- - REBUILDING OF EXISTING BRICO DEPOT HALLS INTO CASTORAMA SHOPPING CENTERS IN STARGARD SZCZECIŃSKI AND POZNAŃ www.primeconstruction.pl CASTORAMA POLAND SHOPPING CENTER INVESTOR: CASTORAMA POLSKA SP . Z O.O. FORMA: GENERAL CONTRACTOR VALUE: COMPLETION DATE: February 2012 - November 2012 (for both localizations) 10-20 mln >20 mln <10 mln As part of the contract two Brico Depot home improvement and construction centers were converted into Castorama DIY shopping centers, together with repainting the buildings' facades, replacing some metalwork as well as installing new metalwork and woodwork. In compliance with the Castorama brand standards, rebranding was carried out, which comprised remodeling the buildings' exterior. In Stargard Szczeciński, a re-zone separating wall was built, whose purpose is to separate the sales floor from the storeroom. In addition, the office building was rebuilt and refurbished. Steel constructions for supporting new advertisements were erected as part of both investments. Additions also include: a ventilation system based on the Swegon air handling unit, SAP re alarm signaling system, floor renovation and installation of complete lighting and new skylights.

Upload: others

Post on 20-Jun-2022

8 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: CASTORAMA POLAND - primeconstruction.pl

-

-

REBUILDING OF EXISTING BRICO DEPOT HALLS INTO CASTORAMA SHOPPING CENTERS IN STARGARD SZCZECIŃSKI AND POZNAŃ

www.primeconstruction.pl

CASTORAMA POLANDSHOPPING CENTER

INVESTOR: CASTORAMA POLSKA SP. Z O.O. FORMA: GENERAL CONTRACTORVALUE: COMPLETION DATE: February 2012 - November 2012 (for both localizations)

10-20 mln >20 mln<10 mln

As part of the contract two Brico Depot home improvement and construction centers were converted into Castorama DIY shopping centers, together with repainting the buildings' facades, replacing some metalwork as well as installing new metalwork and woodwork. In compliance with the Castorama brand standards, rebranding was carried out, which comprised remodeling the buildings' exterior. In Stargard Szczeciński, a fire-zone separating wall was built, whose purpose is to separate the sales floor from the storeroom. In addition, the office building was rebuilt and refurbished. Steel constructions for supporting new advertisements were erected as part of both investments. Additions also include: a ventilation system based on the Swegon air handling unit, SAP fire alarm signaling system, floor renovation and installation of complete lighting and new skylights.