cairns city council cairns water committee 21 …...17/03/2005 house connection old smithfield rd...
TRANSCRIPT
i
CAIRNS CITY COUNCIL
CAIRNS WATER COMMITTEE
21 APRIL 2005
TABLE OF CONTENTS
1. CAIRNS WATER MONTHLY REPORT - MARCH 2005 ........................................1 Brian Smyth:JEA : 1/3/83-01: #969935
2. ENVIRONMENTAL MANAGEMENT REPORT - MARCH 2005...........................45 Ian Clayton:JEA:24/12/1-04: #979350
3. WATER - SITUATION REPORT...........................................................................48 Brian Smyth:JEA : 24/1/5-18 : #979164
4. BARRON RIVER WATER SUPPLY MARCH 2005 – PROGRESS REPORT......51 Brian Smyth: 24/22/29-01: #980267
5. COPPERLODE FALLS DAM - YEARLY INSPECTION.......................................53 Brian Smyth:JEA: 24/13/1-02: #979675 WASTE SEGMENT
6. DOMESTIC WASTE COLLECTION AND RECYCLING COLLECTION CONTRACTS – PERFORMANCE REPORT – MARCH 2005..............................56
Fenn Hughes:JEA : 24/19/79-02: #978830
7. WASTE TO SPRINGMOUNT – MARCH 2005 ....................................................61 Fenn Hughes:JEA : 13/17/3-03: #979400
8. MULTI-OCCUPANCY KERBSIDE RECYCLING .................................................63 Michael Marshall:MM: 18/57/1-03: #980591 9. SUPPORTING INFORMATION ............................................................................68
Agenda - Cairns Water Committee 21/4/05 - #980841
1
CAIRNS WATER COMMITTEE
21 APRIL 2005
1
CAIRNS WATER MONTHLY REPORT - MARCH 2005 Brian Smyth:JEA : 1/3/83-01: #969935
RECOMMENDATION:
It is recommended that this report be noted.
GENERAL MANAGER’S OVERVIEW: The monthly report on the Performance Plan will follow referenced against the Key Result Areas of Cairns Water. CAIRNS WATER 1. Sources of Revenue The total revenue of $5,431,955 was above the budgeted amount of $4,707,361, a
variance of approximately $724,593 or 15%. The breakdown of sources of revenue is shown in the attached Statement of Financial Performance.
2. Expenditure by Type Total operating expenses of $3,500,880 is below the budgeted amount of
$3,882,652, a variance of $381,773 or 9.8%. This is a major variance and is largely attributable to underspending on Chemical, R&M, Engineering Services and timing difference on Electricity.
3. Operating Capability Before Tax, Dividend and Capital Items The net operating surplus of $1,931,075 is above the budgeted amount of
$824,709, a variance of $1,106,366 due to the above mentioned.
Agenda - Cairns Water Committee 21/4/05 - #980841
2
WASTE SERVICES 1. Sources of Revenue The total revenue of $1,281,370 is above the budgeted amount of $1,276,691, a
variance of approximately $4,679 or 0.36%. This is a not a major variance. 2. Expenditure by Type Total operating expenses of $1,058,521 is below the budgeted amount of
$1,251,603, a variance of $193,081 or 15%. This is a major variance and is attributable to under spending in R&M, Other Services and External Consultants.
3. Operating Capability before Tax, Dividend and Capital Items The net operating result of $222,849 is above the expected budget amount of
$25,089, a variance of $197,760 as explained above. FINANCIAL POSITION Attached (Attachment 1) is a list of financial ratio’s that helps analyse the overall performance of Cairns Water. Included are both stability measures along with efficiency and profitability indicators. Additionally, the financial position of Cairns Water is on track. KEY RESULT AREA – SERVICE DELIVERY WATER Customer Enquiries – March 2005 These are set out on Graph 1 attached.
Agenda - Cairns Water Committee 21/4/05 - #980841
3
Monthly Report For the month of: March 2005
New Domestic Services
New Commercial Services
Water Services Repaired
General Enquiries
Leaks – Valves & Hydrants
March 2005 106 3 237 34 33
February 2005 96 6 222 44 22
January 2005 42 2 201 39 19
December 2004 87 12 191 39 79
November 2004 102 19 254 57 25
October 2004 95 8 197 73 41
September 2004 147 15 228 46 44
August 2004 74 4 281 59 55
July 2004 97 6 259 44 138
June 2004 115 9 227 49 95
May 2004 85 4 305 37 44
April 2004 52 4 198 60 24
March 2004 90 4 247 58 45
TOTALS: 1188 96 3047 639 664
Agenda - Cairns Water Committee 21/4/05 - #980841
4
North & Central Areas – Broken Mains Date Location Nature of Break Duration hours Main Size
02/03/05 7 Toohey Street Portsmith Barrel failure, joint failure & radial crack
1 100mm
03/03/05 Cnr Mulgrave & Gregory Street Earlville
Landscaper dug hole for plants and hit main – had only just started the landscaping
1 40mm
05/03/05 59 Jensen Street Manoora Joint failure, service tapping & fitting failure. 50mm takeoff broken on 225 main
1 225mm & 50mm
07/03/05 3 Melaleuca Street Manunda Renew main tapping in brass 1.5 40mm
11/03/05 Reed Road (front of school) Trinity Park
Joint failure All weekend 100mm
14/03/05 90 Christianson Street Machans Beach Radial crack. Roots from tree strangling main
2 100mm
16/03/05 450 Sheridan Street Cairns North Radial crack 2 150mm
16/03/05 440 Sheridan Street Cairns North Radial crack. Had trouble with valve shut off
4 150mm
18/03/05 Cunningham Street Yorkeys Knob Barrel failure & radial crack. Twice broken
1 100mm
18/03/05 13 Fig Tree Drive Caravonica End cap blew off. Renewed service
1 100mm
21/03/05 11 Mylchrest Street Manunda Fitting failure. Scour valve all rusted out
2 100mm
21/03/05 150 Mayers Street Manoora Barrel failure & soft due to age 3 100mm
25/03/05 124 Wilkinson Street Manunda Poor backfilling. Looks like a rock may have caused the problem
2 100mm
TOTAL HOURS: 21.5
Agenda - Cairns Water Committee 21/4/05 - #980841
5
South Area – Broken Mains
Date Location Nature of Break Duration hours Main Size
02/03/05 Sandpiper Ct Bayview Heights
Age factor 2 80mm
08/03/05 Pine Creek Road Gordonvale
Age factor 4 100mm
24/03/05 Second Beach Bessie Point
Radial crack & age factor 2.5 80mm
TOTAL HOURS: 8.5
Babinda Area – Broken Mains
Date Location Nature of Break Duration hours Main Size
15/03/05 Cod Fish Creek Barrell failure, Radial crack, poor construction methods & age factor. Pipe is in extremely bad condition
3 80mm
TOTAL HOURS: 3
Agenda - Cairns Water Committee 21/4/05 - #980841
6
KEY RESULT AREA – SERVICE DELIVERY WASTEWATER WASTEWATER DISTRIBUTION Graph 2 provides information on the nature of sewer reticulation blockages and overflows for the period July 2003/June 2005. Infiltration/Inflow Reduction Programs The matrix below details the status of the current Infiltration/Inflow investigation programme. The Portsmith and Bungalow catchments are currently being surveyed. During March a further 18 illegal stormwater connections to sewer as well as 25 manholes requiring repair were identified in these suburbs. Sewer flushing and cctv surveying continued in the northern beaches catchments.
Activity Location Illegal Connect-
ions
Low Dis-connector
Traps
Action Taken Results Achieved
Sewer Flushing
Kewarra Beach
N/a N/a N/a Continuation of flushing program - sewers are flushed prior to CCTV surveying.
CCTV Surveying
Kewarra Beach
N/a N/a N/a Continuation of cctv program - Defects found during surveying are logged for follow up repairs or rehabilitation.
Illegal Inflow Investigations
Edge Hill & Whitfield
36 illegal connections or house drain defects
35 low DT’s
Owners to be advised by correspondence.
No activity in this catchment this period.
Illegal Inflow Investigations
Portsmith 21 Illegal connections or house drain defects
3 low DT’s Owners to be advised by correspondence.
Repairs planned and follow up inspections required
Illegal Inflow Investigations
Bungalow 17 Illegal Connections or house drain defects
2 low DT’s Owners to be advised by correspondence.
Repairs planned and follow up inspections required
Illegal Inflow Investigations
Palm Cove & Clifton Beach
11 illegal connections or house drain defects
39 low DT’s
Owners advised - Plumbing Inspectors overseeing repairs
No activity in this catchment this period.
Agenda - Cairns Water Committee 21/4/05 - #980841
7
Distribution Maintenance Rainfall in March resulted in the operation of an emergency wet weather overflow valves in the Central City, Northern Beaches, and Babinda catchments. Details are as follows: - 24 pump stations were in high-level alarm at various stages due to the rainfall.
Activation of the respective wet weather overflows were required to prevent sewage surcharge onto private property. Babinda was the worst affected with overflow systems surcharging intermittently from the 11/03/05 until the 19/03/05.
- The Marlin Coast, Northern, and Southern Treatment Plants were placed on wet
weather operational procedures from the 11/03/05 until the 15/03/05 to cope with the added hydraulic loading caused during the high rainfall period. Activation of the emergency overflow from the Southern Plant lagoons was also required due to increased hydraulic flows.
Other Maintenance Works
- The planned mechanical and electrical preventative maintenance program continued during March.
- Interruption to Ergon’s mains power supplies throughout the city was the major cause of after hour’s call-out activity in March.
- External painting of pump buildings at stations’ A, B, E, F, and Kate Street began during March.
- Rising main alterations in Trinity Park to cater for the Bluewater Development was undertaken during this period.
- 28/03/05 - A minor sewage surcharge occurred onto private property due to a pump station failure at Fuller Park Edmonton. A failed PLC was the cause of the problem. No environmental damage resulted from the surcharge.
- 8 house connections (jump-ups) were repaired by maintenance crews during the month. Tree roots within these jump-ups have been the cause of repeated blockages in recent months.
Cairns Water attended to eighteen (18) sewer blockages during March. Blockage Details 03/03/2005 House Connection 549 McCormack Street 05/03/2005 House Connection Tropos Nightclub 06/03/2005 House Connection Power of the Spirit Church 10/03/2005 House Connection 9 Starling Street 14/03/2005 150mm Sewer 24 Lyndal Street 14/03/2005 150mm Sewer 93/97 Mulgrave Road 15/03/2005 150mm Sewer Lake & Aplin Streets 15/03/2005 150mm Sewer 173 McManus Street 17/03/2005 House Connection Old Smithfield Rd & LeGrande St.
