NMT AGENDA FOR CITY OF TSHWANE

SLIDE 1: Cover slide

MMC Picture on a bike…..alternative picture

SLIDE 2: CONTENT

Page 2: carbonn PRESEN…  · Web viewNMT AGENDA FOR CITY OF TSHWANE . SLIDE 1: Cover slide . MMC Picture on a bike…..alternative picture. SLIDE 2: CONTENT. SLIDE 3 & 4. 1.BACKGROUND

SLIDE 3 & 4

1. BACKGROUND

The Department of Transport has developed a national transport strategy to address the challenges experienced by our rural communities. Transport is a basic necessity for sustainable social and economic development. Transport can also play a catalytic role in addressing poverty and development needs as well as correcting spatial distortion. It follows from these that the rural transport implementation plan is responding to the priorities and the needs of district municipalities and province.

To overcome the challenges in the residential and industrial areas and to ensure equitable distribution of sources government departments, NGOs and the business community are acting collectively to respond to social and economic crisis facing our country.

The strategy is aimed at developing balanced and sustainable public transport systems by supporting local infrastructure and services. Parallel to the Rural Development programme, the Department is also addressing mobility challenges facing learners in the urban schools. The emphasis is to improve access roads, develop passable roads, and address neglected infrastructure and corridors, which are linked to markets, provide feeder systems to stations and other social services.

Walking is a major mode of transport in general, and the dominant mode of travel in rural areas. For journeys to work, walking is main of travel for 23% of South Africans (and 53% of commuters in rural). The majority of scholars and students – 76% - walk to their educational institutions. In rural areas and even higher percentage – 91% - do so. Walking and cycling, which is less common – are not lower – income, second best options. The challenge is to make walking and cycling the preferred modes in South Africa for the appropriate distances. They are least expensive modes and therefore most accessible for the majority of commuters, as well as the most attractive from and environment perspective.

To enable and support walking and cycling, planning authorities need to build, expand and maintain continuous networks of formal walking (sidewalks, off-road paths, safe crossings, pedestrian bridges

etc) and dedicated cycleway along lines of high demand. A major objective of providing dedicated infrastructure is to protect walkers and cyclists from conflict with motorised modes, a leading cause of road traffic fatalities. Non-motorised transport is a pleasant, realistic choice only when security is

Page 3: carbonn PRESEN…  · Web viewNMT AGENDA FOR CITY OF TSHWANE . SLIDE 1: Cover slide . MMC Picture on a bike…..alternative picture. SLIDE 2: CONTENT. SLIDE 3 & 4. 1.BACKGROUND

addressed. When quality NMT infrastructure and amenities are provided, as they are with other modes, this mode competes on the world stage.

A pedestrian safety master plan that provides a comprehensive framework for improving pedestrian safety and mobility in the CoT regions was conducted and is available. The objectives of the Pedestrian Safety Master Plan is mainly focused on improved safety and efficiency for pedestrians by implementing traffic calming measures, provision of formal public transport facilities, road markings and road signage, pedestrian walkways.

1. Picture of the infrastructure in Atteridgeville:

Page 4: carbonn PRESEN…  · Web viewNMT AGENDA FOR CITY OF TSHWANE . SLIDE 1: Cover slide . MMC Picture on a bike…..alternative picture. SLIDE 2: CONTENT. SLIDE 3 & 4. 1.BACKGROUND
Page 5: carbonn PRESEN…  · Web viewNMT AGENDA FOR CITY OF TSHWANE . SLIDE 1: Cover slide . MMC Picture on a bike…..alternative picture. SLIDE 2: CONTENT. SLIDE 3 & 4. 1.BACKGROUND

Length of Cycle Path implemented in Atteridgeville is = 4km

Number of bicycles distributed 600 in 2007/08 and 2008/09 financial year

2. Picture of the cycle path in Mamelodi

Page 6: carbonn PRESEN…  · Web viewNMT AGENDA FOR CITY OF TSHWANE . SLIDE 1: Cover slide . MMC Picture on a bike…..alternative picture. SLIDE 2: CONTENT. SLIDE 3 & 4. 1.BACKGROUND

