caminhos de ferro portugueses e.p. european datacomm nv ivu traffic technologies ag national...

15
Caminhos de Ferro Portugueses E.P. European Datacomm NV IVU Traffic Technologies AG National Technical University of Athens Prometni Institut Ljubljana D.O.O. SCIRO S.r.l. TECNOSISTEMI S.p.A. TLC Engineering & Services SIGMA Conseil S.a.r.l. Università degli Studi di Genova F-MAN Project - 3 nd Annual Review SYSTEM Architecture Genova, December 2 & 3, 2004

Post on 22-Dec-2015

214 views

Category:

Documents


2 download

TRANSCRIPT

Page 1: Caminhos de Ferro Portugueses E.P. European Datacomm NV IVU Traffic Technologies AG National Technical University of Athens Prometni Institut Ljubljana

Caminhos de FerroPortugueses E.P.

EuropeanDatacomm NV

IVU TrafficTechnologies AG

National TechnicalUniversity of Athens

Prometni InstitutLjubljana D.O.O.

SCIRO S.r.l. TECNOSISTEMI S.p.A.TLC Engineering & Services

SIGMAConseil S.a.r.l.

Università degli Studidi Genova

F-MAN Project - 3nd Annual Review

SYSTEM Architecture

Genova, December 2 & 3, 2004

Page 2: Caminhos de Ferro Portugueses E.P. European Datacomm NV IVU Traffic Technologies AG National Technical University of Athens Prometni Institut Ljubljana

Final Review

Genoa, December 2nd - 3rd, 2004 2

The fleet management conceptFleeMandata input

Tracking System Externaldata input

GNSS/GSMSensors

Geo data,timetable

Data Processing

Event Messages

- F-Man Pool formulation - ETA- Technical availability of wagons

Train Control info

Wagon related info

Asset Management

Data Base

- Decision Support Financial targetsCommercial,controlling datas

- Position- Status- Events

Page 3: Caminhos de Ferro Portugueses E.P. European Datacomm NV IVU Traffic Technologies AG National Technical University of Athens Prometni Institut Ljubljana

Final Review

Genoa, December 2nd - 3rd, 2004 3

System Architecture: Module overview•Tracking System Module (TSM)

OBT communicationTracking & TracingMap module

•Data Processing Module (DPM)Management of Users, ItinerariesMaintenance dataETA

•Asset Management Module (AMM)ReservationDecision Support SystemETA/Maintenance affecting the processUser-Interface concepts

Page 4: Caminhos de Ferro Portugueses E.P. European Datacomm NV IVU Traffic Technologies AG National Technical University of Athens Prometni Institut Ljubljana

Final Review

Genoa, December 2nd - 3rd, 2004 4

Tracking System Module: Overview

NON F - MAN OBT

F - MAN OBT 1

F - MAN OBT n

Modem

INTERNET

HUB

+32 123 456 789 F-MAN

DPM

Other

Message

Page 5: Caminhos de Ferro Portugueses E.P. European Datacomm NV IVU Traffic Technologies AG National Technical University of Athens Prometni Institut Ljubljana

Final Review

Genoa, December 2nd - 3rd, 2004 5

Tracking System Module: OBT devices

On-Board Terminals (OBTs) mounted on wagons

Loading Sensor apparatus

Micro controller & Mobile

Communication

XML standards for data exchange from Ground Station

> GPS receiver

> mobile communication system

> a loading sensor

(allows the F-man tool to be compliant with OBT devices produced by other companies)

Page 6: Caminhos de Ferro Portugueses E.P. European Datacomm NV IVU Traffic Technologies AG National Technical University of Athens Prometni Institut Ljubljana

Final Review

Genoa, December 2nd - 3rd, 2004 6

Tracking System Module: Ground Station

Cent

Country A

Country B

Country C

OBT

International provider

OBT

National provider

International provider

Roaming

OBT

Users’ premises Users’

premises Users’ premises

Internet connection

Internet connection

Internet connection

Roaming

A central ground station concentrates and elaborates all information entering the system (SMS messages from OBTs, user queries, etc.) and distributes the required information to the users’ premises.