Agenda - Cairns Water Committee 21/4/05 - #980841
8
18/03/2005 150mm Sewer 18 Tribulation Street 18/03/2005 150mm Sewer 32 Christensen Street 22/03/2005 House Connection 26 Minerva Street 23/03/2005 House Connection 42 Hillview Cresent 29/03/2005 150mm Sewer 43 Templeton Street 29/03/2005 150mm Sewer 150 Toogood Road 30/03/2005 House Connection 17 Ragnar Street 30/03/2005 House Connection 33 Rutherford Street 31/03/2005 House Connection Neeve Close Preventative Maintenance Programs Mechanical In March, the mechanical (fitters) section was issued 89 tasks. Of these, 74 remained outstanding at the end of the month due to additional reactive maintenance requirements. Table 1
Mechanical Mar – 05Tasks Issued 89% Preventative Mtnce. (WP) 65.17% Routine Mtnce. (WR) 15.73% Breakdown Mtnce. (WF) 17.98% Other 1.12Tasks Completed 15Tasks Outstanding 74
Electrical In March 41 jobs were issued to the electrical section of which 27 remained outstanding. Table 2
Electrical Mar – 05Tasks Issued 41% Preventative Mtnce. (WP) 36.59% Routine Mtnce. (WR) 39.02% Breakdown Mtnce. (WF) 24.39% Other 0.00Tasks Completed 14Tasks Outstanding 27
Agenda - Cairns Water Committee 21/4/05 - #980841
9
WASTEWATER TREATMENT Sewage Treatment is an Environmentally Relevant Activity (ERA) under the Environmental Protection Act (1994) and therefore requires an Environmental Authority (licence) which is issued by the Environmental Protection Agency (EPA). The licence, which was issued on 25 June 1997 and last amended on November 2001, sets out specific performance criteria for each Wastewater Treatment Plant (WWTP). Performance graphs for each of the six (6) wastewater treatment plants are shown at Graph 3 – (a) to (f). Treatment Plant Flows and Rainfall Data (Flow is listed in mega-litres – Rainfall in mm)
Period Data Marlin Coast Northern Southern Edmonton Gordonvale Babinda
Jul-04 Flow 194.070 498.361 482.917 112.450 31.770 40.203
Rainfall 38 33.5 51.5 44.5 41.5 10.2
Aug-04 Flow 194.876 489.498 471.778 111.8 28.25 35.89
Rainfall 10 10 5 3 6 7
Sep-04 Flow 182.300 450.791 436.598 101.452 25.820 35.262
Rainfall 135 65 10 23 11 90
Oct-04 Flow 205.960 462.007 433.920 109.020 26.500 32.775
Rainfall 22 30.5 22 35.5 35 51
Nov-04 Flow 181.130 452.529 432.522 106.440 29.940 33.879
Rainfall 72 110.5 103.5 103.5 73.5 213
Dec-04 Flow 187.130 470.825 465.072 112.768 24.101 39.377
Rainfall 264 269 278 317 150 142
Jan-05 Flow 226.140 650.792 692.354 126.471 40.830 68.552
Rainfall 456.5 567 634 475 369.5 593
Feb-05 Flow 184.540 543.938 555.393 116.870 40.540 52.159
Rainfall 102 112.5 219 201.5 130.5 256
Mar-05 Flow 222.670 683.463 725.627 150.170 83.490 72.341
Rainfall 277.5 424.5 511 570 417.5 819
Treatment Plant Maintenance and Environmental Incidents: The following plant maintenance occurred during March and the incidents as listed have been reported as per the environmental management system: Marlin Coast Plant & Catchment - Repairs to the belt filter press required this section of plant to be off-line for several
days. - Increased hydraulic flows required the implementation of wet weather operational
procedures. - Environmental Incidents – Emergency overflow valves operated at Kewarra and
Trinity Beach pump stations.
Agenda - Cairns Water Committee 21/4/05 - #980841
10
Northern Plant & Catchment - Mechanical repairs to the belt filter press was required resulting in this equipment
being off-line for several days. - Environmental Incidents – 11/03/05 - #2 clarifier failed due to increased hydraulic
loading. Carry over of solids from the clarifier occurred but were contained within the plant.
- Emergency overflow valves at inner city pump stations operated. Southern Plant & Catchment - 11/03/05 – Emergency overflow from the storage ponds was operated due to an
increase in hydraulic flows caused by rainfall. - Emergency overflow valves on catchment pump stations were operated. Edmonton Plant & Catchment - Replaced gravity table belt on filter press machine. - High ammonia levels in the sludge leachate were controlled by siphoning this
effluent from the old ditch and retreating it through the plant process. Gordonvale Plant & Catchment - Nil Babinda Plant & Catchment - 11/03/05 to 16/03/05 – Operation of overflow valves throughout the Babinda
catchment was required during this period due to rainfall events. All incidents have been reported to the Environmental Protection Agency. TRADE WASTE Operations within the Trade Waste Group were as usual for March 2005 with no exceptions to report. Graph 4 details the number of Trade Waste inspections carried out. KEY RESULT AREA – BUSINESS DEVELOPMENT CAPITAL WORKS 2004/2005 Cairns Water Capital Works Budget 2004/2005 $22M Cairns Water Actual + On Order for March 2005 $10.62M KEY RESULT AREA – BUSINESS DEVELOPMENT NEW MARKETS Yarrabah Council has commissioned Cairns Water to prepare a Waste Management Strategy for Yarrabah.
Agenda - Cairns Water Committee 21/4/05 - #980841
11
KEY RESULT AREA – COMMUNICATION AND MARKETING No issues to raise. KEY RESULT AREA – HUMAN RESOURCES Nine (9) vacancies exists. KEY RESULT AREA – FINANCIAL RESPONSIBILITY AND PERFORMANCE No issues to report. KEY RESULT AREA – ENVIRONMENTAL MANAGEMENT Yearly report to EPA submitted. KEY RESULT AREA – COMPLIANCE Issues relating to reporting to the EPA up to date. KEY RESULT AREA – RISK MANAGEMENT, MANAGEMENT AND STRATEGIC PLANNING WORKPLACE HEALTH & SAFETY ISSUES The following Wastewater Safety issues were actioned during the month: Continuation of Hazard Identification audits at all wastewater depots and treatment
plants in accordance with corporate requirements. Where hazards have been discovered action plans have been implemented for rectification purposes.
Continuation of Toolbox safety talks at wastewater depots in accordance with guidelines established under Council’s Safe Plan policy.
The next Cairns Water Risk-watch Meeting is scheduled for May 2005. RISK ASSESSMENT – LOSS CONTROL Recording and investigating of unsafe working practices and injury incidents by Cairns Water’s Acting Workplace Health & Safety Officer, Michael Brittliff is ongoing. Identification and rectification of unsafe working practices is the primary goal.
Agenda - Cairns Water Committee 21/4/05 - #980841
12
CONFINED SPACE ENTRY During March, Cairns Water staff in the course of their daily duties required access to confined spaces at various sites throughout the City.
Location Number of Confined Space
Entries
Registered by Teamleaders
Northern Beaches 3 Yes Central City 15 Yes Southern Areas 7 Yes
FINANCIAL: Attachment 1 – Financial Analysis, sets out graphical information for the operations of Cairns Water and Waste Management for year to date performance as at 25 March 2005. The graphs compare: - actual revenue to budget revenue YTD March - actual expenditure to budget expenditure YTD March - sources of operating revenue YTD March - capital expenditure compared to total capital works budget. ATTACHMENTS: Graph 1 – Customer Enquiries Graph 2 – Sewer Reticulation Blockages and Overflows Graph 3(a) – Marlin Coast Sewage Treatment Plant - Compliance Report March
2005 Graph 3(b) – Northern Sewage Treatment Plant – Compliance Report March 2005 Graph 3(c) – Southern Sewage Treatment Plant – Compliance Report March 2005 Graph 3(d) – Edmonton Sewage Treatment Plant – Compliance Report March 2005 Graph 3(e) – Gordonvale Sewage Treatment Plant – Compliance Report March 2005 Graph 3(f) – Babinda Sewage Treatment Plant – Compliance Report March 2005 Graph 4 – Tradewaste Inspections Graph 5 – Cairns Water (Annual Comparative Water Production) Graph 6 – Cairns Water (Copperlode Dam Spillway Level) Attachment 1 – Financial Information Brian Smyth GENERAL MANAGER CAIRNS WATER
Agenda - Cairns Water Committee 21/4/05 - #980841
13
GRAPH 1 Customer Enquiries
July 2003 to June 2005
0
5
10
15
20
25
30Ju
ly
Au
gu
st
Se
pte
mb
er
Oct
ob
er
No
vem
be
r
De
cem
be
r
Jan
ua
ry
Fe
bru
ary
Ma
rch
Ap
ril
Ma
y
Jun
e
July
Au
gu
st
Se
pte
mb
er
Oct
ob
er
No
vem
be
r
De
cem
be
r
Jan
ua
ry
Fe
bru
ary
Ma
rch
Ap
ril
Ma
y
Jun
e
Nu
mb
er
of
En
qu
irie
s
Odour Noise Turbidity/Taste Other (visual)
Agenda - Cairns Water Committee 21/4/05 - #980841
14
GRAPH 2 Sewerage Reticulation Blockages & Overflows
July 2003 to June 2005
05
101520253035404550
July
Septe
mbe
rNov
embe
rJa
nuar
y
Mar
ch
May Ju
lySep
tem
ber
Novem
ber
Janu
ary
Mar
ch
May
Nu
mb
er
of
Blo
ck
ag
es
&
Ov
erf
low
s
Blockages Overflows
Agenda - Cairns Water Committee 21/4/05 - #980841
15
Graph 3AMarlin Coast Sewage Treatment Plant - Compliance Report March 2005
0
10
20
30
40
50
60
70
BOD -Maximummeasured
value
BOD -Short term
80thpercentile
BOD- Longterm 80thpercentile
TSS -Maximummeasured
value
TSS - Shortterm 80thpercentile
TSS -Long term
80thpercentile
pH -Minimum
pH -Maximum
DissolvedOxygen -minimum
Oil andGrease -
80thpercentile
Mg
/l -
pH
un
its
Measured Value
Licence Release Limit
Mar-04
pH LicenseRelease
Limit Min - 6.5 / Max - 7.5
Agenda - Cairns Water Committee 21/4/05 - #980841
16
Graph 3BNorthern Sewage Treatment Plant - Compliance Report March 2005
0
10
20
30
40
50
60
70
80
90
100
BOD -Maximummeasured
value
BOD -Short term
80thpercentile
BOD- Longterm 80thpercentile
TSS -Maximummeasured
value
TSS -Short term
80thpercentile
TSS -Long term
80thpercentile
pH -Minimum
pH -Maximum
DissolvedOxygen -minimum
Oil andGrease -
80thpercentile
Mg
/l -
pH
Un
its
Measured Value
Licence Release Limit
Mar-04
pH License Release
LimitMin. 6.5 - Max. 7.5
Agenda - Cairns Water Committee 21/4/05 - #980841
17
Graph 3CSouthern Sewage Treatment Plant - Compliance Report March 2005
0
10
20
30
40
50
60
70
80
90
100
BOD -Maximummeasured
value
BOD -Short term
80thpercentile
BOD- Longterm 80thpercentile
TSS -Maximummeasured
value
TSS -Short term
80thpercentile
TSS -Long term
80thpercentile
pH -Minimum
