1) CONTRACTOR SHALL PERFORM A U.S.A. LOCATE PRIOR TO COMMENCING CONSTRUCTION. Know what's below. Call before you dig. CHLORINE BUILDING DEEP WELL PUMP & MOTOR 22' DOUBLE DRIVE GATES & PERSONNEL GATE HYDROPNEUMATIC TANK SITE ELECTRICAL & CONTROLS 2" TELEPHONE CONDUIT TO EXTEND 5' OUTSIDE THE WELL SITE FENCE ALONG THE FRONTAGE AND TERMINATE IN A TELEPHONE PULL BOX WITH A PULL ROPE 5"Ø PRIMARY CONDUIT PER PG&E. ASSUME 200 LF FOR BIDDING PURPOSES EX. TREE TO REMAIN WELL SITE FENCING & GATES 22' DOUBLE DRIVE GATE DIESEL GENERATOR EPS IS RESPONSIBLE FOR ELECTRICAL SYSTEMS DESIGN ONLY. EPS IS NOT RESPONSIBLE FOR ELECTRICAL SAFETY WORK PROCEDURES AND/OR USE OF REQUIRED PERSONAL PROTECTIVE EQUIPMENT, SEE NFPA 70E "STANDARD FOR ELECTRICAL SAFETY IN THE WORKPLACE'' AND OSHA 29 CFR. CONTRACTOR MUST READ SPECIFICATIONS AND INSTALL MATERIAL AS PER SPECIFICATIONS AND/OR PLANS OR AS PER E.P.S. APPROVAL. PLANS AND SPECIFICATIONS ONLY APPLY TO THE PROJECT FOR WHICH THEY WERE CREATED. JOE PREVENDAR P.E. CA EE 16581 [email protected] JOB: FILE: PLOT: DSGN: DRWN: DATE: PROFESSIONAL AND CONSULTING ELECTRICAL ENGINEERING 4049 N FRESNO ST, FRESNO , CA 93726 P: (559) 221‐7230 F: (559) 221‐0507 GARY O LSEN P.E. CA EE 8283 [email protected] DJA‐17‐108 JPP/LKB CRT FEB 2018 54. WELL 15 SP 2/15/2018 9:33 AM / 1:1 CGB SO CORD 20A PLUG 20A SPEC GRADE PVC COATED GRC CRG ENCLOSURE WALL CAST 2 GANG FINISH FLOOR 10' DOOR FRAME SW DOOR IN 5 1/4 EXHAUST FAN RATED 200% REQ. AIRFLOW FOR 2°C RISE, 1000BTU/HR W/ DISCONNECT FOR BLDG REMOVAL. CONTRACTOR TO PROVIDE ADDITIONAL SUPPORT AS NECESSARY GFI OUTLET RECEPTACLE & PLUG TS ABOVE GRADE ‐ HOT DIPPED GALVANIZED RIGID STEEL CONDUIT TO BE USED FOR ALL EXTERIOR AND INTERIOR LOCATIONS ABOVE GRADE OR ELSEWHERE SHOWN ON PLANS. ALL RIGID CONDUIT AND FITTINGS TO BE THREADED. USE OF SET SCREW OR COMPRESSION TYPE CONNECTOR IS PROHIBITED. MEYERS HUBS TO BE USED ON ALL EXTERIOR PANEL CONNECTIONS. BELOW GRADE ‐ RIGID PVC NONMETALLIC CONDUIT SCHEDULE 40 TO BE USED FOR ALL UNDERGROUND LOCATIONS AND BELOW VAPOR BARRIER OF SLAB. NO CONDUITS SHALL BE INSTALLED TO REDUCE THE STRUCTURAL INTEGRITY OF FOOTINGS. CHEMICAL BUILDINGS AND CORROSIVE ATMOSPHERES ‐ RIGID PVC NONMETALLIC CONDUIT SCHEDULE 80 TO BE USED FOR ALL INTERIOR LOCATIONS ABOVE GRADE IN CHEMICAL BUILDINGS AND CORROSIVE ENVIRONMENTS. THROUGH CONCRETE SLABS AND EXTERIOR CORROSIVE ATMOSPHERES ‐ PVC COATED GALVANIZED RIGID STEEL CONDUIT MINIMUM 40 MIL FACTORY COATING TO BE USED FOR ALL EXPOSED CONDUITS THROUGH CONCRETE SLABS (MINIMUM 12'' ABOVE AND BELOW SLAB) AND ALL EXTERIOR LOCATION CORROSIVE ATMOSPHERES. USE MANUFACTURERS' SPECIFIED TOOLS AND PROCEDURES FOR INSTALLATION. MOTORS AND SENSOR CONNECTIONS ‐ LIQUID TIGHT FLEXIBLE METAL CONDUIT (UV RESISTANT) TO ONLY BE USED ON CONNECTIONS TO MOTORS AND SENSORS OR TO ISOLATE VIBRATION. MAXIMUM LENGTH TO BE 30''. JUNCTION BOXES ‐ MINIMUM SIZE PER NEC. EXPOSED LOCATION, 1 AND 2 GANG TO BE CAST IRON DEVICE BOXES TYPE FS/FD SUITABLE FOR WET LOCATIONS. EXPOSED LOCATION EXTERIOR LARGER SIZES CONTINUOUS HINGE TYPE 4, CORROSIVE LOCATIONS CONTINUOUS HINGE TYPE 4X STAINLESS STEEL. GROUND CONNECTIONS ‐ GROUND CONNECTIONS TO BE EXOTHERMIC CADWELD (ALL 600 AMP OR LARGER SERVICE) OR BURNDY HYDRAULIC COM PRESSION CONNECTORS. GROUND BUS CONNECTIONS TO BE CRIMP LUG TYPE WITH BOLTED CONNECTION TO GROUND BUS. 480 VOLT AND BELOW POWER WIRING TO BE THWN‐2 600 VOLT, ALL POWER CONNECTIONS TO BE TREATED WITH ANTIOXIDANT COMPOUND. ALL VFD MOTOR CABLE TO BE SHIELDED, INVERTER DUTY. CONTACT EPS TO SCHEDULE AN ELECTRICAL PRECONSTRUCTION MEETING PRIOR TO COMMENCING CONSTRUCTION = (N) CONDUIT, UNDERGROUND = (N) CONDUIT, ABOVE GROUND AC = AIR COMPRESSOR FIT = FLOW INDICATING TRANSMITTER HPS = HIGH PRESSURE SWITCH HLS = HIGH LEVEL SWITCH LLS = LOW LEVEL SWITCH LIT = LEVEL INDICATING TRANSMITTER PCV = PUMP CONTROL VALVE PIT = PRESSURE INDICATING TRANSMITTER LS = LEVEL SWITCH SV = SOLENOID VALVE VT = VIBRATION TRANSMITTER IS = INTRUSION SWITCH TS = THERMOSTAT SWITCH = SINGLE POLE SWITCH, 20A = GFI RECEPTACLE = MOTOR. FRACTIONAL = LIGHT FIXTURE = LIGHT FIXTURE = FLOOD LIGHT = POLE LIGHT = INDICATES CONDUIT AND CABLE SCHEDULE = INDICATES FIXTURE NUMBER GFI = GROUND FAULT CIRCUIT (E) = EXISTING (F) = FUTURE (N) = NEW 2 FIT HPS HLS LLS LIT PIT SV VT AC PCV IS TS IS S S E‐W I‐A E‐S 8 PIT 31 30 29 28 27 3 2 23 11 17 LIT SV HPS 7 5 FIT 19 20 4 16 15 11 21 10' 22 18 6 LS LS 9 24 21 25 RADIO ANTENNA ‐ ELECTRICAL CONTRACTOR TO FIELD VERIFY HEIGHT AND DIRECTION 12 P‐DL P‐P 13 P‐DL P‐P 13 E‐S WITH PHOTO CELL & MOTION SENSOR (TYP) TANK E‐F TYP OF 3 PCV 10 TYP OF 2

Upload: truongnguyet

Post on 11-Jul-2018

214 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: CGB 20A PLUG 20A SPEC GRADE ‐ HOT DIPPED GALVANIZED RIGID STEEL CONDUIT ...pjelectric.info/projectsbidding/Arvin CSD Arsenic Mitigation Phase... · = indicates conduit and cable

1) CONTRACTOR SHALL PERFORM A U.S.A. LOCATE PRIOR TO COMMENCING CONSTRUCTION.

Know what's below.Call before you dig.

CHLORINEBUILDING

DEEP WELL PUMP& MOTOR

22' DOUBLE DRIVE GATES& PERSONNEL GATE

HYDROPNEUMATICTANK

SITE ELECTRICAL& CONTROLS

2" TELEPHONE CONDUIT TO EXTEND5' OUTSIDE THE WELL  SITE FENCE

ALONG THE FRONTAGE ANDTERMINATE IN A TELEPHONE PULL

BOX WITH A PULL ROPE

5"Ø PRIMARYCONDUIT PER PG&E.ASSUME 200 LF FORBIDDING PURPOSES

EX. TREE TO REMAIN

WELL SITEFENCING &GATES

22' DOUBLEDRIVE GATE

DIESELGENERATOR

EPS  IS  RESPONSIBLE   FOR  ELECTRICAL   SYSTEMS DESIGN ONLY.  EPS  ISNOT  RESPONSIBLE   FOR  ELECTRICAL   SAFETY  WORK  PROCEDURESAND/OR USE OF  REQUIRED   PERSONAL  PROTECTIVE  EQUIPMENT,   SEENFPA  70E  "STANDARD  FOR  ELECTRICAL   SAFETY  IN  THE WORKPLACE''AND OSHA  29  CFR.  CONTRACTOR  MUST  READ  SPECIFICATIONS  ANDINSTALL MATERIAL AS PER SPECIFICATIONS  AND/OR PLANS OR AS PERE.P.S.  APPROVAL.   PLANS  AND  SPECIFICATIONS   ONLY  APPLY  TO  THEPROJECT FOR WHICH THEY WERE CREATED.

JOE PREVENDAR  P.E. CA EE [email protected]

JOB:FILE:PLOT:DSGN: DRWN:

DATE:

PROFESSIONAL AND CONSULTINGELECTRICAL ENGINEERING

4049 N FRESNO ST, FRESNO , CA  93726P: (559) 221‐7230 F: (559) 221‐0507

GARY OLSEN P.E. CA EE [email protected]

DJA‐17‐108

JPP/LKB CRT

FEB 201854. WELL 15 SP2/15/2018 9:33 AM / 1:1

CGB

SO CORD

20A PLUG

20A SPEC GRADE

PVC COATED GRC

CRG

ENCLOSURE WALL

CAST 2 GANG

FINISH FLOOR

10'

DOOR FRAMESW DOORIN 5 1/4

EXHAUST FAN RATED 200% REQ.AIRFLOW FOR 2°C RISE,1000BTU/HR W/ DISCONNECT FORBLDG REMOVAL. CONTRACTOR TOPROVIDE ADDITIONAL SUPPORT ASNECESSARY

GFI OUTLET RECEPTACLE& PLUG

TS

ABOVE GRADE  ‐ HOT DIPPED GALVANIZED RIGID STEEL CONDUIT TO BE USED FOR ALL EXTERIOR AND INTERIORLOCATIONS ABOVE GRADE OR ELSEWHERE SHOWN ON PLANS. ALL RIGID CONDUIT AND FITTINGS TO BETHREADED. USE OF SET SCREW OR COMPRESSION TYPE CONNECTOR IS PROHIBITED. MEYERS HUBS TO BE USEDON ALL EXTERIOR PANEL CONNECTIONS.

BELOW GRADE  ‐ RIGID PVC NONMETALLIC CONDUIT SCHEDULE 40 TO BE USED FOR ALL UNDERGROUNDLOCATIONS AND BELOW VAPOR BARRIER OF SLAB. NO CONDUITS SHALL BE INSTALLED TO REDUCE THESTRUCTURAL INTEGRITY OF FOOTINGS.

CHEMICAL BUILDINGS AND CORROSIVE ATMOSPHERES  ‐ RIGID PVC NONMETALLIC CONDUIT SCHEDULE 80 TOBE USED FOR ALL INTERIOR LOCATIONS ABOVE GRADE IN CHEMICAL BUILDINGS AND CORROSIVEENVIRONMENTS.

THROUGH CONCRETE SLABS AND EXTERIOR CORROSIVE ATMOSPHERES  ‐ PVC COATED GALVANIZED RIGID STEELCONDUIT MINIMUM 40 MIL FACTORY COATING TO BE USED FOR ALL EXPOSED CONDUITS THROUGH CONCRETE

SLABS (MINIMUM 12'' ABOVE AND BELOW SLAB) AND ALL EXTERIOR LOCATION CORROSIVE ATMOSPHERES. USEMANUFACTURERS' SPECIFIED TOOLS AND PROCEDURES FOR INSTALLATION.

MOTORS AND SENSOR CONNECTIONS  ‐ LIQUID TIGHT FLEXIBLE METAL CONDUIT (UV RESISTANT) TO ONLY BEUSED ON CONNECTIONS TO MOTORS AND SENSORS OR TO ISOLATE VIBRATION. MAXIMUM LENGTH TO BE 30''.

JUNCTION BOXES  ‐ MINIMUM SIZE PER NEC. EXPOSED LOCATION, 1 AND 2 GANG TO BE CAST IRON DEVICE

BOXES TYPE FS/FD SUITABLE FOR WET LOCATIONS. EXPOSED LOCATION EXTERIOR LARGER SIZES CONTINUOUSHINGE TYPE 4, CORROSIVE LOCATIONS CONTINUOUS HINGE TYPE 4X STAINLESS STEEL.

GROUND CONNECTIONS  ‐ GROUND CONNECTIONS TO BE EXOTHERMIC CADWELD (ALL 600 AMP OR LARGER

SERVICE) OR BURNDY HYDRAULIC COMPRESSION CONNECTORS. GROUND BUS CONNECTIONS TO BE CRIMP LUGTYPE WITH BOLTED CONNECTION TO GROUND BUS.

480 VOLT AND BELOW POWER WIRING TO BE THWN‐2 600 VOLT, ALL POWER CONNECTIONS TO BE TREATEDWITH ANTIOXIDANT COMPOUND. ALL VFD MOTOR CABLE TO BE SHIELDED, INVERTER DUTY.

CONTACT EPS TO SCHEDULE AN ELECTRICAL PRECONSTRUCTION MEETING PRIOR TO COMMENCINGCONSTRUCTION

= (N) CONDUIT, UNDERGROUND

= (N) CONDUIT, ABOVEGROUND

AC = AIR COMPRESSOR

FIT = FLOW INDICATING TRANSMITTER

HPS = HIGH PRESSURE SWITCH

HLS = HIGH LEVEL SWITCH

LLS = LOW LEVEL SWITCH

LIT = LEVEL INDICATING TRANSMITTER

PCV = PUMP CONTROL VALVE

PIT = PRESSURE INDICATING TRANSMITTER

LS = LEVEL SWITCH

 SV = SOLENOID VALVE

 VT = VIBRATION TRANSMITTER

 IS = INTRUSION SWITCH

 TS = THERMOSTAT SWITCH

= SINGLE POLE SWITCH, 20A

= GFI RECEPTACLE

= MOTOR. FRACTIONAL

= LIGHT FIXTURE

= LIGHT FIXTURE

= FLOOD LIGHT

= POLE LIGHT

= INDICATES CONDUIT AND CABLESCHEDULE

= INDICATES FIXTURE NUMBER

GFI = GROUND FAULT CIRCUIT

(E) = EXISTING

(F) = FUTURE

(N) = NEW

2

FIT

HPS

HLS

LLS

LIT

PIT

SV

VT

AC

PCV

IS

TS

IS

S

S

E‐W

I‐A

E‐S

8PIT

313029

28273

2

2311

17 LIT SV

HPS

7

5

FIT

19 20

41615

11

21

10'

22

18

6

LS

LS

9

2421

25

RADIO ANTENNA ‐ ELECTRICALCONTRACTOR TO FIELD VERIFY

HEIGHT AND DIRECTION12

P‐DL

P‐P

13

P‐DL

P‐P

13

E‐S

WITH PHOTO CELL& MOTION SENSOR(TYP)

TANK

E‐F

TYP OF 3

PCV

10

TYP OF 2

Page 2: CGB 20A PLUG 20A SPEC GRADE ‐ HOT DIPPED GALVANIZED RIGID STEEL CONDUIT ...pjelectric.info/projectsbidding/Arvin CSD Arsenic Mitigation Phase... · = indicates conduit and cable

Know what's below.Call before you dig.

EPS  IS  RESPONSIBLE   FOR  ELECTRICAL   SYSTEMS DESIGN ONLY.   EPS  ISNOT  RESPONSIBLE   FOR  ELECTRICAL   SAFETY  WORK  PROCEDURESAND/OR USE  OF  REQUIRED   PERSONAL  PROTECTIVE  EQUIPMENT,   SEENFPA  70E  "STANDARD   FOR  ELECTRICAL  SAFETY  IN  THE WORKPLACE''AND OSHA  29  CFR.  CONTRACTOR  MUST  READ  SPECIFICATIONS  ANDINSTALL MATERIAL AS PER SPECIFICATIONS  AND/OR  PLANS OR AS PERE.P.S.  APPROVAL.   PLANS  AND  SPECIFICATIONS   ONLY  APPLY  TO  THEPROJECT FOR WHICH THEY WERE CREATED.

JOE PREVENDAR  P.E. CA EE [email protected]

JOB:FILE:PLOT:DSGN: DRWN:

DATE:

PROFESSIONAL AND CONSULTINGELECTRICAL ENGINEERING

4049 N FRESNO ST, FRESNO , CA  93726P: (559) 221‐7230 F: (559) 221‐0507

GARY OLSEN P.E. CA EE [email protected]

DJA‐17‐108

LKB CRT

JAN 2018WELL 15 ELEC SL2/15/2018 9:33 AM / 1:1

PG&EUTILITY

METERING

SPD

30/3

240KA/PHASECAT C

TRANSIENTVOLTAGE SURGESUPPRESSION

800/3

VFD

WELL500HP

VFD RATED150% FLA

FOR 1 MINUTE

30/2

10KVA XFMR480V‐240/120V1Ø

PANEL`LP'

480/277V, 800A, CU, 65KAIC

10'x3/4'' CU GNDROD

SIZE 1FVNR

AIRCOMPRESSOR

5HP

15/3HMCP

60/2REACTORS

(SEE NOTE 1)

PM

SN

N E

L

CABLELUG 500KW

GENERATOR752A @ 480V

800AATS

NOTES:

1) PROVIDE MONITOR (PM) TO BE ELECTROINDUSTRIES SHARK2000 W/ ETHERNET, SQ. D PM 5300 OR EQUAL.

6'‐6''

8''

10'

8'‐6"

3' 6"

22E‐S

ANTENNA ON POLE ONCENTER TUBINGSUPPORT ‐ ELECTRICALCONTRACTOR TO FIELDVERIFY HEIGHT ANDDIRECTION

12

DRIP LOOP

22

22

E‐F

TYP OF 336'' 36"

78.06"(6'‐6'')

PDP PANEL`LP'

PLC & CONTROLCABINET

VFD460V500HP

150% FLAFOR 1 MIN.50°C RATING

10''

SERVICEMAIN

VFDCB

LTGXFMRCB

PANEL `LP'24 CKT

XFMR

OID

OID

PLC &CONTROLS

AIR COMP.FVNRSZ 1

48" MIN.HEIGHT

HEAT

EXCH.

13' 13'

26'

28'

DIALER

36''

UGPS &METERING

24'' 24'' 36'' 3'‐6''

10 11

7 6 1

4 9

5

S

22

E‐S

PM

SPD

12

LOCKOUT DISCONNECT

22

S SWITCH INSIDE IN‐USE‐COVER

CLAMPS AS NEEDED

E‐F

TYP OF 3

22

22

22

32''

ATS

22E‐S

TYP OF 2

800A

NOTES:

1) ALL DIMENSIONS NOMINAL

2) NEMA 3R, DUST TIGHT.

3) FLUORESCENT LIGHT IN EACH SECTION.

4) MAINTENANCE DUPLEX OUTLET.

5) SUN SHADE

6) AIR HEAT EXCHANGER ON VFD CABINET.

7) PAINT PER DISTRICT SPECS.

8) TVSS 240KA/PH W/30/3 CB

9) HPS = 0‐150PSI, MERCOID DAW SNAP ACTI0N OR EQUAL.

Page 3: CGB 20A PLUG 20A SPEC GRADE ‐ HOT DIPPED GALVANIZED RIGID STEEL CONDUIT ...pjelectric.info/projectsbidding/Arvin CSD Arsenic Mitigation Phase... · = indicates conduit and cable

Know what's below.Call before you dig.

EPS  IS  RESPONSIBLE   FOR  ELECTRICAL   SYSTEMS DESIGN ONLY.   EPS  ISNOT  RESPONSIBLE   FOR  ELECTRICAL   SAFETY  WORK  PROCEDURESAND/OR USE OF  REQUIRED   PERSONAL  PROTECTIVE  EQUIPMENT,  SEENFPA  70E  "STANDARD   FOR  ELECTRICAL  SAFETY  IN  THE WORKPLACE''AND  OSHA  29  CFR.  CONTRACTOR  MUST  READ  SPECIFICATIONS   ANDINSTALL MATERIAL AS PER SPECIFICATIONS  AND/OR  PLANS OR AS PERE.P.S.  APPROVAL.   PLANS  AND  SPECIFICATIONS   ONLY  APPLY  TO  THEPROJECT FOR WHICH THEY WERE CREATED.

JOE PREVENDAR  P.E. CA EE [email protected]

JOB:FILE:PLOT:DSGN: DRWN:

DATE:

PROFESSIONAL AND CONSULTINGELECTRICAL ENGINEERING

4049 N FRESNO ST, FRESNO , CA  93726P: (559) 221‐7230 F: (559) 221‐0507

GARY OLSEN P.E. CA EE [email protected]

DJA‐17‐108

JPP/LKB CRT

FEB 201856. WELL 15 CD2/15/2018 9:34 AM / 1:1

UL APPROVEDOL ALGORITHM

WELLMOTOR

ADJUSTIBLE SPEED DRIVE ACCONTROLLER 150% FLA FOR 1

MIN.