Length of the cycle path is = 5.6 km

Number of cyclist distributed is = zero

Province Project (Cycle Path and Walkway) 2012/2013 YEAR

Street Length Status*( in progress)

Skosana Xaba

1.04km 100% done

Phatudi 1.115km 98%

Phiri 0.39km 100%

Ledwaba 1 km 35%

Mashaba 0.6km 90%

Ribungwana

0.921km 68%

Page 7: carbonn PRESEN…  · Web viewNMT AGENDA FOR CITY OF TSHWANE . SLIDE 1: Cover slide . MMC Picture on a bike…..alternative picture. SLIDE 2: CONTENT. SLIDE 3 & 4. 1.BACKGROUND

Cross 0.525km 86%

Tsosoloso Project (Cycle Path and Walkway) 2012/2013 YEAR

Project Budget Allocated Budget spent

Tsamaya Spine R 9, 120,994.12(excl. VAT) 90%

Intersection Upgrades R 8, 120,994.12(excl. VAT) 75%

T-section R 14, 500, 000.00 (excl. VAT)

55%

Street Length Status*( in progress)

From project

Tsamaya 0.6km 90% done Tsamaya Spine

Maphalla 0.5km 96% Tsamaya Spine

Serapeng 0.3km 45% Intersection Upgrades

3. The cycle paths in Hammanskraal Area, Region 1

Length of the cycle path and sidewalks is = 12.96km

Number of bicycles distributed is 70 in 2009, 194 in 2012/13 and 592 in 2013/14 financial year.

Page 8: carbonn PRESEN…  · Web viewNMT AGENDA FOR CITY OF TSHWANE . SLIDE 1: Cover slide . MMC Picture on a bike…..alternative picture. SLIDE 2: CONTENT. SLIDE 3 & 4. 1.BACKGROUND

HAMMANSKRAAL/ TEMBA

Tsosoloso Project (Cycle Path and Walkway)

Street Name Planned Length

Length From Length To Implemented Length

1. Jubilee road(A23455)

5km Temba City road(A22615)

Molefe Makinta Road (A30289)

2.5km

2. Road A19970

A21413

A23501

A17970

A22615

3.17km x 2

0.69km x 2

1.06km x 2

0.74km x 2

0.74km x 2

A23455

A17970

A21413

A19970

A19970

A17970

A23504

A20143

A20143

A20143

3.17km

1.38km

2.12km

1.48km

1.48km

3. Road around Council offices in Hamma-

4km Hamman Road Hamman Road 4km

Shovakalula Internal (Walkways)

Street Name Planned Length

Length From Length To Implemented Length

1. Kudube Unit D main road

5km A18351 A21048 0

2. Around Sikhululekile School(A18351)

0.8km A22765 A22601 0.4km

Page 9: carbonn PRESEN…  · Web viewNMT AGENDA FOR CITY OF TSHWANE . SLIDE 1: Cover slide . MMC Picture on a bike…..alternative picture. SLIDE 2: CONTENT. SLIDE 3 & 4. 1.BACKGROUND

3. Majaneng Main Road along Hans Kekana School

4km Makapanstad Road

Unknown Road 0.8km

Shovakalula Provincial Projects (Walkways and Cycle paths)

Street Name Planned Length

Length From Length To Implemented Length

1. Hamman road 3km R101 N1 0

2. Makapanstad Road 10km Unknown Road

Road along Jubilee Mall and Metro police training center (Hammanskraal West)

0

3. Road along Jubilee Mall and Metro police training center (Hammanskraal West)

4 Jubilee Road R101 0

Page 10: carbonn PRESEN…  · Web viewNMT AGENDA FOR CITY OF TSHWANE . SLIDE 1: Cover slide . MMC Picture on a bike…..alternative picture. SLIDE 2: CONTENT. SLIDE 3 & 4. 1.BACKGROUND

