calibration instructions – 500ptdealer.salfordgroup.com/uploads/userfiles/files/500... ·...

4
Calibration Instructions – 500PT 1. Mark one of the metering rollers with a felt-tip marker. 2. Pour enough product for the duration of the test into the side of the hopper with the marked roller. 3. Remove the venturi bottom plate by unhooking the rubber latch. 4. Insert the venturi cover plate into the venturis. This will ensure that product does not fall into the manifold during calibration.

Upload: others

Post on 01-Dec-2020

5 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Calibration Instructions – 500PTdealer.salfordgroup.com/uploads/userfiles/files/500... · Calibration Instructions – 500PT 1. Mark one of the metering rollers with a felt-tip

Calibration Instructions – 500PT

1. Mark one of the metering rollers with a felt-tip marker.

2. Pour enough product for the duration of the test into the side of the hopper with the

marked roller.

3. Remove the venturi bottom plate by unhooking the rubber latch.

4. Insert the venturi cover plate into the venturis. This will ensure that product does not fall

into the manifold during calibration.

Page 2: Calibration Instructions – 500PTdealer.salfordgroup.com/uploads/userfiles/files/500... · Calibration Instructions – 500PT 1. Mark one of the metering rollers with a felt-tip

5. Install the calibration crank onto the gearbox input shaft.

6. Place a large container under the venturis to catch the product. Turn the crank until

product is flowing across the entire width of the metering roller. Make sure that product

flows from the bottom of the metering roller, not the top.

7. Empty the container and place it back under the venturis.

8. Turn the crank until the metering roller turns 10 revolutions.

9. Weigh the product collected. Divide this weight by 5. The end result is the product flow

rate in pounds per revolution of the two metering rollers.

10. Multiply this product flow rate by the Metering Roller Revolutions per Acre in each

gearbox setting listed on the blank charts. Use the pesticide chart for the Red Roller and

the fertilizer chart for the Stainless Steel Roller.

11. When the chart is complete, select the gearbox setting that is closest to the desired

application rate.

Page 3: Calibration Instructions – 500PTdealer.salfordgroup.com/uploads/userfiles/files/500... · Calibration Instructions – 500PT 1. Mark one of the metering rollers with a felt-tip
Page 4: Calibration Instructions – 500PTdealer.salfordgroup.com/uploads/userfiles/files/500... · Calibration Instructions – 500PT 1. Mark one of the metering rollers with a felt-tip