CHEMICALPUMP

CONTROLOFF

ON

VALVE LIMIT SWITCH NORMALLY CLOSEDHELD OPEN BY TELLTALE CAM WHEN VALVE FULLY OPEN3CR KEEPS PUMP FROM STARTING IFVALVE NOT OPEN AFTER POWER FAIL

240V, 20A RATED

ONPUMP

CHEMICALPUMP(S) ONTO CPP

120VFROM`LP'

TDOEPFT

0‐30 MIN

ONE SHOTTIMER

CONTROLPOWER

AVAILABLE

PUMP CALLDELAY

480V3Ø

+

TDOEPWT

0‐30 MIN

START ONDELAY0‐5 MIN.

SOLENOIDDEENERGIZEDVALVE OPENS TOWASTE

VFD FAULT

CONTROLPOWER ON

BST ‐ BACKSPIN TIMERONE SHOT PULSE AFTER PUMP SHUTDOWN

`PLC'`DI'

`PLC'`DO'

`PLC'`DI'

CONTROLPOWER

PRE‐LUBESOLENOID

PUMP TO WASTE TIMER

`PLC'`DI'

CLCHEM PUMP ON

VFD RUNNING

MTS ‐ MOTORTHERMOSTAT

SWITCH

HARMONICCONDITIONING

MANUAL SPEEDPOTENTIOMETER

`PLC'`AO'

4‐20mA

ETHERNET COMLINK TO PLC

VFDRUN

VFDFAULT FAULT

DOOR MOUNTDISPLAY

SPEEDREFERENCE

PUMP CALL

PRE‐LUBE STARTDELAY

HIGHPRESSURE

TRIP

PUMP TO WASTE SOLENOID VALVE

`PUMP CONTROL VALVE'(IF INSTALLED)

PUMP CALL CR

VFD RUNPUMP IN:

HAND

TELEMETRY

LOAD FILTER

CP

W

PC

ACALL

CPT

120VACN

HPT

H‐O‐A

H

TE

H

TE oox

xoo

oox

xoo

BST

2CR PF

M‐AUX

W

OS

BST

BST

PC 3CR

TB

TB

TB

TB

TBCP

R

TB

TB

TB

TB

TB

TB

TB

R

1CR

1CR PWT

ETM

SSRVRUN

VFDRUN

G

TB

TB

FREEZE

1CR 3CR

2CR

TB

TB

TB

LIMIT SWITCH

NCC

NO

3CR

3CR

PC VFD SSRVPUMP FAIL

PF

R

A

PFT

PF

RESET

R

JOG

CS

TB

TBRUN

HTR

3‐#12/G

N

G

CLCS

TB

TB

PFTB

TBPUMP FAIL

TB

TB

HPS

PUMP FAIL

HPT

HPS

RESETTDOE

HPT0‐5 MIN

R

TB

TB

TB

TB

H

A

VFDDELAYRELAY

TB

TB

TB

TB

TB

TB

TB

TB

TB TB TB

RCR

G

CONTROLTRANSFORMER

R12W1

HLS

HLS ‐ HIGH LEVEL SWITCH

LLS ‐ LOW LEVEL SWITCH

HPS ‐ HIGH PRESSURE SWITCH

HAT ‐ HIGH ALARM RELAY

LAT ‐ LOW ALARM RELAY

W1 ‐ WARRICK DIFF MODE (0‐5 MIN., TO 90 SEC. TIME DELAY)

W2 ‐ WARRICK DIRECT MODE (0‐5 MIN., TO 90 SEC. TIME DELAY)

W3 ‐ WARRICK INVERSE MODE (0‐5 MIN., TO 90 SEC. TIME DELAY)

ALL SWITCHES TO BE TIME DELAY ON

LLS

H  ‐ O  ‐ A

FILL SOLENOID

PROBE

XOO

OOX

21

FF

LP‐16

1GND

2ANALOG4‐20mASPEEDREF.

3EXTERNAL

STOP

4PULSE

AI4‐20mA

4‐20mAAO

PLCANALOGOUTPUT

PLCANALOGINPUT

120V FROM LP

N

DO

PLCDIGITALOUTPUT

CMP

CMP

CMP

FIT

120VACFROM

PANEL 'LP'

CONTROLLER

CABLE PERMANUFACTURER

4‐20mA2/C ‐#18 TWISTED PAIR SHIELDED

CMP

FIT

Page 4: CGB 20A PLUG 20A SPEC GRADE ‐ HOT DIPPED GALVANIZED RIGID STEEL CONDUIT ...pjelectric.info/projectsbidding/Arvin CSD Arsenic Mitigation Phase... · = indicates conduit and cable

Know what's below.Call before you dig.

EPS  IS  RESPONSIBLE   FOR  ELECTRICAL   SYSTEMS DESIGN ONLY.   EPS  ISNOT  RESPONSIBLE   FOR  ELECTRICAL   SAFETY  WORK  PROCEDURESAND/OR USE OF  REQUIRED   PERSONAL  PROTECTIVE  EQUIPMENT,  SEENFPA  70E  "STANDARD  FOR  ELECTRICAL   SAFETY  IN  THE WORKPLACE''AND  OSHA  29  CFR.  CONTRACTOR  MUST  READ  SPECIFICATIONS   ANDINSTALL MATERIAL AS PER SPECIFICATIONS  AND/OR  PLANS OR AS PERE.P.S.  APPROVAL.  PLANS  AND  SPECIFICATIONS   ONLY  APPLY  TO  THEPROJECT FOR WHICH THEY WERE CREATED.

JOE PREVENDAR  P.E. CA EE [email protected]

JOB:FILE:PLOT:DSGN: DRWN:

DATE:

PROFESSIONAL AND CONSULTINGELECTRICAL ENGINEERING

4049 N FRESNO ST, FRESNO , CA  93726P: (559) 221‐7230 F: (559) 221‐0507

GARY OLSEN P.E. CA EE [email protected]

DJA‐17‐108

LKB CRT

JAN 2018WELL 15 ELEC PLC2/15/2018 9:34 AM / 1:1

TVSS DC POWERSUPPLY

24V & 15VDC

115VAC

POWERSUPPLY

A‐BCOMPACT LOGIX L32E

PLC PROCESSOR

I/O

A‐BPANELVIEW+7

1000

A. GENERAL

THE WELL PUMP HAS 2 MODES OF OPERATION: AUTO AND HAND. THESE MODES ARE SELECTED BY A SELECTOR SWITCH ON THEPUMP STARTER. THE PUMP STARTER IS A VARIABLE FREQUENCY DRIVE WHICH VARIES PUMP SPEED TO MAINTAIN A PRESSURE SETPOINT.

THE STARTUP SEQUENCE IS AS FOLLOWS:

* PRESSURE TRANSMITTER SEES LOW PRESSURE OPERATOR SETPOINT

* PRE LUBE SOLENOID ENERGIZATION (IF USED) 10 SECONDS

* WELL PUMP VFD STARTS.

* THE PUMP RAMPS UP TO PUMP TO PRESSURE SET POINT. PUMP SPEED IS MODULATED THROUGH A PI CONTROLLER TOMAINTAIN PRESSURE.

THE SHUTDOWN SEQUENCE IS AS FOLLOWS:

* PUMP WILL RUN UNTIL AN ADJUSTABLE LOW FLOW OR HIGH FLOW RATE IS RUN AT FOR AN ADJUSTABLE TIME PERIOD OR IFTHE PRESSURE SWITCH SEES HIGH PRESSURE OR IF LOW WELL LEVEL CUTOFF IS REACHED.

* AN ADJUSTABLE BACKSPIN TIMER STARTS TIMING ON PUMP SHUTDOWN PREVENTING PUMP RESTART UNTIL THE WATERCOLUMN HAS SETTLED.

B. MODES OF OPERATION

1. AUTO MODE: THE AUTO MODE IS CONTROL USING THE LOW‐PRESSURE SWITCH TO START THE PUMP AND MODULATE SPEEDTO CONTROL PRESSURE.

2. HAND MODE: THE HAND MODE IS A MAINTENANCE TEST MODE TO RUN THE PUMP LOCALLY.

C. CHLORINATION INJECTION

1. AUTO RESIDUAL MODE: AUTO INJECTS CHEMICAL WHENEVER THE WELL PUMP MOTOR IS RUNNING. THE RATE IS CONTROLLEDFROM A COMPOUND LOOP OF CHEMICAL RESIDUAL AND FLOW.

2. AUTO FLOW MODE: AUTO INJECTS CHEMICAL WHENEVER THE WELL PUMP MOTOR IS RUNNING. THE RATE IS RATIOED TOMEASURED WELL FLOW.

3. AUTO FIXED MODE: AUTO INJECTS CHEMICAL WHENEVER THE WELL PUMP MOTOR IS RUNNING. THE RATE IS MANUALLY SET.

4. JOG MODE: JOG OPERATION IS A MAINTENANCE TEST MODE THAT RUNS THE CHEMICAL PUMP WHEN THE BUTTON IS PRESSED.

1. SUPPLY AND INSTALL A INTEGRATED MCC/PLC ENCLOSURE THAT WILL BE EQUIPPED WITH A THERMOSTAT, FAN, GRILL, FILTER,BACK PANEL, SWING PANEL AND ALL COMPONENTS REQUIRED FOR A COMPLETE PLC/RADIO SYSTEM. PRE‐WIRE AND PROVIDE ACOMPLETE FUNCTIONAL CUSTOMER WITNESSED FACTORY TEST OF ALL CONTROLS.

2. SUPPLY, INSTALL AND PROGRAM AN ALLEN BRADLEY COMPACT LOGIX L32E PLC WITH I/O CARDS AND MEMORY MODULE. THEPROCESSOR WILL HAVE A MINIMUM OF TWO COMMUNICATION PORTS TO ALLOW CONNECTION OF THE RADIO ANDPANELVIEW.

3. SUPPLY, INSTALL, AND PROGRAM AN ALLEN BRADLEY PANELVIEW+ 1000 OPERATOR INTERFACE PANEL (10" COLOR SCREEN) FORLOCAL READOUT AND OPERATION.

4. SUPPLY AND INSTALL A 24VDC AND A 15 VDC POWER SUPPLY FOR THE ANALOG AND RADIO CIRCUITS.

5. SUPPLY AND INSTALL A POWERLOGIC MONITOR CAPABLE OF READING CURRENT, VOLTAGE, KW, AND PHASE LOSS.

6. SUPPLY AND INSTALL AN UNINTERRUPTIBLE POWER SUPPLY (UPS) APC MODEL BP300 FOR POWER CONDITIONING ANDTEMPORARY POWER BACKUP.

7. ALL CHANGES WILL BE DOCUMENTED AND ALL DOCUMENTS TURNED OVER TO THE DISTRICT. ALL SOURCE CODE AND PLCPROGRAMMING SOFTWARE TO BE TURNED OVER TO THE DISTRICT.

UPSSOLA‐HD

REDUNDANT

MANAGEDETHERNETSWITCH

CELLULARMODEM

Page 5: CGB 20A PLUG 20A SPEC GRADE ‐ HOT DIPPED GALVANIZED RIGID STEEL CONDUIT ...pjelectric.info/projectsbidding/Arvin CSD Arsenic Mitigation Phase... · = indicates conduit and cable

Know what's below.Call before you dig.

EPS  IS  RESPONSIBLE   FOR  ELECTRICAL   SYSTEMS DESIGN ONLY.   EPS  ISNOT  RESPONSIBLE   FOR  ELECTRICAL   SAFETY  WORK  PROCEDURESAND/OR USE OF  REQUIRED   PERSONAL  PROTECTIVE  EQUIPMENT,  SEENFPA  70E  "STANDARD   FOR  ELECTRICAL  SAFETY  IN  THE WORKPLACE''AND  OSHA  29  CFR.  CONTRACTOR  MUST  READ  SPECIFICATIONS   ANDINSTALL MATERIAL AS PER SPECIFICATIONS  AND/OR  PLANS OR AS PERE.P.S.  APPROVAL.   PLANS  AND  SPECIFICATIONS   ONLY  APPLY  TO  THEPROJECT FOR WHICH THEY WERE CREATED.

JOE PREVENDAR  P.E. CA EE [email protected]

JOB:FILE:PLOT:DSGN: DRWN:

DATE:

PROFESSIONAL AND CONSULTINGELECTRICAL ENGINEERING

4049 N FRESNO ST, FRESNO , CA  93726P: (559) 221‐7230 F: (559) 221‐0507

GARY OLSEN P.E. CA EE [email protected]

DJA‐17‐108

JPP/LKB CRT

FEB 201858. WELL 15 DT2/15/2018 9:34 AM / 1:1

2"

36"

NOTES:

1) TRANSFORMER PAD SIZE & QUANTITY OF GUARD POSTS PER PG&E RULE 16.

2) ALL PG&E RULE 16 APPLY.

= FIXED

= REMOVABLE

24"

24"

(CUT THROUGH AT CONDUIT OPENINGS)

8"MIN 6'' ABOVE SLAB

24"

REMOVABLE GUARD POSTPER PG&E REQUIREMENTS.SEE DETAIL THIS SHEET.SPACE PER RULE 16

GROUND CLAMP

GROUND CLAMP

GROUND ROD(TYPICAL OF 2)

PRECAST CONCRETE PAD PERPG&E REQUIREMENTS

TRANSFORMER PERPG&E REQUIREMENTS

FIXED GUARD POSTS PERPG&E REQUIREMENTS.SEE DETAIL THIS SHEET.SPACE PER RULE 16

PRECAST PAD OPENINGS

34"x8' GROUND ROD,

COPPERCLAD WITH MIN6' BETWEEN RODS

#2 SOLID/STRANDEDAWG CU GROUND WIRE

FINISHGRADE

GR

GR

±3"3" MIN

32"MIN

48"MIN

1 12" 3"

48"MIN

3" MIN

916"

12"MIN

12"MIN

NOTES:

1) POST, 4"x60" GALVANIZED STEEL PIPE, STANDARD, SCHEDULE 40. FILLFIXED POST W/ CONCRETE TO TOP.

2) SLEEVE, 5"x36" GALVANIZED STEEL PIPE SLEEVE, STANDARD, SCHEDULE40

3) CAP, 4" GALVANIZED MALLEABLE IRON CAP. MAY BE SCREWED.

4) TAPE, VISIBILITY REFLECTIVE YELLOW ADHESIVE STRIPS (2"x12")

FINISH GRADE

FINISH GRADE

2" SAFETY EQUIPMENTLOCK. CODE 170116

(FURNISHED BY PG&E)

CUT FROM1/2"x6" EYEBOLT STEEL,GALVANIZED

CONCRETE

EYE BOLT, 1/2"x6"STEEL, GALVANIZED (TO BEINSTALLED PARALLEL TOEDGE OF PAD)

WELD (TYPICAL)

SEEDETAIL

"A"

WELDS SHALL BE PAINTED OVER WITH A ZINC PRIMER

 ‐ SEE NOTE 3

 ‐ SEE NOTE 4(FURNISHED BY PG&E ANDINSTALLED BY ELECTRICALCONTRACTOR)

 ‐ SEE NOTE 1

‐ SEE NOTE 2

CONCRETE

COMPRESSION LUG CONNECTIONBOLTED TO GROUND BUS ‐38" 2‐HOLE BOLTED CONNECTION

USING BELLEVILLE WASHERTHERMOWELDOR BURNDYCOMPRESSION

GROUND CLAMP

GROUND ROD

#4/0 BARE CU

GFI

N

BOND TO BUILDING STEEL

APPROVED GROUND CLAMP

BOND TO INCOMING STEEL COLDWATER PIPE

GROUND  BUS

UTILITY DISCONNECT LINK, READILYACCESSIBLE. MARKED:

"REMOVAL OF THIS LINK REMOVESCUSTOMER GROUNDING TONEUTRAL OF SUPPLY"

TYPICAL 3 4"x10' COPPER CLAD GROUNDROD, MIN. 12" FROM EDGE OF SLAB AND 10'FROM GROUND ROD IN SERVICE SECTION

#4/0 BARE CU UFER GROUND,MINIMUM LENGTH 25',  MINIMUM3" CONCRETE ENCASEMENT

#4/0 CU

#4/0  BARE CU

NEUTRAL BUS TO GROUND BUS BONDCONNECTION

NOTE:  SERVICE GROUND SIZE AS SHOWN OR AS PER TABLE 250‐94‐CEC(CURRENT). ALL GROUND CONDUCTORS TO BE COPPER.

GROUNDRODMAXIMUMHEIGHTABOVE SLABIS 4"

FINISHED GRADE

 SAW CUT EXISTING (6"SPACING BOTH SIDES) AND PATCH BACK WITH MIN5" ASPHALT (TYPE B) PLACE IN TWO LIFTS OF 2"

OVER 3", 38" DIA MAX AGGREGATE SIZE (BY PAVINGCONTRACTOR), APPLY ASPHALT BINDER ATEXISTING PAVEMENT EDGES IMMEDIATELY PRIORTO PLACING TRENCH RESURFACING

 EARTH BACKFILL PER SPECS.

 SAW CUT EXISTING(FLUSH) AND PATCH BACK WITH MIN 5" THICKCONCRETE SLAB (MIN 6 STACK MIX), MATCHEXISTING FINISH

36"MIN

3"

6"

6"

3"

1 12"1 12"

2"

EARTH BACKFILL PER SPECS.

UNDERGROUND CONDUITS(ELEC., COMM., EMS, ETC.)NUMBER AND SIZE OF CONDUITS AS INDICATED ONPLANS

WARNING TAPE

SAND BACKFILL OR CONCRETE SLURRY

12"MIN

MCC‐______________

PUMP _____________

____ HP

WHITE LAMICOID W/ BLACK LETTERS

3"

1 12"

(SEE LABEL ABOVE)

(MOTOR CONTROL CENTER)

(MOTOR DESCRIPTION)

(HORSEPOWER)

TACK WELD CLAMPTO STAINLESS STEEL

LABEL MOUNT

CLAMP TO MOTORFEED

12 GAUGESTAINLESS STEEL

STAINLESSSTEEL BOLTSOR SCREWS

VERIFY NUMBER OF SECTION(S)ON PLAN(S)/ELEVATION(S)

SEE NOTES 1 & 2

HILTI KWIK BOLT ANCHOR(TYPICAL) ‐ SEE NOTE 3

12" x 3 

34" SS SEISMIC HILTI

KWIK BOLT AT EACH CORNEROF ENCLOSURE AS SHOWNABOVE. DRILL CONCRETE PERMANUFACTURERSRECOMMENDATIONS.MINIMUM 3" EMBEDMENT INCONCRETE

NOTES:

1) FOR INDOORS ‐ 1 1 2" HIGH HOUSEKEEPING PAD. 4" WIDE ALONG BACK, BOTH SIDES AND FRONT.

2) FOR OUTDOORS ‐ 3 1 2" HIGH HOUSEKEEPING PAD. 4" WIDE ALONG BACK, BOTH SIDES AND AS SHOWNON PLANS FOR FRONT.

3) 4 ANCHORS AT CORNERS OF EACH SECTION.

4) 5 1 2" MINIMUM OVERALL PAD THICKNESS.

MIN 48"CLEARANCE

SAND FILL

LENGTH TO SUITSWITCHBOARD

SWITCHBOARD

SWITCHBOARD

CONCRETE SLAB

A A

FINISH GRADE

4000 PSI CONCRETESEE SHEET 47

COOLING FANS

(2 MIN.)

VFDHEATSINKTHRUPANEL

ISOLATEDREACTOR

ENCLOSURE

VFDELECTRONICS

COLDAIR

HOTAIR

REDUNDANT CAPACITYPANEL AIR CONDITIONEROR HEAT EXCHANGER ‐2 FANS MINIMUM,MINIMUM 2' CLEARANCE

SEALED GASKETEDDUST PROOFENCLOSURE

HEATSINK3R COVER

RODENTSCREEN

Page 6: CGB 20A PLUG 20A SPEC GRADE ‐ HOT DIPPED GALVANIZED RIGID STEEL CONDUIT ...pjelectric.info/projectsbidding/Arvin CSD Arsenic Mitigation Phase... · = indicates conduit and cable

Know what's below.Call before you dig.

EPS  IS  RESPONSIBLE   FOR  ELECTRICAL   SYSTEMS DESIGN ONLY.   EPS  ISNOT  RESPONSIBLE   FOR  ELECTRICAL   SAFETY  WORK  PROCEDURESAND/OR USE OF  REQUIRED   PERSONAL  PROTECTIVE  EQUIPMENT,  SEENFPA  70E  "STANDARD   FOR  ELECTRICAL  SAFETY  IN  THE WORKPLACE''AND  OSHA  29  CFR.  CONTRACTOR  MUST  READ  SPECIFICATIONS   ANDINSTALL MATERIAL AS PER SPECIFICATIONS  AND/OR  PLANS OR AS PERE.P.S.  APPROVAL.   PLANS  AND  SPECIFICATIONS   ONLY  APPLY  TO  THEPROJECT FOR WHICH THEY WERE CREATED.

