Adapting and repurposing older buildings for new uses with advancing energy and environmental concerns is challenging and requires specific expertise. Bruner/Cott & Associates presents a methodology for the analysis of building envelope improvements in existing buildings focusing on two buildings in Eastern Massachusetts. This methodology focuses on each building’s unique material characteristics and an approach that not only addresses the concerns of thermal resistance, condensation and freeze/thaw cycles, but also the architectural implications of energy conservation measures. The team’s extensive experience rehabilitating historic buildings and as building science practitioners enables them to evaluate methods and make decisions related to the building envelope while providing the best architectural solutions. This presentation will highlight the approach, the decision making process and the results of various completed and on-the- boards projects including Harvard Blackstone Building and the Dartmouth Class of 1953 Dining. The following topics in particular will be addressed: existing envelope construction and masonry characteristics, weather exposure, freeze/thaw events, saturation and density tests, building program and MEP changes that affect air pressure and RH factors, vapor and moisture permeance, compatibility with architectural enclosures, and recommended monitoring systems.

TRANSCRIPT

Page 1: Case Study: Challenges of Insulating Existing Masonry Buildings in the Commonwealth

Challenges of Insulating Existing Masonry Buildings:An Architectural Approach Based on Technical Knowledge

presented by

Laurie Soave, AIA, LEED APAssociate, Project ArchitectBruner/Cott & Associates, Architects

Page 2: Case Study: Challenges of Insulating Existing Masonry Buildings in the Commonwealth

Presentation Goals• Understanding the Decision Making Process

– envelope construction and characteristics – methodologies of investigation– environments interior / exterior– existing materials properties and testing– owner involvement– third party experts– monitoring

• Audience experience input

Page 3: Case Study: Challenges of Insulating Existing Masonry Buildings in the Commonwealth

Representative Projects

Harvard Blackstone Office RenovationMIT Building E60

Page 4: Case Study: Challenges of Insulating Existing Masonry Buildings in the Commonwealth

Methodology• Step 1: Document Existing Building Statistics

1A: Weather1- Locate building site and determine exposures2- Map exposure of driving rain 3- Note building climate zone4- Note number of freeze/thaw excursions per season (Find this

information on website: http://www.energy-design-tools.aud.ucla.edu/ ) 1B: Interior Environment

1- Document existing building program use (i.e. dining/ offices/performance space, lab, art gallery, etc.)

2- Document existing RH factor based on program use and MEP systems

Page 5: Case Study: Challenges of Insulating Existing Masonry Buildings in the Commonwealth

Methodology• Step 1: Document Existing Building Statistics

1C: Pressure1- Document the existing air pressure on the building (negative orpositive) based on the building use and mechanical systems)

1D: Construction1- Document existing envelope construction:

– Wall Construction and R-Value– Roof Construction and R-Value– Dew point locations– Document % fenestration and U-Value

Page 6: Case Study: Challenges of Insulating Existing Masonry Buildings in the Commonwealth

1D: Construction (cont.)

2- Document roof construction, R-Value and dew point

3- Document conditions of vulnerable areas with potential of exposure to longer wetting periods:(i.e. beam ends, lintels, brick at window openings, spandrel panels below sills, etc.)

Methodology

Page 7: Case Study: Challenges of Insulating Existing Masonry Buildings in the Commonwealth

1E: Testing of Existing Materials Properties (approach Building Science Consultant)

1- Approach Building Science consultant- Permeance testing of entire wall layering materials ( i.e. paint,

mortar, terracotta, bricks: face brick, core brick and interior brick)- Scrit test: Measures the degree of saturation in an existing masonry- Dry Density test - Water uptake tests- Thermograph documentation (infrared imaging) - Simulation Software

Methodology

Page 8: Case Study: Challenges of Insulating Existing Masonry Buildings in the Commonwealth

Methodology• Step 2: Document Proposed Envelope Improvement

Goals

2A: Goals - Increase thermal resistance of wall assembly- Decrease air leakage of envelope assembly- Contain risk of freeze/thaw cycles- Reduce moisture load on brick façade

Page 9: Case Study: Challenges of Insulating Existing Masonry Buildings in the Commonwealth

2B: Analysis of Improvements 1- Proposed envelope R-Value (in conjunction with MEP systems)

2- Proposed insulation materials- R-Value/in- Vapor & moisture permeance- Fire Rating- Installation sequence- Architectural enclosure options/implications - Flashing compatibility at openings

3- Calculate dew point location4- Air barriers5- Proposed condensation controls6- Implications for building systems installations7- Reversibility8- Toxicity9- Disposal (recycling) options

Methodology• Step 2: Document Proposed Envelope Improvement Goals (cont.)

Page 10: Case Study: Challenges of Insulating Existing Masonry Buildings in the Commonwealth

1- Thermograph testing during and post construction2- Remote weather station and site monitoring: temperatures at wall face, wall core, ambient; RH levels.

