LIST OF DISPOSED OF PETITIONS FOR THE PERIOD 1.4.2016 TO 31.3.2017Carried forward from last year
2015-16
Number of Petitions registered during 2016-17
Total Disposed of petitions
Pending as on 31.3.2017
507 322 829 522 307SlNo.
Petition Number
Petition Date
Petitioner Name
Subject Date of Disposal
Type of Petition
1. GT/341/2014 21st
September, 2014
NTPC Limited Petition for determination of tariff of Kawas gas based Combined Cycle Power Station (656.20 MW) for the period from 1.4.2014 to 31.3.2019.
24.3.2017 GenerationTariff
2. GT/289/2014 10th
September, 2014
NTPC Limited Petition for determination of tariff of Feroze Gandhi Unchahar Thermal Power Station, Stage-II (420 MW) for the period from 1.4.2014 to 31.3.2019.
31.3.2017 GenerationTariff
3. GT/281/2015 2nd
November, 2015
Torrent Power Limited
Petition for approval of tariff of 1200 MW DGEN Mega Power Project of Torrent Power Limited for the period from COD of Unit 51 (First Block ) up to 31.3.2019.
31.3.2017 GenerationTariff
4. MP/182/2015 1st
September, 2015
Tata Power DelhiDistributionLimited
Petition seeking appropriate directions of the Commission in exercise of powers under Section 79(1) (a) & (f) of the Electricity Act, 2003 for adjudication of issues relating to Power Purchase Agreement dated 8.5.2008 entered into between TPDDL and NTPC.
31.3.2017 Misc. Petition
5. MP/160/2015 25th June, 2015
NTPC Limited Petition under section 79(1) (f) of the Electricity Act, 2003 read with Regulation 8 of the Central Electricity Regulatory Commission (Terms and Conditions of Tariff determination from Renewable Energy Sources) Regulations, and Regulations 111 and 119 of Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 for applicability of Generic Tariff for 50 MW Rajgarh Solar PV Station of NTPC Limited.
31.3.2017 Misc. Petition
6. GT/252/2014 26th August, 2014
NHPC Limited Petition for determination of tariff for the period 2014-2019 in respect of Chutak Power Station.
24.3.2017 GenerationTariff
7. GT/299/2014 11th
September, 2014
NTPC Limited Petition for revision of tariff of National Capital Thermal Power Station, Dadri Stage-I (840 MW) for the period from 1.4.2009 to 31.3.2014 after truing up exercise.
24.3.2017 GenerationTariff
8. GT/326/2014 21st
September, 2014
NTPC Limited Petition for approval of tariff of Jhanor Gandhar Gas Power Station (657.39 MW) for the period from 1.4.2009 to 31.3.2014 after truing up exercise.
30.3.2017 GenerationTariff
9. GT/337/2014 21st
September, 2014
NTPC Limited Petition for determination of tariff of Sipat Super Thermal Power Station Stage-I 1980 MW) from 1.4.2014 to 31.3.2019.
29.3.2017 GeneratingTariff
112
Central Electricity Regulatory Commission
10. GT/178/2015 8th July, 2015 THDC India Limited
Petition for approval of generation tariff of Tehri Hydro Electric Power Project (HPP) Stage-l (4250MW) for the period 1.4.2014 to 31 .3.2019.
29.3.2017 GenerationTariff
11. MP/143/2016 24th August, 2016
Power Grid Corporation of India Limited
Petition under Section 38 (2) of the Electricity Act, 2003 read with Sections 79 (1) (c) and 79 (1) (k) of the Act, along with (i) CERC (Grant of Regulatory Approval for execution of inter-StateTransmission Scheme to Central Transmission Utility) Regulations, 2010; (ii) Regulations 111 and 114 of CentralElectricity Regulatory Commission (Conduct of Business)Regulations, 1999 and (iii) CERC (Sharing of inter-StateTransmission Charges and Losses) Regulations, 2010 for grantof Regulatory Approval for execution of the Transmission Systemfor Ultra Mega Solar Power Park at Banaskantha (Radhanesda),Gujarat.
30.3.2017 Misc. Petition
12. TT/515/2014 14th
December, 2014
Power links Transmission Limited
Petition for approval of Annual Transmission Charges and truing up of tariff for the period 2013-14 for 400 KV Double Circuit Muzaffarpur-Gorakhpur Transmission Line in Eastern-Northern Inter-region associated with Tala Hydro Electric Project, East-North Inter-Connector and Northern Region Transmission System of Powerlinks Transmission Limited.
31.3.2017 Transmission Tariff
13. MP/291/2015 24th
November, 2015
Transmission Corporationof Andhra PradeshLimited
Petition for exemption from payment of losses for Simhadri Stage- I power to Andhra Pradeshunder the provisions of Regulations Sharing of inter-State Transmission Charges and Losses Regulations , 2010 and Indian Electricity Grid Code.
30.3.2017 Misc. Petition
14. GT/434/2014 30th
October, 2014
JaiprakashPower Ventures Limited
Petition for approval of generation tariff of Jaypee Karcham Wangtoo Hydro-Electric Project (Karcham Wangtoo HEP) for 2014-2019 tariff block.
30.3.2017 GenerationTariff
15. MP/76/2014 25th April, 2014
Spectrum Coal and Power Limited.
Petition for reduction of Long Term Open Access from 60 MW to 30 MW (Unit-I, 15 MW, Unit-II 15 MW) and refund of the excess transmission charges paid by the petitioner as per the Bulk Power Transmission Agreement dated 30.4.2009.
23.3.2017 Misc. Petition
113
Annual Report
16. GT/129/2015 6th May, 2015
ONGCTripura Power Company
Petition under Sections 62 and 79 (1) (b) of the Electricity Act, 2003 read with Regulation 7 of the Central Electricity Regulatory Commission (Terms andConditions of Tariff) Regulations, 2014 and CentralElectricity Regulatory Commission (Procedure formaking application for determination of tariff, publication of application and other related matters) Regulations, 2004 as amended thereto, for determination of tariff of726.6 (2 x 363.3) MW Palatana Combined Cycle GasBased Power Project of ONGC Tripura Power CompanyLimited for the period from 1.4.2014 to 31.3.2019.
30.3.2017 GenerationTariff
17. MP/224/2016 11th
November, 2016
DalmiaCement(Bharat)Limited
Petition for levy of back up supply charges in violation of Central Electricity Regulatory Commission’s Regulations.
24.3.2017 Misc. Petition
18. MP/25/2017 20th
February, 2017
LancoAmarkantakPower Limited
Petition under Section 79(1) (c) read with Section 79 (1) (f) of the Electricity Act, 2003 read with Regulation 111 of the Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 inter alia seeking directions to the respondents to allow the petitioner to draw start-up power for Unit-3 of the petitioner’s thermal power plant.
29.3.2017 Misc. Petition
19. GT/7/2016 14th January, 2016
Udupi Power CorporationLimited
Truing up petition for revision of tariff of 2 X 600 MW Thermal Power Plant set up by Udupi Power Corporation Limited in Udupi Taluka, Udupi District, Karnataka for the period from 11.11.2010 to 31.3.2014.
24.3.2017 GenerationTariff
20. MP/449/2014 11th
December, 2014
Malana Power Company Limited
Petition under Section 79(1) (f) read with Section 60 of the Electricity Act, 2003.
10.3.2017 Misc. Petition
21. GT/346/2014 21st
September, 2014
NTPC Limited Petition for truing up of tariff of Kawas GPS (656.20 MW) for the period from 1.4.2009 to 31.3.2014.
15.3.2017 GenerationTariff
114
Central Electricity Regulatory Commission
22. MP/12/2017 2nd February, 2017
Gurgaon Palwal Transmission Limited
Petition under Section 17(3) & 17(4) of Electricity Act 2003, for creation of security interest over all assets including the movable and immovable assets of Petitioner No.1,in favour of Security Trustee/Lenders and for any subsequent transferees, assigns, novatees thereof and any
acting on behalf of and for the
Indenture of Mortgage, declaration and memorandum of entry and other security creating documents/Financial Agreements and for future
way of mortgage/hypothecation/assignment of Mortgage Properties and project Assets.
22.3.2017 Misc. Petition
23. GT/319/2014 20th
September, 2014
NTPC Limited Petition for determination of tariff of Feroz Gandhi Unchahar Thermal Power Station, Stage-I (420 MW) for the period from 1.4.2014 to 31.3.2019.
22.3.2017 GenerationTariff
24. GT/190/2015 14th August, 2015
NHPC LTD Revision of tariff of Chutak Power Station (4 x 11 MW) of NHPC Ltd. for the period 2012- 14. Truing-up of tariff determined in order dated 23.1.2015 in petition No. 3/GT/2013.
21.3.2017 GenerationTariff
25. GT/172/2015 8th July, 2015 THDC India Limited
Petition for revision of tariff of Tehri Hydroelectric Power Project (HPP), Stage-I (4 X 250 MW) for the period from 1.4.2009 to 31.3.2014. Truing up of tariff order dated 27.1.2015 in Petition No. 195/GT/2013.
20.3.2017 GenerationTariff
26. GT/322/2014 21st
September, 2014
NTPC Limited Petition for determination of tariff of Sipat Super Thermal Power Station Stage-II (1000 MW) for the period from 1.4.2014to 31.3.2019.
21.3.2017 GenerationTariff
27. MP/143/2015 10th June, 2015
NTPC Limitedsharing of capacity charges among
station as per Regulation 30 (4) of CERC (Terms and Conditions of Tariff) Regulations, 2014.
20.3.2017 Misc. Petition
28. MP/177/2016 20th
September, 2016
Indian Wind Power Association-MaharashtraState Council.
Petition seeking relaxation of the Central Electricity Regulatory Commission (Terms and Conditions for Recognition and Issuance of
Renewable Energy Generation) Regulations, 2010 and seeking directions against the respondent, NLDC on the issue of Renewable
2014-2015 and for future.
20.3.2017 Misc. Petition
115
Annual Report
29. MP/72/2016 4th May, 2016
Maithon Power Limited (MPL)
Petition under Regulation 14 (3) (ii) of the Central Electricity Regulatory Commission (Terms and Conditions for Determination of Tariff) 2014 ("Tariff Regulations 2014") read with Regulations 3 (9) and 12 (2) seeking in-principle approval of the "Abstract Schemes" of Capital Expenditure in compliance with Environment (Protection) Amendment Rules, 2015 issued by the Ministry of Environment, Forest and Climate Change dated 7.12.2015.
20.3.2017 Misc. Petition
30. MP/187/2013 7th October, 2013
Sothern Region Load Despatch Center
Petition for non - compliance of Regulations 6.4.6, 6.4.9, 2.3.1.5 of Central Electricity Regulatory Commission (Indian Electricity Grid Code) Regulations, 2010 and Regulation 7.2 of Central Electricity Regulatory Commission (Unscheduled Interchange charges and related matters) (Second Amendment) Regulations, 2012 endangering the secured grid operation in Southern Region by consistent under injection of power by Meenakshi Energy Private Limited, Nellore.
20.3.2017 Misc. Petition
31. GT/336/2014 21st
September, 2014
NTPC Limited Petition for determination of tariff of Tanda Thermal Power Station (440 MW) for the period from 1.4.2014 to 31.3.2019.
21.3.2017 GenerationTariff
32. GT/263/2014 26th August, 2014
Ratnagiri Gas & Power Private Limited.
Petition for revision of tariff of Ratnagiri Power Station (1967.08 MW) for the period from 1.4.2014 to 31.3.2019.
21.3.2017 GenerationTariff
33. MP/149/2015 8th June, 2015
Neyveli Lignite CorporationLtd.
Petition seeking approval for revised Lignite Transfer Price of NLC mines for the period 1.4.2009 to 31.3.2014 on account of truing up additional capitalization, O & M, income tax, return on equity and FERV along with Ministry of Coal guidelines on Fixation of Transfer Price of Lignite.
20.3.2017 Misc. Petition
34. MP/117/2015 10th June, 2015
D.B. Power Limited.
Petition under Sections 79(1) (f) and 79 (i) (K) of the Electricity Act, 2003 seeking appropriate directions against the respondent/ CTU for refund of relinquishment charges paid by the petitioner Company to the respondent for relinquishment of Medium Term Open Access of 208 MW.
20.3.2017 Misc. Petition
116
Central Electricity Regulatory Commission
35. MP/136/2016 17th August, 2016
Power Grid Corporation of India Limited
Petition for reimbursement of additional expenditure towards deployment of special security forces (CISF) at Salakati and Bongaigaon Sub-Stations for the year 2015-19 in respect of Eastern and North Eastern Region.
20.3.2017 Misc. Petition
36. MP/157/2015 10th June, 2015
Costal Gujarat Power Limited.
Petition seeking adjustment of tariff for increase/decrease in revenues/costs of Costal Gujarat Power Limited due to ‘Change in Law’ during the operation period for the Financial Year 2011-12, 2012-13 and 2013-14.
17.3.2017 Misc. Petition
37. MP/136/2014 10th July, 2014
Power Grid Corporation of India Limited
Petition under section 79(i) (c) & (f) of the Electricity Act, 2003 and CERC (Grant of Connectivity, Long Term Access and Medium-term Open Access in Inter-State Transmission and related matters) Regulations, 2009.
20.3.2017 Misc. Petition
38. RP/03/2016 in Petition No. 77/GT/2013
18th January, 2016
GMRKamalangaEnergy Limited
Petition for review of order dated 12.11.2015 in Petition No. 77/GT/2013.
17.3.2017 Review Petition
39. GT/339/2014 21st
September, 2014
NTPC Limited Petition for approval of tariff of Vindhyachal Super Thermal Power Station Stage-IV (1000 MW) from 1.4.2014 to 31.3.2019.
10.3.2017 GenerationTariff
40. GT/266/2014 26th August, 2014
Aravali Power Company Private Limited
Petition for approval of tariff of Aravali Power Company Private Limited (3 X 500 MW) (IGSTPP) for the period from 1.4.2014 to 31.3.2019.
9.3.2017 GenerationTariff
41. GT/316/2014 20th
September, 2014
NTPC Limited Petition for determination of tariff of Farakka Super Thermal Power Station Stage I & II (1600 MW) for the period from 1.4.2014 to 31.3.2019.
10.3.2017 GenerationTariff
42. GT/344/2014 21st
September, 2014
NTPC Limited Petition for revision of tariff of Sipat STPS Stage- II ( 2 X 500 MW) for the period from 1.4.2009 to 31.3.2014 after the truing up exercise.
15.3.2017 GenerationTariff
43. GT/205/2015 20th August, 2015
Damodar Valley Corporation
Petition for approval of tariff for the period 2014 - 2019 in respect of Durgapur Steel TPS Units 1 and 2.
17.3.2017 GenerationTariff
44. MP/306/2015 26th
November, 2015
PTC India Limited
Petition under Section 79(1) (f) read with Section 79 (1) (c) of the Electricity Act, 2003 regarding disputes involving Central Transmission Utility, being the nodal agency for grant of Long Term Open Access to the inter- State Transmission System.
16.3.2017 Misc. Petition
45. GT/261/2014 26th August, 2014
SJVN Limited Petition for approval of generation tariff of Naptha Jhakri Hydro Electric Power Station (6 X 250 MW) for the period 1.4.2014 to 31.3.2019.
15.3.2017 GenerationTariff
117
Annual Report
46. GT/262/2014 26th August, 2014
SJVN Limited Petition for approval of revision of tariff of Naptha Jhakri Hydro Electric Power Station (6 X 250 MW) for the period 1.4.2009 to 31.3.2014.
15.3.2017 GenerationTariff
47. GT/08/2016 12th January, 2016
SJVN Limited Petition under Sections 62 and 79 (1) (a) of the Electricity Act, 2003 read with Chapter - V of the CERC (Conduct of Business) Regulations, 1999 for revision of tariff of Nathpa Jakhri Hydro Electric Power Station ( 6 x 250 MW) for the period 1.4.2004 to 31.3.2009.
15.3.2017 GenerationTariff
48. TT/438/2014 25th
October, 2014
Aravali Power Company Private Limited
Petition for determination of tariff of Jhajjar- Mundka 400 KV D/C ISTS Asset of Aravali Power Company Private Limited for the period from 1.4.2014 to 31.3.2019.
15.3.2017 Transmission Tariff
49. TT/439/2014 1st
December, 2014
Aravali Power Company Private Limited
Petition for approval of tariff of 400 KV D/C Jhajjar-Mundka transmission line of Aravali Power Company Private Limited based on audited accounts as on 31.3.2014 for the period from the COD i.e 1.3.2011 to 31.3.2014.
15.3.2017 Transmission Tariff
50. RP/16/2015Petition in Petition No.109/TT/2013
29th July, 2015
Power Grid Corporation of India Limited
Petition for review of order dated 20.5.2015 in Petition No. 109/TT/2013.
22.8.2016 ReviewPetition
51. RP/08/2016in Petition No. 118/MP/2015
24th
February, 2016
MP Power ManagementCompany Limited
Petition for review of order dated 30.12.2015 in Petition No. 118/MP/2015.
14.3.2017 Review Petition
52. MP/563/2014 30th
December, 2014
Monet Ispat & Energy Limited.
Petition under Regulations 12 and Regulation 13 of the CERC (Deviation Settlement Mechanism and related matters) Regulations, 2014.
10.3.2017 Misc. Petition
53. MP/226/2015 1st October, 2015
TRN Energy Private Limited
Petition under Sections 79 (1) (c) and 79 (1) (K) of the Electricity Act, 2003 seeking appropriate directions for operationalization of the LTA dated 14.9.2015 read with letter dated 27th December, 2013.
10.3.2017 Misc. Petition
54. MP/227/2015 6th October, 2015
Neyveli Lignite CorporationLimited
Petition seeking approval for revision of lignite transfer price for the period 29.12.2011 to 31.3.2014 on account of truing up in respect of NLC Barsingsar Mine.
14.3.2017 Misc. Petition
55. SM/3/2017 10th March, 2017
CentralElectricityRegulatory Commission
Interim truing up of transmission tariff during tariff period 2014-19 in terms of the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2014.
8.3.2017 Suo Motu
56. MP/167/2015 24th June, 2015
HimanchalPradesh State ElectricityBoard Limited
Petition for counter claim under Section 79(1)(f) of the Electricity Act, 2003.
10.3.2017 Misc. Petition
118
Central Electricity Regulatory Commission
57. MP/96/2015 20th March, 2015
ChettinadPower CorporationPrivate Limited
Petition under Sections 79 (i) and 79 (i) (f) of the Electricity Act, 2003 read with CERC (Grant of Connectivity, Long Term Access and Medium Term Open Access in Inter-State Transmission and related matters), Regulations, 2009.
8.3.2017 Misc. Petition
58. GT/256/2014 26th August, 2014
Neyveli Lignite CorporationLimited
Fixed Charges and Energy Charges) for the period 2014-19 under CERC Tariff Regulations, 2014 for NLC TPS-II Stage-I (630 MW) and Stage II (840 MW).
8.3.2017 GenerationTariff
59. MP/310/2015 21st
December, 2015
JabalpurTransmission Company Limited
Petition under Sections 61, 63, and 79 of the Electricity Act, 2003 read with the statutory framework of tariff-based competitive bidding for transmission service.
2.3.2017 Misc. Petition
60. GT/340/2014 21st
September, 2014
NTPC Limited Petition for approval of tariff of Korba Super Thermal Power Station Stage- III (500 MW) from 1.4.2014 to 31.3.2019.
3.3.2017 GenerationTariff
61. GT/280/2014 10th
September, 2014
NTPC Limited Petition for determination of tariff of Farakka Super Thermal Power Station, Stage- III (1 x 500 MW) for the period from 1.4.2014 to 31.3.2019.
3.3.2017 GenerationTariff
62. MP/308/2015 17th
December, 2015
Nu Power Renewables Private Limited & Others
Petition under Section 79 (1) (f) of the Electricity Act, 2003 read with Regulations 14 and 15 of the CERC (Terms and Conditions for Recognition and Issuance of
Renewable Energy Generation) Regulations, 2010.
2.3.2017 Misc. Petition
63. MP/188/2014 4th August, 2014
Power Grid Corporation of India Limited
Petition under Regulations 24, 111 & 113 of the CERC (Conduct of Business) Regulations, 1999 and Regulation 54 (Power to Relax) and Regulation 55 (Power to Remove
Conditions of Tariff) Regulations, 2014 for recovery of cost for the assets of SCDA/EMS system for SLDCs.
2.3.2017 Misc. Petition
64. MP/179/2015 8th July, 2015
Jaipur` Vidyut Vitaran Nigam Limited & Others
Petition under Section 79 of the Electricity Act, 2003 read with clause 5.2 of the operating code under the Indian Electricity Grid Code and Regulations 12 and 13 of the CERC (Unscheduled Interchange Charges and related matters) Regulations, 2009; Regulations 7(1) & (2), 12 and 13 of CERC (Deviation Settlement Mechanism and related matters) Regulations, 2014 and Regulations 111,114 and 115 of the CERC (Conduct of Business) Regulations, 1999.
28.2.2017 Misc. Petition
119
Annual Report
65. MP/120/2014 25th June , 2014
Power Grid Corporation of India Limited
Petition seeking direction from the Commission relating to construction of Mysore (Powergrid) - Kozhikode 400 kV D/C line along with 400/220 kV Kozhikode substation (New) & extension of Mysore substation under Transmission System associated with Kaiga- 3 & 4 (2 x 235 MW) project.
28.2.2017 Misc. Petition
66. MP/50/2016 28th March, 2016
RE Connect Energy SolutionsPrivate Limited
Petition under Section 66 of the Electricity Act, 2003 read with the provisions of the CERC (Power Market) Regulations, 2010.
28.2.2017 Misc. Petition
67. MP/133/2014 3rd July, 2014 Power Gird Corporation of India Limited
Petition under Regulation 55
CERC (Terms and Conditions of Tariff) Regulations, 2014 and under Regulation 111 of the CERC (Conduct of Business) Regulations, 1999.
28.2.2017 Misc. Petition
68. MP/168/2015 30th June, 2015
Porwal Auto ComponentsLimited
Petition under Sections 66 and 79 and other applicable provisions of the Electricity Act, 2003 read with Regulation 14 of the Central Electricity Regulatory Commission (Terms and Conditions of Recognition and Issuance of Renewable Energy
generation) Regulations, 2010.
28.2.2017 Misc. Petition
69. MP/165/2015 30th June , 2015
Atapi Power Petition for Recognition and Issuance
from the date of Commissioning and
Multiplier.
28.2.2017 Misc. Petition
70. GT/204/2015 20th August, 2015
Damodar Valley Corporation
True up petition in respect of approval of tariff of Durgapur Steel TPS Units 1 and 2 (2 x 500 MW) from the respective dates of their commercial operation till 31.3.2014.
27.2.2017 GenerationTariff
71. GT/296/2015 3rd
December, 2015
Damodar Valley Corporation
Petition in respect of approval of tariff of Koderma TPS Units 1 and 2 ( 2 x 500 MW) for the tariff period 2014 – 2019.
28.2.2017 GenerationTariff
72. RP/46/2016 in GT/279/2014
16th
September, 2016
NTPC Limited Petition for review of order dated 30.7.2016 in Petition No. 279/GT/2014.
21.2.2017 Review Petition
73. GT/338/2014 21st
September, 2014
NTPC Limited Petition for approval of tariff of Vindhyachal Super Thermal Power Station Stage-I (1260 MW) from 1.4.2014 to 31.3.2019.
24.2.2017 GenerationTariff
74. GT/342/2014 21st
September, 2014
NTPC Limited Petition for determination of tariff of Vindhyachal Super Thermal Power Station Stage-III (1000 MW) for the period from 1.4.2014 to 31.3.2019.
24.2.2017 GenerationTariff
75. GT/323/2014 21st
September, 2014
NTPC Limited Petition for determination of tariff of Korba Super Thermal Power Station Stage-I & II (2100 MW) for the period from 1.4.2014 to 31.3.2019.
24.2.2017 GenerationTariff
120
Central Electricity Regulatory Commission
76. MP/16/2016 3rd February, 2016
Sasan Power Limited
Petition under Section 79 of the Electricity Act, 2003 read with statutory framework governing procurement of power through competitive bidding and Article 13.2(b) of the Power purchase Agreement dated 7.8.2007 executed between Sasan Power Limited and the procurers for compensation due to ‘Change in Law’ impacting revenues and costs during the operating period.
17.2.2017 Misc. Petition
77. RP/17/2015in Petition No. 37/TT/2011
20th July, 2015
Jaypee Powergrid Limited
Seeking review of the order dated 7th May, 2015 passed in Petition No. 37/TT/2011.
24.2.2017 Review Petition
78. TT/85/2015 4th March, 2015
Powergrid Corporation of India Limited
Petition for approval of determination of transmission tariff from anticipated DOCO to 31.3.2019 for 8 nos. Assets under Eastern Region Strengthening Scheme-III in in ER.
24.2.2017 Transmission Tariff
79. RP/47/2016 in 281/GT/2014
16th
September, 2016
NTPC Limited Petition for review of order dated 29.7.2016 in Petition No. 281/GT/2014.
21.2.2017 Review Petition
80. RP/01/2016 5th January, 2016
Sasan Power Limited
Petitioner seeking review of CERC order dated 18.11.2015 in Petition No. 402/MP/2014.
16.2.2017 Review Petition
81. RP/53/2016 in GT/317/2014
27th
September, 2016
NTPC Limited Petition for review of order dated 29.7.2016 in Petition No. 317/GT/2014.
17.2.2017 Review petition
82. GT/180/2015 17th July, 2015
Damodar Valley Corporation
Petition for determination of tariff of Chandrapura TPS Units 7 & 8 (2 x 250 MW) for the period 2014 -2019.
17.2.2017 GenerationTariff
83. RP/24/2015in Petition No. 112/TT/2013
23rd
November, 2015
Power Grid Corporation of India Limited
Review petition for review of order dated 7.10.2015 in Petition No. 112/TT/2013.
16.2.2017 Review Petition
84. GT/293/2014 11th
September, 2014
NTPC Limited Petition for approval of tariff for Talcher Super Thermal Power Station, Stage-II, (2000 MW) for the period from 1.4.2014 to 31.3.2019.
16.2.2017 GenerationTariff
85. MP/383/2014 28th
September, 2014
MP Power Generating Co. Limited
Application under Clause 4 Part - 7 of CERC ( Indian Electricity Grid Code) Regulations, 2010 for extension of time for implementation of Restricted Governor Mode Operation (RGMO), as required under Clause 5.2 (f) of the Regulation, in respect of certain Thermal & Hydel Generating Stations operated by the Madhya Pradesh Power Generating Co. Limited.
15.2.2017 Misc. Petition
86. GT/184/2014 1st August, 2014
SJVN Limited Petition for approval of generation tariff of Rampur Hydro Electric Project (412 MW) for the period
31.3.2019.
15.2.2017 GenerationTariff
121
Annual Report
87. MP/65/2014 3rd April, 2014
NTPC Limited Petition under Regulation (4) of Part 7 of the CERC (Indian Electricity Grid Code) Regulations, 2010 read with Regulation 111 of CERC (conduct of Business) Regulations, 1999 seeking relaxation of Regulation 5.2(f) (iv) regarding requirement of implementing FGMO for certain units of NTPC.