JOE PREVENDAR  P.E. CA EE [email protected]

JOB:FILE:PLOT:DSGN: DRWN:

DATE:

PROFESSIONAL AND CONSULTINGELECTRICAL ENGINEERING

4049 N FRESNO ST, FRESNO , CA  93726P: (559) 221‐7230 F: (559) 221‐0507

GARY OLSEN P.E. CA EE [email protected]

DJA‐17‐108

JPP/LKB CRT

FEB 201859. WELL 15 DT2/15/2018 9:34 AM / 1:1

SPACE HTR

BLOCK HTR

WATER HTR

BATTERYCHARGER

CONTROL

PER CIVIL

PERCIVIL

SEESINGLE

LINE100%

J

TO ATS

TO ATS

TO 120VAC PANEL

FACTORY SOUNDATTENUATED 3RENCLOSURE

VIBRATION ISOLATORS

#4/0 BARE CU UFERGROUND 2" UP FROMBOTTOM OF SLAB,MINIMUM LENGTH =25'

FINISHGRADE

DETAIL PER CIVIL

MUFFLER

GROUNDCONNECTIONCRIMPED AND

BOLTED

48'' TAIL MIN

CADWELD

SLAB PER CIVIL

34''x10'

COPPERCLADGROUND ROD

THERMO WELD OR BURNDYCOMPRESSION

COMPRESSION LUG BOLTED TO

GROUND BUS. 38" BOLTEDCONNECTION USING BELLEVILLEWASHERENGINE

START

‐ OVERCRANK

‐ LOW OIL PRESSURE

‐ HIGH ENGINE TEMPERATURE

‐ OVERSPEED

‐ LOW BATTERY

‐ LOW FUEL

SWITCHNOT AUTOUTILITY

MODEE‐GENMODE

COMMONPRE‐ALARM

COMMONFAULT

GENERATORRUNNING

UFER GND ‐ MINIMUM25' #4/0 CU WITH 3"CONCRETE ALL AROUND

PANEL

FOUNDATIONREBAR

GENERATOR FRAME

UTILITYXFMR

#4/0 CU

A C

N

B

C

N

B

A

34"x10' GND ROD

IN SERVICESECTION

#4/0 CU

#4/0 CU

ALL CONNECTIONS TOGROUND BUS ARE TO BEBY BOLTED CRIMP LUG

THERMAL WELDOR BRUNDY CRIMPCONNECTION(TYPICAL)

GROUND BUS

GROUNDBUS

36"MIN

NOTES:

1) IF FIELD SENSOR DEVICE IS FURNISHED WITH CONDUIT CONNECTIONPROVISIONS, CONNECT WITH LIQUID‐TIGHT FLEXIBLE METAL CONTUIT.

2) IF FIELD SENSOR DEVICE IS EQUIPPED ONLY WITH LIQUIDTIGHT CABLE,USE LIQUID‐TIGHT CABLE CONNECTOR. PROTECT CABLE WITH SPIRALWRAP FLEX.

FINISHEDGRADE

FIELDSENSORDEVICE

SUNSHIELD,10G ALUMINUM

TRANSMITTER

CABLE OR CONDUIT ‐ SEENOTES BELOW

3" GALVANIZED STEELCHANNEL

12"DIA x 36"  CONCRETEFOUNDATION

PVC COATED RMC

PIPE

30"

PVC

TOCONTROL

PANEL

1 HOLE PVC COATEDCONDUIT STRAP. ATTACH

WITH S.S. 1 4"x20. DRILLAND TAP 1 4"x20 HOLE

HINGED FRONT SUNSHIELD,FLIP UP, 10G ALUMINUM

FRONTHINGE

FIELDTERMINALS

ROSEMOUNT

ROSEMOUNT 3051TGPRESSURE TRANSMITTER W/ LCD DISPLAY0‐150 PSI OR EQUAL

12" LFMC

STEELCONDULET

34"RMC W/#18 TSP

306RT2 THREADEDSTYLE MANIFOLD

TWO‐VALVE

4"MIN

90° CONNECTOR

CONNECTORW/  3 4" TO12" RE

BUSHING

SEE NOTE 1

SEE NOTE 2

3/4"  FLEXTITEMAXIMUM 12" TO3/4"C

SEE NOTE 1

NOTES:

1) PMC/BETA VL4513 W/ TE‐10 DRY BOX AND MP‐11 CABLE TERMINATORSEALED REFERENCE VOLUME FILLED WITH DRY NITROGEN OR EQUAL

2) THIS IS THE 2‐WIRE TWISTED PAIR THAT SUPPLIES THE 9‐30VDVEXCITATION AND RETURNS THE 4‐20MA CURRENT PROPORTIONAL TOPRESSURE/LEVEL, 4MA ‐ THE MINIMUM AND 20MA = THE MAXIMUM

CONDUIT FOR ANTENNA

24"DIA

3" (4) #4 VERTICALREBAR

#4 HORIZONTALREBAR HOOPS

6" OVERLAP OF#4 TAILS

NOTES:

1) BASE SHALL BE 4000 PSI (28 DAY) 6 SACK CONTENT MIX CONCRETE.

2) STANDARDS TO WITHSTAND WIND LOADS OF 100MPH WITH 1.3 GUSTFACTOR PER TITLE 24 EXPOSURE (C).

3) ANCHOR BOLTS AND TEMPLATES FURNISHED BY ELECTRICALCONTRACTOR. CONCRETE BASE AND ANCHOR BOLTS INSTALLED BYGENERAL CONTRACTOR.

BRANCH CIRCUITWIRING

BASE COVER

WEATHERPROOF J‐BOX WITHH‐O‐A LOCKING KEY BYPASSSWITCH

S

48"

FACTORY HANDHOLECOVER

60" CONDUIT

(4) #4 VERTICALREBAR

#4 HORIZONTALTIES @ 12" ON

CENTER

#4 HORIZONTALTIES @ 6" ON

CENTER

A

FINISH GRADE

A

CONDUIT

24"

GROUT

ANCHOR BOLTS

30"

24"DIA

SEE SHEET 54 FORFIXTURE SCHEDULEMOTION SENSOR ‐ IF

ORDERED

PE CELL ‐ IFORDERED

P‐DL

BATTERY+

P‐P

ETHERNET

Page 7: CGB 20A PLUG 20A SPEC GRADE ‐ HOT DIPPED GALVANIZED RIGID STEEL CONDUIT ...pjelectric.info/projectsbidding/Arvin CSD Arsenic Mitigation Phase... · = indicates conduit and cable

Know what's below.Call before you dig.

PROPERTYLINE

CHLORINEBUILDING

DEEP WELL PUMP& MOTOR

22' DOUBLE DRIVE GATES& PERSONNEL GATE

HYDROPNEUMATICTANK

SITE ELECTRICAL& CONTROLS

2" TELEPHONE CONDUITTO EXTEND 5' OUTSIDETHE WELL SITE FENCEALONG THE FRONTAGEAND TERMINATE IN ATELEPHONE PULL BOXWITH A PULL ROPE.

MILLX RD.CENTERLINE

WALNUT DR.CENTERLINE

22' DOUBLEDRIVE GATES

WELL SITEFENCING& GATES

EPS  IS  RESPONSIBLE   FOR  ELECTRICAL   SYSTEMS DESIGN ONLY.  EPS  ISNOT  RESPONSIBLE   FOR  ELECTRICAL   SAFETY  WORK  PROCEDURESAND/OR USE OF  REQUIRED   PERSONAL  PROTECTIVE  EQUIPMENT,   SEENFPA  70E  "STANDARD  FOR  ELECTRICAL   SAFETY  IN  THE WORKPLACE''AND OSHA  29  CFR.  CONTRACTOR  MUST  READ  SPECIFICATIONS  ANDINSTALL MATERIAL AS PER SPECIFICATIONS  AND/OR PLANS OR AS PERE.P.S.  APPROVAL.   PLANS  AND  SPECIFICATIONS   ONLY  APPLY  TO  THEPROJECT FOR WHICH THEY WERE CREATED.

JOE PREVENDAR  P.E. CA EE [email protected]

JOB:FILE:PLOT:DSGN: DRWN:

DATE:

PROFESSIONAL AND CONSULTINGELECTRICAL ENGINEERING

4049 N FRESNO ST, FRESNO , CA  93726P: (559) 221‐7230 F: (559) 221‐0507

GARY OLSEN P.E. CA EE [email protected]

DJA‐17‐108

JPP/LKB CRT

FEB 201860. WELL 16 SP2/15/2018 9:34 AM / 1:1

ABOVE GRADE  ‐ HOT DIPPED GALVANIZED RIGID STEEL CONDUIT TO BE USED FOR ALL EXTERIOR AND INTERIORLOCATIONS ABOVE GRADE OR ELSEWHERE SHOWN ON PLANS. ALL RIGID CONDUIT AND FITTINGS TO BETHREADED. USE OF SET SCREW OR COMPRESSION TYPE CONNECTOR IS PROHIBITED. MEYERS HUBS TO BE USEDON ALL EXTERIOR PANEL CONNECTIONS.

BELOW GRADE  ‐ RIGID PVC NONMETALLIC CONDUIT SCHEDULE 40 TO BE USED FOR ALL UNDERGROUNDLOCATIONS AND BELOW VAPOR BARRIER OF SLAB. NO CONDUITS SHALL BE INSTALLED TO REDUCE THESTRUCTURAL INTEGRITY OF FOOTINGS.

CHEMICAL BUILDINGS AND CORROSIVE ATMOSPHERES  ‐ RIGID PVC NONMETALLIC CONDUIT SCHEDULE 80 TOBE USED FOR ALL INTERIOR LOCATIONS ABOVE GRADE IN CHEMICAL BUILDINGS AND CORROSIVEENVIRONMENTS.

THROUGH CONCRETE SLABS AND EXTERIOR CORROSIVE ATMOSPHERES  ‐ PVC COATED GALVANIZED RIGID STEELCONDUIT MINIMUM 40 MIL FACTORY COATING TO BE USED FOR ALL EXPOSED CONDUITS THROUGH CONCRETE

SLABS (MINIMUM 12'' ABOVE AND BELOW SLAB) AND ALL EXTERIOR LOCATION CORROSIVE ATMOSPHERES. USEMANUFACTURERS' SPECIFIED TOOLS AND PROCEDURES FOR INSTALLATION.

MOTORS AND SENSOR CONNECTIONS  ‐ LIQUID TIGHT FLEXIBLE METAL CONDUIT (UV RESISTANT) TO ONLY BEUSED ON CONNECTIONS TO MOTORS AND SENSORS OR TO ISOLATE VIBRATION. MAXIMUM LENGTH TO BE 30''.

JUNCTION BOXES  ‐ MINIMUM SIZE PER NEC. EXPOSED LOCATION, 1 AND 2 GANG TO BE CAST IRON DEVICE

BOXES TYPE FS/FD SUITABLE FOR WET LOCATIONS. EXPOSED LOCATION EXTERIOR LARGER SIZES CONTINUOUSHINGE TYPE 4, CORROSIVE LOCATIONS CONTINUOUS HINGE TYPE 4X STAINLESS STEEL.

GROUND CONNECTIONS  ‐ GROUND CONNECTIONS TO BE EXOTHERMIC CADWELD (ALL 600 AMP OR LARGERSERVICE) OR BURNDY HYDRAULIC COMPRESSION CONNECTORS. GROUND BUS CONNECTIONS TO BE CRIMP LUGTYPE WITH BOLTED CONNECTION TO GROUND BUS.

480 VOLT AND BELOW POWER WIRING TO BE THWN‐2 600 VOLT, ALL POWER CONNECTIONS TO BE TREATEDWITH ANTIOXIDANT COMPOUND. ALL VFD MOTOR CABLE TO BE SHIELDED, INVERTER DUTY.

CONTACT EPS TO SCHEDULE AN ELECTRICAL PRECONSTRUCTION MEETING PRIOR TO COMMENCINGCONSTRUCTION

CGB

SO CORD

20A PLUG

20A SPEC GRADE

PVC COATED GRC

CRG

ENCLOSURE WALL

CAST 2 GANG

FINISH FLOOR

= (N) CONDUIT, UNDERGROUND

= (N) CONDUIT, ABOVEGROUND

AC = AIR COMPRESSOR

FIT = FLOW INDICATING TRANSMITTER

HPS = HIGH PRESSURE SWITCH

HLS = HIGH LEVEL SWITCH

LLS = LOW LEVEL SWITCH

LIT = LEVEL INDICATING TRANSMITTER

PCV = PUMP CONTROL VALVE

PIT = PRESSURE INDICATING TRANSMITTER

 LS = LEVEL SWITCH

 SV = SOLENOID VALVE

 VT = VIBRATION TRANSMITTER

 IS = INTRUSION SWITCH

 TS = THERMOSTAT SWITCH

= SINGLE POLE SWITCH, 20A

= GFI RECEPTACLE

= MOTOR. FRACTIONAL

= LIGHT FIXTURE

= LIGHT FIXTURE

= FLOOD LIGHT

= POLE LIGHT

= INDICATES CONDUIT AND CABLESCHEDULE

= INDICATES FIXTURE NUMBER

GFI = GROUND FAULT CIRCUIT

(E) = EXISTING

(F) = FUTURE

(N) = NEW

2

FIT

HPS

HLS

LLS

LIT

PIT

SV

VT

AC

PCV

IS

TS

S

I‐A

1) CONTRACTOR SHALL PERFORM A U.S.A. LOCATE PRIOR TO COMMENCING CONSTRUCTION.

DIESELGENERATOR

E‐S

8PIT

313029

28273

2

2311

17LIT SV

HPS

7

5

FIT

19 20

41615

22

18

6

10'

EXHAUST FAN RATED 200% REQ.AIRFLOW FOR 2°C RISE,1000BTU/HR W/ DISCONNECT FORBLDG REMOVAL. CONTRACTOR TOPROVIDE ADDITIONAL SUPPORT ASNECESSARY

GFI OUTLET RECEPTACLE& PLUG

TS

IS

S

E‐W

11

21

10'

LS

LS

9

2421

25

RADIO ANTENNA ‐ ELECTRICALCONTRACTOR TO FIELD VERIFY

HEIGHT AND DIRECTION12

P‐DL

P‐P

13

P‐DL

P‐P13

E‐S

WITH PHOTO CELL& MOTION SENSOR(TYP)

TANK

DOOR FRAMESW DOORIN 5 1/4

E‐FTYP OF 3

PCV

10

TYP OF 2

Page 8: CGB 20A PLUG 20A SPEC GRADE ‐ HOT DIPPED GALVANIZED RIGID STEEL CONDUIT ...pjelectric.info/projectsbidding/Arvin CSD Arsenic Mitigation Phase... · = indicates conduit and cable

Know what's below.Call before you dig.

EPS  IS  RESPONSIBLE   FOR  ELECTRICAL   SYSTEMS DESIGN ONLY.   EPS  ISNOT  RESPONSIBLE   FOR  ELECTRICAL   SAFETY  WORK  PROCEDURESAND/OR USE OF  REQUIRED   PERSONAL  PROTECTIVE  EQUIPMENT,  SEENFPA  70E  "STANDARD   FOR  ELECTRICAL  SAFETY  IN  THE WORKPLACE''AND  OSHA  29  CFR.  CONTRACTOR  MUST  READ  SPECIFICATIONS   ANDINSTALL MATERIAL AS PER SPECIFICATIONS  AND/OR  PLANS OR AS PERE.P.S.  APPROVAL.   PLANS  AND  SPECIFICATIONS   ONLY  APPLY  TO  THEPROJECT FOR WHICH THEY WERE CREATED.

JOE PREVENDAR  P.E. CA EE [email protected]

JOB:FILE:PLOT:DSGN: DRWN:

DATE:

PROFESSIONAL AND CONSULTINGELECTRICAL ENGINEERING

4049 N FRESNO ST, FRESNO , CA  93726P: (559) 221‐7230 F: (559) 221‐0507

GARY OLSEN P.E. CA EE [email protected]

DJA‐17‐108

JPP/LKB CRT

FEB 201861. WELL 16 SL2/15/2018 9:34 AM / 1:1

PG&EUTILITY

METERING

SPD

30/3

240KA/PHASECAT C

TRANSIENTVOLTAGE SURGESUPPRESSION

800/3

VFD

WELL500HP

VFD RATED150% FLA

FOR 1 MINUTE

30/2

10KVA XFMR480V‐240/120V1Ø

PANEL`LP'

480/277V, 800A, CU, 65KAIC

SEE SERVICEGROUNDSHEET 64

NOTES:

1) ALL DIMENSIONS NOMINAL

2) NEMA 3R, DUST TIGHT.

3) FLUORESCENT LIGHT IN EACH SECTION.

4) MAINTENANCE DUPLEX OUTLET.

5) SUN SHADE

6) AIR HEAT EXCHANGER ON VFD CABINET.

7) PAINT PER DISTRICT SPECS.

8) TVSS 240KA/PH W/30/3 CB

9) HPS = 0‐150PSI, MERCOID DAW SNAP ACTI0N OR EQUAL.

SIZE 1FVNR

AIRCOMPRESSOR

5HP

15/3HMCP

60/2REACTORS

(SEE NOTE 1)

PM

SN

N E

L

CABLELUG 500KW

GENERATOR752A @ 480V

800AATS

NOTES:

1) PROVIDE MONITOR (PM) TO BE ELECTROINDUSTRIES SHARK2000 W/ ETHERNET, SQ. D PM 5300 OR EQUAL.

6'‐6''

8''

10'

8'‐6"

3' 6"

22E‐S

ANTENNA ON POLE ONCENTER TUBINGSUPPORT ‐ ELECTRICALCONTRACTOR TO FIELDVERIFY HEIGHT ANDDIRECTION

12

DRIP LOOP

22

22

E‐F

TYP OF 336'' 36"

78.06"(6'‐6'')

PDP PANEL`LP'

PLC & CONTROLCABINET

VFD460V500HP

150% FLAFOR 1 MIN.50°C RATING

10''

SERVICEMAIN

VFDCB

LTGXFMRCB

PANEL `LP'24 CKT

XFMR

OID

OID

PLC &CONTROLS

AIR COMP.FVNRSZ 1

48" MIN.HEIGHT

HEAT

EXCH.

13' 13'

26'

28'

DIALER

36''

UGPS &METERING

24'' 24'' 36'' 3'‐6''

10 11

7 6 1

4 9

5

S

22

E‐S

PM

SPD

12

LOCKOUT DISCONNECT

22

S SWITCH INSIDE IN‐USE‐COVER

CLAMPS AS NEEDED

E‐F

TYP OF 3

22

22

22

32''

ATS

22E‐S

TYP OF 2

800A

800AMAIN

100% LSIG

Page 9: CGB 20A PLUG 20A SPEC GRADE ‐ HOT DIPPED GALVANIZED RIGID STEEL CONDUIT ...pjelectric.info/projectsbidding/Arvin CSD Arsenic Mitigation Phase... · = indicates conduit and cable

Know what's below.Call before you dig.

EPS  IS  RESPONSIBLE   FOR  ELECTRICAL   SYSTEMS DESIGN ONLY.   EPS  ISNOT  RESPONSIBLE   FOR  ELECTRICAL   SAFETY  WORK  PROCEDURESAND/OR USE OF  REQUIRED   PERSONAL  PROTECTIVE  EQUIPMENT,  SEENFPA  70E  "STANDARD   FOR  ELECTRICAL  SAFETY  IN  THE WORKPLACE''AND  OSHA  29  CFR.  CONTRACTOR  MUST  READ  SPECIFICATIONS   ANDINSTALL MATERIAL AS PER SPECIFICATIONS  AND/OR  PLANS OR AS PERE.P.S.  APPROVAL.   PLANS  AND  SPECIFICATIONS   ONLY  APPLY  TO  THEPROJECT FOR WHICH THEY WERE CREATED.

JOE PREVENDAR  P.E. CA EE [email protected]

JOB:FILE:PLOT:DSGN: DRWN:

DATE:

PROFESSIONAL AND CONSULTINGELECTRICAL ENGINEERING

4049 N FRESNO ST, FRESNO , CA  93726P: (559) 221‐7230 F: (559) 221‐0507

GARY OLSEN P.E. CA EE [email protected]

DJA‐17‐108

JPP/LKB CRT

FEB 201862. WELL 16 CD2/15/2018 9:35 AM / 1:1

UL APPROVEDOL ALGORITHM

WELLMOTOR

ADJUSTIBLE SPEED DRIVE ACCONTROLLER 150% FLA FOR 1

MIN.

CHEMICALPUMP

CONTROLOFF

ON

VALVE LIMIT SWITCH NORMALLY CLOSEDHELD OPEN BY TELLTALE CAM WHEN VALVE FULLY OPEN3CR KEEPS PUMP FROM STARTING IFVALVE NOT OPEN AFTER POWER FAIL

240V, 20A RATED

ONPUMP

CHEMICALPUMP(S) ONTO CPP

120VFROM`LP'

TDOEPFT

0‐30 MIN

ONE SHOTTIMER

CONTROLPOWER

AVAILABLE

PUMP CALLDELAY

480V3Ø

+

TDOEPWT

0‐30 MIN

START ONDELAY0‐5 MIN.

SOLENOIDDEENERGIZEDVALVE OPENS TOWASTE

VFD FAULT

CONTROLPOWER ON

BST ‐ BACKSPIN TIMERONE SHOT PULSE AFTER PUMP SHUTDOWN

`PLC'`DI'

`PLC'`DO'

`PLC'`DI'

CONTROLPOWER

PRE‐LUBESOLENOID

PUMP TO WASTE TIMER

`PLC'`DI'

CLCHEM PUMP ON

VFD RUNNING

MTS ‐ MOTORTHERMOSTAT

SWITCH

HARMONICCONDITIONING

MANUAL SPEEDPOTENTIOMETER

`PLC'`AO'

4‐20mA

ETHERNET COMLINK TO PLC

VFDRUN

VFDFAULT FAULT

DOOR MOUNTDISPLAY

SPEEDREFERENCE

PUMP CALL

PRE‐LUBE STARTDELAY

HIGHPRESSURE

TRIP

PUMP TO WASTE SOLENOID VALVE

`PUMP CONTROL VALVE'(IF INSTALLED)

PUMP CALL CR

VFD RUNPUMP IN:

HAND

TELEMETRY

LOAD FILTER

CP

W

PC

ACALL

CPT

120VACN

HPT

H‐O‐A

H

TE

H

TE oox

xoo

oox

xoo

BST

2CR PF

M‐AUX

W

OS

BST

BST

PC 3CR

TB

TB

TB

TB

TBCP

R

TB

TB

TB

TB

TB

TB

TB

R

1CR

1CR PWT

ETM

SSRVRUN

VFDRUN

G

TB

TB

FREEZE

1CR 3CR

2CR

TB

TB

TB

LIMIT SWITCH

NCC

NO

3CR

3CR

PC VFD SSRVPUMP FAIL

PF

R

A

PFT

PF

RESET

R

JOG

CS

TB

TBRUN

HTR

3‐#12/G

N

G

CLCS

TB

TB

PFTB

TBPUMP FAIL

TB

TB

HPS

PUMP FAIL

HPT

HPS

RESETTDOE

HPT0‐5 MIN

R

TB

TB

TB

TB

H

A

TB

TB

TB

TB

TB

TB

TB

TB

TB TB TB

RCR

G

CONTROLTRANSFORMER

R12W1

HLS

HLS ‐ HIGH LEVEL SWITCH

LLS ‐ LOW LEVEL SWITCH

HPS ‐ HIGH PRESSURE SWITCH

HAT ‐ HIGH ALARM RELAY

LAT ‐ LOW ALARM RELAY

W1 ‐ WARRICK DIFF MODE (0‐5 MIN., TO 90 SEC. TIME DELAY)

W2 ‐ WARRICK DIRECT MODE (0‐5 MIN., TO 90 SEC. TIME DELAY)

W3 ‐ WARRICK INVERSE MODE (0‐5 MIN., TO 90 SEC. TIME DELAY)

ALL SWITCHES TO BE TIME DELAY ON

LLS

H  ‐ O  ‐ A

FILL SOLENOID

PROBE

XOO

OOX

21

FF

LP‐16

1GND

2ANALOG4‐20mASPEEDREF.

