cartridge valve installed base sheet · vikrant class. india. installed base sheet. 2 - 4. total...
TRANSCRIPT
TOTAL VALVES PER TOTAL SUBMARINES SUBMARINES DELIVERED
SHIPS/PLATFORMS SHIPS/PLATFORM VALVES Details/Notes
CARTRIDGE VALVE INSTALLED BASE
U.K.
U.S.A.
• SWIFTSURE- SSN
• VANGUARD - SSBN
• TRAFALGAR- SSN
• ASTUTE- SSN
• SEAWOLF- SSN
• VIRGINIA- SSN
1st Commissioned: 1973All Decommissioned
1st Commissioned: 1993
1st Commissioned: 19855 Decommissioned
1st Commissioned: 20105 Boats Confirmed
1st Commissioned: 1997
1st Commissioned: 200418 Boats Confirmed
5 980 4,900
4 2,067 8,268
2 1,750 3,5005 1,750 8,750
7 1,860 13,020
3 4 12
18 4 72
CANADA
• VICTORIA- SS
4 1,260 5,040 formerly Upholder (UK): 1st Commissioned: 1986Victoria (Canada) Commissioned: 2000
SPAIN
• S-80 CLASS- SS
4 580 580 *1st to be Commissioned 2013*one ship
INSTALLED BASE SHEET
1 - 4
Countries:Installed Base
1st Commissioned : 2010
1st to be Commissioned: Expected in 2022 current valves order being manufactured 2020.
1st Commissioned : 2009
1st Commissioned : 19917 925 6,475
1 360
3 486 1,458
8 95 760
U.S.A.In Process In Process
NETHERLANDS
• OFFSHORE PATROL VESSEL
In Construction
CARTRIDGE VALVE INSTALLED BASE
• COLUMBIA CLASS—SSBN
• M-CLASS FRIGATES
SPAIN
• PROJECT 17
• VIKRANT CLASS
INDIA
INSTALLED BASE SHEET
2 - 4TOTAL VALVES PER TOTAL
SUBMARINES SUBMARINES DELIVEREDSHIPS/PLATFORMS SHIPS/PLATFORM VALVES Details/Notes
Countries:Installed Base
FRANCE• BARRACUDA- SSN
Range of regulators Delivered 4 boats so far.
6 2 8
• SCORPENE CLASS—SSK
14 2 14 Range of regulators Delivered 4 boats so far.
CARTRIDGE VALVE INSTALLED BASE INSTALLED BASE SHEET
3 - 4
Countries:Installed Base
TOTAL VALVES PER TOTAL SUBMARINES SUBMARINES DELIVERED
SHIPS/PLATFORMS SHIPS/PLATFORM VALVES Details/Notes
• LNG Gas Supply System for ME-GI gas-injection system Manifold
• CONTAINER SHIPS
• CARRIERS
85 30 2,550
• AIRCRAFT CARRIER
U.S.A.1st to be Commissioned: Expected after Nov 2016
•CVN-78 1 550 550•CVN-79 1 550 550
•CVN-80 1 550 50•CVN-81 1 550 0
1 1,842
INDIAManifolds and cartridge valves
• Submarines: SSN’s, SSBN’s, SSK’s
• Aircraft Carriers: CVN’s, CV’s
• Naval Surface Ships:
• Rocket Launch Pad:
• LNG Carriers
• LNG Container Ships
Date Issued: AUG. 2020
TOTALS
58,745167Total
CARTRIDGE VALVE INSTALLED BASE
LNG Gas Supply System for ME-GI gas-injection system ManifoldLNG
* 10 submarines decommissioned, totaling 13,650 valves.
INSTALLED BASE SHEET
4 - 4
No. of Submarines/ Ships/ Rocket Launch /LNG Total No. of Valves
*58 44,150
5 1,510
18 8,693
1 1,842
85 2,550
75,344
Advantages Reduce Construction & Life-cycle Costs
•Body is integral part of platform for lifetime.
•Cartridge can be replaced, in-line, within minutes.
•Valve seat is part of removable cartridge.
•Thirteen different cartridges (interchangeable)
within each valve body size.
•Reduction in spares/inventory…not necessary to
inventory valve body's….
•End connections-butt weld/socket weld/screwed.
•Cartridge valves = weight reduction.