13.2.2017 Misc. Petition
88. GT/473/2014 14th
December, 2014
Neyveli Lignite CorporationLimited
(Annual Fixed Charges and Energy Charges) for the period 2009-14 under CERC Tariff Regulations, 2009 for NLC TPS II Stage I (630 MW) and Stage II (840 MW) on account of additional capital expenditure incurred (truing up) for the period from 1.4.2009 to 31.3.2014.
10.2.2017 GenerationTariff
89. GT/181/2015 17th July, 2015
Damodar Valley Corporation
True up petition for approval of tariff of Chandrapura TPS Units 7 & 8 for the period 2011 -14.
9.2.2017 GenerationTariff
90. GT/115/2015 23rd April, 2015
Damodar Valley Corporation
True up petition in respect of approval of tariff of Mejia Thermal Power Station Unit Nos. 5 & 6 for the tariff period 2009-2014.
9.2.2017 GenerationTariff
91. RP/06/2016in Petition No. 135/TT/2012
29th January, 2016
Jindal Power Limited
Review Petition for review of order dated 18.12.2015 passed in Petition No. 135/TT/2012.
8.2.2017 Review Petition
92. MP/156/2014 17th July, 2014
Adani Power Limited.
Petition under Section 79 of the Electricity Act, 2003 read with Article 13 of the Power Purchase Agreements dated 7.8.2008 executed amongst Uttar Haryana Bijli Vitran Nigam Limited / Dakshin Haryana Bijli Vitran Nigam and Adani Power Limited.
6.2.2017 Misc. Petition
93. GT/327/2014 21st
September, 2014
NTPC Limited Petition for determination of Vindhyachal Super Thermal Power Station Stage - II (1000 MW) for the period from 1.4.2014 to 31.3.2019.
6.2.2017 GenerationTariff
94. GT/343/2014 21st
September, 2014
NTPC Limited Petition for revision of tariff of Vindhyachal STPS Stage-III from 1.4.2009 to 31.3.2014 after truing up exercise.
6.2.2017 GenerationTariff
95. GT/274/2014 10th
September, 2014
NTPC Limited Petition for revision of tariff of Farakka Super Thermal Power Station, Stage - I, ( 3 x 200 MW + 2 x 500 MW) for the period from 1.4.2009 to 31.3.2014 after the truing up exercise.
6.2.2017 GenerationTariff
122
Central Electricity Regulatory Commission
96. GT/194/2015 14th August, 2015
NHPC Limited Petition under Section 79 (1) & 86 of the CERC (Conduct of Business), Regulations, 1999, Section 62 (1) (a) of the Electricity Act, 2003 and Regulation 6 of CERC (Terms and Conditions of Tariff) Regulations, 2009 for truing up of capital expenditure for the period 2012-14 in respect of Chamera –III Power Station.
6.2.2017 GenerationTariff
97. GT/249/2014 26th August, 2014
NHPC Limited Petition for determination of tariff for the period 2014 -19 in respect of Chamera - III Power Station.
6.2.2017 GenerationTariff
98. TD/201/2016 19th
October, 2016
Atria Energy Services Private Limited
Application for grant of inter State trading licence.
1.2.2017 Trading
99. GT/372/2014 28th
September, 2014
NTPC Limited Petition for determination of tariff of Rihand Super Thermal Power Station Stage-III (1000 MW) for the period from 1.4.2014 to 31.3.2019.
6.2.2017 GenerationTariff
100. GT/248/2014 26th August, 2014
NHPC Limited Petition for approval of tariff for the period 2014-209 in respect of Teesta Low Dam-III Power Station.
6.2.2017 GenerationTariff
101. GT/193/2015 14th August, 2015
NHPC Limited Petition for truing up of capital expenditure for the period 2013 - 2014 in respect of Teesta Low Dam- III Power Station.
6.2.2017 GenerationTariff
102. MP/08/2014 24th January, 2014
Emco Energy Limited
Petition for evolving a mechanism for grant of an appropriate adjustment/
commercial impact of ‘Change in Law’ during construction and operating period.
1.2.2017 Misc. Petition
103. MP/8/2017 27th January, 2017
SKS Power Generation(Chhattisgarh)Limited
Petition under Section 79 (1) (k) of the Electricity Act, 2003 read with Regulation 8 (7) of the CERC (Grant of Connectivity, Long Term Access and Medium Term Open Access in Inter-State Transmission and related matters) Regulations, 2009 seeking permission for extension of the
and drawal of start-up power for commissioning & testing including full load testing of First Unit (Unit #2 (300 MW) of ( 4 X 300MW) Binjkote TPP of SKS Power Generation (Chhattisgarh) Limited, beyond six months from 31.1.2017 to 31.7.2016.
2.2.2017 Misc. Petition
104. MP/125/2014 30th June, 2014
NHPC Limited Petition under Section 79(1) (f) of the Electricity Act, 2003 for reimbursement of interest on the arrear bills issued after revised Regional Energy Account by NRPC in respect of Chamera-I HE Project for the period 1.5.1994 to 31.3.1997.
31.1.2017 Misc. Petition
123
Annual Report
105. GT/292/2014 11th
September, 2014
NTPC Limited Petition for determination of tariff of Ramagundam Super Thermal Power Station, Stage-I & II (2100 MW) for the period from 1.4.2014 to 31.3.2019.
24.1.2017 GenerationTariff
106. GT/345/2014 21st
September, 2014
NTPC Limited Petition for revision of tariff of Korba STPS Stage - I & II ( 3 X 200 MW + 3 X 500 MW) for the period from 1.4.2009 to 31.3.2014 after the truing up exercise.
25.1.2017 GenerationTariff
107. GT/328/2014 21st
September, 2014
NTPC Limited Petition for determination of tariff of Mauda Super Thermal Power Station Stage-I (1000 MW) for the period from 1.4.2014 to 31.3.2019.
1.2.2017 GenerationTariff
108. GT/308/2014 12th
September, 2014
NTPC Limited Petition for determination of tariff of Dadri GPS (829.78) for the period from 1.4.2014 to 31.3.2019.
27.1.2017 GenerationTariff
109. TT/558/2014 29th
December, 2014
Power Grid Corporation of India Limited
Petition for truing up of transmission tariff for 2009-14 and transmission tariff for 2014-19 tariff block for 400 kV D/C Baharmpur- Bheramara T/L, LILO of 400 KV S/C Farakka-Jeeraat T/L at Baharampur and 1 no. 80 MVAR Bus Reactor and associated line bays and reactor bay at Baharampur (DOCO:1.9.2013) under Interconnection between India and Bangaladesh Electrical Grids for India portion in Eastern Region.
31.1.2017 Transmission Tariff
110. GT/251/2014 26th August, 2014
NHPC Limited Petition for truing up of capital expenditure for the period 2009-14 and determination of tariff for the period 2014-19 in respect of Sewa –II Power Station.
27.1.2017 GenerationTariff
111. RP/36/2016 in GT/270/2014
17th August, 2016
NTPC Limited Petition for review of Commission’s order dated 27.6.2016 in Petition No 270/GT/2014.
27.1.2017 Review Petition
112. TDL/194/2016 10th
October, 2016
Re New Solar Services Private Limited
Application for grant of Inter-State Category IV trading licensee.
27.1.2017 Trading
113. TT/53/2016 1st April, 2016
Power Grid Corporation of India Limited
Petition under Regulation-86 of CERC (Conduct of Business) Regulations, 1999 and CERC (Terms and Conditions of Tariff) Regulations, 2014 for determination of transmission tariff from DOCO to 31.3.2019 for Asset- I 11 nos. OPGW links under Central Sector, 789.635 km. Asset-II 03 nos of OPGW links under Central Sector, 112,886 Km Asset- III 5 nos OPGW links under Central Sector 527.751 KM under the project Fiber Optic Communication system in ER under expansion of wide -band communication network in ER.
27.1.2017 Transmission Tariff
114. RP/32/2016 in TT/099/2014
3rd August, 2016
Power Grid Corporation of India Limited
Petition for review of order dated 29.4.2016 in Petition No. 99/TT/2016.
27.1.2017 Review Petition
124
Central Electricity Regulatory Commission
115. 104/MP/2016 4th July, 2016 NRSSXXIXTransmission Company Limited
Petition under Section 79 (1) (f) read with Section 79 (1) (c) of the Electricity Act, 2003 seeking payment of monthly transmission charges for the period starting from 7.4.2016 under the Transmission Services Agreement dated 2.1.2014 and order dated 15.7.2015 issued by the Ministry of Power entitled “Policy for Incentivizing Early Commissioning of Transmission Projects”.
23.1.2017 Misc. Petition
116. GT/283/2014 10th
September, 2014
NTPC Limited Petition for determination of tariff of Kahalgaon Super Thermal Power Station, Stage-II ( 3 x 500 MW) for the period from 1.4.2014 to 31.3.2019.
21.1.2017 GenerationTariff
117. GT/437/2014 9th
December, 2014
Aravali Power Company Private Limited
Petition under Sections 62 and 79(1) (a) of the Electricity Act, 2003, read with Chapter V of the CERC (Conduct of Business) Regulations, 1999 for approval of tariff of Indira Gandhi Super Thermal Power Station ( 3 X 500 MW) based on audited accounts as on 31.3.2014, for the period from the COD of Unit-I, i.e, 5.3.2011 to 31.3.2014 and amendment/ true up of Petition No. 229/2010 based on audited accounts as on 31.3.2014.
17.1.2017 GenerationTariff
118. TT/384/2014 28th
September, 2014
Parbati Koldam Transmission Company Limited
Petition for approval of tariff of 400 kV (Quad) 2 X S/C Parbati-Koldam Transmission Line, starting from LILO point of Parbati (Banala) Pooling Station to Koldam HEP for control period of 2014-2019 under CERC (Terms & Conditions of Tariff) Regulations, 2014.
16.1.2017 Transmission Tariff
119. 155/MP/2016 30th August, 2016
PatranTransmission Company Limited
Petition under Sections 63 and 79 (1) (f) and 79 (1) (c) and other applicable provisions of the Electricity Act, 2003 seeking recovery of transmission charges from the date of commissioning of the transmission project.
4.1.2017 Misc. Petition
120. TT/118/2014 19th June, 2014
Power Grid Corporation of India Limited.
Petition for approval of transmission tariff from DOCO to 31.3.2019 for Assets (07 Nos) under Transmission System for transfer of power from Generation Projects in Sikkim to NR/WR Part-B in ER.
29.12.2016 Transmission Tariff
121. GT/107/2016 6th July, 2016 NHPC Limited Petition for approval of generation tariff of Teesta Low Dam Project Stage-IV for the period from 11.3.2016 to 31.3.2019.
3.1.2017 GenerationTariff
122. MP/238/2016 21st
November, 2016
My Home Power Private Limited
Petition for change of category for Inter -State Trading from Category III to Category II.
2.1.2017 Misc. Petition
125
Annual Report
123. TT/164/2016 1st
September, 2016
Power Grid Corporation of India Limited
Petition under Regulation-86 of CERC (Conduct of Business) Regulations, 1999 and Regulation 6 of CERC (Terms and Conditions of Tariff) Regulations, 2009 and CERC (Terms and Conditions of Tariff) Regulations, 2014 for determination of transmission tariff for 2014 -19 tariff block for the assets of transmission system for Phase-I Generation Projects in Orissa Part - C in Western Region as covered in CERC order dated 18.4.2016 in Petition No. 44/TT/2014 covered in CERC order dtd 14.3.2016 in Petition No. 301/TT/2013.
28.12.2016 Transmission Tariff
124. TT/149/2016 29th August, 2016
Power Grid Corporation of India Limited
Petition under Regulation 86 of CERC (Conduct of Business) Regulations, 1999 and CERC (Terms and Conditions of Tariff) Regulations, 2014 for determination of transmission tariff from DOCO to 31.3.2019 for Assets: 400/220 kV Ludhiana substation: (+) 600 MVAR/ (-) 400 MVAR Under Static VAR Compensators (SVCs) in Northern Region.
28.12.2016 Transmission Tariff
125. SM/11/2016 28th
December, 2016
CentralElectricityRegulatory Commission
Determination of Fee and Charges payable under Regulation 11 of the Central Electricity Regulatory Commission (Terms and Conditions for Recognition and Issuance of
Renewable Energy Generation) Regulations, 2010.
28.12.2016 Suo Motu
126. TT/156/2015 11th June, 2015
Parbati Koldam Transmission Company Limited
Petition for determination of transmission tariff for section of 400 kv (Quad) 2 X S/C Parbati- Koldam Transmission Line, starting from Parbati -II HEP to LILO point of Parbati (Banala) Pooling Station for Circuit-I and from Parbati-II HEP to LILO point of Parbati-III HEP for Circuit-II for control period of 2014-2019 under CERC (Terms and Conditions of Tariff) Regulations, 2014.
29.12.2016 Transmission Tariff
127. TT/245/2015 21st
October, 2015
EasternRegional Load DespatchCentre
Petition for determination of Fees and Charges for Eastern Regional Load Despatch Centre for the tariff period 2014-19 under sub-Section (4) of Section 28 of the Electricity Act, 2003 read with Regulation 6 of CERC (Fees and Charges of Regional Load Desptach Centre and other related matters) Regulations, 2015.
29.12.2016 Transmission Tariff
126
Central Electricity Regulatory Commission
128. TT/242/2015 21st
October, 2015
SouthernRegional Load DespatchCentre
Application under sub-Section (4) of Section 28 of the Electricity Act, 2003 read with Regulation 6 of CERC (Fees and Charges of Regional Load Desptach Centre and other related matters) Regulations, 2015 for SRLDC charges for the control period 1.4.2014 to 31.3.2019.
29.12.2016 Transmission Tariff
129. MP/95/2016 27th June, 2016
Essar Power (Jharkhand)Limited
Petition for adjudication of dispute arising from the termination of the PPA dated 9.7.2010 by the Bihar State Power (Holding) Company Limited.
27.12.2016 Misc. Petition
130. MP/132/2016 9th August, 2016
Neyveli Lignite CorporationLimited
Petition seeking upward revision
schedule of operation of Central Generating Stations and Inter-State Generating Stations and other related issues consequent to CERC (IEGC) (Fourth Amendment) Regulations, 2016.
27.12.2016 Misc. Petition
131. MP/158/2015 10th June, 2015
Power System OperationCorporationLimited
Petition on default in payment of deviation charges in excess of the drawl schedule by PDD J & K and default in opening letter of credit towards the non-payment of deviation (DSM) charges.
28.12.2016 Misc. Petition
132. RP/25/2016 in 205/GT/2013
14th July, 2016
NTPC Limited Petition for review of order dated 14.3.2016 in Petition No. 205/GT/2013..
27.12.2016 Review Petition
133. MP/247/2016 21st
December, 2016
NTPC Limited Petition seeking Commission's permission to allow interchange of power for testing including full load testing and trial run operation of Unit No. 1 of Mouda STPS Stage-II ( 2 x 660 MW) beyond the period of 6 months from the date of its
27.9.2016.
23.12.2016 Misc. Petition
134. MP/101/2016 4th July, 2016 Essar Power (Jharkhand)Limited
Petition for relinquishment of 350 MW of Long Term Access agreed under the Bulk Power Transmission Agreement dated 24.2.2010 under Regulation 18 read with Regulation 32 of Central Electricity Regulatory Commission (Grant of Connectivity, Long-term and Medium-term Open Access in inter-state Transmission and related matters) Regulations, 2009.
22.12.2016 Misc. Petition
127
Annual Report
135. MP/100/2016 4th July, 2016 Essar Power (Jharkhand)Limited
Petition for keeping in abeyance long term access to the extent of 750 MW and consequent connectivity agreed under the Bulk Power Transmission Agreement dated 24.2.2010 under Regulation 32 of Central Electricity Regulatory Commission (Grant of Connectivity, Long-term Access and Medium-term Open Access in inter-State Transmission and related matters) Regulations, 2009.
22.12.2016 Misc. Petition
136. TT/241/2015 21st
October, 2015
Power System OperationCorporationLimited
Application under sub-Section (4) of Section 28 of the Electricity Act, 2003 read with Regulation 6 of CERC (Fees and Charges of Regional Load Desptach Centre and other related matters) Regulations, 2015 for WRLDC charges for the control period 1.4.2014 to 31.3.2019.
26.12.2016 TransmissionTariff
137. TT/243/2015 21st
October, 2015
Power System OperationCorporationLimited
Application under sub-Section (4) of Section 28 of the Electricity Act, 2003 read with Regulation 6 of CERC (Fees and Charges of Regional Load Despatch Centre and other related matters) Regulations, 2015 for NRLDC charges for the control period 1.4.2014 to 31.3.2019.
26.12.2016 Transmission Tariff
138. TT/244/2015 21st
October, 2015
Power System OperationCorporationLimited
Application under sub-section (4) of Section 28 of the Electricity Act, 2003 read with Regulation 6 of CERC (Fees and Charges of Regional Load Desptach Centre and other related matters) Regulation 2015 for NLDC Charges for the control period 1.4.2014 to 31.3.2019.
26.12.2016 Transmission Tariff
139. TT/240/2015 21st
October, 2015
Power System OperationCorporationLimited
Application under sub-section (4) of Section 28 of the Electricity Act, 2003 read with Regulation 6 of CERC (Fees and Charges of Regional Load Desptach Centre and other related matters) Regulation 2015 for NLDC Charges for the control period 2014-2019.
26.12.2016 Transmission Tariff
140. TT/71/2016 2nd May, 2016
Parbati Koldam Transmission Company Limited
Petition under Regulation-86 of CERC (Conduct of Business) Regulations, 1999; CERC (Terms and Conditions of Tariff) Regulation 2009 and CERC (Terms and Conditions of Tariff) Regulations, 2014 for determination of (i) Truing Transmission Tariff for 2009-14 Tariff Block and (ii). Transmission Tariff for 2014-19 Tariff Block for a section of 400 kV (Quad) S/C Parbati - Koldam Transmission Line (Ckt-II) starting from LILO point of Parbati-III HEP to LILO point of Parbati Pooling Station (DOCO - 1.8.2013) in Northern Region.
23.12.2016 Transmission Tariff
128
Central Electricity Regulatory Commission
141. MP/191/2016 7th October, 2016
DB Power Limited
Petition under Section 79(1) (c) read with Section 79 (1) (f) of the Electricity Act, 2003 read with Regulation 111 of the Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999.
20.12.2016 Misc. Petition
142. MP/40/2016 3rd March, 2016
NHDC Limited Petition under Regulation 31 (3) Terms and Conditions of Tariff Regulations, 2014 for declared
by State Load Dispatch Centre of MP in respect of NHDC’s Hydro Generating Stations i.e. Indira Sagar Power Station (ISPS) and Omkareshwer Power Station (OSPS).
20.12.2016 Misc. Petition
143. MP/105/2016 5th July, 2016 The Oudh Sugar Mills Limited
Petition under Section 79 (1) of the Electricity Act, 2003 and Regulations 14 & 15 of CERC (Terms and Conditions for recognition and issuance of Renewable Energy
Generation) Regulations, 2010.
20.12.2016 Misc. Petition
144. RP/39/2016 in 252/TT/2015
29th August, 2016
Power Grid Corporation of India Limited
Review Petition for review of order dated 25.4.2016 in Petition No. 252/TT/2015.
19.12.2016 Review Petition
145. TT/312/2014 20th
September, 2014
Parbati Koldam Transmission Company Limited
Petition for determination of transmission tariff for 400 kV D/C Koldam - Ludhiana transmission line for control period of 2014 - 2019.
19.12.2016 Transmission Tariff
146. MP/135/2016 17th August, 2016
KarnatakaPower Transmission CorporationLimited
Petition under Sections 79 & 94 (2) of the Electricity Act, 2003 read with Regulation 116 of the Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999.
15.12.2016 Misc. Petition
147. MP/88/2016 9th June, 2016
Kerala State ElectricityBoard Limited
Petition seeking extension of time on the order dated 18.8.2015 in
KSEB Ltd. before the Commission in the matter of providing protection systems having reliability, selectivity, speed and sensitivity and keeping them functional.
15.12.2016 Misc. Petition
148. AT/162/2016 30th August, 2016
NRSS XXXVI Transmission Limited
Application under Section 63 of the Electricity Act, 2003 for adoption of transmission charges with respect to Transmission System "System Strengthening Scheme in Northern Region (NRSS-XXXVI) along with LILO of Sikar - Neemrana 400 kv D/C Line at Babai (RRVPNL)" established by NRSS XXXVI Transmission Limited.
14.12.2016 Adoption of Tariff
129
Annual Report
149. TT/246/2014 24th August, 2014
Power Grid Corporation of India Limited
Petition for approval of transmission tariff from DOCO to 31.3.2019 for Assets (09) Nos. under “Transmission System for Phase - I Generation Projects in Orissa- Part –A” in ER.
14.12.2016 Transmission Tariff
150. TT/18/2016 10th
February, 2016
Power Grid Corporation of India Limited
Petition for approval under Regulation 86 of CERC (Conduct of Business) Regulations, 1999 and CERC (Terms and Conditions of Tariff) Regulations, 2014 for determination of Transmission Tariff for 400 KV D/C Surjyamaninagar (Tripura) Indo-Bangladesh Border Transmission Line alongwith two nos. Associated bays at Surjyamaninagar Substation (TSECL) under project Radial Interconnection between India (NER) and Bangladesh Indian portion in North Eastern Region.
8.12.2016 Transmission Tariff
151. TL/161//2016 30th August, 2016
NRSS XXXVI Transmission Limited
Application under Section 14 of the Electricity Act, 2003 read with Central Electricity Regulatory Commission (Procedure, Terms and Conditions for Grant of Transmission License and other related matters) Regulations, 2009 with respect to Transmission License to NRSS XXXVI Transmission Limited.
7.12.2016 Transmission Lincence
152. MP/225/2016 11th
November, 2016
Kanti Bijlee Utpadan Nigam Limited
Petition seeking Commission’s permission to allow extension of the period for drawal of start up
for testing including full load trial operation of Unit 1 & Unit 2 of Muzaffarpur Thermal Power Station (MTPS) Stage-II, ( 2 X 195 MW) of KBUNL beyond six months from initial synchronization.
6.12.2016 Misc. Petition
153. MP/219/2016 4th
November, 2016
SipatTransmission Limited
Petition for approval under Sections 17 (3) & 17 (4) of Electricity Act 2003, for assignment of licence by way for creation of security interest in favour of Security Trustee / Lenders and other security creating documents / Financial Agreements by way of mortgage / hypothecation / assignment of mortgage properties and project assets of Sipat Transmission Limited.
6.12.2016 Misc. Petition
154. GT/306/2014 11th
September, 2014
NTPC Limited Petition for revision of tariff of Vindhyachal Super Thermal Power Station Stage - I (1260 MW) for the period from 1.4.2009 to 31.3.2014 after the true up exercise.
5.12.2016 GenerationTariff
155. GT/296/2014 11th
September, 2014
NTPC Limited Petition for revision of tariff of Vindhyachal STPS Stage-II (2 X 500 MW) for the period from 1.4.2009 to 31.3.2014 after the true up exercise.
6.12.2016 GenerationTariff
130
Central Electricity Regulatory Commission
156. GT/295/2014 11th
September, 2014
NTPC Limited Petition for approval of tariff of Sipat STPS Stage-I (1980 MW) for the period from COD of Unit-1 (1.10.2011) to 31.3.2014 after the true up exercise.
6.12.2016 GenerationTariff
157. MP/159/2012 13th July, 2012
CoastalGujarat Power Limited
Petition under Sections 61, 63 and 79 of the Electricity Act, 2003 for establishing an appropriate mechanism to offset in tariff the adverse impact of the unforeseen, uncontrollable and unprecedented escalation in the imported coal price due to enactment of new Coal Pricing Regulation by Indonesian Government and other factors.
6.12.2016 Misc. Petition
158. MP/155/2012 9th July, 2012 Adani Power Limited
Petition under Section 79 of the Electricity Act, 2002 for evolving a mechanism for regulating including changing and/ or revising tariff on account of frustration and / or occurrence of Force Majeure (Article 12) and or change in law (Article 13) events under the PPAs due to circumstances in the allotment of domestic coal by GOI-CIL and enactment of new Coal Pricing Regulation by Indonesian Government.
6.12.2016 Misc. Petition
159. TT/48/2016 23rd March, 2016
Power Grid Corporation of India Limited
Petition for approval under Regulation 86 of CERC (Conduct of Business) Regulations, 1999 CERC (Terms and Conditions of Tariff) Regulations, 2014 for determination of Transmission Tariff from DOCO to 31.3.2019 for (i) No. OPGW in 21.003 kms under Central Sector (ii) No. of OPGW link 17.03 Kms under WBSETCL sector and (iii) 7 nos of OPGW link under DVC sector 196.81 kms (iv) 02 no of OPGW link 278.641 kms under Central sector (v) 2 No. of OPGW link 35.044 kms under WBSETCL Sector and (vi) 01 no. OPGW link under DVC Sector
optical communication system in lieu
Communication (ULDC) microwave links in Eastern Region.
5.12.2016 Transmission Tariff
160. GT/318/2014 20th
September, 2014
NTPC Limited Petition for determination of tariff of Rihand Stage-II (1000 MW) for the period from 1.4.2014 to 31.3.2019.
1.12.2016 GenerationTariff
161. RP/29/2016 in TT/100/2014
1st August, 2016
Power Grid Corporation of India Limited
Petition for review of order dated 29.4.2016 in Petition No. 100/TT/2014.
24.11.2016 Review Petition
131
Annual Report
162. MP/57/2016 31st March, 2016
Power System OperationCorporationLimited
Petition under sub section (4) of Section 28 of the Electricity Act, 2003 read with Regulation 6 and Regulation 29 of CERC (Fees and Charges of RLDC and other related matters) Regulations, 2015 for approval of Performance Linked incentive for NLDC for the Financial Year 2014-15 with reference to NLDC charges for the control period 1.4.14 to 31.3.2019.
21.11.2016 Misc. Petition
163. MP/60/2016 31st March, 2016
Power System OperationCorporationLimited
Petition under sub Section (4) of Section 28 of the Electricity Act, 2003 read with Regulation 6 and Regulation 29 of CERC (Fees and Charges of RLDC and other related matters) Regulations, 2015.
21.11.2016 Misc. Petition
164. MP/138/2016 18th August, 2016
ArunachalPradesh Power CorporationPrivate Limited
Application for upgradation of inter-State Power Trading Licence from Category – III to Category –II (Including Jammu & Kashmir).
18.11.2016 Misc. Petition
165. MP/59/2016 6th April , 2016
Power System OperationCorporationLimited
Petition under sub Section (4) of Section 28 of the Electricity Act, 2003 read with Regulation 6 and Regulation 29 of CERC (Fees and Charges of RLDC and other related matters) Regulations, 2015 for approval of Performance Linked incentive for WRLDC for the Financial Year 2014-15 with reference to WRLDC charges for the control period 1.4.14 to 31.3.2019.
18.11.2016 Misc. Petition
166. TL/157/2016 30th August, 2016
Khargone Transmission Limited (KTL)
Application under Section 14 read with Section 15 (1) of the Electricity Act, 2003 and Central Electricity Regulatory Commission (Procedure, Terms and Conditions for grant of Transmission License and other related matters) Regulations, 2009 for grant of Transmission License to Khargone Transmission Limited.
17.11.2016 Trading Licence
167. MP/54/2016 1st April, 2016
Power System OperationCorporationLimited.