3EXTERNAL

STOP

4PULSE

AI4‐20mA

4‐20mAAO

PLCANALOGOUTPUT

PLCANALOGINPUT

120V FROM LP

N

DO

PLCDIGITALOUTPUT

CMP

CMP

CMP

FIT

120VACFROM

PANEL 'LP'

CONTROLLER

CABLE PERMANUFACTURER

4‐20mA2/C ‐#18 TWISTED PAIR SHIELDED

CMP

FIT

VFDDELAYRELAY

Page 10: CGB 20A PLUG 20A SPEC GRADE ‐ HOT DIPPED GALVANIZED RIGID STEEL CONDUIT ...pjelectric.info/projectsbidding/Arvin CSD Arsenic Mitigation Phase... · = indicates conduit and cable

Know what's below.Call before you dig.

EPS  IS  RESPONSIBLE   FOR  ELECTRICAL   SYSTEMS DESIGN ONLY.   EPS  ISNOT  RESPONSIBLE   FOR  ELECTRICAL   SAFETY  WORK  PROCEDURESAND/OR USE OF  REQUIRED   PERSONAL  PROTECTIVE  EQUIPMENT,  SEENFPA  70E  "STANDARD   FOR  ELECTRICAL  SAFETY  IN  THE WORKPLACE''AND  OSHA  29  CFR.  CONTRACTOR  MUST  READ  SPECIFICATIONS   ANDINSTALL MATERIAL AS PER SPECIFICATIONS  AND/OR  PLANS OR AS PERE.P.S.  APPROVAL.   PLANS  AND  SPECIFICATIONS   ONLY  APPLY  TO  THEPROJECT FOR WHICH THEY WERE CREATED.

JOE PREVENDAR  P.E. CA EE [email protected]

JOB:FILE:PLOT:DSGN: DRWN:

DATE:

PROFESSIONAL AND CONSULTINGELECTRICAL ENGINEERING

4049 N FRESNO ST, FRESNO , CA  93726P: (559) 221‐7230 F: (559) 221‐0507

GARY OLSEN P.E. CA EE [email protected]

DJA‐17‐108

JPP/LKB CRT

FEB 201863. WELL 16 PLC2/15/2018 9:35 AM / 1:1

TVSS DC POWERSUPPLY

24V & 15VDC

115VAC

POWERSUPPLY

A‐BCOMPACT LOGIX L32E

PLC PROCESSOR

I/O

A‐BPANELVIEW+7

1000

A. GENERAL

THE WELL PUMP HAS 2 MODES OF OPERATION: AUTO AND HAND. THESE MODES ARE SELECTED BY A SELECTOR SWITCH ON THEPUMP STARTER. THE PUMP STARTER IS A VARIABLE FREQUENCY DRIVE WHICH VARIES PUMP SPEED TO MAINTAIN A PRESSURE SETPOINT.

THE STARTUP SEQUENCE IS AS FOLLOWS:

* PRESSURE TRANSMITTER SEES LOW PRESSURE OPERATOR SETPOINT

* PRE LUBE SOLENOID ENERGIZATION (IF USED) 10 SECONDS

* WELL PUMP VFD STARTS.

* THE PUMP RAMPS UP TO PUMP TO PRESSURE SET POINT. PUMP SPEED IS MODULATED THROUGH A PI CONTROLLER TOMAINTAIN PRESSURE.

THE SHUTDOWN SEQUENCE IS AS FOLLOWS:

* PUMP WILL RUN UNTIL AN ADJUSTABLE LOW FLOW OR HIGH FLOW RATE IS RUN AT FOR AN ADJUSTABLE TIME PERIOD OR IFTHE PRESSURE SWITCH SEES HIGH PRESSURE OR IF LOW WELL LEVEL CUTOFF IS REACHED.

* AN ADJUSTABLE BACKSPIN TIMER STARTS TIMING ON PUMP SHUTDOWN PREVENTING PUMP RESTART UNTIL THE WATERCOLUMN HAS SETTLED.

B. MODES OF OPERATION

1. AUTO MODE: THE AUTO MODE IS CONTROL USING THE LOW‐PRESSURE SWITCH TO START THE PUMP AND MODULATE SPEEDTO CONTROL PRESSURE.

2. HAND MODE: THE HAND MODE IS A MAINTENANCE TEST MODE TO RUN THE PUMP LOCALLY.

C. CHLORINATION INJECTION

1. AUTO RESIDUAL MODE: AUTO INJECTS CHEMICAL WHENEVER THE WELL PUMP MOTOR IS RUNNING. THE RATE IS CONTROLLEDFROM A COMPOUND LOOP OF CHEMICAL RESIDUAL AND FLOW.

2. AUTO FLOW MODE: AUTO INJECTS CHEMICAL WHENEVER THE WELL PUMP MOTOR IS RUNNING. THE RATE IS RATIOED TOMEASURED WELL FLOW.

3. AUTO FIXED MODE: AUTO INJECTS CHEMICAL WHENEVER THE WELL PUMP MOTOR IS RUNNING. THE RATE IS MANUALLY SET.

4. JOG MODE: JOG OPERATION IS A MAINTENANCE TEST MODE THAT RUNS THE CHEMICAL PUMP WHEN THE BUTTON IS PRESSED.

1. SUPPLY AND INSTALL A INTEGRATED MCC/PLC ENCLOSURE THAT WILL BE EQUIPPED WITH A THERMOSTAT, FAN, GRILL, FILTER,BACK PANEL, SWING PANEL AND ALL COMPONENTS REQUIRED FOR A COMPLETE PLC/RADIO SYSTEM. PRE‐WIRE AND PROVIDE ACOMPLETE FUNCTIONAL CUSTOMER WITNESSED FACTORY TEST OF ALL CONTROLS.

2. SUPPLY, INSTALL AND PROGRAM AN ALLEN BRADLEY COMPACT LOGIX L32E PLC WITH I/O CARDS AND MEMORY MODULE. THEPROCESSOR WILL HAVE A MINIMUM OF TWO COMMUNICATION PORTS TO ALLOW CONNECTION OF THE RADIO ANDPANELVIEW.

3. SUPPLY, INSTALL, AND PROGRAM AN ALLEN BRADLEY PANELVIEW+ 1000 (10" COLOR SCREEN) OPERATOR INTERFACE PANEL FORLOCAL READOUT AND OPERATION.

4. SUPPLY AND INSTALL A 24VDC AND A 15 VDC POWER SUPPLY FOR THE ANALOG AND RADIO CIRCUITS.

5. SUPPLY AND INSTALL A POWERLOGIC MONITOR CAPABLE OF READING CURRENT, VOLTAGE, KW, AND PHASE LOSS.

6. SUPPLY AND INSTALL AN UNINTERRUPTIBLE POWER SUPPLY (UPS) APC MODEL BP300 FOR POWER CONDITIONING ANDTEMPORARY POWER BACKUP.

7. ALL CHANGES WILL BE DOCUMENTED AND ALL DOCUMENTS TURNED OVER TO THE DISTRICT. ALL SOURCE CODE AND PLCPROGRAMMING SOFTWARE TO BE TURNED OVER TO THE DISTRICT.

UPSSOLA‐HD

REDUNDANT

MANAGEDETHERNETSWITCH

CELLULARMODEM

Page 11: CGB 20A PLUG 20A SPEC GRADE ‐ HOT DIPPED GALVANIZED RIGID STEEL CONDUIT ...pjelectric.info/projectsbidding/Arvin CSD Arsenic Mitigation Phase... · = indicates conduit and cable

Know what's below.Call before you dig.

EPS  IS  RESPONSIBLE   FOR  ELECTRICAL   SYSTEMS DESIGN ONLY.   EPS  ISNOT  RESPONSIBLE   FOR  ELECTRICAL   SAFETY  WORK  PROCEDURESAND/OR USE OF  REQUIRED   PERSONAL  PROTECTIVE  EQUIPMENT,  SEENFPA  70E  "STANDARD   FOR  ELECTRICAL  SAFETY  IN  THE WORKPLACE''AND  OSHA  29  CFR.  CONTRACTOR  MUST  READ  SPECIFICATIONS   ANDINSTALL MATERIAL AS PER SPECIFICATIONS  AND/OR  PLANS OR AS PERE.P.S.  APPROVAL.   PLANS  AND  SPECIFICATIONS   ONLY  APPLY  TO  THEPROJECT FOR WHICH THEY WERE CREATED.

JOE PREVENDAR  P.E. CA EE [email protected]

JOB:FILE:PLOT:DSGN: DRWN:

DATE:

PROFESSIONAL AND CONSULTINGELECTRICAL ENGINEERING

4049 N FRESNO ST, FRESNO , CA  93726P: (559) 221‐7230 F: (559) 221‐0507

GARY OLSEN P.E. CA EE [email protected]

DJA‐17‐108

JPP/LKB CRT

FEB 201864. WELL 16 DT2/15/2018 9:35 AM / 1:1

2"

36"

NOTES:

1) TRANSFORMER PAD SIZE & QUANTITY OF GUARD POSTS PER PG&E RULE 16.

2) ALL PG&E RULE 16 APPLY.

= FIXED

= REMOVABLE

24"

24"

(CUT THROUGH AT CONDUIT OPENINGS)

8"MIN 6'' ABOVE SLAB

24"

REMOVABLE GUARD POSTPER PG&E REQUIREMENTS.SEE DETAIL THIS SHEET.SPACE PER RULE 16

GROUND CLAMP

GROUND CLAMP

GROUND ROD(TYPICAL OF 2)

PRECAST CONCRETE PAD PERPG&E REQUIREMENTS

TRANSFORMER PERPG&E REQUIREMENTS

FIXED GUARD POSTS PERPG&E REQUIREMENTS.SEE DETAIL THIS SHEET.SPACE PER RULE 16

PRECAST PAD OPENINGS

34"x8' GROUND ROD,

COPPERCLAD WITH MIN6' BETWEEN RODS

#2 SOLID/STRANDEDAWG CU GROUND WIRE

FINISHGRADE

GR

GR

±3"3" MIN

32"MIN

48"MIN

1 12" 3"

48"MIN

3" MIN

916"

12"MIN

12"MIN

NOTES:

1) POST, 4"x60" GALVANIZED STEEL PIPE, STANDARD, SCHEDULE 40. FILLFIXED POST W/ CONCRETE TO TOP.

2) SLEEVE, 5"x36" GALVANIZED STEEL PIPE SLEEVE, STANDARD, SCHEDULE40

3) CAP, 4" GALVANIZED MALLEABLE IRON CAP. MAY BE SCREWED.

4) TAPE, VISIBILITY REFLECTIVE YELLOW ADHESIVE STRIPS (2"x12")

FINISH GRADE

FINISH GRADE

2" SAFETY EQUIPMENTLOCK. CODE 170116

(FURNISHED BY PG&E)

CUT FROM1/2"x6" EYEBOLT STEEL,GALVANIZED

CONCRETE

EYE BOLT, 1/2"x6"STEEL, GALVANIZED (TO BEINSTALLED PARALLEL TOEDGE OF PAD)

WELD (TYPICAL)

SEEDETAIL

"A"

WELDS SHALL BE PAINTED OVER WITH A ZINC PRIMER

 ‐ SEE NOTE 3

 ‐ SEE NOTE 4(FURNISHED BY PG&E ANDINSTALLED BY ELECTRICALCONTRACTOR)

 ‐ SEE NOTE 1

‐ SEE NOTE 2

CONCRETE

COMPRESSION LUG CONNECTIONBOLTED TO GROUND BUS ‐38" 2‐HOLE BOLTED CONNECTION

USING BELLEVILLE WASHERTHERMOWELDOR BURNDYCOMPRESSION

GROUND CLAMP

GROUND ROD

#4/0 BARE CU

GFI

N

BOND TO BUILDING STEEL

APPROVED GROUND CLAMP

BOND TO INCOMING STEEL COLDWATER PIPE

GROUND  BUS

UTILITY DISCONNECT LINK, READILYACCESSIBLE. MARKED:

"REMOVAL OF THIS LINK REMOVESCUSTOMER GROUNDING TONEUTRAL OF SUPPLY"

TYPICAL 3 4"x10' COPPER CLAD GROUNDROD, MIN. 12" FROM EDGE OF SLAB AND 10'FROM GROUND ROD IN SERVICE SECTION

#4/0 BARE CU UFER GROUND,MINIMUM LENGTH 25',  MINIMUM3" CONCRETE ENCASEMENT

#4/0 CU

#4/0  BARE CU

NEUTRAL BUS TO GROUND BUS BONDCONNECTION

NOTE:  SERVICE GROUND SIZE AS SHOWN OR AS PER TABLE 250‐94‐CEC(CURRENT). ALL GROUND CONDUCTORS TO BE COPPER.

GROUNDRODMAXIMUMHEIGHTABOVE SLABIS 4"

FINISHED GRADE

 SAW CUT EXISTING (6"SPACING BOTH SIDES) AND PATCH BACK WITH MIN5" ASPHALT (TYPE B) PLACE IN TWO LIFTS OF 2"

OVER 3", 38" DIA MAX AGGREGATE SIZE (BY PAVINGCONTRACTOR), APPLY ASPHALT BINDER ATEXISTING PAVEMENT EDGES IMMEDIATELY PRIORTO PLACING TRENCH RESURFACING

 EARTH BACKFILL PER SPECS.

 SAW CUT EXISTING(FLUSH) AND PATCH BACK WITH MIN 5" THICKCONCRETE SLAB (MIN 6 STACK MIX), MATCHEXISTING FINISH

36"MIN

3"

6"

6"

3"

1 12"1 12"

2"

EARTH BACKFILL PER SPECS.

UNDERGROUND CONDUITS(ELEC., COMM., EMS, ETC.)NUMBER AND SIZE OF CONDUITS AS INDICATED ONPLANS

WARNING TAPE

SAND BACKFILL OR CONCRETE SLURRY

12"MIN

MCC‐______________

PUMP _____________

____ HP

WHITE LAMICOID W/ BLACK LETTERS

3"

1 12"

(SEE LABEL ABOVE)

(MOTOR CONTROL CENTER)

(MOTOR DESCRIPTION)

(HORSEPOWER)

TACK WELD CLAMPTO STAINLESS STEEL

LABEL MOUNT

CLAMP TO MOTORFEED

12 GAUGESTAINLESS STEEL

STAINLESSSTEEL BOLTSOR SCREWS

VERIFY NUMBER OF SECTION(S)ON PLAN(S)/ELEVATION(S)

SEE NOTES 1 & 2

HILTI KWIK BOLT ANCHOR(TYPICAL) ‐ SEE NOTE 3

12" x 3 

34" SS SEISMIC HILTI

KWIK BOLT AT EACH CORNEROF ENCLOSURE AS SHOWNABOVE. DRILL CONCRETE PERMANUFACTURERSRECOMMENDATIONS.MINIMUM 3" EMBEDMENT INCONCRETE

NOTES:

1) FOR INDOORS ‐ 1 1 2" HIGH HOUSEKEEPING PAD. 4" WIDE ALONG BACK, BOTH SIDES AND FRONT.

2) FOR OUTDOORS ‐ 3 1 2" HIGH HOUSEKEEPING PAD. 4" WIDE ALONG BACK, BOTH SIDES AND ASSHOWN ON PLANS FOR FRONT.

3) 4 ANCHORS AT CORNERS OF EACH SECTION.

4) 5 1 2" MINIMUM OVERALL PAD THICKNESS.

MIN 48"CLEARANCE

SAND FILL

LENGTH TO SUITSWITCHBOARD

SWITCHBOARD

SWITCHBOARD

CONCRETE SLAB

A A

FINISH GRADE

4000 PSI CONCRETESEE SHEET 47

COOLING FANS

(2 MIN.)

VFDHEATSINKTHRUPANEL

ISOLATEDREACTOR

ENCLOSURE

VFDELECTRONICS

COLDAIR

HOTAIR

REDUNDANT CAPACITYPANEL AIR CONDITIONEROR HEAT EXCHANGER ‐2 FANS MINIMUM,MINIMUM 2' CLEARANCE

SEALED GASKETEDDUST PROOFENCLOSURE

HEATSINK3R COVER

RODENTSCREEN

Page 12: CGB 20A PLUG 20A SPEC GRADE ‐ HOT DIPPED GALVANIZED RIGID STEEL CONDUIT ...pjelectric.info/projectsbidding/Arvin CSD Arsenic Mitigation Phase... · = indicates conduit and cable

Know what's below.Call before you dig.

EPS  IS  RESPONSIBLE   FOR  ELECTRICAL   SYSTEMS DESIGN ONLY.   EPS  ISNOT  RESPONSIBLE   FOR  ELECTRICAL   SAFETY  WORK  PROCEDURESAND/OR USE OF  REQUIRED   PERSONAL  PROTECTIVE  EQUIPMENT,  SEENFPA  70E  "STANDARD   FOR  ELECTRICAL  SAFETY  IN  THE WORKPLACE''AND  OSHA  29  CFR.  CONTRACTOR  MUST  READ  SPECIFICATIONS   ANDINSTALL MATERIAL AS PER SPECIFICATIONS  AND/OR  PLANS OR AS PERE.P.S.  APPROVAL.   PLANS  AND  SPECIFICATIONS   ONLY  APPLY  TO  THEPROJECT FOR WHICH THEY WERE CREATED.

JOE PREVENDAR  P.E. CA EE [email protected]

JOB:FILE:PLOT:DSGN: DRWN:

DATE:

PROFESSIONAL AND CONSULTINGELECTRICAL ENGINEERING

4049 N FRESNO ST, FRESNO , CA  93726P: (559) 221‐7230 F: (559) 221‐0507

GARY OLSEN P.E. CA EE [email protected]

DJA‐17‐108

JPP/LKB CRT

FEB 201865. WELL 16 DT2/15/2018 9:35 AM / 1:1

SPACE HTR

BLOCK HTR

WATER HTR

BATTERYCHARGER

CONTROL

PER CIVIL

PERCIVIL

SEESINGLE

LINE100%

J

TO ATS

TO ATS

TO 120VAC PANEL

FACTORY SOUNDATTENUATED 3RENCLOSURE

VIBRATION ISOLATORS

#4/0 BARE CU UFERGROUND 2" UP FROMBOTTOM OF SLAB,MINIMUM LENGTH =25'

FINISHGRADE

DETAIL PER CIVIL

MUFFLER

GROUNDCONNECTIONCRIMPED AND

BOLTED

48'' TAIL MIN

CADWELD

SLAB PER CIVIL

34''x10'

COPPERCLADGROUND ROD

THERMO WELD OR BURNDYCOMPRESSION

COMPRESSION LUG BOLTED TO

GROUND BUS. 38" BOLTEDCONNECTION USING BELLEVILLEWASHERENGINE

START

‐ OVERCRANK

‐ LOW OIL PRESSURE

‐ HIGH ENGINE TEMPERATURE

‐ OVERSPEED

‐ LOW BATTERY

‐ LOW FUEL

SWITCHNOT AUTOUTILITY

MODEE‐GENMODE

COMMONPRE‐ALARM

COMMONFAULT

GENERATORRUNNING

UFER GND ‐ MINIMUM25' #4/0 CU WITH 3"CONCRETE ALL AROUND

PANEL

FOUNDATIONREBAR

GENERATOR FRAME

UTILITYXFMR

#4/0 CU

A C

N

B

C

N

B

A

34"x10' GND ROD

IN SERVICESECTION

#4/0 CU

#4/0 CU

ALL CONNECTIONS TOGROUND BUS ARE TO BEBY BOLTED CRIMP LUG

THERMAL WELDOR BRUNDY CRIMPCONNECTION(TYPICAL)

GROUND BUS

GROUNDBUS

36"MIN

NOTES:

1) IF FIELD SENSOR DEVICE IS FURNISHED WITH CONDUIT CONNECTIONPROVISIONS, CONNECT WITH LIQUID‐TIGHT FLEXIBLE METAL CONTUIT.

2) IF FIELD SENSOR DEVICE IS EQUIPPED ONLY WITH LIQUIDTIGHT CABLE,USE LIQUID‐TIGHT CABLE CONNECTOR. PROTECT CABLE WITH SPIRALWRAP FLEX.

FINISHEDGRADE

FIELDSENSORDEVICE

SUNSHIELD,10G ALUMINUM

TRANSMITTER

CABLE OR CONDUIT ‐ SEENOTES BELOW

3" GALVANIZED STEELCHANNEL

12"DIA x 36"  CONCRETEFOUNDATION

PVC COATED RMC

PIPE

30"

PVC

TOCONTROL

PANEL

1 HOLE PVC COATEDCONDUIT STRAP. ATTACH

WITH S.S. 1 4"x20. DRILLAND TAP 1 4"x20 HOLE

HINGED FRONT SUNSHIELD,FLIP UP, 10G ALUMINUM

FRONTHINGE

FIELDTERMINALS

ROSEMOUNT

ROSEMOUNT 3051TGPRESSURE TRANSMITTER W/ LCD DISPLAY0‐150 PSI OR EQUAL

12" LFMC

STEELCONDULET

34"RMC W/#18 TSP

306RT2 THREADEDSTYLE MANIFOLD

TWO‐VALVE

4"MIN

90° CONNECTOR

CONNECTORW/  3 4" TO12" RE

BUSHING

SEE NOTE 1

SEE NOTE 2

3/4"  FLEXTITEMAXIMUM 12" TO3/4"C

SEE NOTE 1

NOTES:

1) PMC/BETA VL4513 W/ TE‐10 DRY BOX AND MP‐11 CABLE TERMINATORSEALED REFERENCE VOLUME FILLED WITH DRY NITROGEN OR EQUAL

2) THIS IS THE 2‐WIRE TWISTED PAIR THAT SUPPLIES THE 9‐30VDVEXCITATION AND RETURNS THE 4‐20MA CURRENT PROPORTIONAL TOPRESSURE/LEVEL, 4MA ‐ THE MINIMUM AND 20MA = THE MAXIMUM

CONDUIT FOR ANTENNA

24"DIA

3" (4) #4 VERTICALREBAR

#4 HORIZONTALREBAR HOOPS

6" OVERLAP OF#4 TAILS

NOTES:

1) BASE SHALL BE 4000 PSI (28 DAY) 6 SACK CONTENT MIX CONCRETE.

