Capability Statement - 2020

Introduction to Jmac Investment Group.Established in 1998 in Western Australia by brothers Michael Chittick and Jamie Chittick, Jmac Investment Group (trading as JMAC Civil), immediately obtained lucrative contracts with large scale construction companies. Well known international contractors such as CIMIC Group Limited and Thiess quickly and confidently aligned with Jmac, setting the foundation for the Company’s reputation to deliver effectively.Spanning both the private and the public sectors, JMACs capabilities provide integrated building and maintenance works across mining, infrastructure & residential. By combining full-service construction requirements performed by skilled industry professionals, Jmac continues to set the benchmark in ground-up building agility & capabilities. Jmac Civil consistently expands its assets and methods to create solutions that satisfy client production goals. Safe, efficient and effective outcomes are the driving motivation behind Jmac’s operations from foundation, to fit out.

Company Mission.JMACs employees and contractors strive to:

• Deliver projects to the highest attainable quality• Promptly comply with all Government and contract requirements• Utilize all resources to achieve every project’s objectives• Maintain open, professional, and responsive communication with all project stakeholders• Give competitive and fair prices to customers, ensuring the best attainable value for

every project• Complete projects in compliance with industry safety standards, all the while

maintaining the company’s current impressive safety records.

Contents

Introduction to Jmac Investment Group. 2Construction Capabilities 5In-house Trades 5Building Solutions 6Flat Pack Construction Method - FPCM 6FPCM Benefit 6Prefabricated Construction Method - PCM 7Project Management 7Health & Safety 7Case Study: Minjar Gold 8

Page - 2

1998JMAC secures its first contract with Leightons (now CIMIC Group) to fit out the new Mandurah Hospital known as Peel Health Campus - contract value $300,000.

Less than 2 months later, JMAC secured a second contract with Leightons. The 100 km Salt Water pipeline project covered works from coastal Australind in Perth to Collie, WA - contract Value $400,000.

2000Thiess awards JMAC the highly sought after contract for all concrete and form-work for the 12 bridges of Perth’s new South Freeway Link - contract value $1,800,000.

2002JMAC wins contracts on Roe Highway bridges and noise-wall construction/installation. With more than 20 km of noise wall and installation of pre-cast panels to bridge components with a contract value of $1.2m dollars.

2004 - 2010During this period JMACs focus was placed on over 50 residential housing renovations and multiple apartment developments throughout WA.

During the six years, the projects consisted of single story houses @ $80k per house and 3 unit, single story developments @$900k per set.

2010 - 2015Further apartment developments undertaken: Single story renovations values $100k each, and 3 unit site single story value $900 k per set.

Large sheds including fit-outs: complete specialised shed in Perth region with contract from 250k to 500k including workshops and equestrian use

First 400-acre subdivision. A 6-million-dollar subdivision in the Perth hills; subdivided into 50 acre lots completing 2 km road works.

The project included :

• Fire management plans• Environment plans,• Plant and wildlife studies,• Power & Telstra services.

2017Operation is moved to Goldfields in Western Australia after winning contracts with Pit N Portal to supply workshops, concrete works and general building and maintenance.

2018 - PresentWork commences at Minjar Gold Mine. JMAC is engaged for a wide scope of works at the Marvel Loch & Nevoria mine sites.

Works included:

• Exploration (construct new core shedand office fit-out( value$450k)

• Set up for Jacaletti undergroundmining workshops ($520k)

• New magazine area set up ($50k)• Camp maintenance as required

($100k to date)• New fire shed ($35k)• Refurbish on-site buildings $350k• Small sheds and various works

(sewer connection, mains electrical/maintenance in the mill)

Site and building maintenance continues on all Marvel Loch camps and residential properties.

Future GoalsJmac will maintain its positive trajectory by continuing to excel in building and maintenance works.

Spanning across Government and Private sectors, in both remote or densely populated locations throughout Australia.

Through vast experience in the aforementioned fields, Jmac plans to exceed expectations in residential apartment and subdivision developments.

This will be achieved through harbouring further strong relationships with industry partners via impeccable construction works and concise and punctual communications.

Company Timeline

Page - 3

Michael Chittick: Jamie Chittick: CEO FinanceFounding director with 34 years experience in all aspects of the building and construction industry.

Jamie utilises more than two decades in finance management with our company.

Shane Tregurtha: Wendy Austin:Operations Manager Accounts & AdminWith a building career spanning 22 years, Shane runs the teams with a experienced approach to safety and productivity

Wendy has been with the company for 15 years. Wendy’s primary role is to manage all aspects of HR, admin and industrial relations.

Doug Circosta: Ben Duffy:Electrical Supervisor Plumbing SupervisorDoug is a electrical contractor with 25 years experience. He has worked in all aspects of the trade, including building, construction and mining.

Ben applies 18 year experience in the plumbing industry, specialising in all aspects of the construction and building works.

Key PersonnelJmac has a dedicated team of trained and highly experienced project managers to oversee every project’s completion. The company’s motivated construction managers are guaranteed to deliver success of all projects under their guidance.

Every undertaking has the Project Management team collaborating with relevant parties to ensure that construction outcomes meet the required specifications and as always, client expectations.

Page - 4

JMAC offers a comprehensive scope of construction capabilities. The company’s in-house team of highly skilled tradespeople will efficiently, cost effectively and safely have your project plans become real.

