Evolution of Agile scrum software development methodology for software industryBy: Abdullah Raza LakhanB08MEIT21
Supervisor Prof. Dr.M.Akram Shaikh Co-Supervisor Assistant Professor Naveed Jaffery
![Page 2: Case Study on agile scrum methodology on shopping cart](https://reader033.vdocuments.site/reader033/viewer/2022061220/54ba88fb4a795961088b45e3/html5/thumbnails/2.jpg)
AGENDA What is Agile Scrum? Life Cycle of Agile Scrum Characteristics of scrum Component of Scrum
i. Roles of Scrum Problem statement Goal Case Study Results Conclusion References
![Page 3: Case Study on agile scrum methodology on shopping cart](https://reader033.vdocuments.site/reader033/viewer/2022061220/54ba88fb4a795961088b45e3/html5/thumbnails/3.jpg)
INTRO OF AGILE SCRUM Scrum is a development methodology commonly used to oversee projects. Below figure represent agile example.
![Page 4: Case Study on agile scrum methodology on shopping cart](https://reader033.vdocuments.site/reader033/viewer/2022061220/54ba88fb4a795961088b45e3/html5/thumbnails/4.jpg)
LIFE CYCLE OF SCRUM
![Page 5: Case Study on agile scrum methodology on shopping cart](https://reader033.vdocuments.site/reader033/viewer/2022061220/54ba88fb4a795961088b45e3/html5/thumbnails/5.jpg)
CHARACTERISTICSSelf-organizing teamsProduct progresses in a series of
two- to- four-week “sprints”Requirements are captured as items
in a list of “product backlog”Uses generative rules to create an
agile environment for delivering projects
![Page 6: Case Study on agile scrum methodology on shopping cart](https://reader033.vdocuments.site/reader033/viewer/2022061220/54ba88fb4a795961088b45e3/html5/thumbnails/6.jpg)
COMPONENT OF SCRUM ROLES Product Owner Scrum master Team
The Product Owner (typically someone from a Marketing role or a key user in internal development) prioritizes the Product Backlog.
The Scrum Master is responsible for making sure a Scrum team lives by the values and practices of Scrum.
Scrum teams do not include any of the Traditional software engineering roles such as Programmer, Designer, Tester, or Architect. Everyone on the project works together to complete the set of work, they have collectively committed to complete within a sprint.
![Page 7: Case Study on agile scrum methodology on shopping cart](https://reader033.vdocuments.site/reader033/viewer/2022061220/54ba88fb4a795961088b45e3/html5/thumbnails/7.jpg)
PROBLEM STATEMENT In traditional methodology Some vital changes are
being made in project and feel difficulty, and during an application in the testing Stage, it is very difficult to go back and do some eminent changes. One may Go to come across large projects with expensive cost.
Customer not involvement during any phase.
Change mind for changing requirement in srs is so difficult
After project execution Customer satisfaction is less than expected.
Tradition methodology Continuous planning for project is the biggest problem.
![Page 8: Case Study on agile scrum methodology on shopping cart](https://reader033.vdocuments.site/reader033/viewer/2022061220/54ba88fb4a795961088b45e3/html5/thumbnails/8.jpg)
GOAL All problems occurring during traditional
methodology phases are fixed using Case study on (shopping cart) project with agile scrum methodology.
![Page 9: Case Study on agile scrum methodology on shopping cart](https://reader033.vdocuments.site/reader033/viewer/2022061220/54ba88fb4a795961088b45e3/html5/thumbnails/9.jpg)
LIFE CYCLE OF CASE STUDY CONTAINS FOLLOWING STEPS Product Backlog. Sprint Planning Meeting. Sprint Backlog. Daily Scrum. Results. Sprint Review Meeting. Release Burn chart.
![Page 10: Case Study on agile scrum methodology on shopping cart](https://reader033.vdocuments.site/reader033/viewer/2022061220/54ba88fb4a795961088b45e3/html5/thumbnails/10.jpg)
PRODUCT BACKLOG The Product Backlog is the master list of all
functionality desired in the product. When using Scrum, it is not necessary to start a project with a lengthy, upfront effort to document all requirements.
![Page 11: Case Study on agile scrum methodology on shopping cart](https://reader033.vdocuments.site/reader033/viewer/2022061220/54ba88fb4a795961088b45e3/html5/thumbnails/11.jpg)
SPRINT PLANNING MEETING The Sprint Planning Meeting is attended by the
Product Owner, the entire Scrum Team. During the sprint planning meeting the Product
Owner describes the highest priority features to the team.
The Product Owner doesn't have to describe every item being tracked on the Product Backlog.
