i CAIRNS CITY COUNCIL CAIRNS WATER COMMITTEE 21 APRIL 2005 TABLE OF CONTENTS 1. CAIRNS WATER MONTHLY REPORT - MARCH 2005 ........................................ 1 Brian Smyth:JEA : 1/3/83-01: #969935 2. ENVIRONMENTAL MANAGEMENT REPORT - MARCH 2005........................... 45 Ian Clayton:JEA:24/12/1-04: #979350 3. WATER - SITUATION REPORT........................................................................... 48 Brian Smyth:JEA : 24/1/5-18 : #979164 4. BARRON RIVER WATER SUPPLY MARCH 2005 – PROGRESS REPORT ...... 51 Brian Smyth: 24/22/29-01: #980267 5. COPPERLODE FALLS DAM - YEARLY INSPECTION ....................................... 53 Brian Smyth:JEA: 24/13/1-02: #979675 WASTE SEGMENT 6. DOMESTIC WASTE COLLECTION AND RECYCLING COLLECTION CONTRACTS – PERFORMANCE REPORT – MARCH 2005.............................. 56 Fenn Hughes:JEA : 24/19/79-02: #978830 7. WASTE TO SPRINGMOUNT – MARCH 2005 .................................................... 61 Fenn Hughes:JEA : 13/17/3-03: #979400 8. MULTI-OCCUPANCY KERBSIDE RECYCLING ................................................. 63 Michael Marshall:MM: 18/57/1-03: #980591 9. SUPPORTING INFORMATION ............................................................................ 68

Upload: others

Post on 19-Sep-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: CAIRNS CITY COUNCIL CAIRNS WATER COMMITTEE 21 …...17/03/2005 House Connection Old Smithfield Rd & LeGrande St. ... 18/03/2005 150mm Sewer 32 Christensen Street 22/03/2005 House Connection

i

CAIRNS CITY COUNCIL

CAIRNS WATER COMMITTEE

21 APRIL 2005

TABLE OF CONTENTS

1. CAIRNS WATER MONTHLY REPORT - MARCH 2005 ........................................1 Brian Smyth:JEA : 1/3/83-01: #969935

2. ENVIRONMENTAL MANAGEMENT REPORT - MARCH 2005...........................45 Ian Clayton:JEA:24/12/1-04: #979350

3. WATER - SITUATION REPORT...........................................................................48 Brian Smyth:JEA : 24/1/5-18 : #979164

4. BARRON RIVER WATER SUPPLY MARCH 2005 – PROGRESS REPORT......51 Brian Smyth: 24/22/29-01: #980267

5. COPPERLODE FALLS DAM - YEARLY INSPECTION.......................................53 Brian Smyth:JEA: 24/13/1-02: #979675 WASTE SEGMENT

6. DOMESTIC WASTE COLLECTION AND RECYCLING COLLECTION CONTRACTS – PERFORMANCE REPORT – MARCH 2005..............................56

Fenn Hughes:JEA : 24/19/79-02: #978830

7. WASTE TO SPRINGMOUNT – MARCH 2005 ....................................................61 Fenn Hughes:JEA : 13/17/3-03: #979400

8. MULTI-OCCUPANCY KERBSIDE RECYCLING .................................................63 Michael Marshall:MM: 18/57/1-03: #980591 9. SUPPORTING INFORMATION ............................................................................68

Page 2: CAIRNS CITY COUNCIL CAIRNS WATER COMMITTEE 21 …...17/03/2005 House Connection Old Smithfield Rd & LeGrande St. ... 18/03/2005 150mm Sewer 32 Christensen Street 22/03/2005 House Connection

Agenda - Cairns Water Committee 21/4/05 - #980841

1

CAIRNS WATER COMMITTEE

21 APRIL 2005

1

CAIRNS WATER MONTHLY REPORT - MARCH 2005 Brian Smyth:JEA : 1/3/83-01: #969935

RECOMMENDATION:

It is recommended that this report be noted.

GENERAL MANAGER’S OVERVIEW: The monthly report on the Performance Plan will follow referenced against the Key Result Areas of Cairns Water. CAIRNS WATER 1. Sources of Revenue The total revenue of $5,431,955 was above the budgeted amount of $4,707,361, a

variance of approximately $724,593 or 15%. The breakdown of sources of revenue is shown in the attached Statement of Financial Performance.

2. Expenditure by Type Total operating expenses of $3,500,880 is below the budgeted amount of

$3,882,652, a variance of $381,773 or 9.8%. This is a major variance and is largely attributable to underspending on Chemical, R&M, Engineering Services and timing difference on Electricity.

3. Operating Capability Before Tax, Dividend and Capital Items The net operating surplus of $1,931,075 is above the budgeted amount of

$824,709, a variance of $1,106,366 due to the above mentioned.

Page 3: CAIRNS CITY COUNCIL CAIRNS WATER COMMITTEE 21 …...17/03/2005 House Connection Old Smithfield Rd & LeGrande St. ... 18/03/2005 150mm Sewer 32 Christensen Street 22/03/2005 House Connection

Agenda - Cairns Water Committee 21/4/05 - #980841

2

WASTE SERVICES 1. Sources of Revenue The total revenue of $1,281,370 is above the budgeted amount of $1,276,691, a

variance of approximately $4,679 or 0.36%. This is a not a major variance. 2. Expenditure by Type Total operating expenses of $1,058,521 is below the budgeted amount of

$1,251,603, a variance of $193,081 or 15%. This is a major variance and is attributable to under spending in R&M, Other Services and External Consultants.

3. Operating Capability before Tax, Dividend and Capital Items The net operating result of $222,849 is above the expected budget amount of

$25,089, a variance of $197,760 as explained above. FINANCIAL POSITION Attached (Attachment 1) is a list of financial ratio’s that helps analyse the overall performance of Cairns Water. Included are both stability measures along with efficiency and profitability indicators. Additionally, the financial position of Cairns Water is on track. KEY RESULT AREA – SERVICE DELIVERY WATER Customer Enquiries – March 2005 These are set out on Graph 1 attached.

Page 4: CAIRNS CITY COUNCIL CAIRNS WATER COMMITTEE 21 …...17/03/2005 House Connection Old Smithfield Rd & LeGrande St. ... 18/03/2005 150mm Sewer 32 Christensen Street 22/03/2005 House Connection

Agenda - Cairns Water Committee 21/4/05 - #980841

3

Monthly Report For the month of: March 2005

New Domestic Services

New Commercial Services

Water Services Repaired

General Enquiries

Leaks – Valves & Hydrants

March 2005 106 3 237 34 33

February 2005 96 6 222 44 22

January 2005 42 2 201 39 19

December 2004 87 12 191 39 79

November 2004 102 19 254 57 25

October 2004 95 8 197 73 41

September 2004 147 15 228 46 44

August 2004 74 4 281 59 55

July 2004 97 6 259 44 138

June 2004 115 9 227 49 95

May 2004 85 4 305 37 44

April 2004 52 4 198 60 24

March 2004 90 4 247 58 45

TOTALS: 1188 96 3047 639 664

Page 5: CAIRNS CITY COUNCIL CAIRNS WATER COMMITTEE 21 …...17/03/2005 House Connection Old Smithfield Rd & LeGrande St. ... 18/03/2005 150mm Sewer 32 Christensen Street 22/03/2005 House Connection

Agenda - Cairns Water Committee 21/4/05 - #980841

4

North & Central Areas – Broken Mains Date Location Nature of Break Duration hours Main Size

02/03/05 7 Toohey Street Portsmith Barrel failure, joint failure & radial crack

1 100mm

03/03/05 Cnr Mulgrave & Gregory Street Earlville

Landscaper dug hole for plants and hit main – had only just started the landscaping

1 40mm

05/03/05 59 Jensen Street Manoora Joint failure, service tapping & fitting failure. 50mm takeoff broken on 225 main

1 225mm & 50mm

07/03/05 3 Melaleuca Street Manunda Renew main tapping in brass 1.5 40mm

11/03/05 Reed Road (front of school) Trinity Park

Joint failure All weekend 100mm

14/03/05 90 Christianson Street Machans Beach Radial crack. Roots from tree strangling main

2 100mm

16/03/05 450 Sheridan Street Cairns North Radial crack 2 150mm

16/03/05 440 Sheridan Street Cairns North Radial crack. Had trouble with valve shut off

4 150mm

18/03/05 Cunningham Street Yorkeys Knob Barrel failure & radial crack. Twice broken

1 100mm

18/03/05 13 Fig Tree Drive Caravonica End cap blew off. Renewed service

1 100mm

21/03/05 11 Mylchrest Street Manunda Fitting failure. Scour valve all rusted out

2 100mm

21/03/05 150 Mayers Street Manoora Barrel failure & soft due to age 3 100mm

25/03/05 124 Wilkinson Street Manunda Poor backfilling. Looks like a rock may have caused the problem

2 100mm

TOTAL HOURS: 21.5

Page 6: CAIRNS CITY COUNCIL CAIRNS WATER COMMITTEE 21 …...17/03/2005 House Connection Old Smithfield Rd & LeGrande St. ... 18/03/2005 150mm Sewer 32 Christensen Street 22/03/2005 House Connection

Agenda - Cairns Water Committee 21/4/05 - #980841

5

South Area – Broken Mains

Date Location Nature of Break Duration hours Main Size

02/03/05 Sandpiper Ct Bayview Heights

Age factor 2 80mm

08/03/05 Pine Creek Road Gordonvale

Age factor 4 100mm

24/03/05 Second Beach Bessie Point

Radial crack & age factor 2.5 80mm

TOTAL HOURS: 8.5

Babinda Area – Broken Mains

Date Location Nature of Break Duration hours Main Size

15/03/05 Cod Fish Creek Barrell failure, Radial crack, poor construction methods & age factor. Pipe is in extremely bad condition

3 80mm

TOTAL HOURS: 3

Page 7: CAIRNS CITY COUNCIL CAIRNS WATER COMMITTEE 21 …...17/03/2005 House Connection Old Smithfield Rd & LeGrande St. ... 18/03/2005 150mm Sewer 32 Christensen Street 22/03/2005 House Connection

Agenda - Cairns Water Committee 21/4/05 - #980841

6

KEY RESULT AREA – SERVICE DELIVERY WASTEWATER WASTEWATER DISTRIBUTION Graph 2 provides information on the nature of sewer reticulation blockages and overflows for the period July 2003/June 2005. Infiltration/Inflow Reduction Programs The matrix below details the status of the current Infiltration/Inflow investigation programme. The Portsmith and Bungalow catchments are currently being surveyed. During March a further 18 illegal stormwater connections to sewer as well as 25 manholes requiring repair were identified in these suburbs. Sewer flushing and cctv surveying continued in the northern beaches catchments.

