ccooaallppaacc ppttyy llttdd - castlereagh coal€¦ · 10 competency and training of personnel ......

14
Last printed 21/04/2011 Original Issue Date: November 2009 Version Number 2 Revision Date November 2010 Review Date 3 Years Page | 1 CPC 26.2.18 Road Closure Management Plan Road Closure Management Plan For The Invincible Colliery Operation Project Approval 07_0127 Sch 3 (26) November 2010 Coalpac Pty Ltd Invincible Colliery Castlereagh Highway Cullen Bullen NSW 2790 Tel: 02 6359 0600 Fax: 02 6359 0608 Proprietors of Invincible Colliery and Cullen Valley Mine C C o o a a l l p p a a c c P P t t y y L L t t d d

Upload: others

Post on 12-Jun-2020

4 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: CCooaallppaacc PPttyy LLttdd - Castlereagh Coal€¦ · 10 COMPETENCY AND TRAINING OF PERSONNEL ... Coalpac have engaged the services of Steve Wilson of Orange Traffic Control to

Last printed 21/04/2011

Original Issue Date: November 2009

Version Number – 2 Revision Date – November 2010

Review Date 3 Years

Page | 1

CPC 26.2.18 Road Closure Management Plan

Road Closure Management Plan

For The Invincible Colliery

Operation

Project Approval 07_0127 Sch 3 (26)

November 2010

Coalpac Pty Ltd Invincible Colliery Castlereagh Highway Cullen Bullen NSW 2790 Tel: 02 6359 0600 Fax: 02 6359 0608

Proprietors of Invincible Colliery

and Cullen Valley Mine

CCooaallppaacc PPttyy LLttdd

Page 2: CCooaallppaacc PPttyy LLttdd - Castlereagh Coal€¦ · 10 COMPETENCY AND TRAINING OF PERSONNEL ... Coalpac have engaged the services of Steve Wilson of Orange Traffic Control to

ROAD CLOSURE MANAGEMENT PLAN November 2010

Last printed 21/04/2011

Original Issue Date: November 2009

Version Number – 2 Revision Date – November 2010

Review Date 3 Years

Page | 2

CPC 26.2.18 Road Closure Management Plan

Proprietors of Invincible Colliery

and Cullen Valley Mine

CCooaallppaacc PPttyy LLttdd

Road Closure Management Plan

Revision History *

Version Revision

Date Reason for Revision Author

Implementation Date

Authorised by: Signature

1 N/A Initial Draft – Consent Condition A Baker (OTC)

06/10/2009

2 11/11/2010 Review Traffic Arrangemnts &

Submit to DI&I for approval B Whichelo 11/4/2011

T Flynn for Operator

COPYRIGHT

Coalpac Pty. Ltd 2010

All intellectual property and copyright reserved.

Apart from any fair dealing for the purpose of private study, research, criticism or review, as permitted under the Copyright Act, 1968, no part of this report may be reproduced, transmitted, stored in a retrieval system or adapted in any form or by any means (electronic, mechanical, photocopying, recording or otherwise) without written permission. Enquiries should be addressed to Coalpac Pty Ltd.

Page 3: CCooaallppaacc PPttyy LLttdd - Castlereagh Coal€¦ · 10 COMPETENCY AND TRAINING OF PERSONNEL ... Coalpac have engaged the services of Steve Wilson of Orange Traffic Control to

ROAD CLOSURE MANAGEMENT PLAN November 2010

Last printed 21/04/2011

Original Issue Date: November 2009

Version Number – 2 Revision Date – November 2010

Review Date 3 Years

Page | 3

CPC 26.2.18 Road Closure Management Plan

Proprietors of Invincible Colliery

and Cullen Valley Mine

CCooaallppaacc PPttyy LLttdd

CONTENTS

Page

1 INTRODUCTION....................................................................................................................................... 4

2 SCOPE ...................................................................................................................................................... 4

3 PURPOSE ................................................................................................................................................. 4

4 ROLES AND RESPONSIBILITIES .......................................................................................................... 5

4.1 OPERATOR (& OPERATOR’S NOMINATED SITE REPRESENTATIVE) ........................................................... 5 4.2 GENERAL MANAGER .......................................................................................................................................... 5 4.3 MANAGER OF MINING ENGINEERING (MINE MANAGER)............................................................................... 5 4.4 WORKFORCE/CONTACTORS ............................................................................................................................ 5 4.5 TRAFFIC CONTROLLERS ................................................................................................................................... 5

5 Notification of Road Closures ............................................................................................................... 5

6 Personnel ................................................................................................................................................. 6