pH -Maximum
DissolvedOxygen -minimum
Oil andGrease -
80thpercentile
Mg
/l -
pH
Un
its
Measured Value
Licence Release Limit
Mar-04pH License
Release Limit
Min. 6.5 - Max. 7.5
Agenda - Cairns Water Committee 21/4/05 - #980841
18
Graph 3DEdmonton Sewage Treatment Plant - Compliance Report March 2005
0
10
20
30
40
50
60
70
BOD -Maximummeasured
value
BOD -Short term
80thpercentile
BOD- Longterm 80thpercentile
TSS -Maximummeasured
value
TSS - Shortterm 80thpercentile
TSS -Long term
80thpercentile
pH -Minimum
pH -Maximum
DissolvedOxygen -minimum
Oil andGrease -
80thpercentile
Mg
/l -
pH
Un
its
Measured Value
Licence Release Limit
Mar-04pH License Release
Limit Min. 6.5 - Max. 7.5
Agenda - Cairns Water Committee 21/4/05 - #980841
19
Graph 3EGordonvale Sewage Treatment Plant - Compliance Report March 2005
0
10
20
30
40
50
60
70
BOD -Maximummeasured
value
BOD -Short term
80thpercentile
BOD- Longterm 80thpercentile
TSS -Maximummeasured
value
TSS - Shortterm 80thpercentile
TSS -Long term
80thpercentile
pH -Minimum
pH -Maximum
DissolvedOxygen -minimum
Oil andGrease -
80thpercentile
Mg
/l -
pH
Un
its
Measured Value
Licence Release Limit
Mar-04pH License
ReleaseLimit
Min. 6.5 - Max.7.5
Agenda - Cairns Water Committee 21/4/05 - #980841
20
Graph 3FBabinda Sewage Treatment Plant - Compliance Report March 2005
0
10
20
30
40
50
60
70
80
90
100
BOD -Maximummeasured
value
BOD -Short term
80thpercentile
BOD- Longterm 80thpercentile
TSS -Maximummeasured
value
TSS - Shortterm 80thpercentile
TSS - Longterm 80thpercentile
pH -Minimum
pH -Maximum
DissolvedOxygen -minimum
Oil andGrease -
80thpercentile
Mg
/l -
pH
Un
its Measured Value
Licence Release Limit
Mar-04pH License
Release Limit
Min. 6.0 - Max. 8.5
Agenda - Cairns Water Committee 21/4/05 - #980841
21
Tradewaste Inspections
0
20
40
60
80
100
120
July
Augus
tSep
tem
ber
Octo
ber
Novem
ber
Decem
ber
Janu
ary
Febru
ary
Mar
ch
April
May
June
Graph 4
Nu
mb
er o
f In
spec
tio
ns
ScheduledNumber ofInspections
ActualInspectionsCarried Out
Agenda - Cairns Water Committee 21/4/05 - #980841
22
GRAPH 5 CAIRNS WATER
(Annual Comparative - Water Production V's Rainfall)
0
500
1000
1500
2000
2500
3000
January February M arch April M ay June July August September October NovemberDecember
Months
Rai
nfa
ll in
(m
m)
Pro
du
ctio
n in
(M
L)
2004 MonthlyRainfall
2005 MonthlyRainfall
2004 MonthlyProduction
2005 MonthlyProduction
Agenda - Cairns Water Committee 21/4/05 - #980841
23
GRAPH 6CAIRNS WATER
(Copperlode Dam Spillway Level)
-7500
-7000
-6500
-6000
-5500
-5000
-4500
-4000
-3500
-3000
-2500
-2000
-1500
-1000
-500
0
500
1000
1500
2000
1 14
27
40
53
66
79
92
105
118
131
144
157
170
183
196
209
222
235
248
261
274
287
300
313
326
339
352
365
Days
Level in
(m
m)
Year 2003
Year 2004
Year 2005
Agenda - Cairns Water Committee 21/4/05 - #980841
24
25th March 2005
Executive Summary~ Overview of Financial Analysis~ Aged Debtors Analysis
Cairns Water~ Efficiency & Profitability Ratio's
~ Financial Stability Ratio's
~ Ratio Comparison~ Ratio Graphs
~ Statement of Financial Performance
~ Statement of Financial Position
~ Explanation of Statement of Financial Position
Waste Management~ Efficiency & Profitability Ratio's
~ Financial Stability Ratio's
~ Ratio Comparison~ Ratio Graphs
~ Statement of Financial Performance
~ Statement of Financial Position
~ Explanation of Statement of Financial Position
Capital Works~ Capital Work in Progress
25th March 2005
Table of Contents
iv
v
ix
ii - iiii
ixx
xx
vii -viii
xviii
xv-xvi
Page
x
xiii
xvii
vi
xiv
xi
xii
For the Month Ended
CAIRNS WATERA Business Unit of Cairns City Council
CAIRNS WATER COMMITTEE MEETINGMONTHLY REPORT
Agenda - Cairns Water Committee 21/4/05 - #980841
25
25th March 2005
In order for Council to adequately determine the efficiency, effectiveness and stability of Cairns Water, financial statements have been developed. Financial statements help by providing the Council with a snapshot of the organisation, however, the statements by themselves do not provide information on itemssuch as:
Is the organisation controlling expenditure?Are debtors tightly controlled?Are we avoiding a liquidity crisis? - eg are funds available for unforseen eventsAre we meeting financial targets?
Financial statement analysis can answer these questions. The particular focus of Cairns Water is on: Debtors Control
Measures of Efficiency and ProfitabilityMeasures of Financial Stability
Measures of Efficiency and Profitability
Measures of efficiency and profitability are relative measures. Efficiency is a relationship between somemeasure of output and a measure of input. For example Cairns Water may have a revenue of $18M andfull time equivalent staff (FTE) of 168, the measure of profitabilit in this case is 0.1M per FTE.
A measure of efficiency also is a relationship between an output and measure of input. Return on Equity isconsidered a classical measure of efficiency. As a general rule it is expected that returns would be higherthan those returns experienced in the market place from financial institutions or equivalent.
Measures of Financial Stability
Measures of financial stability are designed in two categories, generally short and long term. An exampleof short term financial stability is the working capital ratio. Such a ratio depicts the relationship between current assets and current liabilities. If current liabilities exceed current assets then it could be arguedthat the organisation is financially unstable in the short term. In many industries a general "rule" of two toone is used.
Long term measures are indicators of financial stability. A common ratio is the debt / equity ratio. This iscalculated as total debt funds represented by liabilities over total equity funds. This is a particularly usefulmeasure as it can indicate the level of risk the organisation may face if there is a high debt / equity component.
i
CAIRNS WATERA Business Unit of Cairns City Council
CAIRNS WATER COMMITTEE MEETINGEXECUTIVE SUMMARY
For the Month Ended
Agenda - Cairns Water Committee 21/4/05 - #980841
26
Water Billing issue 1st and 2nd reminder notices 44 and 51 days after the due date of issue. It is Water Billings target to have all accounts sitting in current.
Accounts which have been issued both reminder letters move into the corporate Debt Recovery process.
#REF! ii
CAIRNS WATERA Business Unit of Cairns City Council
CAIRNS WATERAGED DEBTORS ANALYSIS
As at 30th March 2005
Water Usage Charges Outstanding
0
100
200
300
400
500
600
700
800
900
1,000
Th
ou
san
ds
Water UsageCharges
Water Usage Charges 900,390 200,095 93,279 26,521 241,845
Current 30 Days 60 Days 90 Days 90 + Days
Rates Outstanding
-
200
400
600
800
1,000
1,200
1,400
Th
ou
san
ds
Water Access
Sewerage Access
Cleaner SeasLevy
CleansingCharges
Water Access 365,227 76,491 35,956
Sewerage Access 1,200,108 255,938 124,458
Cleaner Seas Levy 60,203 11,306 4,393
Cleansing Charges 509,568 108,843 89,794
Current Overdue Arrears
Agenda - Cairns Water Committee 21/4/05 - #980841
27
It is Cairns Waters target to hold all sundry fees and charges in current.
#REF! iii
CAIRNS WATERA Business Unit of Cairns City Council
CAIRNS WATERAGED DEBTORS ANALYSIS
As at 30th March 2005
Fees & Charges Outstanding
-100
-50
-
50
100
150
200
250
300
Th
ou
san
ds
Private Works
LaboratoryTesting Fees
Trade WasteCharges
CommercialWaste Charges
Private Works -79,957 -1,173 -14,317 -55,185
Laboratory Testing Fees 24,752 1,335 1,848 14,004
Trade Waste Charges 8,102 -153 4,365 9,191
Commercial Waste Charges 247,704 98,358 - 615
Current 30 Days 60 Days 90 Days +
Agenda - Cairns Water Committee 21/4/05 - #980841
28
CAIRNS WATERA Business Unit of Cairns City Council
CAIRNS WATER FINANCIAL RATIO ANALYSIS
For the Month Ended 25th March 2005
EFFICIENCY & PROFITABILITY MEASURES
Operating Profit / Person
YTD Operating Capabilities before Interest, Income Tax
& Dividend (EBIT) $20,174,103 = $120,084Number of Full Time
Equivalent (FTE) Employees 168
Return on Council Equity
YTD Operating Capabilities before Interest, Income Tax
& Dividend (EBIT) $20,174,103 = 3.96%Community Equity $510,003,312
Return on Assets
YTD Operating Capabilities before Interest, Income Tax
& Dividend (EBIT) $20,174,103 = 3.30%
Total Assets $610,656,185
Total Asset Turnover Total Operating Revenue $48,594,627 = 0.08
Total Assets $610,656,185
##iv
Provides data to management on whether operating capabilities are increasing, decreasing or remaining stagnant.
Rate of return on the councils investment in Cairns Water.
This rate of return should be compared with the cost of borrowed funds to determine whether leverage is favourable. If the ratio is greater than the cost of borrowing then leverage is favourable and will result in higher after tax earnings.
The relationship between total revenue and investment gives an indication of how many dollars in revenue the business generates out of each dollar invested in assets.
Agenda - Cairns Water Committee 21/4/05 - #980841
29
CAIRNS WATERA Business Unit of Cairns City Council
CAIRNS WATER COMMITTEE MEETINGFINANCIAL RATIO ANALYSIS
For the Month Ended 25th March 2005
FINANCIAL STABILITY MEASURES
Working Capital Ratio Current Assets $79,963,274 = 3.68
Current Liabilities $21,731,098
Debt Equity Ratio Total Liabilities $100,652,873 = 19.74%
Total Community Equity $510,003,312
Long Term Debt to Capitalisation Non Current Liabilities $78,921,775 = 13.40%
Non Current Liabilities + Community Equity $588,925,087
Net Debt per Capita Total Liabilities $100,652,873 = $1,869Net debt owed by Cairns Water per ratepayer head.
Total Number of Ratepayers 53852
v
Indicates the businesses degree of liquidity to repay current debts.
Measures the level of debt funding compared to equity funding. ie. The funding mix.
Indicates the extent to which the business has used long term debt for its permanent financing.