Activity Location Illegal Connect-

ions

Low Dis-connector

Traps

Action Taken Results Achieved

Sewer Flushing

Kewarra Beach

N/a N/a N/a Continuation of flushing program - sewers are flushed prior to CCTV surveying.

CCTV Surveying

Kewarra Beach

N/a N/a N/a Continuation of cctv program - Defects found during surveying are logged for follow up repairs or rehabilitation.

Illegal Inflow Investigations

Edge Hill & Whitfield

36 illegal connections or house drain defects

35 low DT’s

Owners to be advised by correspondence.

No activity in this catchment this period.

Illegal Inflow Investigations

Portsmith 21 Illegal connections or house drain defects

3 low DT’s Owners to be advised by correspondence.

Repairs planned and follow up inspections required

Illegal Inflow Investigations

Bungalow 17 Illegal Connections or house drain defects

2 low DT’s Owners to be advised by correspondence.

Repairs planned and follow up inspections required

Illegal Inflow Investigations

Palm Cove & Clifton Beach

11 illegal connections or house drain defects

39 low DT’s

Owners advised - Plumbing Inspectors overseeing repairs

No activity in this catchment this period.

Page 8: CAIRNS CITY COUNCIL CAIRNS WATER COMMITTEE 21 …...17/03/2005 House Connection Old Smithfield Rd & LeGrande St. ... 18/03/2005 150mm Sewer 32 Christensen Street 22/03/2005 House Connection

Agenda - Cairns Water Committee 21/4/05 - #980841

7

Distribution Maintenance Rainfall in March resulted in the operation of an emergency wet weather overflow valves in the Central City, Northern Beaches, and Babinda catchments. Details are as follows: - 24 pump stations were in high-level alarm at various stages due to the rainfall.

Activation of the respective wet weather overflows were required to prevent sewage surcharge onto private property. Babinda was the worst affected with overflow systems surcharging intermittently from the 11/03/05 until the 19/03/05.

- The Marlin Coast, Northern, and Southern Treatment Plants were placed on wet

weather operational procedures from the 11/03/05 until the 15/03/05 to cope with the added hydraulic loading caused during the high rainfall period. Activation of the emergency overflow from the Southern Plant lagoons was also required due to increased hydraulic flows.

Other Maintenance Works

- The planned mechanical and electrical preventative maintenance program continued during March.

- Interruption to Ergon’s mains power supplies throughout the city was the major cause of after hour’s call-out activity in March.

- External painting of pump buildings at stations’ A, B, E, F, and Kate Street began during March.

- Rising main alterations in Trinity Park to cater for the Bluewater Development was undertaken during this period.

- 28/03/05 - A minor sewage surcharge occurred onto private property due to a pump station failure at Fuller Park Edmonton. A failed PLC was the cause of the problem. No environmental damage resulted from the surcharge.

- 8 house connections (jump-ups) were repaired by maintenance crews during the month. Tree roots within these jump-ups have been the cause of repeated blockages in recent months.

Cairns Water attended to eighteen (18) sewer blockages during March. Blockage Details 03/03/2005 House Connection 549 McCormack Street 05/03/2005 House Connection Tropos Nightclub 06/03/2005 House Connection Power of the Spirit Church 10/03/2005 House Connection 9 Starling Street 14/03/2005 150mm Sewer 24 Lyndal Street 14/03/2005 150mm Sewer 93/97 Mulgrave Road 15/03/2005 150mm Sewer Lake & Aplin Streets 15/03/2005 150mm Sewer 173 McManus Street 17/03/2005 House Connection Old Smithfield Rd & LeGrande St.

Page 9: CAIRNS CITY COUNCIL CAIRNS WATER COMMITTEE 21 …...17/03/2005 House Connection Old Smithfield Rd & LeGrande St. ... 18/03/2005 150mm Sewer 32 Christensen Street 22/03/2005 House Connection

Agenda - Cairns Water Committee 21/4/05 - #980841

8

18/03/2005 150mm Sewer 18 Tribulation Street 18/03/2005 150mm Sewer 32 Christensen Street 22/03/2005 House Connection 26 Minerva Street 23/03/2005 House Connection 42 Hillview Cresent 29/03/2005 150mm Sewer 43 Templeton Street 29/03/2005 150mm Sewer 150 Toogood Road 30/03/2005 House Connection 17 Ragnar Street 30/03/2005 House Connection 33 Rutherford Street 31/03/2005 House Connection Neeve Close Preventative Maintenance Programs Mechanical In March, the mechanical (fitters) section was issued 89 tasks. Of these, 74 remained outstanding at the end of the month due to additional reactive maintenance requirements. Table 1

Mechanical Mar – 05Tasks Issued 89% Preventative Mtnce. (WP) 65.17% Routine Mtnce. (WR) 15.73% Breakdown Mtnce. (WF) 17.98% Other 1.12Tasks Completed 15Tasks Outstanding 74

Electrical In March 41 jobs were issued to the electrical section of which 27 remained outstanding. Table 2

Electrical Mar – 05Tasks Issued 41% Preventative Mtnce. (WP) 36.59% Routine Mtnce. (WR) 39.02% Breakdown Mtnce. (WF) 24.39% Other 0.00Tasks Completed 14Tasks Outstanding 27

Page 10: CAIRNS CITY COUNCIL CAIRNS WATER COMMITTEE 21 …...17/03/2005 House Connection Old Smithfield Rd & LeGrande St. ... 18/03/2005 150mm Sewer 32 Christensen Street 22/03/2005 House Connection

Agenda - Cairns Water Committee 21/4/05 - #980841

9

WASTEWATER TREATMENT Sewage Treatment is an Environmentally Relevant Activity (ERA) under the Environmental Protection Act (1994) and therefore requires an Environmental Authority (licence) which is issued by the Environmental Protection Agency (EPA). The licence, which was issued on 25 June 1997 and last amended on November 2001, sets out specific performance criteria for each Wastewater Treatment Plant (WWTP). Performance graphs for each of the six (6) wastewater treatment plants are shown at Graph 3 – (a) to (f). Treatment Plant Flows and Rainfall Data (Flow is listed in mega-litres – Rainfall in mm)

Period Data Marlin Coast Northern Southern Edmonton Gordonvale Babinda

Jul-04 Flow 194.070 498.361 482.917 112.450 31.770 40.203

Rainfall 38 33.5 51.5 44.5 41.5 10.2

Aug-04 Flow 194.876 489.498 471.778 111.8 28.25 35.89

Rainfall 10 10 5 3 6 7

Sep-04 Flow 182.300 450.791 436.598 101.452 25.820 35.262

Rainfall 135 65 10 23 11 90

Oct-04 Flow 205.960 462.007 433.920 109.020 26.500 32.775

Rainfall 22 30.5 22 35.5 35 51

Nov-04 Flow 181.130 452.529 432.522 106.440 29.940 33.879

Rainfall 72 110.5 103.5 103.5 73.5 213

Dec-04 Flow 187.130 470.825 465.072 112.768 24.101 39.377

Rainfall 264 269 278 317 150 142

Jan-05 Flow 226.140 650.792 692.354 126.471 40.830 68.552

Rainfall 456.5 567 634 475 369.5 593

Feb-05 Flow 184.540 543.938 555.393 116.870 40.540 52.159

Rainfall 102 112.5 219 201.5 130.5 256

Mar-05 Flow 222.670 683.463 725.627 150.170 83.490 72.341

Rainfall 277.5 424.5 511 570 417.5 819

Treatment Plant Maintenance and Environmental Incidents: The following plant maintenance occurred during March and the incidents as listed have been reported as per the environmental management system: Marlin Coast Plant & Catchment - Repairs to the belt filter press required this section of plant to be off-line for several

days. - Increased hydraulic flows required the implementation of wet weather operational

procedures. - Environmental Incidents – Emergency overflow valves operated at Kewarra and

Trinity Beach pump stations.

Page 11: CAIRNS CITY COUNCIL CAIRNS WATER COMMITTEE 21 …...17/03/2005 House Connection Old Smithfield Rd & LeGrande St. ... 18/03/2005 150mm Sewer 32 Christensen Street 22/03/2005 House Connection

Agenda - Cairns Water Committee 21/4/05 - #980841

10

Northern Plant & Catchment - Mechanical repairs to the belt filter press was required resulting in this equipment

being off-line for several days. - Environmental Incidents – 11/03/05 - #2 clarifier failed due to increased hydraulic

loading. Carry over of solids from the clarifier occurred but were contained within the plant.

- Emergency overflow valves at inner city pump stations operated. Southern Plant & Catchment - 11/03/05 – Emergency overflow from the storage ponds was operated due to an

increase in hydraulic flows caused by rainfall. - Emergency overflow valves on catchment pump stations were operated. Edmonton Plant & Catchment - Replaced gravity table belt on filter press machine. - High ammonia levels in the sludge leachate were controlled by siphoning this

effluent from the old ditch and retreating it through the plant process. Gordonvale Plant & Catchment - Nil Babinda Plant & Catchment - 11/03/05 to 16/03/05 – Operation of overflow valves throughout the Babinda

catchment was required during this period due to rainfall events. All incidents have been reported to the Environmental Protection Agency. TRADE WASTE Operations within the Trade Waste Group were as usual for March 2005 with no exceptions to report. Graph 4 details the number of Trade Waste inspections carried out. KEY RESULT AREA – BUSINESS DEVELOPMENT CAPITAL WORKS 2004/2005 Cairns Water Capital Works Budget 2004/2005 $22M Cairns Water Actual + On Order for March 2005 $10.62M KEY RESULT AREA – BUSINESS DEVELOPMENT NEW MARKETS Yarrabah Council has commissioned Cairns Water to prepare a Waste Management Strategy for Yarrabah.