Methodology• Step 3: Performance Monitoring – Post construction

(owner buy-in and consultant contracts)

Page 11: Case Study: Challenges of Insulating Existing Masonry Buildings in the Commonwealth

Representative Projects

• Harvard Blackstone Office Renovation Originally Constructed 1890’s Masonry bearing walls with timber beam & floor structure Brick masonry 3 wythes Completed renovation for new offices

Page 12: Case Study: Challenges of Insulating Existing Masonry Buildings in the Commonwealth

Harvard University Operational ServicesBlackstone Office Renovation, Cambridge, MA

Case Study – Vapor Migration and Exterior Wall Insulation• Design Goals

– Successfully manage the exterior envelope without creating damage due to increased and prolonged moisture content in the existing brick and mortar

– Target R-values for the overall envelope

• Concerns– Interior insulation that will not impede vapor passage – Continuous air barrier w/minimal cold bridging– Moisture management at brick – Moisture management at window openings– Comparable installations with empirical assessment and data

• Strategies– Proper repointing and masonry repairs and sealing of roof wall joints– Detail an interior insulation approach with continuous thermal break– Advocate quantitative approaches including monitoring of insulated and non-

insulated walls at various exposures– Provide operable windows

Page 13: Case Study: Challenges of Insulating Existing Masonry Buildings in the Commonwealth

Existing Conditions Review• Visual Review

– Rust Jacked Lintels– Cracks – Spalling

• Test interior Finish – Vapor barrier

Load bearing masonry walls

Page 14: Case Study: Challenges of Insulating Existing Masonry Buildings in the Commonwealth

Analysis of existing interior paint permeance

Page 15: Case Study: Challenges of Insulating Existing Masonry Buildings in the Commonwealth

Process

Architectural Considerations

Page 16: Case Study: Challenges of Insulating Existing Masonry Buildings in the Commonwealth

Exterior Wall - Alternate 1Faced Batt insulation

ProsProvides interior insulationAllows air spaceNo special installation

ConsRequires ventilation gaps R-Value far below goalNo continuous air barrierLimited run space for systems

Not approved

Process - Options

Page 17: Case Study: Challenges of Insulating Existing Masonry Buildings in the Commonwealth

Process - OptionsExterior Wall - Alternate 2 Rigid Insulation

ProsMeets the R12 min. goalSemi Permeable insulationCreates continuous thermal breakAllows run space for systems

ConsConstructability is difficult / tediousNo continuous air barrierCareful treatment at penetrations

Page 18: Case Study: Challenges of Insulating Existing Masonry Buildings in the Commonwealth

Selected option -Icynene Insulation

Exterior Wall - Alternate 3Icynene SPF insulation

ProsMeets the R12 min. goalVapor-permeable insulationCreates continuous thermal breakAllows run space for systemsDependable air barrierConstructability

ConsSpecialized tradeCareful treatment at penetrationsRequires thicker wall section

Process - Options

Page 19: Case Study: Challenges of Insulating Existing Masonry Buildings in the Commonwealth

Process

existing interior VB paint

sandblast 75% paint3.5” (SPF open cell)

Page 20: Case Study: Challenges of Insulating Existing Masonry Buildings in the Commonwealth

Results

Page 21: Case Study: Challenges of Insulating Existing Masonry Buildings in the Commonwealth

Post Results

Recent site visit to begin investigations into vapor/moisture in wall and insulation material performance

Efflourescent noted at interior non-insulated stairwells walls.

Saturation at north wall bricks

Page 22: Case Study: Challenges of Insulating Existing Masonry Buildings in the Commonwealth

Representative Projects

• Arthur D. Little Building; MIT Building E60 Originally Constructed 1917 Masonry Bearing Wall with concrete floor structure Brick masonry with interior wythe of clay tile Under renovation for new office and conference space

Page 23: Case Study: Challenges of Insulating Existing Masonry Buildings in the Commonwealth

Existing Conditions Review

• Visual Review– Rust Jacked Lintels– Cracks – Spalling

• Tested Brick– Cold Water Absorption, ASTM C67– Boiling Water Absorption, ASTM C67– Capillary Uptake, ASTM C67– Dry Density, ASTM C642– Critical saturation (Scrit) Frost

Dilatometry• Tested Mortar

– Chemical Analysis– Aggregate Composition– Type Identification

• Test interior Finish – Vapor barrier?

Page 24: Case Study: Challenges of Insulating Existing Masonry Buildings in the Commonwealth

Develop Proposal

• Establish Design Conditions• Establish Performance Criteria

with HVAC• Design Insulating System

– Air Barrier– Vapor Barrier– Insulating Layer– Finish

• WUFI Analysis

Denotes line of temperature across existing uninsulated masonry

Page 25: Case Study: Challenges of Insulating Existing Masonry Buildings in the Commonwealth

Detail

Page 26: Case Study: Challenges of Insulating Existing Masonry Buildings in the Commonwealth

On-Going Concerns• Structural elements embedded in wall• Steel or Wood vulnerable to water• Channels to the exterior

Exposed rebar at concrete lintel

Voids within wall at sill SCT cores at header courses

Page 27: Case Study: Challenges of Insulating Existing Masonry Buildings in the Commonwealth

Audience Experience Discussion