Petition under sub Section (4) of Section 28 of the Electricity Act, 2003 read with Regulation 6 and Regulation 29 of CERC (Fees and Charges of RLDC and other related matters) Regulations, 2015 for approval of Performance Linked incentive for SRLDC for the Financial Year 2014-15 with reference to SRLDC charges for the control period 1.4.14 to 31.3.2019.
18.11.2016 Misc. Petition
132
Central Electricity Regulatory Commission
168. MP/55/2016 30th March, 2016
Power System OperationCorporationLimited
Petition under Regulations 6 and 29 of CERC (Fees and Charges of Regional Load Despatch Centre and other related matters) Regulations, 2015 for approval of performance linked incentive for
with reference to NRLDC charges for the control period 1.4.2014 to 31.3.2019.
18.11.2016 Misc. Petition
169. MP/56/2016 31st March, 2016
Power System OperationCorporationLimited
Petition under sub-section (4) of Section 28 of Electricity Act, 2003 read with Regulation 6 and Regulation 29 of CERC (Fees and Charges of RLDC and other related matters) Regulations 2015 for approval of Performance Linked incentive for ERLDC for the Financial year 2014-15 with reference to ERLDC charges for the control period 1.4.14 to 31.3.2019.
18.11.2016 Misc. Petition
170. AT/156/2016 30th August, 2016
Khargone Transmission Limited
Petition under Section 63 of Electricity Act, 2003 and CERC (Procedure, Terms & Conditions for grant of Transmission License and other related matters) Regulation, 2009 for adoption of transmission charges with respect to transmission system being established by Khargone Transmission Limited.
11.11.2016 Adoption of Tariff
171. MP/82/2016 28th May, 2016
NTPC Limited Petition under Section 79 (1) (a) of the Electricity Act, 2003 read with the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2009 for extension of Power Purchase Agreement dated 22.12.1995 with erstwhile Haryana State Electricity Board (now Haryana Power Purchase Centre) for ten (10) years beyond 31.12.2015.
10.11.2016 Misc. Petition
172. TT/129/2016 3rd August, 2016
Power Grid Corporation of India Limited
Petition for truing up transmission tariff for 2009-14 tariff block and transmission tariff for 2014-19 tariff block for Neelamangala Mysore 400 kV D/C Transmission Line along with 2 X 315 MVA, 400 /220 kV ICTs at Mysore Substation (1.5.2006) in Southern Region.
25.10.2016 Transmission Tariff
173. MP/199/2016 18th
October, 2016
NTPC Limited Petition under Regulation 8 (7) of CERC (Grant of Connectivity, LTA and MTOA in inter- State transmission and related matters) (Fourth amendment) Regulations, 2014 seeking the Commission's permission to allow extension of drawl of start-up power beyond 15 months from the date of commencement of the same for pre-commissioning activities, including full load testing of Unit-I (660 MW) of Solapur STPP (2X660 MW).
8.11.2016 Misc. Petition
174. GT/268/2014 10th
September, 2014
NTPC Limited Petition for determination of tariff of Ramagundam Super Thermal Power Station, Stage - III, (500 MW) for the period 1.4.2014 to 31.3.2019.
8.11.2016 GenerationTariff
133
Annual Report
175. TT/27/2016 19th
February, 2016
Power Grid Corporation of India Limited
Petition for approval under Regulation -86 of CERC (Conduct of Business) Regulations, 1999 and CERC (Terms and Conditions of Tariff) Regulations, 2014 for determination of transmission tariff from anticipated DOCO to 31.3.2019 for ASSET-I Ranchi-WR Pooling Station (Sipat) and Asset - II 765 kv 3 x 80 MVAR Bus Reactor I I along with associated bays at Ranchi under Common Scheme for 765 KV Pooling Stations and Network for NR Import by NR from ER and from NER/SR/WT via ER and Common scheme for network for WR and import by WR from ER and from NER/SR/WT via ER in Eastern Region.
7.11.2016 Transmission Tariff
176. I.A Nos. 34/2015 and 5 of 2016 in Petition No. MP/205/2011(Consequentialorder as per Appellate Tribunal vide its judgment dated 13.1.2014 in Appeal No. 16 of 2013)
17th
October, 2011
MeenakshiEnergy Private Limited
Petition for giving directions to SRLDC and POSOCO to recognize the 1000 MW project being developed by the petitioner as an independent generating station and to treat thermal power projects developed by the petitioner and by Simhapuri Energy Private Ltd. as separate and independent generating stations for the purpose of scheduling & dispatch, metering, energy accounting including UI computation.
3.8.2016 Misc. Petition
177. RP/30/2016 in TT/017/2014
3rd August, 2016
Power Grid Corporation of India Limited
Petition for review of the order dated 31.5.2016 in Petition No. 17/TT/2014.
31.10.2016 Review Petition
178. MP/166/2016 1st
September, 2016
PatranTransmission Company Limited
Petition under Section 17 (3) of the Electricity Act for creation of security interest over the transmission assets of the petitioner.
31.10.2016 Misc. Petition
179. MP/212/2016 26th
October, 2016
NTPC Limited Petition under Regulation 8 of CERC (Grant of Connectivity, Long term Access and Medium term Open Access in inter-State Transmission and related matters) Regulations, 2009.
31.10.2016 Misc. Petition
180. MP/114/2016 15th July, 2016
My Home Power Private Limited
Petition for change of Category for Trading Licence from Category III to Category II.
31.10.2016 Misc.
181. TT/147/2016 29th August, 2016
Power Grid Corporation of India Limited
Petition for approval under Regulation-86 of CERC (Conduct of Business) Regulations, 1999 and CERC (Terms and Conditions of Tariff) Regulations, 2014 for determination of transmission tariff from DOCO to 31.3.2019 for Asset-I: 400kV D/C Patiala Panchkula T/L under Northern Region System Strengthening scheme- XXXII.
28.10.2016 Transmission Tariff
134
Central Electricity Regulatory Commission
182. RP/49/2016 in 248/TT/2015
20th
September, 2016
Power Grid Corporation of India Limited
Petition for review of the order dated 30.5.2016 in Petition No. 248/TT/2015.
27.10.2016 Review Petition
183. RP/43/2016 in 113/TT/2013
8th
September, 2016
Power Grid Corporation of India Limited
Petition seeking review of the order dated 18.3.2016 in Petition No. 113/TT/2013.
27.10.2016 Review Petition
184. RP/34/2016 in MP/62/2014
5th August, 2016
Rattan India Power Limited
Petition for review of the order dated 25.5.2016 in Petition No. 62/MP/2014.
20.10.2016 Review Petition
185. GT/269/2014 10th
September, 2014
NTPC Limited Petition for determination of tariff of Rajiv Gandhi Combined Cycle Power Project, Kayamkulam, (359.58 MW) for the period 1.4.2014 to 31.3.2019.
27.10.2016 GenerationTariff
186. RP/10/2015 in Petition Nos. 127/2012, 128/TL/2012 & 156/MP/2012.
4th June, 2015
Power Grid Corporation of India Limited
Petition for review of order dated 6.4.2015 in Petition Nos. 127/2012, 128/TL/2012 & 156/MP/2012.
20.10.2016 Review Petition
187. MP/35/2016 3rd March, 2016
Power Grid Corporation of India Limited
Petition under Section 38 (2) of the Electricity Act, 2003 read with Section 79 (1) (c) and Section 79 (1) (k) of Act, alongwith (i) CERC (Grant of Connectivity Long Term and Medium Term Open Access to the Inter-State Transmission and Related Matters) Regulations, 2009 (ii) CERC (Grant of Regulatory Approval for execution of inter-State Transmission Scheme to Central Transmission Utility Regulations, 2010 (iii) Regulations 111 and 114 of CERC (Conduct of Business) Regulations, 1999 and (iv) CERC (Sharing of inter-State Transmission Charges and Losses) Regulations, 2010 for signing of Long Term Access Agreement and Grant of Regulatory Approval for execution of the Transmission System associated with Nabinagar-II STPP.
20.10.2016 Misc. Petition
188. SM/10/2016 20th July, 2016
CentralElectricityRegulatory Commission
Non-compliance of the Central Electricity Regulatory Commission (Procedure Terms and Conditions for grant of trading licence and other related matters) Regulations, 2009
20.10.2016 Suo Motu
189. RP/26/2016 in 50/MP/2015
15th July, 2016
MB Power (Madhya Pradesh)Limited
Petition for review of order dated 25.05.2016 in Petition No. 50/MP/2016.
20.10.2016 Review Petition
135
Annual Report
190. TT/106/2016 6th July, 2016 Power Grid Corporation of India Limited
Petition for approval under Regulation- 86 of CERC (Conduct of Business) Regulations, 1999 and CERC (Terms and Conditions of Tariff) Regulations, 2014 for determination of Transmission Tariff from DOCO to 31.3.2019 for Asset 1 :- 1 no. of 400 kV Bay along with 50 MVAR Line Reactor for Ckt # 1 of 400 kV RAPP-Shujalpur Transmission Line (DOCO-04.02.2016) and Asset 2 :- 1 no. of 400 kV Bay along with 50 MVAR Line Reactor for Ckt # 2 of 400 kV RAPP-Shujalpur Transmission Line (DOCO-28.02.2016) under provision of 400 KV bays at Shujalpur for parts ATS of RAPP 7 & 8 in Western Region.
26.10.2016 Transmission Tariff
191. TT/160/2016 30th August, 2016
Power Grid Corporation of India Limited
Petition for approval under Regulation 86 of CERC (Conduct of Business) Regulations, 1999 and Regulation 6 of CERC (Terms and Conditions of Tariff) Regulations, 2009 and CERC (Terms and Conditions of Tariff) Regulations, 2014 for truing up of transmission tariff for 2009-14 tariff block and transmission tariff for 2014-19 tariff block for Vallur TPS-Melakottaiyur 400 kV D/C line under Supplementary Transmission System associated with Vallur TPS in Southern Region.
26.10.2016 Transmission Tariff
192. RP/41/2016 in GT/207/2014
8th
September, 2016
NTPC Limited Petition for review of order dated 20.7.2016 in in Petition No. 207/GT/2014.
27.10.2016 Review Petition
193. TT/163/2016 30th August, 2016
Power Grid Corporation of India Limited
Petition for approval under Regulation-86 of CERC (Conduct of Business) Regulations, 1999 and Regulation 6 of CERC (Terms and Conditions of Tariff) Regulations, 2009 and CERC (Terms and Conditions of Tariff) Regulations, 2014 for determination of (i) truing up transmission tariff for 2009-14 tariff block and (ii) transmission tariff for 2014-19 tariff block for LILO of 1st circuit of 400 kV D/C Nathpa Jhakri- Nalagarh (Triple Snowbird) Line at Rampur (DOCO: 1.3.2014) under Transmission System associated with Rampur HEP.
26.10.2016 Transmission Tariff
136
Central Electricity Regulatory Commission
194. TT/124/2016 1st August, 2016
Power Grid Corporation of India Limited
Petition for approval under regulation-86 of CERC (Conduct of Business) Regulations, 1999 and Regulation -6 of CERC (Terms and Conditions of Tariff) Regulations, 2009 and CERC (Terms and Conditions of Tariff) Regulations, 2014 for determination of (i) truing up transmission tariff for 2009-14 tariff block and (ii) transmission tariff for 2014-19 tariff block for Asset-I: 315 MVA, 400/220 kV ICT at Bhiwadi (DOCO: 1.2.2013), under provision of spare ICTs and Reactors in Eastern, Northern, Southern & Western Regions.
26.10.2016 Transmission Tariff
195. TT/145/2016 29th August, 2016
Power Grid Corporation of India Limited
Petition for approval under regulation-86 of CERC (Conduct of Business) Regulations, 1999 and Regulation -6 of CERC (Terms and Conditions of Tariff) Regulations, 2009 and CERC (Terms and Conditions of Tariff) Regulations, 2014 for determination of (i) truing up transmission tariff for 2009-14 tariff block and (ii) transmission tariff for 2014-19 tariff block for provision of Spare ICTs and Reactors for Southern Region.
21.10.2016 Transmission Tariff
196. RP/48/2016 in GT/302/2014
17th
September, 2016
NTPC Limited Petition for review of the order dated 30.7.2016 in Petition No. 302/GT/2014.
20.10.2016 Review Petition
197. MP/74/2016 4th May, 2016
PatranTransmission Company Limited
Petition under Section 79 (1) (f) read with Section 79 (1) (c) and other applicable provisions of the Electricity Act, 2003 seeking declaration of the effective date and the scheduled COD of the project in terms of the Transmission Services Agreement executed by the petitioner with the respondent.
14.10.2016 Misc. Petition
198. TDL/2/2016 8th January, 2016
NTPC Limited Petition for grant of license for inter-State trading in electricity.
14.10.2016 Trading
199. GT/254/2014 26th August, 2014
Neyveli Lignite CorporationLimited
Petition for tariff (Annual Fixed Charges and Energy Charges) for the period 2014-19 under CERC Tariff Regulations, 2014 for NLC TPS I Expansion 2 X 210 MW.
4.10.2016 GenerationTariff
200. GT/207/2015 22nd July, 2015
Damodar Valley Corporation
Petition for approval of tariff of Mejia TPS Units 7 and 8 (2 x 500 MW) for the period 2014 – 2019.
3.10.2016 GenerationTariff
201. RC/211/2015 18th August, 2015
Power Exchange India Limited
Application seeking additional time period to comply with the Net worth Norms and Shareholding Pattern as prescribed under Regulation 18 (i)19 (1) and 20 of the CERC(Power Market) Regulations, 2010.
29.9.2016 Regulatory Compliance
137
Annual Report
202. RP/05/2016in Petition No.251/GT/2013
25th January, 2016
Bhakhra Beas ManagementBoard
Petition for review of the order dated 12.11.2015 in Petition No.251/GT/2013.
30.9.2016 Review Petition
203. GT/354/2014 28th
September, 2014
Damodar Valley Corporation
Petition for determination of tariff for Maithon Hydel power Station unit Nos I, II and III (2 X 20 MW + 1 X 23.2 MW) for the tariff period 2014-19.
20.9.2016 GenerationTariff
204. GT/352/2014 28th
September, 2014
Damodar Valley Corporation
Petition for determination of tariff for Mejia Thermal Power Station unit No. IV ( I X 210 MW) for the tariff period 2014 -2019.
20.9.2016 GenerationTariff
205. GT/351/2014 28th
September, 2014
Damodar Valley Corporation
Petition for determination of tariff for Tilaya Hydel Power Station unit Nos. I and II ( 2 X 2 MW) for the tariff period 2014-2019.
23.9.2016 GenerationTariff
206. GT/350/2014 28th
September, 2014
Damodar Valley Corporation
Petition for determination of tariff for Bokaro Thermal Power Station unit Nos I, II and III (3 X 210 MW) for the period 2014 - 2019.
27.9.2016 GenerationTariff
207. GT/349/2014 28th
September, 2014
Damodar Valley Corporation
Petition for determination of tariff for Chandrapura Thermal Power Station unit Nos I, II and III ( 3 X 130 MW) for the period 2014-2019.
23.9.2016 GenerationTariff
208. TL/122/2016 29th July, 2016
Gurgaon Palwal Transmission Limited
Application for grant of transmission license under Section 14 read with Section 15 (1) of Electricity Act, 2003.
29.9.2016 Trading Licence
209. TL/116/2016 18th July, 2016
North KaranpuraTransco Limited
Application under Sections 14, 15, 79 (1) (e) of the Electricity Act, 2003 read with Central Electricity Regulatory Commission (Procedure, Terms and Conditions for Grant of Transmission License and other related matters) Regulations, 2009 with respect to Grant of Transmission License to North Karanpura Transco Limited.
29.9.2016 Trading Licence
210. TL/111/2016 July 14, 2016 Warora Kurnoon Transmission Limited
Application under Section 14 of the Electricity Act, 2003 read with Central Electricity Regulatory Commission (Procedure, Terms and Conditions for Grant of Transmission License and other related matters) Regulations, 2009 with respect to Transmission License to Warora-Kurnool Transmission Limited.
29.9.2016 Trading Licence
211. RP/7/2016 in Petition No. 291/TT/2013
27th January, 2016
Power Grid Corporation of India Limited
Petition for review of order dated 24.11.2015 in Petition No.291/TT/2013.
29.9.2016 Review Petition
138
Central Electricity Regulatory Commission
212. MP/030/2014 22nd
February, 2014
National Load DispatchCentre
Petition for grant of Connectivity as per Regulation 8 (2) and 8 (4) of the Central Electricity Regulatory Commission (Grant of Connectivity, Long-term Access and Medium-term Open Access in Inter-State Transmission and related matters) Regulations, 2009 and Regulation 4(2) and 6 (6) of the Central Electricity Authority (Technical Standards for Connectivity to the Grid) Regulations, 2007.
28.9.2016 Misc. Petition
213. TT/25/2016 19th
February, 2016
Power Grid Corporation of India Limited
Petition for approval under Regulation 86 of CERC (Conduct of Business) Regulations, 1999 and CERC (Terms and Conditions of Tariff) Regulations, 2014 for determination of (i) truing up transmission tariff for 2009-14 tariff block and (ii) transmission tariff for 2014-19 tariff block - for Asset-I 400 KV D/C (Quad) Maithon-Koderma (Part of Koderma-Gaya) line under contingency arrangement under Supplementary Transmission System associated with DVC and Maithan (RB) Projects in Eastern Region.
29.9.2016 Transmission Tariff
214. GT/334/2014 21st
September, 2014
NTPC Limited Petition for determination of tariff of Talcher Thermal Power Station (460 MW) for the period from 1.4.2014 to 31.3.2019.
26.9.2016 GenerationTariff
215. 11/MP/2016 25th January, 2016
NationalEnergy Trading and Services Limited
Petition under Section 79 (1) (c) and (f) of the Electricity Act, 2003 read with Regulations 10,19 and 23 of CERC (Grant of Connectivity, Long Term Access and Medium Term Open Access in inter-State Transmission and related matters), Regulation 2009 read with Regulations 110,111, 112 & 115 of the CERC (Conduct of Business), Regulation 1999.
26.9.2016 Misc. Petition
216. GT/253/2014 26th August, 2014
Neyveli Lignite CorporationLimited
Fixed Charges and Energy Charges) for 6 X 50 + 3 X 100) MW, NLC TPS I under CERC Tariff Regulations, 2014 for the period 2014-19.
26.9.2016 GenerationTariff
217. 19/RP/2016in Petition No.153 of 2015
21st March, 2016
Sasan Power Limited
Petition for review of order dated 19.2.2016 in Petition No.153 of 2015.
22.9.2016 Review Petition
218. GT/229/2014 24th August, 2014
NHPC Limited Petition for determination of tariff for the period 2014 -19 in respect of Nimoo Bazgo HE Project ( 3 x 15 MW) for the period from 2014-19.
22.9.2016 GenerationTariff
139
Annual Report
219. MP/43/2016 14th March, 2016
RAPPTransmission Company Limited
Petition under Section 79(1) (f) read with Sec 79(1) (c) of Electricity Act, 2003 seeking payment of monthly transmission charges for the period starting from 26.12.2015 under the Transmission Services Agreement dated 22.12.2015 and the Revenue Sharing Agreement dated 23.12.2015 read with Transmission Services Agreement dated 24.7.2013 and order dated 15.7.2015 issued by the Ministry of Power for Policy for Incentivizing Early Commissioning of Transmission Projects.
21.9.2016 Misc. Petition
220. RP/27/2016 in 286/GT/2014
18th July, 2016
NTPC Limited Petition for review of the order dated 31.5.2016 in Petition No. 286/GT/2014.
22.9.2016 Review Petition
221. TT/243/2014 24th August, 2014
Power Grid Corporation of India Limited
Petition for approval under Regulation 86 of CERC (Conduct of Business) Regulations, 1999 and CERC (Terms and Conditions of Tariff), Regulations, 2014 for determination of transmission tariff from DOCO to 31.3.2019 for Special Protection Scheme (SPS) for Northern Regional Grid Stage-II.
22.9.2016 Transmission Tariff
222. MP/158/2016 30th August, 2016
LancoAmarkantakPower Limited
Petition under Sections 79 (1) (b) read with 79 (1) (f) and 79 (1) (k) of the Electricity Act, 2003, inter alia, seeking a declaration that Clause 3.1. 4, and 6.2 of the proposed Memorandum of Understanding to be executed between the petitioner and the respondent no. 1 for operation and maintenance of the petitioner’s 02 nos. of 400 kV line bays including 02 Tie Bays at 765/400 kV switchyard at Power Grid, Bharari, sub-station, Bilaspur, Chhattisgarh are contrary to the Regulation 3 (42) of the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2014 and consequent direction to bring the said Clauses in conformity with Regulation 3 (42) of the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2014 and other reliefs.
21.9.2016 Misc. Petition
223. TT/543/2014 29th
December, 2014
Power Grid Corporation of India Limited
Petition for truing up transmission tariff for 2009 -14 and transmission tariff for 2014-19 for 400kV S/C Singrauli-Vindhyachal Transmission Link along with (2 X 250 MW) HVDV Back to Back at Vindhyachal between NR and WR (DOCO 06.06.1989).
20.9.2016 Transmission Tariff
224. GT/353/2014 28th
September, 2014
Damodar Valley Corporation(DVC)
Petition for determination of tariff for Panchet Hydel Power Station Unit Nos. I & II (2 X 40 MW) for the period 2014-19.
20.9.2016 GenerationTariff
140
Central Electricity Regulatory Commission
225. MP/123/2016 1st August, 2016
OdishaGenerationPhase II Transmission Limited
Petition for approval under Section 17(3) of Electricity Act 2003, for creating security in favour of Security Trustee pursuant to Unattested Deed of Hypothecation by way of hypothecation on Project Assets
Trustee to the Project and also for any future security creation in favour of security trustee/lenders, for the following Transmission Line :-i) Jharsuguda (Sundargarh) - Raipur Pool 765 kV D/C line (Hexa Zebra Conductor) and (ii)OPGC - Jharsuguda (Sundargarh) 400 kV D/C (Triple Snowbird Conductor).
20.9.2016
226. SM/05/2016 28th April, 2016
CentralElectricityRegulatory Commission
Non - compliance of the CERC (Procedure, Terms and Conditions for grant of trading licence and other related matters) Regulations, 2009.
20.9.2016 Suo Motu
227. MP/76/2016 18th May, 2016
Power System OperationCorporationLimited
Petition under Regulation 24 read with Regulation 111 of Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 and Regulation 14 (Power to give directions) and Regulation 15 (Power to Relax) of the Central Electricity Regulatory Commission (Terms and Conditions for Recognition and Issuance of Renewable Energy
Generation) Regulations, 2010.
20.9.2016 Misc. Petition
228. MP/159/2016 30th August, 2016
Jindal Power Limited
Petition under Section 79 (1) (k) of the Electricity Act, 2003 read with Regulation 8 (7) of the CERC (Grant of Connectivity, Long Term Access and Medium Term Open access in Inter-State Transmission and related matters) Regulations, 2009 seeking permission for allowing injection of
full load testing for Unit 4 of 4 X 600 MW power plant beyond 30 September 2016.
20.9.2016 Misc. Petition
229. TT/134/2015 12th May, 2015
Torrent Power Grid Limited
Petition for truing up of capital cost for the period from 1st April, 2009 to 31st March, 2014 and determination of transmission tariff for the period from 1st April, 2014 to 31st March, 2019 for transmission system constructed, maintained and operated by Torrent Power Grid Ltd vide License No. 2/Transmission/CERC dated 16.05.2007.
19.9.2016 Transmission Tariff
141
Annual Report
230. MP/02/2014 17th Jan, 2014
Neyveli Lignite CorporationLimited
Petition of Kerela State Electricity Board regarding quantum of adjustment for Income Tax pursuant to the order dated 20.9.2012 passed in Petition No. 15 of 2010 by the Commission and order dated 3.7.2013 in Appeal No 250 of 2012 passed by the Appellate Tribunal for Electricity.
9.9.2016 Misc. Petition
231. MP/206/2014 14th
August,2014Power Grid Corporation of India Limited
Petition for grant of regulatory
Time Dynamic State Measurement (URTDSM) Phase-II.
16.9.2016 Misc. Petition
232. GT/287/2014 10th
September, 2014
NTPC Limited Petition for determination of tariff of Anta GPS (419.33 MW) for the period from 1.4.2014 to 31.3.2019.
19.9.2016 GenerationTariff
233. TT/57/2014 31st March, 2014
Power Grid Corporation of India Limited
Petition for approval under sub-section (4) of Section 28 and Section 79(1)(d) of Electricity Act, 2003 for determination of Fees and Charges for Fibre Optic Communication
Load Despatch and Communication (ULDC) Microwave links in Eastern Region for the period 2009-14 block.
15.9.2016 Transmission Tariff
234. RP/6/2015in Petition No. TT/100/2012
23rd March, 2015
Power Grid Corporation of India Limited
Petition for review of order dated 20.1.2015 in Petition No. TT/100/2012.
15.9.2016 Review Petition
235. MP/117/2016 26th July, 2016
Bhartiya Rail Bijlee Company Limited
Petition under Regulation 8 of CERC (Grant of Connectivity, Long-term and Medium term Open Access in inter-State Transmission and related matters), 2009 seeking permission to allow extension of the period of withdrawal of start up power
commissioning and testing including full load testing of unit No. I (250 MW) of Nabinagar TPP ( 4 x 250 MW), beyond six months from initial synchronization.
14.9.2016 Misc. Petition
236. MP/58/2016 31st March, 2016
M. B. Power (MP) Limited
Petition under Section 79(1) (b) and (f) of the Electricity Act, 2003 for declaration of ‘Change in Law’ and consequential reliefs as per the provisions of the PPA dated 20.1.2014 (between the petitioner and respondent no.6) read with back to back PPA dated 18.1.2014 (between the respondent no. 6 and respondent nos. 2 to 5).
14.9.2016 Misc. Petition
142
Central Electricity Regulatory Commission
237. MP/47/2016 16th March, 2016
M.B. Power (Madhya Pradesh)Limited
Petition under Section 79 (1) (b) and (f) of the Electricity Act, 2003 for adjudication of claims towards compensation arising out of ‘Change in Law’ and consequential reliefs as per provisions of the PPA dated 20.1.2014 singed between the Petitioner (M/s M.B. Power (MP) Limited and respondent no. 6 (M/s PTC India Limited) read with back to back PPA dated 18.1.2014 (between the parties in dispute designated as respondent no. 6 and respondent nos. 2 to 5.
14.9.2016 Misc. Petition
238. TT/96/2016 2nd July, 2016 Power Grid Corporation of India Limited
Petition for augmentation of HOSUR sub station by 1 x 315 MVA 400/220kV transformer and associated bays under System Strengthening Scheme XIV in Southern Region.
22.8.2016 Transmission Tariff
239. GT/273/2014 10th
September, 2014
NTPC Limited Final true up petition in Petition No. 304 of 2009 for Talcher Thermal Power Station, Station (460 MW) for 2009-2014 tariff period.
31.8.2016 GenerationTariff
240. RP/31/2016 in TT/247/2015
3rd August, 2016
Power Grid Corporation of India Limited
Petition for review of order dated 29.4.2016 in Petition No. 247/TT/2015.
