cea-ps-11-21(19)/2/2019-pspa-i division · floor, 14, ashok marg, lucknow - 226 001...
TRANSCRIPT
CEA-PS-11-21(19)/2/2019-PSPA-I Division
Nominated members for NRSCT:
1.
Member Secretary,
NRPC,
18-A ShajeedJeet
Singh Sansanwal
Marg, Katwaria Sarai,
New Delhi - 110016
(Fax-011-26865206)
2.
Director (W &P)
UPPTCL, Shakti
Bhawan Extn,3rd
floor,
14, Ashok Marg,
Lucknow - 226 001
(Fax:0522-2287822)
3.
Director (Projects)
PTCUL,
Vidhyut Bhawan, Near
ISBT -Crossing,
Saharanpur Road, Majra,
Dehradun-248002.
Uttrakhand
4.
Director (Technical),
Punjab State
Transmission
Corporation Ltd.
(PSTCL)
Head Office
The Mall Patiala -
147001
5. Member (Power)
BBMB,
Sectot-19 B
Madhya Marg,
Chandigarh-1 60019
(Fax-01 72-2549857
6.
Director (Operation)
Delhi Transco Ltd.
Shakti Sadan,
Kotla Marg,
New Delhi-110002
(Fax-01123234640)
7.
Director (PP&D)
RVPN, 3rd Floor,
Room no 330,
Vidhyut Bhawan,
Janpath,
Jaipur-302005.
8.
Director (Technical)
HVPNL
Shakti Bhawan,
Sector-6
Panchkula-134109
9.
Director (Technical)
HPSEB Ltd.
VidutBhawan,
Shimla -171004
Fax-0177-2813554
10.
Managing Director,
HPPTCL,
Barowalias, Khalini
Shimla-171002
Fax-0177-2623415
11
.
Chief Engineer
(Operation)
Ministry of Power,
UT Secretariat,
Sector-9 D
Chandigarh -161009
Fax-0172-2637880
12
.
Development
Commissioner (Power),
Power Department, Grid
Substation Complex,
Janipur, Jammu,
Fax: 191-2534284
13.
Director (Projects)
POWERGRID
Saudamini Plot no. 2,
Sector - 29.
Gurgaon-122 001
(Fax-0124-2571809)
14
.
CEO,
POSOCO
B-9, Qutab
Institutional Area,
Katwaria Sarai
New Delhi – 110010
15
COO (CTU)
POWERGRID,
Saudamini, Plot no. 2,
Sector -29,
Gurgaon-122 001
(Fax-0124-2571809)
1.
Er Rajesh Gupta,
Chief Engineer/
Tranmission Systems,
BBMB, BBMB
SLDC Complex,
66kV Subsatation ,
Industrial area Phase
–I, Chandigarh-02
2. Chief Engineer
(PP&D), RVPN,
3rdFloor,
Room No. 330,
Vidyut Bhawan
Janpath, Jaipur,
Contact No. 0141-
2740794 (O)
3.
Director (planning &
Contract),
Himfed Bhawan,
Panjiri
Shimla-171005
CEA-PS-11-21(19)/2/2019-PSPA-I Division
Agenda note for 4th Meeting of Northern Region Standing Committee on Transmission
1.0 Confirmation of the Minutes of the 3rd meeting of Northern Region Standing
Committee on Transmission held on 24.05.2019.
1.1 The 3rd meeting of Northern Region Standing Committee on Transmission (NRSCT) was
held on 24.05.2019 and the minutes of the meeting were issued vide CEA letter no. File
No.CEA-PS-11-21(19)/1/2019-PSPA-I Division-Part (1) dated 17.7.2019.
1.2 The minutes of 3rd meeting of NRSCT may please be confirmed.
2.0 Transmission scheme for controlling high loading and high short circuit level at
Moga substation
2.1 The transmission scheme for evacuation of 8.9 GW of RE power from Solar Energy Zones
(SEZs) in Rajasthan was agreed technically in the 2nd NRSCT meeting held on 13.11.2018.
Subsequently, Punjab had objected to the augmentation of 1x1500 MVA, 765/400 kV ICT
(3rd) at Moga substation as it would further increase the fault level at Moga, which is
already at higher side and with ISTS injection in west of Punjab (at Moga), their associated
220 kV network is strained. Therefore, PSTCL had requested to review the proposal of
additional 1x1500 MVA (3rd) transformer at Moga substation.
The observations made by PSTCL are as follows:
a) As per their studies, in the paddy season, the loading 2x1500 MVA, 765/400kV
transformers is only 17% and will further decrease with installation of additional
transformer. Installation of third 1x1500 MVA, 765/400kV ICT at PGCIL Moga
S/S may not be beneficial on account of power evacuation point of view as the MW
flows through the ICTs at Moga remain unaffected because of its direct connectivity
with Talwandi-Sabo TPS of 3x660 MW.
b) In the light load conditions, Punjab's load reduces to about 3000-3500 MW
especially in winters, problem of high bus voltages at 220/ 400/ 765kV buses arises.
c) Fault level at PGCIL Moga has already exceeded design limit. Under these
circumstances, it may not be beneficial for the system to have more 1x1500 MVA,
765/400 kV ICT & 765 /400 kV lines to be terminated at Moga.
d) CTU studies shows about 4000 MW of RE power injection from Bikaner to Moga
through 765 kV D/C line and drawl of about 3000 MW through 3 nos. of 765/400
kV ICTs at Moga. Injection of such quantum of power at Moga (in western side of
Punjab) is going to overload the associated 400 kV and 220 kV systems of Punjab.
e) To control the short circuit level at Moga 220 kV and 400 kV level, bus splitting at
765 kV or 400 kV level may be considered and outlets may be planned from Moga
so that their 220 kV system do not get overloaded.
2.2 The issue was deliberated in the 3rd meeting of NRSCT wherein it was agreed that studies
would be carried by CEA and CTU in association with PSTCL, to evolve additional
transmission schemes (inter-state as well as intra-state) in order to address the technical
concerns raised by PSTCL. The same would be deliberated in a joint meeting of CEA,
CTU and PSTCL to be held on 3rd/4th June 2019. The transmission scheme finalized in
that meeting would also be included as agenda for the 45th NRPC meeting scheduled on
6th and 7th June 2019.
CEA-PS-11-21(19)/2/2019-PSPA-I Division
2.3 Subsequently, a meeting was held on 3rd & 4th June 2019 (minutes enclosed as Annexure-
II) at PSTCL office, Patiala and Chandigarh, among CEA, CTU and PSTCL wherein,
following was agreed:
i) In order to resolve the issues of high short circuit levels of Moga(PG) 400kV bus, bus
split arrangement will be required. The following splitting option resolves the issues of
high short circuit level and high loading levels on 765/400kV transformers at Moga:
400kV Bus Section-1
400kV Kishenpur D/c feeders
400kV Hisar D/c feeders
2 nos. 765/400kV transformers
1 No. 80 MVAR or 125 MVAR Reactor based on feasibility
400kV Bus Section-2
400kV Jalandhar D/c feeders
400kV Bhiwani feeder
400kV Fatehabad feeder
400kV Nakodar feeder
400kV Talwandi Sabo/Malkana Feeder
4 nos. 400/220kV transformers
1 No. 80 MVAR or 125 MVAR Reactor based on feasibility
ii) The above splitting arrangement would require relocation of the bays for bus section-1
for which existing buildings shall have to be relocated for space creation. Further, other
options for interconnection of feeders of bus section-1 to 400kV main Bus (bus section-
2) through GIS bus duct needs to be explored.
