03/07/2019 2
First NPP fully designed in Argentina
Integral PWR type
Integrated Primary System
Natural circulation
Self-pressurized
100 MW / 32 MWe
Enriched UO2 fuel (3,1 and 1,8%)
Passive safety systems
Pressure suppression containment type
Operating cycle length of 18 months
CAREM PROTOTYPE - BASIC FACTS
CAREM25 CURRENT STATUS
03/07/2019 3
PASSIVE SAFETY SYSTEMSA) CoreB) Steam generators1) Safe Shutdown System2) Diverse Shutdown System3) Containment building4) Medium Pressure Injection
System5) Pressure Suppression Pool6) Removal Heat Decay System7) RPV relief valve8-11) Containment building
pressure equalizer
≥36hr passivecapability
CAREM25 CURRENT STATUS
03/07/2019 4
PASSIVE CAPABILITY EXTENSION
A) Core (hot source)B) Steam generators (cold source)
1) Pressure SuppressionContainment2) Pressure SuppressionPool3) Pressure relief tubes RS4) RPS Pressure Relief Valve5) RSSECR Pressure Relief Tubes6) RSSECR Relief Membrane7) Spraying the containment8) Hydrogen Recombiners9) PSSECR autonomous condenser10) Autonomousreplacement of
PSSECR inventory11) Autonomouscooling PS12) Autonomousspraying of RPR13) AutonomousVents RPS
CAREM25 CURRENT STATUS
CURRENT STATUS
03/07/2019 7
PRESSURE VESSEL
11 mts
3,35 mts
CAREM25 CURRENT STATUS
03/07/2019 8
PRESSURE VESSEL
ESTIMATEDPROGRESS:
52%
CAREM25 CURRENT STATUS
03/07/2019 8
STEAM GENERATORS
Capa#1
Capa#7
externa
Camisa tubos
Interna
Carcaza
Carcaza
Baffles
condensadoCabezal del
CondensadoVapor
IngresoaguaPrimario
SalidaaguaPrimario
• 12 modules in parallel, divided in 2 independent subsystems
• Each of them consists of 52 tubes of about 35 m long, arranged in 6 coiled layers.
CAREM25 CURRENT STATUS
03/07/2019 11
STEAM GENERATORS
Already delivered: 700 Inconel-690 tubes, 35m long each
ESTIMATEDPROGRESS:
48%
Next steps:
• Manufacture of onepre-series SG
• Production of the 12 modules (once manufacturing process is validated)
CAREM25 CURRENT STATUS
03/07/2019 10
CORE / F.A.61 Fuel Assemblies:• Fuel active length: 1,4m • Maximum enrichment: 3,1% (U02)• Reactivity control: CR, BP• Cladding: Zr-4
DesignerManufacturer
CAREM25 CURRENT STATUS
03/07/2019 14
FUEL ASSEMBLIES
ESTIMATEDPROGRESS:
51%Under production:
- Fuel assemblies
Pre-production stage:
- Fuel pellets
CAREM25 CURRENT STATUS
Fast Shutdown System
Adjustment & Control System
03/07/2019 12
CONTROL RODS DRIVES MECHANISMSCAREM25 CURRENT STATUS
03/07/2019 13
CAPEMCONTROL RODS DRIVES MECHANISMS TESTING FACILITY
• IFE (integral effect test)• Closed loop of water at
high pressure and temperature (320ºC -120bar)
• Self-pressurized• Main flow: 20m3 / h• Main container:
o Houses the mechanisms and the fuel assembly.
o Simulates flow by natural circulation.
o Flange with instrumentation connections.
STRART UP:
Nov 2019
CAREM25 CURRENT STATUS
03/07/2019 14
CAREM PROTOTYPE SITE
CAREM25 CURRENT STATUS
• Reactor Building• Containment• Spent Fuel Pool• Safety & Process Systems• Control Room
• Turbine Building• Service Building
• Offices• Changing rooms• Emergency Control Room
03/07/2019 15
CAREM PROTOTYPE BUILDING
• Reactor Building• Containment• Spent Fuel Pool• Safety & Process Systems• Control Room
• Turbine Building• Service Building
• Offices• Changing rooms• Emergency Control Room
CAREM25 CURRENT STATUS
03/07/2019 16
CAREM PROTOTYPE BUILDING
CAREM25 CURRENT STATUS
03/07/2019 17
CAREM PROTOTYPE BUILDING
ESTIMATEDPROGRESS:
52%
CAREM25 CURRENT STATUS
03/07/2019 18
CONTAINMENT LINER
ESTIMATEDPROGRESS:
78%
CAREM25 CURRENT STATUS
03/07/2019 19
BALANCE OF PLANT
ESTIMATEDPROGRESS:
62%
• Basic design: 100.00%• Detail design: 99.87%
Turbo-generator and auxiliary equipment supply: 100%
CAREM25 CURRENT STATUS
03/07/2019 20
OVERALL PROGRESS (MAR19)
Phases Accumulated physicalprogress (%)
CNEA facilities 100,00%
Site preparation 100,00%
Design 90,60%
Supplies 53,20%
Construction 61,70%
EM assembly 0,6%
Start up 0,00%
TOTAL 55,93%
CAREM25 CURRENT STATUS
03/07/2019 21
Goals achieved:
• Funding
• HHRR training
• Licencing of non-heavy water reactor
• Supply chain development
• Construction/manufacturingbeginning
CAREM25 CURRENT STATUS
• Argentina is leading the PWR SMR design-construction process with the FOAK CAREM25
• Established supply chain for main local components
• Handful of lessons learnt not possible without the FOAK
• SMR cost structure knowledge
• Readiness for commercial plant based on the prototype design criteria. Economic asessment modules of ≈100MWe
2203/07/2019
FINAL REMARKS
CAREM25 CURRENT STATUS
2303/07/2019
VIDEO – Apr 2019CAREM25 CURRENT STATUS
THANK YOU FOR YOUR ATTENTION
Ignacio de Arenaza Head of Civil and Electrical Engineering Department | CAREM - CNEA