26.8.2016 Review Petition
241. TT/98/2016 2nd August, 2016
Power Grid Corporation of India Limited
Petition for approval under Regulation 86 of CERC (Conduct of Business) Regulations,1999 and Regulation 6 of CERC (Terms and Conditions of Tariff) Regulations, 2009 and CERC (Terms and Conditions of Tariff) Regulations, 2014 for revision of (i) trued up transmission tariff for 2009-14 tariff block and (ii) transmission tariff for 2014-19 tariff block for LILO of existing Bangalore Salem 400kV S/C line at Hosur under System Strengthening Scheme XVIII in Southern Regional Grid.
30.8.2016 Transmission Tariff
242. TT/97/2016 2nd July, 2016 Power Grid Corporation of India Limited
Petition for approval under Regulation 86 of CERC (Conduct of Business) Regulations,1999 and Regulation 6 of CERC (Terms and Conditions of Tariff) Regulations, 2009 and CERC (Terms and Conditions of Tariff) Regulations, 2014 for determination of (i) truing up transmission tariff for 2009-14 tariff block and (ii) transmission tariff for 2014-19 tariff block for 2 nos. line bays along with 2 nos. 50 MVAR line reactors (charged as bus reactor) (interim contingency till readiness of 400kV D/C MB TPS (Annupur) - Jabalpur Pool Station TL covered in CERC order dated 24.11.2015 in Petition no. TT/38/2014 under transmission system for connectivity of M.B. Power (M.P.) Ltd. in Western Region.
22.8.2016 Transmission Tariff
143
Annual Report
243. TT/23/2015 22nd January, 2015
Power Grid Corporation of India Limited
Petition under sub Section (4) of Section 28 of the Electricity Act, 2003 for (1) determination of trued up fees and charges for 2009-14 tariff block and (2) fees and charges for the period 2014-19 tariff block for Communication Scheme under National Load Dispatch Centre (POWERGRID portion).
14.9.2016 Transmission Tariff
244. GT/206/2015 22nd July, 2015
Damodar Valley CorporationLimited
True up petition in respect of approval of tariff of Mejia Thermal Power Station Unit Nos.7 and 8 for the tariff period 2011-2014.
14.9.2016 GenerationTariff
245. TT/148/2016 29th August, 2016
Power Grid Corporation of India Limited
Petition for approval under Regulation 86 of CERC (Conduct of Business) Regulations, 1999 and Regulation 6 of CERC (Terms and Conditions of Tariff) Regulations, 2009 and CERC (Terms and Conditions of Tariff) Regulations, 2014 for revision of (i) truing up transmission tariff for 2009-14 tariff block and (ii) transmission tariff for 2014-19 tariff block for Sipat-I Transmission System in Western Region.
9.9.2016 Transmission Tariff
246. TT/152/2016 29th August, 2016
Power Grid Corporation of India Limited
Petition for approval under Regulation-86 of CERC (Conduct of Business) Regulations, 1999 and Regulation 6 of CERC (Terms and Conditions of Tariff) Regulations, 2009 and CERC (Terms and Conditions of Tariff) Regulations, 2014 for breaking up of trued up Transmission tariff for 2009-14 tariff block and transmission tariff for 2014-19 tariff block for transmission assets under “Pallatana GBPP and Bongaigaon TPS project” in North Eastern Region.
08/09/2016 Transmission Tariff
247. RP/35/2016 in Petition No. TT/53/2015
9th August, 2016
Power Grid Corporation of India Limited
Petition for review of order dated 21.4.2016 in Petition No. TT/53/2015.
7.9.2016 Review Petition
248. MP/106/2015 6th April, 2015
NSLNagapatnam Infrastructure Private Limited
Petition under Section 79 (i) (c) and (f) and other applicable provisions of the Electricity Act, 2003 read with Regulation 32 of CERC (Grant of Connectivity, Long Term Access and Medium Term Open Access in inter-State transmission and related matters), Regulations, 2009 against the action of the respondent in threatening to cancel the open access and encashment of bank guarantee.
7.9.2016 Misc. Petition
249. AT/120/2016 29th July, 2016
Gurgaon Palwal Transmission Limited
Petition for adoption of transmission charges with respect to transmission system being established by the petitioner.
6.9.2016 Adoption of Tariff
144
Central Electricity Regulatory Commission
250. RP/19/2015in Petition No. TT/91/2012
29th July, 2015
Power Grid Corporation of India Limited
Petition for review of order dated 26.5.2015 in Petition No. TT/91/2012.
7.9.2016 Review Petition
251. MP/68/2015 2nd March, 2015
NTPC Limited Petition for providing uniform methodology to be used for billing
Regulation 30 (4) of CERC Tariff Regulations 2014 -19.
6.9.2016 Misc.Petition
252. AT/121/2016 29th July, 2016
North KaranpuraTransco Limited
Application under Section 63 of the Electricity Act, 2003 for Adoption of Transmission Charges with respect to the transmission system being established by North Karanpura Transco Limited.
6.09.2016 Adoption of Transmission tariff
253. TT/422/2014 23rd
November, 2014
Power Grid Corporation of India Limited
Petition for determination of transmission tariff of Asset-I: 765 kV 3x80 MVAR bus reactor at Bina Sub-station along with associated bays, Asset-II: 765 kV 3x80 MVAR bus reactor at Indore Sub-station with bays, Asset-III: 765 kV 3x80 MVAR line reactor along with associated bays at Gwalior Sub-station (to be used as bus reactor under interim contingency scheme till readiness of 765 kV S/C Gwalior Jaipur 2nd circuit transmission line, Asset-IV: 765 kV S/C Gwalior-Jaipur 2nd circuit transmission line and bay extension of 765/400 kV Phagi (RVPN-Jaipur) Sub-station and Asset-V: 765 kV S/C Bina-Gwalior 3rd circuit transmission line under Transmission System for Phase-I Generation Projects in Orissa Part-C in Western Region for the 2014-19 tariff period under Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2014 under Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999.
27.4.2016 Transmission Tariff
254. MP/150/2015 24th June, 2015
Assam Power DistributionCompany Limited
Petition for permission of realization of cost of energy for the period 1.4.2003 onwards against export of energy to Royal Govt. of Bhutan under the scheme of re-import of Kurichhu energy through Assam grid.
13.6.2016 Misc. Petition
255. RP/12/2015 in Petition No. 229 of 2010
24th June, 2015
Aravali Power Company Private Limited
Review of order dated 6.5.2015 in Petition No. 229 of 2010 approving the tariff of Indira Gandhi Super Thermal Power Project, Stage-I (3 X 500 MW) for the period from the date of commercial operation of Unit-I to 31.3.2014.
27.6.2016 Review Petition
145
Annual Report
256. MP/419/2014 29th
October, 2014
RaichurSholapur Transmission Company Limited
Petition under Section 79 (1 )(f) of the Electricity Act, 2003 read with Transmission Service Agreement dated 4.8.2010.
27.6.2016 Misc. Petition
257. TT/418/2014 29th
October, 2014
Power Grid Corporation of India Limited
Petition for determination of transmission tariff from DOCO to 31.3.2019 for Asset-I: 765 KV S/C Solapur-Pune TL and LILO of 400kV D/C Pune-Parli at Pune GIS SS with associated bays and equipments, 2 X 1500 MVA, 765/400kV ICT 1 & 2 at Pune (GIS) and 240 MVAR, 765KV Bus Reactor and 765KV, 240 MVAR Switchable Line Reactor at Pune (GIS) S/S with associated bays Asset-II: LILO of 400kV D/C Aurangabad Pune TL at Pune GIS SS with associated bays and 400kV, 50MVAR line reactor under “Transmission System associated with Krishnapatnam UMPP-Part B” in Western Region.
31.5.2016 Transmission Tariff
258. TT/416/2014 29th
October, 2014
Power Grid Corporation of India Limited
Petition for determination of transmission tariff from DOCO to 31.3.2019 for New 400kV GIS pooling station at Nagapattinam with 1 X 125 MVAR Bus Reactor under Transmission System associated with Common Transmission Scheme associated with ISGS projects in Nagapattinam / Cuddalore Area of Tamil Nadu Part-AI (a) in Southern Region.
22.8.2016 Transmission Tariff
259. TT/164/2015 2nd July, 2015 Power Grid Corporation of India Limited
Petition for determination of transmission tariff from anticipated DOCO to 31.3.2019 for Re-conductoring of Ckt-I of 400 KV D/C Siliguri-Purnea (HTLS Cond.) transmission line under Eastern Region Strengthening Scheme- I in Eastern Region.
29.4.2016 Transmission Tariff
260. TT/415/2014 29th
October, 2014
Power Grid Corporation of India Limited
Petition for determination of transmission tariff from DOCO to 31.3.2019 for 400kV D/C Solapur (STPP)-Slapur (PG) T/L along with bay extension at Solapur (PG) S/S (Ant. DOCO 1.1.2015)- Asset I & extension of 400/220KV Solapur S/S Augmentation of substation by 1 X 315 MVA (3rd) Transformer (by Shifting of 500 MVA Transformer from Wardha to Solapur) (Ant. DOCO- 1.4.2015)- Asset II under transmission system for Solapur STPP (2X660 MW) in Western Region.
30.5.2016 Transmission Tariff
261. TT/411/2014 29th
October, 2014
Power Grid Corporation of India Limited
Petition for determination of transmission tariff from DOCO (1.4.2014) to 31.3.2019 for LILO of Ist Ckt of 400 kV D/C Parbati-II-Koldam Transmission Line at Parbati Pooling Station (Banala) under Transmission System associated with Parbati-III HEP in Northern Region for tariff block 2014-19.
30.7.2016 Transmission Tariff
146
Central Electricity Regulatory Commission
262. RC/175/2015 10th July, 2015
Power Exchange India Limited
Application in compliance of Regulation 24 and other applicable provisions of the Central Electricity Regulatory Commission (Power Market) Regulations, 2010.
6.5.2016 Regulatory Compliance
263. RP/14/2015 in Petition No. TT/201/2012
10th July, 2015
Power Grid Corporation of India Limited
Petition for review of order dated 6.5.2015 in Petition No. 201/TT/2012 for approval of tariff for transmission assets (Group-3 associated with system for Central Part of Northern Grid Part-II in Northern Region for tariff block 2009-2014.
29.6.2016 Review Petition
264. TT/410/2014 29th
October, 2014
Power Grid Corporation of India Limited
Petition for determination of transmission tariff from DOCO to 31.3.2019 for (A) ICT 500 MVA 400/220 KV Bassi Extension Substation, (B) ICT 315 MVA 400/220 KV Allahabad Extension Substation , (C) ICT 500 MVA 400/220 KV Meerut Extension Substation under (D) 400/220KV, 105MVA ICT along with associated bays at Wagoora Substation, (E) 500 MVA ICT along with associated bays at Ludhiana S/s (DOCO: 1.4.2014) and (F) 2 no. of 220 KV bays at Ludhiana S/s under the “Augmentation of Transformers in Northern Region- Part-A” in Northern Region.
2.6.2016 Transmission Tariff
265. TT/189/2015 27th July, 2015
Power Grid Corporation of India Limited
Petition for determination of transmission tariff from DOCO to 31.3.2019 for (a) Central Sector Portion of Establishment of Fibre Optic Communication System in Northern Region (1030.426 km).
10.8.2016 Transmission Tariff
266. SM/8/2015 27/7/2015 CentralElectricityRegulatory Commission
Non-Compliance of Regulation 5.2(o) of the CERC (Indian Electricity Grid Code) Regulations, 2010.
31.5.2016 Suo Motu
267. TT/409/2014 29/10/2014 Power Grid Corporation of India Limited
Petition for determination of transmission tariff from DOCO to 31.3.2019 for Asset-I: 400 KV 125 MVAR (3 Ph) Bus Reactor-2 with associated bays at Jabalpur 765/400 KV Pooling S/S 9 Ant. DOCO-1.11.2014), Asset II: 765 KV, 3*80+1*80 (Spare) MVAR Bus Reactor-2 with associated bays at Jabalpur 765/400 KV Pooling S/S (Ant. DOCO -1.1.2015) and Asset III: 765 KV bay for Dharamjaygarh ckt.#2 and 3*80 MVAR Line Reactor at 765/400 KV Jabalpur Pooling S/S (Interim Contingency as Bus Reactor) Ant. DOCO-1.1.2015) at Jabalpur Pooling S/S under “Transmission System for Phase-I Generation Projects in Orissa (Part-B)” in Western Region.
28.4.2016 Transmission Tariff
147
Annual Report
268. TT/403/2014 29th
October, 2014
Power Grid Corporation of India Limited
Petition for determination of Tariff from DOCO to 31.03.2019 for Gooty-Madhugiri 400 KV D/C line along with the associated bays & establishment of new 400/220 KV substation at Madhugiri with 2X500 MVA transformers under transmission system associated with System strengthening-XIII in Southern regional grid.
19.7.2016 Transmission Tariff
269. GT/401/2014 29th
October, 2014
Torrent Power Limited
Petition for determination of generation tariff for the period from 1.4.2014 up to 31.3.2014 in terms of CERC (Terms and Conditions of Tariff) Regulations, 2014 of UNOSUGEN Gas based Combined Cycle Power Project (382.5 MW).
18.8.2016 GenerationTariff
270. TT/399/2014 29th
October, 2014
Power Grid Corporation of India Limited
Petition for determination of transmission tariff from DOCO to 31.3.2019 for (A) 400 KV, 1*125MVAR Bus Reactor at Parli S/S (Ant. DOCO: 1.10.2014) and (B) conversion of 50 MVAR Line reactor (4nos) into Switchable Line Reactors at 400/220 KV Pune S/S (Ant. DOCO: 1.1.2015) under installation of Reactors (part-II) in Western Region.
26.4.2016 Transmission Tariff
271. TT/199/2015 6th August, 2015
Power Grid Corporation of India Limited
Petition for approval under Regulation-86 of CERC (Conduct of Business) Regulations, 1999 and Regulation 6 of CERC (Term and Conditions of Tariff) Regulations, 2014 for determination of transmission tariff from DOCO to 31.3.2019 for Sikar- Ratangarh line with associated bays under System Strengthening in Northern Region for Sasan and Mundra UMPP in NR.
28.4.2016 Transmission Tariff
272. TT/201/2015 4th August, 2015
Power Grid Corporation of India Limited
Petition for approval under Regulation 86 of CERC (Conduct of Business) Regulations, 1999 CERC (Term and Conditions of Tariff) Regulations, 2014 for determination of tariff DOCO 31.3.2019 for 4 Nos. 400 kV Line bays at Narendra (New) for Kudigi TPS- Narendra (New) 400 kv 2 x D/c Quad lines under sub station extension works associated with transmission system required for evacuation of power from Kudigi TPS ( 3 x 800 MW in Phase – I) of NTPC Limited” in Southern Region.
29.7.2016 Transmission Tariff
273. TT/208//2015 17th August, 2015
Power Grid Corporation of India Limited
Petition for approval under Regulation-86 of CERC (Conduct of Business) Regulations, 1999 and CERC (Term and Conditions of Tariff) Regulations, 2014 for determination of transmission tariff from DOCO to 31.3.2019 for Asset 1 Bhiwani-Hisar 400 KV/D/C line alongwith associated bays at Bhiwani and Hisar and Asset-2 LILO of Moga Bhiwadi 400 kV D/C line at Hisar alongwith associated bays at Hisar under NRSS XXV in Northern Region.
26.4.2016 Transmission Tariff
148
Central Electricity Regulatory Commission
274. TT/213/2015 31st July, 2015
North East Transmission Company Limited
Petition for determination of transmission tariff w.e.f. CODs of Assets viz 1.9.2012 to 22.2.2015 under the applicable provisions of the CERC (Terms and Conditions of Tariff) Regulations 2014-2019 Asset-I Palantan-Silchar Twin Moose Conductor transmission line. Asset-II Silchar-Byrnihat (one circuit on D/C towers) Twin Moose Conductor Transmission Line – 214.41 km. Asset-III Byrnihat-Bongaigoan (one circuit on D/C towers) Twin Moose Conductor Transmission Line 201 Km. Asset-IV Silchar-Azara (one circuit on D/C towers). Asset-V Azara-Bongaigaon of North East Transmission Company Limited.
16.8.2016 Transmission Tariff
275. TT/215/2015 8th
September, 2015
Power Grid Corporation of India Limited
Petition for approval under Regulation-86 for determination of transmission tariff from DOCO to 31.3.2019 for Asset-I 01 no. of 50 MVA 3 Ph ICT at Gangtok S/s under the provisions of spare ICTs and reactors for Eastern, Northern, Southern and Western Region.
25.4.2016 Transmission Tariff
276. MP/216/2015 8th
September, 2015
Essar Steel India Limited
Petition under Section 79(1) (f) of the Electricity Act, 2003.
6.7.2016 Misc. Petition
277. MP/222/2015 23rd
September, 2015
Power Grid Corporation of India Limited
Petition under Regulation 24 read with Regulation 111 of CERC (Conduct of Business) (Amendment) Regulations 2009 and Regulation 35 (Power to Relax) and Regulation
RLDC fees and Charges Regulations, 2015.
30.8.2016 Misc. Petition
278. GT/347/2014 28th
September, 2014
Damodar Valley Corporation
Petition for determination of tariff for Mejia Thermal Power Station Unit Nos. I, II and III (3X210 MW) for the period 2014-19.
31.8.2016 GenerationTariff
279. TT/230/2015 13th
October, 2015
Power Grid Corporation of India Limited
Petition for approval under Regulation -86 of CERC (Conduct of Business) Regulations, 1999 and CERC (Terms and Conditions of Tariff) Regulations, 2014 for determination of tariff from anticipated DOCO to 31.3.2019 for Asset I 400KV D/C (Quad) Kishangaj-Patna transmission line alongiwth by associated bays at Kishanganj sub-station under Transmission System for “Transfer of Power from Generation Projects in Sikkim to NR/WR Part – B” in Eastern Region.
31.5.2016 Transmission Tariff
149
Annual Report
280. TT/233/2015 11th
September, 2015
North East Transmission Company Limited
True up petition for the period 2009-2014 for determination of transmission tariff for Asset-I Palatana-Silchar from DOCO-1.9.2012 and Asset-II Silchar -Byrnihat from DOCO 1.3.2013 under the provisions of CERC (Terms and Conditions of Tariff) Regulations, 2009-2014.
29.7.2016 Transmission Tariff
281. GT/234/2015 14th
October, 2015
NTPC Limited Petition for approval of tariff of Vindhyachal Super Thermal Power Station Stage-V ( 500 MW) for the period from anticipated date of commercial operation i.e. 31.10.2015 to 31.3.2019.
31.8.2016 GenerationTariff
282. MP/236/2015 20th
October, 2015
Kudgi Transmission Limited
Petition to recover transmission charges
element of the transmission project.
27.6.2016 Misc. Petition
283. MP/239/2015 21st
October, 2015
Assam Power DistributionCompany Limited
Petition under Regulation 21 “Power
(Sharing of inter-State Transmission Charges and Losses) Regulations, 2010 in the matter of abnormal hike of POC charges of Assam following the implementation of the recent amendment vide CERC (Sharing of inter-State Transmission Charges and Losses) (Third Amendment) Regulations, 2015.
30.6.2016 Misc. Petition
284. MP/246/2015 6th October, 2015
Power Exchange India Limited
Petition under Sections 66, 79 (1) (c ), 79 (1) (k) and 178 of the Electricity Act, 2003, Regulations 111 and 113 of the CERC (Conduct of Business) Regulations, 1999 and Regulations 63 (i) and 63 (iii) of the CERC (Power market) Regulations, 2010.
8.8.2016 Misc. Petition
285. TT/247/2015 27th
October, 2015
Power Grid Corporation of India Limited
Petition for approval under Regulation 86 of CERC (Conduct of Business) Regulations, 1999 and CERC (Term and Conditions of Tariff) Regulations, 2014 for determination of transmission tariff from DOCO to 31.3.2019 for 2 no. 220 kV Line Bays at Moga under “Augmentation of transformers in NR Part A in Northern Region.
29.4.2016 Transmission Tariff
286. MP/249/2015 28th
October, 2015
Kerala State ElectricityBoard Limited
Petition under Section 79 (1) (c) and 79 (1) (f) of Electricity Act, 2003 and Regulation 32 of CERC (Grant of Connectivity, Long- Term Access and Medium-Term Open Access in inter-State transmission and related matters) Regulations, 2009.
6.7.2016 Misc. Petition
150
Central Electricity Regulatory Commission
287. TT/256/2015 30th
October, 2015
Power System OperationCorporationLimited
Petition for determination of transmission tariff for Kurukshetra (NR) - Jallandhar 400 kV D/C (Quad) line, one ckt. via 400/220 kV Nakodar (PSTCL) Sub-station along with associated bays (2 no. GIS bays at Kurukshetra, 02 no. conventional bays at Jallandhar, 2 no. conventional bays at Nakodar, 1 no. 50 MVAR Line Reactor at Nakodar and 1 no. 50 MVAR Line Reactor at Jallandhar), LILO of Abdullapur Sonepat 400 kV D/C (Triple) atKurukshetra Sub-station along with associated bays (4 no. GIS Bays at Kurukshetra) and, 1 no. 400 kV 125 MVAR Bus Reactor at Kurukshetra along with 1 no. associated GIS Bay at Kurukshetra under “WR - NR HVDC lnterconnector for IPP projects in Chhattisgarh” in Northern Region for 2014- 19 tariff block under Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2014 and under Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999.
25.5.2016 Transmission Tariff
288. TT/254/2015 30th
October, 2015
Power Grid Corporation of India Limited
Petition for approval under Regulation 86 of CERC (Conduct of Business) Regulations, 1999 and CERC (Terms and Conditions of Tariff) Regulations, 2014 for determination of transmission tariff from actual DOCO to 31.3.2019 for Asset-I 400 KV Lara STPS-I to Raigarh (Kotra) PS Transmission line alongwith associated bays at Raigarh (Kotra) PS under Transmission System Associated with Lara STPS generation project of NTPC in Western Region for tariff block period 2014-2019.
25.5.2016 Transmission Tariff
289. TT/255/2015 30th
October, 2015
Power Grid Corporation of India Limited
Petition for approval under Regulation 86 of CERC (Conduct of Business) Regulations, 1999 and CERC (Terms and Conditions of Tariff) Regulations, 2014 for determination of transmission tariff from actual DOCO to 31.3.2019 for Asset-I 19.50 KM Optic Fiber under TSTRANSCO Sector DOCO 1.6.2015 and Asset-II Optic Fiber under KSEBL Sector DOCO. 1.6.2015 under Fiber Optic Communication System in lieu
Communication Microwave Links (Part-III) in Southern Region.
29.7.2016 Transmission Tariff
151
Annual Report
290. TT/252/2015 30th
October, 2015
Power Grid Corporation of India Limited
Petition for approval under Regulation 86 of CERC (Conduct of Business) Regulations, 1999 and CERC (Terms and Conditions of Tariff) Regulations, 2014 for determination of transmission tariff from actual DOCO to 31.3.2019 for Assets (05 Nos) under Transmission System for phase-I generation projects in Orissa- Part-A in Eastern Region.
25.4.2016 Transmission Tariff
291. TT/258/2015 30th
October, 2015
Power Grid Corporation of India Limited
Petition for approval under Regulation 86 of CERC (Conduct of Business) Regulations, 1999 and CERC (Terms and Conditions of Tariff) Regulations, 2014 for determination of transmission tariff from DOCO to 31.3.2019 for 08 nos of Assets at Kishanganj substation under Transmission System for transfer of power from generation project in Sikkim to NR/WR Part-A in Eastern Region.
26.5.2016 Transmission Tariff
292. TT/257/2015 30th
October, 2015
Power Grid Corporation of India Limited
Petition for approval under Regulation 86 of CERC (Conduct of Business) Regulations, 1999 and CERC (Terms and Conditions of Tariff) Regulations, 2014 for determination of transmission tariff from actual DOCO to 31.3.2019 for Asset-I 160 MVA 220/132 kV at Purnea substation alongwith associated bays; Asset-II: 160 MVA transformer II at Purnea substation under augmentation of transformation capacity and reactive compensation in Eastern Region.
26.5.2016 Transmission Tariff
293. TT/253/2015 30th
October, 2015
Power Grid Corporation of India Limited
Petition for approval under Regulation 86 of CERC (Conduct of Business) Regulations, 1999 and CERC (Terms and Conditions of Tariff) Regulations, 2014 for determination of transmission tariff from DOCO to 31.3.2019 for Asset-I: LILO of both circuits of 400 kV D/C (QUAD) Meerut-Kaithal 400 kV D/C TL and associated bays at Bagppat GISS/STn (Anticipated DOCO 25.12.2015, Asset-II 125 MVAR Bus Reactor at Bagpat GIS Anticipated DOCO 31.12.2015 Asset-III: 500 MVA at Bagpat alongwith 220 kV line bays anticipated DOCO 31.12.2015 Asset-IV at Bagpat GIS S/stn. Along with 4 nos 220 kV lines bays anticipated DOCO 31.12.2015 under Northern Region System Strengthening Scheme -XIX in Northern Region.
30.6.2016 Transmission Tariff
152
Central Electricity Regulatory Commission
294. TT/259/2015 4th
November, 2015
Power Grid Corporation of India Limited
Petition for approval under Regulation 86 of CERC (Conduct of Business) Regulations, 1999 and CERC (Terms and Conditions of Tariff) Regulations, 2014 for Asset I 200 MVA, 400/132/33kV ICT – 2 along with associated bays at Chariali, Asset-II 80 MVAR Bus Reactor-1 alongwith associated Bays at Biswanath Chariali, Asset-III 80 MVAR Bus Reactor-2 along with associated bays at Biswanath Chariali, Asset-IV Augmentation of 400 kV Agra sub-station 1X315 MVA, 400/220/33kV ICT alongwith Associated Bays, Asset-V 400 kV D/C Balipara Biswanath Chariali PS from anticipated DOCO 15.11.2015 to 31.3.2019 under the at Balipara-Biswanath Chariali transmission line alongwith associated bays at Balipara Biswanath Chariali PS from anticipated DOCO 15.11.2015 to 31.3.2019 under the transmission system Associated with North East-Northern/Western Inter connector-I Project in North Eastern and Northern Western Regions.
26.5.2016 Transmission Tariff
295. TT/263/2015 30th
October, 2015
Power Grid Corporation of India Limited
Petition for approval under Regulation 86 of CERC (Conduct of Business) Regulations, 1999 and CERC (Terms and Conditions of Tariff) Regulations, 2014 for determination of transmission tariff from DOCO to 31.3.2019 for (A) Combined Assets of (A1) associated bays of 765 KV Lucknow Bareilly transmission line including switchable line reactor at Lucknow (New) and line reactor at Bareilly (New) S/s DOCO 1.4.2015 (A2) 2nd circuit of DC (Quard) Bareilly (New) Bareilly (Old) transmission line with associated bays DOCO 1.4.2015 and (A3) 765/400 KV 1500 MVA MVA ICT – I at Bareilly (New) S/s alongwith associated bays DOCO 1.4.2015 (B) 765 kV, 3 x 80 MVAR bus reactors at Bareilly DOCO 5.7.2015 (C) Associated bays of 1st Circuit of 400 kV D/C Quard Bareilly (New) Bareilly (Old) Transmission Line DOCO 25.4.2015 (D) 765/400 kV 1500 MVA ICT-II at Bareilly (New) S/s alongwith associated bays DOCO 31.8.2015(E) 1st Circuit Bareilly (New) Kashipur (PTCUL) transmission line and associated bay DOCO 23.4.2015 (F) 2nd
Circuit of 400 kV D/C (Quard) Bareilly (New) Kashipur (PTCUL) transmission line and associated bays DOCO 24.4.2015 (G) 400 kV D/C Kashipur – Roorkee line along with associated bays (Anticipated DOCO: 30.11.2015) ; H) 400 kV D/C Roorkee Saharanpur line along with associated bays (Anticipated DOCO: 31.12.2015 under “Northern Region System Strengthening Scheme – XXI” in Northern Region.
