41
CAIRO AIRPORT COMPANY FOD MANAGEMENT AHMED HELMY AVIATION SAFETY MANAGER 24- 26 March 2014 Cairo, Egypt 1 [email protected] March2014

Upload: others

Post on 26-Mar-2020

4 views

Category:

Documents


0 download

TRANSCRIPT

CAIRO AIRPORT COMPANY

FOD MANAGEMENT

AHMED HELMYAVIATION SAFETY MANAGER

24- 26 March 2014Cairo, Egypt

[email protected] March2014

[email protected] March2014 2

Cairo International Airport Layout

[email protected] March2014 3

CAC

SAFETY POLICY

[email protected] March2014 4

Aerodrome FOD Sources Personnel ;

Airport Infrastructure ;

The Weather Conditions ;

The Environment ;

[email protected] March2014 5

The Vehicles and Equipment

operating on the Airside ;

Apron Activities ;

Aircraft Parts & Maintenance

Activities .

[email protected] March2014 6

Aerodrome FOD Sources contd

[email protected] March2014

AerodromeFOD

Includes :-

[email protected] March2014 8

GSE Parts :

wheels

Metal parts

Rubber parts

…etc

[email protected] March2014 9

Apron Items :

paper , glass and plastic debris

mainly from catering

activities

Luggage & baggage parts

…etc

[email protected] March2014 10

Cargo Activities

Debris : pallets containers wooden

materials plastic sheets ...etc

[email protected] March2014 11

Maintenance Materials :

tools rugs ...etc

[email protected] March2014 12

ACFT Partsmetal

parts Rubber

parts ...etc

[email protected] March2014

[email protected] March2014

Runway and Taxiway Materials :

pavements parts

rubber joint

materials

broken signs and

lights

…etc

[email protected] March2014 15

ConstructionDebris :pieces of

woodstones metal objects gravels …etc

[email protected] March2014 16

The Environment : weeds plants wildlife …etc

[email protected] March2014 17

The Weather Conditions { wind , rains } :

sands standing water mud …etc

[email protected] March2014 18

FOD Management

Programme

[email protected] March2014 19

FOD Management ProgrammeComponents

PREVENTION

DETECTION

REMOVAL

EVALUATION

[email protected] March2014 20

1- Prevention Methods

Awareness :-FOD Seminars FOD BulletinsSafety Campaigns Runway Safety Team

Committee Ramp Safety Committee

[email protected] March2014 21

Training :- Airport

Staff Airside

Users

[email protected] March2014 22

1- Prevention Methods contd

Construction & WIP Activities Provisions :- Requiring Contractors to Cover all loads ;

Requiring Contractors to Secure any lose items that could

easily be blown ;

Requiring Contractors to Isolate the construction areas ;

Requiring Contractors to Clean up the construction areas

frequently .

[email protected] March2014 23

1- Prevention Methods contd

Airside Maintenance Programmes :-

Paved Areas Unpaved Areas Signage System Lighting System

[email protected] March2014 24

1- Prevention Methods contd

[email protected] March2014

Violation Penalties :-

Personnel Entities

[email protected] March2014 26

1- Prevention Methods contd

Daily InspectionProgrammes :- Runways Taxiways Aircraft Stands Service Roads Cargo Area Unpaved Areas Construction &

WIP Areas

[email protected] March2014 27

2- Detection Methods

Mechanical Cleaning :- Sweepers provided with Magnetic

Bars ( 6 units + 3 new units by April.2014 )

Sweepers ( 2 units )

FOD Disposal Trucks ( 9 units )

[email protected] March2014 28

3- Removal Methods

[email protected] March2014 29

Sweeper with Magnetic Bar

Sweeper with Magnetic Bar

Sweeper

FOD Disposal Truck

Manual Cleaning :- Manpower Picking –

Up Walking Patrols

Manpower Teams for cuttingweeds & plants in the RWYs & TWYs Strip Areas

[email protected] March2014 30

3- Removal Methods contd

صندوق المخلفات

FOD

Review the effectiveness of existing FOD-Management Procedures from daily Monitoring Reports and Self Audits ;

[email protected] March2014 31

4- EVALUATION METHODS

Verify that the Aerodrome is meeting identified performance indicators and targets ;

Communicate findings to staff and implement corrective procedures and mitigation strategies ;

[email protected] March2014 32

4- Evaluation Methods contd

Responsibility

Facilities

Information

Documentation

Continuous Improvement

[email protected] March2014

FOD Management Programme Substrates

Operation Sector

Follow Me Units

Ground Service Control Units

[email protected] March2014 34

1- Responsibility

TOOLS

EQUIPMENT

MANPOWER

[email protected] March2014 35

2- FACILITIES

3- Information EMERGENCY OPS CENTRE

OTHERS OPS UNITS ATC

AVIATION SAFETY

[email protected] March2014 36

FORMAL REPORTING

INFORMAL REPORTING

4- Documentation Inspection

Checklists FOD Event

Records Data Base

[email protected] March2014 37

•Monitoring

•Analysis

•Evaluation

•Corrective Actions

[email protected] March2014 38

5- Continuous Improvement

FOD Observations Trend (HECA/CAI)

0

5

10

15

20

25

30

35

2011 2012 2013

FOD Obs.

Years

[email protected] March2014

[email protected] March2014 40

THANK YOU …….

Make It FOD Free

[email protected] March2014