cal dqm 18-25 february 2004 thomas schörner-sadenius desy, 25 february 2004

26
CAL DQM 18-25 February 2004 Thomas Schörner-Sadenius DESY, 25 February 2004

Upload: beatrice-atkinson

Post on 02-Jan-2016

217 views

Category:

Documents


2 download

TRANSCRIPT

CAL DQM18-25 February 2004

Thomas Schörner-SadeniusDESY, 25 February 2004

DESY, 25/02/2004 TSS: CAL DQM 18-25/02/2004 2

This CAL DQM Week …

… was actually very quiet

… showed only minor problems:

1. Thursday (?): Funny GFLT energy distributions; RunCo asked to check. Beams dumped soon afterwards probably beam-induced and not indicating CAL problem.

2. Friday/Sunday: Called to ZEUS hall to take calibration run (CAL_QUICK_CALIB) because shift team was busy doing MVD calibration … (?)

3. Monday: Had to restart readout several times after interfering interventions of CFLT and shift leader.

4. Tuesday: Unhappy with FEC: Leaving with 0/1/2 holes.

DESY, 25/02/2004 TSS: CAL DQM 18-25/02/2004 3

Wednesday 18th

Bad channel updateQINJ 17116: 2/0/6 (1/0/0)UNO 17117: 1/4/0 (1/1/0)PED 17118: 3/0/0 (1/0/0) calibration version 3411 with 282 bad channels, 0 holes

FECec_1 17119ec_5 17123 calibration version 3412

Trimming UNO 17124-17128Bad channel update

QINJ 17129: UNO 17128:PED 17132: calibration version 3413 (245 bad channels, 0 holes)

UNO scale factor update

FCAL BCAL RCAL TotalFEC 45 1 11 57UNO 45 95 21 161Qinj 7 3 2 12PED 11 4 0 15Total 108 103 34 245

DESY, 25/02/2004 TSS: CAL DQM 18-25/02/2004 4

Friday 20th

Bad channel update (CAL_QUICK_CALIB 48066)QINJ 1/0/0 UNO 3/9/0PED 1/1/0 calibration version 3414 with 259 bad channels, 0 holes

UNO scale factor update

Bad channel update (CAL_QUICK_CALIB 48074 with cal version 3413!)QINJ 2/0/0 UNO 6/11/0PED 1/0/0

calibration version 3415 with 268 bad channels, 0 holesUNO scale factor update

FCAL BCAL RCAL TotalFEC 45 1 11 57UNO 47 104 21 172Qinj 8 3 2 13PED 12 5 0 17Total 112 113 34 259

FCAL BCAL RCAL TotalFEC 45 1 11 57UNO 50 107 22 179Qinj 9 3 2 14PED 13 5 0 18Total 117 116 35 268

DESY, 25/02/2004 TSS: CAL DQM 18-25/02/2004 5

Friday 20th ctd’

Bad channel update QINJ 17136 0/6/0 UNO 17137 0/1/0PED 17138 0/1/0 calibration version 3416 with 276 bad channels, 0 holes

Auto_adc2voltec_1 17139 adc-to-volt constants 2314 (1 bad channel BCAL)

Bad channel update QINJ 17140 8/2/2 UNO 17141 45/101/22 (0/1/0)PED 17142 19/8/2 calibration version 3417

with 252 bad channels, 1 hole BEMC2 m22 t4

Update UNO scale factors

FCAL BCAL RCAL TotalFEC 45 1 11 57UNO 45 100 21 166Qinj 8 2 2 12PED 12 5 0 17Total 110 108 34 252

DESY, 25/02/2004 TSS: CAL DQM 18-25/02/2004 6

Sunday 22ndBad channel update

QINJ 17143 0/0/0 UNO 17144 0/7/0PED 17145 1/0/0

calibration version 3418 with 260 bad channels, BEMC2 m22 hole

Auto_adc2voltec_1 17146 adc-to-volt constants 2315

Bad channel update QINJ 17147 8/2/2 UNO 17148 46/101/22 (0/1/0)PED 17149 18/8/2 calibration version 3419

with 251 bad channels, 1 hole BEMC2 m22 t4

Update UNO scale factors

FCAL BCAL RCAL TotalFEC 45 1 11 57UNO 45 107 21 173Qinj 8 2 2 12PED 13 5 0 18Total 111 115 34 260

FCAL BCAL RCAL TotalFEC 45 1 11 57UNO 45 100 21 166Qinj 8 2 2 12PED 11 5 0 16Total 109 108 34 251

DESY, 25/02/2004 TSS: CAL DQM 18-25/02/2004 7

Monday 23rdBad channel update

QINJ 17153 1/1/0 UNO 17154 1/4/0PED 17155 2/0/0

calibration version 3420 with 259 bad channels, BEMC2 m22 hole

Some checkout runs

FCAL BCAL RCAL TotalFEC 45 1 11 57UNO 45 104 21 170Qinj 9 3 2 14PED 13 5 0 18Total 112 113 34 259

DESY, 25/02/2004 TSS: CAL DQM 18-25/02/2004 8

Tuesday 24thBad channel update (CAL_QUICK_CALIB 48176)

QINJ 0/0/0 UNO 2/3/0PED 0/0/0

calibration version 3421 with 264 bad channels, BEMC2 m22 hole

Update UNO scale factorsBad channel update

QINJ 17162 0/0/0 UNO 17163 0/3/0PED 17164 0/0/0

calibration version 3422 with 267 bad channels, BEMC2 m22 hole

FECec_1 17165ec_5 17169 FEC calibration version 3423

FCAL BCAL RCAL TotalFEC 45 1 11 57UNO 47 107 21 175Qinj 9 3 2 14PED 13 5 0 18Total 114 116 34 264