•Cartridge valves = reduced space envelope savings
•Installed Base = cartridge valves
Date Issued: AUG. 2020
1 2 3 4 5 6
802 Check
(Non-Return) Valve
801 Stop Valve
806 Actuated Stop Valve
Normally Closed 803
SDNR Valve
807 Actuated Stop Valve
Normally Open 810
Flushing Adapter
7 8 9 10 11 12 13
813 Relief Valve
814 Filter
817 Dome Pressure
Regulator 818
Pressure Reducer
821 Electrically
Actuated Valve
828 Back Pressure
Regulator (Spring Loaded)
Cartridge Valve
Forged Body
Cartridge Valves
Different Valve Cartridges (for different applications) fit into each valve body size 1/2” thru 3” 13 Submarine Systems
Hydraulic or Pneumatic Actuator
Removable cartridge incorporating a balanced valve stem
Forged Housing (Body)
13
Valve Body Sizes: A2: 1/2”
B3: 3/4”
C4: 1”
D5: 1 1/4”
E6: 1 ½”
G7: 2”
H8: 2 ½”
J9: 3”
Design Pressure: 70 bar /1000 psi thru 400 bar/6000 psi
Total Valve Sizes: 8
Different Cartridges: 13
Dynamiccontrols.co.uk cunicocorp.com
:
Cartridge Valve Size
1/8” thru 3-1/3” Total per s/s installed
1,881 7 S/S = 13,167 Total valves on
Astute Class
AIR AVBS =Aux Vent & Blow System 42 BIB = Built in Breathing System & Hood Inflation System 24 DDS =Diesel Air Start System 38 EBA = Emergency Air Breathing System 41 FAS = Firing Air Systems 93 HPA = High Pressure Air System 166 HPB = High Pressure Blow System 44 MLO = Main Lube Oil System 43 WHA = Weapons Handling System 48 DQA = Divers Quality Breathing Air System 9 CO2 CDR = Carbon Dioxide Removal System 13
NITROGEN HPDHR =hpdhR System 8 N =Nitrogen System 131 PC =Primary Circuit 75 OPG =Valve OP & Gas System 42 WM Water Mist System 13 WATER E =Emergency Core Cooling System 12 FT = Feed Transfer System 37 H&C = Hot & Cold Domestic System 29 PCD = Primary Coolant Discharge System 59 PCM = Primary Coolant Make-up System 77 PCS = Primary Coolant Sampling System 43
PSW =Primary Shield Water System 31 RCFW = RCFW Cooling System 24 OIL EHP External Hydraulic Power Plant 69 EHS External Hydraulics Systems 87 HTS Hydraulic Oil Fill & Transfer System 86 HDS Hydroplane & Steering Control System 48 HHP Hydroplane & Steering Gear Hydraulic Power Plant 45 MHP Main Hydraulic Power Plant 113 HS Main Hydraulic System 195 SP Secondary Propulsion System 5 WH Weapons Handling System 52 HFI Hydraulic Fire Isolation 5
ASTUTE CLASS - SSN
Cartridge Valve
Forged Body
Date Issued: AUG. 2020
Class Type: Nuclear attack submarine (SSN) Surface Displacement: 7,000-7,400t Submerged Displacement: 7,400-7,800t Length: 318ft 3in (97 m) Beam: 37ft (11.3 m) Propulsion: Rolls-Royce PWR2 reactor
Submarine Systems DCL Installed Base on Astute SSN’s Astute Class SSN – Cartridge Valves installed on all the following systems
INSTALLED/ DESIGNED IN BASE
(Planned: 7 • Active: 3)
QTY. QTY. QTY.
Date Issued: AUG. 2020
VANGUARD CLASS - SSBN (Active: 4)
Class Type: Nuclear-Powered Ballistic Missile Submarine (SSBN)
Displacement: 17,200 t (16,900 long tons; 19,000 short tons)
Length: 153.6 meters (504ft)
Propulsion: PWR3 nuclear reactor, turbo electric drive, pump-jet
MOD Planned: 4 SSBN’s
Submarine Under Construction: 1
DREADNOUGHT CLASS - SSBN (4 Planned)
Class Type: Ship Submersible Ballistic Nuclear (SSBN) Displacement: 15,680 tons dived
Length: 149.9m (491 ft 10 in) Propulsion: Rolls-Royce PWR2 nuclear reactor
Vanguard Class four boats: Vanguard (S28), Victorious (S29), Vigilant (S30), and Vengeance (S31)
Successor
Cartridge Valve
Forged Body
Cartridge Valve Sizes
1/2” thru 3-1/2”
Total to be Installed
per s/s = 3,500+
4 Dreadnought
SSBN’s to be built
Cartridge Valve Sizes
1/2” thru 3-1/2”
Total per s/s Installed
2,067 4 s/s =8,268 Total
Valves on
Vanguard Class
SSBN - CLASS
AIR AVBS -Aux Vent & Blow System BIB -Built in Breathing System & Hood Inflation System DDS - Diesel Air Start System EBA - Emergency Air Breathing System FAS - Firing Air Systems HPA - High Pressure Air System HPB - High Pressure Blow System MLO - Main Lub Oil System WHA - Weapons Handling System DQA - Divers Quality Breathing Air System CO2 CDR - Carbon Dioxide Removal System HYDROGEN LPE - Electrolyser System METHANOL GM - Gas Mgmt Plant System
NITROGEN HPDHR System N - Nitrogen System PC - Primary Circuit OPG - Valve OP & Gas System WM - Water Mist System WATER E - Emergency Core Cooling System FT - Feed Transfer System H&C - Hot & Cold Domestic System PCD - Primary Coolant Discharge System PCM - Primary Coolant Make-up System PCS - Primary Coolant Sampling System PSW - Primary Shield Water System RCFW - RCFW Cooling System EBS - Emergency Blow System TBCW - Thermostatic Bypass Chilled Water SH - Sewerage
OIL EHP - External Hydraulic Power Plant EHS - External Hydraulics Systems HTS - Hydraulic Oil Fill & Transfer System HDS - Hydroplane & Steering Control System HHP - Hydroplane & Steering Gear Hydraulic Power Plant MHP - Main Hydraulic Power Plant HS - Main Hydraulic System SP - Secondary Propulsion System WH - Weapons Handling System HFI - Hydraulic Fire Isolation STEAM PROPULSION GL - Gland Steam PS - Primary Steam SS - Secondary Steam
Submarine Systems DCL Installed base on SSBN’s
INSTALLED/
DESIGNED IN BASE
INSTALLED/
DESIGNED IN BASE