30.5.2016 Transmission Tariff
153
Annual Report
296. TT/262/2015 2nd
November, 2015
Powergrid Corporation of India Limited
Petition for approval under Regulation 86 of CERC (Conduct of Business) Regulations, 1999 and CERC (Terms and Conditions of Tariff) Regulations, 2014 for determination of transmission tariff from DOCO to 31.3.2019 for 400 KV (Quad) D/C line from NCC generation switchyard to Nellore Pooling Station and associated bays under transmission system for connectivity for NCC Power Projects Ltd. (Anticipated DOCO 1.1.2016).
23.5.2016 Transmission Tariff
297. TT/261/2015 2nd
November, 2015
Power Grid Corporation of India Limited
Petition for approval under Regulation 86 of CERC (Conduct of Business) Regulations, 1999 and CERC (Terms and Conditions of Tariff) Regulations, 2014 for determination of transmission tariff from DOCO to 31.3.2019 for Champa PS- Dharamjaygarh (KOrba) 765 kV S/C line alongwith bays, Rajgarh PS (near Kotra) – Champa PS 765 kV S/C line along with bays and establishment of 765/400 kV 6 x 1500 MVA Champa Pooling substation under “Eastablishment of Pooling stations at Champa & Raigarh (near Tamnar) for IPP Generation Projects in Chhattisgarh” in Western Region.
27.5.2016 Transmission Tariff
298. TT/264/2015 2nd
November, 2015
Power Grid Corporation of India Limited
Petition for approval under Regulation 86 of CERC (Conduct of Business) Regulations, 1999 and CERC (Terms and Conditions of Tariff) Regulations, 2014 for determination of transmission tariff from DOCO to 31.3.2019 for 765 kV S/C Kurnool- Raichur transmission line aongwith associated bay extension at 765/KV Kurnool S/s and Raichur Substation under “Southern Region System Strengthening Scheme-XXII (Anticipated DOCO 15.12.2015).
12.5.2016 Transmission Tariff
299. TT/260/2015 2nd
November, 2015
Power Grid Corporation of India Limited
Petition for approval under Rule 86 of CERC (Conduct of Business) Regulations, 1999 and CERC (Terms and Conditions of Tariff) Regulations, 2014 for determination of transmission tariff from DOCO to 31.3.2019 for Champa PS Dharamjaygarh (Korba) linge alongwith bays Raigarh PS(Kotra)-Champa PS 765 kV S/C line alongwith bays and establishment of 765/400 kV 6 x 1500 MVA Champa Pooling station under “Establishment of Pooling stations at Champa & Raigarh (near Tamnar) for IPP Generation Projects in Chhattisgarh in Western Region.
31.5.2016 Transmission Tariff
154
Central Electricity Regulatory Commission
300. MP/265/2015 29th
October, 2015
KarnatakaPower CorporationLimited
Petition under Section 94(f) of the Act seeking review of the time period for implementing certain works pursuant to the Commission's order dated (i) 20.02.2014 in petition no. 146/MP/2013 with I.A.
CERC in the matter of providing protection systems having reliability, selectivity, speed and sensitivity and keeping them functional in terms of regulation 5.2 (i) of the CERC (Indian Electricity Grid Code) (First amendment), Regulations, 2012 read along with regulation 3 (e) of Central Electricity Authority (Grid Standards) Regulations, 2010 and following best practices of O&M of transmission elements for ensuing security of the Southern Regional grid as well as the interconnected Indian Grid and (ii) 18.8.2015 in Petition Nos. 86/MP/2014 and 374/MP/2014.
3.5.2016 Misc. Petition
301. TT/266/2015 30th
October, 2015
Power Grid Corporation of India Limited
Petition for determination of transmission tariff for 765 kV D/C Dharamjaygarh-Jabalpur PS T/L and 2*330 MVAR Switchable Line Reactors with associated bays at Dharamjaygarh Sub-station and line bays at Dharamjaygarh Sub-station only under “Transmission System for Phase-I Generation projects in Orissa- Part B” for 2014-19 Tariff block period in Western Region for the 2014-19 tariff period under Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2014 under Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999.
26.5.2016 Transmission Tariff
302. TT/268//2015 2nd
November, 2015
Power Grid Corporation of India Limited
Petition for approval under Regulation 86 of CERC (Conduct of Business) Regulations, 1999 and CERC (Terms and Conditions of Tariff) Regulations, 2014 for determination of transmission tariff from DOCO to 31.3.2019 for Asset I: LILO of one ckt of 400 KV D/C Teesta-III Kishangunj line (LILO-I) at Rangpo and associated bays at Rangpo sub-station under Sikkim Generation Projects-Part-B in Eastern Region.
11.5.2016 Transmission Tariff
155
Annual Report
303. TT/269/2015 2nd
November, 2015
Power Grid Corporation of India Limited
Petition for approval under Regulation 86 of CERC (Conduct of Business) Regulations, 1999 and CERC (Terms and Conditions of Tariff) Regulations, 2014 for determination of transmission tariff from DOCO to 31.3.2019 for Asset (A) 765 KV 3 x 80 MVAR Bus reactor at 765/400 kV Jaipur Phagi - RVPNL) S/s DOCO 9.8.2015 and Asset (B) 765 KV Jaipur (Phagi-RVPNL) (-Bhiwani transmission line along with 3 x 80 MVAR switchable line reactor at Jaipur (Phagi RVPNL) and 3 x 80 MVAR non switchable reactor at Bhiwani end and its associated bays DOCO 24.8.2015 under Transmission System for Phase-I Generation Project in Orissa (Part-C) in NR.
23.5.2016 Transmission Tariff
304. TT/270/2015 4th
November, 2015
Power Grid Corporation of India Limited
Petition for approval under Regulation 86 of CERC (Conduct of Business) Regulations, 1999 and CERC (Terms and Conditions of Tariff) Regulations, 2014 for determination of transmission tariff from DOCO to 31.3.2019 for 02 Nos. 400kv Bays at Khamman S/s and 02 No. 400kv bays at Nagarjun Sagar s/s under works associated with System Strengthening in Southern Region for import of power from Eastern Region anticipated DOCO 1.1.2016.
23.5.2016 Transmission Tariff
305. TT/271/2015 4th
November, 2015
Power Grid Corporation of India Limited
Petition for approval under Regulation 86 of CERC (Conduct of Business) Regulations, 1999 and CERC (Terms and Conditions of Tariff) Regulations, 2014 for determination of transmission tariff from DOCO to 31.03.2019 for Asset-I Kishenpur - New Wanpoh 400KV D/C line alongwith associated bays at Kishenpur and New Wanpoh under Northern Regions System Strengthening Scheme XVI in Northern Region.
11.5.2016 Transmission Tariff
306. TT/273/2015 3rd
November, 2015
Power Grid Corporation of India Limited
Petition for approval under Regulation 86 of CERC (Conduct of Business) Regulations, 1999 and CERC (Terms and Conditions of Tariff) Regulations, 2014 for determination of transmission tariff from DOCO to 31.3.2019 for Asset-I 1500 MVA 765/400 ICT-1 and associated bays at Varanasi GIS anticipated DOCO 31.12.2015, Asset-II 1500 MVA ICT-2 and associated bays at Varanasi GIS anticipated DOCO 31.12.2015, Asset-III 330 MVAR 765kV Bus Reactor-1 at Varanasi anticipated DOCO 31.12-2015 Asset-IV 765 S/C Balia - Varanasi line and associated bays including 240 MVAR line reactor at both end and anticipated DOCO 31.12.2015, Asset-V 765 KV S/C Gaya-Varanasi transmission line and associated bays including 240 MVAR line reactor anticipated DOCO 30.12.2015 and Asset-VI 765 KV S/C Ranchi-Dharamjaygarh transmission line alongwith associated bays at Dharamjaygarh anticipated DOCO 20.11.2015 under transmission System for Phase-I generation Projects in Jharkhand and West Bengal Part - A2.
30.5.2016 Transmission Tariff
156
Central Electricity Regulatory Commission
307. TT/274/2015 6th
November, 2015
Power Grid Corporation of India Limited
Petition for approval of transmission tariff for Asset-I: 765kV D/C Varanasi-Kanpur (new) line and associated bays including 240 MVAR Switchable L/R in both Ckt. at Varanasi GIS Substation and 330 MVAR non-switchable L/R in both Ckt. at Kanpur GIS Sub-station (Anticipated COD:31.01.2016) Asset- II: 765 kV S/C Kanpur (new) GIS-Jhatikra line & associated bays including 330 MVAR switchable L/R at Kanpur GIS S/S and 330 MVAR non-switchable L/R at Jhatikara Sub-station (Anticipated COD:31.01.2016) Asset- III: 400kV D/C (Quad) Kanpur (New) GIS-Kanpur (old) line & Associated bays (Anticipated COD:31.01.2016) Asset- IV: LILO of one Ckt of 400kV D/C Sasaram-Allahabad line & Associated bays at Varanasi GIS S/S (Anticipated COD:31.12.2015) Asset- V: 2*1500 MVA 765/400 kV ICT-I&II Associated bays at 765/400 kV Kanpur (new) GIS Sub-station (Anticipated COD:31.01.2016) Asset- VI: 240 MVAR, 765 kV Bus Reactor-1 & associated bay at Kanpur(new) GIS S/S (Anticipated COD:31.01.2016) Asset- VII: 240 MVAR, 765kV Bus Reactor & associated bay at Kanpur (new) GIS Sub-station (Anticipated COD:31.01.2016) Asset- VIII: 125 MVAR, 400 kV Bus Reactor & associated bay at Kanpur (new) GIS S/S (Anticipated COD:31.01.2016) Asset- IX: 240 MVAR, 765 kV Bus Reactor & associated bay at Jhatikara Sub-station (Anticipated COD: 1.12.2015) Asset- X: 125 MVAR, 400 kV Bus Reactor & associated bay at Varanasi GIS Sub-station (Anticipated COD:31.1.2016) under “Transmission System for Phase-I Generation Projects in Jharkhand and West Bengal Part-B” in Northern Region under Regulation 86 of Central Electricity Regulatory Commission (Conduct and Business) Regulation, 1999 and Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulation, 2014 from anticipated COD to 31.3.2019.
31.5.2016 Transmission Tariff
157
Annual Report
308. TT/276/2015 6th
November, 2015
Power Grid Corporation of India Limited
Petition for approval under Regulation 86 of CERC (Conduct and Business) Regulation 1999 and CERC (Terms and Conditions of Tariff) Regulation, 2014 for determination of Transmission Tariff from DOCO to 31.3.2019 for Mysore-Kozhikode 400 KV D/C line alongwith new 400/220 KV S/S with reactor at Kozhikode and extension of Mysore s/s under Transmission System associated with Kaiga 3 /7 4 ( 2x 235 MW) project in Southern Region.
30.5.2016 Transmission Tariff
309. TT/277/2015 5th
November, 2015
Power Grid Corporation of India Limited
Petition for approval under Regulation 86 of CERC (Conduct of Business) Regulations, 1999 and CERC (Terms and Conditions of Tariff) Regulation, 2014 for determination of Transmission Tariff from DOCO to 31.03.2019 for Asset-I extension of both ckt of 400 KV D/C (Quad) Biharsharif Sasaram line to Varanasi by passing Sasaram and associated bays including 50 MVAR line reactor in each circuit at Varanansi S/s anticipated DOCO 31.12.2015, Asset-II one circuit of 400 KV D/C Sasaram- Allahabad line to be shifted from NR to ER bus at Sasaram S/S (Anticipated DOCO 31.12.2015) Asset-III LILO of (Loop in portion) 765 KV S/C Gaya-Fathepur line and associated bays at Varanasi GIS including 240 MVAR non-switchable L/R in Gaya bay anticipated DOCO 31.12.2015 under NR System Strengthening Scheme-XXVIII.
30.5.2016 Transmission Tariff
310. SM/14/2014 21st
September, 2014
CentralElectricityRegulatory Commission
Non Compliance of the provisions of Regulation 30 (7) under Section 142 against those who have failed to comply with or have partially compiled with the regulations.
20.5.2016 Suo Motu
311. TT/283/2015 2nd
November, 2015
Power Grid Corporation of India Limited
Petition for approval under Regulation 86 of CERC (Conduct of Business) Regulations, 1999 and CERC (Terms and Conditions of Tariff) Regulations, 2014 for determination of transmission tariff from DOCO to 31.3.2019 for Asset 0I LILO of 400 KV/ DC Kolhapur-Mapusa Kolhapur GIS(New) along with associated bays and Asset-II 124 MVAR Bus Reactor along with associated bays at 400 KV Kolhapur GIS (New) under Transmission System associated with System Strengthening--XVII in SR Grid in WR.
25.5.2016 Transmission Tariff
158
Central Electricity Regulatory Commission
312. TT/248/2015 2nd
November, 2015
Power Grid Corporation of India Limited
Petition for approval under Regulation 86 of CERC (Conduct of Business) Regulations, 1999 and CERC (Terms and Conditions of Tariff) Regulations, 2014 for determination of transmission tariff for Asset-I Solapur-Aurangabad line Reactor with associated bays at Solapur S/s DOCO 7.10.2015 and Asset-2 2 x 240 MVAR switchable line reactor along with associated bays at Aurangabad S/s (Anticipated DOCO 15.3.2016 associated with inter regional System Strengthening Scheme for WR and NR (Part-A).
30.5.2016 Transmission Tariff
313. TT/275//2015 6th
November, 2015
Power Grid Corporation of India Limited
Petition for approval under Regulation 86 of CERC (Conduct of Business) Regulations, 1999 and CERC (Terms and Conditions of Tariff) Regulations, 2014 for determination of transmission tariff from DOCO to 31.3.2019 for Asset-I 275.93 km OPGW Fiber Optic Cable along with associated equipments which are under commercial operation w.e.f. 1.4.2014 Asset-II 291.124 km OPGW Fiber Optic Cable alongwith associated equipments (includes 88.63 km under cost apportionment with POWERTEL) which are under commercial operation w.e.f. 1.7.2014 and Asset-III 1717.112 km OPGW Fibre Optic Cable alongwith associated equipments (includes 966.436 km under cost apportionment with POWERTEL) which are under commercial operation w.e.f. 30.3.2015 under Fiber Optic Communication system for central sector s/s and Generating Stations in Southern Region.
29.7.2016 Transmission Tariff
314. RP/23/2015 in Petition No. SM/06/2014
16th
November, 2015
PunjabState Power Transmission CorporationLimited
Petition for review of the order dated 9.10.2015 in Petition No. 6/SM/2014.
29.6.2016 Review Petition
315. GT/335/2014 21st
September, 2014
NTPC Limited Petition for revision of tariff of Auria GPS (663.36 MW) for the period from 1.4.2009 to 31.3.2014 after the truing up exercise.
28.6.2016 GenerationTariff
316. GT/295/2015 3rd
December, 2015
Damodar Valley Corporation
True up petition in respect of approval of tariff of Koderma TPS Unit 1 for the period 2013-2014.
22.8.2016 GenerationTariff
317. GT/331/2014 21st
September, 2014
NTPC Limited Petition for revision of tariff of Anta GPS (419.33 MW) for the period from 1.4.2009 to 31.3.2014 after the truing up exercise.
25.5.2016 GenerationTariff
318. RP/26/2015in Petition Nos. 208/GT/2013 and 305/GT/2014
28th
October, 2015
NTPC Limited Petition for review of the order dated 31.8.2015 in Petition Nos. 208/GT/2013 and 305/GT/2014.
20.6.2016 Review Petition
159
Annual Report
319. MP/304/2015 8th
December, 2015
Super Smelters Limited
Petition under Section 9 and 79 (1) of the Electricity Act, 2003 read with the CERC (Open Access in Transmission) Regulations 2008 towards refusal of Open Access by DVC.
28.7.2016 Misc. Petition
320. GT/329/2014 21st
September, 2014
NTPC Limited Petition for revision of tariff of Tanda TPS (440 MW) for the period from 1.4.2009 to 31.3.2014 after the truing up exercise.
23.08./2016 GenerationTariff
321. GT/321/2014 21st
September, 2014
NTPC Limited Petition for approval of tariff Feroze Gandhi Unchahar Thermal Power Station Stage- III, (210 MW) for the period from 1.4.2009 to 31.3.2014 after truing up.
27.6.2016 GenerationTariff
322. GT/320/2014 21st
September, 2014
NTPC Limited Petition for approval of tariff of Feroze Gandhi Unchahar Thermal Power Station Stage-I, (420 MW) for the period from 1.4.2009 to 31.3.2014.
25.5.2016 GenerationTariff
323. GT/317/2014 20th
September, 2014
NTPC Limited Petition for approval of tariff of Rihand Stage-I, (1000 MW) for the period from 1.4.2009 to 31.3.2014 after the truing up exercise.
29.7.2016 GenerationTariff
324. GT/332/2014 21st
September, 2014
NTPC Limited Petition for revision of tariff of Feroze Gandhi Unchahar Thermal Power Station Stage-II, (420 MW) for the period from 1.4.2009 to 31.3.2014 after the truing up exercise.
25.5.2016 GenerationTariff
325. GT/302/2014 11th
September, 2014
NTPC Limited Petition for determination of tariff for Badarpur Thermal Power Station (705MW) for the period from 1.4.2009 to 31.3.2014.
30.7.2016 GenerationTariff
326. GT/300/2014 11th
September, 2014
` Petition for approval of tariff of National Capital Thermal Power Station, Stage-II Dadri (980 MW) for the period from 31.1.2010 to 31.3.2014.
23.8.2016 GenerationTariff
160
Central Electricity Regulatory Commission
327. TT/290/2015 9th
December, 2015
Power Grid Corporation of India Limited
Petition for truing up of transmission tariff for 2009-14 tariff block under Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2009 and determination of transmission tariff for 2014-19 tariff block under Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2014 of Asset-I: 400/220 kV 500 MVA ICT-I at Jaipur South Sub-station along with associated bays and 02 nos. 200 kV line bays; Asset-II: 400/220 kV 500 MVA ICT-II at Jaipur South Substation along with associated bays; Asset-III: 400/220 kV 2 X 315 MCA ICTs at Sohawal Sub-station along with associated bays; Asset-IV: LILO on one ckt of 400 kV D/C Agra Jaipur T/L with 50 MVAR Line reactor at Jaipur South Sub-station along with associated bays, Asset V: LILO of 2nd ckt of 400 kV D/C Ballia-Lucknow T/L with 50 MVAR line reactor at Sohawal Sub-station; Asset-VI: LILO of 1st ckt of 400 kV D/C Ballia-Lucknow T/L with 50 MVAR line reactor at Sohawal Sub-station and Asset VII: LILO of 2 nd ckt of 400 kV D/C Agra-Jaipur T/L with 50 MVAR line reactor at Jaipur South Sub-station along with associated bays under Northern Transmission Strengthening Scheme (NRTSS) Project in Northern Region under Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999.
18.4.2016 Transmission Tariff
328. MP/307/2015 16th
December, 2015
Udupi Power CorporationLimited
Petition under Regulation 17 of the CERC (Conduct of Business) Regulations, 1999 seeking
dated 5.10.2015 in Petition No. 517/MP/2014.
27.6.2016 Misc. Petition
329. SM/10/2015 21st July, 2015
CentralElectricityRegulatory Commission
Investigation of line outage due to tower collapse in Northern Region during April, 2015 to June (1st qtr. of 2015-2016).
14.6.2016 Suo Motu
330. GT/294/2014 11th
September, 2014
NTPC Limited Petition for determination of tariff of Simhadri Super Thermal Power Station, Stage-II (1000 MW) for the period from 1.4.2014 to 31.3.2019.
29.7.2016 GenerationTariff
331. GT/291/2014 11th
September, 2014
NTPC Limited Petition for determination of tariff of Rihand Stage-I (1000 MW) for the period from 1.4.2014 to 31.3.2019.
23.8.2016 GenerationTariff
161
Annual Report
332. TT/313/2015 30th
December, 2015
Power Grid Corporation of India Limited
Petition for approval under Regulation-86 of CERC (Conduct of Business) Regulations, 1999 and Regulation 6 of the CERC (Terms and Conditions of Tariff) Regulations, 2009 and CERC (Terms and Conditions of Tariff Regulations, 2014 for determination of tariff of (i) truing up transmission tariff for 2009-2014 tariff block and (ii) transmission tariff for 2014-2019 tariff block. For Asset I: LILO of both circuits of 400 kV D/C Bamnauli-Mundka/Bawana at Jatikalan 765/400 kV Sub-station, Asset-II: Agra – Jatikalan 765 kV S/C Transmission Line, Asset-III: Agra – Meerut 765 kV S/C Transmission Line under 765 kV system for Central Part of Northern Grid Part-I in Northern Region.
23.5.2016 Transmission Tariff
333. GT/290/2014 10th
September, 2014
NTPC Limited Petition for determination of tariff of Singrauli Super Thermal Power Station (2000 MW) for the period from 1.4.2014 to 31.3.2019.
28.7.2016 GenerationTariff
334. MP/5/2016 6th January, 2016
NHPC Limited Petition under Section 79(1)(f) of the Electricity Act, 2003 for adjudication of dispute between NHPC Limited and UPPCL regarding interpretation of Regulation 5(3) of CERC (Terms and Conditions of Tariff) Regulations, 2009.
26.8.2016 Misc. Petition
335. GT/286/2014 10th
September, 2014
NTPC Limited Petition for determination of tariff of Faridabad GPS (431.586 MW) for the period from 1.4.2014 to 31.3.2019.
31.5.2016 GenerationTariff
336. MP/09/2016 14th January, 2016
National High Power Test Laboratory Pvt Limited
Petition under Section 79(1) (c) and Section 79(1) of Electricity Act, 2003 read with Regulation 8 of CERC (Grant of Connectivity, Long Terms Access and Medium Terms Access in inter-State Transmissions and related matters Regulations, 2009 and Regulations 111-113 (Inherent Power) and Regulation 115 Power
(Conduct of Business) Regulations, 1999.
16.5.2016 Misc. Petition
337. RP/02/2016in Petition No.303/GT/2014
23rd
December, 2015
NTPC Limited Petition for review of order dated 2.11.2015 in Petition No.303/GT/2014 for revision of tariff for Simhadri Talcher Super Thermal Power Station, Stage- II (2X 500 MW).
9.5.2016 Review Petition
338. GT/282/2014 10th
September, 2014
NTPC Limited Petition for revision of tariff of Farakka STPS, Stage-III, (1 x 500 MW) for the period from COD i.e. 4.4.2012 to 31.3.2014 after the truing up exercise.
24.8.2016 GenerationTariff
162
Central Electricity Regulatory Commission
339. MP/12/2016 8th January, 2016
Torrent Power Limited
Petition in compliance of the directions issued vide order dated 7.1.2015 in Petition No. 209/MP/2014 for the purpose of assigning license granted to TEL to Torrent Power Limited.
27.4.2016 Misc. Petition
340. TT/13/2016 29th January, 2016
Power Grid Corporation of India Limited
Petition for determination of transmission tariff from anticipated COD to 31.3.2019 for Asset I : Re-conductoring of one ckt. (CKT- I) Farakka – Malda 400 kV D/C with HTLS conductor and upgradation/replacement of associated bay equipments at Farakka and Malda & Asset II : Re-conductoring of one ckt. (CKT-II) Farakka-Malda 400 kV D/C with HTLS conductor and up-gradation/replacement of associated bay equipments at Farakka and Malda under Eastern Region Strengthening Scheme-XIII (ERSS XIII) in Eastern Region under Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 and Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2014.
30.6.2016 Transmission Tariff
341. GT/281/2014 10th
September, 2014
NTPC Limited Petition for determination of tariff of Talcher Super Thermal Power Station, Stage-I (1000 MW) for the period from 1.4.2014 to 31.3.2019.
29.7.2016 GenerationTariff
342. MP/17/2016 2nd February, 2016
Neyveli Lignite CorporationLimited
Petition for dispute on payment of tariff with interest in regard to power station of Neyveli Lignite Corporation Limited, namely, NLC TPS I (600MW) NLC TPS-II, State- I ( 3 x 210 MW) TPS-II Stage-II (4 x 210 MW) and NLC TPS I expn (2 x 210 MW) due to the increase in operation and maintenance expenses incurred by NLCs mine on account of Wage Revision to Employees for the period from 1.1.2007 and pay revision to CISF personnel posted in NLC Mines for the period from 1.1.2006.
30.8.2016 Misc. Petition
343. GT/279/2014 10th
September, 2014
NTPC Limited Petition for determination of tariff of Kahalgaon Super Thermal Power Station, Stage- I (840 MW) for the period from 1.4.2014 to 31.3.2019.
30.7.2016 GenerationTariff
163
Annual Report
344. TT/21/2016 5th February, 2016
Power Grid Corporation of IndiaLimited
Petition for truing up of transmission tariff for 2009-14 tariff period under Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2009 and determination of transmission tariff for 2014-19 tariff period under Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2014 for Asset-I: 1 x 100 MVAR, 220/132 kV, 3-Phase Spare ICT at Dimapur Sub-Station and Asset-II: 1 x 5 MVA, 132/33 kV, 1-Phase at Ziro Sub-station under Provisions of Spare Transformers and Reactors in North Eastern Region under Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999.
16.6.2016 Transmission Tariff
345. TT/22/2016 16th
February, 2016
Power Grid Corporation of India Limited
Petition for determination of transmission tariff for Asset-I:132/33 kV, 50 MVA, 3-Ph ICT-1 at 132 / 33 kV Nirjuli Sub-station (POWERGRID) (COD-14.2.2016), Asset-II: 132/ 33 kV, 50 MVA, 3-Ph ICT-II at 132/33 kV, Nirjuli Sub-station (POWERGRID) (COD - 29.3.2016) and Asset-III: 400/220kV, 315 MVA, 3-Ph ICT-II (2nd ICT) along with associated bays at 400/220 kV Balipara Sub-station (POWERGRID) (COD -28.5.2016) under “North Eastern Region Strengthening Scheme-II (NERSS-II) Part-A” in North-Eastern Region” for the 2014-19 tariff period under Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2014 and Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999.
27.6.2016 Transmission Tariff
346. TT/23/2016 22nd
February, 2016
Power Grid Corporation of India Limited
Petition for determination of transmission tariff of Asset I :1 X 500 MVA, 400/220/33kV ICT at Malekuttaiayur Sub-station along with associated bays and equipment, Asset II: 1 X 500 MVA, 400/220/33 kV ICT at Somanahalli Sub-station along with associated bays and equipment and Asset-III : 1X500 MVA, 400/220/33 kV ICT at Mysore Sub-station along with associated bays and equipment under System strengthening-XX" in Southern Region from anticipated COD to 31.3.2019 under Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 and Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2014.
28.6.2016 Transmission Tariff
164
Central Electricity Regulatory Commission
347. TT/24/2016 18th
February, 2016
Power Grid Corporation of India Limited
Petition for approval under Regulation 86 of CERC (Conduct of Business) Regulations, 1999 and CERC (Terms and Conditions of Tariff) Regulations, 2014 for determination of tariff (i) truing up transmission tariff for 2009-14 tariff block and (ii) transmission tariff for 2014-19 tariff block - for 400 KV D/C Chamera Pooling Station Jalandhar transmission line alongwith bays and line Reactor at Jalandhar DOCO 1.4.2013 under Transmission System for Power evacuation from Chamera-III.