Page 7: Caminhos de Ferro Portugueses E.P. European Datacomm NV IVU Traffic Technologies AG National Technical University of Athens Prometni Institut Ljubljana

Final Review

Genoa, December 2nd - 3rd, 2004 7

Fleet Managersasking for wagons

Fleet Managersoffering wagons to the pool

Wagon LeasingCompaniesOrder Manager

WagonsMaintenance Managers

OperationalManagers,Infrastructure managers & other authorisedactors

Authorised station staff

Data Processing Module: Actors Involved

Page 8: Caminhos de Ferro Portugueses E.P. European Datacomm NV IVU Traffic Technologies AG National Technical University of Athens Prometni Institut Ljubljana

Final Review

Genoa, December 2nd - 3rd, 2004 8

Data Processing Module: Information Flow

Empty wagons path and timetable data

Wagons Running

OPM FM F-Man toolOM

time

Wagons request in coded form (O/D, loading, departure and delivery dates,

wagons quantity and type)

Wagons request (O/D, loading, departure and delivery dates,

wagons quantity and type)

F-Man options: alternative sets of empty wagons (criteria: cost,

wagons location, time availability…)

A request for verification of the OPM availability to move wagons to the transportation

origin

The OPM confirmation of availability

Order confirmation

Wagons are empty and again available

F-Man action perimeter

1 2

4

Order for the sending of empty wagons

Information to release the other alternative

6

5

Transport request

Transport confirmation

3

Wagon

Delay*: a delay compared to a given time but also a damage

9

11

12

CSTransport request including :•O/D,•loading, departure and delivery dates, •freights type and quantityor•wagon types and quantity

Real time events

16

14

87

13

14Delay * detection

10

15

Wagons movement confirmation

Wagons identification numbers

Loaded wagons path and timetable data

Event messages ( departure and arrival dates, delivery, restitution…)

Page 9: Caminhos de Ferro Portugueses E.P. European Datacomm NV IVU Traffic Technologies AG National Technical University of Athens Prometni Institut Ljubljana

Final Review

Genoa, December 2nd - 3rd, 2004 9

Data Processing Module: User Management

Select language

Allocate privileges

Page 10: Caminhos de Ferro Portugueses E.P. European Datacomm NV IVU Traffic Technologies AG National Technical University of Athens Prometni Institut Ljubljana

Final Review

Genoa, December 2nd - 3rd, 2004 10

Data Processing Module: other aspects

Agreements

Itineraries

Information

Page 11: Caminhos de Ferro Portugueses E.P. European Datacomm NV IVU Traffic Technologies AG National Technical University of Athens Prometni Institut Ljubljana

Final Review

Genoa, December 2nd - 3rd, 2004 11

Data Processing Module: ETA Management

A B C D

Re

al w

ag

on

p

osi

tio

n

Wa

go

n

po

siti

on

a

cco

rd. t

o

sch

ed

ule

Time

Railw.

nodes

Page 12: Caminhos de Ferro Portugueses E.P. European Datacomm NV IVU Traffic Technologies AG National Technical University of Athens Prometni Institut Ljubljana

Final Review

Genoa, December 2nd - 3rd, 2004 12

Asset Management:  State Machine

Page 13: Caminhos de Ferro Portugueses E.P. European Datacomm NV IVU Traffic Technologies AG National Technical University of Athens Prometni Institut Ljubljana

Final Review

Genoa, December 2nd - 3rd, 2004 13

Technical Approach

HTML client

JSP

HTML / DHTML

HTTP / SSL

firewall

RMI-IIOP RMI-IIOP

EJB session bean

EJB entity bean

RMI-IIOP

application server

web servers

database

JDBC JDBC

database-layer

business-layer

presentation-layer

CommunicationServer servlet

Page 14: Caminhos de Ferro Portugueses E.P. European Datacomm NV IVU Traffic Technologies AG National Technical University of Athens Prometni Institut Ljubljana

Final Review

Genoa, December 2nd - 3rd, 2004 14

OBT functionality and limitations: SCIRO, EDC, TechnosistemiOBT to Ground Station communication: EDC, SCIRO

User (national FMs) dependences and hostilities F-Man system role in the FMs Decision support PI, CP, SigmaRealistic level of procedure automation SCIRO Business rules NTUA IVU

ETA algorithm: NTUAState of the art software solutions: IVU NTUA SCIRO (map viewer)

Simulation analysis of management aspects: UGDIE, NTUA

Acknowledgement of Partners Contribution The high-level architecture of the system has already been defined in the Technical annex of the project.

System architecture at a more detailed level required the synthesis of the complimentary knowledge and qualification of all partners as well as the work performed in previous work-packages (user requirements, AFNOR analysis) for the analysis of the following aspects

Page 15: Caminhos de Ferro Portugueses E.P. European Datacomm NV IVU Traffic Technologies AG National Technical University of Athens Prometni Institut Ljubljana

Caminhos de FerroPortugueses E.P.

EuropeanDatacomm NV

IVU TrafficTechnologies AG

National TechnicalUniversity of Athens

Prometni InstitutLjubljana D.O.O.

SCIRO S.r.l. TECNOSISTEMI S.p.A.TLC Engineering & Services

SIGMAConseil S.a.r.l.

Università degli Studidi Genova

Thank you for your attention