Page 1: Capitalizing Complex Capital Projects Effortlessly with

Session ID:

Prepared by:

Remember to complete your evaluation for this session within the app!

11189

Capitalizing Complex Capital Projects Effortlessly with Oracle Project Portfolio Management Cloud

April 10, 2019

Sumit Wasuja

Vijay Dhanapal

Deloitte Consulting LLP

Page 2: Capitalizing Complex Capital Projects Effortlessly with

Presenter

Sumit is an Oracle Cloud and JDE functional Consultant with over 11 years of

experiencing designing, implementing and supporting financial processes.

• Industries: Oil & Gas, Healthcare, Consumer, Technology, Healthcare

• Processes: Record to Report, Procure to Pay, Order to Cash, Project Accounting, &

Fixed assets

• Oracle Financials Cloud Certified Implementation Specialist

Photo

Sumit Wasuja

Manager

Deloitte Consulting LLP

San Francisco

Page 3: Capitalizing Complex Capital Projects Effortlessly with

Presenter

Vijay is an Oracle Cloud and EBS Financials & PPM Functional Consultant with over

14 years of experience in designing solutions for customer requirements in Account to

Report, Order to Cash, Procure to Pay, Acquire to Retire and Project to Close

processes

• Chartered Accountant from ICAI

• PMP® Certified

• Oracle PPM/Financials/SCM Cloud Certified Implementation Specialist

• Presented Oracle Fusion Financials & PPM Capabilities in Oracle Open Word 2014

• Presented Oracle Financials Consolidated Invoicing solution in Collaborate16

• Presented Oracle Cloud PPM Suite Shared Service Cost Allocation solution in

Collaborate17

Photo

Vijay Dhanapal

Manager

Deloitte Consulting LLP

Houston

Page 4: Capitalizing Complex Capital Projects Effortlessly with

Agenda

• Executive summary

• Illustrative case study

• Business challenges

• AFE Best Practices

• Functional Solution

• Solution Limitations

• Conclusion

• Q&A

Page 5: Capitalizing Complex Capital Projects Effortlessly with

Executive Summary

• Executing mega capital project with billions of dollars in spend typically requires Authorization for Expenditures (AFEs) to be structured as delivery teams.

• While this approach has some advantages from overall project delivery/execution standpoint, it can cause further complexities such as:– The project structure does not align with the resulting asset to be capitalized such as

buildings, plants etc.

– The resulting assets will be placed in service at different times requiring partial capitalization of the AFEs

– As the projects are structured as functions, all the projects will continue to receive costs and stay open for the duration of the project.

• Session objectives:– Discuss best practices for setting up AFE cost code structure

– Discuss best practices to streamline project close and asset capitalization

– Discuss various project cost allocation strategies and their implications

Page 10: Capitalizing Complex Capital Projects Effortlessly with

10

Power Plant

(Asset)

CONSTRUCTION

Cons. Direct

General Services3% of total direct costs AFE budget

ENGINEERINGEngineering Allocation

Area A is 9% of total ENG AFE

Budget

OWNERS COST

OWN Construction

10% of the constructions

16% of Infra AFE Budget

OWN Infra36% of Infra AFE

Budget

OWN Shared7% of total direct costs AFE budget

OWN EngineeringInherits 5% ENG

allocation

An illustrative case study

Page 11: Capitalizing Complex Capital Projects Effortlessly with

Business challenges

• Project/AFE structure not aligned to Fixed Assets

• AFEs open for a long period of time

• Use of spreadsheets to track and estimate asset costs

• Accruals/late invoicing require changes to asset cost and depreciation

Page 12: Capitalizing Complex Capital Projects Effortlessly with

AFE WBS structure – best practices

Level 1

Task levels

AFE levels

Effective coding structure( Classic triangle)

Approach should be to have an AFE refer discrete scope of fork for a particular period (i.e. Asset class/ Ownership/time)

AFE levels

Task levels

Ineffective coding structure(Diamond shape)

Contracting set of deliverables

AFEs setup by discipline

without defined deliverables

(procurement, engineering)

Issue: AFEs might need to

stay open for a long time,

causing concern for control

and budget

Lower cost code level

references delivery package

Issue: Difficult to manage

reclass of cost to assets

Page 14: Capitalizing Complex Capital Projects Effortlessly with

Functional SolutionOracle Cloud PPM – Capitalizing Complex Project Solution Process Flow

Proj

ect

Ma

nage

rPr

ojec

t Acc

ount

ant

Pro

ject

Cre

ato

rP

roje

ct

Ad

min

istr

ato

r

Bus

ines

s

Proc

ess

Ass

et A

ccou

nta

nt

Create Capital Project

Approve

Capital

Project

Capture

Labor Costs

Define Capitalizable Project Type

Define

Expenditure

Types

Define Rate

Schedules

Define

Project

Templates

Define

Transaction

Sources

Define

Costing

Rules

Capture

Material

Costs

Capture

Usage Costs

Capture

Miscellaneou

s Costs

Import and Process

Capitalizable Costs

Manage Project

DefinitionManage Project Costs

Define Assets Assign Assets

Run Create Periodic

Capital Event Program

Event Processing Method?

Periodic

None

Manual

Generate Asset Lines

Create Capital Events manually

by grouping assets and costs

Place Asset in Service

Is asset Already placed

in service?

New Asset

Existing Asset

Transfer Asset Details

to Fixed Assets

Post Assets/Additions in Fixed Assets

Update Asset Details from Fixed Assets

Page 15: Capitalizing Complex Capital Projects Effortlessly with

Functional Solution (Setup)

• Start from the project type and define project templates

• Determine the project organization (hierarchy)

• Setup project types

• Configure capitalization options

– Cost Type: Option to capitalize Raw Cost or Burdened

Cost

– Asset Line Grouping Method: Create asset lines by

grouping cost transactions at different levels such as by

Expenditure Type, Expenditure Category, etc.

– Asset Cost Allocation Method: Actual Units, Current

Cost, Estimated Cost, Spread Evenly and Client

Extension

– Event Processing Method: Periodic, Manual and None

Capitalization Options

Project Type

Project

Page 16: Capitalizing Complex Capital Projects Effortlessly with

Functional Solution (Transact)

• Create project and inherit setup values from project templates created for the specific project type

• Define assets and assign them either at the project level or task level

• Capture cost and flag them as capitalizable using transaction controls and other setup options

• Capitalize assets when they are ready to be placed in service

• Create capital events as necessary by grouping eligible assets and costs

• Generate asset lines by grouping costs based on asset line grouping method and allocate costs to assets appropriately using asset cost allocation methods

• Transfer asset/asset line details to Oracle Fixed Assets Cloud and post asset/asset lines/additions

Manage Project Budget

Manage Project

Manage Project Costs

Manage Capital assets

Monitor Project Performance

Page 17: Capitalizing Complex Capital Projects Effortlessly with

Solution Limitations

• Additional Design and Development efforts to leverage client extension

• PaaS services are required to build custom solution

• IaaS services are required if the custom logic requires a custom table to

maintain data

Page 18: Capitalizing Complex Capital Projects Effortlessly with

Conclusion

• Oracle Cloud PPM Suites offers wide range of functionalities to structure

projects, define the level at which the activities and associated costs can be

capitalized.

• The approach to determine the WBS structure and asset capitalization varies

across industries, size of the project and other factors such as local

regulations.

• However, it is important to decide the capitalization strategy at the time

determining the project organizational hierarchy.

Page 19: Capitalizing Complex Capital Projects Effortlessly with

Session ID:

Remember to complete your evaluation for this session within the app!

11189

[email protected]

[email protected]