Agenda - Cairns Water Committee 21/4/05 - #980841
30
CAIRNS WATER
A Business Unit of Cairns City Council
CAIRNS WATER
RATIO COMPARISONS
For the Month Ended 25th March 2005
YTD February 05 YTD March 05
Operating Profit / Person $17,747,398 $105,639 $20,174,103 $120,084
168 168
Return on Council Equity $17,747,398 3.51% $20,174,103 3.96%
$505,912,345 $510,003,312
Return on Assets $17,747,398 2.91% $20,174,103 3.30%
$609,536,335 $610,656,185
Total Asset Turnover $43,162,672 0.07 $48,594,627 0.08
$609,536,335 $610,656,185
Working Capital Ratio $81,839,616 3.47 $79,963,274 3.68
$23,571,813 $21,731,098
Debt Equity Ratio $103,623,990 20.48% $100,652,873 19.74%
$505,912,345 $510,003,312
Long Term Debt to Capitalisation $80,052,177 13.66% $78,921,775 13.40%
$585,964,522 $588,925,087
Net Debt per Capita $103,623,990 $1,924 $100,652,873 $1,869
53,852 53,852
### vi
Explanation of Change
YTD Profit Increase
No Significant Change
Slight change in Asset Base compared to increasing YTD Operating Profit
YTD Profit Increase
No Significant Change
No Significant Change
No Significant Change
No Significant Change
Agenda - Cairns Water Committee 21/4/05 - #980841
31
Agenda - Cairns Water Committee 21/4/05 - #980841
32
Agenda - Cairns Water Committee 21/4/05 - #980841
33
CAIRNS WATERA Business Unit of Cairns City Council
CAIRNS WATERSTATEMENT OF FINANCIAL PERFORMANCE
For the Month Ended 25th March 2005
Period To Date Percentage Annual
Actual Budget Actual Budget Variance Budget
OPERATING REVENUE
Rates and Utility Charges 4,622,481 4,037,767 38,635,676 37,926,457 1.87% 50,200,963
Less Discount and Pensioner Remissions (140,618) (145,542) (1,287,290) (1,304,218) -1.30% (1,740,843)
Net Rates & Utility Charges 4,481,862 3,892,226 37,348,386 36,622,240 1.98% 48,460,120
Fees and Charges 311,512 210,895 2,161,683 2,023,863 6.81% 2,656,548
Interest Received 12,216 12,138 91,553 100,016 -8.46% 136,431
Miscellaneous Revenue 28,684 37,121 394,522 530,876 -25.68% 642,240
Community Service Obligations 364,982 364,982 3,284,837 3,284,837 0.00% 4,379,782
Donations 0 0 0 0 0.00% 0
Contributions 232,699 189,999 5,313,646 5,285,858 0.53% 5,855,867
Subsidies and Grants 0 0 0 0 0.00% 0
Total Operating Revenue 5,431,955 4,707,361 48,594,627 47,847,690 1.56% 62,130,989
OPERATING EXPENDITURE
Employee Costs 757,110 780,695 7,149,624 7,199,432 -0.69% 9,730,977
Materials and Services Costs 806,409 1,146,520 7,904,462 8,343,116 -5.26% 11,723,912
Depreciation and Amortisation Expenses 1,231,755 1,191,205 11,693,797 11,653,247 0.35% 15,523,150
Bank Fees and Charges 0 0 1,091 1,091 0.00% 1,121
Borrowing Costs 495,630 560,543 5,128,756 5,197,400 -1.32% 6,879,029
Other 3,161 4,613 53,730 42,233 27.22% 56,122
Competitive Neutrality Charges 237,806 237,806 1,996,831 1,996,831 0.00% 2,710,250
3,531,870 3,921,382 33,928,291 34,433,349 -1.47% 46,624,562
Less Expenses Capitalised (30,991) (38,729) (379,010) (404,293) -6.25% (521,177)
Total Operating Expenditure 3,500,880 3,882,652 33,549,281 34,029,057 -1.41% 46,103,385
OPERATING CAPABILITIES BEFORE INCOME TAX & DIVIDEND 1,931,075 824,709 15,045,347 13,818,633 8.88% 16,027,603
Notional Income Tax Expense (613,259) (287,053) (5,540,002) (5,127,606) 8.04% (5,909,218)
Notional Dividend Expense (1,086,032) (384,215) (7,664,814) (6,932,237) 10.57% (7,917,832)
OPERATING CAPABILITIES BEFORE CAPITAL ITEMS 231,784 153,441 1,840,531 1,758,790 4.65% 2,200,553
Capital Items:
Gain (Loss) on Disposal of Property Plant and Equipment 0 0 0 0 0.00% 0
Contributions 3,859,183 132,133 7,089,736 3,268,460 116.91% 5,204,380
Subsidies and Grants 0 0 185,243 112,516 0.00% 112,516
Total Capital Items 3,859,183 132,133 7,274,980 3,380,976 115.17% 5,316,896
NET OPERATING RESULT 4,090,967 285,574 9,115,510 5,139,766 77.35% 7,517,449
### ix
Year to Date
Agenda - Cairns Water Committee 21/4/05 - #980841
34
CAIRNS WATERA Business Unit of Cairns City Council
CAIRNS WATERSTATEMENT OF FINANCIAL POSITION
As at 25th March 2005
This Month Last Month Movement
CURRENT ASSETS
Cash & Cash Equivalents 73,442,985 67,477,369 5,965,616
Receivables 3,795,423 12,017,966 (8,222,543)
Inventories 147,234 133,585 13,649
Other 2,577,633 2,210,696 366,936
Total Current Assets 79,963,274 81,839,616 (1,876,342)
NON-CURRENT ASSETS
Property, Plant & Equipment 515,648,011 513,123,205 2,524,806
Capital Work in Progress 13,066,622 12,659,318 407,304
Other 1,978,278 1,914,196 64,082
Total Non-Current Assets 530,692,911 527,696,719 2,996,192
TOTAL ASSETS 610,656,185 609,536,335 1,119,850
CURRENT LIABILITIES
Creditors & Borrowings 20,741,801 22,592,578 (1,850,777)
Provisions 904,447 852,234 52,213
Other 84,850 127,001 (42,151)
Total Current Liabilities 21,731,098 23,571,813 (1,840,715)
NON-CURRENT LIABILITIES
Creditors & Borrowings 76,888,817 78,019,219 (1,130,402)
Provisions 2,032,958 2,032,958 0
Total Non-Current Liabilities 78,921,775 80,052,177 (1,130,402)
TOTAL LIABILITIES 100,652,873 103,623,990 (2,971,117)
NET COMMUNITY ASSETS 510,003,312 505,912,345 4,090,967
COMMUNITY EQUITY
Community Capital 428,384,333 428,384,333 0
Constrained Works Reserves 75,737,403 75,737,403 0
Accumulated Surplus / (Deficiency) (3,233,935) (3,233,935) 0
Current Year's Earnings / (Deficiency) 9,115,510 5,024,543 4,090,967
TOTAL COMMUNITY EQUITY 510,003,312 505,912,345 4,090,967
### x
Agenda - Cairns Water Committee 21/4/05 - #980841
35
CAIRNS WATERA Business Unit of Cairns City Council
CAIRNS WATEREXPLANATION OF STATEMENT OF FINANCIAL POSITION
As at 25th March 2005
CURRENT ASSETS
Cash & Cash Equivalents Notional bank account of Cairns Water and petty cash floats held.
Receivables Rates & fees & charges invoiced but not yet paid. Including access and usage charges.
Inventories The value of work in progress for private works jobs and the value of chemicals stored at Tunnel Hill.
Other The estimated value of water consumed but not yet invoiced.
Total Current Assets Total Cairns Water resources which provide the base for future operations. ie. This category
represents relatively liquid assets to be used within 12 months.
NON-CURRENT ASSETS
Property, Plant & Equipment The value of property, plant & equipment less accumulated depreciation.
Capital Work in Progress Total cost of work in progress on capital works activities.
Other Future income tax benefit (FITB) Cairns Water will receive due to timing differences as a result of differentaccounting and taxation rules. ie. Employee provisions are not tax deductible until actually incurred.
Total Non-Current Assets Total Cairns Water resources which provide the base for furture operations ie. This category
represents assets to be used beyond a 12 month period.
TOTAL ASSETS
CURRENT LIABILITIES
Creditors & Borrowings Trade creditors, income tax & dividend payable and the value of rates invoiced which relate to future months.
Provisions Employee provisions for annual leave and long service leave.
Total Current Liabilities Total amount which Cairns Water must pay within the next 12 months.
NON-CURRENT LIABILITIES
Creditors & Borrowings
Provisions Employee provision for long service leave which is not expected to be used within the next 12 months.
Total Non-Current Liabilities Total amount of Cairns Water debts falling due beyond the next 12 months.
TOTAL LIABILITIES
NET COMMUNITY ASSETS Total Assets minus Total Liabilities
COMMUNITY EQUITY
Community Capital
Constrained Works Reserves Monetary developer contributions which are restricted for use on future capital works for specific purposes.
Accumulated Surplus / (Deficiency)
Current Year's Earnings / (Deficiency) Year to date operating capability as shown on the statement of financial performance.
TOTAL COMMUNITY EQUITY
### xi
QTC Loan payable and the provision for deferred income tax (PDIT) payable in the future as a result of the reversal of timing differences. ie. Prepayment of subscriptions expensed over 12 months however the initial payment is fully tax deductible.
This amount represents the net assets which equates to the financial interest the council has in Cairns Water.
Represents funds which are not required to meet specific future needs. The balance of this account at the end of each financial year may be used to offset against expenditure in the following year.
The retained surplus of the business that is not available for distribution & is required to meet the current level of services to the community. ie. The value of Cairns Waters capital assets.
Agenda - Cairns Water Committee 21/4/05 - #980841
36
CAIRNS WATERA Business Unit of Cairns City Council
WASTE MANAGEMENTFINANCIAL RATIO ANALYSIS
For the Month Ended 25th March 2005
EFFICIENCY & PROFITABILITY MEASURES
Operating Profit / Person
YTD Operating Capabilities before Interest, Income Tax
& Dividend (EBIT) $1,326,490 = $120,590Number of Full Time
Equivalent (FTE) Employees 11
Return on Council Equity
YTD Operating Capabilities before Interest, Income Tax
& Dividend (EBIT) $1,326,490 = 13.76%Community Equity $9,639,822
Return on Assets
YTD Operating Capabilities before Interest, Income Tax
& Dividend (EBIT) $1,326,490 = 9.07%
Total Assets $14,623,951
Total Asset Turnover Total Operating Revenue $12,062,114 = 0.82
Total Assets $14,623,951
##xii
Provides data to management on whether operating capabilities are increasing, decreasing or remaining stagnant.
Rate of return on the councils investment in Waste Management.
This rate of return should be compared with the cost of borrowed funds to determine whether leverage is favourable. If the ratio is greater than the cost of borrowing then leverage is favourable and will result in higher after tax earnings.
The relationship between total revenue and investment gives an indication of how many dollars in revenue the business generates out of each dollar invested in assets.
Agenda - Cairns Water Committee 21/4/05 - #980841
37
CAIRNS WATERA Business Unit of Cairns City Council
WASTE MANAGEMENTFINANCIAL RATIO ANALYSIS
For the Month Ended 25th March 2005
FINANCIAL STABILITY MEASURES
Working Capital Ratio Current Assets $3,103,766 = 0.64
Current Liabilities $4,828,392
Debt Equity Ratio Total Liabilities $4,984,129 = 51.70%
Total Community Equity $9,639,822
Long Term Debt to Capitalisation Non Current Liabilities $155,737 = 1.59%
Non Current Liabilities + Community Equity $9,795,559
Net Debt per Capita Total Liabilities $4,984,129 = $93Net debt owed by Waste Management per ratepayer head.
Total Number of Ratepayers 53852
##xiii
Indicates the businesses degree of liquidity to repay current debts.
Measures the level of debt funding compared to equity funding. ie. The funding mix.
Indicates the extent to which the business has used long term debt for its permanent financing.
