Who are we?

• We are management and technical consultant

• We principally support the rail sector

• We have offices in London, York and Sydney, Australia

• We are also working in Ireland and New Zealand• We are also working in Ireland and New Zealand

• We have worked in Africa and the Middle East

• We have a team of 50 permanent staff and over 30 associates

• We have a strong set of values that guide the business

Page 3: Cdl Group Presentation

What do we do?

• Help our clients deliver:• Projects

• Technical solutions to problems

• Business change• Business change

• Business improvement

• On going effective business management

• Examples of long term clients include:• Heathrow Express, London Underground,

Arriva and Auckland Regional Council

Page 4: Cdl Group Presentation

The CDL Approach

Page 5: Cdl Group Presentation

CDL’s Services Areas

Project Management

Asset Management

Audit

Commercial Advisory

Transport Planning

Required Service

Railway Safety

Mainline and

Freight Railways

Metro Railways

Systems

Compliance Urban

Transport

Page 6: Cdl Group Presentation

Project Management

Project

Loss Control

• Focused on management of

• capital investment projects

• business change projects

• Projects involving Project

Management:

• Tube Lines – Station

Modernisation Programme

Organisational Change

Business Transformation

Transition Management

Project Management

Project Controls

Modernisation Programme

• Bringing maintenance

in-house NR / LU

• Project Management - LU

PPP Periodic Reviews

Management of Business

Management of Projects

Control of Projects

Change Management

Project Development

Interface Management

Programme Management

Management

Page 7: Cdl Group Presentation

Projects involvingProject Management

• Tube Lines Station Modernisation Programme

• CDL Engineering Managers taking lead roles on +50% of stations

• Focus on effective assurance delivers programme efficiencies

• Challenging environment – design certainty central to success

• Bringing Maintenance in-house

• Clients: Network Rail / Tube Lines / Metronet

• Demanded both engineering and change management skills

• Produced significant commercial efficiencies and benefits

• London Underground PPP – Project Management of

• Metronet Extraordinary Review – 2007

• Tube Lines Periodic Review -2007/08

• OPPPA Cost Reference with Tube Lines in 2008.

Page 8: Cdl Group Presentation

Asset Management

• Focused on:

