ccm energy solar pv cawpca november 1, 2012 900 chapel street new haven, ct 06510 203-498-3000...

14
CCM ENERGY SOLAR PV CAWPCA November 1, 2012 900 Chapel Street New Haven, CT 06510 203-498-3000 [email protected]

Upload: mavis-walsh

Post on 28-Dec-2015

216 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: CCM ENERGY SOLAR PV CAWPCA November 1, 2012 900 Chapel Street New Haven, CT 06510 203-498-3000 amerola@ccm-ct.org

CCM ENERGY SOLAR PV

CAWPCA

November 1, 2012

900 Chapel Street

New Haven, CT 06510

203-498-3000

[email protected]

Page 2: CCM ENERGY SOLAR PV CAWPCA November 1, 2012 900 Chapel Street New Haven, CT 06510 203-498-3000 amerola@ccm-ct.org

CCM Energy Solar PV Program

PRESENTER:Andy Merola, CCM

2

AGENDA: • Connecticut's ZREC Program • Economic Drivers of Solar Projects • Savings • CCM Energy & Competitive Procurement • CCM Energy Results• Preparing Now for the Next ZREC Auction• Summary• Q&A

Page 3: CCM ENERGY SOLAR PV CAWPCA November 1, 2012 900 Chapel Street New Haven, CT 06510 203-498-3000 amerola@ccm-ct.org

CCM Energy Solar PV Program

3

Converting sunlight into electricity

via a photovoltaic cellA solid-state device composed of thin

layers of semiconductor materials that

produce an electric current when

exposed to lightSingle cells are grouped to form a moduleModules are grouped into an arrayPhotovoltaic cells produce direct

current (DC) electricity (batteries)An inverter changes the current from

DC to AC

What is Solar PV?

Page 4: CCM ENERGY SOLAR PV CAWPCA November 1, 2012 900 Chapel Street New Haven, CT 06510 203-498-3000 amerola@ccm-ct.org

CCM Energy Solar PV Program

Connecticut ZREC Program• As of 10/1/07: net metering for "Class I" renewable-energy

resources (includes solar PV with a capacity ≤ 2 megawatts)

• “Excess electricity” during any month is “banked”, i.e., carried over to the next month as a per kWh credit

• Customers receive full retail value of electricity generated on site

• For any “excess electricity” remaining in the “bank” at end of annualized period, utility pays its avoided-cost rate — much lower than retail value

• As a result, sizing your solar PV project appropriately is critical (and is one of the services provided by CCM Energy)

• 2011 - CT legislature decides to subsidize solar development• Requires electric utilities to enter into long-term contracts to purchase

Renewable Energy Credits from these projects

4

Page 5: CCM ENERGY SOLAR PV CAWPCA November 1, 2012 900 Chapel Street New Haven, CT 06510 203-498-3000 amerola@ccm-ct.org

CCM Energy Solar PV Program

Connecticut ZREC Program• April 4, 2012: PURA approves utility plan for purchase of Zero and Low

Emission Renewable Energy Credits (ZRECs and LRECs)

• $1.02 billion in ZRECs and LRECs• CL&P and UI enter into $8 million of annual 15-year contracts every year

for six years ($720 million ZREC contracts over next six years)

• Larger ZREC contracts awarded in annual utility auction

• Small ZREC contracts awarded at tariff rate in annual application process

• First solicitation for large and medium ZRECs held in June: 296 applications for the ZRECs; selection of 76 winners representing

24.92 mW of renewable generation

5

Page 6: CCM ENERGY SOLAR PV CAWPCA November 1, 2012 900 Chapel Street New Haven, CT 06510 203-498-3000 amerola@ccm-ct.org

CCM Energy Solar PV Program

Economic Drivers

• Solar PV projects require two separate and distinct procurements:• PPA between the solar development company and the community (the

contract that CCM Energy competitively procures)• Contract for sale of the ZRECS (the contract between the solar

development company and the utility)

• Proceeds from the sale of ZRECs are the economic driver behind solar PV projects, providing the lion’s share of the annual revenue

• As a result, success of these solar PV projects depends upon the ability to sell the ZRECS to the utility

6

Page 7: CCM ENERGY SOLAR PV CAWPCA November 1, 2012 900 Chapel Street New Haven, CT 06510 203-498-3000 amerola@ccm-ct.org

CCM Energy Solar PV Program

Savings• “Behind the meter” projects (the solar array produces power that reduces the

amount of electricity delivered to the meter)

• Savings on the supply (generation) and transmission and distribution (charged per kWh) of power

• Three or four solar projects might collectively yield 500 kW of solar capacity with the potential to generate somewhere between $11,000 per year and $35,000 per year in savings

• CCM Energy’s four projects in East Hartford awarded in the first round with a combined capacity of 591 kW are expected to generate $53,000 in first-year savings

