of Engineering sustainable development.

Teamwork: We always establish and collaborate with our partners, our clients and our employees based on

VISION & Mission

Core Values

Page 9: CGE Profile

trust, respect and openness.

Works in Hand M/S BHP Petroleum Pakistan Contact person (Mr. Javed Malhi: Mechanical Engineer---- 0300-8528561)

BHP Billiton Zam Zama Gas Field Dadu.

Technical Supplies through worldwide.

Operation and maintenance contract for HVAC and Refrigeration Equipment.

M/S Child Aid Association Contact person (Dr. Salman Burny ---- 0321-2186686)

Jinnah Hospital Children ward

Installation of HVAC system for IV section in children ward.

Contract for servicing and maintenance of all MEP.

M/S Hinopak Motors Ltd. Contact person (Jamal Qamar: Manager Maintenance. ---- 0300-8286795)

Operation and maintenance of reciprocating chiller and other mechanical work related to

HVAC. (On call services)

Execution and modification in existing Plant to improve production.

Replacement of Packaged Type AC units for Engine Shop. (Capacity 100TR)

Jaffer Brother Contact person (Mr. Javed Shahmim. Supply Chain Manager 0345-8273070)

Design, installation work related to HVAC for Fermentation Lab at Fatima Fertilizer

Design, installation work related to Electrical for Fermentation Lab at Fatima Fertilizer

Design, installation of Cold Storage for Fermentation Lab at Fatima Fertilizer

Page 10: CGE Profile

M/S HASCOL Petroleum Ltd. Contact person (Mr. Habib Uddin: Project Manager ---- 0321-2444171)

Operation and maintenance contract of HVAC for All Sindh Region

Technical Supplies.

M/S FMD Lab (Peshawar). Contact person (Mr. Danish: C.E.O ---- 0300-9506759)

Design, Execution & Commissioning of Sterile Area and BSL 3.

Page 11: CGE Profile

Work Done

S.No. Company Description of Job Year Project Cost Million (Rs.)

1 Aga Khan University Hospital

Plumbing & HVAC Work for Sopariwala Building

2014 1.4

2 Aga Khan University Hospital

Plumbing Work for Pond at FOB Building 2014 0.9

3 Aga Khan University Hospital

HVAC & Plumbing Work for Cytotoxic Pharmacy

2015 1.6

4 Aicon Provide Consultancy for Equipment Manufacturing

2012 1.2

5 BHP Billiton Zam Zama Gas Plant (Phase 1)

Installation of Screw chiller with FCUs 2003 to 2004 5.6

6 BHP Billiton Zam Zama Gas Plant (Phase 2)

Installation of Screw chiller with FCUs 2006 to 2007 7.8

7 Cold Kraft Installation of Cold Storage 2010 to 2011 0.8

8 Dockyard Refurbishment of AC Mobile Equipment 2012 2.5

9 Hilton Pharma Installation of AHUs and Duct Work 1998 to 2000 0.6

10 Hinopak Motors Ltd. Supply and Installation of Central Exhaust System for Paint Shop

2008 to 2009 1.8

11 Hinopak Motors Ltd. Refurbishment of Reciprocating Chiller 2013 1.5

12 Hinopak Motors Ltd. Repair & Maintenance of AC Packaged type Units at Engine Shop

2014 1.9

13 Hinopak Motors Ltd. Supply & Installation of Chilled Water & Fresh Air Supply System at PTED

2015 8.7

14 Hinopak Motors Ltd. Supply & Installation of Ventilation & Exhaust System at BOP

2015 2.2

15 IBA ( Karachi University ) HVAC Piping Work at Plant Room 2013 0.4

Page 12: CGE Profile

16 Jaffer Agro Services Overhauling of Scrubbing Exhaust System

2014 1.5

17 Jinnah Hospital HVAC & Lab Equipment Installation 2010 to 2011 1.2

18 Liberty Power Project Installation of chiller and AHUs at plant and for colony

1998 to 2000 2.8

19 Linz Pharma Modification of Existing HVAC system 2014 2.5

20 Mediate Pharma Modification of Existing HVAC system 2005 0.5

21 Nabi Qasim Pharma Installation of AHUs and Duct Work 2001 to 2002 1.4

22 PARCO Refurbishment of Reciprocating Chiller And replacement of Duct work

2014 3.4

23 Roush Power Plant Installation of Chiller, AHUs & FCUs for different areas of Plant

1997 to 1999 1.8

24 Sindh Poultry Vaccination Research Building

Installation of HVAC system for Lab Area 2003 to 2004 3.8

25 Walmart Global Marketing

Operation and Maintenance Contract. 2010 to 2011 0.3

26 Zia Uddin Hospital Installation & Commissioning of Lab Equipment

2006 to 2007 2.6

Page 13: CGE Profile

ORGANIZATION SETUP

01. Main-Office (Karachi)

Office No. 429, 4th Floor, Mashrique Center, Block-14, Gulshan-e-Iqbal, Karachi

02. Work Shop

Plot # 165, Category C-I, Sector 6-B, North Karachi, Industrial Area, Karachi.

03. Site Setup

Our site setup depends upon the nature of work for each field. Nos. of staff depends upon

the span & nature of the work.

C.E.O

Management

Accounts & Finance

Office Assistant

Management Representitve

Mechanical

Workshop

Projects

HVAC

Projects

Commissioning

Electrical

Projects

Procurement

Imports

Local Purchase

Page 14: CGE Profile

PROJECT MANAGEMENT

Our past experiences have proven that Creators

Group of Engineering is one of the integrated

company in the field of Mechanical, Electrical, and

HVAC & Trading works with outstanding

performance records providing the driving force

behind a complete of system services and products

supply for our customers in a trustful and reliable

way based upon the past proven track record.