7 Road Closures ......................................................................................................................................... 6

8 Mine Staff Responsibilities ................................................................................................................. 7

9 Traffic Control Responsibilities ............................................................................................................. 7

10 COMPETENCY AND TRAINING OF PERSONNEL ................................................................................ 8

11 ONGOING REVIEW ................................................................................................................................. 8

APPENDIX 1 ..................................................................................................................................................... 9

APPENDIX 2 ................................................................................................................................................... 10

TCP 47 ............................................................................................................................................................. 10

APPENDIX 3 ................................................................................................................................................... 11

RTA Approval ................................................................................................................................................. 11

APPENDIX 4 ................................................................................................................................................... 13

RTA Extension Approval............................................................................................................................... 13

APPENDIX 5 ................................................................................................................................................... 14

RTA Speed zone Authorisation .................................................................................................................... 14

Page 4: CCooaallppaacc PPttyy LLttdd - Castlereagh Coal€¦ · 10 COMPETENCY AND TRAINING OF PERSONNEL ... Coalpac have engaged the services of Steve Wilson of Orange Traffic Control to

ROAD CLOSURE MANAGEMENT PLAN November 2010

Last printed 21/04/2011

Original Issue Date: November 2009

Version Number – 1 Revision Date – November 2010

Review Date 3 Years

Page 4

CPC 26 2 18 Road Closure Management Plan V2

Proprietors of Invincible Colliery

and Cullen Valley Mine

CCooaallppaacc PPttyy LLttdd

1 INTRODUCTION

The Road Closure Management Plan (RCMP), forming part of the Invincible Health, Safety,

Environment and Community (HSEC) Management System, is referenced via the requirements of

Project Approval 07_0127 issued under Sec 75J of the Environmental Planning and Assessment

Act 1979.

In accordance with that approval, under Schedule 3 (26), the Proponent (Coalpac Pty Ltd) “shall

prepare and implement a Road Closure Management Plan”, prior to blasting within 500 metres of

any public road.

Coalpac have engaged the services of Steve Wilson of Orange Traffic Control to assist with the

preparation of this Management Plan.

2 SCOPE

This plan relates to the management of blasting activities and subsequent public road closures

within 500m of any such activities on the Invincible Colliery site.

It relates specifically to road closures associated with the Castlereagh Highway in the Cullen Bullen

area (ref Att. 1).

The plan would only be placed into effect during the following Hours:

Monday to Saturday 9.00 am to 5.00 pm (No Public Holidays)

3 PURPOSE

To ensure that during mining operations on site, Coalpac shall not undertake blasting within 500

metres of public roads unless suitable arrangements have been implemented to ensure road users

are protected from the risk of flyrock-related impact.

Page 5: CCooaallppaacc PPttyy LLttdd - Castlereagh Coal€¦ · 10 COMPETENCY AND TRAINING OF PERSONNEL ... Coalpac have engaged the services of Steve Wilson of Orange Traffic Control to

ROAD CLOSURE MANAGEMENT PLAN November 2010

Last printed 21/04/2011

Original Issue Date: November 2009

Version Number – 2 Revision Date – November 2010

Review Date 3 Years

Page | 5

CPC 26.2.18 Road Closure Management Plan

Proprietors of Invincible Colliery

and Cullen Valley Mine

CCooaallppaacc PPttyy LLttdd

4 ROLES AND RESPONSIBILITIES

4.1 Operator (& Operator’s Nominated Site Representative)

(a) Ensure the provision and adherence to the requirements of this Plan.

(b) Provide sufficient resources to allow the adequate implementation of this Plan.

4.2 General Manager

(a) Arrange for the appropriate training of mine personnel in this Plan.

(b) Ensure the provision and adherence to the requirements of this Plan.

4.3 Manager of Mining Engineering (Mine Manager)

(a) Ensure the adherence to the requirements of this Plan.

(b) Audit the Plan for compliance every three years.

4.4 Workforce/Contactors

(a) Undergo training in the operation of this system.

4.5 Traffic Controllers

(a) Undergo training in the operation of this system.

5 NOTIFICATION OF ROAD CLOSURES Custom Red on White Signage is to be displayed at both closure points displaying the following messages

Sign 1 – Rock Blasting Works Ahead – Dates

Sign 2 - Road Closures 10 - 15 minute delays

Signage shall be mounted so that the bottom of the sign is at least 1.5m above the ground 2 days in advance of works commencing. Residents in the area are also to be notified in advance of works by phone and placement of notices in local newspapers. All emergency services in the area are to be notified of Closure periods & times in advance of works.