Page 12: CAIRNS CITY COUNCIL CAIRNS WATER COMMITTEE 21 …...17/03/2005 House Connection Old Smithfield Rd & LeGrande St. ... 18/03/2005 150mm Sewer 32 Christensen Street 22/03/2005 House Connection

Agenda - Cairns Water Committee 21/4/05 - #980841

11

KEY RESULT AREA – COMMUNICATION AND MARKETING No issues to raise. KEY RESULT AREA – HUMAN RESOURCES Nine (9) vacancies exists. KEY RESULT AREA – FINANCIAL RESPONSIBILITY AND PERFORMANCE No issues to report. KEY RESULT AREA – ENVIRONMENTAL MANAGEMENT Yearly report to EPA submitted. KEY RESULT AREA – COMPLIANCE Issues relating to reporting to the EPA up to date. KEY RESULT AREA – RISK MANAGEMENT, MANAGEMENT AND STRATEGIC PLANNING WORKPLACE HEALTH & SAFETY ISSUES The following Wastewater Safety issues were actioned during the month: Continuation of Hazard Identification audits at all wastewater depots and treatment

plants in accordance with corporate requirements. Where hazards have been discovered action plans have been implemented for rectification purposes.

Continuation of Toolbox safety talks at wastewater depots in accordance with guidelines established under Council’s Safe Plan policy.

The next Cairns Water Risk-watch Meeting is scheduled for May 2005. RISK ASSESSMENT – LOSS CONTROL Recording and investigating of unsafe working practices and injury incidents by Cairns Water’s Acting Workplace Health & Safety Officer, Michael Brittliff is ongoing. Identification and rectification of unsafe working practices is the primary goal.

Page 13: CAIRNS CITY COUNCIL CAIRNS WATER COMMITTEE 21 …...17/03/2005 House Connection Old Smithfield Rd & LeGrande St. ... 18/03/2005 150mm Sewer 32 Christensen Street 22/03/2005 House Connection

Agenda - Cairns Water Committee 21/4/05 - #980841

12

CONFINED SPACE ENTRY During March, Cairns Water staff in the course of their daily duties required access to confined spaces at various sites throughout the City.

Location Number of Confined Space

Entries

Registered by Teamleaders

Northern Beaches 3 Yes Central City 15 Yes Southern Areas 7 Yes

FINANCIAL: Attachment 1 – Financial Analysis, sets out graphical information for the operations of Cairns Water and Waste Management for year to date performance as at 25 March 2005. The graphs compare: - actual revenue to budget revenue YTD March - actual expenditure to budget expenditure YTD March - sources of operating revenue YTD March - capital expenditure compared to total capital works budget. ATTACHMENTS: Graph 1 – Customer Enquiries Graph 2 – Sewer Reticulation Blockages and Overflows Graph 3(a) – Marlin Coast Sewage Treatment Plant - Compliance Report March

2005 Graph 3(b) – Northern Sewage Treatment Plant – Compliance Report March 2005 Graph 3(c) – Southern Sewage Treatment Plant – Compliance Report March 2005 Graph 3(d) – Edmonton Sewage Treatment Plant – Compliance Report March 2005 Graph 3(e) – Gordonvale Sewage Treatment Plant – Compliance Report March 2005 Graph 3(f) – Babinda Sewage Treatment Plant – Compliance Report March 2005 Graph 4 – Tradewaste Inspections Graph 5 – Cairns Water (Annual Comparative Water Production) Graph 6 – Cairns Water (Copperlode Dam Spillway Level) Attachment 1 – Financial Information Brian Smyth GENERAL MANAGER CAIRNS WATER

Page 14: CAIRNS CITY COUNCIL CAIRNS WATER COMMITTEE 21 …...17/03/2005 House Connection Old Smithfield Rd & LeGrande St. ... 18/03/2005 150mm Sewer 32 Christensen Street 22/03/2005 House Connection

Agenda - Cairns Water Committee 21/4/05 - #980841

13

GRAPH 1 Customer Enquiries

July 2003 to June 2005

0

5

10

15

20

25

30Ju

ly

Au

gu

st

Se

pte

mb

er

Oct

ob

er

No

vem

be

r

De

cem

be

r

Jan

ua

ry

Fe

bru

ary

Ma

rch

Ap

ril

Ma

y

Jun

e

July

Au

gu

st

Se

pte

mb

er

Oct

ob

er

No

vem

be

r

De

cem

be

r

Jan

ua

ry

Fe

bru

ary

Ma

rch

Ap

ril

Ma

y

Jun

e

Nu

mb

er

of

En

qu

irie

s

Odour Noise Turbidity/Taste Other (visual)

Page 15: CAIRNS CITY COUNCIL CAIRNS WATER COMMITTEE 21 …...17/03/2005 House Connection Old Smithfield Rd & LeGrande St. ... 18/03/2005 150mm Sewer 32 Christensen Street 22/03/2005 House Connection

Agenda - Cairns Water Committee 21/4/05 - #980841

14

GRAPH 2 Sewerage Reticulation Blockages & Overflows

July 2003 to June 2005

05

101520253035404550

July

Septe

mbe

rNov

embe

rJa

nuar

y

Mar

ch

May Ju

lySep

tem

ber

Novem

ber

Janu

ary

Mar

ch

May

Nu

mb

er

of

Blo

ck

ag

es

&

Ov

erf

low

s

Blockages Overflows

Page 16: CAIRNS CITY COUNCIL CAIRNS WATER COMMITTEE 21 …...17/03/2005 House Connection Old Smithfield Rd & LeGrande St. ... 18/03/2005 150mm Sewer 32 Christensen Street 22/03/2005 House Connection

Agenda - Cairns Water Committee 21/4/05 - #980841

15

Graph 3AMarlin Coast Sewage Treatment Plant - Compliance Report March 2005

0

10

20

30

40

50

60

70

BOD -Maximummeasured

value

BOD -Short term

80thpercentile

BOD- Longterm 80thpercentile

TSS -Maximummeasured

value

TSS - Shortterm 80thpercentile

TSS -Long term

80thpercentile

pH -Minimum

pH -Maximum

DissolvedOxygen -minimum

Oil andGrease -

80thpercentile

Mg

/l -

pH

un

its

Measured Value

Licence Release Limit

Mar-04

pH LicenseRelease

Limit Min - 6.5 / Max - 7.5

Page 17: CAIRNS CITY COUNCIL CAIRNS WATER COMMITTEE 21 …...17/03/2005 House Connection Old Smithfield Rd & LeGrande St. ... 18/03/2005 150mm Sewer 32 Christensen Street 22/03/2005 House Connection

Agenda - Cairns Water Committee 21/4/05 - #980841

16

Graph 3BNorthern Sewage Treatment Plant - Compliance Report March 2005

0

10

20

30

40

50

60

70

80

90

100

BOD -Maximummeasured

value

BOD -Short term

80thpercentile

BOD- Longterm 80thpercentile

TSS -Maximummeasured

value

TSS -Short term

80thpercentile

TSS -Long term

80thpercentile

pH -Minimum

pH -Maximum

DissolvedOxygen -minimum

Oil andGrease -

80thpercentile

Mg

/l -

pH

Un

its

Measured Value

Licence Release Limit

Mar-04

pH License Release

LimitMin. 6.5 - Max. 7.5

Page 18: CAIRNS CITY COUNCIL CAIRNS WATER COMMITTEE 21 …...17/03/2005 House Connection Old Smithfield Rd & LeGrande St. ... 18/03/2005 150mm Sewer 32 Christensen Street 22/03/2005 House Connection

Agenda - Cairns Water Committee 21/4/05 - #980841

17

Graph 3CSouthern Sewage Treatment Plant - Compliance Report March 2005

0

10

20

30

40

50

60

70

80

90

100

BOD -Maximummeasured

value

BOD -Short term

80thpercentile

BOD- Longterm 80thpercentile

TSS -Maximummeasured

value

TSS -Short term

80thpercentile

TSS -Long term

80thpercentile

pH -Minimum

pH -Maximum

DissolvedOxygen -minimum

Oil andGrease -

80thpercentile

Mg

/l -

pH

Un

its

Measured Value

Licence Release Limit

Mar-04pH License

Release Limit

Min. 6.5 - Max. 7.5

Page 19: CAIRNS CITY COUNCIL CAIRNS WATER COMMITTEE 21 …...17/03/2005 House Connection Old Smithfield Rd & LeGrande St. ... 18/03/2005 150mm Sewer 32 Christensen Street 22/03/2005 House Connection

Agenda - Cairns Water Committee 21/4/05 - #980841

18

Graph 3DEdmonton Sewage Treatment Plant - Compliance Report March 2005

0

10

20

30

40

50

60

70

BOD -Maximummeasured

value

BOD -Short term

80thpercentile

BOD- Longterm 80thpercentile

TSS -Maximummeasured

value

TSS - Shortterm 80thpercentile

TSS -Long term

80thpercentile

pH -Minimum

pH -Maximum

DissolvedOxygen -minimum

Oil andGrease -

80thpercentile

Mg

/l -

pH

Un

its

Measured Value

Licence Release Limit

Mar-04pH License Release

Limit Min. 6.5 - Max. 7.5

Page 20: CAIRNS CITY COUNCIL CAIRNS WATER COMMITTEE 21 …...17/03/2005 House Connection Old Smithfield Rd & LeGrande St. ... 18/03/2005 150mm Sewer 32 Christensen Street 22/03/2005 House Connection