2) STANDARDS TO WITHSTAND WIND LOADS OF 100MPH WITH 1.3 GUSTFACTOR PER TITLE 24 EXPOSURE (C).

3) ANCHOR BOLTS AND TEMPLATES FURNISHED BY ELECTRICALCONTRACTOR. CONCRETE BASE AND ANCHOR BOLTS INSTALLED BYGENERAL CONTRACTOR.

BRANCH CIRCUITWIRING

BASE COVER

WEATHERPROOF J‐BOX WITHH‐O‐A LOCKING KEY BYPASSSWITCH

S

48"

P‐P

FACTORY HANDHOLECOVER

60" CONDUIT

(4) #4 VERTICALREBAR

#4 HORIZONTALTIES @ 12" ON

CENTER

#4 HORIZONTALTIES @ 6" ON

CENTER

A

FINISH GRADE

A

CONDUIT

24"

GROUT

ANCHOR BOLTS

30"

24"DIA

SEE SHEET 60 FORFIXTURE SCHEDULE

MOTION SENSOR ‐ IFORDERED

PE CELL ‐ IFORDERED

P‐DL

BATTERY+

ETHERNET

Page 13: CGB 20A PLUG 20A SPEC GRADE ‐ HOT DIPPED GALVANIZED RIGID STEEL CONDUIT ...pjelectric.info/projectsbidding/Arvin CSD Arsenic Mitigation Phase... · = indicates conduit and cable

Know what's below.Call before you dig.

PROPERTYLINE

CHLORINEBUILDING

DEEP WELLPUMP & MOTOR

22' DOUBLEDRIVE GATES &

PERSONNEL GATE

HYDROPNEUMATICTANK

SITE ELECTRICAL& CONTROLS

2" TELEPHONE CONDUIT TO EXTEND5' OUTSIDE THE WELL SITE FENCE

ALONG THE FRONTAGE ANDTERMINATE IN A TELEPHONE PULL

BOX WITH A PULL ROPE

BURKETT BLVD.CENTERLINE

DIESELGENERATOR

MID‐SECTION LINEOF SECTION 2

22' DOUBLE DRIVE GATES& PERSONNEL GATE

EPS  IS  RESPONSIBLE   FOR  ELECTRICAL   SYSTEMS DESIGN ONLY.   EPS  ISNOT  RESPONSIBLE   FOR  ELECTRICAL  SAFETY  WORK  PROCEDURESAND/OR USE OF  REQUIRED   PERSONAL  PROTECTIVE  EQUIPMENT,  SEENFPA  70E  "STANDARD  FOR  ELECTRICAL   SAFETY  IN  THE WORKPLACE''AND  OSHA  29  CFR.  CONTRACTOR  MUST  READ  SPECIFICATIONS  ANDINSTALL MATERIAL AS PER SPECIFICATIONS  AND/OR  PLANS OR AS PERE.P.S.  APPROVAL.  PLANS  AND  SPECIFICATIONS  ONLY  APPLY  TO  THEPROJECT FOR WHICH THEY WERE CREATED.

JOE PREVENDAR  P.E. CA EE [email protected]

JOB:FILE:

PLOT:DSGN: DRWN:

DATE:

PROFESSIONAL AND CONSULTINGELECTRICAL ENGINEERING

4049 N FRESNO ST, FRESNO , CA  93726P: (559) 221‐7230 F: (559) 221‐0507

GARY OLSEN P.E. CA EE [email protected]

DJA‐17‐108

JPP/LKB CRT

FEB 201866. WELL 17 SP2/15/2018 9:35 AM / 1:1

ABOVE GRADE  ‐ HOT DIPPED GALVANIZED RIGID STEEL CONDUIT TO BE USED FOR ALL EXTERIOR AND INTERIORLOCATIONS ABOVE GRADE OR ELSEWHERE SHOWN ON PLANS. ALL RIGID CONDUIT AND FITTINGS TO BETHREADED. USE OF SET SCREW OR COMPRESSION TYPE CONNECTOR IS PROHIBITED. MEYERS HUBS TO BE USEDON ALL EXTERIOR PANEL CONNECTIONS.

BELOW GRADE  ‐ RIGID PVC NONMETALLIC CONDUIT SCHEDULE 40 TO BE USED FOR ALL UNDERGROUNDLOCATIONS AND BELOW VAPOR BARRIER OF SLAB. NO CONDUITS SHALL BE INSTALLED TO REDUCE THESTRUCTURAL INTEGRITY OF FOOTINGS.

CHEMICAL BUILDINGS AND CORROSIVE ATMOSPHERES  ‐ RIGID PVC NONMETALLIC CONDUIT SCHEDULE 80 TOBE USED FOR ALL INTERIOR LOCATIONS ABOVE GRADE IN CHEMICAL BUILDINGS AND CORROSIVEENVIRONMENTS.

THROUGH CONCRETE SLABS AND EXTERIOR CORROSIVE ATMOSPHERES  ‐ PVC COATED GALVANIZED RIGID STEELCONDUIT MINIMUM 40 MIL FACTORY COATING TO BE USED FOR ALL EXPOSED CONDUITS THROUGH CONCRETESLABS (MINIMUM 12'' ABOVE AND BELOW SLAB) AND ALL EXTERIOR LOCATION CORROSIVE ATMOSPHERES. USEMANUFACTURERS' SPECIFIED TOOLS AND PROCEDURES FOR INSTALLATION.

MOTORS AND SENSOR CONNECTIONS  ‐ LIQUID TIGHT FLEXIBLE METAL CONDUIT (UV RESISTANT) TO ONLY BEUSED ON CONNECTIONS TO MOTORS AND SENSORS OR TO ISOLATE VIBRATION. MAXIMUM LENGTH TO BE 30''.

JUNCTION BOXES  ‐ MINIMUM SIZE PER NEC. EXPOSED LOCATION, 1 AND 2 GANG TO BE CAST IRON DEVICE

BOXES TYPE FS/FD SUITABLE FOR WET LOCATIONS. EXPOSED LOCATION EXTERIOR LARGER SIZES CONTINUOUSHINGE TYPE 4, CORROSIVE LOCATIONS CONTINUOUS HINGE TYPE 4X STAINLESS STEEL.

GROUND CONNECTIONS  ‐ GROUND CONNECTIONS TO BE EXOTHERMIC CADWELD (ALL 600 AMP OR LARGER

SERVICE) OR BURNDY HYDRAULIC COMPRESSION CONNECTORS. GROUND BUS CONNECTIONS TO BE CRIMP LUGTYPE WITH BOLTED CONNECTION TO GROUND BUS.

480 VOLT AND BELOW POWER WIRING TO BE THWN‐2 600 VOLT, ALL POWER CONNECTIONS TO BE TREATEDWITH ANTIOXIDANT COMPOUND. ALL VFD MOTOR CABLE TO BE SHIELDED, INVERTER DUTY.

CONTACT EPS TO SCHEDULE AN ELECTRICAL PRECONSTRUCTION MEETING PRIOR TO COMMENCINGCONSTRUCTION

CGB

SO CORD

20A PLUG

20A SPEC GRADE

PVC COATED GRC

CRG

ENCLOSURE WALL

CAST 2 GANG

FINISH FLOOR

10'

10'

DOOR FRAME

SW DOORIN 5 1/4

EXHAUST FAN RATED 200% REQ. AIRFLOW FOR 2°CRISE, 1000BTU/HR W/ DISCONNECT FOR BLDGREMOVAL. CONTRACTOR TO PROVIDE ADDITIONALSUPPORT AS NECESSARY

GFI OUTLETRECEPTACLE &PLUG

TS

= (N) CONDUIT, UNDERGROUND

= (N) CONDUIT, ABOVEGROUND

AC = AIR COMPRESSOR

FIT = FLOW INDICATING TRANSMITTER

HPS = HIGH PRESSURE SWITCH

HLS = HIGH LEVEL SWITCH

LLS = LOW LEVEL SWITCH

LIT = LEVEL INDICATING TRANSMITTER

PCV = PUMP CONTROL VALVE

PIT = PRESSURE INDICATING TRANSMITTER

 LS = LEVEL SWITCH

 SV = SOLENOID VALVE

 VT = VIBRATION TRANSMITTER

 IS = INTRUSION SWITCH

 TS = THERMOSTAT SWITCH

= SINGLE POLE SWITCH, 20A

= GFI RECEPTACLE

= MOTOR. FRACTIONAL

= LIGHT FIXTURE

= LIGHT FIXTURE

= FLOOD LIGHT

= POLE LIGHT

= INDICATES CONDUIT AND CABLESCHEDULE

= INDICATES FIXTURE NUMBER

GFI = GROUND FAULT CIRCUIT

(E) = EXISTING

(F) = FUTURE

(N) = NEW

2

FIT

HPS

HLS

LLS

LIT

PIT

SV

VT

AC

PCV

IS

TS

ISSS

S

E‐W

I‐A

1) CONTRACTOR SHALL PERFORM A U.S.A. LOCATE PRIOR TO COMMENCING CONSTRUCTION.

E‐S

8

PIT

28273

2

242321

17

LIT

SV HPS

7

5

FIT

19

41615

22

18

313029

6

20

LS

LS

9

MCC (FRONT)

11

11

21

25

RADIO ANTENNA ‐ ELECTRICALCONTRACTOR TO FIELD VERIFY

HEIGHT AND DIRECTION

12P‐DL

P‐P 13

P‐DL

P‐P

13

E‐S

WITH PHOTO CELL& MOTION SENSOR

(TYP)

TANK

E‐FTYP OF 3

TYP OF 2

10

PCV

Page 14: CGB 20A PLUG 20A SPEC GRADE ‐ HOT DIPPED GALVANIZED RIGID STEEL CONDUIT ...pjelectric.info/projectsbidding/Arvin CSD Arsenic Mitigation Phase... · = indicates conduit and cable

Know what's below.Call before you dig.

EPS  IS  RESPONSIBLE   FOR  ELECTRICAL   SYSTEMS DESIGN ONLY.   EPS  ISNOT  RESPONSIBLE   FOR  ELECTRICAL   SAFETY  WORK  PROCEDURESAND/OR USE OF  REQUIRED   PERSONAL  PROTECTIVE  EQUIPMENT,  SEENFPA  70E  "STANDARD   FOR  ELECTRICAL  SAFETY  IN  THE WORKPLACE''AND  OSHA  29  CFR.  CONTRACTOR  MUST  READ  SPECIFICATIONS   ANDINSTALL MATERIAL AS PER SPECIFICATIONS  AND/OR  PLANS OR AS PERE.P.S.  APPROVAL.   PLANS  AND  SPECIFICATIONS   ONLY  APPLY  TO  THEPROJECT FOR WHICH THEY WERE CREATED.

JOE PREVENDAR  P.E. CA EE [email protected]

JOB:FILE:PLOT:DSGN: DRWN:

DATE:

PROFESSIONAL AND CONSULTINGELECTRICAL ENGINEERING

4049 N FRESNO ST, FRESNO , CA  93726P: (559) 221‐7230 F: (559) 221‐0507

GARY OLSEN P.E. CA EE [email protected]

DJA‐17‐108

JPP/LKB CRT

FEB 201867. WELL 17 SL2/15/2018 9:36 AM / 1:1

PG&EUTILITY

METERING

SPD

30/3

240KA/PHASECAT C

TRANSIENTVOLTAGE SURGESUPPRESSION

800/3

VFD

WELL500HP

VFD RATED150% FLA

FOR 1 MINUTE

30/2

10KVA XFMR480V‐240/120V1Ø

PANEL`LP'

480/277V, 800A, CU, 65KAIC

SEE SERVICEGROUNDSHEET 70

NOTES:

1) ALL DIMENSIONS NOMINAL

2) NEMA 3R, DUST TIGHT.

3) FLUORESCENT LIGHT IN EACH SECTION.

4) MAINTENANCE DUPLEX OUTLET.

5) SUN SHADE

6) AIR HEAT EXCHANGER ON VFD CABINET.

7) PAINT PER DISTRICT SPECS.

8) TVSS 240KA/PH W/30/3 CB

9) HPS = 0‐150PSI, MERCOID DAW SNAP ACTI0N OR EQUAL.

SIZE 1FVNR

AIRCOMPRESSOR

5HP

15/3HMCP

60/2REACTORS

(SEE NOTE 1)

PM

SN

N E

L

CABLELUG 500KW

GENERATOR752A @ 480V

800AATS

NOTES:

1) PROVIDE MONITOR (PM) TO BE ELECTROINDUSTRIES SHARK2000 W/ ETHERNET, SQ. D PM 5300 OR EQUAL.

6'‐6''

8''

10'

8'‐6"

3' 6"

22I‐LO

ANTENNA ON POLE ONCENTER TUBINGSUPPORT ‐ ELECTRICALCONTRACTOR TO FIELDVERIFY HEIGHT ANDDIRECTION

12

DRIP LOOP

VFD & MCC

22

22

36'' 36"

78.06"(6'‐6'')

PDP PANEL`LP'

PLC & CONTROLCABINET

VFD460V500HP

150% FLAFOR 1 MIN.50°C RATING

10''

SERVICEMAIN

VFDCB

LTGXFMRCB

PANEL `LP'24 CKT

XFMR

OID

OID

PLC &CONTROLS

AIR COMP.FVNRSZ 1

48" MIN.HEIGHT

HEAT

EXCH.

13' 13'

26'

28'

DIALER

36''

UGPS &METERING

24'' 24'' 36'' 3'‐6''

10 11

7 6 1

4 9

5

S

22

E‐S

PM

SPD

12

LOCKOUT DISCONNECT

22

S SWITCH INSIDE IN‐USE‐COVER

CLAMPS AS NEEDED

E‐F

TYP OF 3

22

22

22

32''

ATS

22E‐S

E‐F

TYP OF 3

TYP OF 2

800A

800AMAIN

100% LSIG

Page 15: CGB 20A PLUG 20A SPEC GRADE ‐ HOT DIPPED GALVANIZED RIGID STEEL CONDUIT ...pjelectric.info/projectsbidding/Arvin CSD Arsenic Mitigation Phase... · = indicates conduit and cable

Know what's below.Call before you dig.

EPS  IS  RESPONSIBLE   FOR  ELECTRICAL   SYSTEMS DESIGN ONLY.   EPS  ISNOT  RESPONSIBLE   FOR  ELECTRICAL   SAFETY  WORK  PROCEDURESAND/OR USE OF  REQUIRED   PERSONAL  PROTECTIVE  EQUIPMENT,  SEENFPA  70E  "STANDARD   FOR  ELECTRICAL  SAFETY  IN  THE WORKPLACE''AND  OSHA  29  CFR.  CONTRACTOR  MUST  READ  SPECIFICATIONS   ANDINSTALL MATERIAL AS PER SPECIFICATIONS  AND/OR  PLANS OR AS PERE.P.S.  APPROVAL.   PLANS  AND  SPECIFICATIONS   ONLY  APPLY  TO  THEPROJECT FOR WHICH THEY WERE CREATED.

JOE PREVENDAR  P.E. CA EE [email protected]

JOB:FILE:PLOT:DSGN: DRWN:

DATE:

PROFESSIONAL AND CONSULTINGELECTRICAL ENGINEERING

4049 N FRESNO ST, FRESNO , CA  93726P: (559) 221‐7230 F: (559) 221‐0507

GARY OLSEN P.E. CA EE [email protected]

DJA‐17‐108

JPP/LKB CRT

FEB 201868. WELL 17 CD2/15/2018 9:36 AM / 1:1

UL APPROVEDOL ALGORITHM

WELLMOTOR

ADJUSTIBLE SPEED DRIVE ACCONTROLLER 150% FLA FOR 1

MIN.

CHEMICALPUMP

CONTROLOFF

ON

VALVE LIMIT SWITCH NORMALLY CLOSEDHELD OPEN BY TELLTALE CAM WHEN VALVE FULLY OPEN3CR KEEPS PUMP FROM STARTING IFVALVE NOT OPEN AFTER POWER FAIL

240V, 20A RATED

ONPUMP

CHEMICALPUMP(S) ONTO CPP

120VFROM`LP'

TDOEPFT

0‐30 MIN

ONE SHOTTIMER

CONTROLPOWER

AVAILABLE

PUMP CALLDELAY

480V3Ø

+

TDOEPWT

0‐30 MIN

START ONDELAY0‐5 MIN.

SOLENOIDDEENERGIZEDVALVE OPENS TOWASTE

VFD FAULT

CONTROLPOWER ON

BST ‐ BACKSPIN TIMERONE SHOT PULSE AFTER PUMP SHUTDOWN

`PLC'`DI'

`PLC'`DO'

`PLC'`DI'

CONTROLPOWER

PRE‐LUBESOLENOID

PUMP TO WASTE TIMER

`PLC'`DI'

CLCHEM PUMP ON

VFD RUNNING

MTS ‐ MOTORTHERMOSTAT

SWITCH

HARMONICCONDITIONING

MANUAL SPEEDPOTENTIOMETER

`PLC'`AO'

4‐20mA

ETHERNET COMLINK TO PLC

VFDRUN

VFDFAULT FAULT

DOOR MOUNTDISPLAY

SPEEDREFERENCE

PUMP CALL

PRE‐LUBE STARTDELAY

HIGHPRESSURE

TRIP

PUMP TO WASTE SOLENOID VALVE

`PUMP CONTROL VALVE'(IF INSTALLED)

PUMP CALL CR

VFD RUNPUMP IN:

HAND

TELEMETRY

LOAD FILTER

CP

W

PC

ACALL

CPT

120VACN

HPT

H‐O‐A

H

TE

H

TE oox

xoo

oox

xoo

BST

2CR PF

M‐AUX

W

OS

BST

BST

PC 3CR

TB

TB

TB

TB

TBCP

R

TB

TB

TB

TB

TB

TB

TB

R

1CR

1CR PWT

ETM

SSRVRUN

VFDRUN

G

TB

TB

FREEZE

1CR 3CR

2CR

TB

TB

TB

LIMIT SWITCH

NCC

NO

3CR

3CR

PC VFD SSRVPUMP FAIL

PF

R

A

PFT

PF

RESET

R

JOG

CS

TB

TBRUN

HTR

3‐#12/G

N

G

CLCS

TB

TB

PFTB

TBPUMP FAIL

TB

TB

HPS

PUMP FAIL

HPT

HPS

RESETTDOE

HPT0‐5 MIN

R

TB

TB

TB

TB

H

A

TB

TB

TB

TB

TB

TB

TB

TB

TB TB TB

RCR

G

CONTROLTRANSFORMER

R12W1

HLS

HLS ‐ HIGH LEVEL SWITCH

LLS ‐ LOW LEVEL SWITCH

HPS ‐ HIGH PRESSURE SWITCH

HAT ‐ HIGH ALARM RELAY

LAT ‐ LOW ALARM RELAY

W1 ‐ WARRICK DIFF MODE (0‐5 MIN., TO 90 SEC. TIME DELAY)

W2 ‐ WARRICK DIRECT MODE (0‐5 MIN., TO 90 SEC. TIME DELAY)

W3 ‐ WARRICK INVERSE MODE (0‐5 MIN., TO 90 SEC. TIME DELAY)

ALL SWITCHES TO BE TIME DELAY ON

LLS

H  ‐ O  ‐ A

FILL SOLENOID

PROBE

XOO

OOX

21

FF

LP‐16

1GND

2ANALOG4‐20mASPEEDREF.

3EXTERNAL

STOP

4PULSE

AI4‐20mA

4‐20mAAO

PLCANALOGOUTPUT

PLCANALOGINPUT

120V FROM LP

N

DO

PLCDIGITALOUTPUT

CMP

CMP

CMP

FIT

120VACFROM

PANEL 'LP'

CONTROLLER

CABLE PERMANUFACTURER

4‐20mA2/C ‐#18 TWISTED PAIR SHIELDED

CMP

FIT

VFDDELAYRELAY

Page 16: CGB 20A PLUG 20A SPEC GRADE ‐ HOT DIPPED GALVANIZED RIGID STEEL CONDUIT ...pjelectric.info/projectsbidding/Arvin CSD Arsenic Mitigation Phase... · = indicates conduit and cable

Know what's below.Call before you dig.

EPS  IS  RESPONSIBLE   FOR  ELECTRICAL   SYSTEMS DESIGN ONLY.   EPS  ISNOT  RESPONSIBLE   FOR  ELECTRICAL   SAFETY  WORK  PROCEDURESAND/OR USE OF  REQUIRED   PERSONAL  PROTECTIVE  EQUIPMENT,  SEENFPA  70E  "STANDARD   FOR  ELECTRICAL  SAFETY  IN  THE WORKPLACE''AND  OSHA  29  CFR.  CONTRACTOR  MUST  READ  SPECIFICATIONS   ANDINSTALL MATERIAL AS PER SPECIFICATIONS  AND/OR  PLANS OR AS PERE.P.S.  APPROVAL.   PLANS  AND  SPECIFICATIONS   ONLY  APPLY  TO  THEPROJECT FOR WHICH THEY WERE CREATED.