Agenda - Cairns Water Committee 21/4/05 - #980841
38
CAIRNS WATER
A Business Unit of Cairns City Council
WASTE MANAGEMENT
RATIO COMPARISIONS
For the Month Ended 25th March 2005
YTD February 05 YTD March 05
Operating Profit / Person $1,103,641 $100,331 $1,326,490 $120,590
11 11
Return on Council Equity $1,103,641 11.45% $1,326,490 13.76%
$9,639,821 $9,639,822
Return on Assets $1,103,641 7.36% $1,326,490 9.07%
$14,990,608 $14,623,951
Total Asset Turnover $10,780,744 0.72 $12,062,114 0.82
$14,990,608 $14,623,951
Working Capital Ratio $3,443,719 0.66 $3,103,766 0.64
$5,195,050 $4,828,392
Debt Equity Ratio $5,350,787 55.51% $4,984,129 51.70%
$9,639,821 $9,639,822
Long Term Debt to Capitalisation $155,737 1.59% $155,737 1.59%
$9,795,558 $9,795,559
Net Debt per Capita $5,350,787 $99 $4,984,129 $93
53,852 53,852
No significant change
Reduction in Current Liabilities offset by reduction in total Assets
No significant change
No significant change
Explanation of Change
YTD Profit Increase
Increase in YTD Operating Revenue and reduction in Assets (Cleansing Rates Receivables)
YTD Profit increase compared to slight asset base reduction
YTD Profit Increase
Agenda - Cairns Water Committee 21/4/05 - #980841
39
Agenda - Cairns Water Committee 21/4/05 - #980841
40
Agenda - Cairns Water Committee 21/4/05 - #980841
41
CAIRNS WATERA Business Unit of Cairns City Council
WASTE MANAGEMENTSTATEMENT OF FINANCIAL PERFORMANCE
For the Month Ended 25th March 2005
Period To Date Year to Date Percentage Annual
Actual Budget Actual Budget Variance Budget
OPERATING REVENUE
Rates and Utility Charges 963,998 963,998 8,597,287 8,597,509 0.00% 11,489,502
Less Discount and Pensioner Remissions (38,937) (46,780) (368,853) (381,477) -3.31% (521,818)
Net Rates & Utility Charges 925,061 917,218 8,228,434 8,216,032 0.15% 10,967,684
Fees and Charges 294,478 326,076 2,892,646 2,887,670 0.17% 3,865,898
Interest Received 4,059 1,482 22,742 21,646 5.06% 26,091
Miscellaneous Revenue 28,946 3,090 658,855 423,256 55.66% 432,526
Community Service Obligations 28,826 28,826 259,436 259,436 0.00% 345,915
Donations 0 0 0 0 0.00% 0
Contributions 0 0 0 0 0.00% 0
Subsidies and Grants 0 0 0 0 0.00% 0
Total Operating Revenue 1,281,370 1,276,691 12,062,114 11,808,040 2.15% 15,638,114
OPERATING EXPENDITURE
Employee Costs 76,630 82,333 733,703 748,232 -1.94% 1,007,975
Materials and Services Costs 839,671 1,027,048 8,481,656 8,526,702 -0.53% 11,358,057
Depreciation and Amortisation Expenses 30,560 30,560 306,932 306,932 0.00% 406,253
Bank Fees and Charges 0 0 22 22 0.00% 22
Borrowing Costs 0 0 0 0 0.00% 0
Other 153 153 4,050 4,050 0.00% 4,509
Competitive Neutrality Charges 111,508 111,508 1,209,263 1,209,263 0.00% 1,543,785
1,058,521 1,251,603 10,735,625 10,795,200 -0.55% 14,320,600
Less Expenses Capitalised 0 0 0 0 0.00% 0
Total Operating Expenditure 1,058,521 1,251,603 10,735,625 10,795,200 -0.55% 14,320,600
OPERATING CAPABILITIES BEFORE INCOME TAX & DIVIDEND 222,849 25,089 1,326,490 1,012,840 30.97% 1,317,514
Notional Income Tax Expense (66,854) (7,527) (437,006) (342,913) 27.44% (434,315)
Notional Dividend Expense (155,994) (17,562) (889,482) (669,928) 0.00% (794,880)
OPERATING CAPABILITIES BEFORE CAPITAL ITEMS 1 0 2 (1) 0.00% 88,319
Capital Items:
Gain (Loss) on Disposal of Property Plant and Equipment 0 0 0 0 0.00% 0
Contributions 0 0 0 0 0.00% 0
Subsidies and Grants 0 0 0 0 0.00% 0
Total Capital Items 0 0 0 0 0.00% 0
NET OPERATING RESULT 1 0 2 (1) -300.00% 88,319
### xvii
Agenda - Cairns Water Committee 21/4/05 - #980841
42
CAIRNS WATERA Business Unit of Cairns City Council
WASTE MANAGEMENTSTATEMENT OF FINANCIAL POSITION
As at 25th March 2005
This Month Last Month Movement
CURRENT ASSETS
Cash & Cash Equivalents 1,713,388 (290,425) 2,003,813
Receivables 1,199,110 3,533,379 (2,334,269)
Inventories 0 228 (228)
Other 191,268 200,537 (9,269)
Total Current Assets 3,103,766 3,443,719 (339,953)
NON-CURRENT ASSETS
Property, Plant & Equipment 11,089,736 11,120,296 (30,560)
Capital Work in Progress 587,564 578,814 8,750
Other (157,114) (152,221) (4,893)
Total Non-Current Assets 11,520,185 11,546,889 (26,704)
TOTAL ASSETS 14,623,951 14,990,608 (366,657)
CURRENT LIABILITIES
Creditors & Borrowings 4,739,659 5,115,601 (375,942)
Provisions 88,733 79,449 9,284
Total Current Liabilities 4,828,392 5,195,050 (366,658)
NON-CURRENT LIABILITIES
Creditors & Borrowings 56,170 56,170 0
Provisions 99,567 99,567 0
Total Non-Current Liabilities 155,737 155,737 0
TOTAL LIABILITIES 4,984,129 5,350,787 (366,658)
NET COMMUNITY ASSETS 9,639,822 9,639,821 1
COMMUNITY EQUITY
Community Capital 9,482,838 9,482,838 0
Constrained Works Reserve 156,981 156,981 0
Accumulated Surplus / (Deficiency) 2 2 0
Current Year's Earnings / (Deficiency) 2 1 1
TOTAL COMMUNITY EQUITY 9,639,822 9,639,821 1
### xviii
Agenda - Cairns Water Committee 21/4/05 - #980841
43
CAIRNS WATERA Business Unit of Cairns City Council
WASTE MANAGEMENTEXPLANATION OF STATEMENT OF FINANCIAL POSITION
As at 25th March 2005
CURRENT ASSETS
Cash & Cash Equivalents Notional bank account of Waste Management and till floats held.
Receivables Cleansing rates & commercial waste fees invoiced but not yet paid.
Total Current Assets Total Waste Management resources which provide the base for future operations. ie. This category
represents relatively liquid assets to be used within 12 months.
NON-CURRENT ASSETS
Property, Plant & Equipment The value of property, plant & equipment less accumulated depreciation.
Capital Work in Progress Total cost of work in progress on capital works activities.
Other Future income tax benefit (FITB) Waste Management will receive due to timing differences as a result of differentaccounting and taxation rules. ie. Employee provisions are not tax deductible until actually incurred.
Total Non-Current Assets Total Waste Management resources which provide the base for furture operations ie. This category
represents assets to be used beyond a 12 month period.
TOTAL ASSETS
CURRENT LIABILITIES
Creditors & Borrowings Trade creditors, income tax & dividend payable and the value of rates invoiced which relate to future months.
Provisions Employee provisions for annual leave and long service leave.
Total Current Liabilities Total amount which Waste Management must pay within the next 12 months.
NON-CURRENT LIABILITIES
Provisions Employee provision for long service leave which is not expected to be used within the next 12 months.
Total Non-Current Liabilities Total amount of Waste Management debts falling due beyond the next 12 months.
TOTAL LIABILITIES
NET COMMUNITY ASSETS Total Assets minus Total Liabilities
COMMUNITY EQUITY
Community Capital
Accumulated Surplus / (Deficiency)
Current Year's Earnings / (Deficiency) Year to date operating capability as shown on the statement of financial performance.
TOTAL COMMUNITY EQUITY
### ixx
This amount represents the net assets which equates to the financial interest the council has in Waste Management.
Represents funds which are not required to meet specific future needs. The balance of this account at the end of each financial year may be used to offset against expenditure in the following year.
The retained surplus of the business that is not available for distribution & is required to meet the current level of services to the community. ie. The value of Waste Managements capital assets.
Agenda - Cairns Water Committee 21/4/05 - #980841
44
### xx
CAIRNS WATERA Business Unit of Cairns City Council
CAPITAL WORKS PROGRESSFINANCIAL CHARTS
For the Month Ended 25th March 2005
CAPITAL WORKS PROGRESS(Water, Wastewater & Waste Management)
-1,000,000
3,000,000
7,000,000
11,000,000
15,000,000
19,000,000
23,000,000
Actual 2,707,367 3,292,320 4,000,927 6,089,555 9,215,404 9,926,815 10,154,000 10,441,879 10,629,328
Budget 1,861,283 3,722,566 5,583,849 7,445,132 9,306,415 11,167,698 13,028,981 14,890,264 16,751,547 18,612,830 20,474,113 22,335,396
Jul-04 Aug-04 Sep-04 Oct-04 Nov-04 Dec-04 Jan-05 Feb-05 Mar-05 Apr-05 May-05 Jun-05
Agenda - Cairns Water Committee 21/4/05 - #980841
45
CAIRNS WATER COMMITTEE
21 APRIL 2005
2
ENVIRONMENTAL MANAGEMENT REPORT - MARCH 2005 Ian Clayton:JEA:24/12/1-04: #979350
RECOMMENDATION:
It is recommended that this report be noted.
INTRODUCTION: Under the adopted Integrated Environmental Management System, a monthly Environmental Management report is to be prepared for the consideration of Council.
BACKGROUND: During the month of March three (3) incidents were recorded and reported. It should also be noted that twenty-five (25) wet weather overflow events were reported, as a result of heavy seasonal rainfall. 1. Loss of Power to Northern Wastewater Treatment Plant during 6 March 2005
On Sunday 6 March 2005 at approximately 0800 hours, power was disrupted to the Northern Wastewater Treatment Plant. It was discovered that a vehicle accident had resulted in urgent Ergon repairs. The primary generator was then engaged and normal operational works continued at the treatment plant site. At 0915 hours, mains power was restored, and the generator was shut down. During this time, waste activated sludge was being drawn from the oxidation ditch, and a high level alarm indicated a pump failure. Inspection revealed that a circuit breaker had activated. Operational procedure called for an electrical inspection prior to power reinstatement. This was immediately carried out, and power to the pump was restored. No evidence of any waste activated sludge release to the environment could be found.
Agenda - Cairns Water Committee 21/4/05 - #980841
46
2. Overflow of Treated Effluent from Lagoons at The Southern Wastewater
Treatment Plant during 11 March 2005
As a result of high seasonal rainfall substantially increasing hydraulic flow during 11 March 2005, a release of treated effluent occurred from the storage lagoons. This has occurred previously, and is the consequence of the outfall pumps being incapable of matching the incoming hydraulic flows. Programmed upgrades of this treatment plant should rectify this issue.
3. Hydraulic Failure of Clarifier #2 at Northern Wastewater Treatment Plant
during 12 March 2005.
As a result of high seasonal rainfall substantially increasing hydraulic flow during 12 March 2005, hydraulic failure of #2 Clarifier occurred. Hydraulic failure caused the sludge blanket to rise, releasing solids into the contact chamber. Emergent operational procedures were put into place, which minimized the time of occurrence, and allowed containment of bacterial sludge within the contact chamber. Samples were then collected for laboratory analysis.