Agenda - Cairns Water Committee 21/4/05 - #980841

19

Graph 3EGordonvale Sewage Treatment Plant - Compliance Report March 2005

0

10

20

30

40

50

60

70

BOD -Maximummeasured

value

BOD -Short term

80thpercentile

BOD- Longterm 80thpercentile

TSS -Maximummeasured

value

TSS - Shortterm 80thpercentile

TSS -Long term

80thpercentile

pH -Minimum

pH -Maximum

DissolvedOxygen -minimum

Oil andGrease -

80thpercentile

Mg

/l -

pH

Un

its

Measured Value

Licence Release Limit

Mar-04pH License

ReleaseLimit

Min. 6.5 - Max.7.5

Page 21: CAIRNS CITY COUNCIL CAIRNS WATER COMMITTEE 21 …...17/03/2005 House Connection Old Smithfield Rd & LeGrande St. ... 18/03/2005 150mm Sewer 32 Christensen Street 22/03/2005 House Connection

Agenda - Cairns Water Committee 21/4/05 - #980841

20

Graph 3FBabinda Sewage Treatment Plant - Compliance Report March 2005

0

10

20

30

40

50

60

70

80

90

100

BOD -Maximummeasured

value

BOD -Short term

80thpercentile

BOD- Longterm 80thpercentile

TSS -Maximummeasured

value

TSS - Shortterm 80thpercentile

TSS - Longterm 80thpercentile

pH -Minimum

pH -Maximum

DissolvedOxygen -minimum

Oil andGrease -

80thpercentile

Mg

/l -

pH

Un

its Measured Value

Licence Release Limit

Mar-04pH License

Release Limit

Min. 6.0 - Max. 8.5

Page 22: CAIRNS CITY COUNCIL CAIRNS WATER COMMITTEE 21 …...17/03/2005 House Connection Old Smithfield Rd & LeGrande St. ... 18/03/2005 150mm Sewer 32 Christensen Street 22/03/2005 House Connection

Agenda - Cairns Water Committee 21/4/05 - #980841

21

Tradewaste Inspections

0

20

40

60

80

100

120

July

Augus

tSep

tem

ber

Octo

ber

Novem

ber

Decem

ber

Janu

ary

Febru

ary

Mar

ch

April

May

June

Graph 4

Nu

mb

er o

f In

spec

tio

ns

ScheduledNumber ofInspections

ActualInspectionsCarried Out

Page 23: CAIRNS CITY COUNCIL CAIRNS WATER COMMITTEE 21 …...17/03/2005 House Connection Old Smithfield Rd & LeGrande St. ... 18/03/2005 150mm Sewer 32 Christensen Street 22/03/2005 House Connection

Agenda - Cairns Water Committee 21/4/05 - #980841

22

GRAPH 5 CAIRNS WATER

(Annual Comparative - Water Production V's Rainfall)

0

500

1000

1500

2000

2500

3000

January February M arch April M ay June July August September October NovemberDecember

Months

Rai

nfa

ll in

(m

m)

Pro

du

ctio

n in

(M

L)

2004 MonthlyRainfall

2005 MonthlyRainfall

2004 MonthlyProduction

2005 MonthlyProduction

Page 24: CAIRNS CITY COUNCIL CAIRNS WATER COMMITTEE 21 …...17/03/2005 House Connection Old Smithfield Rd & LeGrande St. ... 18/03/2005 150mm Sewer 32 Christensen Street 22/03/2005 House Connection

Agenda - Cairns Water Committee 21/4/05 - #980841

23

GRAPH 6CAIRNS WATER

(Copperlode Dam Spillway Level)

-7500

-7000

-6500

-6000

-5500

-5000

-4500

-4000

-3500

-3000

-2500

-2000

-1500

-1000

-500

0

500

1000

1500

2000

1 14

27

40

53

66

79

92

105

118

131

144

157

170

183

196

209

222

235

248

261

274

287

300

313

326

339

352

365

Days

Level in

(m

m)

Year 2003

Year 2004

Year 2005

Page 25: CAIRNS CITY COUNCIL CAIRNS WATER COMMITTEE 21 …...17/03/2005 House Connection Old Smithfield Rd & LeGrande St. ... 18/03/2005 150mm Sewer 32 Christensen Street 22/03/2005 House Connection

Agenda - Cairns Water Committee 21/4/05 - #980841

24

25th March 2005

Executive Summary~ Overview of Financial Analysis~ Aged Debtors Analysis

Cairns Water~ Efficiency & Profitability Ratio's

~ Financial Stability Ratio's

~ Ratio Comparison~ Ratio Graphs

~ Statement of Financial Performance

~ Statement of Financial Position

~ Explanation of Statement of Financial Position

Waste Management~ Efficiency & Profitability Ratio's

~ Financial Stability Ratio's

~ Ratio Comparison~ Ratio Graphs

~ Statement of Financial Performance

~ Statement of Financial Position

~ Explanation of Statement of Financial Position

Capital Works~ Capital Work in Progress

25th March 2005

Table of Contents

iv

v

ix

ii - iiii

ixx

xx

vii -viii

xviii

xv-xvi

Page

x

xiii

xvii

vi

xiv

xi

xii

For the Month Ended

CAIRNS WATERA Business Unit of Cairns City Council

CAIRNS WATER COMMITTEE MEETINGMONTHLY REPORT

Page 26: CAIRNS CITY COUNCIL CAIRNS WATER COMMITTEE 21 …...17/03/2005 House Connection Old Smithfield Rd & LeGrande St. ... 18/03/2005 150mm Sewer 32 Christensen Street 22/03/2005 House Connection

Agenda - Cairns Water Committee 21/4/05 - #980841

25

25th March 2005

In order for Council to adequately determine the efficiency, effectiveness and stability of Cairns Water, financial statements have been developed. Financial statements help by providing the Council with a snapshot of the organisation, however, the statements by themselves do not provide information on itemssuch as:

Is the organisation controlling expenditure?Are debtors tightly controlled?Are we avoiding a liquidity crisis? - eg are funds available for unforseen eventsAre we meeting financial targets?

Financial statement analysis can answer these questions. The particular focus of Cairns Water is on: Debtors Control

Measures of Efficiency and ProfitabilityMeasures of Financial Stability

Measures of Efficiency and Profitability

Measures of efficiency and profitability are relative measures. Efficiency is a relationship between somemeasure of output and a measure of input. For example Cairns Water may have a revenue of $18M andfull time equivalent staff (FTE) of 168, the measure of profitabilit in this case is 0.1M per FTE.

A measure of efficiency also is a relationship between an output and measure of input. Return on Equity isconsidered a classical measure of efficiency. As a general rule it is expected that returns would be higherthan those returns experienced in the market place from financial institutions or equivalent.

Measures of Financial Stability

Measures of financial stability are designed in two categories, generally short and long term. An exampleof short term financial stability is the working capital ratio. Such a ratio depicts the relationship between current assets and current liabilities. If current liabilities exceed current assets then it could be arguedthat the organisation is financially unstable in the short term. In many industries a general "rule" of two toone is used.

Long term measures are indicators of financial stability. A common ratio is the debt / equity ratio. This iscalculated as total debt funds represented by liabilities over total equity funds. This is a particularly usefulmeasure as it can indicate the level of risk the organisation may face if there is a high debt / equity component.

i

CAIRNS WATERA Business Unit of Cairns City Council

CAIRNS WATER COMMITTEE MEETINGEXECUTIVE SUMMARY

For the Month Ended

Page 27: CAIRNS CITY COUNCIL CAIRNS WATER COMMITTEE 21 …...17/03/2005 House Connection Old Smithfield Rd & LeGrande St. ... 18/03/2005 150mm Sewer 32 Christensen Street 22/03/2005 House Connection

Agenda - Cairns Water Committee 21/4/05 - #980841

26

Water Billing issue 1st and 2nd reminder notices 44 and 51 days after the due date of issue. It is Water Billings target to have all accounts sitting in current.

Accounts which have been issued both reminder letters move into the corporate Debt Recovery process.

#REF! ii

CAIRNS WATERA Business Unit of Cairns City Council

CAIRNS WATERAGED DEBTORS ANALYSIS

As at 30th March 2005

Water Usage Charges Outstanding

0

100

200

300

400

500

600

700

800

900

1,000

Th

ou

san

ds

Water UsageCharges

Water Usage Charges 900,390 200,095 93,279 26,521 241,845

Current 30 Days 60 Days 90 Days 90 + Days

Rates Outstanding

-

200

400

600

800

1,000

1,200

1,400

Th

ou

san

ds

Water Access

Sewerage Access

Cleaner SeasLevy

CleansingCharges

Water Access 365,227 76,491 35,956

Sewerage Access 1,200,108 255,938 124,458

Cleaner Seas Levy 60,203 11,306 4,393

Cleansing Charges 509,568 108,843 89,794

Current Overdue Arrears

Page 28: CAIRNS CITY COUNCIL CAIRNS WATER COMMITTEE 21 …...17/03/2005 House Connection Old Smithfield Rd & LeGrande St. ... 18/03/2005 150mm Sewer 32 Christensen Street 22/03/2005 House Connection

Agenda - Cairns Water Committee 21/4/05 - #980841

27

It is Cairns Waters target to hold all sundry fees and charges in current.

#REF! iii

CAIRNS WATERA Business Unit of Cairns City Council

CAIRNS WATERAGED DEBTORS ANALYSIS

As at 30th March 2005

Fees & Charges Outstanding

-100

-50

-

50

100

150

200

250

300

Th

ou

san

ds

Private Works

LaboratoryTesting Fees

Trade WasteCharges

CommercialWaste Charges

Private Works -79,957 -1,173 -14,317 -55,185

Laboratory Testing Fees 24,752 1,335 1,848 14,004

Trade Waste Charges 8,102 -153 4,365 9,191

Commercial Waste Charges 247,704 98,358 - 615

Current 30 Days 60 Days 90 Days +

Page 29: CAIRNS CITY COUNCIL CAIRNS WATER COMMITTEE 21 …...17/03/2005 House Connection Old Smithfield Rd & LeGrande St. ... 18/03/2005 150mm Sewer 32 Christensen Street 22/03/2005 House Connection

Agenda - Cairns Water Committee 21/4/05 - #980841

28

CAIRNS WATERA Business Unit of Cairns City Council

CAIRNS WATER FINANCIAL RATIO ANALYSIS

For the Month Ended 25th March 2005

EFFICIENCY & PROFITABILITY MEASURES

Operating Profit / Person

YTD Operating Capabilities before Interest, Income Tax

& Dividend (EBIT) $20,174,103 = $120,084Number of Full Time

Equivalent (FTE) Employees 168

Return on Council Equity

YTD Operating Capabilities before Interest, Income Tax

& Dividend (EBIT) $20,174,103 = 3.96%Community Equity $510,003,312

Return on Assets

YTD Operating Capabilities before Interest, Income Tax

& Dividend (EBIT) $20,174,103 = 3.30%

Total Assets $610,656,185

Total Asset Turnover Total Operating Revenue $48,594,627 = 0.08

Total Assets $610,656,185

##iv

Provides data to management on whether operating capabilities are increasing, decreasing or remaining stagnant.