Page 6: CCooaallppaacc PPttyy LLttdd - Castlereagh Coal€¦ · 10 COMPETENCY AND TRAINING OF PERSONNEL ... Coalpac have engaged the services of Steve Wilson of Orange Traffic Control to

ROAD CLOSURE MANAGEMENT PLAN November 2010

Last printed 21/04/2011

Original Issue Date: November 2009

Version Number – 2 Revision Date – November 2010

Review Date 3 Years

Page | 6

CPC 26.2.18 Road Closure Management Plan

Proprietors of Invincible Colliery

and Cullen Valley Mine

CCooaallppaacc PPttyy LLttdd

6 PERSONNEL

Traffic Controllers must be in appropriate PPE to carry out works – Hi Vis Vest, Steel Cap Boots, Hi Vis Clothing, Hard Hats etc. Traffic Controllers must hold their OH & S White Card, Traffic Controllers Blue Ticket, Traffic Controllers Yellow Ticket and a least one must hold the Traffic Controllers Red Ticket.

7 ROAD CLOSURES A distance of approximately 2.7km’s is to be closed to allow for work area. Closure Points are to be located at 200mtrs North of Invincible Colliery Mine Entry / Exit Way and 260mtrs South of Private Haul Road on the Castlereagh Highway. A 200mtr traffic storage area is to be setup to hold traffic at closure points and to minimise long queue lengths. Once closures are in place and Blasting Works commence permanent radio contact must be in place between traffic controllers and mine staff. Custom Signage is to be setup approximately 500mtrs from closures when blasting works are in progress and are to display the following messages

Sign 1 – Road Closure Ahead

Sign 2 – Reduce Speed

Page 7: CCooaallppaacc PPttyy LLttdd - Castlereagh Coal€¦ · 10 COMPETENCY AND TRAINING OF PERSONNEL ... Coalpac have engaged the services of Steve Wilson of Orange Traffic Control to

ROAD CLOSURE MANAGEMENT PLAN November 2010

Last printed 21/04/2011

Original Issue Date: November 2009

Version Number – 2 Revision Date – November 2010

Review Date 3 Years

Page | 7

CPC 26.2.18 Road Closure Management Plan

Proprietors of Invincible Colliery

and Cullen Valley Mine

CCooaallppaacc PPttyy LLttdd

8 MINE STAFF RESPONSIBILITIES A Clearance Procedure must be in place by Invincible Mine Staff. Mining company must have machinery capable of removing debris from roadway immediately after inspection at both closure points. All machinery used for debris removal must be road registered. If debris is found on roadway it must be quickly cleared and removed to allow traffic controllers to send traffic through work area. If debris found is small and able to be removed with hand tools mine staff are to be on standby with shovels etc to remove any small debris found on roadway. Mine staff must wear appropriate PPE when working on roadway e.g. Hi Vis Vest, Steel Cap Boots, Hard Hats etc. Mine staff is to be in constant radio contact with traffic controllers when blasting works commence and cease. Mine Staff must only carry out blasting when traffic controllers have closures set in place and motorists stopped at closure points.

9 TRAFFIC CONTROL RESPONSIBILITIES Traffic Controllers are to setup the site as per T.C.P. #47 (Att. 2) in accordance with Traffic Control at Worksites Manual 1742.3. Traffic Controllers are being used on the site as traffic needs to be stopped for short periods of time to allow for blasting works to be carried out. Traffic Controllers are required to stop motorists and inform them of works ahead and delays expected Traffic Control is then to travel from closure to closure to check roadway of debris. Once debris is cleared and removed traffic controllers are required to let all traffic waiting at closure points through. All signage is to be packed up at the end of each blasting operation involving road closure.

Page 8: CCooaallppaacc PPttyy LLttdd - Castlereagh Coal€¦ · 10 COMPETENCY AND TRAINING OF PERSONNEL ... Coalpac have engaged the services of Steve Wilson of Orange Traffic Control to

ROAD CLOSURE MANAGEMENT PLAN November 2010

Last printed 21/04/2011

Original Issue Date: November 2009

Version Number – 2 Revision Date – November 2010

Review Date 3 Years

Page | 8

CPC 26.2.18 Road Closure Management Plan

Proprietors of Invincible Colliery

and Cullen Valley Mine

CCooaallppaacc PPttyy LLttdd

Full access to Cullen Bullen / Lithgow on the Castlereagh Highway is to be established at the end of each blasting operation to allow for normal vehicle traffic flow.

