case study - feigin electric

13
General Manager Andrew Dimitriev Prepared by: Project ID: A-012345 Dominos Pizza Singapore CASE STUDY 176 Joo Chiat Road, #02-02 Singapore 427447 E-mail: [email protected] Web : www.feiginelectric.com

Upload: others

Post on 26-Oct-2021

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: CASE STUDY - Feigin Electric

General ManagerAndrew DimitrievPrepared by:

Project ID: A-012345Dominos Pizza Singapore

CASE STUDY

176 Joo Chiat Road, #02-02Singapore 427447E-mail: [email protected] : www.feiginelectric.com

Page 2: CASE STUDY - Feigin Electric

2Web design & development by Codepace

Electronic controller regulates the direction of the current in coil of each transformer (one per phase)to regulate and balance the network parameter to sustain within it highest performance whilst minimize power loss in the network

WORKING PRINCIPLE

Smart Optimizer ECOD is an electric power saving device which• Control the voltage and current in the optimum range• Filtering harmonic and increase power factor• Improve quality of electrical power supply in overall.

METHOD

To achieve electrical energy saving minimum -8%

OBJECTIVE

Electric energy-saving device for Domino’s Pizza Singapore

Case Study & InstallationDOMINOS PIZZA SINGAPORE

1. From 25 of April at store Domino’s Pizza Killiney Road 71 Singapore have been installed device Smart-Optimizer ECOD for achieve reducing of electricity consumption2. From 25 of May at store Domino’s Pizza Tajong Katong Road Singapore have been installed device Smart-Optimizer ECOD for achieve reducing of electricity consumption3. From 26 of May at store Domino’s Pizza Tampines Ave 4 Singapore have been installed device Smart-Optimizer ECOD for achieve reducing of electricity consumptionAfter comparison bills of months with using and without ECOD, we can determine differences (reducing) of electricity consumption on close to 10%. Also, we can determine a reducing KVAR(reactive power) and KW (Demand).

TEST CONCLUSION

Energy saving is a persistent strategy to enhance competitiveness and environmental conservation.

PROBLEM STATEMENT

Page 3: CASE STUDY - Feigin Electric

Test ResultsDOMINOS PIZZA SINGAPORE

3Web design & development by Codepace

Page 4: CASE STUDY - Feigin Electric

4Web design & development by Codepace

INVESTMENT ANALYSIS

Total consumption per month – average 14,000.00 kW/h• Average bill per month - 2,800.00 SGD• Required investment per store – 4,490.00 SGD• Minimum saving 8% = 224.00 SGD (per month)• Payback period of investment around 16 months becausereal energy saving effect is close 10%• Warranty period of (120) months from the date of sale• Price include audit, shipping and installation

Page 5: CASE STUDY - Feigin Electric

5Web design & development by Codepace

1. KWH - A kilowatt hour (kWh) is a measure of how much energy you’re using. 2. KW - Reflects the rate of electricity usage. Peak demand3. KVAR – A Reactive power. Domino’s Pizza don’t pay for reactive power but higher KVAR caused higher losses and higher KVAR mean higher current of load as a results affected on lifespan of electrical equipment because heating are calculated according to

the Joule –Lenz law* the power of heating generated by an electrical current I: W = R*I2, where the conductor resistance is R = (1/g) *(L/A). The electric current value could be calculated I = V / R

EXPLANATION WHAT IS KWH, KVAR, KW DEMAND

Page 6: CASE STUDY - Feigin Electric

BUKIT TIMAH 8 Chun Tin Road

Singapore 599595

6Web design & development by Codepace

ANG MO KIO AVE 10 Blk 574 Ang Mo Kio Ave 10

ANG MO KIO #01-1827, Singapore 560574

Page 7: CASE STUDY - Feigin Electric

HILLVIEW 1, Hillview Rise

#01-03, Hillview Community Club, Singapore 667970

7Web design & development by Codepace

GREENRIDGE Blk 524A Jelapang Road

#01-02 Greenridge Shopping Centre, Singapore 671524

Page 8: CASE STUDY - Feigin Electric

JOO KOON #03-23/24 Fairprice Hub

Jurong West 1 Joo Koon Circle, Singapore 629117

8Web design & development by Codepace

YISHUN 1 Yishun Avenue 9

#01-03 Nee Soon East CC Singapore 768893

Page 9: CASE STUDY - Feigin Electric

JURONG 6 Jurong West Ave 1

Jurong West #01-03 Jurong Green CC Singapore 649520

9Web design & development by Codepace

JURONG EAST Blk 202 Jurong East Street

21 #01-115 Singapore 600202

Page 10: CASE STUDY - Feigin Electric

TOA PAYOH Blk 47 Toa Payoh Lorong 6

#01-148 Singapore 310047

10Web design & development by Codepace

KEBUN BARU 216 Ang Mo Kio Avenue 4,

#01-04 Kebun Baru Community Club, Singapore 569897

Page 11: CASE STUDY - Feigin Electric

KLY 71A Killiney Road

(Killiney) Singapore 239527

11Web design & development by Codepace

WOODLANDS RISE 01-14 Block 785E

Woodland Rise Singapore 735785

Page 12: CASE STUDY - Feigin Electric

TPT Blk 802 Tampines Ave 4

(Tampines Two) #01-23 Singapore 52080

12Web design & development by Codepace

SEM 369 Sembawang Road

(Sembawang) #01-06 Singapore 758382

Page 13: CASE STUDY - Feigin Electric

13Web design & development by Codepace

TKR 301 Tanjong Katong Road

(Tanjong Katong) Singapore 437084