![Page 12: Case Study on agile scrum methodology on shopping cart](https://reader033.vdocuments.site/reader033/viewer/2022061220/54ba88fb4a795961088b45e3/html5/thumbnails/12.jpg)
SPRINT BACKLOG OF FIRST ITERATION
![Page 13: Case Study on agile scrum methodology on shopping cart](https://reader033.vdocuments.site/reader033/viewer/2022061220/54ba88fb4a795961088b45e3/html5/thumbnails/13.jpg)
LAYOUT OF WEBSITE
![Page 14: Case Study on agile scrum methodology on shopping cart](https://reader033.vdocuments.site/reader033/viewer/2022061220/54ba88fb4a795961088b45e3/html5/thumbnails/14.jpg)
DAILY SCRUM Team members involve in this meeting on
the following seniors. Time: • 20-minutes
Three questions:• What did you do yesterday• What will you do today?• What obstacles are in your way?
![Page 15: Case Study on agile scrum methodology on shopping cart](https://reader033.vdocuments.site/reader033/viewer/2022061220/54ba88fb4a795961088b45e3/html5/thumbnails/15.jpg)
MENUS ON LAYOUT
![Page 16: Case Study on agile scrum methodology on shopping cart](https://reader033.vdocuments.site/reader033/viewer/2022061220/54ba88fb4a795961088b45e3/html5/thumbnails/16.jpg)
LINKS ON MENUS LAYOUT
![Page 17: Case Study on agile scrum methodology on shopping cart](https://reader033.vdocuments.site/reader033/viewer/2022061220/54ba88fb4a795961088b45e3/html5/thumbnails/17.jpg)
DISPLAY PRODUCTS ON MAIN PAGE
![Page 18: Case Study on agile scrum methodology on shopping cart](https://reader033.vdocuments.site/reader033/viewer/2022061220/54ba88fb4a795961088b45e3/html5/thumbnails/18.jpg)
CUSTOMER ACCOUNT FORM
![Page 19: Case Study on agile scrum methodology on shopping cart](https://reader033.vdocuments.site/reader033/viewer/2022061220/54ba88fb4a795961088b45e3/html5/thumbnails/19.jpg)
TEST CASE ITERATION ONE
![Page 20: Case Study on agile scrum methodology on shopping cart](https://reader033.vdocuments.site/reader033/viewer/2022061220/54ba88fb4a795961088b45e3/html5/thumbnails/20.jpg)
RESULTS OF FIRST TWO WEEKS ITERATION
![Page 21: Case Study on agile scrum methodology on shopping cart](https://reader033.vdocuments.site/reader033/viewer/2022061220/54ba88fb4a795961088b45e3/html5/thumbnails/21.jpg)
SPRINT REVIEW MEETING
Team presents what it accomplished during the sprint
Typically takes the form of a demo of new features or underlying architecture
Informal 2-hour prep time rule
Participants Customers Management Product Owner Other engineers
![Page 22: Case Study on agile scrum methodology on shopping cart](https://reader033.vdocuments.site/reader033/viewer/2022061220/54ba88fb4a795961088b45e3/html5/thumbnails/22.jpg)
SPRINT BACKLOG OF SECOND ITERATION
![Page 23: Case Study on agile scrum methodology on shopping cart](https://reader033.vdocuments.site/reader033/viewer/2022061220/54ba88fb4a795961088b45e3/html5/thumbnails/23.jpg)
CART IMPLEMENT
![Page 24: Case Study on agile scrum methodology on shopping cart](https://reader033.vdocuments.site/reader033/viewer/2022061220/54ba88fb4a795961088b45e3/html5/thumbnails/24.jpg)
CUSTOMER ACCOUNT FORM
![Page 25: Case Study on agile scrum methodology on shopping cart](https://reader033.vdocuments.site/reader033/viewer/2022061220/54ba88fb4a795961088b45e3/html5/thumbnails/25.jpg)
CUSTOMER FILLED THE FORM
![Page 26: Case Study on agile scrum methodology on shopping cart](https://reader033.vdocuments.site/reader033/viewer/2022061220/54ba88fb4a795961088b45e3/html5/thumbnails/26.jpg)
CUSTOMER LOGIN
![Page 27: Case Study on agile scrum methodology on shopping cart](https://reader033.vdocuments.site/reader033/viewer/2022061220/54ba88fb4a795961088b45e3/html5/thumbnails/27.jpg)
TEST CASE 2
![Page 28: Case Study on agile scrum methodology on shopping cart](https://reader033.vdocuments.site/reader033/viewer/2022061220/54ba88fb4a795961088b45e3/html5/thumbnails/28.jpg)
RESULTS OF ITERATION TWO
![Page 29: Case Study on agile scrum methodology on shopping cart](https://reader033.vdocuments.site/reader033/viewer/2022061220/54ba88fb4a795961088b45e3/html5/thumbnails/29.jpg)
THIRD ITERATION
![Page 30: Case Study on agile scrum methodology on shopping cart](https://reader033.vdocuments.site/reader033/viewer/2022061220/54ba88fb4a795961088b45e3/html5/thumbnails/30.jpg)
ORDER PLACEMENT
![Page 31: Case Study on agile scrum methodology on shopping cart](https://reader033.vdocuments.site/reader033/viewer/2022061220/54ba88fb4a795961088b45e3/html5/thumbnails/31.jpg)
AFTER ORDER PLACEMENT