10 COMPETENCY AND TRAINING OF PERSONNEL The Mine Manager will ensure that other persons required to perform duties as part of the operation’s explosives management plan are competent to carry out those duties and are given appropriate training in this plan as required.

11 ONGOING REVIEW This Road Closure Management Plan is subject to a continual audit and review as to it’s effect and control upon the operation, the conduct of and the safety and health of persons on and off site. Should the operation change substantially due to the introduction of technology or methodology that is, or will be known to have a direct affect upon the ability to comply with the requirements of this plan then a full review will be conducted and amendments made accordingly.

Page 9: CCooaallppaacc PPttyy LLttdd - Castlereagh Coal€¦ · 10 COMPETENCY AND TRAINING OF PERSONNEL ... Coalpac have engaged the services of Steve Wilson of Orange Traffic Control to

ROAD CLOSURE MANAGEMENT PLAN November 2010

9Last printed 21/04/2011

Original Issue Date: November 2009

Version Number – 1 Revision Date – November 2010

Review Date 3 Years

Page 9

CPC 26.2.18 Road Closure Management Plan

Proprietors of Invincible Colliery

and Cullen Valley Mine

CCooaallppaacc PPttyy LLttdd

APPENDIX 1 Location Map

Page 10: CCooaallppaacc PPttyy LLttdd - Castlereagh Coal€¦ · 10 COMPETENCY AND TRAINING OF PERSONNEL ... Coalpac have engaged the services of Steve Wilson of Orange Traffic Control to

ROAD CLOSURE MANAGEMENT PLAN November 2010

Last printed 21/04/2011

Original Issue Date: November 2009

Version Number – 2 Revision Date – November 2010

Review Date 3 Years

Page | 10

CPC 26.2.18 Road Closure Management Plan

Proprietors of Invincible Colliery

and Cullen Valley Mine

CCooaallppaacc PPttyy LLttdd

APPENDIX 2 TCP 47

Page 11: CCooaallppaacc PPttyy LLttdd - Castlereagh Coal€¦ · 10 COMPETENCY AND TRAINING OF PERSONNEL ... Coalpac have engaged the services of Steve Wilson of Orange Traffic Control to

ROAD CLOSURE MANAGEMENT PLAN November 2010

Last printed 21/04/2011

Original Issue Date: November 2009

Version Number – 2 Revision Date – November 2010

Review Date 3 Years

Page | 11

CPC 26.2.18 Road Closure Management Plan

Proprietors of Invincible Colliery

and Cullen Valley Mine

CCooaallppaacc PPttyy LLttdd

APPENDIX 3 RTA APPROVAL

Page 12: CCooaallppaacc PPttyy LLttdd - Castlereagh Coal€¦ · 10 COMPETENCY AND TRAINING OF PERSONNEL ... Coalpac have engaged the services of Steve Wilson of Orange Traffic Control to

ROAD CLOSURE MANAGEMENT PLAN November 2010

Last printed 21/04/2011

Original Issue Date: November 2009

Version Number –2 Revision Date – November 2010

Review Date 3 Years

Page | 12

CPC 26.2.18 Road Closure Management Plan

Proprietors of Invincible Colliery

and Cullen Valley Mine

CCooaallppaacc PPttyy LLttdd

Page 13: CCooaallppaacc PPttyy LLttdd - Castlereagh Coal€¦ · 10 COMPETENCY AND TRAINING OF PERSONNEL ... Coalpac have engaged the services of Steve Wilson of Orange Traffic Control to

ROAD CLOSURE MANAGEMENT PLAN November 2010

Last printed 21/04/2011

Original Issue Date: November 2009

Version Number –2 Revision Date – November 2010

Review Date 3 Years

Page | 13

CPC 26.2.18 Road Closure Management Plan

Proprietors of Invincible Colliery

and Cullen Valley Mine

CCooaallppaacc PPttyy LLttdd

APPENDIX 4 RTA EXTENSION APPROVAL

Page 14: CCooaallppaacc PPttyy LLttdd - Castlereagh Coal€¦ · 10 COMPETENCY AND TRAINING OF PERSONNEL ... Coalpac have engaged the services of Steve Wilson of Orange Traffic Control to

ROAD CLOSURE MANAGEMENT PLAN November 2010

Last printed 21/04/2011

Original Issue Date: November 2009

Version Number –2 Revision Date – November 2010

Review Date 3 Years

Page | 14

CPC 26.2.18 Road Closure Management Plan

Proprietors of Invincible Colliery

and Cullen Valley Mine

CCooaallppaacc PPttyy LLttdd

APPENDIX 5 RTA SPEED ZONE AUTHORISATION