JOE PREVENDAR  P.E. CA EE [email protected]

JOB:FILE:PLOT:DSGN: DRWN:

DATE:

PROFESSIONAL AND CONSULTINGELECTRICAL ENGINEERING

4049 N FRESNO ST, FRESNO , CA  93726P: (559) 221‐7230 F: (559) 221‐0507

GARY OLSEN P.E. CA EE [email protected]

DJA‐17‐108

JPP/LKB CRT

FEB 201869. WELL 17 PLC2/15/2018 9:36 AM / 1:1

TVSS DC POWERSUPPLY

24V & 15VDC

115VAC

POWERSUPPLY

A‐BCOMPACT LOGIX L32E

PLC PROCESSOR

I/O

A‐BPANELVIEW+7

1000

A. GENERAL

THE WELL PUMP HAS 2 MODES OF OPERATION: AUTO AND HAND. THESE MODES ARE SELECTED BY A SELECTOR SWITCH ON THEPUMP STARTER. THE PUMP STARTER IS A VARIABLE FREQUENCY DRIVE WHICH VARIES PUMP SPEED TO MAINTAIN A PRESSURE SETPOINT.

THE STARTUP SEQUENCE IS AS FOLLOWS:

* PRESSURE TRANSMITTER SEES LOW PRESSURE OPERATOR SETPOINT

* PRE LUBE SOLENOID ENERGIZATION (IF USED) 10 SECONDS

* WELL PUMP VFD STARTS.

* THE PUMP RAMPS UP TO PUMP TO PRESSURE SET POINT. PUMP SPEED IS MODULATED THROUGH A PI CONTROLLER TOMAINTAIN PRESSURE.

THE SHUTDOWN SEQUENCE IS AS FOLLOWS:

* PUMP WILL RUN UNTIL AN ADJUSTABLE LOW FLOW OR HIGH FLOW RATE IS RUN AT FOR AN ADJUSTABLE TIME PERIOD OR IFTHE PRESSURE SWITCH SEES HIGH PRESSURE OR IF LOW WELL LEVEL CUTOFF IS REACHED.

* AN ADJUSTABLE BACKSPIN TIMER STARTS TIMING ON PUMP SHUTDOWN PREVENTING PUMP RESTART UNTIL THE WATERCOLUMN HAS SETTLED.

B. MODES OF OPERATION

1. AUTO MODE: THE AUTO MODE IS CONTROL USING THE LOW‐PRESSURE SWITCH TO START THE PUMP AND MODULATE SPEEDTO CONTROL PRESSURE.

2. HAND MODE: THE HAND MODE IS A MAINTENANCE TEST MODE TO RUN THE PUMP LOCALLY.

C. CHLORINATION INJECTION

1. AUTO RESIDUAL MODE: AUTO INJECTS CHEMICAL WHENEVER THE WELL PUMP MOTOR IS RUNNING. THE RATE IS CONTROLLEDFROM A COMPOUND LOOP OF CHEMICAL RESIDUAL AND FLOW.

2. AUTO FLOW MODE: AUTO INJECTS CHEMICAL WHENEVER THE WELL PUMP MOTOR IS RUNNING. THE RATE IS RATIOED TOMEASURED WELL FLOW.

3. AUTO FIXED MODE: AUTO INJECTS CHEMICAL WHENEVER THE WELL PUMP MOTOR IS RUNNING. THE RATE IS MANUALLY SET.

4. JOG MODE: JOG OPERATION IS A MAINTENANCE TEST MODE THAT RUNS THE CHEMICAL PUMP WHEN THE BUTTON IS PRESSED.

1. SUPPLY AND INSTALL A INTEGRATED MCC/PLC ENCLOSURE THAT WILL BE EQUIPPED WITH A THERMOSTAT, FAN, GRILL, FILTER,BACK PANEL, SWING PANEL AND ALL COMPONENTS REQUIRED FOR A COMPLETE PLC/RADIO SYSTEM. PRE‐WIRE AND PROVIDE ACOMPLETE FUNCTIONAL CUSTOMER WITNESSED FACTORY TEST OF ALL CONTROLS.

2. SUPPLY, INSTALL AND PROGRAM AN ALLEN BRADLEY COMPACT LOGIX L32E PLC WITH I/O CARDS AND MEMORY MODULE. THEPROCESSOR WILL HAVE A MINIMUM OF TWO COMMUNICATION PORTS TO ALLOW CONNECTION OF THE RADIO ANDPANELVIEW.

3. SUPPLY, INSTALL, AND PROGRAM AN ALLEN BRADLEY PANELVIEW+ 1000 (10" COLOR SCREEN) OPERATOR INTERFACE PANEL FORLOCAL READOUT AND OPERATION.

4. SUPPLY AND INSTALL A 24VDC AND A 15 VDC POWER SUPPLY FOR THE ANALOG AND RADIO CIRCUITS.

5. SUPPLY AND INSTALL A POWERLOGIC MONITOR CAPABLE OF READING CURRENT, VOLTAGE, KW, AND PHASE LOSS.

6. SUPPLY AND INSTALL AN UNINTERRUPTIBLE POWER SUPPLY (UPS) APC MODEL BP300 FOR POWER CONDITIONING ANDTEMPORARY POWER BACKUP.

7. ALL CHANGES WILL BE DOCUMENTED AND ALL DOCUMENTS TURNED OVER TO THE DISTRICT. ALL SOURCE CODE AND PLCPROGRAMMING SOFTWARE TO BE TURNED OVER TO THE DISTRICT.

UPSSOLA‐HD

REDUNDANT

MANAGEDETHERNETSWITCH

CELLULARMODEM

Page 17: CGB 20A PLUG 20A SPEC GRADE ‐ HOT DIPPED GALVANIZED RIGID STEEL CONDUIT ...pjelectric.info/projectsbidding/Arvin CSD Arsenic Mitigation Phase... · = indicates conduit and cable

Know what's below.Call before you dig.

EPS  IS  RESPONSIBLE   FOR  ELECTRICAL   SYSTEMS DESIGN ONLY.   EPS  ISNOT  RESPONSIBLE   FOR  ELECTRICAL   SAFETY  WORK  PROCEDURESAND/OR USE OF  REQUIRED   PERSONAL  PROTECTIVE  EQUIPMENT,  SEENFPA  70E  "STANDARD   FOR  ELECTRICAL  SAFETY  IN  THE WORKPLACE''AND  OSHA  29  CFR.  CONTRACTOR  MUST  READ  SPECIFICATIONS   ANDINSTALL MATERIAL AS PER SPECIFICATIONS  AND/OR  PLANS OR AS PERE.P.S.  APPROVAL.   PLANS  AND  SPECIFICATIONS   ONLY  APPLY  TO  THEPROJECT FOR WHICH THEY WERE CREATED.

JOE PREVENDAR  P.E. CA EE [email protected]

JOB:FILE:PLOT:DSGN: DRWN:

DATE:

PROFESSIONAL AND CONSULTINGELECTRICAL ENGINEERING

4049 N FRESNO ST, FRESNO , CA  93726P: (559) 221‐7230 F: (559) 221‐0507

GARY OLSEN P.E. CA EE [email protected]

DJA‐17‐108

JPP/LKB CRT

FEB 201870. WELL 17 DT2/15/2018 9:36 AM / 1:1

2"

36"

NOTES:

1) TRANSFORMER PAD SIZE & QUANTITY OF GUARD POSTS PER PG&E RULE 16.

2) ALL PG&E RULE 16 APPLY.

= FIXED

= REMOVABLE

24"

24"

(CUT THROUGH AT CONDUIT OPENINGS)

8"MIN 6'' ABOVE SLAB

24"

REMOVABLE GUARD POSTPER PG&E REQUIREMENTS.SEE DETAIL THIS SHEET.SPACE PER RULE 16

GROUND CLAMP

GROUND CLAMP

GROUND ROD(TYPICAL OF 2)

PRECAST CONCRETE PAD PERPG&E REQUIREMENTS

TRANSFORMER PERPG&E REQUIREMENTS

FIXED GUARD POSTS PERPG&E REQUIREMENTS.SEE DETAIL THIS SHEET.SPACE PER RULE 16

PRECAST PAD OPENINGS

34"x8' GROUND ROD,

COPPERCLAD WITH MIN6' BETWEEN RODS

#2 SOLID/STRANDEDAWG CU GROUND WIRE

FINISHGRADE

GR

GR

±3"3" MIN

32"MIN

48"MIN

1 12" 3"

48"MIN

3" MIN

916"

12"MIN

12"MIN

NOTES:

1) POST, 4"x60" GALVANIZED STEEL PIPE, STANDARD, SCHEDULE 40. FILLFIXED POST W/ CONCRETE TO TOP.

2) SLEEVE, 5"x36" GALVANIZED STEEL PIPE SLEEVE, STANDARD, SCHEDULE40

3) CAP, 4" GALVANIZED MALLEABLE IRON CAP. MAY BE SCREWED.

4) TAPE, VISIBILITY REFLECTIVE YELLOW ADHESIVE STRIPS (2"x12")

FINISH GRADE

FINISH GRADE

2" SAFETY EQUIPMENTLOCK. CODE 170116

(FURNISHED BY PG&E)

CUT FROM1/2"x6" EYEBOLT STEEL,GALVANIZED

CONCRETE

EYE BOLT, 1/2"x6"STEEL, GALVANIZED (TO BEINSTALLED PARALLEL TOEDGE OF PAD)

WELD (TYPICAL)

SEEDETAIL

"A"

WELDS SHALL BE PAINTED OVER WITH A ZINC PRIMER

 ‐ SEE NOTE 3

 ‐ SEE NOTE 4(FURNISHED BY PG&E ANDINSTALLED BY ELECTRICALCONTRACTOR)

 ‐ SEE NOTE 1

‐ SEE NOTE 2

CONCRETE

COMPRESSION LUG CONNECTIONBOLTED TO GROUND BUS ‐38" 2‐HOLE BOLTED CONNECTION

USING BELLEVILLE WASHERTHERMOWELDOR BURNDYCOMPRESSION

GROUND CLAMP

GROUND ROD

#4/0 BARE CU

GFI

N

BOND TO BUILDING STEEL

APPROVED GROUND CLAMP

BOND TO INCOMING STEEL COLDWATER PIPE

GROUND  BUS

UTILITY DISCONNECT LINK, READILYACCESSIBLE. MARKED:

"REMOVAL OF THIS LINK REMOVESCUSTOMER GROUNDING TONEUTRAL OF SUPPLY"

TYPICAL 3 4"x10' COPPER CLAD GROUNDROD, MIN. 12" FROM EDGE OF SLAB AND 10'FROM GROUND ROD IN SERVICE SECTION

#4/0 BARE CU UFER GROUND,MINIMUM LENGTH 25',  MINIMUM3" CONCRETE ENCASEMENT

#4/0 CU

#4/0  BARE CU

NEUTRAL BUS TO GROUND BUS BONDCONNECTION

NOTE:  SERVICE GROUND SIZE AS SHOWN OR AS PER TABLE 250‐94‐CEC(CURRENT). ALL GROUND CONDUCTORS TO BE COPPER.

GROUNDRODMAXIMUMHEIGHTABOVE SLABIS 4"

FINISHED GRADE

 SAW CUT EXISTING (6"SPACING BOTH SIDES) AND PATCH BACK WITH MIN5" ASPHALT (TYPE B) PLACE IN TWO LIFTS OF 2"

OVER 3", 38" DIA MAX AGGREGATE SIZE (BY PAVINGCONTRACTOR), APPLY ASPHALT BINDER ATEXISTING PAVEMENT EDGES IMMEDIATELY PRIORTO PLACING TRENCH RESURFACING

 EARTH BACKFILL PER SPECS.

 SAW CUT EXISTING(FLUSH) AND PATCH BACK WITH MIN 5" THICKCONCRETE SLAB (MIN 6 STACK MIX), MATCHEXISTING FINISH

36"MIN

3"

6"

6"

3"

1 12"1 12"

2"

EARTH BACKFILL PER SPECS.

UNDERGROUND CONDUITS(ELEC., COMM., EMS, ETC.)NUMBER AND SIZE OF CONDUITS AS INDICATED ONPLANS

WARNING TAPE

SAND BACKFILL OR CONCRETE SLURRY

12"MIN

MCC‐______________

PUMP _____________

____ HP

WHITE LAMICOID W/ BLACK LETTERS

3"

1 12"

(SEE LABEL ABOVE)

(MOTOR CONTROL CENTER)

(MOTOR DESCRIPTION)

(HORSEPOWER)

TACK WELD CLAMPTO STAINLESS STEEL

LABEL MOUNT

CLAMP TO MOTORFEED

12 GAUGESTAINLESS STEEL

STAINLESSSTEEL BOLTSOR SCREWS

VERIFY NUMBER OF SECTION(S)ON PLAN(S)/ELEVATION(S)

SEE NOTES 1 & 2

HILTI KWIK BOLT ANCHOR(TYPICAL) ‐ SEE NOTE 3

12" x 3 

34" SS SEISMIC HILTI

KWIK BOLT AT EACH CORNEROF ENCLOSURE AS SHOWNABOVE. DRILL CONCRETE PERMANUFACTURERSRECOMMENDATIONS.MINIMUM 3" EMBEDMENT INCONCRETE

NOTES:

1) FOR INDOORS ‐ 1 1 2" HIGH HOUSEKEEPING PAD. 4" WIDE ALONG BACK, BOTH SIDES AND FRONT.

2) FOR OUTDOORS ‐ 3 1 2" HIGH HOUSEKEEPING PAD. 4" WIDE ALONG BACK, BOTH SIDES AND ASSHOWN ON PLANS FOR FRONT.

3) 4 ANCHORS AT CORNERS OF EACH SECTION.

4) 5 1 2" MINIMUM OVERALL PAD THICKNESS.

4"

MIN 48"CLEARANCE

SAND FILL

LENGTH TO SUITSWITCHBOARD

SWITCHBOARD

SWITCHBOARD

CONCRETE SLAB

A A

FINISH GRADE

4000 PSI CONCRETESEE SHEET 47

COOLING FANS

(2 MIN.)

VFDHEATSINKTHRUPANEL

ISOLATEDREACTOR

ENCLOSURE

VFDELECTRONICS

COLDAIR

HOTAIR

REDUNDANT CAPACITYPANEL AIR CONDITIONEROR HEAT EXCHANGER ‐2 FANS MINIMUM,MINIMUM 2' CLEARANCE

SEALED GASKETEDDUST PROOFENCLOSURE

HEATSINK3R COVER

RODENTSCREEN

Page 18: CGB 20A PLUG 20A SPEC GRADE ‐ HOT DIPPED GALVANIZED RIGID STEEL CONDUIT ...pjelectric.info/projectsbidding/Arvin CSD Arsenic Mitigation Phase... · = indicates conduit and cable

Know what's below.Call before you dig.

EPS  IS  RESPONSIBLE   FOR  ELECTRICAL   SYSTEMS DESIGN ONLY.   EPS  ISNOT  RESPONSIBLE   FOR  ELECTRICAL   SAFETY  WORK  PROCEDURESAND/OR USE OF  REQUIRED   PERSONAL  PROTECTIVE  EQUIPMENT,  SEENFPA  70E  "STANDARD   FOR  ELECTRICAL  SAFETY  IN  THE WORKPLACE''AND  OSHA  29  CFR.  CONTRACTOR  MUST  READ  SPECIFICATIONS   ANDINSTALL MATERIAL AS PER SPECIFICATIONS  AND/OR  PLANS OR AS PERE.P.S.  APPROVAL.   PLANS  AND  SPECIFICATIONS   ONLY  APPLY  TO  THEPROJECT FOR WHICH THEY WERE CREATED.

JOE PREVENDAR  P.E. CA EE [email protected]

JOB:FILE:PLOT:DSGN: DRWN:

DATE:

PROFESSIONAL AND CONSULTINGELECTRICAL ENGINEERING

4049 N FRESNO ST, FRESNO , CA  93726P: (559) 221‐7230 F: (559) 221‐0507

GARY OLSEN P.E. CA EE [email protected]

DJA‐17‐108

JPP/LKB CRT

FEB 201871. WELL 17 DT2/15/2018 9:37 AM / 1:1

SPACE HTR

BLOCK HTR

WATER HTR

BATTERYCHARGER

CONTROL

PER CIVIL

PERCIVIL

SEESINGLE

LINE100%

J

TO ATS

TO ATS

TO 120VAC PANEL

FACTORY SOUNDATTENUATED 3RENCLOSURE

VIBRATION ISOLATORS

#4/0 BARE CU UFERGROUND 2" UP FROMBOTTOM OF SLAB,MINIMUM LENGTH =25'

FINISHGRADE

DETAIL PER CIVIL

MUFFLER

GROUNDCONNECTIONCRIMPED AND

BOLTED

48'' TAIL MIN

CADWELD

SLAB PER CIVIL

34''x10'

COPPERCLADGROUND ROD

THERMO WELD OR BURNDYCOMPRESSION

COMPRESSION LUG BOLTED TO

GROUND BUS. 38" BOLTEDCONNECTION USING BELLEVILLEWASHER

ENGINESTART

‐ OVERCRANK

‐ LOW OIL PRESSURE

‐ HIGH ENGINE TEMPERATURE

‐ OVERSPEED

‐ LOW BATTERY

‐ LOW FUEL

SWITCHNOT AUTOUTILITY

MODEE‐GENMODE

COMMONPRE‐ALARM

COMMONFAULT

GENERATORRUNNING

UFER GND ‐ MINIMUM25' #4/0 CU WITH 3"CONCRETE ALL AROUND

PANEL

FOUNDATIONREBAR

GENERATOR FRAME

UTILITYXFMR

#4/0 CU

A C

N

B

C

N

B

A

34"x10' GND ROD

IN SERVICESECTION

#4/0 CU

#4/0 CU

ALL CONNECTIONS TOGROUND BUS ARE TO BEBY BOLTED CRIMP LUG

THERMAL WELDOR BRUNDY CRIMPCONNECTION(TYPICAL)

GROUND BUS

GROUNDBUS

36"MIN

NOTES:

1) IF FIELD SENSOR DEVICE IS FURNISHED WITH CONDUIT CONNECTIONPROVISIONS, CONNECT WITH LIQUID‐TIGHT FLEXIBLE METAL CONTUIT.

2) IF FIELD SENSOR DEVICE IS EQUIPPED ONLY WITH LIQUIDTIGHT CABLE,USE LIQUID‐TIGHT CABLE CONNECTOR. PROTECT CABLE WITH SPIRALWRAP FLEX.

FINISHEDGRADE

FIELDSENSORDEVICE

SUNSHIELD,10G ALUMINUM

TRANSMITTER

CABLE OR CONDUIT ‐ SEENOTES BELOW

3" GALVANIZED STEELCHANNEL

12"DIA x 36"  CONCRETEFOUNDATION

PVC COATED RMC

PIPE

30"

PVC

TOCONTROL

PANEL

1 HOLE PVC COATEDCONDUIT STRAP. ATTACH

WITH S.S. 1 4"x20. DRILLAND TAP 1 4"x20 HOLE

HINGED FRONT SUNSHIELD,FLIP UP, 10G ALUMINUM

FRONTHINGE

FIELDTERMINALS

ROSEMOUNT

ROSEMOUNT 3051TGPRESSURE TRANSMITTER W/ LCD DISPLAY0‐150 PSI OR EQUAL

12" LFMC

STEELCONDULET

34"RMC W/#18 TSP

306RT2 THREADEDSTYLE MANIFOLD

TWO‐VALVE

4"MIN

90° CONNECTOR

CONNECTORW/  3 4" TO12" RE

BUSHING

SEE NOTE 1

SEE NOTE 2

3/4"  FLEXTITEMAXIMUM 12" TO3/4"C

SEE NOTE 1

NOTES:

1) PMC/BETA VL4513 W/ TE‐10 DRY BOX AND MP‐11 CABLE TERMINATORSEALED REFERENCE VOLUME FILLED WITH DRY NITROGEN OR EQUAL

2) THIS IS THE 2‐WIRE TWISTED PAIR THAT SUPPLIES THE 9‐30VDVEXCITATION AND RETURNS THE 4‐20MA CURRENT PROPORTIONAL TOPRESSURE/LEVEL, 4MA ‐ THE MINIMUM AND 20MA = THE MAXIMUM

CONDUIT FOR ANTENNA

24"DIA

3" (4) #4 VERTICALREBAR

#4 HORIZONTALREBAR HOOPS

6" OVERLAP OF#4 TAILS

NOTES:

1) BASE SHALL BE 4000 PSI (28 DAY) 6 SACK CONTENT MIX CONCRETE.

2) STANDARDS TO WITHSTAND WIND LOADS OF 100MPH WITH 1.3 GUSTFACTOR PER TITLE 24 EXPOSURE (C).

3) ANCHOR BOLTS AND TEMPLATES FURNISHED BY ELECTRICALCONTRACTOR. CONCRETE BASE AND ANCHOR BOLTS INSTALLED BYGENERAL CONTRACTOR.

BRANCH CIRCUITWIRING

BASE COVER

WEATHERPROOF J‐BOX WITHH‐O‐A LOCKING KEY BYPASSSWITCH

S

48"

P‐P

FACTORY HANDHOLECOVER

60" CONDUIT

(4) #4 VERTICALREBAR

#4 HORIZONTALTIES @ 12" ON

CENTER

#4 HORIZONTALTIES @ 6" ON

CENTER

A

FINISH GRADE

A

CONDUIT

24"

GROUT

ANCHOR BOLTS

30"

24"DIA

SEE SHEET 66 FORFIXTURE SCHEDULE

MOTION SENSOR ‐ IFORDERED

PE CELL ‐ IFORDERED

P‐DL

BATTERY+

ETHERNET

Page 19: CGB 20A PLUG 20A SPEC GRADE ‐ HOT DIPPED GALVANIZED RIGID STEEL CONDUIT ...pjelectric.info/projectsbidding/Arvin CSD Arsenic Mitigation Phase... · = indicates conduit and cable

Know what's below.Call before you dig.

EX. HYDROPNEUMATIC TANK

BOOSTERPUMP #1

80'Ø X 28' TALLWELDED STEELSTORAGE TANK

(E) SITEFENCING

LIGHT STANDARDWITH PHOTOCELL &MOTION SENSOR(TYP OF 3)

PROPERTY LINE

(E) XMER

SITE ELECTRICAL& CONTROLS

(E) CITYWELL 11

EPS  IS  RESPONSIBLE   FOR  ELECTRICAL   SYSTEMS DESIGN ONLY.   EPS  ISNOT  RESPONSIBLE   FOR  ELECTRICAL   SAFETY  WORK  PROCEDURESAND/OR USE OF  REQUIRED   PERSONAL  PROTECTIVE  EQUIPMENT,  SEENFPA  70E  "STANDARD  FOR  ELECTRICAL   SAFETY  IN  THE WORKPLACE''AND  OSHA  29  CFR.  CONTRACTOR  MUST  READ  SPECIFICATIONS   ANDINSTALL MATERIAL AS PER SPECIFICATIONS  AND/OR  PLANS OR AS PERE.P.S.  APPROVAL.   PLANS  AND  SPECIFICATIONS   ONLY  APPLY  TO  THEPROJECT FOR WHICH THEY WERE CREATED.