It was agreed in principle that the Bus Bar splitting at Moga would be done by suitable
reengineering and it would become part of Bikaner- Moga 765 kV D/C line as a
supplementary ISTS strengthening scheme. This Scheme shall remain associated with the
transmission scheme of Bikaner-Moga 765 kV D/C line and would require to be
completed in same time of the line. However, since Bikaner-Moga line is in advance stage
of implementation, suitable operational measures in consultation with POSOCO shall
need to be taken in forthcoming meeting.
iii) With the above proposed Moga bus split arrangement, 3rd 1x1500 MVA, 765/400kV
transformer at Moga is not required as a part of the present scheme of Transmission
system of Rajasthan Solar Energy Zones (8.9 GW).
2.5 Members may like to deliberate.
3.0 Transmission System for evacuation of Power from potential solar energy zones –
Phase -II in Northern Region.
3.1 Govt. of India had set a target for establishing 175 GW renewable capacity by 2022, which
includes 100 GW Solar, 60 GW Wind generation capacity. MNRE vide its order dated
08.06.2018 had constituted a Sub-Committee to identify ISTS connectivity for renewable
energy projects from potential solar energy zones (SEZs) and potential wind energy zones
(WEZs) of about 50 GW and 16.5 GW respectively. SEZs and WEZs envisaged in 7 RE
CEA-PS-11-21(19)/2/2019-PSPA-I Division
rich states (Tamil Nadu, Andhra Pradesh, Karnataka, Gujarat, Rajasthan, Maharashtra and
Madhya Pradesh) were identified by SECI in association with MNRE in consultation with
RE power developers.
To ease implementation of transmission infrastructure, it was proposed to bifurcate these
requirements in two phases. A total of 20 GW solar & 9 GW wind projects has been
planned in Phase-I (up to Dec’2020) and 30 GW solar & 7.5 GW wind has been planned
for Phase-II (Dec’ 2021). For Northern Region the same translates into a requirement of
10 GW solar in Phase-I (up to Dec’2020) and 10 GW solar in Phase-II (Dec’2021)
totalling to 20 GW. The details of SEZs in Northern Region are given below:
Solar Energy Zones
State/District Ph-1 (GW) Ph-2 (GW) Total
2020 2021
Rajasthan
Jaisalmer (S: Ramgarh, Fatehgarh) 5 3 8
Jodhpur (S: Phalodi) 2 1 3
Bikaner (S: Kolayat/Pugal) 3 1 4
Barmer (S: Barmer) 0 5 5
Subtotal 10 10 20
MNRE has subsequently revised Solar Potential complexes details in Rajasthan for
development by 2020/2021 in two phases, which is as under:
District Taluk/Tehsil
Ph-1(GW)
2020
Ph-2(GW)
2021 Total
Jaisalmer Kuchhri - 4.00 4.00
Fatehgarh 3.50 2.20 5.70
Jodhpur Phalodi/Bhadla 3.55 1.75 5.30
Bikaner Koyalat /Pugal 1.85 3.15 5.00
Total 8.90 11.1 20
3.2 Out of total 20 GW REZ [Solar] in Rajasthan, transmission system for 8.9 GW in Bhadla
(3.55 GW), Fatehgarh (3.5 GW), Bikaner (1.85 GW) complexes under Phase-I, was
agreed in the 2nd meeting of Northern Region Standing Committee on Transmission
(NRSCT) held on 13.11.2018.
3.3 The details of connectivity/LTA granted are as follows:
Sl
no.
Location St-II connectivity
granted/ (MW)
LTA granted (MW)
1 Bhadla 3380 3380
2 Bhadla-II 900 (agreed for grant)+ 980
(Received)
980 (Received)
3 Fatehgarh 2200 2200
4 Fatehgarh-II 1790 (agreed for grant) 900 (agreed for grant) +
390 (Received)
CEA-PS-11-21(19)/2/2019-PSPA-I Division
3.4 Subsequently, transmission system was evolved for integration of balance 11.1 GW solar
potential in Rajasthan [Phase –II :11.1GW] (Out of total 20 GW REZ [Solar]) from
Ramgarh/Kuchheri (4 GW), Bikaner (3.15 GW), Bhadla (1.75GW) & Fatehgarh (2.2
GW) and same was deliberated in the 3rd meeting of NRSCT held on 24.5.2019. In the
meeting RVPNL highlighted that the intra-state EHV transmission in Western Rajasthan
is sufficient to evacuate about 10 GW RE projects (7.4 GW already commissioned and
1.3 GW under implementation). In addition to this, 2 GW, 2.1 GW and 2.211 GW of RE
capacity addition is expected in the year 2020-21, 2021-22 and 2022-23 respectively. For
evacuation of this additional 6.3 GW RE capacity, 765/400 kV Jodhpur GSS (Hingola)
along with its interconnections with Phagi 765/400 kV GSS has been planned.
Considering the above, it was accounted that transmission system for only 8.1 GW of RE
potential is required to be planned under ISTS as compared to 11.1 GW system that has
been proposed earlier and it was decided that that a joint study meeting would be
convened in the to further deliberate on the scheme.
3.5 Subsequently, a study file was circulated to all the Northern region constituents to send
their comments on the transmission system proposed as well as the on load flow file based
on which the transmission system for evacuation of power from 8.1 GW RE (solar)
projects has been proposed.
3.6 A joint study meeting was convened on 17.6.2019 & 18.6.2019 at Powergrid, Gurgaon,
wherein, the representatives from CTU, POSOCO, Haryana, Punjab ,Himachal Pradesh
, Rajasthan and Delhi were present. No representative from UPPTCL, PTCUL and
JKPDD attended the meeting. All the State representative furnished their load generation
balance as well as existing and planned RE generations in their respective states.
3.7 Further, as per MoP OM dated 14.6.2018 had notified the long term RPO trajectory, solar
and non-solar, uniformly for all the States, wherein, RPO (%) (of total consumption
Excluding Hydro) 10.5% for Solar and 10.5% for non- solar has been mentioned for
2021-22. However, RPO (%) as per the State Electricity Regulatory commission for
2021-22 furnished by respective State are as follows:
S.
No
State RPO (%) of Total Consumption Excluding
Hydro (as per SERC) for 2021-22
Solar Non-Solar
1 Punjab 6.5 8
2 Haryana 8 3
3 Rajasthan 8.5 9.8
5 Bikaner 850 + 1200 (agreed for grant) 850
CEA-PS-11-21(19)/2/2019-PSPA-I Division
4 Uttar Pradesh 4 6
The comments furnished by the constituents were discussed and accordingly the load
flow study was revised.