• Optimising asset performance

• Gaining best whole life value

• Projects Involving Asset

Management

• Heathrow Express – Technical

PAS 55 Advisory

Asset Information

System

New System & Process

Development Delivery

• Heathrow Express – Technical

Advisor

• Hutchison Ports – Felixstowe

• Transport for London – East

London Line

Asset Management

System Improvement

Review of Existing Systems

Whole Life Analysis

Asset Information &

Condition Collection

Page 9: Cdl Group Presentation

Projects involving Asset Management

• Heathrow Express

• 6 year commission advising on all aspects of rail asset maintenance

• Delivering continuous improvement in reliability and efficiency

• Responsible for Safety Acceptance of T5 track and electrification

• Hutchison Ports• Hutchison Ports

• Review of asset management of port rail facilities

• Design and administration of new maintenance contract strategy

• Review of key operational risk areas

• East London Railway – Asset Engineer

• Residual assets not being upgraded as part of the ELL Project

• Design and administration of new maintenance contract strategy

• Asset protection responsibility

Page 10: Cdl Group Presentation

Audit

Quality Audits

Quality Management

Internal Auditor Training

• Assuring clients that their

investments, operations and

maintenance activities are being

delivered safely and to

specification

• Projects on which Compliance,

Audit has played a key roleAudit & Training

Technical Audits

Competency Management

Systems

Quality Management

System Training

Audit has played a key role

• QMS Improvement – Pathology Services – Frimley Park

• LU – Assurance Manager to the Civil Engineering Department

• Tube Lines Audits - Track

Page 11: Cdl Group Presentation

Projects involvingAudit

• QMS Improvement – Pathology Services – Frimley Park

• Focused on meeting Clinical Pathology Accreditation Standards

• Reduction of bureaucracy, improvement of operational control

• Communication and training to support implementation of change

• Tube Lines Audits - Track

• Safety & technical audits on 6 key areas

• Both Tube Lines and its supply chain

• Audits of both system design and system implementation

• LU – Assurance Manager to the Civil Engineering Department

• Planning and management of Infraco surveillance visits

• Trend analysis & recommendations for performance improvement

• Track welding audits undertaken on behalf of LU and Infracos

Page 12: Cdl Group Presentation

Compliance

Business Excellence

Environmental Management

Advice

Quality Management

• Assuring clients that their

investments, operations and

maintenance activities are being

delivered safely and to

specification

• Projects on which Compliance

has played a key role

Compliance

Advice

Health and Safety

Management

Competency Management

Systems

Management

has played a key role

• QMS Improvement – Pathology Services – Frimley Park

• LU – Assurance Manager to the Civil Engineering Department

• Tube Lines Audits - Track

Page 13: Cdl Group Presentation

Railway Safety

Safety Management

Systems Development

• Helping clients maintain and

improve the safety of their

railway operations and activities

• Projects on which Railway

Safety has played a key role

• Go-Ahead Safety audits

Railway Safety

Safety Audit

Safety Improvement Programmes

Independent Safety Audit

• Independent Assessor – Irish Railway Safety Commission

• Isle of Man – Railway Safety Management System

Page 14: Cdl Group Presentation

Projects involving Railway Safety

• Go-Ahead – Safety Audits

• Three year programme across 3 franchises

• Integrated part of Annual Safety Report

• Includes planning for ISO 18001

• Irish Railway Safety Commission

• Isle of Man Railways

• Comprehensive Safety Review across railways

• Development of improvement plan

• Development of Safety Management System

• Irish Railway Safety Commission

• Independent Assessor for Heritage Railways

• Detailed review of Safety Cases

• Inspection of operations and facilities

Page 15: Cdl Group Presentation

Mainline & Freight Railways

Scheme Planning

• Supporting clients in the

maintenance, operation and

enhancement of their railway

networks

• Projects on which Mainline &

Freight Railways has played a

key roleMainline & Freight

Railways

Design & Specification Development

Construction & Commissioning

Operational & Technical Planning

key role

• Network Rail – Stafford Remodelling

• Commercial Estates – Manse Farm Knaresborough

• DfT – West Anglia and Stansted Business Case

Page 16: Cdl Group Presentation

Projects involvingMainline & Freight Railways

• Network Rail – Stafford Remodelling

• Engaged as the Scheme Development Manager

• Managed feasibility and outline design

• Backdrop of TWA and Corporate and Regulatory requirements

• Commercial Estates – Manse Farm, Knaresborough

• DfT – West Anglia and Stansted Business Case (2008)

• Investigation of infrastructure options for journey time improvement

• Support on Railsys Model Building

• Costing of options

• Commercial Estates – Manse Farm, Knaresborough

• Engineering and operation study of new station

• Timetabling and journey time analysis

• Engineering feasibility of new station

Page 17: Cdl Group Presentation

Metro Railways

Scheme Planning • Projects on which Metro

Railways has played a key role

• Metronet BCV Track Compliance Recovery

• Multiplex – White City Development

• Metronet BCV – Friction Management and Control

Metro Railways

Design & Specification Development

Construction & Commissioning

Operational & Technical Planning

Management and Control

Page 18: Cdl Group Presentation

Projects involving Metro Railways

• London Underground – Leadership - PPP Engineering Strategies

• LU own view for PPP review

• ‘Six Sigma’ process to assess signalling project risk

• Also covered track, rolling stock and L&E

• Metronet Rail – Assurance Engineer Waterloo and City Line

• Needed to deliver compliance in a demanding environment

• Key focus on competence of contractors’ personnel

• Responsible for agreeing concessions & temporary non compliances

• Tube Lines – Friction Management Control

• Defined process for successful friction management

• Developed and supported training programme for measurement and lubrication

• Helped develop more productive relationship between Tube Lines operatives and Equipment suppliers

Page 19: Cdl Group Presentation

Systems

Scheme Planning

• Focused on addressing the

systems challenges on rail and

light rail projects, to achieve

well integrated outcomes

• Projects on which Systems has

played a key role

• Manchester Metrolink – Systems

SystemsDesign &

Specification Development

Construction & Commissioning

Operational & Technical Planning

• Manchester Metrolink – Systems Integration

• White City Development – Systems Integration

• ARTA – Co-located Control Centre

Page 20: Cdl Group Presentation

Projects involving Systems

• Manchester Metrolink – Systems Integration

• Integration of improvements and upgrades

• Key challenge is network wide line of sight operation

• Other changes to be integrated power upgrade and DDA compliance

• White City Development – Systems Integration• White City Development – Systems Integration

