  • 7/25/2019 CASE1.2 (Star TCC)

    1/1

    D14-RP - P

    OC1

    220kV BUS SECTION

    ABB

    REF615

    CT Ratio 3000:1

    IEC - Normal Inverse

    Pickup = 1.2 (0.3 - 5 xCT Sec)

    Time Dial = 0.49

    3x = 3.09 s, 5x = 2.1 s, 8x = 1.62 s

    D05-RP - P

    OC1

    120MVA T/F

    ABB

    REF615

    CT Ratio 600:1

    IEC - Normal Inverse

    Pickup = 0.8 (0.3 - 5 xCT Sec)

    Time Dial = 0.31

    3x = 1.95 s, 5x = 1.33 s, 8x = 1.02 s

    Inst = 6 (0.5 - 35 xCT Sec)

    Time Delay = 0.1 s

    10K.5 1 10 100 1K3 5 30 50 300 500 3K 5K

    Amps X 100 BB-1A (Nom. kV=220, Plot Ref. kV=220)

    10K.5 1 10 100 1K3 5 30 50 300 500 3K 5K

    Amps X 100 BB-1A (Nom. kV=220, Plot Ref. kV=220)

    1K

    .01

    .1

    1

    10

    100

    .03

    .05

    .3

    .5

    3

    5

    30

    50

    300

    500

    Seconds

    1K

    .01

    .1

    1

    10

    100

    .03

    .05

    .3

    .5

    3

    5

    30

    50

    300

    500

    Seconds

    ETAP Star 12.5.0C

    N7733- ZAKHER GRID CASE1.2

    Project: 220/33/11kV Zakher Grid

    Location: Zakher Area of Al Ain

    Contract: N7733

    Engineer: JM

    Filename: C:\ETAP 1250\N7733\N7733.OTI

    Date: 18-01-2016

    SN: LARSENTRN2

    Rev: Base

    Fault: Phase

    Circuit: 120MVA T/F, 220KV B/S