Rate of return on the councils investment in Cairns Water.

This rate of return should be compared with the cost of borrowed funds to determine whether leverage is favourable. If the ratio is greater than the cost of borrowing then leverage is favourable and will result in higher after tax earnings.

The relationship between total revenue and investment gives an indication of how many dollars in revenue the business generates out of each dollar invested in assets.

Page 30: CAIRNS CITY COUNCIL CAIRNS WATER COMMITTEE 21 …...17/03/2005 House Connection Old Smithfield Rd & LeGrande St. ... 18/03/2005 150mm Sewer 32 Christensen Street 22/03/2005 House Connection

Agenda - Cairns Water Committee 21/4/05 - #980841

29

CAIRNS WATERA Business Unit of Cairns City Council

CAIRNS WATER COMMITTEE MEETINGFINANCIAL RATIO ANALYSIS

For the Month Ended 25th March 2005

FINANCIAL STABILITY MEASURES

Working Capital Ratio Current Assets $79,963,274 = 3.68

Current Liabilities $21,731,098

Debt Equity Ratio Total Liabilities $100,652,873 = 19.74%

Total Community Equity $510,003,312

Long Term Debt to Capitalisation Non Current Liabilities $78,921,775 = 13.40%

Non Current Liabilities + Community Equity $588,925,087

Net Debt per Capita Total Liabilities $100,652,873 = $1,869Net debt owed by Cairns Water per ratepayer head.

Total Number of Ratepayers 53852

v

Indicates the businesses degree of liquidity to repay current debts.

Measures the level of debt funding compared to equity funding. ie. The funding mix.

Indicates the extent to which the business has used long term debt for its permanent financing.

Page 31: CAIRNS CITY COUNCIL CAIRNS WATER COMMITTEE 21 …...17/03/2005 House Connection Old Smithfield Rd & LeGrande St. ... 18/03/2005 150mm Sewer 32 Christensen Street 22/03/2005 House Connection

Agenda - Cairns Water Committee 21/4/05 - #980841

30

CAIRNS WATER

A Business Unit of Cairns City Council

CAIRNS WATER

RATIO COMPARISONS

For the Month Ended 25th March 2005

YTD February 05 YTD March 05

Operating Profit / Person $17,747,398 $105,639 $20,174,103 $120,084

168 168

Return on Council Equity $17,747,398 3.51% $20,174,103 3.96%

$505,912,345 $510,003,312

Return on Assets $17,747,398 2.91% $20,174,103 3.30%

$609,536,335 $610,656,185

Total Asset Turnover $43,162,672 0.07 $48,594,627 0.08

$609,536,335 $610,656,185

Working Capital Ratio $81,839,616 3.47 $79,963,274 3.68

$23,571,813 $21,731,098

Debt Equity Ratio $103,623,990 20.48% $100,652,873 19.74%

$505,912,345 $510,003,312

Long Term Debt to Capitalisation $80,052,177 13.66% $78,921,775 13.40%

$585,964,522 $588,925,087

Net Debt per Capita $103,623,990 $1,924 $100,652,873 $1,869

53,852 53,852

### vi

Explanation of Change

YTD Profit Increase

No Significant Change

Slight change in Asset Base compared to increasing YTD Operating Profit

YTD Profit Increase

No Significant Change

No Significant Change

No Significant Change

No Significant Change

Page 32: CAIRNS CITY COUNCIL CAIRNS WATER COMMITTEE 21 …...17/03/2005 House Connection Old Smithfield Rd & LeGrande St. ... 18/03/2005 150mm Sewer 32 Christensen Street 22/03/2005 House Connection

Agenda - Cairns Water Committee 21/4/05 - #980841

31

Page 33: CAIRNS CITY COUNCIL CAIRNS WATER COMMITTEE 21 …...17/03/2005 House Connection Old Smithfield Rd & LeGrande St. ... 18/03/2005 150mm Sewer 32 Christensen Street 22/03/2005 House Connection

Agenda - Cairns Water Committee 21/4/05 - #980841

32

Page 34: CAIRNS CITY COUNCIL CAIRNS WATER COMMITTEE 21 …...17/03/2005 House Connection Old Smithfield Rd & LeGrande St. ... 18/03/2005 150mm Sewer 32 Christensen Street 22/03/2005 House Connection

Agenda - Cairns Water Committee 21/4/05 - #980841

33

CAIRNS WATERA Business Unit of Cairns City Council

CAIRNS WATERSTATEMENT OF FINANCIAL PERFORMANCE

For the Month Ended 25th March 2005

Period To Date Percentage Annual

Actual Budget Actual Budget Variance Budget

OPERATING REVENUE

Rates and Utility Charges 4,622,481 4,037,767 38,635,676 37,926,457 1.87% 50,200,963

Less Discount and Pensioner Remissions (140,618) (145,542) (1,287,290) (1,304,218) -1.30% (1,740,843)

Net Rates & Utility Charges 4,481,862 3,892,226 37,348,386 36,622,240 1.98% 48,460,120

Fees and Charges 311,512 210,895 2,161,683 2,023,863 6.81% 2,656,548

Interest Received 12,216 12,138 91,553 100,016 -8.46% 136,431

Miscellaneous Revenue 28,684 37,121 394,522 530,876 -25.68% 642,240

Community Service Obligations 364,982 364,982 3,284,837 3,284,837 0.00% 4,379,782

Donations 0 0 0 0 0.00% 0

Contributions 232,699 189,999 5,313,646 5,285,858 0.53% 5,855,867

Subsidies and Grants 0 0 0 0 0.00% 0

Total Operating Revenue 5,431,955 4,707,361 48,594,627 47,847,690 1.56% 62,130,989

OPERATING EXPENDITURE

Employee Costs 757,110 780,695 7,149,624 7,199,432 -0.69% 9,730,977

Materials and Services Costs 806,409 1,146,520 7,904,462 8,343,116 -5.26% 11,723,912

Depreciation and Amortisation Expenses 1,231,755 1,191,205 11,693,797 11,653,247 0.35% 15,523,150

Bank Fees and Charges 0 0 1,091 1,091 0.00% 1,121

Borrowing Costs 495,630 560,543 5,128,756 5,197,400 -1.32% 6,879,029

Other 3,161 4,613 53,730 42,233 27.22% 56,122

Competitive Neutrality Charges 237,806 237,806 1,996,831 1,996,831 0.00% 2,710,250

3,531,870 3,921,382 33,928,291 34,433,349 -1.47% 46,624,562

Less Expenses Capitalised (30,991) (38,729) (379,010) (404,293) -6.25% (521,177)

Total Operating Expenditure 3,500,880 3,882,652 33,549,281 34,029,057 -1.41% 46,103,385

OPERATING CAPABILITIES BEFORE INCOME TAX & DIVIDEND 1,931,075 824,709 15,045,347 13,818,633 8.88% 16,027,603

Notional Income Tax Expense (613,259) (287,053) (5,540,002) (5,127,606) 8.04% (5,909,218)

Notional Dividend Expense (1,086,032) (384,215) (7,664,814) (6,932,237) 10.57% (7,917,832)

OPERATING CAPABILITIES BEFORE CAPITAL ITEMS 231,784 153,441 1,840,531 1,758,790 4.65% 2,200,553

Capital Items:

Gain (Loss) on Disposal of Property Plant and Equipment 0 0 0 0 0.00% 0

Contributions 3,859,183 132,133 7,089,736 3,268,460 116.91% 5,204,380

Subsidies and Grants 0 0 185,243 112,516 0.00% 112,516

Total Capital Items 3,859,183 132,133 7,274,980 3,380,976 115.17% 5,316,896

NET OPERATING RESULT 4,090,967 285,574 9,115,510 5,139,766 77.35% 7,517,449

### ix

Year to Date

Page 35: CAIRNS CITY COUNCIL CAIRNS WATER COMMITTEE 21 …...17/03/2005 House Connection Old Smithfield Rd & LeGrande St. ... 18/03/2005 150mm Sewer 32 Christensen Street 22/03/2005 House Connection

Agenda - Cairns Water Committee 21/4/05 - #980841

34

CAIRNS WATERA Business Unit of Cairns City Council

CAIRNS WATERSTATEMENT OF FINANCIAL POSITION

As at 25th March 2005

This Month Last Month Movement

CURRENT ASSETS

Cash & Cash Equivalents 73,442,985 67,477,369 5,965,616

Receivables 3,795,423 12,017,966 (8,222,543)

Inventories 147,234 133,585 13,649

Other 2,577,633 2,210,696 366,936

Total Current Assets 79,963,274 81,839,616 (1,876,342)

NON-CURRENT ASSETS

Property, Plant & Equipment 515,648,011 513,123,205 2,524,806

Capital Work in Progress 13,066,622 12,659,318 407,304

Other 1,978,278 1,914,196 64,082

Total Non-Current Assets 530,692,911 527,696,719 2,996,192

TOTAL ASSETS 610,656,185 609,536,335 1,119,850

CURRENT LIABILITIES

Creditors & Borrowings 20,741,801 22,592,578 (1,850,777)

Provisions 904,447 852,234 52,213

Other 84,850 127,001 (42,151)

Total Current Liabilities 21,731,098 23,571,813 (1,840,715)

NON-CURRENT LIABILITIES

Creditors & Borrowings 76,888,817 78,019,219 (1,130,402)

Provisions 2,032,958 2,032,958 0

Total Non-Current Liabilities 78,921,775 80,052,177 (1,130,402)

TOTAL LIABILITIES 100,652,873 103,623,990 (2,971,117)

NET COMMUNITY ASSETS 510,003,312 505,912,345 4,090,967

COMMUNITY EQUITY

Community Capital 428,384,333 428,384,333 0

Constrained Works Reserves 75,737,403 75,737,403 0

Accumulated Surplus / (Deficiency) (3,233,935) (3,233,935) 0

Current Year's Earnings / (Deficiency) 9,115,510 5,024,543 4,090,967

TOTAL COMMUNITY EQUITY 510,003,312 505,912,345 4,090,967

### x

Page 36: CAIRNS CITY COUNCIL CAIRNS WATER COMMITTEE 21 …...17/03/2005 House Connection Old Smithfield Rd & LeGrande St. ... 18/03/2005 150mm Sewer 32 Christensen Street 22/03/2005 House Connection

Agenda - Cairns Water Committee 21/4/05 - #980841

35

CAIRNS WATERA Business Unit of Cairns City Council

CAIRNS WATEREXPLANATION OF STATEMENT OF FINANCIAL POSITION

As at 25th March 2005

CURRENT ASSETS

Cash & Cash Equivalents Notional bank account of Cairns Water and petty cash floats held.