Test Result (mg/l) BOD 18 Suspended Solids 48
Due to effective operational procedures, only a small increase in effluent strength was
observed. 4. Wet Weather Overflows
Location Date Activated
Time Activated (Hrs)
Date Closed Time Closed
Peevers Road
11/03/2005 1400 19/03/2005 0700
Knowles Street
11/03/2005 1500 14/03/2005 0730
Mill Street 11/03/2005 1500 14/03/2005 0735 Weinerts Creek
11/03/2005 1530 15/03/2005 0630
PS R1 12/03/2005 1600 13/03/2005 0630 Brown Street 12/03/2005 1500 13/03/2005 0630 PS R5 12/03/2005 1530 14/03/2005 1000 PS R12 11/03/2005 1530 13/03/2005 0800 Boland Street
11/03/2005 1530 13/03/2005 0800
PS S1 12/03/2005 0700 13/03/2005 0500 Marshall Street
12/03/2005 0700 13/03/2005 0500
Agenda - Cairns Water Committee 21/4/05 - #980841
47
Cont. Location Date
Activated Time Activated (Hrs)
Date Closed Time Closed
PS T1 12/03/2005 0700 13/03/2005 0200 PS C 12/03/2005 0700 13/03/2005 0900 PS D 12/03/2005 0730 13/03/2005 0500 PS E&F 12/03/2005 0730 14/03/2005 0930 PS K 12/03/2005 0730 12/03/2005 1530 Greenslopes Street
12/03/2005 0730 12/03/2005 1530
Pease Street 12/03/2005 0730 12/03/2005 1530 Woodwards PS
12/03/2005 0730 12/03/2005 1730
PS KB1 12/03/2005 0830 12/03/2005 1430 PS KB2 12/03/2005 0830 12/03/2005 1230 PS KB3 12/03/2005 0830 12/03/2005 1230 PS TB1 12/03/2005 0830 12/03/2005 1600 PS TB4 12/03/2005 0830 13/03/2005 1530 Parramatta Pk
12/03/2005 0730 12/03/2005 1530
BJ SMYTH GENERAL MANAGER CAIRNS WATER
Agenda - Cairns Water Committee 21/4/05 - #980841
48
CAIRNS WATER COMMITTEE
21 APRIL 2005
3
WATER - SITUATION REPORT Brian Smyth:JEA : 24/1/5-18 : #979164
RECOMMENDATION:
It is recommended that this report be noted.
COPPERLODE FALLS DAM - Currently at 100% full to the end of March 2005; - Rainfall recorded at the Freshwater Creek Plant for March 2005 was 476mm. The Southern Oscillation Index from the Bureau of Meteorology is positive.
Agenda - Cairns Water Committee 21/4/05 - #980841
49
Freshwater Treatment Plant Operations Statistics Finished Water Quality Recorded Low
Limit Recorded High Limit NH&MRC Limits
Apparent Colour, Pt/Co units 0.1 2.5 5
Turbidity, NTU 0.02 0.2 5
pH 6.9 7.2 6.50 – 8.50
Alkalinity, mg/L as CaCo3 10.0 11.5 N/A
Total iron, mg/L Fe 0.1 0.2 0.3
Total Manganese, mg/L Mn 0.02 0.04 0.1
Total Aluminium, mg/L A 0.02 0.06 0.2
BEHANA CREEK Behana Creek at the end of March 2005 had a creek flow at the intake weir of 85 ML/day. Behana Operations Statistics
Water Quality at Gordonvale
Recorded Low Limit
Recorded High Limit NH&MRC Limits
Apparent Colour, Pt/Co units 2.5 5.7 15
Turbidity, NTU 0.2 0.4 5
PH 7.1 7.3 6.50 – 8.50
CUSTOMER SERVICE STANDARDS - COMPLIANCE STANDARD
Freshwater Water Treatment Plant Achieved Target Total Coliform 100 89.7%
Faecal Coliform 100 97.0%
Turbidity 100 99.0%
Behana Water Treatment Plant - (Rural) Achieved Target
Total Coliform 100 89.7%
Faecal Coliform 100 97.0%
Turbidity 100 93.4%
CONSUMPTION AND RAINFALL:
The consumption trends and rainfall at Copperlode Falls Dam, Behana Creek chlorinator and Freshwater Creek Water Treatment Plant from December 2004 to March 2005 are attached.
ATTACHMENT: Water Consumption / Rainfall Chart Brian Smyth GENERAL MANAGER CAIRNS WATER
Agenda - Cairns Water Committee 21/4/05 - #980841
50
CAIRNS WATERA Business Unit of Cairns City Council
CAIRNS WATERCONSUMPTION / RAINFALL
WATER CONSUMPTION December 04 / January/February/March 05
404550556065707580859095100105110115120
01-D
ec-0
4
08-D
ec-0
4
15-D
ec-0
4
22-D
ec-0
4
29-D
ec-0
4
05-J
an-0
5
12-J
an-0
5
19-J
an-0
5
26-J
an-0
5
02-F
eb-0
5
09-F
eb-0
5
16-F
eb-0
5
23-F
eb-0
5
02-M
ar-0
5
09-M
ar-0
5
16-M
ar-0
5
23-M
ar-0
5
30-M
ar-0
5
DATE
ML
PE
R D
AY
Production Log. (Production)
RAINFALL CHART - 2005
0
100
200
300
400
500
600
700
Rainfall in MM
Copperlode Falls Dam 600 155 548.7 0 0
Freshwater Creek 480 154 476 82.5 0
Behana Creek 452.8 138.05 425 0 0
January February March April May June July AugustSeptembe
rOctober November December
Agenda - Cairns Water Committee 21/4/05 - #980841
51
CAIRNS WATER COMMITTEE
21 APRIL 2005
4
BARRON RIVER WATER SUPPLY MARCH 2005 – PROGRESS REPORT Brian Smyth: 24/22/29-01: #980267
RECOMMENDATION:
It is recommended that this report be noted.
BARRON RIVER RESOURCE OPERATIONS PLAN The release date for the Barron River Resource Operations Plan by the Department of Natural Resources and Mines remains July 2005. The following are in the process of preparation for lodgement with the Department of Natural Resources and Mines: all IDAS Application forms for the development of the infrastructure within the
Barron Gorge National Park; details of demand management issues being addressed by Council; demonstration that Barron usage does not prejudice later development of the
Mulgrave aquifer; confirmation that all other approvals are in place.
LEAST COST PLANNING STUDY The final draft report has recently been received from consultants MWH and is in the process of being reviewed. When this review is finalised it will be presented to Council for consideration.
Agenda - Cairns Water Committee 21/4/05 - #980841
52
EXPENDITURE TO DATE 2004/2005 Expenditure to date for 2004/2005:$253,918 (including committals). Revised Budget for 2004/2005:$488,932.00 has been amended due to the review of scheduled outcomes to be achieved by the end of the fiscal year of June 2005. The expenditure to date has been in the areas of:
Original Revised Carried Y.T.D Budget Budget Forward Spending 04/05 Costs
PCW2030 Barron River Water Supply 103,932 103,932 91,570 39,789 PCW5751 Least Cost Planning 35,000 35,000 9,589 35,853 PCW5804 Detailed P&D Barron River Intake 30,000 30,000 - - PCW6810 Barron River Water Supply Planning 450,000 250,000 - 178,276 PCW6855 P & D Barron River Intake 20,000 20,000 - - PCW6860 P & D Barron River Raw Water Mains 50,000 50,000 - - PCW6865 P & D Barron River Supply Mains 100,000 - - - Total 788,932 488,932 101,159 253,918 B J SMYTH GENERAL MANAGER CAIRNS WATER
Agenda - Cairns Water Committee 21/4/05 - #980841
53
CAIRNS WATER COMMITTEE
21 APRIL 2005
5
COPPERLODE FALLS DAM - YEARLY INSPECTION Brian Smyth:JEA: 24/13/1-02: #979675
RECOMMENDATION:
It is recommended that this report be noted.
BACKGROUND: The yearly inspection of Copperlode Falls Dam was recently undertaken by a senior dam hydrologist.
REPORT: The purpose of the inspection was to: a. Review the status of the access road drainage at the embankment toe and make
recommendations for any potential improvements. b. Inspect the crest wall and make recommendations after further analysis as to the
best means of raising the wall to allow the spillway to pass the Probable Maximum Flood determined in the GHD report entitled “Copperlode Falls Dam Probable Maximum Flood Revision, Hydrological and Hydraulic Modelling Results”.
c. Evaluate whether any potential safety issues have arisen due to the construction
of the access road and make recommendations for any improvements necessary to ensure the safety of the dam.
The inspection has made certain recommendations in respect of minor works in the outlet tunnel and some minor drainage works on the downstream face of the dam wall. In respect of the existing wave wall, the inspection has resulted in advice being given that the design of the wave wall should be re-assessed to provide a factor of safety of 1.5 under the highest flood level. Present studies of cyclonic conditions at the Ross River Dam in Townsville indicate that high wind speeds may occur coincidentally with high rainfall. This could have consequences given the relatively short critical storm duration at Copperlode falls Dam at the Probable Maximum Flood of six (6) hours.
Agenda - Cairns Water Committee 21/4/05 - #980841
54
The wave overtopping flows resulting from the combined wind and reservoir level can lead to significant depths and discharges over the embankment crest with the potential for back erosion through the crest and embankment breach. Cognisance of the wave overtopping flow and hydrograph for the critical storm duration should, therefore, be taken in finalising the required wave wall height necessary for safely passing the spillway design flood. It is proposed that: 1. The minor works as required by the inspection proceed. 2. The wave wall re-design be now undertaken with a view to including any
modifications in the 2005/2006 capital works budget. BJ SMYTH GENERAL MANAGER CAIRNS WATER
Agenda - Cairns Water Committee 21/4/05 - #980841
55
WASTE
SEGMENT
Agenda - Cairns Water Committee 21/4/05 - #980841
56
CAIRNS WATER COMMITTEE
21 APRIL 2005
6
DOMESTIC WASTE COLLECTION AND RECYCLING COLLECTION CONTRACTS – PERFORMANCE REPORT – MARCH 2005 Fenn Hughes:JEA : 24/19/79-02: #978830
RECOMMENDATION:
It is recommended that this report be noted. The data in the following graphs shows the collected tonnages of the kerbside garbage and recycling collection contracts from 1 July 2004 to date. Garbage Collection Contract
K e r b s id e D o m e s t ic G a r b a g e 2 0 0 4 - 2 0 0 5
01 0 0 02 0 0 03 0 0 04 0 0 05 0 0 0
J u l A u g S e p O c t N o v D e c J a n F e b M a r A p r M a y J u n
M o n t h
To
nn
es
Agenda - Cairns Water Committee 21/4/05 - #980841
57
Kerbside Recycling Collection Cairns Recycling
Cairns New Garbage Services
Cairns New Recycle Services
Cairns Recycling 2004/2005
0
100
200
300
400
500
Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun
Month
To
nn
es
New Garbage Services 2004/2005
050
100150200
1 2 3 4 5 6 7 8 9 10 11 12
Division
Nu
mb
er o
f S
ervi
ces
New Recycle Services 2004/2005
0
50
100
150
200
1 2 3 4 5 6 7 8 9 10 11 12
Division
Nu
mb
er o
f S
ervi
ces
Agenda - Cairns Water Committee 21/4/05 - #980841
58
Missed Services Garbage Bins
Missed Services Recycle Bins
Repairs Garbage Bins
Missed Services Garbage - 2004/2005
0
20
40
60
80
1 2 3 4 5 6 7 8 9 10 11 12
Division
Nu
mb
er o
f S
ervi
ces
Missed Services Recycling - 2004/2005
0
5
10
15
20
25
1 2 3 4 5 6 7 8 9 10 11 12
Division
Nu
mb
er o
f S
ervi
ces
Bin Repairs Garbage - 2004/2005
0
50
100
150
1 2 3 4 5 6 7 8 9 10 11 12
Division
Nu
mb
er o
f B
ins
Agenda - Cairns Water Committee 21/4/05 - #980841
59
Repairs Recycle Bins
Replacement Bins Garbage
Replacement Bins Recycle
Bin Repairs Recycling - 2004/2005
0
10
20
30
1 2 3 4 5 6 7 8 9 10 11 12
Division
Nu
mb
er o
f B
ins
Replacement Bins Garbage - 2004/2005
0102030405060
1 2 3 4 5 6 7 8 9 10 11 12
Division
Nu
mb
er o
f B
ins
Replacement Bins Recycling - 2004/2005
0
10
20
30
40
1 2 3 4 5 6 7 8 9 10 11 12Division
Nu
mb
er o
f B
ins
Agenda - Cairns Water Committee 21/4/05 - #980841
60
A total of seven (7) complaints were logged with the Customer Service Centre. Three (3) complaints related to the operation of Council transfer stations, one (1) to late collection of Clean Up Australia Day waste, one (1) to abuse from garbage truck driver and one (1) to non-collection of recycling bin due to contamination and one (1) to bins being remaining out after collection. All complaints were resolved to the satisfaction of the residents. Brian Smyth GENERAL MANAGER CAIRNS WATER
Agenda - Cairns Water Committee 21/4/05 - #980841
61
CAIRNS WATER COMMITTEE
21 APRIL 2005
7
WASTE TO SPRINGMOUNT – MARCH 2005 Fenn Hughes:JEA : 13/17/3-03: #979400
RECOMMENDATION:
It is recommended that this report be noted. Graph 1 This graph shows the month-by-month tonnage of waste transported to the Springmount Landfill facility from the Redden Street Temporary Transfer Station and is made up of waste from: 1. Commerce and industry 2. Council facilities 3. Domestic kerbside collection.