3.8 As per the load flow studies, following alternatives are proposed for evacuation of power
from 8.1 GW potential RE generation in Northern Region (Ramgarh/Kuchheri (1.9
GW), Bikaner (2.95 GW), Bhadla (1.05GW) & Fatehgarh (2.2GW)):
Alternative-1
1) Establishment of 400/220kV, 4x500 MVA pooling station at suitable location near
Ramgarh/Kuchheri in Distt Jaisalmer (Ramgarh-II PS)
2) Establishment of 400/220kV, 6x500MVA pooling station at suitable location near
Bikaner (Bikaner-II PS)
3) Establishment of 765/400kV, 2x1500 MVA S/s at suitable location near Sikar (Sikar-II
Substation)
4) Establishment of 765/400kV, 2x1500MVA substation at suitable location near Kadarpur
(Kadarpur-II substation)
5) Augmentation with 765/400kV, 2x1500MVA transformer (5th & 6th) at Fatehgarh-II PS
6) Augmentation with 400/220kV, 4x500MVA transformer at Fatehgarh-II PS
7) Augmentation with 765/400kV, 1x1500MVA transformer (4th) at Bhadla-II PS
8) Augmentation with 400/220kV, 3x500MVA transformer at Bhadla-II PS
9) Ramgarh-II PS –Fatehgarh-II PS 400 kV D/c Line (Twin HTLS)
10) Ramgarh-II PS – Jaisalmer-II (RVPN) 400 kV D/c Line (Twin HTLS)
11) Fatehgarh-II PS – Bhadla-II PS 765kV D/c line (2nd)
12) Bhadla-II PS – Sikar-II 765kV 2xD/c line
13) Sikar-II – Kadarpur-II 765kV D/c line
14) Sikar-II – Neemrana 400kV D/c line (Twin HTLS)
15) LILO of 765kV Jhatikara – Agra S/c line at Kadarpur-II
16) Kadarpur-II – Bareilly 765kV D/c line
17) Kadarpur-II – Prithala 400kV D/c line (Twin HTLS)
18) Bikaner-II PS – Khetri 400kV 2xD/c line (Twin HTLS line on M/c tower)
19) Khetri - Bhiwadi 400kV D/c line (Twin HTLS)
20) Bikaner-II PS – Bikaner (PG) 400kV D/c line (Twin AL59)
21) Khetri - Gr. Noida (UPPCL) 765kV D/c line
22) Power reversal on +500kV, 2500MW Balia – Bhiwadi HVDC line upto 2000MW from
Bhiwadi to Balia for solar maximized time
23) 220kV line bays for interconnection of solar projects at Bikaner-II PS (10 nos.),
Ramgarh-II PS (7 nos), Fatehgarh-II PS (7 nos) & Bhadla-II PS (4 nos)
24) 1x125 MVAr (420kV), 2x240 MVAr (765kV) Bus Reactor each at Sikar-II & , Kadarpur-
II Substation
25) 2x125 MVAr (420kV) Bus Reactor each at Bikaner-II & Ramgarh-II PS
26) 1x240 MVAr Switchable line reactor for each circuit at each end of Fatehgarh-II –
Bhadla-II 765kV D/c line
27) 1x240 MVAr Switchable line reactor for each circuit at Bhadla-II end of Bhadla-II –
Sikar-II 765kV D/c line
28) 1x330 MVAr Switchable line reactor for each circuit at Sikar-II end of Bhadla-II – Sikar-
II 765kV D/c line
CEA-PS-11-21(19)/2/2019-PSPA-I Division
29) 1x240 MVAr Switchable line reactor for each circuit at each end of Sikar-II – Kadarpur-
II 765kV D/c line
30) 1x240 MVAr Switchable line reactor for each circuit at each end of Kadarpur-II –
Bareilly 765kV D/c line
31) 1x80 MVAr Switchable line reactor for each circuit at each end of Bikaner-II – Khetri
400kV 2xD/c line
32) 1x240 MVAr Switchable line reactor for each circuit at Gr. Noida end of Khetri – Gr.
Noida (UPPCL) 765kV D/c line
Estimated Cost : Rs 12,000 Cr
Alternative-2
1. EHVAC Portion
1) Establishment of 400/220kV, 4x500 MVA pooling station at suitable location near
Ramgarh/Kuchheri in Distt Jaisalmer (Ramgarh-II PS)
CEA-PS-11-21(19)/2/2019-PSPA-I Division
2) Establishment of 400/220kV, 6x500MVA pooling station at suitable location near
Bikaner (Bikaner-II PS)
3) Augmentation with 765/400kV, 2x1500MVA transformer (5th & 6th) at Fatehgarh-II PS
4) Augmentation with 400/220kV, 4x500MVA transformer at Fatehgarh-II PS
5) Augmentation with 400/220kV, 3x500MVA transformer at Bhadla-II PS
6) Ramgarh-II PS –Fatehgarh-II PS 400 kV D/c Line (Twin HTLS)
7) Ramgarh-II PS – Jaisalmer-II (RVPN) 400 kV D/c Line (Twin HTLS)
8) Fatehgarh-II PS – Bhadla-II PS 765kV D/c line (2nd)
9) Bikaner-II PS – Khetri 400kV 2xD/c line (Twin HTLS line on M/c tower)
10) Khetri - Bhiwadi 400kV D/c line (Twin HTLS)
11) Bikaner-II PS – Bikaner (PG) 400kV D/c line (Twin AL59)
12) Khetri - Gr. Noida (UPPCL) 765kV D/c line
13) Power reversal on +500kV, 2500MW Balia – Bhiwadi HVDC line upto 2000MW from
Bhiwadi to Balia for solar maximized time
14) 220kV line bays for interconnection of solar projects at Bikaner-II PS (10 nos.),
Ramgarh-II PS (7 nos), Fatehgarh-II PS (7 nos) & Bhadla-II PS (4 nos)
15) 2x125 MVAr (420kV) Bus Reactor each at Bikaner-II & Ramgarh-II PS
16) 1x240 MVAr Switchable line reactor for each circuit at each end of Fatehgarh-II –
Bhadla-II 765kV D/c line
17) 1x80 MVAr Switchable line reactor for each circuit at each end of Bikaner-II – Khetri
400kV 2xD/c line
18) 1x240 MVAr Switchable line reactor for each circuit at Gr. Noida end of Khetri – Gr.
Noida (UPPCL) 765kV D/c line
2. HVDC Portion
19) VSC based HVDC system between Bhadla-II PS and suitable location (near Aliganj)
between Bareily and Mainpuri
– +400kV, 5000 MW HVDC terminal at Pooling point near Bhadla-II PS
– +400kV, 5000 MW HVDC terminal at Pooling point in suitable location (near Aliganj)
between Bareilly and Mainpuri
– +400kV HVDC line (Quad) between Bhadla-II PS and suitable location (near Aliganj)
between Bareilly and Mainpuri
Opt 2.1 (AC portion beyond Aliganj)
20) 5x1500MVA transformer at suitable location (near Aliganj) between Bareilly and
Mainpuri
21) Aliganj- Bareilly (PG) 765kV D/c line
22) Aliganj- Mainpuri (UPPCL) 765kV D/c line
23) 1x125 MVAr (420kV), 2x240 MVAr (765kV) Bus Reactor at Aliganj Substation
Estimated Cost : Rs 15,800 Cr
Opt 2.2 (AC portion beyond Aliganj)
20) Aliganj- Bareily (PG) 400kV D/c line (Twin HTLS)
21) Aliganj- Mainpuri (UPPCL) 400kV D/c line (Twin HTLS)
22) Aliganj- Hapur (UPPCL) 400kV D/c line (Twin HTLS)
23) 2x125 MVAr (420kV) Bus Reactor at Aliganj Substation
CEA-PS-11-21(19)/2/2019-PSPA-I Division
Estimated Cost : Rs 15,100 Cr
The load flow study results are enclosed as Annexure-I .
Members may like to deliberate.
CEA-PS-11-21(19)/2/2019-PSPA-I Division
4.0 HPPTCL’s proposal for transmission elements to be included in GEC-II.
4.1 H.P. Power Transmission Corporation Limited (HPPTCL) vide its letter
HPPTCL/Planning/GEC-II/2017-18-19820-21 dated 15.03.2018 has submitted the DPR
for for following intra-state transmission elements for evacuation of power from small
hydroelectric plants in Himachal Pradesh to be included under GEC-II:
S.
No.
Name of Transmission Project Estimated
Cost (in
Crore)
1 Construction of 220/66 kV, 80/100 MVA substation at Mindhal in Chenab
basin in Distt. Lahaul & Spiti.