• PPAs run for the lifetime of the solar equipment (typically 20 years) and could yield between $220,000 and $700,000 in total savings

• Savings are impacted by project size, rate class, bid price, and other variables

7

Page 8: CCM ENERGY SOLAR PV CAWPCA November 1, 2012 900 Chapel Street New Haven, CT 06510 203-498-3000 amerola@ccm-ct.org

CCM Energy Solar PV Program

CCM Energy’s Competitive Procurement

8

• Twenty-year commitment requires expert advice to negotiate reasonable terms

• CCM Energy services include:• Screen potential sites• Develop the procurement documents• Qualify bidders• Organize site visits• Evaluate bids• Negotiate power purchase agreements• Recommend the winning bidder and contract• Monitor the project from contract execution through the start of

construction (from start to finish this may be a 12 month effort)

Page 9: CCM ENERGY SOLAR PV CAWPCA November 1, 2012 900 Chapel Street New Haven, CT 06510 203-498-3000 amerola@ccm-ct.org

CCM Energy Solar PV Program

• Our process designed to maximize success in subsequent ZREC Auctions• Our Phase 1 program (this past spring) achieved the following results:• Competitive Process: 30 solar development companies replied, eventually leading

to six finalists and three selected firms.

• Favorable Terms and Conditions: We negotiated terms that allowed the buyer to substitute alternate sites for the arrays and or suspend service during the term to accommodate renovations and reconstruction activities.

• Competitive Prices: We procured a price that is below current utility prices and fixed and flat for 20 years.

• Compatible with utility ZREC process: Only 28% of the solar projects that submitted bids into the June 12 CL&P ZREC auction received ZREC awards. 75% of the CCM solar projects received ZREC awards. Based on the lessons learned we expect to improve on that hit ratio in upcoming procurements.

9

CCM Energy’s Results

Page 10: CCM ENERGY SOLAR PV CAWPCA November 1, 2012 900 Chapel Street New Haven, CT 06510 203-498-3000 amerola@ccm-ct.org

CCM Energy Solar PV Program

Preparing for Next ZREC Auction

10

• Identify rooftops that meet the following specifications:• Installed or replaced since 2002• With at least 10 years of roof warranty remaining• On a building that consumes 200,000 kWh or more per year• With a available roof area of at least 15,000 square feet

• Or identify acreage for a ground mounted array:• With available un-shaded space of 15,000 square feet or more

• Adjacent to building that consumes 200,000 kWh or more per year

• Wastewater plants could be ideal sites for solar arrays

• Send us the address and we will review initial suitability with you• If it makes sense to proceed:• Sign a Participation Agreement• Complete a more detailed survey questionnaire• Note: Re Smaller projects

Page 11: CCM ENERGY SOLAR PV CAWPCA November 1, 2012 900 Chapel Street New Haven, CT 06510 203-498-3000 amerola@ccm-ct.org

CCM Energy Solar PV Program

11

CCM Energy Solar Procurement Schedule: Fall 2012Step Activity Date

1 Nominate potential sites (we will assist you with this process) Oct 15

2 Provide documents and details:•Site questionnaire •One recent utility bill for each site•Recent Audited Financial Statement•Participation Agreement

Nov 1

3 Issue RFQ Mid Nov

4 Host Site Visits by Bidders (We will organize and attend) Early Dec

5 Accept Bids Late Dec

6 Negotiate with and select finalists Jan 15

7 If you’d like, coordinate & attend presentations by finalists Late Jan

8 Make final recommendation Feb 1

9 Execute Power Purchase Agreement Mar 1

10 Monitor performance starting w ZREC Auction in April Ongoing

Page 12: CCM ENERGY SOLAR PV CAWPCA November 1, 2012 900 Chapel Street New Haven, CT 06510 203-498-3000 amerola@ccm-ct.org

CCM Energy Solar PV Program

Summary

12

Why CCM Energy?•Large group of program participants ensures continuing interest among multiple solar developers

•Multi-supplier/competitively bid pricing yields lower per kWh cost

•Multi-supplier/competitively negotiated power purchase agreements yields beneficial PPA terms and conditions

•Expert, reliable advice and assistance throughout the process including negotiating with your current supplier if required by your current supply agreement (already allowed by most CCM procured contracts)

•Savings and reduced risk for participants

•No capital investment by the community

Page 13: CCM ENERGY SOLAR PV CAWPCA November 1, 2012 900 Chapel Street New Haven, CT 06510 203-498-3000 amerola@ccm-ct.org

CCM Energy Solar PV Program

13

Thank you for listening.

I would be pleased to answer any additional questions.

Page 14: CCM ENERGY SOLAR PV CAWPCA November 1, 2012 900 Chapel Street New Haven, CT 06510 203-498-3000 amerola@ccm-ct.org