Redden St to Springmount
0
2000
4000
6000
8000
Nov-04 Dec-04 Jan-05 Feb-05 Mar-05 Apr-05 May-05 Jun-05
Month
To
nn
es
Agenda - Cairns Water Committee 21/4/05 - #980841
62
Graph 2 Graph 2 shows the month-by-month tonnage of waste transported to the Springmount Landfill from the Smithfield Transfer Station and is made up of waste from: 1. Domestic kerbside garbage collection 2. Domestic waste brought by residents to the transfer station.
Brian Smyth GENERAL MANAGER CAIRNS WATER
Smithfield Waste to Springmount
0.00500.00
1000.001500.002000.002500.003000.003500.00
Dec-04 Jan-05 Feb-05 Mar-05 Apr-05 May-05 Jun-05
Month
To
nn
es
Agenda - Cairns Water Committee 21/4/05 - #980841
63
CAIRNS WATER COMMITTEE
21 APRIL 2005
8
MULTI-OCCUPANCY KERBSIDE RECYCLING Michael Marshall:MM: 18/57/1-03: #980591
RECOMMENDATION:
It is recommended that this report be noted
INTRODUCTION: With the imminent completion of the new Materials Recycling Facility (MRF) at the old Portsmith landfill site (completion scheduled for early July), Cairns Water Waste Services is preparing to target multi-occupancy dwellings that currently do not recycle at kerbside.
BACKGROUND: Kerbside recycling at multi-occupancy dwellings is currently limited due to a number of factors. One of the more prominent reasons being that many of these properties were constructed pre kerbside recycling and as such don’t have the storage capacity for additional bins, another major factor has been the reluctance of multi-occupancy owners to participate in kerbside recycling due to high level of contamination experienced when they have previously participated. These issues have never really been addressed fully as Council has not had the required capacity to process recyclables at the volumes which could be expected from fully involving multi-occupancy dwellings.
COMMENT: With Council soon to have the ability to more than double its processing capacity, it is now an opportune time to target multi-occupancy dwellings and provide a full suite of options for service delivery, including flexible collection days, bin sizes which suit each individual premises and a high level of eduction aimed at getting the best possible product with minimal contamination levels.
Agenda - Cairns Water Committee 21/4/05 - #980841
64
CONSIDERATIONS: Corporate and Operational Plans: There will be no effect on operational plans as this increase in service provision is already within the scope of Waste Services contract management. Waste Services waste strategy is currently being updated to reflect this increase in multi-occupancy recycling and the to include details of the new MRF and its functions. Statutory: The only statutory issues related to this issue is that Council is required to make the service available to all ratepayers which pay the full domestic waste management charge incorporated within their rates. This provision of service achieves that objective. Financial: There are no financial implications, as these services will be covered by the domestic waste management charge on a pure cost for service basis. Sustainability: The increase in recycling volumes generated through multi-occupancy participation offers strong sustainability in the area of the waste hierarchy, which has waste reuse and recycling as a fundamental element of achieving long-term sustainability in the waste generation sector.
CONSULTATION: The consultation process will encompass Council officers making direct contact with strata owners and property managers and developing individual recycling collection systems which best suit each property within the confines of Council’s recycling collection contract. Cairns Water Business Advisory Officer has drafted a Council media release in conjunction with the letter of invitation to take up the recycling service. This media release will be issued in conjunction with Council’s PR Manager.
OPTIONS: 1. Proceed with proposed increase to multi-occupancy recycling volumes as outlined
above. 2. Do not proceed to promote and target multi-occupancy dwellings and continue to
allow these properties to only dispose of waste. This is not preferred as it is not in line with the waste hierarchy, is not conducive to sound sustainable practices by householders and is contrary to Councils aim of waste minimisation.
Agenda - Cairns Water Committee 21/4/05 - #980841
65
CONCLUSION: Option 1 offers a sustainable and viable long-term process for recovering the maximum volume of recyclable material. There is the added incentive of potential revenue from the subsequent sale of the processed product.
ATTACHMENTS: 1. Flow chart indicating timeframe for implementation 2. Copy of letter to residents and body corporate
Mick Marshall Waste Services Coordinator Brian Smyth General manager Cairns Water
Agenda - Cairns Water Committee 21/4/05 - #980841
66
Implementation of Multi-Occupancy kerbside recycling
hierarchy
Contact multi-occupancy premises
By: 22 April 2005
Conduct onsite assessments By: 27 May
2005
Delivery of bins By: 17 June
2005
Commencement of services By: 4 July
2005
Agenda - Cairns Water Committee 21/4/05 - #980841
67
ENQUIRIES: Mr F Hughes
PHONE: (07) 4044 8226
FACSIMILE: (07) 4044 8228
OUR REF: FH:#964796 24/19/86-01
{Enter "Date"} {Enter "Company"} {Enter "Address"} {Enter "Suburb"} Dear Sir/Madam
New Recycling Service for Multi-Occupancy Properties Construction has begun on a new recycling Material Recovery Facility (MRF) for the City of Cairns. The new plant will be able to process an increased volume of recyclable material collected from the kerbside. To gain an increase in recycling volumes, Council is targeting multi-occupancy properties, which currently do not recycle at the kerbside. To enable multi-occupancy properties to participate in the kerbside recycling service, Council has developed a special site specific recycling system, this will allow for the opportunity for a Council Officer to meet with a property/body corporate representative on-site to discuss the specific recycling requirements for each individual property. Council is able to offer the following options:
240 litre bin collection 360 litre bin collection Bulk bin collection Multiple weekly recycling collections if bin storage capacity is limited.
Councils recycling system allows for the collection of plastics 1, 2 and 3, glass, steel cans and tins and aluminum cans. For the opportunity to assist in increasing Cairns City Council’s recycling volumes and reduce waste at your premises, please contact Cairns Water Officer Mr Fenn Hughes on 4044 8226 as soon as possible to arrange an on-site meeting to assess your specific recycling requirements. Please note that there is no additional charge for this recycling service. If you are already using the kerbside recycle service at your multi-occupancy property, please disregard this letter. Yours faithfully
B J SMYTH
GENERAL MANAGER – CAIRNS WATER
Agenda - Cairns Water Committee 21/4/05 - #980841
68
SUPPORTING
INFORMATION
#979556
Agenda - Cairns Water Committee 21/4/05 - #980841
69
CONSULTANCY PROGRESS REPORT – MARCH 2005 BACKGROUND This report advises current progress with respect to consultancies which have been issued and are underway. All consultancies and their award have been in accordance with the adopted purchasing policy of Cairns City Council. Consultancy CW14/03 Project: Least Cost Planning Study Consultant: MWH Australia Progress: Final Report currently being reviewed Consultancy CW02/04 Project: Campbell St Pump Station Consultant: JWP Progress: Delay due to technical information Consultancy CW06a/04 Project: Wastewater Treatment Plant Upgrades Consultant: Zemek Environmental Progress: Underway - Ongoing Consultancy CW06c/04 Project: Wastewater Treatment Plant Upgrades Consultant: KPMG Cairns Progress: Underway - Ongoing
Agenda - Cairns Water Committee 21/4/05 - #980841
70
Consultancy CW13/04 Project: Kamerunga Water Treatment Plant Process Selection Consultant: GHD Progress: Ongoing Consultancy CW14/04 Project: Upgrade of Pump Stations R2, R5, WW and PC1 Consultant: GHD Progress: Draft report expected mid April Consultancy CW02/05 Project: Survey and Design of 375mm Rising Main at Smithfield Consultant: Cardno CCC Progress: Survey commencing Consultancy CW11/05 Project: Reef Cove Water & Sewerage Planning Report Consultant: GHD Progress: Draft report received
Agenda - Cairns Water Committee 21/4/05 - #980841
71
CONTRACT PROGRESS REPORT – MARCH 2005
BACKGROUND The purpose of this report is to update the Committee on the various Cairns Water contracts that are currently underway. WATER – CURRENT CONTRACTS Contract: 75106 Contract Name: Design, Supply & Install PLC, SCADA
Control Equipment, Switchboard & Switchboard Room to Freshwater Creek Water Treatment Plant
Contractor: JM Switchboards Accepted Contract Value: $421,490.00 Payments to Date: $400,298.00 Variations to Date: $10,360.00 Anticipated Completion Date: March 2005 Comments: Commissioning in progress Contract: 75172 Contract Name: Design and Construction of Service Road
Copperlode Falls Dam Contractor: B J Peach Constructions Pty Ltd Accepted Contract Value: $364,322.00 Payments to Date: $142,644.00 Variations to Date: Nil Anticipated Completion Date: March 2005 Comments: Completed - signage being installed
Agenda - Cairns Water Committee 21/4/05 - #980841
72
WASTEWATER – CURRENT CONTRACTS Contract: 75145 Contract Name: DSI Switchboards to SWWTP Contractor: JM Switchboards Accepted Contract Value: $372,580.00 Payments to Date: $384,672.50 Variations to Date: $87,145 Anticipated Completion Date: Mid May 2005 Comments: Software installation being completed -
installation works continuing. Contract: 75148 Contract Name: Integration of SCADA System Contractor: Parasyn Controls Accepted Contract Value: $420,489.00 Payments to Date: $372,377.84 Variations to Date: $1,989.39 Anticipated Completion Date: End of April 2005 Comments: Software being installed Contract: 75169 Contract Name: Construction of R8 Pump Station &
Associated Works Contractor: LDI Constructions Accepted Contract Value: $247,576.00 Payments to Date: $265,650.60 Variations to Date: $29,953.00 Anticipated Completion Date: Mid March 2005 Comments: Completed Contract: 75180 Contract Name: Construction of SWWTP Outfall Pump
Station Contractor: LDI Constructions Accepted Contract Value: $897,955.00 Payments to Date: $150,505.20 Variations to Date: Nil Anticipated Completion Date: June 2005 Comments: Progressing.