4. Pictures of cycle path in Olievenhoutbosch Area, Region 3

Tsosoloso Project (Cycle Path and Walkway)

Street Name Length From

Length To Implemented Length

4. Bogosi/Morudi Morudi Str Monument Str 1.4km

Shovakalula Provincial Projects (Walkways and Cycle paths)

Page 11: carbonn PRESEN…  · Web viewNMT AGENDA FOR CITY OF TSHWANE . SLIDE 1: Cover slide . MMC Picture on a bike…..alternative picture. SLIDE 2: CONTENT. SLIDE 3 & 4. 1.BACKGROUND

Street Name Length From Length To Implemented Length

4. R55 Samrand Rd Waterberg rd 1.2

Length of the cycle path is 2.6 km

Number of cyclist distributed is 400 in 2013/14 financial year.

Page 12: carbonn PRESEN…  · Web viewNMT AGENDA FOR CITY OF TSHWANE . SLIDE 1: Cover slide . MMC Picture on a bike…..alternative picture. SLIDE 2: CONTENT. SLIDE 3 & 4. 1.BACKGROUND

5.

11th Road / noname & Klip Rd 8km Ward 9 & 24

Pinkys Road / noname & Rooibos 5.5km Ward 19 & 24

5th Avenue /nonme & Klip 5.0 km Ward 9

Moroela Str/ Molefe Makinta & 5th 4.5km Ward 9 & 19

Rooibos Str/11th & 1st Ave 5.5km Ward 9, 19 &24

Noname Str Between Dube and 8th Ave 2.5km Ward 24

Noname next Manamelong P. Sch 4.5km Ward 19

Bushveld between Noname & Dube 6km Ward 9, 19 &24 (Provincial RD)

Molefe Makinta between 11th & Mokhetle 4km Ward 19 &24 (Provincial RD)

Morogorogo between Pinkys & Rooibos 2.5km Ward 24

Length of the cycle path is zero

Number of bicycles distributed is 355 in 2012/13 financial year.

Proposed length of cycle paths and sidewalks is 48km in 2013/14 financial year.

Number of bicycles distributed is 400 in 2013/14 financial year.

Page 13: carbonn PRESEN…  · Web viewNMT AGENDA FOR CITY OF TSHWANE . SLIDE 1: Cover slide . MMC Picture on a bike…..alternative picture. SLIDE 2: CONTENT. SLIDE 3 & 4. 1.BACKGROUND

5. Launch in Hammanskraal/Winterveldt /Former Metweding Area

Number of bicycles distributed is = 1300

Pictures

Page 14: carbonn PRESEN…  · Web viewNMT AGENDA FOR CITY OF TSHWANE . SLIDE 1: Cover slide . MMC Picture on a bike…..alternative picture. SLIDE 2: CONTENT. SLIDE 3 & 4. 1.BACKGROUND
Page 15: carbonn PRESEN…  · Web viewNMT AGENDA FOR CITY OF TSHWANE . SLIDE 1: Cover slide . MMC Picture on a bike…..alternative picture. SLIDE 2: CONTENT. SLIDE 3 & 4. 1.BACKGROUND

6. Launch in former Metsweding Area( Region 5&7)

Number of bicycles distributed is 720 bicycles in 2010/11 financial year.

Number of bicycles distributed is 750 bicycles in 2011/12 financial year.

Number of bicycles distributed is

Cycle path implemented in Refilwe-Ring road Length of cycle path is = 4km Cycle path implemented in Ekangala section F- Ring Road Length of cycle path is = 4km

Cycle path implemented in Sokhulumi RoadLength of cycle path is = 4km

7. I hope all is well with you. Below is the scope/planning for Winterveldt Region 1 NMT next financial years

“ Quick and wins”

Implementations of NMT projects from the budgeto Hammanskraal Areao Mamelodio Hatfield: BRT/TRT