23.8.2016 Transmission Tariff
348. TT/26/2016 18th
February, 2016
Power Grid Corporation of India Limited
Petition for approval under Regulation 86 of CERC (Conduct of Business) Regulations, 1999 and CERC (Terms and Conditions of Tariff) Regulations, 2014 for determination of tariff from DOCO to 31.3.2019 for LILO of 400 KV Kadapa-Kolar S/C line at NP Kunta and Establishment at NP Kunta under Transmission System for Ultra Mega Solar Park in Anantpur District AP Part- A (Phase-I) anticipated DOCO 1.4.2016.
30.6.2016 Transmission Tariff
349. GT/271/2014 10th
September, 2014
NTPC Limited Petition for revision of tariff of Kahalgaon Super Thermal Power Station, Stage - I, (840 MW) for the period 1.4.2009 to 31.3.2014 after the truing up exercise.
27.7.2016 GenerationTariff
350. GT/270/2014 10th
September, 2014
NTPC Limited Petition for determination of tariff of Simhadri Super Thermal Power Station, Stage - I (2 x 500 MW) for the period 1.4.2014 to 31.3.2019.
27.6.2016 GenerationTariff
351. TT/29/2016 24th
February, 2016
Power Grid Corporation of India Limited
Approval of transmission tariff of Asset-I: 1 No. of 1 X 125 MVAR Bus Reactor and associated bay at 400 kV Maithon S/S, (Anticipated COD: 30.4.2016), Asset-II: Replacement of 1 No. of 1 X 315 MVA, 400/220 kV ICT with 1 x 500 MVA, 400/220 kV ICT (1st) at 400 kV Maithon S/S (Anticipated COD: 30.4.2016) and Asset-III: Replacement of 1 No. of 1X315 MVA, 400/220 kV ICT with 1x500 MVA, 400/220 kV ICT (2nd) at 400 kV Maithon S/S (Anticipated COD: 31.5.2016) under Transmission System for “Eastern Region System Strengthening Scheme-IX” in Eastern Region from actual COD to 31.3.2019 under Regulation-86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 and Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2014.
29.6.2016 Transmission Tariff
165
Annual Report
352. MP/30/2016 23rd
February, 2016
Bhopal Dhule Transmission Company Limited
Petition for approval under Sections 17(3) and 17(4) of the Electricity Act, 2003 for creation of security interest over all the movable and immovable assets of the petitioner in favour security trustee/lenders and for any subsequent transferees, assigns, novatees thereof and any
of the lenders pursuant to Indenture of Mortgage Agreement and other security creating documents /Financial Agreements and for future
way of mortgage/hypothecation / assignment of mortgaged properties and project Assets, for the following transmission line - Jabalpur-Bhopal Transmission line from Bhopal Indore Transmission Line, Bhopal-Bhopal 400 kV DC TL Aurangabad --Dhule 400 KV/DC line and sub stations at Dhule being implemented by Bhopal-Dhule Transmission Company.
6.4.2016 Misc. Petition
353. MP/34/2016 2nd March, 2016
MaheshwaramTransmission Limited & SBI CAP Trustee Company Limited
Petition for approval under Sections 17 (3) & 17(4) of the Electricity Act, 2003 for creation of security interest over all the movable and immovable assets of the petitioner in favour of Security Trustee/ Lenders and for any subsequent transferees, assigns,
lenders to the project acting on
lenders pursuant to Indenture of Mortgage Agreement and other security creating documents/Financial Agreements and for future
way of mortgage/ hypothecation/assignment of Mortgaged Properties and Project Assets, for the following transmission lines - (i) Maheshwaram - Mehboob Nagar 400 kV D/C Line and (ii) Nizamabad- Yeddumailaram (Shankarpalli) 400 kV D/C Line.
6.4.2016 Misc. Petition
354. GT/265/2014 26th August, 2014
NHDC Limited Petition for approval of generation tariff of Indira Sagar HE Project (8 X 125 MW) for the period 2014-2019.
31.5.2016 GenerationTariff
166
Central Electricity Regulatory Commission
355. MP/36/2016 7th March, 2016
Power Grid Corporation of India Limited
Petition under Section 38(2) of the Electricity Act, 2003 read with Sections 79(1) (c) and 79(1) (k) of the Act alongwith (i) CERC (Grant of Regulatory approval for execution of Inter-state Transmission Scheme to Central Transmission Utility Regulations, 2010 (ii) Regulations 111 and 114 of CERC (Conduct of Business) Regulations, 1999 and (iii) CERC (Sharing of inter-State Transmission Charges and Losses) Regulations, 2010 for Grant of Regulatory approval for execution of the Transmission System for Ultra Mega Solar Power Park at Tumkur (Pavagada) Karnataka.
19.8.2016 Misc. Petition
356. RP/11/2016 in Petition No. GT/283/2014
3rd March, 2016
NTPC Limited Petition for review of order dated 25.1.2016 in Petition No.283/GT/2014.
30.6.2016 Review Petition
357. RP/12/2016 in Petition No. TT/37/2014
10th March, 2016
Power Grid Corporation of India Limited
Petition for review of order dated 22.1.2016 in Petition No. 37/TT/2014.
17.8.2016 Review Petition
358. TT/39/2016 8th March, 2016
Power Grid Corporation of India Limited
Petition for truing up of transmission tariff for 2009-14 tariff period and determination of tariff of 2014-19 Tariff Period of Asset-1: 400 kV D/C Raipur – Wardha T/L along with FSC at Wardha under WRSS-II Set-A; Asset-2 765 kV S/C Seoni- Wardha T/L WRSSII, Set A;
(Loc 179/2) 400 kV D/C transmission line – First ckt; Asset-II BALCO (179/2) – Vandana (176/0) 400 kV D/C transmission line – First ckt.; Asset-III Korba - Vandana (176/0) 400 kV D/C transmission line – Second ckt; Asset-IV BALCO (179/2) – Birsinghpur 400 kV D/C transmission line – First Ckt; Asset-V Vandana (176/0) – Birsinghpur 400 kV D/C transmission line – Second ckt and WRSS-II, Set D scheme of Western Region.
28.6.2016 Transmission Tariff
359. RP/13/2016 in Petition No. TT/161/2015
10th March, 2016
Power Grid Corporation of India Limited
Petition for review of order dated 30.12.2015 in Petition No. 616/TT/2015.
30.5.2016 Review Petition
360. RP/15/2016 in Petition No. TT/248/2013
15th
February, 2016
Power Grid Corporation of India Limited
Petition for review of order dated 18.12.2015 in Petition No. 248/TT/2013.
30.5.2016 Review Petition
361. GT/264/2014 26th August, 2014
NHDC Limited Petition for approval of generation tariff for Omkareshwar HE Project (8 X 65 MW) for the period 2014 - 2019.
26.5.2016 GenerationTariff
362. SM/02/2016 14th March, 2016
CentralElectricityRegulatory Commission
Non-compliance of the CERC (Procedure, Terms and Conditions for grant of trading license and other related matters) Regulations, 2009.
8.6.2016 Suo Motu
363. SM/04/2016 15th March, 2016
CentralElectricityRegulatory Commission
Non-compliance of the CERC (Procedure, Terms and Conditions for grant of trading license and other related matters) Regulations, 2009.
4.7.2016 Suo Motu
364. RP/16/2016 in Petition No. TT/272/2015
17th March, 2016
Power Grid Corporation of India Limited
Petition for review of order dated 25.1.2016 in Petition No. 272/TT/2015.
31.5.2016 Review Petition
365. RP/17/2016 in Petition No. TT/253/2015
17th March, 2016
Power Grid Corporation of India Limited
Petition for review of order dated 25.1.2016 in Petition No. 253/TT/2015.
31/05/2016 Review Petition
167
Annual Report
366. RP/18/2016 in Petition No. TT/278/2015
17th March, 2016
Power Grid Corporation of India Limited
Petition for review of order dated 25.01.2016 in Petition No. 278/TT/2015.
31.5.2016 Review Petition
367. RP/14/2016 in Petition No. TT/34/2014
15th
February, 2016
Powergrid Corporation of India Limited
Petition for review of order dated 31.12.2015 in Petition No. 34/TT/2014.
31.5.2016 Review Petition
368. MP/46/2016 29th
February, 2016
Essar Power Transmission Company Limited & Anr.
Application for approval under Sections 17(3) and 17(4) of the Electricity Act, 2003.
25.5.2016 Misc. Petition
369. GT/259/2014 26th August,2014
Kanti Bijli Utpadan Nigam Limited
Petition for determination of tariff of Muzaffarpur Thermal Power Station Stage-I (2 X 110 MW) for the period from 1.4.2014 to 31.3.2019.
30.7.2016 GenerationTariff
370. TT/49/2016 21st March, 2016
Power Grid Corporation of India Limited
Petition for truing up of transmission tariff for 2009-14 tariff block under Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations 2009 and determination of transmission tariff for 2014-19 tariff block under Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations 2014 for Asset A: Raipur (Existing S/S)-Raipur PS (Durg) 400 kV D/C Transmission Line along with associated bays; Asset B : 400 kV D/C Raigarh PS (Near Kotra)-Raigarh (Existing) S/S Transmission Line along with associated bays; Asset C: 765 kV D/C Raigarh PS (Near Kotra)-Raipur PS (Durg) Transmission Line along with associated bays; Asset D: 765/400 kV, 1500 MVA, ICT-I with spare unit and 765 kV, 240 MVAR Bus Reactor with Spare unit at Raigarh 1.6.2013 Page 8 of 71 Order in Petition No. 162/TT/2013 Pooling Station along with associated bays; Asset E: Part-I)-765/400 kV, 1500 MVA, ICT-II and 400 kV, 80 MVAR Bus Reactor at Raigarh Pooling Station (Near Kotra) along with associated Bays and Part II 765 kV, 3x80 MVAR, Shunt Reactor for 765 kV D/C Raigarh PS (Near Kotra)-Raipur PS (Durg) Ckt-I charged as Bus Reactor along with associated bays; Asset F: 765/400 kV, 1500 MVA, ICT with Spare unit and 765 kV, 240 MVAR Bus Reactor with Spare unit at Raipur Pooling Station(Durg) along with associated bays; Asset G: 765/400 kV, 1500 MVA, ICT-III at Raigarh Pooling Station (Near Kotra) along with associated bays; Asset H: 765/400 kV, 1500 MVA, ICT-IV at Raigarh PS along with associated bays and 765 kV, 3 x 80 MVAR Shunt Reactor for 765 kV D/C Raigarh PS (Near Kotra)- Raipur PS (Durg) Ckt-II charged as Bus Rector along with associated bays under establishment of pooling Station at Raigarh (Kotra) and Raipur for IPP Generation Projects in Chattisgarh in Western Region under Regulation- 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations , 1999.
20/06/2016 Transmission Tariff
168
Central Electricity Regulatory Commission
371. GT/258/2014 26th August, 2014
Ratnagiri Gas And Power Private Limited
Petition for determination of tariff of Ratnagiri Power Station (1967.08 MW) for the period from 1.4.2009 to 31.3.2014 after truing up exercise.
21.6.2016 GenerationTariff
372. TT/52/2016 29th March, 2016
Power Grid Corporation of India Limited
Petition for truing up of transmission tariff for 2009-14 tariff period under Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2009 and determination of transmission tariff for 2014-19 tariff period under Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2014 for Asset-I: 400/220 kV, 315 MVA ICT –I at Fatehpur Extension, Asset-II: 400/220 kV, 315 MVA ICT –II at Fatehpur Extension, Asset-III: LILO of Singrauli Kanpur at Fatehpur, Asset-IV: LILO of Fatehpur (UPPCL)-Kanpur(UPPCL) 220kV D/C line at Fatehpur, Asset-V: LILO of Allahabad-Kanpur 400 kV S/C line at Fatehpur, Asset-VI: 765 kV Sasaram- Fatehpur S/C Transmission line, AssetVII: LILO of Ckt- I 220 kV D/C Dehri Bodhgaya at Gaya Sub-station and associated 220 kV line bays, Asset-VIII: LILO of Ckt- II 220 kV D/C Dehri Bodhgaya at Gaya Sub-station and associated 220 kV line bays, Asset-IX: 315 MVA 400/220 kV ICT-I at Gaya Extension, Asset-X: 315 MVA 400/220 kV ICT-II at Gaya Extension, Asset-XI: 765 kV S/C Fatehpur-Agra Transmission Line under supplementary transmission system under DVC and Maithon Right Bank Project in Northern Region under Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999.
27/06/2016 Transmission Tariff
373. GT/257/2014 26th
August.2014NTPCSAIL Power Company Private Limited
Petition for approval of tariff of Bhilai Expansion Power Plant (2 X 250 MW) for the period from 1.4.2014 to 31.3.2019.
2.8.2016 GenerationTariff
374. TT/69/2016 2nd May, 2016
Power Grid Corporation of India Limited
Petition for approval under Regulation 86 of CERC (Conduct of Business Regulations), 1999 and CERC (Terms and Conditions of Tariff) Regulations, 2014 for determination of transmission tariff from anticipated DOCO to 31.3.2019 for 10 nos of assets under Eastern Region Strengthening Scheme of ERSS-XII.
22.8.2016 Transmission Tariff
375. GT/250/2014 26th August, 2014
NHPC Limited Petition for approval of tariff for the period 2014 2019 in respect of Uri-II Power Station.
22.7.2016 GenerationTariff
169
Annual Report
376. TT/244/2014 24th August, 2014
Power Grid Corporation of India Limited
Petition for determination of transmission tariff of Asset I: 4 x 500 MVA, 765/400 kV ICT-2 with one spare unit at Jabalpur 765/400 KV PS, Asset II: 3 x 80 MVAR, 765 KV Line Reactor to be used as Bus Reactor at Jabalpur PS for Dharamjaygarh ckt.#1, Asset III: 765 KV, 3 x 110 MVAR, Bus Reactor-1 at Dharamjaygarh Substation along with associated bays and LILO of 765 KV S/C Ranchi-WR Pooling Station (near Sipat) transmission line at Dharamjaygarh, Asset-IV: 765, 3 x 110 MVAR Bus Reactor-2 at Dharamjaygarh Sub-station along with associated bays, Asset V: 765 KV D/C Jharsuguda Pooling Station-Dharamjaygarh (near Korba) Line under “Transmission System for Phase-I Generation Projects in Orissa (Part-B)” in Western Region for 2014-19 tariff period under Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2014 for under Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999.
26.4.2016 Transmission Tariff
377. TT/242/2014 24th August, 2014
Power Grid Corporation of India Limited
Petition for determination of transmission tariff of (A) 1 x 125 MVAR Bus Reactor at 400 kV Damoh Sub-station (B) 1x125 MVAR Bus Reactor at 400 kV Bachau Sub-station (C) 1x125 MVAR Bus Reactor at 400 kV Pirana Sub-station (D) 1x125 MVAR Bus Reactor-1 at 400 kV Itarsi Sub-station (E) 1x125 MVAR Bus Reactor-2 at 400 kV Itarsi Sub-station, (F) 1x125 MVAR Bus Reactor at 400 kV Gwalior Sub-station under installation of Reactors (Part-II) in Western Region for 2014-19 tariff block under Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2014 and under Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999.
28.4.2016 Transmission Tariff
378. GT/238/2014 24th August, 2014
NHPC Limited Petition for truing up of capital expenditure for the period 2009-2014 in respect of Uri Power Station.
13.7.2016 GenerationTariff
379. GT/234/2014 24th August, 2014
NHPC Limited Petition for truing up of capital expenditure for the period 2009-14 and tariff for 2014-19 in respect of Teesta- V Power Station.
16.8.2016 GenerationTariff
170
Central Electricity Regulatory Commission
380. MP/65/2016 28th April, 2016
Ind Barath Energy Utkal Limited
Petition under 4th proviso to Regulation 8 (7) of Central Electricity Regulatory Commission (Grant of Connectivity, Long Term Access and Medium Term Access in inter-State transmission and related matters) Regulations, 2009 read with Section 79(1) (c) of the Electricity Act for extension of time for achievement of commercial operation of Unit I 350 MW of the project.
31.5.2016 Misc. Petition
381. TL/67/2016 2nd May, 2016
OdishaGenerationPhase II Transmission Limited
Petition for transmission licence under Section 14 read with Section 15 (1) of the Electricity Act, 2003 for grant of transmission license to Odisha Generation Phase II Transmission Limited.
30.6.2016 Transmission Licence
382. ADP/66/2016 28th April, 2016
OdishaGenerationPhase II Transmission Limited
Petition for determination of transmission tariff under Section 63 of the Electricity Act, 2003 for adoption of transmission charges with respect to Transmission System being established by Odisha Generation Phase II Transmission Limited.
31.5.2016 Adoption of Tariff
383. MP/62/2016 28th March, 2016
Essar Power MP Limited
Application for extension of time for liquidating the outstanding in relation to UI charges payable by Essar Power MP Limited.
22.4.2016 Misc. Petition
384. MP/75/2016 5th May, /2016
Pan India Network Infravest Limited
Application for downgrading the inter-state Trading license of Pan India Network Infravest Limited from Category I to Category IV.
4.7.2016 Misc. Petition
385. TDL/63/2016 22nd March, 2016
CleantechSolar Energy (India) Private Limited
Application for grant of Category-I Inter-State trading license to Cleantech Solar Energy (India) Private Limited
29.8.2016 Trading Licence
386. MP/70/2016 2nd May, 2016
JabalpurTransmission Company Limited & Anr.
Petition for security creation for approval under section 17(3) and 17(4) of the Electricity Act 2003, for creation of security interest over all the movable and immovable assets of the petitioner in favour of security trustee/ lenders and for any subsequent transferees, assigns,
lenders to the project, acting on
lenders pursuant to Indenture of Mortgage Agreement and other security creating documents/Financial Agreements and for future
way of mortgage/hypothecation/assignment of Mortgaged Properties and Project Assets, for the following transmission lines (i) Dhramjaygarh Jabalpur Pool 765 kV 1 x D/C Line and (ii) Jabalpur Pool Bina 765 kV S/C Line.
15.7.2016 Misc. Petition
171
Annual Report
387. TT/32/2016 29th
February, 2016
Power Grid Corporation of India Limited
Petition for truing up of transmission tariff for 2009-14 tariff block under Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2009 and determination of transmission tariff for 2014-19 tariff block under Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2014 for Asset-I 765 kV, 240 (3*80) MVAR Bus Reactor II along with associated bays at 765/400 kV Balia sub-station; Asset-II 765 kV 330 MVAR (3*110) Bus Reactor along with associated bays at 765/400/220 kV Fatehpur sub-station ;Asset-III 765 kV 3*80 MVAR Bus Reactor at Lucknow along with associated bays ;Asset-IV 400 kV 125 MVAR Bus Reactor III along with associated bays at 765/400 KV Agra (Augmentation) sub-station ;Asset-V 400 kV 125 MVAR Bus Reactor II along with associated bays at 765/400 KV Agra (Augmentation) sub-station ;Asset-VI 400 kV 125 MVAR Bus Reactor III at Ballia sub-station along with associated bays(Augmentation of 400 KV to 765 kV) under common scheme for 765 kV Pooling station and Network for NR, import by NR from ER and common scheme for network for WR and import by WR from ER and from NER/SR/WR via ER in Northern Region under Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999.
20.6.2016 Transmission Tariff
388. TT/68/2016 2nd May, 2016
Power Grid Corporation of India Limited
Petition for approval of transmission tariff for Assets (4 nos.) under "Transfer of power from Generation Projects in Sikkim to NR/WR Part-B " in Eastern Region under Regulation 86 of Central Electricity Regulatory Commission (Conduct and Business) Regulation, 1999 and Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulation, 2014 from COD to 31.3.2019.
29.7.2016 Transmission Tariff
389. TT/90/2016 13th June, 2016
Power Grid Corporation of India Limited
Petition for determination of transmission tariff for 400 kV D/C Ranchi – Chandwa – Gaya line alongwith associated bays at Ranchi, Chandwa (GIS) and Gaya Sub-stations and 2 X 125 MVAR 400 kV Bus Reactor alongwith associated bays at Chandwa (GIS) under “Transmission System for Phase-I Generation Projects in Jharkhand and West Bengal Part A1” in Eastern Region for 2014-19 Tariff period.
29.7.2016 Transmission Tariff
172
Central Electricity Regulatory Commission
390. TT/78/2016 19th May, 2016
Power Grid Corporation of India Limited
Petition for truing up of transmission tariff for 2009-14 tariff period under Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2009 and determination of transmission tariff for 2014-19 tariff period under Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2014 for 8 nos. of transmission assets under “Pallatana Gas Based Power Projects and Bongaigaon TPS Projects” in North Eastern Region under Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999.
16.6.2016 Transmission Tariff
391. TT/75/2015 6th February, 2015
Essar Power Transmission Company Limited.
Petition for approval of transmission tariff for control period from 2014-15 to 2018-19 for combined assets of LILO of 400 kV S/C Vindyachal-Korba transmission line; 400 kV D/C Gandhar Hazira transmission line; and 400/220 kV GIS Sub-station at Hazira (Stage-I of transmission assets of Essar Power Transmission Company Limited) under Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 and Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2014.
17.6.2016 Transmission Tariff
392. RP/22/2016 in TT/106/2014
6th June, 2016
Power Grid Corporation of India Limited
Petition for review of order dated 21.12.2015 in Petition No. 106/TT/2014.
29.6.2016 Review Petition
393. SM/3/2016 16th March, 2016
CentralElectricityRegulatory Commission(CERC)
Determination of Generic levelised
2016-17 under Regulation of 8 of CERC(Terms and Conditions) for tariff determination for renewal sources Regulations, 2012.
29.4.2016 Suo Motu
394. SM/06/2016 3rd May, 2016
CentralElectricityRegulatory Commission
Non-compliance of the CERC (Procedure, Terms and Conditions for grant of trading licence and other related matters) Regulations, 2009.
27.6.2016 Suo Motu
395. SM/7/2016 3rd May, 2016
CentralElectricityRegulatory Commission
Non-compliance of the CERC (Procedure, Terms and Conditions for grant of trading licence and other related matters) Regulations, 2009.
13.7.2016 Suo Motu
396. GT/233/2014 24th August, 2014
NHPC Limited Petition for truing up of capital expenditure for the period 2009-2014 in respect of Chamera-II Power Station.
17.6.2016 GenerationTariff
173
Annual Report
397. AT/112/2016 14th July, 2016
Warora – Kurnool Transmission Limited
Petition under Section 63 of the Electricity Act, 2003 for adoption of transmission charges with respect to the Transmission System established by Warora-Kurnool Transmission Limited.
30.8.2016 Adoption of Tariff
398. SM/8/2016 6th May, 2016
CentralElectricityRegulatory Commission
Check list in respect of tariff petitions for 2014-19.
6.5.2016 Suo Motu
399. GT/231/2014 24th August, 2014
NHPC Limited Petition for truing up of capital expenditure for the period 2009-14 and 19 in respect of Dulhasti Power Station.
30.8.2016 GenerationTariff
400. MP/79/2016 25th May, 2016
Maruti Clean Coal and Power Limited
Petition under Section 79 (1) (c) and 79 (1) (k) read along with section 79 (1) (f) of the Electricity Act, 2003 read with Regulation 12(6) of the CERC (Sharing of inter-State transmission charges and losses) Regulations, 2010 alongwith Regulation 111 and Regulation 115 of the CERC (Conduct of Business) Regulations, 1999 and Clause 3.5.6 of the Billing, Collection and Disbursement (BCD) Procedure under the CERC (Sharing of Inter State Transmission Charges and Losses) Regulations, 2010 read with Regulation 2(1)(i) of the CERC (Payment of Fees) Regulations, 2012.
9.8.2016 Misc. Petition
401. TT/92/2016 13th June, 2016
Power Grid Corporation of India Limited
Petition for determination of transmission tariff for 2019 for LILO of Gladni — Hiranagar 220 kV S/C line at 400/220 kV Samba (POWERGRID) Sub-station (the lines are to be terminated at existing 220 kV line bays at samba Substation) under "Northern Region System Strengthening Scheme —XXXIV (NRSS-XXXIV) for the 2014-19 tariff period under Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2014 and Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999.
28.7.2016 Transmission Tariff
402. MP/87/2016 8th June, 2016
RaipurRajnandgaonWarora Transmission Limited & Anr.
Petition for approval under Sections 17(3) & 17(4) of Electricity Act, 2003 for Assignment of Licence by way for creation of security interest in favour of Security Trustee/Lenders and other security creating documents / Financial Agreements by way of mortgage / hypothecation / assignment of mortgage properties and project assets of Raipur- Rajnandgaon-Warora Transmission Project.
28.7.2016 Misc. Petition
174
Central Electricity Regulatory Commission
403. MP/83/2016 31st May, 2016
M.P. Power ManagementCo. Ltd.
Petition under Section 79 of the Electricity Act, 2003 read with Article 17 of Power Purchase Agreement dated 7.8.2007 between Sasan Power Limited and the petitioner.
3.6.2016 Misc. Petition
404. GT/219/2014 24th August, 2014
NTPC Limited Petition for revision of tariff of Ramagundam Super Thermal Power Station, Stage-III for the period from 1.4.2009 to 31.3.2014 after truing up exercise.
8.8.2016 GenerationTariff
405. MP/93/2016 14th June, 2016
Haryana Power Purchase Centre
Petition under Section 79 of the Electricity Act, 2003 read with Article 17 of the Power Purchase Agreement dated 7.8.2007 between Sasan Power Limited and the MP Power Management Company Limited and Central Electricity Regulatory Commission (Regulation of Power Supply) Regulations, 2010.
16.6.2016 Misc. Petition
406. GT/217/2014 24th August, 2014
NTPC Limited Petition for revision of tariff of Ramagundam Super Thermal Power Station, Stage-I & II (2100 MW) from 1.4.2009 to 31.3.2014 after truing up exercise.
27.6.2016 GenerationTariff
407. GT/207/2014 14th August, 2014
NTPC Limited Petition under Section 62 and 79 (i) (a) of the Electricity Act, 2003 read with Chapter-V of the CERC (Conduct of Business) Regulations, 1999 for revision of tariff of Talcher Super Thermal Power Station Stage - I, (1000 MW) from 1.4.2009 to 31.3.2014 after truing up exercise.
20.7.2016 GenerationTariff
408. SM/9/2016 17th June, 2016
CentralElectricityRegulatory Commission (
Operation of 24 X 7 Round the Clock Intra-day/Contingency Market (Extended Market Session) on the Power Exchange.
17.6.2016 Suo Motu
409. RP/24/2016 in Petition No. TT/58/2015
5th July, 2016 Power Grid Corporation of India Limited
Petition for review of order dated 29.4.2016 in Petition No. 58/TT/2015.
26.8.2016 Review Petition
410. TT/201/2014 10th August, 2014
Power Grid Corporation of India Limited
Petition for determination of transmission tariff for 2014-19 tariff block for 765 kV S/C Satna - Gwalior ckt. 2 Transmission Line along with associated bays and respective line reactor at Satna & Gwalior Sub-Station under Vindhyachal IV & Rihand III (1000 MW)(Group-3) Generation Project under Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 and Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2014.