We have plentiful experiences from the stand point

of such a job handling as general consolation,

feasibility study at the beginning stage of the

project, development, detail design, procurement,

manufacturing, fabrication, installation, and

commissioning, testing, hand – over based on Turn

– Key project and on the site.

Page 15: CGE Profile

LIST OF EQUIPMENT AND MACHINES

DESCRIPTION QUANTITY

1. Hydraulic press 02 nos. 2. Lock former machine 01 no. 3. Manual bender machine 03 nos. 4. Welding machine 06 nos. 5. Welding generator 02 nos. 6. Duct Manufacturing Machine 01 set. 7. Sheet Banding Hydraulic Press 01 no. 8. Sheet roller 01 no. 9. Electricity generator 04 nos. 10. Speed cutter 04 nos. 11. Hand grinder 10 nos. 12. Lath machine 02 nos. 13. Shaper Machine 01 no. 14. Milling Machine 01 no. 15. Bench drill machine 04 nos. 16. Hilti drill machine 16 nos. 17. Drill machine 12 nos. 18. Pipe cutting & Treading machine 04 nos. 19. Pipe threading machine up to 4” thick 01 comp. Set 20. Gas cutting Set/Brazing Set 10 comp. Set Commissioning, Testing and Balancing Equipment:

a. Micro manometer for air balancing b. Micro manometer for water balancing c. Capture hood for measuring air flow d. Digital Anemometer e. Electronic mugger testing f. Noise Level Meter g. Light Intensity Meter h. Multi-meters i. Clamp on Multi-Meter

Page 16: CGE Profile

QA/ QC PLAN

Quality Policy and Authority:

Management is totally committed to providing commercial & industrial General contracting

services that comply fully with the specification and expectation of our valued clients The

QCM has the responsibility and organizational freedom to identity quality control problems,

stop works, recommend solution and verify resolution off such problems.

Management Responsibility:

Management has the responsibility to define and document its policy and objectives for and

commitment to quality. Management will ensure that its policy is understood, implemented

and maintained at all levels of the organization.

Quality System:

Documented quality system procedure and instruction to ensure that all activities and

performed in accordance with established requirement. Effective management support to

ensure compliance and the use of the QA/AC procedure and instructions.

Project Review and Setup:

Upon receipt of a request for proposal (RFQ) from a client, Management will review the

requirement of the FRQ and determine if a proposal will be submitted to perform the work.

If management decides to submit a proposal for the work, a project manager is assigned the

responsibility of generating the proposal to perform the work. The proposal must include all

costs related to completing the work in accordance with the client’s specifications.

Document Control:

Revisions to the QA/QC document shall be by section and approved for adequacy by the

authorized personnel prior to issue. A revised table of contents indicating the newly issued

approved and accepted revision shall accompany the revised sections

Page 17: CGE Profile

Purchasing and Material Control:

The Project Manager has the overall responsibility to ensure that all materials and services

purchased are in accordance with established QA/QC procedure the project specifications

and drawings.

Material Certification and Traceability:

The Project Manager shall ensure that all materials and equipment furnished by the client

are verified, stored and maintained until incorporation into work. Any such items that are

damaged or otherwise unsuitable for use shall be recorded and reported to the client

immediately, where, and to the extent that traceability is a specified requirement of the

contract, individual products or product batches shall have a unique identification. This

identification shall be recorded in the Job File and issued to the client with specified As-Built

Data.

Process Control:

During project setup the project manager develops the project QA/QC plan covering all

construction activities and applicable process which directly affect quality. The Project

Manager shall ensure that these process are carried out under controlled conditions.

Inspection and Testing:

All Material and equipment shall be inspected and tested to ensure conformance with the

project requirement before it is released for use. Verification that all items conform to

specified requirement of the quality plan shall be documented and filed in the project

QA/AC file

Inspection, Measuring and Test Equipment:

The QCM shall ensure that all inspection, measuring, and test equipment is controlled,

calibrated and maintained, whether owned by CGE or provided by the client, Equipment

shall be uses in a manner which ensure that measurement uncertainty is knows and is

consistent with the required measurement capability.

Page 18: CGE Profile

Control of Non-Conforming Actions and Corrective Actions:

The project manager shall established and maintain procedure to ensure that any work that

does not conform to specified requirement is prevented from inadvertent release to the

client. Control shall provide for identification, documentation, evaluation, segregation when

practical, and disposition of nonconforming work and for notification to management as

required.

Audit, Records and Training:

The QCM shall carry out internal audits to verify whether quality activities comply with

planned arrangement and to determine the effectiveness of the quality system. The QCM

shall maintain records on the performance and adequacy of each project’s QA/QC activities.

Page 19: CGE Profile

SAFETY POLICY

Safety both on site and in the office is our top priority. We consider that creating a safe working environment which poses no harm to the health and life of all employees and customers is our responsibility.

Compliance with occupational health and safety requirements is “must” in all of the Creators Group of Engineering building operations.

It is a requirement of our company safety regulations that each employee is made aware of their individual responsibilities, their obligation to implement the rules and to undertake frequent training to ensure that a safe working environment is instigated and maintained at each project site.

The Creators Group of Engineering safety policy demands cooperation and compliance

from all relevant parties such as suppliers and sub-contractors. The safety system has been improved by the involvement of all participants to ensure that no one works in an unsafe environment.