JOE PREVENDAR  P.E. CA EE [email protected]

JOB:FILE:

PLOT:DSGN: DRWN:

DATE:

PROFESSIONAL AND CONSULTINGELECTRICAL ENGINEERING

4049 N FRESNO ST, FRESNO , CA  93726P: (559) 221‐7230 F: (559) 221‐0507

GARY OLSEN P.E. CA EE [email protected]

DJA‐17‐108

LKB CRT

FEB 201872. TANK ELEC SP2/15/2018 9:37 AM / 1:1

BOOSTERPUMP #3

(F) BOOSTERPUMP #4

BOOSTERPUMP #2

(F) BOOSTERPUMP #5

ABOVE GRADE  ‐ HOT DIPPED GALVANIZED RIGID STEEL CONDUIT TO BE USED FOR ALL EXTERIOR AND INTERIORLOCATIONS ABOVE GRADE OR ELSEWHERE SHOWN ON PLANS. ALL RIGID CONDUIT AND FITTINGS TO BETHREADED. USE OF SET SCREW OR COMPRESSION TYPE CONNECTOR IS PROHIBITED. MEYERS HUBS TO BE USEDON ALL EXTERIOR PANEL CONNECTIONS.

BELOW GRADE  ‐ RIGID PVC NONMETALLIC CONDUIT SCHEDULE 40 TO BE USED FOR ALL UNDERGROUNDLOCATIONS AND BELOW VAPOR BARRIER OF SLAB. NO CONDUITS SHALL BE INSTALLED TO REDUCE THESTRUCTURAL INTEGRITY OF FOOTINGS.

CHEMICAL BUILDINGS AND CORROSIVE ATMOSPHERES  ‐ RIGID PVC NONMETALLIC CONDUIT SCHEDULE 80 TOBE USED FOR ALL INTERIOR LOCATIONS ABOVE GRADE IN CHEMICAL BUILDINGS AND CORROSIVEENVIRONMENTS.

THROUGH CONCRETE SLABS AND EXTERIOR CORROSIVE ATMOSPHERES  ‐ PVC COATED GALVANIZED RIGIDSTEEL CONDUIT MINIMUM 40 MIL FACTORY COATING TO BE USED FOR ALL EXPOSED CONDUITS THROUGHCONCRETE SLABS (MINIMUM 12'' ABOVE AND BELOW SLAB) AND ALL EXTERIOR LOCATION CORROSIVEATMOSPHERES. USE MANUFACTURERS' SPECIFIED TOOLS AND PROCEDURES FOR INSTALLATION.

MOTORS AND SENSOR CONNECTIONS  ‐ LIQUID TIGHT FLEXIBLE METAL CONDUIT (UV RESISTANT) TO ONLY BEUSED ON CONNECTIONS TO MOTORS AND SENSORS OR TO ISOLATE VIBRATION. MAXIMUM LENGTH TO BE 30''.

JUNCTION BOXES  ‐ MINIMUM SIZE PER NEC. EXPOSED LOCATION, 1 AND 2 GANG TO BE CAST IRON DEVICE

BOXES TYPE FS/FD SUITABLE FOR WET LOCATIONS. EXPOSED LOCATION EXTERIOR LARGER SIZES CONTINUOUSHINGE TYPE 4, CORROSIVE LOCATIONS CONTINUOUS HINGE TYPE 4X STAINLESS STEEL.

GROUND CONNECTIONS  ‐ GROUND CONNECTIONS TO BE EXOTHERMIC CADWELD (ALL 600 AMP OR LARGER

SERVICE) OR BURNDY HYDRAULIC COMPRESSION CONNECTORS. GROUND BUS CONNECTIONS TO BE CRIMPLUG TYPE WITH BOLTED CONNECTION TO GROUND BUS.

480 VOLT AND BELOW POWER WIRING TO BE THWN‐2 600 VOLT, ALL POWER CONNECTIONS TO BE TREATEDWITH ANTIOXIDANT COMPOUND. ALL VFD MOTOR CABLE TO BE SHIELDED, INVERTER DUTY.

CONTACT EPS TO SCHEDULE AN ELECTRICAL PRECONSTRUCTION MEETING PRIOR TO COMMENCINGCONSTRUCTION

= (N) CONDUIT, UNDERGROUND

= (N) CONDUIT, ABOVE GROUND

AC = AIR COMPRESSOR

CMP = CHEMICAL METERING PUMP

FCV = FISHER FLOW CONTROL VALVE

FIT = FLOW INDICATING TRANSMITTER

HPS = HIGH PRESSURE SWITCH

HLS = HIGH LEVEL SWITCH

LLS = LOW LEVEL SWITCH

LIT = LEVEL INDICATING TRANSMITTER

PCV = PUMP CONTROL VALVE

PIT = PRESSURE INDICATING TRANSMITTER

 LS = LEVEL SWITCH

= SOLENOID VALVE

= VIBRATION TRANSMITTER

= GFI RECEPTACLE

= FLOOD LIGHT

= POLE LIGHT

= INDICATES CONDUIT AND CABLE SCHEDULE

= INDICATES FIXTURE NUMBER

GFI = GROUND FAULT CIRCUIT

(E) = EXISTING

(F) = FUTURE

(N) = NEW

2

FIT

HPS

HLS

LLS

LIT

PIT

SV

VT

PCV

AC

MCC (FRONT)

3329

22

P‐DLP‐P

P‐DL

P‐P P‐DL

P‐P

E‐S

HPS

32

PIT

LS

28

98

30 31

HPS

36

34 35

HPS

40

38 39

HPS

53

50 51

(F)

(F)

(F)(F)

HPS

57

54

(F)

(F)

(E) MCC(FRONT)

(E)CHLORINESYSTEM &BUILDING

LS

13

13

13

5237

(F)56 (F)

55

RADIO ANTENNA ‐ELECTRICAL CONTRACTORTO FIELD VERIFY HEIGHTAND DIRECTION

12

1516SV

27

HLS LLS

76

LIT

5

XFMR

FCV

FCV

1718

FCV

1920

FCV

2324

DIESELGENERATOR

2

727170

73

(E) PLCPANEL

E‐F

TYP OF 3

I‐A

42 43

44 45

46 47

58 59

60 61

TYP OF 3

FIT200

6667

FIT100

FIT15

6869

FIT10

6263

FIT11

6465

CMP

21

ADD 2NDCHEMICALPUMP

CMP

Page 20: CGB 20A PLUG 20A SPEC GRADE ‐ HOT DIPPED GALVANIZED RIGID STEEL CONDUIT ...pjelectric.info/projectsbidding/Arvin CSD Arsenic Mitigation Phase... · = indicates conduit and cable

Know what's below.Call before you dig.

EPS  IS  RESPONSIBLE   FOR  ELECTRICAL   SYSTEMS DESIGN ONLY.   EPS  ISNOT  RESPONSIBLE   FOR  ELECTRICAL   SAFETY  WORK  PROCEDURESAND/OR USE OF  REQUIRED   PERSONAL  PROTECTIVE  EQUIPMENT,  SEENFPA  70E  "STANDARD   FOR  ELECTRICAL  SAFETY  IN  THE WORKPLACE''AND  OSHA  29  CFR.  CONTRACTOR  MUST  READ  SPECIFICATIONS   ANDINSTALL MATERIAL AS PER SPECIFICATIONS  AND/OR  PLANS OR AS PERE.P.S.  APPROVAL.   PLANS  AND  SPECIFICATIONS   ONLY  APPLY  TO  THEPROJECT FOR WHICH THEY WERE CREATED.

JOE PREVENDAR  P.E. CA EE [email protected]

JOB:FILE:PLOT:DSGN: DRWN:

DATE:

PROFESSIONAL AND CONSULTINGELECTRICAL ENGINEERING

4049 N FRESNO ST, FRESNO , CA  93726P: (559) 221‐7230 F: (559) 221‐0507

GARY OLSEN P.E. CA EE [email protected]

DJA‐17‐108

JPP/LKB CRT

FEB 201873. TANK ELEC SL2/15/2018 9:37 AM / 1:1

PG&EUTILITY

METERING

SPD

30/3

240KA/PHASECAT C

TRANSIENTVOLTAGE SURGESUPPRESSION

30/2

10KVA XFMR480V‐240/120V1Ø

PANEL`LP'

480/277V, 800A, CU, 65KAIC

SEE SERVICEGROUNDSHEET 76

NOTES:

1) ALL DIMENSIONS NOMINAL

2) NEMA 3R, DUST TIGHT.

3) FLUORESCENT LIGHT IN EACH SECTION.

4) MAINTENANCE DUPLEX OUTLET.

5) SUN SHADE

6) AIR HEAT EXCHANGER ON VFD CABINET.

7) PAINT PER DISTRICT SPECS.

8) TVSS 240KA/PH W/30/3 CB

9) HPS = 0‐150PSI, MERCOID DAW SNAP ACTI0N OR EQUAL.

36'' 30"

78.06"(6'‐6'')

6'‐6''

8''

PDP PANEL`LP'

PLC & CONTROLCABINET

BOOSTERPUMP #1

VFD460V75HP

150% FLAFOR 1 MIN.50°C RATING

SERVICEMAIN

VFDCB

LTGXFMRCB

PANEL `LP'24 CKT

XFMR

LOCKOUT DISCONNECT(TYP ON ALL VFDS)

OID

PLC &CONTROLS

SIZE 1FVNR

AIRCOMPRESSOR

5HP

AIR COMP.FVNRSZ 1

48" MIN.HEIGHT

15/3HMCP

60/2

15'‐6" 15'‐6"

31'

33'

10'

8'‐6"

DIALER

3'

36''

UGPS &METERING

24'' 24'' 36'' 10''

 (SEE NOTE 1)

PM

6"

S

SN

N E

L

CABLELUG 700KW

GENERATOR1052A @ 480V

1000AATS

22

22E‐S

NOTES:

1) PROVIDE MONITOR (PM) TO BE ELECTROINDUSTRIES SHARK2000 W/ ETHERNET, SQ. D PM 5300 OR EQUAL.

PM

SPD

150/3

BOOSTERPUMP #175HP

VFD RATED150% FLA

FOR 1 MINUTE

VFD

O/P FILTER

REACTORS

150/3

BOOSTERPUMP #275HP

VFD RATED150% FLA

FOR 1 MINUTE

VFD

O/P FILTER

REACTORS

300/3

BOOSTERPUMP #3150HP

VFD RATED150% FLA

FOR 1 MINUTE

VFD

O/P FILTER

REACTORS

30"

BOOSTERPUMP #2

VFD460V75HP

150% FLAFOR 1 MIN.50°C RATING

30"

BOOSTERPUMP #3

VFD460V150HP

150% FLAFOR 1 MIN.50°C RATING

OID10 11

7 6 1

4 9

5

30"

(F) BOOSTERPUMP #4

VFD460V150HP

150% FLAFOR 1 MIN.50°C RATING

30"

(F) BOOSTERPUMP #5

VFD460V150HP

150% FLAFOR 1 MIN.50°C RATING

(F)300/3

(F) BOOSTERPUMP #4150HP

VFD RATED150% FLA

FOR 1 MINUTE

VFD

O/P FILTER

REACTORS

(F)

(F)300/3

(F) BOOSTERPUMP #5150HP

VFD RATED150% FLA

FOR 1 MINUTE

VFD

O/P FILTER

REACTORS

(F)

ANTENNA ON POLE ONCENTER TUBINGSUPPORT ‐ ELECTRICALCONTRACTOR TO FIELDVERIFY HEIGHT ANDDIRECTION

12

DRIP LOOP

12

VFD & MCC

S SWITCH INSIDEIN‐USE‐COVER

22

22

CLAMPS, TYP OF ____

E‐F

TYP OF 322

22

22

22

1000AMAIN

100% LSIG

32''

ATS

1000A

E‐S

TYP OF 3

E‐F

TYP OF 3

OID10 11

7 6 1

4 9

5

OID10 11

7 6 1

4 9

5

E‐SE‐S

22 22

12

Page 21: CGB 20A PLUG 20A SPEC GRADE ‐ HOT DIPPED GALVANIZED RIGID STEEL CONDUIT ...pjelectric.info/projectsbidding/Arvin CSD Arsenic Mitigation Phase... · = indicates conduit and cable

Know what's below.Call before you dig.

EPS  IS  RESPONSIBLE   FOR  ELECTRICAL   SYSTEMS DESIGN ONLY.   EPS  ISNOT  RESPONSIBLE   FOR  ELECTRICAL   SAFETY  WORK  PROCEDURESAND/OR USE OF  REQUIRED   PERSONAL  PROTECTIVE  EQUIPMENT,  SEENFPA  70E  "STANDARD   FOR  ELECTRICAL  SAFETY  IN  THE WORKPLACE''AND  OSHA  29  CFR.  CONTRACTOR  MUST  READ  SPECIFICATIONS   ANDINSTALL MATERIAL AS PER SPECIFICATIONS  AND/OR  PLANS OR AS PERE.P.S.  APPROVAL.   PLANS  AND  SPECIFICATIONS   ONLY  APPLY  TO  THEPROJECT FOR WHICH THEY WERE CREATED.

JOE PREVENDAR  P.E. CA EE [email protected]

JOB:FILE:PLOT:DSGN: DRWN:

DATE:

PROFESSIONAL AND CONSULTINGELECTRICAL ENGINEERING

4049 N FRESNO ST, FRESNO , CA  93726P: (559) 221‐7230 F: (559) 221‐0507

GARY OLSEN P.E. CA EE [email protected]

DJA‐17‐108

JPP/LKB CRT

FEB 201874. TANK ELEC CD2/15/2018 9:37 AM / 1:1

CONTROLTRANSFORMER

R12W1

HLS

HLS ‐ HIGH LEVEL SWITCH

LLS ‐ LOW LEVEL SWITCH

HPS ‐ HIGH PRESSURE SWITCH

HAT ‐ HIGH ALARM RELAY

LAT ‐ LOW ALARM RELAY

W1 ‐ WARRICK DIFF MODE (0‐5 MIN., TO 90 SEC. TIME DELAY)

W2 ‐ WARRICK DIRECT MODE (0‐5 MIN., TO 90 SEC. TIME DELAY)

W3 ‐ WARRICK INVERSE MODE (0‐5 MIN., TO 90 SEC. TIME DELAY)

ALL SWITCHES TO BE TIME DELAY ON

LLS

H  ‐ O  ‐ A

FILL SOLENOID

PROBE

XOO

OOX

21

FF

LP‐16

MFU

TO BUS

480V3Ø60HZ

L1

L2

L3

L1R

L2S

L3T

1FU 2FU

115VACFU

XFMR

LINE REACTOR

T1U

T2V

T3W

PE

PE

(‐)

ANIN1

(+)

(‐)

ANIN2

(+)

GND

GND

      (HORIZ. GND BUS)

PE

0‐10V

4‐20mA

MOTOR

RESET

"J"

HIGHPRESSURE

0‐3 MIN

HIGHPRESSURE

PLCANALOGOUTPUT

PLCDI

PLCDI

ETHERNETCOM TO PLC

FAIL TO PUMP

0‐5 MIN

H ‐ O ‐ A

PUMPCALL DELAY

H

A

A

A

PLCDO

REFERENCESELECT

PLCINPUT

ENABLECHEMICALPUMPS HIM LCD DISPLAY

ANALOGPOTENTIOMETER

MANUALPOTENTIOMETER &KEYPAD TO BEACCESSIBLE W/OOPENING DOOR

120VACLP

CHEMICALPUMPS

N

CB

T.C.

AUTOSPEED

REFERENCE

T.C.

RS

TB

PF

HP

FUSE

FUSE

FUSE

FUSE

TB

TB

TB

DRIVEFAULT

RR

DRIVERUNNING

ETM

RR

RR

RR

RSTR1 RR

RR

CP

FAN1

FAN2

PUMP CALLDELAYTR1

PF

HIGHPRESSURE

TP

RESET

THERMOSTAT

START

JOG

PRESSURESWITCH

OS ‐ OPEN ONPUMP SHUTDOWN

LOAD REACTOR

NOTES:

1) MANUFACTURER TO BE A‐B, C‐H, SQ. D, OR APPROVED EQUAL.

2) HEAVY DUTY RATED 150% FULL RATED CURRENT FOR 60 SECONDS

3) DRIVE RATED FOR 50°C AMBIENT MINIMUM, HEAT SINK MOUNTEDTHROUGH ENCLOSURE.

4) REDUNDANT COOLING FANS.

5) 5% LINE REACTORS

6) 3% LOAD REACTORS

ONE SHOT ON PUMP STOP

0‐5 MIN

A

CP

R

TR1

PF

OS

RRR

G

HP

RS

Page 22: CGB 20A PLUG 20A SPEC GRADE ‐ HOT DIPPED GALVANIZED RIGID STEEL CONDUIT ...pjelectric.info/projectsbidding/Arvin CSD Arsenic Mitigation Phase... · = indicates conduit and cable

Know what's below.Call before you dig.

EPS  IS  RESPONSIBLE   FOR  ELECTRICAL   SYSTEMS DESIGN ONLY.   EPS  ISNOT  RESPONSIBLE   FOR  ELECTRICAL   SAFETY  WORK  PROCEDURESAND/OR USE OF  REQUIRED   PERSONAL  PROTECTIVE  EQUIPMENT,  SEENFPA  70E  "STANDARD   FOR  ELECTRICAL  SAFETY  IN  THE WORKPLACE''AND  OSHA  29  CFR.  CONTRACTOR  MUST  READ  SPECIFICATIONS   ANDINSTALL MATERIAL AS PER SPECIFICATIONS  AND/OR  PLANS OR AS PERE.P.S.  APPROVAL.   PLANS  AND  SPECIFICATIONS   ONLY  APPLY  TO  THEPROJECT FOR WHICH THEY WERE CREATED.

JOE PREVENDAR  P.E. CA EE [email protected]

JOB:FILE:PLOT:DSGN: DRWN:

DATE:

PROFESSIONAL AND CONSULTINGELECTRICAL ENGINEERING

4049 N FRESNO ST, FRESNO , CA  93726P: (559) 221‐7230 F: (559) 221‐0507

GARY OLSEN P.E. CA EE [email protected]

DJA‐17‐108

JPP/LKB CRT

FEB 201875. TANK ELEC PLC2/15/2018 9:38 AM / 1:1

TVSS DC POWERSUPPLY

24V & 15VDC

115VAC

POWERSUPPLY

A‐BCOMPACT LOGIX L32E

PLC PROCESSOR

I/O

A‐BPANELVIEW+7

1000

1. SUPPLY AND INSTALL A INTEGRATED MCC/PLC ENCLOSURE THAT WILL BE EQUIPPED WITH A THERMOSTAT, FAN, GRILL, FILTER,BACK PANEL, SWING PANEL AND ALL COMPONENTS REQUIRED FOR A COMPLETE PLC/RADIO SYSTEM. PRE‐WIRE AND PROVIDE ACOMPLETE FUNCTIONAL CUSTOMER WITNESSED FACTORY TEST OF ALL CONTROLS.

2. SUPPLY, INSTALL AND PROGRAM AN ALLEN BRADLEY COMPACT LOGIX L32E PLC WITH I/O CARDS AND MEMORY MODULE. THEPROCESSOR WILL HAVE A MINIMUM OF TWO COMMUNICATION PORTS TO ALLOW CONNECTION OF THE RADIO ANDPANELVIEW.

3. SUPPLY, INSTALL, AND PROGRAM AN ALLEN BRADLEY PANELVIEW+ 1000 (10" COLOR SCREEN) OPERATOR INTERFACE PANEL FORLOCAL READOUT AND OPERATION.

4. SUPPLY AND INSTALL A 24VDC AND A 15 VDC POWER SUPPLY FOR THE ANALOG AND RADIO CIRCUITS.

5. SUPPLY AND INSTALL A POWERLOGIC MONITOR CAPABLE OF READING CURRENT, VOLTAGE, KW, AND PHASE LOSS.

6. SUPPLY AND INSTALL AN UNINTERRUPTIBLE POWER SUPPLY (UPS) APC MODEL BP300 FOR POWER CONDITIONING ANDTEMPORARY POWER BACKUP.

7. ALL CHANGES WILL BE DOCUMENTED AND ALL DOCUMENTS TURNED OVER TO THE DISTRICT. ALL SOURCE CODE AND PLCPROGRAMMING SOFTWARE TO BE TURNED OVER TO THE DISTRICT.

TANK FILL VALVES MODULATE TO MAINTAIN AN OPERATOR ADJUSTABLE TANK LEVEL AND BLEND THE WELL WATER.

1. THE BOOSTER PUMPS WILL BE USED TO PROVIDE REQUIRED DISTRIBUTION PRESSURE AT VARYING FLOW RATES . THE PUMPSWILL HAVE A SELECTOR SWITCH FOR HAND OFF AND AUTOMATIC OPERATION.

2. IN AUTO THE BOOSTER PUMPS WILL OPERATE ON AN ALTERNATOR BASIS THAT IS OPERATOR MODIFIABLE FOR ANY VARIATIONOF QUANTITY AND SEQUENCE OF PUMPS. IF ANY PUMP IN THE SEQUENCE FAILS TO START THE NEXT PUMP IN THE SEQUENCEWILL START. A LOW SYSTEM PRESSURE (NOMINAL 80 PSI) SET POINT WILL BE ENTERED TO START THE FIRST PUMP AND A HIGHSYSTEM PRESSURE (NOMINAL 100 PSI) WILL BE USED TO STOP THE LEAD PUMP. A HIGH HIGH PRESSURE ALARM POINT(NOMINAL 110 PSI) IS ALSO ENTERED. IF IT IS UNABLE TO MAINTAIN PRESSURE (PRESSURE IS BELOW THE LOW PRESSURE STARTSET POINT AND THE SECOND LOW PRESSURE (NOMINAL 70 PSI)) THE SECOND PUMP WILL START AFTER A TIME DELAY. THISWOULD CONTINUE THROUGH ALL FOUR BOOSTERS. THE PUMPS WILL RUN UNTIL THE HIGH PRESSURE SETPOINT IS REACHED.THE BOOSTER PUMPS ARE INTERLOCKED TO LOW TANK LEVEL (LOW SUCTION). A SETTABLE LOW TANK LEVEL INTERLOCK WILLSTOP BOOSTER PUMPS (NOMINAL 6'). A HIGH AND LOW TANK LEVEL ALARM WILL BE PROGRAMMED. A HARD WIRED HIGHPRESSURE SWITCH INTERLOCK IS ON EACH PUMP DISCHARGE.