23.5.2016 Transmission Tariff
175
Annual Report
411. TT/102/2016 4th July, 2016 Power Grid Corporation of India Limited
Petition for approval under Regulation-86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations 1999, Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations 2009 and Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations 2014 for determination of (i) truing up transmission tariff for 2009-14 tariff block and (ii) transmission tariff for 2014-19 tariff block for (a) LILO of both circuit of 400 kV D/C, Gazuwaka-Vijayawada line at Vemagiri and (b) Extension of 400/220 kV substation at Vijayawada under System Strengthening-VI of Southern Region Grid in Southern Region.
25.7.2016 Transmission Tariff
412. TT/185/2014 1st August,2014
Power Grid Corporation of IndiaLimited
Petition for determination of transmission tariff of Asset 1 : Aurangabad (MSETCL)-Aurangabad (PG) 400 kV D/C (Quad) Line (Ckt#1) and shifting of 400 kV D/C Akola-Aurangabad (MSETCL) line to Aurangabad (PG) along with associated bays at both ends. Asset 2: Aurangabad (MSETCL) - Aurangabad (PG) 400 kV D/C Akola- Aurangabad (MSETCL) line to Aurangabad (PG) along with associated bays at both ends. Asset-3: 240 MVAR Switchable Line reactor for 765 kV Seoni- Wardha Ckt#1 at Seoni Sub-station, Asset-4: 240 MVAR Switchable Line reactor for 765 kV Seoni- Wardha ckt#2 at Seoni- Wardha Ckt#2 at Seoni Sub-station. Asset-5: 400 kV D/C Vapi-Kala transmission line WR1 portion from AP 38- AP 44-AP45A/0 (Part of 400 kV D/C Navsari- Boisar transmission line), Asset-6: 80 MVAR Line reactor for 400 kV D/C Wardha-Aurangabad transmission line Ckt#1 to be charged as bus reactor 1 at 400/220 kV Wardha Sub-station, Asset-7: 80 MVAR Line reactor for 400 kV D/C Wardha- Aurangabad transmission line Ckt#2 to be charged as bus reactor 1 at 400/220 kV Wardha Sub-station under transmission system associated with Mundra Ultra Mega Power Project (UMPP) in Western Region for 2014-19 tariff period.
29.4.2016 Transmission Tariff
176
Central Electricity Regulatory Commission
413. TT/180/2014 25th July, 2014
Power Grid Corporation of India Limited
Petition for truing up of transmission tariff for 2009-14 tariff period under Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2009 and determination of transmission tariff for 2014-19 tariff period under Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2014 for Additional Converter Transformer (Spare) for Rihand-Dadri Bi-pole, in Northern Region under Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999.
18.4.2016 Transmission Tariff
414. MP/103/2016 4th July, 2016 NRSSXXIXTransmission Company Limited & Anr.
Petition for approval under Sections 17(3) & 17(4) of Electricity Act, 2003 for creation of security interest over all the movable and immovable assets of the Petitioner in favour of Security Trustee/ Lenders and for any subsequent transferees, assigns, novatees thereof and
of the lenders pursuant to Indenture of Mortgage Agreement and other security creating documents/Financial
transactions also, by way of mortgage/hypothecation/assignment of Mortgaged Properties and Project Assets, for the following transmission lines (i) Jullandhar Samba 400 kV D/C Line and (ii) LILO of both circuits of Uri Wagoora 400 kV D/C line at Amargarh (on multi-circuit towers) (iii) Samba - Amargarh 400 kV D/c routed through Akhnoor/ Rajouri (iv) II. sub-station establishment of 7 x 105 MVA (1 ph units), with 400/220 kV GIS sub-station at Amargarh.
27.7.2016 Misc. Petition
415. TT/139/2014 10th July, 2014
Power Grid Corporation of India Limited
Petition for determination of transmission tariff from COD to 31.3.2019 for Fibre Optic communication system (847.124 km) in lieu of existing United Load Despatch and Communication (ULDC) Microwave Links in Northern Region.
12.4.2016 Transmission Tariff
416. MP/135/2014 10th July, 2014
NTPC Limited Petition under section 79(1) (c) of the Electricity Act, 2003 and Regulation 32 of the CERC (Grant of Connectivity, Long Term Access and Medium- Term Open Access in inter-State transmission and related matters) Regulations, 2009 for Faridabad Solar PV (5MW).
29.6.2016 Misc. Petition
177
Annual Report
417. MP/109/2016 13th July, 2016
ChhattisgarhWRTransmission Limited
Petition for approval under Section 17 (3) and (4) of the Electricity Act, 2003 for assignment of license by way for creation of security interest in favour of Security Trustee/Lenders and other security creating documents/Financial Agreement by way of mortgage/hypothecation/assignment of mortgage properties and project assets of Chatttisgarh-WR Transmission Limited.
16/08/2016 Misc. Petition
418. TT/127/2014 30th June, 2014
Power Grid Corporation of India Limited
Petition for approval of transmission tariff from COD to 31.3.2019 for LILO of both circuits of Tuticorin JV - Madurai 400kV D/C (Quad) line at Tuticorin Pooling Station along with new 765 kV Pooling Station at Tuticorin(initially charged at 4Q0 kV) including 1X80 MVAR, 400 kV Bus Reactor under Transmission System associated with Common System Associated with Coastal Energen Private Limited & Ind-Bharat Power (Madras) Limited LTOA Generation Projects in Tuticorin Area - PART-A in Southern Region.
29.7.2016 Transmission Tariff
419. SM/10/2014 20th June, 2014
CentralElectricityRegulatory Commission
Non-Compliance of Regulation 8 (6) of Central Electricity Regulatory Commission (Sharing of inter -State Transmission Charges and Losses) Regulations, 2010.
30.6.2016 Suo Motu
420. SM/09/2014 20th June, 2014
CentralElectricityRegulatory Commission
Investigation of load crash in Northern Region on 30.05.2014
14.6.2016 Suo Motu
421. TT/119/2014 19th June, 2014
H.P. Power Transmission CorporationLimited.
Petition for determination of tariff in respect of H.P. Power Transmission Corporation Limited owned transmission lines/system connecting with other states and intervening transmission lines incidental to inter-State transmission of electricity as per the Central Electricity Regulatory Commission’s order dated 14.3.2012 in Petition No.15/Suo-Moto/2012, for inclusion in POC charges in accordance with Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2009.
16.5.2016 Transmission Tariff
422. RC/140/2016 23rd August, 2016
Powergrid Parli Transmission Limited
Regulatory Compliance application under CERC (Conduct of Business) Regulations, 1999 for change of name of inter-State transmission license of Gadarwara (B) Transmission Limited to Powergrid Parli Transmission Limited.
29.8.2016 Regulatory Compliance
178
Central Electricity Regulatory Commission
423. TT/117/2014 16th June, 2014
Powergrid Corporation of India Limited
Petition for determination of transmission tariff for Asset 1: 400 kV, 125 MVAR bus reactor at Raipur Sub-station, Asset 2: 400 kV, 125 MVAR bus reactor at Seoni Substation, Asset 3: 400 kV, 63 MVAR line reactor at Raipur sub-station under “Installation of Reactors (Part-II) in Western Region” for the 2014-19 tariff period under Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2014 and Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999.
26.5.2016 Transmission Tariff
424. TT/116/2014 16th June, 2014
Powergrid Corporation of India Limited
Petition for determination of transmission tariff of Asset 1: 420 kV, 125 MVAR Bus Reactor at Jabalpur sub-station, Asset 2: 420 kV, 125 MVAR Bus Reactor at Khandawa Sub-station, Asset 3: 420 kV, 125 MVAR Bus Reactor at Bhatapara Sub-station, Asset 4: 420kV, 125 MVAR Bus Reactor at Raigarh Sub-station, Asset 5: 420kV, 80 MVAR Switchable Line Reactor at Solapur Substation, Asset 6: 420 kV, 125 MVAR Bus Reactor at Aurangabad Sub-station under “Installation of reactors in Western Region” in Western Region for 2014-19 tariff period.
29.4.2016 Transmission Tariff
425. TT/115/2014 13th June, 2014
Powergrid Corporation of India Limited
Petition for determination of transmission tariff of (A) 765 kV, 240 MVAR Switchable Line Reactor of 765 kV D/C Aurangabad-Padghe Line Ckt-I to be charged as Bus Reactor at Aurangabad -substation and (B) 765 kV, 240 MVAR Switchable Line Reactor of 765 kV D/C Aurangabad-Padghe Line Ckt-II to be charged as Bus Reactor at Aurangabad Sub-station under “System Strengthening in North/West part of WR for IPP Projects in Chhattisgarh (IPP-E)” in Western Region for 2014-19 tariff block.
27.4.2016 Transmission Tariff
426. TT/110/2014 4th June, 2014
Powergrid Corporation of India Limited
Petition for determination of transmission tariff for 2 x 315, 400/220 kV GIS Sub-station at Kala in UT of D & NH & LILO of one circuit of 400 kV D/C Vapi-Navi Mumbai Transmission Line at Kala Sub-station (multi-circuit tower) (Interim Contingency Arrangement),under Transmission System for establishment of 400/220 kV GIS Substation at Kala in UT of D&NH in Western Region for 2014-19 tariff block under Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2014 for Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999
29.4.2016 Transmission Tariff
179
Annual Report
427. MP/119/2016 28th July, 2016
Nuclear Power Corporation of India Limited
Petition for anticipated delay in synchronization of unit-2 of 2 x 1000 MW Kundankulam Nuclear Power Project (KKNPP-2) of Nuclear Power Corporation of India Limited.
19.8.2016 Misc. Petition
428. TT/109/2014 4th June, 2014
Powergrid Corporation of India Limited
Petition for determination of transmission tariff from DOCO to 31.3.2019 for Assets-I: 400/220 KV 1 X 500 MVA transformer at Navasari sub-station, Asset-2 2 nos. 400 KV line bays at 765/400 KV Indore sub-station, Asset 3 : 2 nos. 220 KV line bays at 400/220 KV Pirana sub-station under Augmentation of Transformer and Bays in WR.
23.5.2016 Transmission Tariff
429. TT/108/2014 4th June, 2014
Powergrid Corporation of India Limited
Petition for approval of transmission tariff for Asset-I: consisting of Nellore-Thiruvalam 400 kV D/C Quad line, Extension of 400/220 kV sub-station at Nellore, Extension of 400/220 kV sub-station at Thiruvalam and 1x50 MVAR line reactor at both ends of each circuit of Nellore-Thiruvalam 400 kV Quad line along with 450 ohms NGR and Asset-II: ThiruvalamMelakottaiyur 400 kV D/C line along with bay extensions at Thiruvalam and Melakottaiyur Sub-stations “under Transmission system associated with System Strengthening XVIII in Southern Regional Grid” in Southern Region.
31.5.2016 Transmission Tariff
430. TT/107/2014 2nd June, 2014
Powergrid Corporation of India Limited
Petition for approval of transmission charges for Asset I: 765 kV S/C Bareilly-Lucknow Transmission Line at 400 kV level and Asset II: One Circuit of 400 kV D/C Bareilly (New) Bareilly (New) Bareilly (Existing) Transmission Line in Northern Region under "Northern Region System Strengthening Scheme XXI" for tariff block 2014-19 under Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Tariff Regulations, 1999 and Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2014.
25.4.2016 Transmission Tariff
431. MP/118/2016 28th July, 2016
SKS Power Generation(Chhattisgarh)Limited
Petition under Regulation 8 of CERC (Grant of Connectivity, Long Term Access and Medium Term Open Access in inter-State Transmission and related matters) 2009 as amended till date seeking permission of the Commission to allow extension of the period for withdrawal
power for commissioning and testing including full load testing of Unit No. I (300 MW) of ( 4 X 300MW) Binjkot TPP of SKS Power Generation (Chhattisgarh) Limited, beyond six months from expected initial synchronization date of 30th September, 2016.
29.7.2016 Misc. Petition
180
Central Electricity Regulatory Commission
432. TT/104/2014 30th May, 2014
Powergrid Corporation of India Limited
Petition for determination of transmission tariff for 2019 for Asset 1: 765 KV 3 X 110 MVAR Bus Reactor at Wardha Sub-Station, Asset 2: 3 x 110 MVAR Line Reactor for 765 kV D/C Raipur-Wardha Line 1 Ckt#1 charged as Bus Reactor at Wardha Substation, Asset 3A: 765 kV D/C Raipur Pooling Station-Wardha line-I Transmission Line, Asset 3B: 765 KV 240 MVAR Switchable Line Reactor of Wardha I bay at Raipur Pooling Station (Charged as a Bus Reactor), Asset 3C: 765 KV 240 MVAR Switchable Line Reactor of Wardha II bay at Raipur Pooling Station (Charged as a Bus Reactor) under “Integration of Pooling Stations in Chhattisgarh with central part of WR for IPP generation projects in Chhattisgarh” in Western Region for the 2014-19 tariff period under Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2014 and Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999.
29.4.2016 Transmission Tariff
433. MP/103/2014 30th May, 2014
MaharashtraState Electricity Transmission Company Limited
Petition under Section 79 (1) (c), (f) and (k) of the Electricity Act, 2003 read with the CERC (Conduct of Business) Regulations, 1999 for keeping in abeyance the ongoing trial operation of the incomplete SR Synchronization [synchronization of SR Grid with NEW Grid over 765 KV Raichur (SR)- Sholapur (WR) -1 * S/C lines] till the satisfactory resolution of all concerns arising out of the trial run of the SR Synchronization and serious issues causing major grid disruption.
5.4.2016 Misc. Petition
434. MP/134/2016 17th August, 2016
Ind Barath Energy Utkal Limited
Petition under 4th Proviso to Regulation 8 (7) of Central Electricity Regulatory Commission (Grant of Connectivity, Long Term Access and Medium Term Open Access in inter-State transmission and related matters) Regulations, 2009 read with Section 79 (1) (c) of the Electricity Act, 2003 for the extension of time to complete dedicated 400 KV transmission line and evacuation of power through the existing LILO till then.
30.8.2016 Misc. Petition
181
Annual Report
435. TT/100/2014 27th May, 2014
Powergrid Corporation of India Limited
Petition for approval under the Regulation 4 (3) (ii) of Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations 2014 and Regulation 24 of Central Electricity Regulatory Commission (Conduct of Business) Regulations 1999 for commissioning date and (ii) Approval under Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations 1999 and Central Electricity Regulatory Commission (Terms and Conditions
determination of transmission tariff from COD to 31.3.2019 for Asset A: LILO of 400 kV S/C Bhiwadi-Bassi TL at Kotputli Sub-station and Asset B: 315 MVA 400/220 kV ICT-I &II with 06 no 220 kV Line Bays at Kotputli S/S under Northern Region System Strengthening Scheme-XV in Northern Region.
29.4.2016 Transmission Tariff
436. TT/99/2014 27th May, 2014
Powergrid Corporation of India Limited
Petition for determination of transmission tariff from 1.4.2014 to 31.3.2019 for 400/220 KV, 315 MVA ICT-II alongwith associated Bays at Hamirpur S/S in Northern Region.
29.4.2016 Transmission Tariff
437. MP/98/2014 27th May, 2014
Shyam Century Ferrous & Others
Petition under Section 79 (1) (c) read with Regulations 17,18& 26 of the CERC (Open Access in inter- State Transmission) Regulations, 2008 and Regulation 5 of the CERC (Deviation Settlement Mechanism and related matters) Regulations, 2014 (and appropriate corresponding regulations earlier).
30.6.2016 Misc. Petition
438. MP/91/2014 19th May, 2014
The Southern India Mills Association
Petition under Section 79 of the Electricity Act, 2003 read with clause 5.2 of the operating code under the Indian Electricity Grid Code and Regulations 12 and 13 of the Central Electricity Regulatory Commission (Unscheduled Interchange Charges and related matters) Regulations, 2009; Regulations 7(1) and (2), 12, 13 of the Central Electricity Regulatory Commission (Deviation Settlement Mechanism And Related Matters) Regulations, 2014 and Regulations 111, 114 and 115 of the Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999.
13.7.2016 Misc. Petition
182
Central Electricity Regulatory Commission
439. MP/084/2014 12th May, 2014
Sasan Power Limited
Petition under Section 79 of the Electricity Act, 2003 read with statutory framework governing procurement of power through competitive bidding and Article 17 of the Power Purchase Agreement dated 7.8.2007 executed between Sasan Power Limited and the procurers for recovery of amounts claimed by Sasan Power Limited in terms of monthly bills.
9.6.2016 Misc. Petition
440. MP/62/2014 31st May, 2014
India Bulls Power Limited
Petition for revision of the mechanism for calculating the escalation rates for domestic coal published by the Central Electricity Regulatory Commission for the purpose of tariff payment in a PPA under Case-I bidding process.
25.5.2016 Misc. Petition
441. TT/46/2014 28th
February, 2014
Powergrid Corporation of India Limited
Petition for determination of transmission tariff of Assets (05 nos) under Common Scheme for 765 KV Pooling Stations and Network for NR, import by NR from ER and from NER/SR/WR via ER and Common Scheme for network for WR and Import by WR from ER and from NER/SR/WR via ER in WR for tariff block 2009-14.
29.7.2016 Transmission Tariff
442. TT/44/2014 28th
February, 2014
Powergrid Corporation of India Limited
Petition for determination of transmission tariff for 2009-14 tariff period under Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2014 for Asset-I 3 x 80 MVAR line reactor with associated bays at Gwalior Substation used as bus reactor till commissioning of 765 kV Bina-Gwalior ckt-3, Asset-II 3 x 80 MVAR line reactor with associated bays at Bina Sub-station to be used as bus reactor till commissioning of 765 kV S/C Bina-Gwalior till commissioning of 765 kV Bina-Gwalior Ckt-3, Asset-III 765 kV S/C Bina-Gwalior Ckt-3 under “Transmission System for Phase-I Generation Projects in Orissa Part-C” in Western Region under Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999.
18.4.2016 Transmission Tariff
443. TT/36/2014 25th
February, 2014
Powergrid Corporation of India Limited
Petition for determination of transmission tariff for LILO of one circuit of Neyveli-Trichy 400 kV line at Nagapattinam Pooling Station for initial arrangement which later shall be bypassed under Transmission System associated with Common Transmission Scheme associated with ISGS Projects in Nagapattinam/Cuddalore Area of Tamil Nadu Part-A1(a) in Southern Region for tariff block 2014-19.
31.5.2016 Transmission Tariff
183
Annual Report
444. MP/32/2014 24th
February, 2014
East North Interconnection Company Limited
Petition under Sections 61, 63 and 79 of the Electricity Act, 2003 read with the statutory framework for tariff-based competitive bidding for transmission service of 400 kV D/C quad transmission line from Bongaigaon-Siliguri and 400 kV D/C quad transmission line from Purnia-Biharsharif being implemented by East-North Interconnection Company Ltd.
24.8.2016 Misc. Petition
445. TT/22/2014 11th
February, 2014
Powergrid Corporation of India Limited
Petition for determination of transmission tariff from COD to 31.3.2019 for Fibre Optic Communication System (847.124 km) in lieu of existing United Load Despatch and Communication (ULDC) Microwave Links (Part-II) in Northern Region.
27.5.2016 Transmission Tariff
446. TT/20/2014 7th February, 2014
Powerlinks Transmission Limited
Petition for truing-up of annual transmission charges for the period FY 2009-13 and Revised Estimates of FY 2013-14 for (i) 400 kV D/C Gorakhpur-Lucknow transmission line, and (ii) 400 kV D/C Bareilly-Mandola transmission line in Northern Region associated with Tala Hydro Electric Projects, East North Interconnector and Northern Region Transmission System of Powerlinks Transmission Ltd.
23.5.2016 Transmission Tariff
447. TT/19/2014 7th February, 2014
Powerlinks Transmission Limited
Petition for truing-up of annual transmission charges for the period FY 2009-13 and Revised Estimates of FY 2013-14 for (i) 400 kV D/C Siliguri-Purnea transmission line, (ii) 400 kV D/C Purnea-Muzaffarpur transmission line, and (iii) 220 kV D/C Muzaffarpur (PGCIL)-Muzaffarpur (BSEB) transmission line in Eastern Region, associated with Tala Hydro Electric Project, East-North Inter-Connector and Northern Region Transmission System of Powerlinks Transmission Ltd.
16.5.201TT6 Transmission Tariff
448. TT/18/2014 7th February, 2014
Powerlinks Transmission Limited
Petition for truing-up of annual transmission charges for the period FY 2009-13 and Revised Estimates of FY 2013-14 for 400 kV D/C Muzaffarpur-Gorakhpur transmission line in Eastern-Northern Inter-Region associated with Tala Hydro Electric Project, East-North Inter-Connector and Northern Region Transmission System of Powerlinks Transmission Ltd.
6.5.2016 Transmission Tariff
449. TT/17/2014 7th February, 2014
Powergrid Corporation of India Limited
Petition for approval for determination of Fees and Charges for Fibre Optic Communication System in lieu of
Communication (ULDC) Microwave links in North Eastern Region for the period 2009-14 block.
31.5.2016 Transmission Tariff
184
Central Electricity Regulatory Commission
450. MP/04/2014 17th January, 2014
Kerala State ElectricityBoard Limited
Petition under Section 79(f) of the Electricity Act, 2003 for adjudicating the dispute on the 'Arbitrary Denial of Open Access on the power tied up with GRIDCO by the constituents in the Southern-S2 Region' and 'Arbitrary denial of URS power and STOA by SRLDC on apprehended system security concerns violating the prudent utility practices resulting in under utilization of generation and transmission assets'.
29.7.2016 Misc. Petition
451. MP/319/2013 7th
December, 2013
Tata Power DelhiDistributionLimited
Petition seeking a declaration that COD by the generating company was illegal and not in accordance with the terms of the PPA and prudent utility practices.
18.4.2016 Misc. Petition
452. MP/315/2013 7th
December, 2013
PEL Power Limited
Petition for adjudication of disputes arising out of the open access approval granted to the petitioner for evacuation of electricity and terms and conditions for the Bulk Power Transmission Agreement dated 24.12.2010.
12.7.2016 Misc. Petition
453. TT/289/2013 6th
November, 2013
Powergrid Corporation of India Limited
Petition for determination of transmission tariff for (1) 400 kV Vadodara Pirana transmission line along with associated bays at Pirana Sub-station (for direct inter-connection with 400 kV D/C Vadodara Asoj transmission line under interim contingency scheme) (anticipated COD:1.1.2014) under transmission system for IPP Generation projects in Madhya Pradesh & Chhattisgarh in Western Region for tariff block 2009-14 period.
8.7.2016 Transmission Tariff
454. TT/258/2013 25th
September, 2013
Powergrid Corporation of India Limited
Petition for determination of transmission tariff for Tiruvelam (Powergrid) – Chitoor (APTRANSCO) 400 kV D/C (Quad) line along with associated bays and equipments under Supplementary Transmission system associated with Vallur TPS for the period from anticipated COD to 31.3.2014 in Southern Region for tariff block 2014-19 under Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulation, 1999 and Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2014.
5.4.2016 Transmission Tariff
455. MP/158/2013 29th August, 2013
Power Exchange India Limited
arising due to present method of transmission corridor allocation to Power Exchange for collective transactions.
4.4.2016 Misc. Petition
456. TT/239/2013 25th June, 2013
Damodar Valley Corporation
Petition for determination of tariff for inter- state transmission of DVC for the period from 1.4.2006 to 31.3.2009
10.5.2016 Transmission Tariff
185
Annual Report
457. TT/104/2013 15th May, 2013
Powergrid Corporation of India Limited
Petition for determination of transmission tariff for Asset-I: Reconductoring Ckt-I of 400 kV D/C Siliguri-Purnea (HTLS Cond.) Transmission Line; Asset II: Reconductoring Ckt-II of 400 kV D/C Siliguri- Purnea (HTLS Cond.) Transmission Line under ERSS-I in Eastern Region from anticipated DOCO (1.6.2013) to 31.3.2014.
12.4.2016 Transmission Tariff
458. MP/14/2013 11th
February, 2013
Sasan Power Limited
Petition under Section 79 of the Electricity Act, 2003 read with statutory framework governing procurement of power through competitive bidding and Articles 12 and 17 of the Power Purchase Agreement dated 7.8.2007 executed between Sasan Power Limited and the procurers for compensation due to unprecedented, unforeseen and uncontrollable depreciation of the Indian Rupees.
26.4.2016 Misc. Petition
459. TT/173/2013 7th January, 2013
Essar Power Transmission Company Limited
Petition for approval of transmission tariff of Combined assets of LILO of 400 kV S/C Vindhyachal-Korba Transmission line and 400 kV D/C Gandhar-Hazira Transmission line and 400/220 kV GIS sub-station at Hazira and associated bays and400 kV D/C Quad Moose Transmission line from Mahan Thermal Power Plant- Sipat Pooling Substation and associated bays for the years 2012-13 and 2013-14 in tariff block 2009- 14under Regulation,86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 and Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2009.
15.6.2016 Transmission Tariff
460. MP/163/2012 23rd July, 2012
Bhusan Power & Steel Limited
Petition under section 79(1) (f) of the Electricity Act, 2003 read with Regulation 20 of the CERC (Open Access in Inter-State Transmission) Regulations,2008 towardsunpaid unscheduled Inter-change charges for the period ranging from 28.8.2005 to 31.12.2006.
10.6.2016 Misc. Petition
461. GT/23/2013 4th April, 2013
NTPC Limited Petition for revision of tariff Jhanor Gandhar GPS (657.39 MW) from 1.4.2009-31.3.2014 after the truing up exercise.
*Decided vide order dated 30.3.2017 in Petition No. GT/326/2014.in compliance of the direction of the Appellate Tribunal.
GenerationTariff
186
Central Electricity Regulatory Commission
462. GT/168/2013 17th
September, 2013
SJVN Limited Petition for approval of generation tariff of Nathpa Jhakri Hydro Electric Power Station for the period 2009-2014.
21.4.2016 GenerationTariff
463. TT/536/2014 12th
December, 2014
Powergrid Corporation of India Limited
Petition for truing up of transmission tariff for 2009-14 tariff period and determination of transmission tariff for 2014-19 tariff period for Asset-1: Moga-Hissar D/C transmission line alongwith 220 kV Hissar-Hissar (BBMB) D/C line and 400 kV S/C Hissar- Bhiwani Ckt.-I transmission line alongwith associated bays at Hissar and Bhiwani Sub-stations (COD: 1.7.1995) and Asset-2: one bay at Bhiwani Substation for termination of one Ckt. Of 400 kV Bawana-Bhiwani transmission line and 400 kV Bawana-Bhiwani transmission line and 400 kV S/C of Hissar-Bawana transmission line upto Bhiwani alongwith associated bays at Hissar (COD: 1.2.1998) under Moga- Hissar- Bhiwani Transmission System in Northern Region under Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999, Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2009, and Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2014.
7.6.2016 Transmission Tariff
464. TT/91/2012 14th March, 2012
Powergrid Corporation of India Limited
Petition for determination of transmission tariff from DOCO to 31.3.2014 for combined assets for transmission system associated with Parbati-III-HEP in Northern Region for tariff block 2009-14.
21.7.2016 Transmission Tariff
465. TT/533/2014 12th
December, 2014
Powergrid Corporation of India Limited
Truing up of transmission tariff for 2009 - 14 tariff period under Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2009 and determination of transmission tariff for 2014 19 tariff period under Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2014 for transmission assets under system strengthening - VIII in Southern Regional Grid in Southern Region Under Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999.