91.5
2 Construction of 400 kV D/c transmission line (initially charged at 220 kV)
from 220/66 kV, 80/100 MVA substation at Mindhal to 400/220 kV GIS
pooling station at Mazra in Distt. Chamba.
531.81
3 Construction of 132/33 kV, 31.5 MVA GIS substation upstream of
Malana-II HEP in Distt. Kullu along with LILO of one circuit of 132 kV
Barsaini – Charor D/c transmission line.
75.28
4 Construction of 132 kV D/c transmission line from Chanju-I HEP to
220/132 kV substation at Mazra in Distt. Chamba.
36.98
5 Construction of 400/220 kV, 2x315 MVA GIS Pooling Station at Mazra
along with LILO of 400 kV Chamera – I to Chamera – II S/c line in Distt.
Chamba.
301.92
Total 1037.49
4.2 CEA vide its letter no. CEA-PS-11-21(17)/2/2018-PSPA-I Division dated 30.11.2018 has
accorded concurrence to the proposal submitted by HPPTCL.
4.3 Members may like to note.
5.0 Intra-State transmission works of HPPTCL posed for funding from Multilateral
Development Banks:
5.1 HPPTCL vide its letter no HPPTCL/CEA/Vol-IV/2019-2533 dated 11.06.2019 has
submitted the proposal related to following intra –state transmission works posed for
funding from Multilateral Development Bank:
S.No. Transmission Element Estimated
Cost (in
Crores)
Remarks
1 LILO of 132kV Giri-Kulhal
transmission line at 132/33kV
Paonta(Gondpur) sub-station
16.15 Required to provide
reliable supply to
Paonta area.
2 132/33kV, 2x20 MVA new sub-station
in Rajgarh area at Charna by LILO of
132 kV Giri-Gaura S/c transmission
line
65.78 Required to improve
voltage profile and
provide reliable supply
to Rajgarh area.
3 Up gradation of existing 33/11kV sub-
station Bahri (Dharampur) to
36.97 Required to provide
reliable supply to
CEA-PS-11-21(19)/2/2019-PSPA-I Division
132/33kV, 2x16/20 MVA by LILO of
132kV Bassi-Hamirpur transmission
line
Dharampur area.
4 220/132kV, 2x100 MVA sub-station
at Ochaghat (Solan) alongwith LILO
of 132kV Solan-Gaura line at
Ochaghat.
Construction of 132 kV S/c
transmission line from proposed
220/132 kV Ochaghat Substation to
132/33 kV Solan substation (using 4
km portion of dismantled 132 kV S/c
Solan- Giri transmission line )
113.94 Required to enhance
reliability of power
supply to Solan and
Giri area.
5 Dismantling of 60 km portion of
existing Giri-Solan 132 kV S/c line
on S/c towers (64 km).
Construction of 220 kV D/c
transmission line from 220/132kV
Ochaghat Substation to 400/220kV
Arandwala (Kala Amb) substation
(PGCIL)[34 km on D/c towers and
14 km on M/c towers]*
220 kV D/c Line from 220/132 kV
Giri substation to 400/220kV
Arandwala (Kala Amb) substation
(PGCIL)[30 km on D/c towers and
14 km on M/c towers]*.
* Using RoW of dismantled portion of
Giri-Solan 132 kV S/c line
214.64 Required to enhance
reliability of power
supply to Solan and
Giri area.
6 132/33kV, 2X31.5 MVA sub-station
in Dharamshala area & 132kV D/c
transmission line from proposed
substation to 220/132 kV Patti
(Dehan) substation
88.82
Required to meet the
increased load demand
in Dharmashala area
which has been
identified as a smart
city.
Total 536.30
5.2 The proposal submitted by HPPTCL has been examined by CEA and found to be
technically in order except the transmission element mentioned at S. No. 1 i.e. LILO of
Giri-Kulhal 132 kV transmission line at 132/33kV Paonta(Gondpur) sub-station, which
is an inter-state transmission line between Uttarakhand and Himachal Pradesh, therefore,
needs the approval of NRSCT as Giri-Kulhal 132 kV line is an ISTS line.
5.3 Members may like to deliberate.
6.0 Construction of 2 nos. of 400 kV bays under ISTS at 765/400 kV PGCIL substation,
Varanasi:
CEA-PS-11-21(19)/2/2019-PSPA-I Division
6.1 In the 38th meeting of Standing Committee on Power System Planning for Northern
Region, Jaunpur-Varanasi (PGCIL) 400 kV D/c line and 400 kV bays at Varanasi
(PGCIL) were approved.
6.2 UPPTCL vide its letter no. 57/Dir(Comm & plg)/UPPTCL/2019/TWC Queries dated
26.06.2019 has informed that 400 kV Jaunpur substation(UPPTCL) is under
construction and shall be completed by January 2021 and construction of Jaunpur-
Varanasi (PGCIL) 400 kV D/c line will be completed by November 2020. In view of
above, UPPTCL has requested to construct 02 nos 400 kV bays at Varanasi (PGCIL)
under ISTS scheme within the matching time frame.
6.3 Members may like to deliberate.
7.0 Up-gradation and Strengthening of Delhi transmission system Phase-I
7.1 In the 3rd meeting of NRSCT the DTL has proposed for of following 220kV transmission
lines from zebra conductor to HTLS:
i. Bawana-Rohini 220 KV line - D/C line
ii. Bawana-Shalimarbagh 220 KV line – D/C line
iii. Mandaula-Gopalpur 220 KV line – D/C line
iv. Mandaula to Wazirabad - 2 X D/C line
v. BTPS to Sarita Vihar - D/C line
vi. Maharanibagh to Lodhi Road – D/C line
7.2 After discussions in 3rd NRSCT, the proposal of re-conductoring of the following 2 nos.
of 220kV lines of DTL with HTLS conductor was agreed:
a. 220 kV BTPS-Sarita Vihar ckt-I & II
b. 220 kV Maharani Bagh - Lodhi Road, ckt-I & II
7.3 Regarding remaining 4 nos. of transmission lines, it was opined that in view of
implementation of 400/220 kV Gopalpur substation and Shalimar S/s as inra—state
works, the loading on these lines will reduce. Therefore, it was agreed that CEA and
DTL may be deliberate the proposal of reconductoring of following 220kV
transmission lines of DTL:
a. Bawana-Rohini 220 kV D/C line
b. Bawana-Shalimarbagh 220 kV D/C line
c. Mandaula-Gopalpur 220 kV D/C line
d. Mandaula to Wazirabad 2 x D/C line
7.4 Subsequently, a meeting was held in CEA on 29.5.2019, wherein, DTL informed that
that works for Gopalpur 400 KV sub-station are presently under tendering process, and
the substation is likely to be commissioned by 2021-22. DTL also stated that there is
no proposal for establishment of 400 kV Shalimarbagh S/S. Therefore, immediate
solution to meet with the summer peak demand is re-conducting of these lines, as the
same could be completed within few months and would provide the necessary relief to
the system near Gopalpur and Wazirabad areas. DTL added that the reconductoring of
CEA-PS-11-21(19)/2/2019-PSPA-I Division
the lines from Rohini and Shalimarbagh to Bawana would provide necessary relief to
Shalimarbagh area. Considering the above facts, the proposal for re-conducting of
transmission lines (mentioned at Para 6.3 above) with HTLS conductor as proposed by
DTL was agreed in principle subject to ratification in the next meeting of NRSCT.
7.5 Members may like to deliberate.
Any other issue with the permission of chair.