Receivables Rates & fees & charges invoiced but not yet paid. Including access and usage charges.

Inventories The value of work in progress for private works jobs and the value of chemicals stored at Tunnel Hill.

Other The estimated value of water consumed but not yet invoiced.

Total Current Assets Total Cairns Water resources which provide the base for future operations. ie. This category

represents relatively liquid assets to be used within 12 months.

NON-CURRENT ASSETS

Property, Plant & Equipment The value of property, plant & equipment less accumulated depreciation.

Capital Work in Progress Total cost of work in progress on capital works activities.

Other Future income tax benefit (FITB) Cairns Water will receive due to timing differences as a result of differentaccounting and taxation rules. ie. Employee provisions are not tax deductible until actually incurred.

Total Non-Current Assets Total Cairns Water resources which provide the base for furture operations ie. This category

represents assets to be used beyond a 12 month period.

TOTAL ASSETS

CURRENT LIABILITIES

Creditors & Borrowings Trade creditors, income tax & dividend payable and the value of rates invoiced which relate to future months.

Provisions Employee provisions for annual leave and long service leave.

Total Current Liabilities Total amount which Cairns Water must pay within the next 12 months.

NON-CURRENT LIABILITIES

Creditors & Borrowings

Provisions Employee provision for long service leave which is not expected to be used within the next 12 months.

Total Non-Current Liabilities Total amount of Cairns Water debts falling due beyond the next 12 months.

TOTAL LIABILITIES

NET COMMUNITY ASSETS Total Assets minus Total Liabilities

COMMUNITY EQUITY

Community Capital

Constrained Works Reserves Monetary developer contributions which are restricted for use on future capital works for specific purposes.

Accumulated Surplus / (Deficiency)

Current Year's Earnings / (Deficiency) Year to date operating capability as shown on the statement of financial performance.

TOTAL COMMUNITY EQUITY

### xi

QTC Loan payable and the provision for deferred income tax (PDIT) payable in the future as a result of the reversal of timing differences. ie. Prepayment of subscriptions expensed over 12 months however the initial payment is fully tax deductible.

This amount represents the net assets which equates to the financial interest the council has in Cairns Water.

Represents funds which are not required to meet specific future needs. The balance of this account at the end of each financial year may be used to offset against expenditure in the following year.

The retained surplus of the business that is not available for distribution & is required to meet the current level of services to the community. ie. The value of Cairns Waters capital assets.

Page 37: CAIRNS CITY COUNCIL CAIRNS WATER COMMITTEE 21 …...17/03/2005 House Connection Old Smithfield Rd & LeGrande St. ... 18/03/2005 150mm Sewer 32 Christensen Street 22/03/2005 House Connection

Agenda - Cairns Water Committee 21/4/05 - #980841

36

CAIRNS WATERA Business Unit of Cairns City Council

WASTE MANAGEMENTFINANCIAL RATIO ANALYSIS

For the Month Ended 25th March 2005

EFFICIENCY & PROFITABILITY MEASURES

Operating Profit / Person

YTD Operating Capabilities before Interest, Income Tax

& Dividend (EBIT) $1,326,490 = $120,590Number of Full Time

Equivalent (FTE) Employees 11

Return on Council Equity

YTD Operating Capabilities before Interest, Income Tax

& Dividend (EBIT) $1,326,490 = 13.76%Community Equity $9,639,822

Return on Assets

YTD Operating Capabilities before Interest, Income Tax

& Dividend (EBIT) $1,326,490 = 9.07%

Total Assets $14,623,951

Total Asset Turnover Total Operating Revenue $12,062,114 = 0.82

Total Assets $14,623,951

##xii

Provides data to management on whether operating capabilities are increasing, decreasing or remaining stagnant.

Rate of return on the councils investment in Waste Management.

This rate of return should be compared with the cost of borrowed funds to determine whether leverage is favourable. If the ratio is greater than the cost of borrowing then leverage is favourable and will result in higher after tax earnings.

The relationship between total revenue and investment gives an indication of how many dollars in revenue the business generates out of each dollar invested in assets.

Page 38: CAIRNS CITY COUNCIL CAIRNS WATER COMMITTEE 21 …...17/03/2005 House Connection Old Smithfield Rd & LeGrande St. ... 18/03/2005 150mm Sewer 32 Christensen Street 22/03/2005 House Connection

Agenda - Cairns Water Committee 21/4/05 - #980841

37

CAIRNS WATERA Business Unit of Cairns City Council

WASTE MANAGEMENTFINANCIAL RATIO ANALYSIS

For the Month Ended 25th March 2005

FINANCIAL STABILITY MEASURES

Working Capital Ratio Current Assets $3,103,766 = 0.64

Current Liabilities $4,828,392

Debt Equity Ratio Total Liabilities $4,984,129 = 51.70%

Total Community Equity $9,639,822

Long Term Debt to Capitalisation Non Current Liabilities $155,737 = 1.59%

Non Current Liabilities + Community Equity $9,795,559

Net Debt per Capita Total Liabilities $4,984,129 = $93Net debt owed by Waste Management per ratepayer head.

Total Number of Ratepayers 53852

##xiii

Indicates the businesses degree of liquidity to repay current debts.

Measures the level of debt funding compared to equity funding. ie. The funding mix.

Indicates the extent to which the business has used long term debt for its permanent financing.

Page 39: CAIRNS CITY COUNCIL CAIRNS WATER COMMITTEE 21 …...17/03/2005 House Connection Old Smithfield Rd & LeGrande St. ... 18/03/2005 150mm Sewer 32 Christensen Street 22/03/2005 House Connection

Agenda - Cairns Water Committee 21/4/05 - #980841

38

CAIRNS WATER

A Business Unit of Cairns City Council

WASTE MANAGEMENT

RATIO COMPARISIONS

For the Month Ended 25th March 2005

YTD February 05 YTD March 05

Operating Profit / Person $1,103,641 $100,331 $1,326,490 $120,590

11 11

Return on Council Equity $1,103,641 11.45% $1,326,490 13.76%

$9,639,821 $9,639,822

Return on Assets $1,103,641 7.36% $1,326,490 9.07%

$14,990,608 $14,623,951

Total Asset Turnover $10,780,744 0.72 $12,062,114 0.82

$14,990,608 $14,623,951

Working Capital Ratio $3,443,719 0.66 $3,103,766 0.64

$5,195,050 $4,828,392

Debt Equity Ratio $5,350,787 55.51% $4,984,129 51.70%

$9,639,821 $9,639,822

Long Term Debt to Capitalisation $155,737 1.59% $155,737 1.59%

$9,795,558 $9,795,559

Net Debt per Capita $5,350,787 $99 $4,984,129 $93

53,852 53,852

No significant change

Reduction in Current Liabilities offset by reduction in total Assets

No significant change

No significant change

Explanation of Change

YTD Profit Increase

Increase in YTD Operating Revenue and reduction in Assets (Cleansing Rates Receivables)

YTD Profit increase compared to slight asset base reduction

YTD Profit Increase

Page 40: CAIRNS CITY COUNCIL CAIRNS WATER COMMITTEE 21 …...17/03/2005 House Connection Old Smithfield Rd & LeGrande St. ... 18/03/2005 150mm Sewer 32 Christensen Street 22/03/2005 House Connection

Agenda - Cairns Water Committee 21/4/05 - #980841

39

Page 41: CAIRNS CITY COUNCIL CAIRNS WATER COMMITTEE 21 …...17/03/2005 House Connection Old Smithfield Rd & LeGrande St. ... 18/03/2005 150mm Sewer 32 Christensen Street 22/03/2005 House Connection

Agenda - Cairns Water Committee 21/4/05 - #980841

40

Page 42: CAIRNS CITY COUNCIL CAIRNS WATER COMMITTEE 21 …...17/03/2005 House Connection Old Smithfield Rd & LeGrande St. ... 18/03/2005 150mm Sewer 32 Christensen Street 22/03/2005 House Connection

Agenda - Cairns Water Committee 21/4/05 - #980841

41

CAIRNS WATERA Business Unit of Cairns City Council

WASTE MANAGEMENTSTATEMENT OF FINANCIAL PERFORMANCE

For the Month Ended 25th March 2005

Period To Date Year to Date Percentage Annual

Actual Budget Actual Budget Variance Budget

OPERATING REVENUE

Rates and Utility Charges 963,998 963,998 8,597,287 8,597,509 0.00% 11,489,502

Less Discount and Pensioner Remissions (38,937) (46,780) (368,853) (381,477) -3.31% (521,818)