28.4.2016 Transmission Tariff
187
Annual Report
466. TT/510/2014 12th
December, 2014
Powergrid Corporation of India Limited
Petition for approval under Regulation-86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations 1999, Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2009 and Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations 2014 for determination of (i) Truing up Transmission tariff for 2009-14 tariff block and (ii) Transmission tariff for 2014-19 tariff block for Additional Special Energy Meters in Northern Region.
21.7.2016 Transmission Tariff
467. GT/460/2014 14th
December, 2014
NHDC Limited Petition for truing up of generation tariff for Omkareshwar H.E. Project (8 x 65 MW) for the period 2009 -2014.
10.5.2016 GenerationTariff
468. GT/461/2014 14th
December, 2014
NHDC Limited Petition for tariff of Indira Sagar Power Station for the period from 1.4.2009 to 31.3.2014.
26.5.2016 GenerationTariff
469. GT/472/2014 14th
December, 2014
Neyveli Lignite CorporationLimited
Truing up of capital expenditure and tariff thereof for the period 2009-14 under CERC Tariff Regulations, 2009 for NLC TPS I (6 x 50 + 3 X 100 MW) on account of actual additional capital expenditure incurred for the period from 1.4.2009 to 31.3.2014.
26.5.2016 GenerationTariff
470. TT/534/2014 12th
December, 2014
Powergrid Corporation of India Limited
Petition for transmission tariff for A) Kurnool-Thiruvalam 765 kV D/C line, B) Extension of 765 kV Substation at Kurnool and upgradation of 400 kV Sub-station at Thiruvalam to 765/400 kV with 2 x 1500 MVA, 765/400 kV transformers and C) 1x240 MVAR line reactor at both ends of each circuit of Kurnool- Thiruvalam 765 kV D/C line under “System Strengthening XIX in Southern Regional Grid” under Regulation-86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 and Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2014 from COD to 31.3.2019.
12.5.2016 Transmission Tariff
471. GT/474/2014 14th
December, 2014
Neyveli Lignite CorporationLimited
Petition for truing up of capital expenditure and tariff thereof for the period 2009-14 under CERC Tariff Regulations, 2009 for NLC TPS I Expansion (2 X 210 MW) on account of actual additional capital expenditure incurred for the period from 1.4.2009 to 31.3.2014.
27.7.2016 GenerationTariff
472. MP/483/2014 14th
December, 2014
Indian Energy ExchangeLimited
Petition under Regulation 63 (iii) of CERC (Power Market) Regulations, 2010 seeking consent for enabling cross border transactions at Indian Energy Exchange.
26.5.2016 Misc. Petition
188
Central Electricity Regulatory Commission
473. TT/487/2014 12th
December, 2014
Powergrid Corporation of India Limited
Petition under sub-section (4) of Section 28 and Section 79(1)(d) of Electricity Act, 2003 for determination of Fees and Charges for Fibre Optic Communication System in
Communication (ULDC) Microwave Links (Part-II) in Southern Region for the period 2009- 14 block.
31.5.2016 Transmission Tariff
474. TT/540/2014 15th
December, 2014
Powergrid Corporation of India Limited
Petition for determination of transmission tariff for Asset-I: 9.292 km of Fibre Optic Communication system (Central Sector) (Actual DOCO: 1.2.2014) and Asset-II: 392.393 km of Fibre Optic Communication system (State Sector) (Actual DOCO:
Despatch and Communication (ULDC) Microwave links in North-Eastern Region for tariff block 2014-19.
27.6.2016 Transmission Tariff
475. TT/545/2014 29th
December, 2014
Powergrid Corporation of India Limited
Petition for determination of truing up of Fees and Charges for the period 2009-14 block, Fees and charges for the period
and Communication Scheme (Powergrid portion i.e. communication system portion and SLDC system retained by the petitioner after formation of POSOCO) in Southern region for the period 2014-19 block.
15.7.2016 Transmission Tariff
476. TT/506/2014 10th
December, 2014
Powergrid Corporation of India Limited
Petition for truing up of transmission tariff for 2009-14 tariff period under Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2009 and determination of transmission tariff for 2014-19 tariff period under Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2014 for Transmission system associated with Farakka-III in Eastern Region under Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999.
21.4.2016 Transmission Tariff
477. TT/476/2014 10th
December, 2014
Powergrid Corporation of India Limited
Petition for determination of transmission tariff from anticipated DOCOs to 31.3.2019 for Asset I : 400 kV Transmission Line for
IV from its present position to Stage II side of Kahalgaon Switchyard of NTPC, Asset II: 400 kV Transmission Line for swapping of Purnea bays (1 & 2) with Sasaram bays (#3 & 4) and Kahalgaon #1 bays with Sasaram #1 bay at Biharsharif Substation and Asset III: Splitting arrangements with Tie Line breaker for 400 kV Biharsharif substation under Split Bus arrangement for various substations in Eastern Region.
22.4.2016 Transmission Tariff
478. GT/47/2015 17th
February, 2015
THDC India Limited
Petition for determination of generation tariff of Koteshwar HEP (400 MW) for the period 2014-2019.
15.7.2016 GenerationTariff
189
Annual Report
479. TT/11/2015 15th January, 2015
Powergrid Corporation of India Limited
Petition for determination of truing up of Fees and Charges for the period 2009-14 block, Fees and charges for the period 2014-19
Communication Scheme (Powergrid portion i.e. communication system portion and SLDC system retained by the petitioner after formation of POSOCO) in Western Region for the period 2014-19 block.
14.7.2016 Transmission Tariff
480. TT/19/2015 15th January, 2015
Powergrid Corporation of India Limited
Petition for approval under sub-section 4 of Section 28 of the Electricity Act, 2003 for determination of (i) Truing up of fee and charges for the period 2009-14 block and (ii) fee and charges for the period
and Communication Scheme (PGCIL portion i.e. Communication system portion and SLDC system retained by PGCIL after formation of POSOCO) in Northern Region.
15.7.2016 Transmission Tariff
481. TT/20/2015 15th January, 2015
Powergrid Corporation of India Limited
Petition for truing up of transmission tariff for the 2009-14 tariff period under Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2009 and determination of transmission tariff for 2014-19 tariff period under Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2014 for assets covered in the following Orders of Central Electricity Regulatory Commission.
26.5.2016 Transmission Tariff
482. TT/26/2015 22nd January, 2015
Powergrid Corporation of India Limited
Petition for truing up of transmission tariff for 2009-14 tariff block and transmission tariff for 2014-19 tariff block for Combined Asset-1 (315 MVA ICT-II at Malerkotla Sub-station, 400 kV Hissar-Jaipur Line with associated bays, 400 kV Bawana-Bhiwani-1 and Bawana-Bhiwani II lines with associated bays – DOCO-01.02.1998), Combined Asset-2 (400 kV Abdullapur-Bawana and Nalagarh-Hissar line with associated bays, ICT-I at Nalagarh with associated bays, ICT-II at Nalagarh with associated bays, ICT-II at Jalandhar with associated bays, Bus Reactor at Nalagarh with associated bays, ICT-I at Jaipur (Bassi), Two nos LILO bays associated with ICT-Jaipur, ICT-II at Jaipur with associated bays, LILO of Chamera-Moga line and ICT-I at Jalandhar with associated bays, 220 kV Jallandhar-Dasuya line-DOCO – 01.03.2001), Combined Asset-3 (400kV D/C Nathpa-Jhakri-Abdullapur line and 400 kV D/C Naptha-Jhakri-Nalagarh line-DOCO-01.04.2003) under NathpaJhakri Transmission System in Northern Region.
3.6.2016 Transmission Tariff
190
Central Electricity Regulatory Commission
483. TT/27/2015 22nd January, 2015
Powergrid Corporation of India Limited
Petition for truing up of transmission tariff for the 2009-14 tariff period under Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2009 and determination of transmission tariff for 2014-19 tariff period under Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2014 for Asset-I: 400 kV D/C Maithon (RB) – Ranchi (PG) Transmission Line and associated bays at Ranchi, Asset- II: 400 kV D/C Maithon – Mejia Transmission Line, Asset-III: 400 kV D/C Biharsharif – Sasaram (Quad) Transmission Line under supplementary transmission system associated with DVC and Maithan (RB) projects in Eastern Region, under Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999.
18.4.2016 Transmission Tariff
484. TT/32/2015 29th January, 2015
Powergrid Corporation of India Limited
Petition for truing up of transmission tariff for 2009-14 tariff block under Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations 2009 and determination of transmission tariff for 2014-19 tariff block under Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations 2014 for Transmission System associated with Neyveli Lignite Corporation-II (NLCII) Expansion Project in Southern Region and Regulation-86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations 1999.
25.4.2016 Transmission Tariff
485. TT/33/2015 29th January, 2015
Powergrid Corporation of India Limited
Petition for determination of transmission tariff for Asset-A: LILO of Ckt-II of 400 kV D/C Lucknow-Bareily TL at Shahjahanpur, Asset-B: 315 MVA 400/220 kV ICT-I with 03 Nos. of 220 kV Line Bays at Shahjahanpur, Asset-C: 315 MVA 400/220 kV ICT-II with 03 Nos. of 220 kV Line Bays at Shahjahanpur, Asset-D: Extn. of 400/220 kV GIS Gurgaon, Asset-E: 2x50 MVAR Bus Reactor at 400/220 kV Bareilly S/S along with associated bays (Existing Line Reactors retained and used as Bus Reactor) , Asset-F: 125 MVAR Bus Reactor at Shahjahanpur under “Northern Regional Transmission Strengthening Scheme” in Northern Region for 2014-19 tariff block under Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2014 for Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999.
30.4.2016 Transmission Tariff
191
Annual Report
486. TT/34/2015 29th January, 2015
Powergrid Corporation of India Limited
Petition for truing up of transmission tariff for 2009-14 tariff block under Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2009 and determination of transmission tariff for 2014-19 tariff block under Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2014 of (a) WRSS-II: SET-A, (b) WRSS-II: SET-B, (c) WRSS-II: SET-C (d) WRSS-II: SET-D for Transmission system in Western Region (POWERGRID portion) under Western Region Strengthening Scheme-II under Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999.
29.8.2016 Transmission Tariff
487. TT/37/2015 29th January, 2015
Powergrid Corporation of India Limited
Petition for truing up of transmission tariff for 2009-14 tariff block under Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations 2009 and determination of transmission tariff for 2014-19 tariff block under Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations 2014 for Combined Assets of Transmission System associated with Koteshwar HEP (Effective DOCO 01.05.2011) in Northern Region consisting of Asset-1: 400 kV D/C Koteshwar HEP — Koteshwar Pooling Station Circuit - l & ll along with associated bays (DOCO 1.4.2011), Asset-2 : LILO of Circuit-I of 765 kV Tehri-Meerut Line at Koteshwar Pooling Station along with associated bays (DOCO 1.3.2011) and Asset-3 : LILO of Circuit-ll of 765 kV Tehri-Meerut Line at Koteshwar Pooling Station along with associated bays (DOCO 1.7.2011).
18.7.2016 Transmission Tariff
488. TT/51/2015 16th January, 2015
Powergrid Corporation of India Limited
Petition for approval of transmission tariff for (a) LILO of 2nd Circuit of Neyveli-Trichy 400 kV D/C line at Nagapattinam pooling station along with associated bays and (b) Strengthening of Neyveli TS-II-TS-I Exp link with higher capacity conductor under “Transmission System associated with contingency plan for evacuation of power from IL&FS (2x600 MW) in Southern Region” from COD to 31.3.2019 under Regulation-86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 and Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2014.
20.7.2016 Transmission Tariff
192
Central Electricity Regulatory Commission
489. TT/61/2015 6th February, 2015
Powergrid Corporation of India Limited
Petition for approval of transmission tariff for “Asset-I: Narendra (New, Kudgi)- Narendra (Existing) 400 kV D/C Quad transmission line along with New 765/400 kV GIS Sub-station at Narendra (New, Kudgi) and Bay extensions at Narendra (Existing) and AssetII:Narendra (New, Kudgi)-Kolhapur (New) 765 kV D/C transmission line and associated bays at Narendra (New, Kudgi) and Kolhapur (New) under Transmission System associated with System Strengthening-XVII in Southern regional Grid” in Southern Region under Regulation-86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 and Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2014 from COD to 31.3.2019.
26.5.2016 Transmission Tariff
490. TT/81/2015 5th February, 2015
Powergrid Corporation of India Limited
Petition for approval under sub-section 4 of Section 28 and Section 79(1)(d) of the Electricity Act, 2003 for determination of Fee and Charges of Fibre Optic Communication System for the period 2009-14 blockunder expansion of Wideband Communication Network in Eastern Region.
22.7.2016 Transmission Tariff
491. TT/62/2015 6th February, 2015
Powergrid Corporation of India Limited
Petition for determination of transmission tariff for Asset 1: LILO of Dehar-Bhiwani 400 kV S/C line at Rajpura Sub-station, Asset 2: LILO of Dehar-Panipat 400 kV S/C line at Panchkula Sub-station, Asset 3: Extension of Chamera 400/220 kV pooling Sub-station (GIS)-01 no. of 220 kV line bay, and Asset 4: Extension of 400 kV Kota Sub-station associated with “Northern Region System Strengthening Scheme-XXVII” in Northern Region for the 2014-19 tariff period under Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2014 and Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999.
27.5.2016 Transmission Tariff
492. TT/58/2015 9th February, 2015
Powergrid Corporation of India Limited
Petition for determination of transmission tariff for 765 kV D/C Wardha-Aurangabad transmission line 1 and associated bays along with 765 kV, 3X80 MVAR line reactor at Aurangabad Sub-station, 765/400 kV, 1500 MVA ICT-1 with bays and equipments at Aurangabad Sub-station, 400 kV, 80 MVAR switchable line reactor for Aurangabad-Boiser transmission line ckt-1 charged as bus reactor at Aurangabad Sub-station, 400 kV, 80 MVAR switchable line reactor for Aurangabad-Boiser transmission line ckt-2 charged as bus reactor at Aurangabad Sub-station, 400/220 kV, 500 MVA ICT-3 with bays and equipments at Boiser, 400 kV, 80 MVAR line reactor for Aurangabad-Boiser transmission line ckt-1 charged as bus reactor at Boiser Sub-station, 400 kV, 80 MVAR line reactor for Aurangabad-Boiser transmission line ckt-2 charged as bus reactor at Boiser Sub-station under IPPs generation projects in Chhattisgarh (IPP D) in Western Region for 2014-19 tariff block under Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2014 and under Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999.
29.4.2016 Transmission Tariff
193
Annual Report
493. TT/65/2015 9th February, 2015
Powergrid Corporation of India Limited
Petition for approval under Regulation-86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 and Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2014 of transmission tariff Asset I : 400 kV, D/C (Quad) Balipara-Bongaigaon transmission line along with associated bays at Bongaigaon Sub-station and Balipara Sub-station including 30% Fixed Series Compensation at Balipara and 4X63 MVAR, 420 kV line Reactors (2 nos. each at Bongaigaon and Balipara ends) (COD: 7.11.2014) under “Transmission System for immediate evacuation of power from Kameng HEP (Part-B of North East-Northern/Western Interconnector-I)”in North Eastern Region from actual COD to 31.3.2019.
14.7.2016 Transmission Tariff
494. TT/66/2015 10th
February, 2015
Powergrid Corporation of India Limited
Petition for determination of transmission tariff for 2014-19 tariff period for 765 kV Line bay & 3*80 MVAR line reactor at 765 kV Vadodara GIS for Vadodara-Dhule T/L (IPTC) under “Line bays and reactor provisions at Powergrid sub-stations associated with system strengthening for western region” for 2014-19 Tariff block period in Western Region.
25.5.2016 Transmission Tariff
495. TT/71/2015 13th
February, 2015
Powergrid Corporation of India Limited
Petition for determination of transmission tariff from DOCO to 31.3.2019 for Six (06) nos. Assets under Vindhyachal-IV & Rihand-III {1000 MV} Generation Project in Western & Northern Region.
31.5.2016 Transmission Tariff
496. MP/76/2015 16th
February, 2015
NHPC Limited Petition for approval of Renovation & Modernisation (R & M) proposal in respect of Bairasiul Power Station.
3.6.2016 Misc. Petition
497. MP/50/2015 17th
February, 2015
MB Power (Madhya Pradesh)Limited
Petition seeking revision of methodology for computing the escalation rates for domestic coal (payment) published by the CERC under clause 5.6 (VI) of the Competitive Bidding Guidelines dated 19.1.2005.
25.5.2016 Misc. Petition
498. TT/77/2015 18th
February, 2015
Powergrid Corporation of India Limited
Petition for approval of transmission tariff for 02 Nos. 400 kV line bays at Bhiwani (Powergrid) Substation under “Construction of 02 Nos. 400 kV line bays at Bhiwani” in Northern Region under Regulation-86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 and Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2014 from COD to 31.3.2019.
23.5.2016 Transmission Tariff
194
Central Electricity Regulatory Commission
499. TT/53/2015 2nd March, 2015
Powergrid Corporation of India Limited
Petition for truing up of transmission tariff for 2009-14 tariff block and determination of transmission tariff for 2014-19 tariff block for Transmission System associated with Kudankulam Atomic Power Project in Southern Region.
21.4.2016 Transmission Tariff
500. TT/56/2015 2nd March, 2015
Powergrid Corporation of India Limited
Petition for determination of transmission tariff for installation of 1X315 MVA 400/220 kV ICT at Bhadrawati HDVC back to back station under “Installation of transformer & procurement of spare converter transformer at Bhadrawati back to back station from COD to 31.3.2019.
29.7.2016 Transmission Tariff
501. TT/70/2015 2nd March, 2015
Powergrid Corporation of India Limited
Petition for truing up of transmission tariff for 2009-14 tariff period under Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2009 and determination of transmission tariff for 2014-19 tariff period under Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2014 for Asset-I: 125 MVAR Bus Reactor-I (Asset-IA) & 125 MVAR Bus Reactor-II (Asset-IB) at Fatehpur Sub-station along with associated bay, Asset II: 125 MVAR Bus Reactor-II at Balia Sub-station, Asset-III: Combined Asset of 1500 MVA ICT-I at Agra Sub-station along with associated bays (Asset-IIIA), 125 MVAR 765/400 kV Bus Reactor-I at Sasaram along with associated bays (Asset-IIIB) and Associated line bays of 765 kV S/C Fatehpur-Agra T/L at Fatehpur and Agra Sub-station (Asset-IIIC), Asset-IV: 1500 MVA ICT-2 at Agra Sub-station along with associated bays, Asset-V: 125 MVAR Bus Reactor along with associated bays at Lucknow, Asset-VI: 125 MVAR 400 kV Bus Reactor-II at Sasaram along with associated bays (Asset-VI A) and 2 no. 50 MVAR Bus Reactor at 400 kV Maithon Sub-station and associated bays (Maithon-Gaya Line) (Asset-VI B), Asset-VII: 2 nos. of 400 kV bays at Maithon Sub-station for 400 kV D/C Maithon-Mejia Transmission Line, Asset-VIII: LILO of Barh-Balia 400 kV D/C Transmission Line at Patna 400 kV Sub-station along with associated bays, Asset-IX: 1500 MVA 765/400 kV ICT-I at Sasaram Sub-station along with associated bays under common scheme for 765 kV pooling station and network for NR, Import by NR from ER and common scheme for network for WR and import by WR from ER and from NER/SR/WR via ER in Northern Region & Eastern Region under Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999.
18.4.2016 Transmission Tariff
195
Annual Report
502. 80/MP/2015 4th March, 2015
Tata Power Trading Company Limited
Petition seeking directions to the respondents to allow/enable the petitioner to sell power procured by it from the Dagachhu Project under short term including on power exchanges in terms of order of the Commission dated 11.9.2014 in Petition No 187/MP/2014.
26.5.2016 Misc. Petition
503. TT/82/2015 4th March, 2015
Powergrid Corporation of India Limited
Petition for truing up of transmission tariff for 2009-14 tariff period and determination of transmission tariff for 2014-19 tariff period for Asset-I: 125 MVAR, 400 kV Bus Reactor at new Purnea S/S along with associated bays, Asset-II: Shifting of 1 no 63 MVAR Bus Reactor installed
line reactor at new Purnea end of one ckt new Siliguri-new Purnea 400 kV D/C (quad) line, Asset-III: Installation of 1 no new 125 MVAR bus reactor at new Purnea 400 kV bus, AssetIV: Durgapur-Maithon 400 kV D/C line with associated bays at Durgapur and Maithon Sub-station, Asset-V: Installation of 1 no new 125 MVAR bus reactor at Siliguri 400 kV bus, shifting of 3 no. 63 MVAR reactors at 400 kV Siliguri SS, Asset-VI: Installation of new 125 MVAR bus reactor at new Siliguri Substation and Asset-VII: 220/132 kV, 160 MVA ICT at Baripada under ERSS-II in Eastern Region.
19.4.2016 Transmission Tariff
504. TT/475/2014 10th
December, 2014
Powergrid Corporation of India Limited
Petition for approval of transmission tariff for Asset I: 1 No. 1x500 MVA ICT at 400/220 kV Subhasgram Sub-station along with the associated bays and 2 Nos. of 220 kV equipped line bays at 400 kV Subhasgram Sub-station (Anticipated COD: 31.12.2014), Asset-II: 125 MVAR Bus Reactor-I Muzaffarpur Sub-station along with bays (Anticipated COD: 1.1.2015) and Asset-III: 125 MVAR Bus Reactor-II replacing existing 63 MVAR Bus Reactor at Muzaffarpur along with bays (Anticipated COD: 1.2.2015) under Transmission System for “Eastern region strengthening Scheme-VIII” in Eastern Region from COD to 31.3.2019, under Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 and Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2014.
23.5.2016 Transmission Tariff
505. TT/87/2015 16th March, 2015
Powergrid Corporation of India Limited
Petition for determination of transmission tariff for Meerut-Moga 765 kV S/C Transmission Line alongwith associated bays at Meerut & Moga 765/400 kV Sub-station with 2 Nos. 240 MVAR line reactors (1 no. switchable and 1 no. non-switchable line reactor) each at Meerut & Moga under “Northern Regional Strengthening Scheme–XXVI” in Northern Region for 2014-19 tariff period under Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2014 and Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999.
18.4.2016 Transmission Tariff
196
Central Electricity Regulatory Commission
506. TT/445/2014 9th April, 2014
Powergrid Corporation of India Limited
Petition for (i) Truing up transmission tariff for 2009-14 tariff block and (ii) Transmission tariff for 2014-19 tariff block Tuticorin JV – Madurai 400 kV D/C (Quad Conductor) Line and extension of 400/220 kV Madurai S/S under ATS of Tuticorin JV TPS in Southern Region.
30.6.2016 Transmission Tariff
507. TT/111/2015 9th April, 2015
Essar Power Transmission Company Limited
Petition for truing up of Annual Fixed Cost of capital cost of combined assets of LILO of 400 kV S/C Vindhyachal-Korba transmission line and 400 kV D/C Gandhar-Hazira transmission line and 400/220 kV GIS Sub-station at Hazira and associated bays (actual date of commercial operation 1.4.2013) referred as Stage-I (Asset-1) for 2013-14 under Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2009 and Regulation, 86 of the Central Electricity Regulatory Commission (Conduct of Business) Regulation, 1999.
15.6.2016 Transmission Tariff
508. GT/471/2014 5th
December, 2014
Damodar Valley Corporation
Petition for approval of tariff of Durgapur Thermal Power Station Unit Nos. 3 and 4 for the tariff period 2009-2014.
29.7.2016 GenerationTariff
509. GT/470/2014 5th
December, 2014
Damodar Valley Corporation
True up petition for Chandrapura Thermal Power Station Unit Nos. 1 to 3 for the tariff period 2009-2014.
29.7.2016 GenerationTariff
510. TT/136/2015 22nd May, 2015
Powergrid Corporation of India Limited
Petition for determination of transmission tariff from anticipated DOCOs to 31.3.2019 for Asset I: Split Bus Arrangement at Durgpaur sub-station, and Asset II: Split Bus Arrangement at Maithon sub-station under Split Bus arrangement for various sub-stations in Eastern Region.
29.4.2016 Transmission Tariff
511. MP/121/2015 22nd May, 2015
ITC Limited Petition for grant of inter-State Open Access for the energy generated by ITC Limited at the Wind Power Project in Anantapur District, Andhra Pradesh, for captive consumption at its factory at Bhadrachalam, Telengana.
13.6.2016 Misc. Petition
512. GT/144/2015 28th May, 2015
Damodar Valley Corporation
Petition for approval of tariff for Mejia Thermal Power Station Units 5 and 6 (2 X 250 = 500 MW) for the tariff period 2014-19.
16.3.2017 GenerationTariff
197
Annual Report
513. TT/145/2015 28th May, 2015
Powergrid Corporation of India Limited
Petition for truing up of transmission tariff for the 2009-14 tariff period under Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2009 and determination of transmission tariff for 2014-19 tariff period under Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2014 for combined assets
Andal TPS (portion of 400 kV Durgapur-Jamshedpur TL), (ii) 400 kV D/C Baripada Mendhasal T/L and associated bays at Baripada and Mendhasal Sub-station, (iii) 400 kV D/C Andal(DVC)-Jamshedpur section of Durgapur-Jamshedpur TL and associated bays at Jamshedpur, (iv) 400 kV D/C Baripada-DVC (Jamshedpur) TL (part of 400 kV D/C Jamshedpur-Baripada TL) and associated bays at Baripada Sub-station under ERSS-I in Eastern Region under Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999.
25.4.2016 Transmission Tariff
514. SM/07/2015 28th May, 2015
CentralElectricityRegulatory Commission
Review of Power Exchanges. 10.6.2016 Suo Motu
515. GT/469/2014 5th
December, 2014
Damodar Valley Corporation
True Up petition of Bokaro Thermal Power Station Units 1 to 3 for the period 2009-14.
29.7.2016 GenerationTariff
516. GT/468/2014 5th
December, 2014
Damodar Valley Corporation
Petition for approval of tariff of Tilaya Hydel Power Station Unit Nos 1 and 2 (2X40 MW) for the period 2009-2014.
29.7.2016 GenerationTariff
517. GT/467/2014 5th
December, 2014
Damodar Valley Corporation
Petition for approval of tariff of Panchet Hydel Power Station Unit Nos. 1 and 2 (2 X 40 MW for the period 2009-2014.
29.7.2016 GenerationTariff
518. GT/466/2014 5th
December, 2014
Damodar Valley Corporation
Petition for approval of tariff for Mejia Thermal Power Station Unit No. 4 (1 X 210 MW) for the tariff period 2009-2014.
29.7.2016 GenerationTariff
519. GT/465/2014 5th
December, 2014
Damodar Valley Corporation
Petition for approval of tariff for Mejia Thermal Power Station Unit Nos 1 to 3 for the tariff period 2009-2014.
29.7.2016 GenerationTariff
520. GT/464/2014 5th
December, 2014
Damodar Valley Corporation
Petition for approval of tariff for Maithon Hydel Power Station Unit Nos 1 to 3 (2 X 20 + 1 x 23.2 MW) for the period 2009-2014.
29.7.2016 GenerationTariff
521. TT/427/2014 23rd
November, 2014
Powergrid Corporation of India Limited
Petition for determination of fees and charges of sub-load dispatch centre at Modipuram under UPPCL for the period 2014-2019.
16.5.2016 Transmission Tariff
522. MP/162/2015 22nd June, 2015
Sasan Power Limited
Petition for computation of compensation for ‘Change in Law’ events during construction period.
2.6.2016 Misc. Petition