3. AN EXERCISER TIMER SHALL BE PROGRAMMED FOR THE BOOSTER PUMPS. THE OPERATOR WILL SET THE TIME FOR THE PUMPSTO RUN AND THE EXERCISE PRESSURE SET POINT TO RUN AT. IN GENERAL THIS PRESSURE SET POINT IS HIGHER THAN NORMALOPERATING DISTRIBUTION PRESSURE. THE PURPOSE IS TO ENSURE WATER IS REGULARLY CIRCULATED OUT OF THE TANK. ATIME OF DAY OPERATION TIMER WILL BE INCLUDED THAT CAN BE DISABLED IF DESIRED.

4. A TIME AND DATE STAMPED HISTORICAL LOG WILL BE KEPT FOR ALL FAULTS AVAILABLE AT THE LOCAL OPERATOR INTERFACE ASWELL AS THE SCADA TERMINAL. ELAPSED RUN TIME FOR EACH PUMP WILL BE RECORDED. PUMPING EFFICIENCY WILL BERECORDED AS CALCULATED GALLONS PER KWH.

1. THE HYDROTANK LEVEL WILL BE CONTROLLED WITH TWO LEVEL PROBES AND A FILL SOLENOID. A HIGH LEVEL PROBE WILLENERGIZE THE SOLENOID WHICH STAYS ENERGIZED UNTIL THE LOW LEVEL PROBE IS UNCOVERED.

2. THE AIR COMPRESSOR IS STAND ALONE AND RUN OFF AN INTEGRAL PRESSURE SWITCH.

UPSSOLA‐HD

REDUNDANT

MANAGEDETHERNETSWITCH

CELLULARMODEM

MANAGEDETHERNETSWITCH

(E)WELL 11PLC

(E)PANELVIEW

(E) WELL SITE 11

Page 23: CGB 20A PLUG 20A SPEC GRADE ‐ HOT DIPPED GALVANIZED RIGID STEEL CONDUIT ...pjelectric.info/projectsbidding/Arvin CSD Arsenic Mitigation Phase... · = indicates conduit and cable

Know what's below.Call before you dig.

EPS  IS  RESPONSIBLE   FOR  ELECTRICAL   SYSTEMS DESIGN ONLY.   EPS  ISNOT  RESPONSIBLE   FOR  ELECTRICAL   SAFETY  WORK  PROCEDURESAND/OR USE OF  REQUIRED   PERSONAL  PROTECTIVE  EQUIPMENT,  SEENFPA  70E  "STANDARD   FOR  ELECTRICAL  SAFETY  IN  THE WORKPLACE''AND  OSHA  29  CFR.  CONTRACTOR  MUST  READ  SPECIFICATIONS   ANDINSTALL MATERIAL AS PER SPECIFICATIONS  AND/OR  PLANS OR AS PERE.P.S.  APPROVAL.   PLANS  AND  SPECIFICATIONS   ONLY  APPLY  TO  THEPROJECT FOR WHICH THEY WERE CREATED.

JOE PREVENDAR  P.E. CA EE [email protected]

JOB:FILE:PLOT:DSGN: DRWN:

DATE:

PROFESSIONAL AND CONSULTINGELECTRICAL ENGINEERING

4049 N FRESNO ST, FRESNO , CA  93726P: (559) 221‐7230 F: (559) 221‐0507

GARY OLSEN P.E. CA EE [email protected]

DJA‐17‐108

JPP/LKB CRT

FEB 201876. TANK ELEC DT2/15/2018 9:38 AM / 1:1

COMPRESSION LUG CONNECTIONBOLTED TO GROUND BUS ‐38" 2‐HOLE BOLTED CONNECTION

USING BELLEVILLE WASHERTHERMOWELDOR BURNDYCOMPRESSION

GROUND CLAMP

GROUND ROD

#4/0 BARE CU

GFI

N

BOND TO BUILDING STEEL

APPROVED GROUND CLAMP

BOND TO INCOMING STEEL COLDWATER PIPE

GROUND  BUS

UTILITY DISCONNECT LINK, READILYACCESSIBLE. MARKED:

"REMOVAL OF THIS LINK REMOVESCUSTOMER GROUNDING TONEUTRAL OF SUPPLY"

TYPICAL 3 4" x 10' COPPER CLAD GROUNDROD, MIN. 12" FROM EDGE OF SLAB AND 10'FROM GROUND ROD IN SERVICE SECTION

#4/0 BARE CU UFER GROUND,MINIMUM LENGTH 25',  MINIMUM3" CONCRETE ENCASEMENT

#4/0 CU

#4/0  BARE CU

NEUTRAL BUS TO GROUND BUS BONDCONNECTION

NOTE:  SERVICE GROUND SIZE AS SHOWN OR AS PER TABLE 250‐94‐CEC(CURRENT). ALL GROUND CONDUCTORS TO BE COPPER.

GROUNDRODMAXIMUMHEIGHTABOVE SLABIS 4"

FINISHED GRADE

 SAW CUT EXISTING (6"SPACING BOTH SIDES) AND PATCH BACK WITH MIN5" ASPHALT (TYPE B) PLACE IN TWO LIFTS OF 2"

OVER 3", 38" DIA MAX AGGREGATE SIZE (BY PAVINGCONTRACTOR), APPLY ASPHALT BINDER ATEXISTING PAVEMENT EDGES IMMEDIATELY PRIORTO PLACING TRENCH RESURFACING

 EARTH BACKFILL PER SPECS.

 SAW CUT EXISTING(FLUSH) AND PATCH BACK WITH MIN 5" THICKCONCRETE SLAB (MIN 6 STACK MIX), MATCHEXISTING FINISH

36"MIN

3"

6"

6"

3"

1 12"1 12"

2"

EARTH BACKFILL PER SPECS.

UNDERGROUND CONDUITS(ELEC., COMM., EMS, ETC.)NUMBER AND SIZE OF CONDUITS AS INDICATED ONPLANS

WARNING TAPE

SAND BACKFILL OR CONCRETE SLURRY

12"MIN

MCC‐______________

PUMP _____________

____ HP

WHITE LAMICOID W/ BLACK LETTERS

3"

1 12"

(SEE LABEL ABOVE)

(MOTOR CONTROL CENTER)

(MOTOR DESCRIPTION)

(HORSEPOWER)

TACK WELD CLAMPTO STAINLESS STEEL

LABEL MOUNT

CLAMP TO MOTORFEED

12 GAUGESTAINLESS STEEL

STAINLESSSTEEL BOLTSOR SCREWS

VERIFY NUMBER OF SECTION(S)ON PLAN(S)/ELEVATION(S)

SEE NOTES 1 & 2

HILTI KWIK BOLT ANCHOR(TYPICAL) ‐ SEE NOTE 3

12" x 3 

34" SS SEISMIC HILTI

KWIK BOLT AT EACH CORNEROF ENCLOSURE AS SHOWNABOVE. DRILL CONCRETE PERMANUFACTURERSRECOMMENDATIONS.MINIMUM 3" EMBEDMENT INCONCRETE

NOTES:

1) FOR INDOORS ‐ 1 1 2" HIGH HOUSEKEEPING PAD. 4" WIDE ALONG BACK, BOTH SIDES AND FRONT.

2) FOR OUTDOORS ‐ 3 1 2" HIGH HOUSEKEEPING PAD. 4" WIDE ALONG BACK, BOTH SIDES AND AS SHOWNON PLANS FOR FRONT.

3) 4 ANCHORS AT CORNER OF EACH SECTION.

4) 5 1 2" MINIMUM OVERALL PAD THICKNESS.

MIN 48"CLEARANCE

SAND FILL

LENGTH TO SUITSWITCHBOARD

SWITCHBOARD

SWITCHBOARD

CONCRETE SLAB

A A

FINISH GRADE

4000 PSI CONCRETESEE SHEET 47

2"

36"

NOTES:

1) TRANSFORMER PAD SIZE & QUANTITY OF GUARD POSTS PER PG&E RULE 16.

2) ALL PG&E RULE 16 APPLY.

= FIXED

= REMOVABLE

24"

24"

(CUT THROUGH AT CONDUIT OPENINGS)

8"MIN 6'' ABOVE SLAB

24"

REMOVABLE GUARD POSTPER PG&E REQUIREMENTS.SEE DETAIL THIS SHEET.SPACE PER RULE 16

GROUND CLAMP

GROUND CLAMP

GROUND ROD(TYPICAL OF 2)

PRECAST CONCRETE PAD PERPG&E REQUIREMENTS

TRANSFORMER PERPG&E REQUIREMENTS

FIXED GUARD POSTS PERPG&E REQUIREMENTS.SEE DETAIL THIS SHEET.SPACE PER RULE 16

PRECAST PAD OPENINGS

34"x8' GROUND ROD,

COPPERCLAD WITH MIN6' BETWEEN RODS

#2 SOLID/STRANDEDAWG CU GROUND WIRE

FINISHGRADE

GR

GR

±3"3" MIN

32"MIN

48"MIN

1 12" 3"

48"MIN

3" MIN

916"

12"MIN

12"MIN

NOTES:

1) POST, 4"x60" GALVANIZED STEEL PIPE, STANDARD, SCHEDULE 40. FILLFIXED POST W/ CONCRETE TO TOP.

2) SLEEVE, 5"x36" GALVANIZED STEEL PIPE SLEEVE, STANDARD, SCHEDULE40

3) CAP, 4" GALVANIZED MALLEABLE IRON CAP. MAY BE SCREWED.

4) TAPE, VISIBILITY REFLECTIVE YELLOW ADHESIVE STRIPS (2"x12")

FINISH GRADE

FINISH GRADE

2" SAFETY EQUIPMENTLOCK. CODE 170116

(FURNISHED BY PG&E)

CUT FROM1/2"x6" EYEBOLT STEEL,GALVANIZED

CONCRETE

EYE BOLT, 1/2"x6"STEEL, GALVANIZED (TO BEINSTALLED PARALLEL TOEDGE OF PAD)

WELD (TYPICAL)

SEEDETAIL

"A"

WELDS SHALL BE PAINTED OVER WITH A ZINC PRIMER

 ‐ SEE NOTE 3

 ‐ SEE NOTE 4(FURNISHED BY PG&E ANDINSTALLED BY ELECTRICALCONTRACTOR)

 ‐ SEE NOTE 1

‐ SEE NOTE 2

CONCRETE

Page 24: CGB 20A PLUG 20A SPEC GRADE ‐ HOT DIPPED GALVANIZED RIGID STEEL CONDUIT ...pjelectric.info/projectsbidding/Arvin CSD Arsenic Mitigation Phase... · = indicates conduit and cable

Know what's below.Call before you dig.

EPS  IS  RESPONSIBLE   FOR  ELECTRICAL   SYSTEMS DESIGN ONLY.   EPS  ISNOT  RESPONSIBLE   FOR  ELECTRICAL   SAFETY  WORK  PROCEDURESAND/OR USE OF  REQUIRED   PERSONAL  PROTECTIVE  EQUIPMENT,  SEENFPA  70E  "STANDARD   FOR  ELECTRICAL  SAFETY  IN  THE WORKPLACE''AND  OSHA  29  CFR.  CONTRACTOR  MUST  READ  SPECIFICATIONS   ANDINSTALL MATERIAL AS PER SPECIFICATIONS  AND/OR  PLANS OR AS PERE.P.S.  APPROVAL.   PLANS  AND  SPECIFICATIONS   ONLY  APPLY  TO  THEPROJECT FOR WHICH THEY WERE CREATED.

JOE PREVENDAR  P.E. CA EE [email protected]

JOB:FILE:PLOT:DSGN: DRWN:

DATE:

PROFESSIONAL AND CONSULTINGELECTRICAL ENGINEERING

4049 N FRESNO ST, FRESNO , CA  93726P: (559) 221‐7230 F: (559) 221‐0507

GARY OLSEN P.E. CA EE [email protected]

DJA‐17‐108

JPP/LKB CRT

FEB 201877. TANK ELEC DT2/15/2018 9:38 AM / 1:1

SPACE HTR

BLOCK HTR

WATER HTR

BATTERYCHARGER

CONTROL

PER CIVIL

PERCIVIL

SEESINGLE

LINE100%

J

TO ATS

TO ATS

TO 120VAC PANEL

FACTORY SOUNDATTENUATED 3RENCLOSURE

VIBRATION ISOLATORS

#4/0 BARE CU UFERGROUND 2" UP FROMBOTTOM OF SLAB,MINIMUM LENGTH =25'

FINISHGRADE

DETAIL PER CIVIL

MUFFLER

GROUNDCONNECTIONCRIMPED AND

BOLTED

48'' TAIL MIN

CADWELD

SLAB PER CIVIL

34''x10'

COPPERCLADGROUND ROD

THERMO WELD OR BURNDYCOMPRESSION

COMPRESSION LUG BOLTED TO

GROUND BUS. 38" BOLTEDCONNECTION USING BELLEVILLEWASHER

ENGINESTART

‐ OVERCRANK

‐ LOW OIL PRESSURE

‐ HIGH ENGINE TEMPERATURE

‐ OVERSPEED

‐ LOW BATTERY

‐ LOW FUELSWITCH

NOT AUTOUTILITYMODE

E‐GENMODE

COMMONPRE‐ALARM

COMMONFAULT

GENERATORRUNNING

UFER GND ‐ MINIMUM25' #4/0 CU WITH 3"CONCRETE ALL AROUND

PANEL

FOUNDATIONREBAR

GENERATOR FRAME

UTILITYXFMR

#4/0 CU

A C

N

B

C

N

B

A

34"x10' GND ROD

IN SERVICESECTION

#4/0 CU

#4/0 CU

ALL CONNECTIONS TOGROUND BUS ARE TO BEBY BOLTED CRIMP LUG

THERMAL WELDOR BRUNDY CRIMPCONNECTION(TYPICAL)

GROUND BUS

GROUNDBUS

36"MIN

NOTES:

1) IF FIELD SENSOR DEVICE IS FURNISHED WITH CONDUIT CONNECTIONPROVISIONS, CONNECT WITH LIQUID‐TIGHT FLEXIBLE METAL CONTUIT.

2) IF FIELD SENSOR DEVICE IS EQUIPPED ONLY WITH LIQUIDTIGHT CABLE,USE LIQUID‐TIGHT CABLE CONNECTOR. PROTECT CABLE WITH SPIRALWRAP FLEX.

FINISHEDGRADE

FIELDSENSORDEVICE

SUNSHIELD,10G ALUMINUM

TRANSMITTER

CABLE OR CONDUIT ‐ SEENOTES BELOW

3" GALVANIZED STEELCHANNEL

12"DIA x 36"  CONCRETEFOUNDATION

PVC COATED RMC

PIPE

30"

PVC

TOCONTROL

PANEL

1 HOLE PVC COATEDCONDUIT STRAP. ATTACH

WITH S.S. 1 4"x20. DRILLAND TAP 1 4"x20 HOLE

HINGED FRONT SUNSHIELD,FLIP UP, 10G ALUMINUM

FRONTHINGE

FIELDTERMINALS

ROSEMOUNT

ROSEMOUNT 3051TGPRESSURE TRANSMITTER W/ LCD DISPLAY0‐150 PSI OR EQUAL

12" LFMC

STEELCONDULET

34"RMC W/#18 TSP

306RT2 THREADEDSTYLE MANIFOLD

TWO‐VALVE

4"MIN

90° CONNECTOR

CONNECTORW/  3 4" TO12" RE

BUSHING

SEE NOTE 1

SEE NOTE 2

3/4"  FLEXTITEMAXIMUM 12" TO3/4"C

SEE NOTE 1

NOTES:

1) PMC/BETA VL4513 W/ TE‐10 DRY BOX AND MP‐11 CABLE TERMINATORSEALED REFERENCE VOLUME FILLED WITH DRY NITROGEN OR EQUAL

2) THIS IS THE 2‐WIRE TWISTED PAIR THAT SUPPLIES THE 9‐30VDVEXCITATION AND RETURNS THE 4‐20MA CURRENT PROPORTIONAL TOPRESSURE/LEVEL, 4MA ‐ THE MINIMUM AND 20MA = THE MAXIMUM

CONDUIT FOR ANTENNA

24"DIA

3" (4) #4 VERTICALREBAR

#4 HORIZONTALREBAR HOOPS

6" OVERLAP OF#4 TAILS

NOTES:

1) BASE SHALL BE 4000 PSI (28 DAY) 6 SACK CONTENT MIX CONCRETE.

2) STANDARDS TO WITHSTAND WIND LOADS OF 100MPH WITH 1.3 GUSTFACTOR PER TITLE 24 EXPOSURE (C).

3) ANCHOR BOLTS AND TEMPLATES FURNISHED BY ELECTRICALCONTRACTOR. CONCRETE BASE AND ANCHOR BOLTS INSTALLED BYGENERAL CONTRACTOR.

BRANCH CIRCUITWIRING

BASE COVER

WEATHERPROOF J‐BOX WITHH‐O‐A LOCKING KEY BYPASSSWITCH

S

48"

P‐P

FACTORY HANDHOLECOVER

60" CONDUIT

(4) #4 VERTICALREBAR

#4 HORIZONTALTIES @ 12" ON

CENTER

#4 HORIZONTALTIES @ 6" ON

CENTER

A

FINISH GRADE

A

CONDUIT

24"

GROUT

ANCHOR BOLTS

30"

24"DIA

SEE SHEET 72 FORFIXTURE SCHEDULEMOTION SENSOR ‐ IF

ORDERED

PE CELL ‐ IFORDERED

P‐DL

BATTERY+

ETHERNET

Page 25: CGB 20A PLUG 20A SPEC GRADE ‐ HOT DIPPED GALVANIZED RIGID STEEL CONDUIT ...pjelectric.info/projectsbidding/Arvin CSD Arsenic Mitigation Phase... · = indicates conduit and cable

Know what's below.Call before you dig.

EPS  IS  RESPONSIBLE   FOR  ELECTRICAL   SYSTEMS DESIGN ONLY.   EPS  ISNOT  RESPONSIBLE   FOR  ELECTRICAL   SAFETY  WORK  PROCEDURESAND/OR USE OF  REQUIRED   PERSONAL  PROTECTIVE  EQUIPMENT,  SEENFPA  70E  "STANDARD  FOR  ELECTRICAL   SAFETY  IN  THE WORKPLACE''AND  OSHA  29  CFR.  CONTRACTOR  MUST  READ  SPECIFICATIONS   ANDINSTALL MATERIAL AS PER SPECIFICATIONS  AND/OR  PLANS OR AS PERE.P.S.  APPROVAL.   PLANS  AND  SPECIFICATIONS   ONLY  APPLY  TO  THEPROJECT FOR WHICH THEY WERE CREATED.

JOE PREVENDAR  P.E. CA EE [email protected]

JOB:FILE:PLOT:DSGN: DRWN:

DATE:

PROFESSIONAL AND CONSULTINGELECTRICAL ENGINEERING

4049 N FRESNO ST, FRESNO , CA  93726P: (559) 221‐7230 F: (559) 221‐0507

GARY OLSEN P.E. CA EE [email protected]

DJA‐17‐108

JPP AVS

FEB 201878. SCADA2/15/2018 9:38 AM / 1:1

A‐B COMPACTLOGIXPLC

(N) MANAGEDETHERNET

4 PORT SWITCH

(N) CELLULAR MODEM

(E) A‐B COMPACTLOGIX1769‐L32E PLC

(N) A‐B COMPACTLOGIXPLC

(N) MANAGEDETHERNET

4 PORT SWITCH

(N) CELLULAR MODEM

(N) A‐B COMPACTLOGIXPLC

(N) MANAGEDETHERNET

4 PORT SWITCH

(N) CELLULAR MODEM

(N) WIRELESSROUTER

(N) IGNITIONSCADA SYSTEM

INTERNETSERVICE PROVIDER

(N) MANAGEDETHERNET

4 PORT SWITCH

(N) MANAGEDETHERNET

4 PORT SWITCH

(N) CELLULAR MODEM

(N) A‐B PANELVIEW PLUS 715" HMI

(N) A‐B PANELVIEW PLUS 715" HMI

(N) A‐B PANELVIEW PLUS 715" HMI

(E) A‐B PANELVIEW PLUS 610" HMI

(E) A‐B COMPACTLOGIX1769‐L32E PLC

(N) MANAGEDETHERNET

4 PORT SWITCH

(N) CELLULAR MODEM

(E) A‐B PANELVIEW PLUS 610" HMI

(N) A‐B COMPACTLOGIXPLC

(N) MANAGEDETHERNET

4 PORT SWITCH

(N) CELLULAR MODEM

(N) A‐B PANELVIEW PLUS 710" HMI

(N) A‐B COMPACTLOGIXPLC

(N) MANAGEDETHERNET

4 PORT SWITCH

(N) CELLULAR MODEM

(N) A‐B PANELVIEW PLUS 710" HMI

(N) A‐B COMPACTLOGIXPLC

(N) MANAGEDETHERNET

4 PORT SWITCH

(N) CELLULAR MODEM

(N) A‐B PANELVIEW PLUS 710" HMI

ANALOG I/O TO HAVE REDUNDANT SOLA 24 VDC POWER SUPPIES.

THE CONTRACTOR SHALL SETUP THE MANAGED SWITCHES TO MINIMIZENETWORK TRAFFIC TO ONLY REQUIRED INFORMATION.

MANAGED ETHERNET 4 PORT SWITCHED TO BE STRATIX 5700

INTERNET SERVICE PROVIDER TO HAVE STATIC IP ONLY