167458BIKANER-NW
775.9
164480FATEHG-2
399.5
167459BHADLA PG
767.4
1000.0
0.0H
164460FATEHGARH
399.3
1085.7
52.9
1112.3
85.0
164459BHADLA PG
398.2
162498BHADLA-2
218.4
3550.0
399.6
137703MOGA-PG
775.3
167774KHETRI
781.0
776.8
147704BHIWN-PG
772.1
2370.8
2342.1
127.0
850.0
0.0H
400.5 1346.9
324.8
164404BHADLA
398.8
560.8
28.4
1395.6
30.2
324.8
4.7
324.8
14.2
25.3
1369.4
164.4
1369.4
164.4
218.0
572.9
783.2
164774KHETRI
404.4
238.3
36.9
36.9
58.3
49.1
58.3
49.1
162359BHADLA-PG
217.2
3346.9
465.5
250.0
0.0H
162397ADANI
218.0
0.0
124.5
0.2
500.0
0.0H
162398SOURYA
218.7
248.0
7.6
250.0
0.0
0.0H
162399ESSEL
221.5
375.0
0.0
361.0
65.2
756.5
124.2
749.2
1300.6
99.6
1390.2
118.2
402.9
1483.3
300.1
775.8
1067.3
35.6
426.2
78.1
425.3
109.2
1468.7
177.1
779.5
34.7
1046.5
175.6
167498BHADLA-2
781.1
1189.2
661.6
180.6
1000.0
0.0H
999.9
126.7
4500.0
164498BHADLA-2
399.6
4460.7
2318.4
125.0
162480FATEH-2
750.0
164451JAIPUR_RS
325.9
167417AJMER-NW
50.2
943.6
779.3
144201KADARPUR-NEW
407.8
154463JHATIKALA-PG
403.6
677.7
676.7
157708JHATI-PG
164458BIKANER-NW
120.9
TO KANKROLI
TO BIHAR SHARF
TO SOHAWAL
164417AJMER-NW
TO ANTA
250.5
TO MAU
TO BIKANER(RVPN)
TO BHINMAL
50.2
162458BIKANER
167773JAIPURR
407.8
TO GWALIOR
324.2
TO BHILWARA
TO DEENWANATO HEERAPURA
TO BIKANER(RVPN)
TO BAP
TO BADISID
TO TEHRI POOL(FSC)
TO BASSI
TO BASSI
177707MERUT-PG
405.1
134423MOGA
TO PATNA
TO GURGAON
TO BABAI
TO ALIGARH
TO AGRA
518.2
TO DHANONDA
TO MANESAR
TO AGRA
TO KOTPUTLI
218.4
TO TALWANDI SABO
TO HISSAR
TO HISSAR
TO JALANDHAR
TO SIKAR
TO BHIWANI
TO KISHENPUR
TO NOKADAR
TO LUCKNOW
Transmission Scheme for Rajasthan SEZ PH-II
TO ALIGARH
TO SIKAR
218.6
TO NAUBATPUR
TO NOIDA
TO Gr. NOIDA
TO Sikanderabad
TO BAMNOLI
TO DWARKA
TO MUNDKA
TO KADARPUR
TO KANASAR
TO CHITTORGARH
TO MERTA
TO MERTA
TO ALIGARH
TO ALIGARH
TO JAWAHARPUR TPS
TO MODIPURAM
TO FATEHBAD
401.8
164110JAISALMER-2
7247.7
1473.6
93.9
1200.0
0.0H
455.9
164403RAMGARH
399.8
259.8
4.0
164401AKAL-4
401.8
22.7
53.4
22.7
2.1
262.7
4.6
164402BARMER-4
400.4
285.3
34.1
17.8
167.3
29.4
400.2
313.4
25.8
400.6
15.4
11.8
162.0
39.8
275.2
205.6
26.5
88.1
25.9
225.9
40.1
225.9
40.1
344.7
3.1
528.0
109.9
455.3
105.4
342.4
31.5
400.0
151.8
23.9
257.8
17.1
826.8
29.3
1037.8
306.2
518.1
137.0
518.9
127.5
164497SIKAR NEW
407.9
1527.0
197.8
400.4
763.5
46.4
23.2
389.7
26.1
164461RAMG-II
400.7
673.4
67.4
670.9
66.2
400.5
654.5
68.2
654.5
68.2
643.9
50.8
643.9
50.8
20.4
165.9
0.3
164921BHIWADI
400.0
369.4
5.9
275.2
5.6
275.9
24.7
174475BAL74-PG
400.0
77.0
95.9
76.8
96.0
239.3
29.9
134.7
134.2
23.0
91.5
59.2
197.5
7.4
661.6
138.7
138.7
1056.8
147.8
1289.0
4.2
74.1
522.4
579.6
47.0
579.6
47.0
591.4
109.9
591.4
109.9
31.9
74.8
107.8
52.1
107.8
52.1
522.4
86.8
164433JODH SURPURA
74.1
144001PRITHHLA
33.2
858.1
18.4
866.2
217.1
8.6
217.1
8.6101.4
16.4
278.3
140.6
278.3
140.6
52.5
139.9
52.5
139.9
404.8
619.4
110.9
400.6
164757POKARAN
275.6
44.3
276.5
46.7
40.5
711.3
62.3
62.3
370.5
18.7
370.5
18.7
711.3
1876.3
755.6
226.6
62.5
226.6
62.5
562.4
539.3
38.2
44.4
446.2
1.3377.7
36.1377.7
36.1 397.9
41.5 397.9
41.5
134325MALKANA
399.8
444.5
20.1
1200.0
0.0
134438MOGA SPLT
397.7
244.5
20.1
26.0
43.8
25.4
41.3
5.4
355.9
0.5
384.2
10.3
164445NEEMR-PG
25.4
779.5
20.611
779.5
34.7
164495BIKANER-II
174266GNOIDAUP
405.7
1272.4
143.211
1272.4
217.6
328.7
168.1
329.3
161.7
107.7
15.2 107.6
19.4
199.2
58.3
199.2
74.9
661.6
154708JHATIKARASP
114.3
979.4
11
11
979.4
213.4
124.0
403.3
1136.1
736.9
87.7
661.6
138.7
1 1
2388.9
148.4
262.9
31.4
263.9
17.1
262.9
31.4
263.9
17.1
626.6
39.4
619.4
15.4
559.4
51.9
553.1
2.9
27.3
453.7
68.6
449.3
30.6
164413RAJWEST
513.8
374.9
26.1
164434JODH KANKANI
164430PACHPADRA
400.8
292.3
61.5
289.9
3.3
99.6
48.9
99.3
33.7
234.1
22.8
232.0
21.3
165.9
776.7
729.7
121.7
726.0
175.6 1362.5
185.7
1370.1
327.9
883.5
81.1
880.8
80.2
1211.1
226.3
2040.0
82.7
419.2
2025.3
167480FATEH-2
1040.3
27.3
1625.4
198.3
1036.8
1762.9
108.6
147201KADARPUR-NEW
789.8
314.7
257.9
177806BAREILLY
794.1
785.1
1068.7
400.7
1063.0
194.9
2222.7
255.1
77.6
325.4
1507.3
394.71507.3
394.7
78.1
78.1
1362.5
185.7
1370.1
327.9
180.0 1205.4
165.9
1582.3
94.7
2200.1
731.4
76.2
662.6
278.6
63.4
1493.1
1770.5
1493.1
257.0
1181.8
145.0
1194.5
240.3
767.6
167799JODH KANKANI
167.9
48.9
167.9
48.9
27.3
910.5
597.81040.3
177265GNOIDAUP
782.2
434.8