![Page 32: Case Study on agile scrum methodology on shopping cart](https://reader033.vdocuments.site/reader033/viewer/2022061220/54ba88fb4a795961088b45e3/html5/thumbnails/32.jpg)
FINAL RECEIPT IN PDF
![Page 33: Case Study on agile scrum methodology on shopping cart](https://reader033.vdocuments.site/reader033/viewer/2022061220/54ba88fb4a795961088b45e3/html5/thumbnails/33.jpg)
TEST CASE 3
![Page 34: Case Study on agile scrum methodology on shopping cart](https://reader033.vdocuments.site/reader033/viewer/2022061220/54ba88fb4a795961088b45e3/html5/thumbnails/34.jpg)
RESULTS OF ITERATION THREE
![Page 35: Case Study on agile scrum methodology on shopping cart](https://reader033.vdocuments.site/reader033/viewer/2022061220/54ba88fb4a795961088b45e3/html5/thumbnails/35.jpg)
FOUR ITERATION OF SPRINT BACKLOG
![Page 36: Case Study on agile scrum methodology on shopping cart](https://reader033.vdocuments.site/reader033/viewer/2022061220/54ba88fb4a795961088b45e3/html5/thumbnails/36.jpg)
ADMIN LOGIN FORM
![Page 37: Case Study on agile scrum methodology on shopping cart](https://reader033.vdocuments.site/reader033/viewer/2022061220/54ba88fb4a795961088b45e3/html5/thumbnails/37.jpg)
ADMIN PANEL WITH MENUS
![Page 38: Case Study on agile scrum methodology on shopping cart](https://reader033.vdocuments.site/reader033/viewer/2022061220/54ba88fb4a795961088b45e3/html5/thumbnails/38.jpg)
PAYMENT PANEL
![Page 39: Case Study on agile scrum methodology on shopping cart](https://reader033.vdocuments.site/reader033/viewer/2022061220/54ba88fb4a795961088b45e3/html5/thumbnails/39.jpg)
TEST CASE 4
![Page 40: Case Study on agile scrum methodology on shopping cart](https://reader033.vdocuments.site/reader033/viewer/2022061220/54ba88fb4a795961088b45e3/html5/thumbnails/40.jpg)
RESULTS OF FOUR ITERATION
![Page 41: Case Study on agile scrum methodology on shopping cart](https://reader033.vdocuments.site/reader033/viewer/2022061220/54ba88fb4a795961088b45e3/html5/thumbnails/41.jpg)
CUSTOMER SATISFACTION GRAPH
![Page 42: Case Study on agile scrum methodology on shopping cart](https://reader033.vdocuments.site/reader033/viewer/2022061220/54ba88fb4a795961088b45e3/html5/thumbnails/42.jpg)
RELEASE BURNDOWN On a Scrum project, the team tracks its progress against
a release plan by updating a release burn down chart at the end of each sprint. The horizontal axis of the release burn down chart shows the sprints months; the vertical axis shows the amount of work complete.
![Page 43: Case Study on agile scrum methodology on shopping cart](https://reader033.vdocuments.site/reader033/viewer/2022061220/54ba88fb4a795961088b45e3/html5/thumbnails/43.jpg)
TOOLS AND LANGUAGES Presta shop (tool) Php6.0(Language) Mysql5.0 Apache 2.3 SqlYog Css HTML5.0 Javascript
![Page 44: Case Study on agile scrum methodology on shopping cart](https://reader033.vdocuments.site/reader033/viewer/2022061220/54ba88fb4a795961088b45e3/html5/thumbnails/44.jpg)
CONCLUSION Sprint to Sprint check the progress of web project Customer involve at the end of every sprint Requirements can recharge easily. Customer can change his/her mind at the end of
sprint Planning is proper sprint to sprint and get idea for
next iteration. Proper planning in each sprint get idea for good
planning for next iteration. Functionality is improve on each stage. Short term sprint is better than long term duration. Changing requirements is very easy at the end of
sprint.
![Page 45: Case Study on agile scrum methodology on shopping cart](https://reader033.vdocuments.site/reader033/viewer/2022061220/54ba88fb4a795961088b45e3/html5/thumbnails/45.jpg)
REFERENCES [1] A Case Study on Agile Estimating and Planning using Scrum V. Manic (research paper) 2011. [2] Stephen Schacht Classical and Object-Oriented Software Engineering. 6/e, WCB McGraw Hill, New York, (white paper)2010. [3] Schatz B., Abdul shafi I. Primavera Gets Agile: A Successful Transition to Agile Development (white paper)2011. [4] Gerber, Aurona; Van der Merwe, Alta; Alberts, Ronell, Implications of Rapid Development Methodologies, CSITEd , Mauritius (research paper)2011. [5] Yatco, Mei Agile Joint Application/development. University of Missouri-St. Louis (research paper)2011. [6] Schell Jesse "Chapter Seven: The Game Improves Through scrum Iteration". The Art of Game .Design. Elsevier. pp. 79–95. ISBN 978-0-12- 369496-6 2010. [7] Carver J. Shull F. A checklist for integrating student empirical studies
with research and teaching goals // Empirical Software Engineering, (research paper)
2010.