• New 10 road depot under development

• Two new stations and new depot connections to existing network

• Signalling, comms and M&E integration

• ARTA – Co-Located Control Centre

• Overall project management of investment and change programme

• Integrated signalling, station management and security management

• Integrated requirements of different organisations and stakeholders

Page 21: Cdl Group Presentation

Urban Transport

Scheme Planning

• Focused on helping clients

develop, operate and maintain

their light rail systems safely and

efficiently

• Projects on which Urban

Transport has played a key role

• Technical Advisor on Edinburgh Urban

Transport

Design & Specification Development

Construction & Commissioning

Operational & Technical Planning

• Technical Advisor on Edinburgh Tram

• Acting Engineering Team leader Manchester Metrolink

• Interim Bid Technical Manager MetroExpress – Dublin Metro North

Page 22: Cdl Group Presentation

Projects involvingUrban Transport

• Technical Advisor for Edinburgh Tram System

• Concept Design manager – system specification leader

• Helped develop overall implementation strategy

• Early timetabling option development

• Manchester Metrolink

• Metro Express - Dublin

• Interim Technical Manager of Bid Development

• Bid design management

• Support on issues such as SPV structure

• Manchester Metrolink

• Acting Engineering Team Leader 2006 – 2008

• Systems Integration of upgrades and extensions

• Client side management of procurement of 8 new vehicles

Page 23: Cdl Group Presentation

Transport Planning

TimetableCAM -

Planning Model

• Focused on helping railway

operators improve business

performance

• Projects on which Transport

Planning has played a key role:

• Arriva – Cross Country

Franchise Bid Support

Revenue Management

Transport Planning

Fares and Ticketing

Franchise Bidding

RTM Planning

Model

Yield -Planning

Model

Crowding -Planning

Model

Franchise Bid Support

• Chiltern

• London Underground - CAM

Page 24: Cdl Group Presentation

Projects involvingTransport Planning

• Arriva Cross Country Franchise Bid

• Developed and managed Crowding Model

• Developed timetable for new route

• PM role for Ticketing System Implementation

• Chiltern Railways Revenue Analysis & Forecasting Model

• RFM flexible, easy-to-use yet powerful forecasting & analysis tool

• Compliant with DfT franchise modelling requirements

• Short to long-term revenue & journey forecasts – flow or ticket

• London Underground – Cost Aggregation Model

• A whole business long-term asset management costing tool

• Identifies spending profiles for a whole railway asset system

• Flexible input, flexible output

Page 25: Cdl Group Presentation

Commercial Advisory

Cost and Commercial Management

Procurement and Supply

Chain Service Delivery

Stakeholder Management and Project

Sponsorship

• Focused on helping clients

efficiently implement their

investment programmes

• Projects on which commercial

Advisory has played a key role

• Network Rail – Operational Strategy

Commercial Advisory

Contract and Facilitation Mediatory Services

Project Audits, Due

Diligence and Forensic

Investigation

Risk Management

Value Management

• ARTA – Organisation Restructuring

• Rolling Stock Procurement Early Advice – Transport Scotland

Page 26: Cdl Group Presentation

Projects involvingCommercial Advisory

• Network Rail – Operational Strategy Support

• Auckland Rail Network Restructuring - ARTA

• Strategic support on operational strategy, commercial negotiation

• Contract management, due diligence, investment planning

• Organisational change, staff management and transition planning

• Network Rail – Operational Strategy Support

• Commercial, programming & risk management strategic support

• Work streams: Signalling Tech, Traffic Man Span of Control

• Complex stakeholder management

• Rolling Stock Procurement Early Advice – Transport Scotland

• Technical, operations, maintenance and commercial advice

• Advice on rolling stock cascade to support business case

• Advice on long term detailed technical and financial advisors

Page 27: Cdl Group Presentation

In Conclusion, we

• Focus on our clients needs

• We provide the Required Service

• Are able to deliver this through• The breadth of the skills of our team• The breadth of the skills of our team

• A focus on working as an integrated team

• A willingness and ability to work with other advisors to our clients

• Are equally able to:• Lead and participate in major initiatives; and

• Undertake small specialist support roles

Page 28: Cdl Group Presentation

We provide

Bespoke, balanced,

efficient and effective support

solutions for our clients

Thank you