35.0
434.4
286.6
228.0
435.3
582.3
42.8
1466.7
110.5
378.2
449.8
167497SIKAR NEW
1773.6
218.8
1764.1
0.3
218.8
0.3
1764.1
1773.6
220.0
565.0
1.9
631.2
78.5
236.2
8.4
186.3
8.0
216.0
14.0
89.6
1287.2
5.8
162361RAMG-II
SZ1900.0
0.0H
162495BIKANER-2
219.0
2950.0
0.0
4500.0
0.0
3550.0
0.0
1880.0
0.0
2950.0
458.5
32.6
0.0H
896.3
109.3
1899.8
228.0
146.0
28.8
292.3
78.5
34.2
527.8
1144.0
15.8RS1
S2160.0
2.2R
162285BHADLA-S
73.9
18.8
73.9
18.8
138.8
18.7
133.3
22.0
235.3
20.5
624.7
220.0
1006.2
506.8
962.0
514.71006.2
506.8 514.7
962.0
595.6
77.6RW1
139.5V1
162280AKAL-2
220.0
164416AJMER
406.8
18.2R
21.0
132.7
23.8
5.6
0.0HS
0.0H
56.0
64.0
0.0H
18.9
6.2
132.7
60.01
S2
S1
107.6
2.1
161047BHADLA
161240KHETUSAR
169.3
11.411
11
338.7
51.5 338.6
21.811
11
213.4
32.7
218.8
0.3
162403RAMGARH_RE
190.3
45.6
1515.9
92.11533.4
136.8
167461RAMGARH ISTS
765.0
1
ALTERNATIVE-1
167458BIKANER-NW
761.8
164480FATEHG-2
392.6
167459BHADLA PG
757.1
1000.0
0.0H
164460FATEHGARH
392.4
1085.7
51.0
1112.3
84.9
164459BHADLA PG
396.6
162498BHADLA-2
218.6
3550.0
398.8
137703MOGA-PG
764.1
167774KHETRI
768.8
768.3
147704BHIWN-PG
762.3
2488.5
2455.6
208.1
850.0
0.0H
395.2
1084.4
197.1
164404BHADLA
397.3
508.0
15.5
1526.1
116.5
362.3
17.6
362.3
29.7
5.8
1325.7
98.7
1325.7
98.7
214.1
594.0
768.8
164774KHETRI
399.5
147.3 59.0
59.0
46.8
54.9
46.8
54.9
162359BHADLA-PG
216.2
3346.6
470.1
250.0
0.0H
162397ADANI
217.1
0.0
124.5
0.1
500.0
0.0H
162398SOURYA
217.8
248.0
7.8
250.0
0.0
0.0H
162399ESSEL
220.5
375.0
0.0
360.9
66.0
747.5
64.5
740.4
1292.9
106.3
1381.9
125.2
398.8
1600.1
279.2
768.8
885.9
83.9
492.7
87.7
491.5
85.1
1552.2
81.3
821.3
5.5
1000.1
210.5
167498BHADLA-2
764.4
30.3
80.8
1000.0
0.0H
999.9
130.2
4500.0
164498BHADLA-2
400.0
499.3
1485.2
125.0
162480FATEH-2
750.0
164451JAIPUR_RS
18.3
167417AJMER-NW
35.9 777.5
769.3
400.0
154463JHATIKALA-PG
399.7
925.6
924.1
157708JHATI-PG
164458BIKANER-NW
61.8
TO KANKROLI
TO BIHAR SHARF
164417AJMER-NW
TO ANTA
104.2
TO MAU
TO BIKANER(RVPN)
TO BHINMAL
35.9
162458BIKANER
167773JAIPURR
403.1
TO GWALIOR
361.5
TO BHILWARA
TO DEENWANA TO HEERAPURA
TO BIKANER(RVPN)
TO BAP
TO BADISID
TO KANASAR
TO TEHRI POOL(FSC)
TO BASSI
TO BASSI
400.5
134423MOGA
TO PATNA
TO GURGAON
TO BABAI
TO ALIGARH
TO AGRA
378.1
TO DHANONDA
TO AGRA
TO KOTPUTLI
190.8
TO TALWANDI SABO
TO SIKAR
TO BHIWANI
TO KISHENPUR
TO LUCKNOW
TO ALIGARH
TO SIKAR
215.5
TO NAUBATPUR
TO Gr. NOIDA
TO BAMNOLI
TO DWARKA
TO MUNDKA
TO QADARPUR
TO Sikanderabad
144201KADARPUR-NEW
TO UNNAO
TO NOIDA
TO JAWAHARPUR
TO JAWAHARPUR
TO MODIPURAM
TO JALJIVI
665.9
TO GURUSARAI
TO BARA
TO ALIGARH
TO RAMPUR
TO MAINPURI
TO ORAI
TO FARUKKABAD
TO RAMPUR
TO GURUSARAI
TO GHAZIABAD
TO DASNA
TO MURADNAGAR
TO KASHIPUR
TO MURADABAD
TO MURADABAD
TO LUCKNOW
TO SHAHAJAHANPUR
TO MEERUT
TO BARELY(UP)
TO FATEHBAD
TO MANESAR
TO JALANDHAR
TO NOKADAR
TO CHITTORGARH
TO MERTA
TO MERTA
TO MODIPURAM
TO HISSAR
TO HISSAR
TO SOHAWAL
Transmission Scheme for Rajasthan SEZ PH-II
177707MERUT-PG
TO ALIGARH
TO ALIGARH
400.2
164110JAISALMER-2
7089.3
1397.6
250.8
1200.0
0.0H
977.5
164403RAMGARH
399.2
291.8
2.9
164401AKAL-4
401.0
3.9
48.8
3.9
6.6
318.5
22.0
164402BARMER-4
400.0
301.2
47.1
2.5
161.4
26.2
398.9
319.4
24.4
398.5
17.4
22.1
151.2
24.7
290.4
201.5
18.6
102.9
3.4
229.1
40.4
229.1
40.4
364.3
2.1
528.0
64.9
974.7 224.3
361.7
27.8
400.0
120.8
23.8
289.2
17.8
803.1
14.4
164497SIKAR NEW
400.0
398.0
507.4
26.3
164461RAMG-II
397.5
752.9
107.8
749.7
119.3
394.8
674.3
62.6
674.3
62.6
662.7
67.3
662.7
67.3
126.4
36.3
126.3
15.7
164921BHIWADI
400.0
425.8
43.4
26.0
39.6
26.1
65.8
174475BAL74-PG
400.0
147.5
65.1
147.1
65.3
288.6
65.7
96.7
96.7
32.5
65.7
53.8
249.1
32.2
665.9
39.2
39.2
174483BAREILY
408.8
1413.2
102.5
1265.4
14.8
72.5
520.1
577.8
44.0
577.8
44.0
589.7
106.8
589.7
106.8
28.1
46.8
111.1
37.4
111.1
37.4
520.1
6.6
72.5
16.5
962.2
108.7
972.6
219.6
21.7
219.6
21.7129.1
11.9
55.9
42.455.9
42.4
230.3
141.3
230.3
141.3
396.4
637.7
164434JODH KANKANI
103.6
399.2
164757POKARAN
196.5
88.4
197.0
8.1
32.5
763.3
42.6
42.6
395.8
12.1
395.8
12.1
763.3
1917.5 258.8
34.0
258.8
34.0
571.4
547.9
55.1
60.3
623.3
34.5146.4
77.3146.4
77.3 319.4
66.0 319.4
66.0
134325MALKANA
399.8
445.6
18.5
134438MOGA SPLT
397.5
245.6
18.5
27.8
45.3
29.5
41.8
29.5
41.8
348.4
1.3
378.1
3.0
164495BIKANER-II
174266GNOIDAUP
403.1
1322.5
128.9