Agenda - Cairns Water Committee 21/4/05 - #980841
73
WASTE – CURRENT CONTRACTS Contract: 75155 Contract Name: Construction of Waste Recycling &
Reprocessing Faciltiy Contractor: Theiss / FGF Developments Accepted Contract Value: $4,706,876.00 Payments to Date: Nil Variations to Date: Nil Anticipated Completion Date: July 2005 Comments: Delays due to wet weather
Agenda - Cairns Water Committee 21/4/05 - #980841
74
CAIRNS WATER LABORATORY SERVICES
PROGRESS REPORT – MARCH 2005
BUDGET PERFORMANCE
Income and expenditure figures for laboratory services are included in figures 1, 2 and 3. Completed Works
This Month % of total Last Month Value ($) of completed work $119,769.97 $113,619.51 External $71,689.91 $57,618.15 YTD Average (external) $44,671.79 Internal $48,080.06 $56,001.36 YTD Average (internal) $64,654.28
Budgeted value of completed works for 2004/2005 is $ 83,778 per month. Comparative average monthly external works for 2003/2004 was $ 38,785. Comparative average monthly internal works for 2003/2004 was $ 49,283. Revenue and Expenses YTD Variance (%) Operating Revenue ($) 369,215.00 (Compared to budget) 364,919.00 + 1.18 Operating Expenses ($) 345,360.00 (Compared to budget) 322,788.00 + 6.99 Revenue and Expenditure figures for the month of March are derived from Oracle records. LABORATORY ACTIVITIES Customer Satisfaction An indication of the satisfaction of our customers can be obtained from the number of samples and analysis requests received, and also from a measure of the laboratory’s ability to produce a timely result for the customer to use.
Agenda - Cairns Water Committee 21/4/05 - #980841
75
This month saw 11 new external clients.
This Month
Last Month
12 month moving average
Target
# samples received 1029 1221 930 # analyses performed 7058 7304 5672 % samples finished in less than 14 days 87.3 89.1 90.7 98 % samples finished in less than 5 days 54.8 52.9 58.0 75
From Figure 4, 5, 6 and 7.
Agenda - Cairns Water Committee 21/4/05 - #980841
76
Figure1
Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun
Actuals
Internal 51,248.31$ 48,630.50$ 40,957.73$ 100,738.18$ 96,455.45$ 92,349.90$ 47,427.04$ 56,001.36$ 48,080.06$ -$ -$ -$
External 31,278.77$ 41,692.00$ 37,533.28$ 47,728.89$ 39,031.36$ 41,669.18$ 33,804.55$ 57,618.15$ 71,689.91$ -$ -$ -$
Total 82,527.08$ 90,322.50$ 78,491.01$ 148,467.07$ 135,486.81$ 134,019.08$ 81,231.59$ 113,619.51$ 119,769.97$ -$ -$ -$
% Internal 62.1% 53.8% 52.2% 67.9% 71.2% 68.9% 58.4% 49.3% 40.1% 0.0% 0.0% 0.0%
% External 37.9% 46.2% 47.8% 32.1% 28.8% 31.1% 41.6% 50.7% 59.9% 0.0% 0.0% 0.0%
Cumulatives
Internal 51,248.31$ 99,878.81$ 140,836.54$ 241,574.72$ 338,030.17$ 430,380.07$ 477,807.11$ 533,808.47$ 581,888.53$ ####### ####### #######
External 31,278.77$ 72,970.77$ 110,504.05$ 158,232.95$ 197,264.30$ 238,933.48$ 272,738.04$ 330,356.19$ 402,046.10$ ####### ####### #######
Total 82,527.08$ 172,849.58$ 251,340.59$ 399,807.67$ 535,294.47$ 669,313.55$ 750,545.15$ 864,164.66$ 983,934.63$ ####### ####### #######
% Internal 62% 58% 56% 60% 63% 64% 64% 62% 59% 59% 59% 59%
% External 38% 42% 44% 40% 37% 36% 36% 38% 41% 41% 41% 41%
Projections
Internal (av mth) 51,248.31$ 49,939.41$ 46,945.51$ 60,393.68$ 67,606.03$ 71,730.01$ 68,258.16$ 66,726.06$ 64,654.28$ ####### ####### #######
External (av mth) 31,278.77$ 36,485.39$ 36,834.68$ 39,558.24$ 39,452.86$ 39,822.25$ 38,962.58$ 41,294.52$ 44,671.79$ ####### ####### #######
Internal (est final) 614,979.72$ 599,272.86$ 563,346.16$ 724,724.16$ 811,272.41$ 860,760.14$ 819,097.90$ 800,712.71$ 775,851.37$ ####### ####### #######
External (est final) 375,345.27$ 437,824.64$ 442,016.22$ 474,698.84$ 473,434.32$ 477,866.97$ 467,550.92$ 495,534.29$ 536,061.47$ ####### ####### #######
Total (est final) 990,324.99$ 1,037,097.50$ 1,005,362.38$ 1,199,423.00$ 1,284,706.73$ 1,338,627.11$ 1,286,648.82$ 1,296,246.99$ 1,311,912.84$ ####### ####### #######
These figures are EXCLUDING GST
Agenda - Cairns Water Committee 21/4/05 - #980841
77
Figure 2
Cumulative Budget vs Actual
0.00
100,000.00
200,000.00
300,000.00
400,000.00
500,000.00
600,000.00
1-J
ul-0
4
1-O
ct-0
4
1-J
an
-05
3-A
pr-0
5
TOTAL OPERATING REVENUE (budget) TOTAL OPERATING REVENUE (actual) TOTAL OPERATING EXPENSES (budget) TOTAL OPERATING EXPENSES (actual)
Agenda - Cairns Water Committee 21/4/05 - #980841
78
Figure 3
Aged Trial Balance - Laboratory Testing Fees
-10,000
-
10,000
20,000
30,000
40,000
50,000
60,000
70,000
80,000
90,000
Current < 30 days > 30 days > 60 days > 90 days
Age of Accounts (days)
$ V
alu
e o
f A
cco
un
ts
Oct-04
Dec-04
Jan-05
Feb-05
Mar-05
Agenda - Cairns Water Committee 21/4/05 - #980841
79
Figure 4
Sample Completion Time
0%
10%
20%
30%
40%
50%
60%
70%
80%
90%
100%
Jan-
95
Jul-
95
Jan-
96
Jul-
96
Jan-
97
Jul-
97
Jan-
98
Jul-
98
Jan-
99
Jul-
99
Jan-
00
Jul-
00
Jan-
01
Jul-
01
Jan-
02
Jul-
02
Jan-
03
Jul-
03
Jan-
04
Jul-
04
Jan-
05
Jul-
05
Jan-
06
End of Month
% o
f S
amp
les
Co
mp
lete
d
0
200
400
600
800
1000
1200
1400
1600
To
tal N
um
ber
bo
ttle
s
>30 days >14 days>5 days <5 daystotal <14 days 98% target for <14 days75% target for <5 days Total bottles (secondary axis)12 months Mov. Avg (total <14 days) 12 month Moving average (<5 days)
Agenda - Cairns Water Committee 21/4/05 - #980841
80
Figure 5
Number of Samples Received Per Month
0
200
400
600
800
1000
1200
1400
Jan-
93
Jan-
94
Jan-
95
Jan-
96
Jan-
97
Jan-
98
Jan-
99
Jan-
00
Jan-
01
Jan-
02
Jan-
03
Jan-
04
Jan-
05
Jan-
06
Nu
mb
er S
amp
les
Monthly Total 12-month moving average
Agenda - Cairns Water Committee 21/4/05 - #980841
81
Figure 6
0
50
100
150
200
250
Jan-
00
Jul-0
0
Jan-
01
Jul-0
1
Jan-
02
Jul-0
2
Jan-
03
Jul-0
3
Jan-
04
Jul-0
4
Jan-
05
Nu
mb
er o
f A
nal
yses
Anions 12 month moving average
800
1000
1200
1400
1600
1800
Jan-
00
Jul-0
0
Jan-
01
Jul-0
1
Jan-
02
Jul-0
2
Jan-
03
Jul-0
3
Jan-
04
Jul-0
4
Jan-
05
Nu
mb
er o
f A
nal
yses
Bactos 12 month moving average
600
1100
1600
2100
2600
3100
Jan-
00
Jul-0
0
Jan-
01
Jul-0
1
Jan-
02
Jul-0
2
Jan-
03
Jul-0
3
Jan-
04
Jul-0
4
Jan-
05
Nu
mb
er o
f A
nal
yses
Physical Properties 12 month moving average
200
400
600
800
1000
1200
1400
1600
Jan-
00
Jul-0
0
Jan-
01
Jul-0
1
Jan-
02
Jul-0
2
Jan-
03
Jul-0
3
Jan-
04
Jul-0
4
Jan-
05
Nu
mb
er o
f A
nal
yses
Nutrients 12 month moving average
0100200300400500600700800900
Jan-
00
Jul-0
0
Jan-
01
Jul-0
1
Jan-
02
Jul-0
2
Jan-
03
Jul-0
3
Jan-
04
Jul-0
4
Jan-
05
Nu
mb
er o
f A
nal
yses
Metals 12 month moving average
50
150
250
350
450
550
Jan-
00
Jul-0
0
Jan-
01
Jul-0
1
Jan-
02
Jul-0
2
Jan-
03
Jul-0
3
Jan-
04
Jul-0
4
Jan-
05
Nu
mb
er o
f A
nal
yses
Solids 12 month moving average
100
300
500
700
900
1100
Jan-
00
Jul-0
0
Jan-
01
Jul-0
1
Jan-
02
Jul-0
2
Jan-
03
Jul-0
3
Jan-
04
Jul-0
4
Jan-
05
Nu
mb
er o
f A
nal
yses
Other 12 month moving average
0100200300400500600700800
Jan-
00A
pr-0
0Ju
l-00
Oct
-00
Jan-
01A
pr-0
1Ju
l-01
Oct
-01
Jan-
02A
pr-0
2Ju
l-02
Oct
-02
Jan-
03A
pr-0
3Ju
l-03
Oct
-03
Jan-
04A
pr-0
4Ju
l-04
Oct
-04
Jan-
05
Nu
mb
er o
f A
nal
yses
Subcontracted 12 month moving average
Agenda - Cairns Water Committee 21/4/05 - #980841
82
Figure 7
Total Number of Analyses - Summary Per Month
3000
3500
4000
4500
5000
5500
6000
6500
7000
7500
8000Ja
n-00
Apr
-00
Jul-0
0
Oct
-00
Jan-
01
Apr
-01
Jul-0
1
Oct
-01
Jan-
02
Apr
-02
Jul-0
2
Oct
-02
Jan-
03
Apr
-03
Jul-0
3
Oct
-03
Jan-
04
Apr
-04
Jul-0
4
Oct
-04
Jan-
05
Month
Nu
mb
er o
f A
nal
yses
(B
AR
)
Totals 12 monthly moving average
Agenda - Cairns Water Committee 21/4/05 - #980841
83