Net Rates & Utility Charges 925,061 917,218 8,228,434 8,216,032 0.15% 10,967,684

Fees and Charges 294,478 326,076 2,892,646 2,887,670 0.17% 3,865,898

Interest Received 4,059 1,482 22,742 21,646 5.06% 26,091

Miscellaneous Revenue 28,946 3,090 658,855 423,256 55.66% 432,526

Community Service Obligations 28,826 28,826 259,436 259,436 0.00% 345,915

Donations 0 0 0 0 0.00% 0

Contributions 0 0 0 0 0.00% 0

Subsidies and Grants 0 0 0 0 0.00% 0

Total Operating Revenue 1,281,370 1,276,691 12,062,114 11,808,040 2.15% 15,638,114

OPERATING EXPENDITURE

Employee Costs 76,630 82,333 733,703 748,232 -1.94% 1,007,975

Materials and Services Costs 839,671 1,027,048 8,481,656 8,526,702 -0.53% 11,358,057

Depreciation and Amortisation Expenses 30,560 30,560 306,932 306,932 0.00% 406,253

Bank Fees and Charges 0 0 22 22 0.00% 22

Borrowing Costs 0 0 0 0 0.00% 0

Other 153 153 4,050 4,050 0.00% 4,509

Competitive Neutrality Charges 111,508 111,508 1,209,263 1,209,263 0.00% 1,543,785

1,058,521 1,251,603 10,735,625 10,795,200 -0.55% 14,320,600

Less Expenses Capitalised 0 0 0 0 0.00% 0

Total Operating Expenditure 1,058,521 1,251,603 10,735,625 10,795,200 -0.55% 14,320,600

OPERATING CAPABILITIES BEFORE INCOME TAX & DIVIDEND 222,849 25,089 1,326,490 1,012,840 30.97% 1,317,514

Notional Income Tax Expense (66,854) (7,527) (437,006) (342,913) 27.44% (434,315)

Notional Dividend Expense (155,994) (17,562) (889,482) (669,928) 0.00% (794,880)

OPERATING CAPABILITIES BEFORE CAPITAL ITEMS 1 0 2 (1) 0.00% 88,319

Capital Items:

Gain (Loss) on Disposal of Property Plant and Equipment 0 0 0 0 0.00% 0

Contributions 0 0 0 0 0.00% 0

Subsidies and Grants 0 0 0 0 0.00% 0

Total Capital Items 0 0 0 0 0.00% 0

NET OPERATING RESULT 1 0 2 (1) -300.00% 88,319

### xvii

Page 43: CAIRNS CITY COUNCIL CAIRNS WATER COMMITTEE 21 …...17/03/2005 House Connection Old Smithfield Rd & LeGrande St. ... 18/03/2005 150mm Sewer 32 Christensen Street 22/03/2005 House Connection

Agenda - Cairns Water Committee 21/4/05 - #980841

42

CAIRNS WATERA Business Unit of Cairns City Council

WASTE MANAGEMENTSTATEMENT OF FINANCIAL POSITION

As at 25th March 2005

This Month Last Month Movement

CURRENT ASSETS

Cash & Cash Equivalents 1,713,388 (290,425) 2,003,813

Receivables 1,199,110 3,533,379 (2,334,269)

Inventories 0 228 (228)

Other 191,268 200,537 (9,269)

Total Current Assets 3,103,766 3,443,719 (339,953)

NON-CURRENT ASSETS

Property, Plant & Equipment 11,089,736 11,120,296 (30,560)

Capital Work in Progress 587,564 578,814 8,750

Other (157,114) (152,221) (4,893)

Total Non-Current Assets 11,520,185 11,546,889 (26,704)

TOTAL ASSETS 14,623,951 14,990,608 (366,657)

CURRENT LIABILITIES

Creditors & Borrowings 4,739,659 5,115,601 (375,942)

Provisions 88,733 79,449 9,284

Total Current Liabilities 4,828,392 5,195,050 (366,658)

NON-CURRENT LIABILITIES

Creditors & Borrowings 56,170 56,170 0

Provisions 99,567 99,567 0

Total Non-Current Liabilities 155,737 155,737 0

TOTAL LIABILITIES 4,984,129 5,350,787 (366,658)

NET COMMUNITY ASSETS 9,639,822 9,639,821 1

COMMUNITY EQUITY

Community Capital 9,482,838 9,482,838 0

Constrained Works Reserve 156,981 156,981 0

Accumulated Surplus / (Deficiency) 2 2 0

Current Year's Earnings / (Deficiency) 2 1 1

TOTAL COMMUNITY EQUITY 9,639,822 9,639,821 1

### xviii

Page 44: CAIRNS CITY COUNCIL CAIRNS WATER COMMITTEE 21 …...17/03/2005 House Connection Old Smithfield Rd & LeGrande St. ... 18/03/2005 150mm Sewer 32 Christensen Street 22/03/2005 House Connection

Agenda - Cairns Water Committee 21/4/05 - #980841

43

CAIRNS WATERA Business Unit of Cairns City Council

WASTE MANAGEMENTEXPLANATION OF STATEMENT OF FINANCIAL POSITION

As at 25th March 2005

CURRENT ASSETS

Cash & Cash Equivalents Notional bank account of Waste Management and till floats held.

Receivables Cleansing rates & commercial waste fees invoiced but not yet paid.

Total Current Assets Total Waste Management resources which provide the base for future operations. ie. This category

represents relatively liquid assets to be used within 12 months.

NON-CURRENT ASSETS

Property, Plant & Equipment The value of property, plant & equipment less accumulated depreciation.

Capital Work in Progress Total cost of work in progress on capital works activities.

Other Future income tax benefit (FITB) Waste Management will receive due to timing differences as a result of differentaccounting and taxation rules. ie. Employee provisions are not tax deductible until actually incurred.

Total Non-Current Assets Total Waste Management resources which provide the base for furture operations ie. This category

represents assets to be used beyond a 12 month period.

TOTAL ASSETS

CURRENT LIABILITIES

Creditors & Borrowings Trade creditors, income tax & dividend payable and the value of rates invoiced which relate to future months.

Provisions Employee provisions for annual leave and long service leave.

Total Current Liabilities Total amount which Waste Management must pay within the next 12 months.

NON-CURRENT LIABILITIES

Provisions Employee provision for long service leave which is not expected to be used within the next 12 months.

Total Non-Current Liabilities Total amount of Waste Management debts falling due beyond the next 12 months.

TOTAL LIABILITIES

NET COMMUNITY ASSETS Total Assets minus Total Liabilities

COMMUNITY EQUITY

Community Capital

Accumulated Surplus / (Deficiency)

Current Year's Earnings / (Deficiency) Year to date operating capability as shown on the statement of financial performance.

TOTAL COMMUNITY EQUITY

### ixx

This amount represents the net assets which equates to the financial interest the council has in Waste Management.

Represents funds which are not required to meet specific future needs. The balance of this account at the end of each financial year may be used to offset against expenditure in the following year.

The retained surplus of the business that is not available for distribution & is required to meet the current level of services to the community. ie. The value of Waste Managements capital assets.

Page 45: CAIRNS CITY COUNCIL CAIRNS WATER COMMITTEE 21 …...17/03/2005 House Connection Old Smithfield Rd & LeGrande St. ... 18/03/2005 150mm Sewer 32 Christensen Street 22/03/2005 House Connection

Agenda - Cairns Water Committee 21/4/05 - #980841

44

### xx

CAIRNS WATERA Business Unit of Cairns City Council

CAPITAL WORKS PROGRESSFINANCIAL CHARTS

For the Month Ended 25th March 2005

CAPITAL WORKS PROGRESS(Water, Wastewater & Waste Management)

-1,000,000

3,000,000

7,000,000

11,000,000

15,000,000

19,000,000

23,000,000

Actual 2,707,367 3,292,320 4,000,927 6,089,555 9,215,404 9,926,815 10,154,000 10,441,879 10,629,328

Budget 1,861,283 3,722,566 5,583,849 7,445,132 9,306,415 11,167,698 13,028,981 14,890,264 16,751,547 18,612,830 20,474,113 22,335,396

Jul-04 Aug-04 Sep-04 Oct-04 Nov-04 Dec-04 Jan-05 Feb-05 Mar-05 Apr-05 May-05 Jun-05

Page 46: CAIRNS CITY COUNCIL CAIRNS WATER COMMITTEE 21 …...17/03/2005 House Connection Old Smithfield Rd & LeGrande St. ... 18/03/2005 150mm Sewer 32 Christensen Street 22/03/2005 House Connection

Agenda - Cairns Water Committee 21/4/05 - #980841

45

CAIRNS WATER COMMITTEE

21 APRIL 2005

2

ENVIRONMENTAL MANAGEMENT REPORT - MARCH 2005 Ian Clayton:JEA:24/12/1-04: #979350

RECOMMENDATION:

It is recommended that this report be noted.

INTRODUCTION: Under the adopted Integrated Environmental Management System, a monthly Environmental Management report is to be prepared for the consideration of Council.

BACKGROUND: During the month of March three (3) incidents were recorded and reported. It should also be noted that twenty-five (25) wet weather overflow events were reported, as a result of heavy seasonal rainfall. 1. Loss of Power to Northern Wastewater Treatment Plant during 6 March 2005

On Sunday 6 March 2005 at approximately 0800 hours, power was disrupted to the Northern Wastewater Treatment Plant. It was discovered that a vehicle accident had resulted in urgent Ergon repairs. The primary generator was then engaged and normal operational works continued at the treatment plant site. At 0915 hours, mains power was restored, and the generator was shut down. During this time, waste activated sludge was being drawn from the oxidation ditch, and a high level alarm indicated a pump failure. Inspection revealed that a circuit breaker had activated. Operational procedure called for an electrical inspection prior to power reinstatement. This was immediately carried out, and power to the pump was restored. No evidence of any waste activated sludge release to the environment could be found.