418.1
108.2
418.9
104.3
113.7
15.4 113.6
18.6
128.7
47.4
128.7
64.7
665.9
1101.2
79.0
953.4
172.8
953.4
172.8
397.1
721.9
64.6
665.9
80.8
174502ALIGANJ_VSC
400.0
4778.9
1101.0
174262MAINPURIUP
411.8
843.5
156.6
150.3
5.5150.3
5.5
402.2
104.0
402.2
104.0
66.3
22.2
66.3
22.2
205.7
12.0
189.8
174267HAPUR
405.4
723.2
7.7
136.4
2.5
136.4
2.5
32.1
10.0
32.1
10.0 14.6
40.4
66.1
29.6
174410BAREL-PG
408.8
706.5
81.4
706.6
81.4
104.7
6.4
105.8
5.9
23.9
61.1
249.0
87.1
87.1
23.9
61.1
24.9
15.824.9
15.8
38.0
25.0
38.0
25.0
78.9
29.8
237.4
25.0237.4
25.0
129.3
91.2
821.3
5.5
249.0
97.3
144001PRITHHLA
154708JHATIKARASP
2386.0
86.6 257.1
39.4
258.0
9.1
257.1
39.4
258.0
9.1
362.9
25.0
538.1
25.8
164433JODH SURPURA
164430PACHPADRA
399.8
296.9
53.7
294.3
3.5103.7
39.8
103.4
41.8
645.3
31.2
637.7
17.4
576.2
44.5
569.4
1.0
456.2
58.5
451.6
38.1
164413RAJWEST
244.0
15.0
241.6
15.6
164445NEEMR-PG
762.8
962.7
152.5
955.9
69.1 1162.1
114.2
1167.8
285.0
1209.0
128.9
1203.7
27.3
1611.2
106.5
1946.3
18.2
333.2
1932.6
167480FATEH-2
1242.9
21.0
1712.5
160.8
1237.7
1910.1
133.4
147201KADARPUR-NEW
765.0
177806BAREILLY
778.7
167497SIKAR NEW
765.0
57.0
1162.1
114.2
1167.8
285.0
167461RAMGARH ISTS
765.0
180.6
1600.8
144.5
1666.0
101.7
796.9
13.0
722.1
322.3
1.6
1919.3
156.2
1180.3
165.3
1193.0
207.0
762.0
167799JODH KANKANI
163.0
2.6
163.0
2.6
21.0
1242.9
177265GNOIDAUP
774.1
424.1
7.8
423.7
255.0
11.8
395.3
12
.0
12
4.8
167.1
38.7
1285.2
153.4
195.3
502.8
195.0
37.1
177502ALIGANJ_VSC
776.4
1441.9
231.9
1437.6
45.5
177262MAINPURIUP
781.5
13.4
330.4
947.6
318.6 945.7
82.2
177266HAPUR
153.6
221.5
153.6
221.5
548.7
53.0
535.9
90.5
714.6
202.1
224.8
103.6
400.6
15.2
1601.6
302.7
1593.5
63.7
1601.6
302.7
1593.5
63.7
220.0
575.8
20.7
631.2
51.0
244.1
20.9
189.9
3.7
223.4
7.5
90.0
1314.1
50.7
162361RAMG-II
217.0
1900.0
0.0H
162495BIKANER-2
215.9
2950.0
322.9
4500.0
0.0
3550.0
0.0
1880.0
0.0
2950.0
464.9
69.6
0.0H
880.2
27.8
1899.8
231.8
152.3
23.7
174.4
43.4
0.4
1144.0
37.5H
160.0
48.4R
162285BHADLA-S
75.5
18.2
75.5
18.2
128.2
17.0
124.0
20.5
135.8
28.1
624.7
162403RAMGARH_RE
220.0
595.6
53.9R
139.5
162280AKAL-2
220.0
164416AJMER
402.7
12.6R
6.3
132.6
25.7
5.1
0.0H
0.0H
56.0
64.0
0.0H
18.9
6.2
132.6
60.0
111.5
0.4
161047BHADLA
161240KHETUSAR
167.3
31.8
167.3
31.8
212.9
32.3
338.0
50.7
168.9
25.9
338.0
50.7
18.3
516.0
190.6
43.3
1567.7
143.6 1587.2
134.4
1006.2
506.8
962.0
514.71006.2
506.8
962.0
514.7
1250.0
265.4
1194.8
178.0
1250.0
265.4
1194.8
178.0
1250.0
265.4
1194.8
178.0
1250.0
265.4
1194.8
178.0
1
ALTERNATIVE-2 OPTION-1
167458BIKANER-NW
761.6
164480FATEHG-2
392.6
167459BHADLA PG
757.0
1000.0
0.0H
164460FATEHGARH
392.3
1085.7
51.0
1112.3
84.9
164459BHADLA PG
396.5
162498BHADLA-2
218.6
3550.0
398.8
137703MOGA-PG
763.7
167774KHETRI
768.3
768.0
147704BHIWN-PG
762.0
2484.9
2452.2
205.1
850.0
0.0H
395.1
1087.3
195.5
164404BHADLA
397.3
507.4
16.2
1525.0
118.3
361.5
17.7
361.5
29.8
5.7
1323.0
96.5
1323.0
96.5
214.0
594.2
768.3
164774KHETRI
399.4
141.4 59.6
59.6
47.0
55.1
47.0
55.1
162359BHADLA-PG
216.2
3346.6
470.1
250.0
0.0H
162397ADANI
217.1
0.0
124.5
0.1
500.0
0.0H
162398SOURYA
217.8
248.0
7.8
250.0
0.0
0.0H
162399ESSEL
220.5
375.0
0.0
360.9
66.0
748.1
62.8
741.0
1296.4
102.0
1385.7
120.6
398.6
1593.5
276.9
767.9
928.9
75.0
489.5
88.2
488.3
84.8
1534.8
74.8
815.2
2.7
1022.7
204.3
167498BHADLA-2
764.3
36.8
77.9
1000.0
0.0H
999.9
130.3
4500.0
164498BHADLA-2
400.0
500.1
1485.0
125.0
162480FATEH-2
750.0
164451JAIPUR_RS
21.8
167417AJMER-NW
35.8 780.4
769.1
400.0
154463JHATIKALA-PG
399.6
905.8
904.4
157708JHATI-PG
164458BIKANER-NW
60.1
TO KANKROLI
TO BIHAR SHARF
164417AJMER-NW
TO ANTA
101.9
TO MAU
TO BIKANER(RVPN)
TO BHINMAL
35.8
162458BIKANER
167773JAIPURR
403.0
TO GWALIOR
360.8
TO BHILWARA
TO DEENWANA TO HEERAPURA
TO BIKANER(RVPN)
TO BAP
TO BADISID
TO KANASAR
TO TEHRI POOL(FSC)
TO BASSI
TO BASSI
400.4
134423MOGA
TO PATNA
TO GURGAON
TO BABAI
TO ALIGARH
TO AGRA
373.9
TO DHANONDA
TO AGRA
TO KOTPUTLI
188.6
TO TALWANDI SABO
TO SIKAR
TO BHIWANI
TO KISHENPUR
TO LUCKNOW
TO ALIGARH
TO SIKAR
215.5
TO NAUBATPUR
TO Gr. NOIDA
TO BAMNOLI
TO DWARKA
TO MUNDKA
TO QADARPUR
TO Sikanderabad
144201KADARPUR-NEW
TO UNNAO
TO NOIDA
TO JAWAHARPUR
TO JAWAHARPUR
TO MODIPURAM
TO JALJIVI
657.4
TO GURUSARAI
TO BARA
TO ALIGARH
TO RAMPUR
TO MAINPURI
TO ORAI
TO FARUKKABAD
TO RAMPUR