Scope Of OfferingsWith access to qualified personnel and reliable equipment, JMAC transforms and maintains any site, remote or otherwise into a thriving base for operations. As technology and building standards evolve; so does Jmacs capability. The company’s willingness to apply new techniques and utilise modern tools enables JMAC to maintain their competitive edge in the industry.

Construction CapabilitiesForever increasing in scope and quality, Jmac’s broad-scope of construction capabilities continues to satisfy client project goals. All works undertaken by JMAC are compliant with current Australian Building Codes and encompass the following:

• New Builds - Industrial or Residential• Renovations and refurbishments• Camp Maintenance• Erection of mining core sheds• Site/mining camp building

refurbishment• Small and large scale concrete works,

e.g. slabs and footings

• General concrete works, e.g. footpaths, stairs

• Concrete form works for structures• Full scope project earthworks• Architectural design

In-house TradesJMACs versatile team of in-house tradespeople caters for all construction needs, using safe and cost effective methods to excel beyond market competitors. All team members are highly experienced, Australian certified and qualified in the following trades:

• Carpenters• Electricians• Painters• Plumbers

• Shed Erectors• Concreters• Air Conditioning Technicians• Earth Works Professionals & personnel

Page - 5 Page - 5 Page - 5

With JMAC, you’ll have access to what ever equipment or technology your project needs to have it run smoothly and on budget.

Equipment On HandJmac continues to invest heavily in the acquisition of equipment, systems and technology to ensure sound, efficient and safe construction activities. Should the need arise for additional equipment Jmac has the capability to source what ever the project requires.

Currently, JMAC has the following equipment on hand:

• Iveco semi-trailer with machinery trailer• Pantach semi-trailer for our on-site office and workshops• Kubota Skid Steer (mine spec)• Kubota 5.5 tonne excavator (mine spec)• Scissor lift (mine spec)• 2 smaller trucks for team & materials (mine spec)• Tool trailers (mine spec)• Toyota LV’s (mine spec)

Building SolutionsFlat Pack Construction Method - FPCMThe unique ‘flat packed’ construction solutions enable efficient means of transport and timely construction. The versatile assembled-on-site strategies are compliant with engineering and building codes. This viable option is bottom line focused and includes the following examples:

• Offices Blocks• Toilet and Shower Blocks - specified to underground mining requirements• Kitchen & Crib Rooms

FPCM Benefit1. Ten site buildings can be packed in one container, eliminating construction lag time and

logistical expenditure2. Flat packed solutions can be assembled on site within two days of delivery

Page - 6 Page - 6

JMAC has a wide and flexible range of building options for your remote project. Applying decades worth of experience, you can be confident that your project will be looked after by a team with a solid track record.

Included - Start to finish • Transportation• Foundation Setting - if required• Set up/Erection

• Electrical works• Plumbing works• Craneage

Prefabricated Construction Method - PCMJmac Civil designs and supplies transportable buildings for all types of work sites and camps. These ‘ready to use’ solutions are available for purchase or rent.

Capability• Offices Blocks• Toilet and Shower Blocks - specced to underground mining requirements• Kitchen and Crib Rooms

Project Management Jmac has a dedicated team of trained and highly experienced project managers to oversee every project’s completion. The company’s motivated construction managers are guaranteed to deliver success of all projects under their guidance. Every project has the Project Management team collaborating with relevant parties to ensure that construction outcomes meet the required specifications and as always, client expectations.

Health & Safety For JMAC, ‘Zero Harm’ is the foundation of efficient, modern construction. The company’s safety strategies have been developed and implemented within the context of perpetual improvement; with all construction operations aligning to bring out the best possible outcomes. By applying thorough risk assessments and concentrating on risk mitigation, JMAC continuously strives to reduce safety-related incidents in the workplace.

Page - 7 Page - 7 Page - 7

Despite the usual challenges of remote site construction and the need to mitigate client production disruption, this example project was completed safely, on time and to budget.

Case Study: Minjar GoldType of project: Design and construct new core shed in Marvel Loch , WA (Tianye SXO).

Duration of project:2 months

Summary of deliverables:This mining infrastructure project required the design and construction of a new core shed and removal of the previous one. Once built, the new shed enabled the client to house 4 additional drill rigs; equating to a production increase of 300%.

Key problems faced:During the project’s construction phase (concreting & operational cranes), Minjar’s exploration team were also on site performing works. Despite the challenges and potential safety risks, all barriers were overcome with minimal disruption to either party, via regular pre-start meetings and clear communication .

Key achievements:No safety incidents or lost time injuries occurred throughout the project. The entire scope was completed on time and to client budget.

Deliverables in detail:

• Removal of existing shed

• Set up temp works area

• Complete earth works and set out for newconstruction

• Supply/ install concrete footings & slabs

• Design and construct concrete waste pit forcore saw waste & drainage

• Placement of new dome to protect workersfrom elements

• Supply and install all electrical and data

• Supply and install core saw noise reduction(freezer panel rooms)

• Supply and install freezer panel design roomfor photography of the core

• Supply and install the specialised coring racksystem to flow through construction

• Supply and install air conditioners to all roomsand fans for team member safety and comfort

Page - 8 Page - 8

Jmac Investment Group T/A JMAC Civil

a: 245 Beringarra Avenue Malaga, Western Australia, 6090

e: [email protected]: 0419 049 397