FCAL BCAL RCAL TotalFEC 45 1 11 57UNO 47 110 21 178Qinj 9 3 2 14PED 13 5 0 18Total 114 119 34 267

DESY, 25/02/2004 TSS: CAL DQM 18-25/02/2004 9

Tuesday 24th ctd’Trimming

UNO runs 17170 – 17172only short trimming, pressure from HERA. After trimming: 1 hole in BCAL (BEMC2 22/4) and two in RHAC module 21)

Bad channel updateQINJ 17174 10/3/2 UNO 17173 59/101/24 (0/1/2)PED 17175 17/9/2

calibration version 3424 with 266 bad channels, 3 holes

Update UNO scale factors

FCAL BCAL RCAL TotalFEC 43 0 11 54UNO 57 100 23 180Qinj 10 3 2 15PED 12 5 0 17Total 122 108 36 266

DESY, 25/02/2004 TSS: CAL DQM 18-25/02/2004 10

Status I Calibration version 3424 with 264 bad channels and 3

holes should go for new full calibration asap.

DQMCOC checked until end of ep runs list (48031). Zmon checking is far behind because ep runs list not

updated (and I do not want to check runs which are not needed, and I would not like to override the script that makes the CAL DQM run list entries).

No major problems … let’s look at some plots (not from newest

calibration but nevertheless they may clarify a few points for us newcomers …

DESY, 25/02/2004 TSS: CAL DQM 18-25/02/2004 11

Status IIlist of bad front end cardsF7 FEC 16 with 12 used channelsCa Crt Crd Chn Poser Mod Tow Typ Sid Index FEC Ch Nbf Code Message f 11 15 19 CE3 7 15 1 1 992 16( 8L) 1 6/6 46 Pipeline gain f 11 15 20 CE5 7 15 2 1 994 16( 8L) 2 6/6 42 Pipeline gain spread f 11 15 21 CE7 7 15 3 1 996 16( 8L) 3 6/6 42 Pipeline gain spread f 11 15 22 CE9 7 15 4 1 998 16( 8L) 4 6/6 47 Buffer gain f 11 15 24 CED 7 15 6 1 1000 16( 8L) 6 6/6 42 Pipeline gain spread f 11 15 23 CEF 7 15 7 1 1002 16( 8L) 5 6/6 46 Pipeline gain f 3 1 9 CF3 7 16 1 1 1004 16( 8L) 9 6/6 42 Pipeline gain spread f 3 1 10 CF5 7 16 2 1 1006 16( 8L) 10 6/6 47 Buffer gain f 3 1 11 CF7 7 16 3 1 1008 16( 8L) 11 6/6 65 Nonlinearity f 3 1 12 CF9 7 16 4 1 1010 16( 8L) 12 6/6 46 Pipeline gain f 3 1 8 CFD 7 16 6 1 1012 16( 8L) 8 6/6 42 Pipeline gain spread f 3 1 7 CFF 7 16 7 1 1014 16( 8L) 7 6/6 42 Pipeline gain spread

list of bad adc's/buffer chipsRCAL transputer 7 digital card 13 ADC 4 with 6 used channelsCa Crt Crd Chn Poser Mod Tow Typ Sid Index FEC Ch Nbf Code Message r 7 13 21 A86A 21 7 5 0 6495 2( 1L) 9 6/6 42 Pipeline gain spread r 7 13 20 A86C 21 7 6 0 6497 2( 1L) 8 6/6 42 Pipeline gain spread r 7 13 19 A87A 21 8 5 0 6499 2( 1L) 7 6/6 42 Pipeline gain spread r 7 13 22 A87C 21 8 6 0 6501 2( 1L) 10 6/6 42 Pipeline gain spread r 7 13 24 A88A 21 9 5 0 6503 2( 1L) 12 6/6 42 Pipeline gain spread r 7 13 23 A88C 21 9 6 0 6505 2( 1L) 11 6/6 42 Pipeline gain spread

DESY, 25/02/2004 TSS: CAL DQM 18-25/02/2004 12

DESY, 25/02/2004 TSS: CAL DQM 18-25/02/2004 13

DESY, 25/02/2004 TSS: CAL DQM 18-25/02/2004 14

DESY, 25/02/2004 TSS: CAL DQM 18-25/02/2004 15

DESY, 25/02/2004 TSS: CAL DQM 18-25/02/2004 16

DESY, 25/02/2004 TSS: CAL DQM 18-25/02/2004 17

DESY, 25/02/2004 TSS: CAL DQM 18-25/02/2004 18

DESY, 25/02/2004 TSS: CAL DQM 18-25/02/2004 19

DESY, 25/02/2004 TSS: CAL DQM 18-25/02/2004 20

DESY, 25/02/2004 TSS: CAL DQM 18-25/02/2004 21

DESY, 25/02/2004 TSS: CAL DQM 18-25/02/2004 22

DESY, 25/02/2004 TSS: CAL DQM 18-25/02/2004 23

DESY, 25/02/2004 TSS: CAL DQM 18-25/02/2004 24

DESY, 25/02/2004 TSS: CAL DQM 18-25/02/2004 25

DESY, 25/02/2004 TSS: CAL DQM 18-25/02/2004 26