TO GURUSARAI
TO GHAZIABAD
TO DASNA
TO MURADNAGAR
TO KASHIPUR
TO MURADABAD
TO MURADABAD
TO LUCKNOW
TO SHAHAJAHANPUR
TO MEERUT
TO BARELY(UP)
TO FATEHBAD
TO MANESAR
TO JALANDHAR
TO NOKADAR
TO CHITTORGARH
TO MERTA
TO MERTA
TO MODIPURAM
TO HISSAR
TO HISSAR
TO SOHAWAL
Transmission Scheme for Rajasthan SEZ PH-II
177707MERUT-PG
TO ALIGARH
TO ALIGARH
400.1
164110JAISALMER-2
7088.8
1397.4
252.5
1200.0
0.0H
977.8
164403RAMGARH
399.2
291.6
3.0
164401AKAL-4
401.0
3.7
48.8
3.7
6.6
318.5
22.2
164402BARMER-4
400.0
301.4
47.3
2.2
161.5
26.0
398.8
319.5
24.3
398.4
17.2
22.4
151.2
24.3
290.6
202.1
18.3
102.6
3.4
229.7
40.7
229.7
40.7
364.0
1.6
528.0
64.6
975.0 225.9
361.4
28.2
400.0
121.0
23.8
289.0
17.9
802.4
14.1
164497SIKAR NEW
400.0
397.9
505.4
26.9
164461RAMG-II
397.5
753.2
108.2
750.0
119.7
394.7
673.7
62.5
673.7
62.5
662.2
67.1
662.2
67.1
127.6
36.6
127.5
16.0
164921BHIWADI
400.0
424.2
43.6
28.4
40.8
28.4
66.9
174475BAL74-PG
400.0
144.9
63.2
144.5
63.3
287.3
66.0
95.5
95.5
32.2
64.9
53.5
245.7
34.0
657.4
37.3
37.3
174483BAREILY
405.8
585.1
24.6
1241.2
3.4
72.6
515.5
573.3
43.8
573.3
43.8
585.2
106.7
585.2
106.7
23.4
38.5
106.7
34.0
106.7
34.0
515.5
5.2
72.6
18.5
959.6
109.8
970.0
219.3
22.2
219.3
22.2128.1
11.8
54.8
41.054.8
41.0
224.8
140.5
224.8
140.5
396.2
637.7
164434JODH KANKANI
103.5
399.2
164757POKARAN
196.3
88.7
196.7
7.8
32.2
761.1
42.7
42.7
394.5
11.9
394.5
11.9
761.1
1702.0 255.6
34.1
255.6
34.1
568.6
545.2
56.3
61.5
621.2
34.1144.2
77.7144.2
77.7 317.0
67.8 317.0
67.8
134325MALKANA
399.8
446.1
18.5
134438MOGA SPLT
397.5
246.1
18.5
28.4
45.2
29.6
41.8
29.6
41.8
347.9
1.4
376.8
3.1
164495BIKANER-II
174266GNOIDAUP
402.6
1215.9
129.4
422.1
96.2
422.9
92.4
110.9
15.0 110.8
19.0
74.2
29.1
74.2
46.9
657.4
1082.6
83.6
939.5
173.9
939.5
173.9
396.8
712.7
66.8
657.4
77.9
174502ALIGANJ_VSC
400.0
174262MAINPURIUP
408.4
136.6
21.7
202.7
30.0202.7
30.0
543.0
152.1
543.0
152.1
124.5
4.7
124.5
4.7
156.0
32.3
135.5
174267HAPUR
404.4
793.1
194.6
793.1
194.6
521.0
34.5
521.0
34.5230.8
7.6
250.2
11.8
250.2
11.8
35.9
10.4
35.9
10.4131.3
39.9
145.6
36.3
174410BAREL-PG
405.9
761.3
199.0
761.4
198.7
79.7
20.6
80.5
20.3
34.4
77.3
270.3
98.4
98.4
34.4
77.3
26.4
8.826.4
8.8
36.8
18.5
36.8
18.5
68.1
2.9
276.5
2.8276.5
2.8
152.7
97.3
815.2
2.7
270.3
81.6
144001PRITHHLA
154708JHATIKARASP
2387.0
84.3 257.1
39.5
258.0
9.0
257.1
39.5
258.0
9.0
362.9
25.0
537.6
25.9
164433JODH SURPURA
164430PACHPADRA
399.8
296.8
53.6
294.3
3.6103.8
39.6
103.5
42.1
645.4
30.9
637.7
17.2
576.2
44.3
569.4
1.2
456.2
58.2
451.7
38.3
164413RAJWEST
244.0
14.8
241.7
15.4
1064.4
100.4
1053.9
205.8
164445NEEMR-PG
762.6
964.0
151.8
957.2
69.2 1162.2
114.4
1167.9
285.0
1208.6
128.6
1203.3
27.1
1610.4
108.5
1945.8
16.2
331.2
1932.1
167480FATEH-2
1239.0
20.9
1712.6
159.2
1233.9
1909.5
130.8
147201KADARPUR-NEW
765.0
177806BAREILLY
776.5
167497SIKAR NEW
765.0
480.1
1162.2
114.4
1167.9
285.0
167461RAMGARH ISTS
765.0
178.4
1600.0
145.2
1666.0
102.0
558.2
13.5
505.9
345.1
0.8
1918.6
144.3
1180.7
165.9
1193.5
205.8
761.9
167799JODH KANKANI
135.7
8.5
135.7
8.5
20.9
1239.0
177265GNOIDAUP
773.4
512.2
9.0
511.7
251.8
4.4
394.4
4.5 12
4.4
335.5
42.4
1131.3
149.4
204.3
498.1
204.0
40.8
177502ALIGANJ_VSC
765.0
177262MAINPURIUP
780.3
226.0
337.6
177266HAPUR
101.7
220.0
101.7
220.0
251.5
52.2
691.0
71.6
598.8
199.8
244.1
129.8
223.7
34.9
1603.3
296.7
1595.3
58.8
1603.3
296.7
1595.3
58.8
220.0
575.7
21.1
631.2
50.6
244.0
21.2
189.5
3.7
223.2
7.3
89.9
1313.9
51.7
162361RAMG-II
217.0
1900.0
0.0H
162495BIKANER-2
215.8
2950.0
323.0
4500.0
0.0
3550.0
0.0
1880.0
0.0
2950.0
462.8
70.9
0.0H
880.2
26.8
1899.8
231.9
152.0
23.6
169.9
44.1
0.4
1144.0
37.5H
160.0
49.5R
162285BHADLA-S
75.5
18.2
75.5
18.2
128.3
16.9
124.1
20.5
136.4
28.4
624.7
162403RAMGARH_RE
220.0
595.6
53.5R
139.5
162280AKAL-2
220.0
164416AJMER
402.7
12.5R
6.6
132.6
25.7
5.1
0.0H
0.0H
56.0
64.0
0.0H
18.9
6.2
132.6
60.0
111.4
0.4
161047BHADLA
161240KHETUSAR
211.8
28.4
211.8
28.4
212.7
32.3
337.8
50.7
168.8
25.9
337.8
50.7
17.9
516.1
190.5
43.2
1571.3
143.5 1590.9
131.8
1006.2
506.8
962.0
514.71006.2
506.8
962.0
514.7
1250.0
267.8
1194.8
180.6
1250.0
267.8
1194.8
180.6
1250.0
267.8
1194.8
180.6
1250.0
267.8
1194.8
180.6
1
ALTERNATIVE-2 OPTION-2
Scanned by CamScanner
Scanned by CamScanner
Scanned by CamScanner
Scanned by CamScanner