Page 47: CAIRNS CITY COUNCIL CAIRNS WATER COMMITTEE 21 …...17/03/2005 House Connection Old Smithfield Rd & LeGrande St. ... 18/03/2005 150mm Sewer 32 Christensen Street 22/03/2005 House Connection

Agenda - Cairns Water Committee 21/4/05 - #980841

46

2. Overflow of Treated Effluent from Lagoons at The Southern Wastewater

Treatment Plant during 11 March 2005

As a result of high seasonal rainfall substantially increasing hydraulic flow during 11 March 2005, a release of treated effluent occurred from the storage lagoons. This has occurred previously, and is the consequence of the outfall pumps being incapable of matching the incoming hydraulic flows. Programmed upgrades of this treatment plant should rectify this issue.

3. Hydraulic Failure of Clarifier #2 at Northern Wastewater Treatment Plant

during 12 March 2005.

As a result of high seasonal rainfall substantially increasing hydraulic flow during 12 March 2005, hydraulic failure of #2 Clarifier occurred. Hydraulic failure caused the sludge blanket to rise, releasing solids into the contact chamber. Emergent operational procedures were put into place, which minimized the time of occurrence, and allowed containment of bacterial sludge within the contact chamber. Samples were then collected for laboratory analysis.

Test Result (mg/l) BOD 18 Suspended Solids 48

Due to effective operational procedures, only a small increase in effluent strength was

observed. 4. Wet Weather Overflows

Location Date Activated

Time Activated (Hrs)

Date Closed Time Closed

Peevers Road

11/03/2005 1400 19/03/2005 0700

Knowles Street

11/03/2005 1500 14/03/2005 0730

Mill Street 11/03/2005 1500 14/03/2005 0735 Weinerts Creek

11/03/2005 1530 15/03/2005 0630

PS R1 12/03/2005 1600 13/03/2005 0630 Brown Street 12/03/2005 1500 13/03/2005 0630 PS R5 12/03/2005 1530 14/03/2005 1000 PS R12 11/03/2005 1530 13/03/2005 0800 Boland Street

11/03/2005 1530 13/03/2005 0800

PS S1 12/03/2005 0700 13/03/2005 0500 Marshall Street

12/03/2005 0700 13/03/2005 0500

Page 48: CAIRNS CITY COUNCIL CAIRNS WATER COMMITTEE 21 …...17/03/2005 House Connection Old Smithfield Rd & LeGrande St. ... 18/03/2005 150mm Sewer 32 Christensen Street 22/03/2005 House Connection

Agenda - Cairns Water Committee 21/4/05 - #980841

47

Cont. Location Date

Activated Time Activated (Hrs)

Date Closed Time Closed

PS T1 12/03/2005 0700 13/03/2005 0200 PS C 12/03/2005 0700 13/03/2005 0900 PS D 12/03/2005 0730 13/03/2005 0500 PS E&F 12/03/2005 0730 14/03/2005 0930 PS K 12/03/2005 0730 12/03/2005 1530 Greenslopes Street

12/03/2005 0730 12/03/2005 1530

Pease Street 12/03/2005 0730 12/03/2005 1530 Woodwards PS

12/03/2005 0730 12/03/2005 1730

PS KB1 12/03/2005 0830 12/03/2005 1430 PS KB2 12/03/2005 0830 12/03/2005 1230 PS KB3 12/03/2005 0830 12/03/2005 1230 PS TB1 12/03/2005 0830 12/03/2005 1600 PS TB4 12/03/2005 0830 13/03/2005 1530 Parramatta Pk

12/03/2005 0730 12/03/2005 1530

BJ SMYTH GENERAL MANAGER CAIRNS WATER

Page 49: CAIRNS CITY COUNCIL CAIRNS WATER COMMITTEE 21 …...17/03/2005 House Connection Old Smithfield Rd & LeGrande St. ... 18/03/2005 150mm Sewer 32 Christensen Street 22/03/2005 House Connection

Agenda - Cairns Water Committee 21/4/05 - #980841

48

CAIRNS WATER COMMITTEE

21 APRIL 2005

3

WATER - SITUATION REPORT Brian Smyth:JEA : 24/1/5-18 : #979164

RECOMMENDATION:

It is recommended that this report be noted.

COPPERLODE FALLS DAM - Currently at 100% full to the end of March 2005; - Rainfall recorded at the Freshwater Creek Plant for March 2005 was 476mm. The Southern Oscillation Index from the Bureau of Meteorology is positive.

Page 50: CAIRNS CITY COUNCIL CAIRNS WATER COMMITTEE 21 …...17/03/2005 House Connection Old Smithfield Rd & LeGrande St. ... 18/03/2005 150mm Sewer 32 Christensen Street 22/03/2005 House Connection

Agenda - Cairns Water Committee 21/4/05 - #980841

49

Freshwater Treatment Plant Operations Statistics Finished Water Quality Recorded Low

Limit Recorded High Limit NH&MRC Limits

Apparent Colour, Pt/Co units 0.1 2.5 5

Turbidity, NTU 0.02 0.2 5

pH 6.9 7.2 6.50 – 8.50

Alkalinity, mg/L as CaCo3 10.0 11.5 N/A

Total iron, mg/L Fe 0.1 0.2 0.3

Total Manganese, mg/L Mn 0.02 0.04 0.1

Total Aluminium, mg/L A 0.02 0.06 0.2

BEHANA CREEK Behana Creek at the end of March 2005 had a creek flow at the intake weir of 85 ML/day. Behana Operations Statistics

Water Quality at Gordonvale

Recorded Low Limit

Recorded High Limit NH&MRC Limits

Apparent Colour, Pt/Co units 2.5 5.7 15

Turbidity, NTU 0.2 0.4 5

PH 7.1 7.3 6.50 – 8.50

CUSTOMER SERVICE STANDARDS - COMPLIANCE STANDARD

Freshwater Water Treatment Plant Achieved Target Total Coliform 100 89.7%

Faecal Coliform 100 97.0%

Turbidity 100 99.0%

Behana Water Treatment Plant - (Rural) Achieved Target

Total Coliform 100 89.7%

Faecal Coliform 100 97.0%

Turbidity 100 93.4%

CONSUMPTION AND RAINFALL:

The consumption trends and rainfall at Copperlode Falls Dam, Behana Creek chlorinator and Freshwater Creek Water Treatment Plant from December 2004 to March 2005 are attached.

ATTACHMENT: Water Consumption / Rainfall Chart Brian Smyth GENERAL MANAGER CAIRNS WATER

Page 51: CAIRNS CITY COUNCIL CAIRNS WATER COMMITTEE 21 …...17/03/2005 House Connection Old Smithfield Rd & LeGrande St. ... 18/03/2005 150mm Sewer 32 Christensen Street 22/03/2005 House Connection

Agenda - Cairns Water Committee 21/4/05 - #980841

50

CAIRNS WATERA Business Unit of Cairns City Council

CAIRNS WATERCONSUMPTION / RAINFALL

WATER CONSUMPTION December 04 / January/February/March 05

404550556065707580859095100105110115120

01-D

ec-0

4

08-D

ec-0

4

15-D

ec-0

4

22-D

ec-0

4

29-D

ec-0

4

05-J

an-0

5

12-J

an-0

5

19-J

an-0

5

26-J

an-0

5

02-F

eb-0

5

09-F

eb-0

5

16-F

eb-0

5

23-F

eb-0

5

02-M

ar-0

5

09-M

ar-0

5

16-M

ar-0

5

23-M

ar-0

5

30-M

ar-0

5

DATE

ML

PE

R D

AY

Production Log. (Production)

RAINFALL CHART - 2005

0

100

200

300

400

500

600

700

Rainfall in MM

Copperlode Falls Dam 600 155 548.7 0 0

Freshwater Creek 480 154 476 82.5 0

Behana Creek 452.8 138.05 425 0 0

January February March April May June July AugustSeptembe

rOctober November December

Page 52: CAIRNS CITY COUNCIL CAIRNS WATER COMMITTEE 21 …...17/03/2005 House Connection Old Smithfield Rd & LeGrande St. ... 18/03/2005 150mm Sewer 32 Christensen Street 22/03/2005 House Connection

Agenda - Cairns Water Committee 21/4/05 - #980841

51

CAIRNS WATER COMMITTEE

21 APRIL 2005

4

BARRON RIVER WATER SUPPLY MARCH 2005 – PROGRESS REPORT Brian Smyth: 24/22/29-01: #980267

RECOMMENDATION:

It is recommended that this report be noted.

BARRON RIVER RESOURCE OPERATIONS PLAN The release date for the Barron River Resource Operations Plan by the Department of Natural Resources and Mines remains July 2005. The following are in the process of preparation for lodgement with the Department of Natural Resources and Mines: all IDAS Application forms for the development of the infrastructure within the

Barron Gorge National Park; details of demand management issues being addressed by Council; demonstration that Barron usage does not prejudice later development of the

Mulgrave aquifer; confirmation that all other approvals are in place.

LEAST COST PLANNING STUDY The final draft report has recently been received from consultants MWH and is in the process of being reviewed. When this review is finalised it will be presented to Council for consideration.

Page 53: CAIRNS CITY COUNCIL CAIRNS WATER COMMITTEE 21 …...17/03/2005 House Connection Old Smithfield Rd & LeGrande St. ... 18/03/2005 150mm Sewer 32 Christensen Street 22/03/2005 House Connection

Agenda - Cairns Water Committee 21/4/05 - #980841

52

EXPENDITURE TO DATE 2004/2005 Expenditure to date for 2004/2005:$253,918 (including committals). Revised Budget for 2004/2005:$488,932.00 has been amended due to the review of scheduled outcomes to be achieved by the end of the fiscal year of June 2005. The expenditure to date has been in the areas of:

Original Revised Carried Y.T.D Budget Budget Forward Spending 04/05 Costs

PCW2030 Barron River Water Supply 103,932 103,932 91,570 39,789 PCW5751 Least Cost Planning 35,000 35,000 9,589 35,853 PCW5804 Detailed P&D Barron River Intake 30,000 30,000 - - PCW6810 Barron River Water Supply Planning 450,000 250,000 - 178,276 PCW6855 P & D Barron River Intake 20,000 20,000 - - PCW6860 P & D Barron River Raw Water Mains 50,000 50,000 - - PCW6865 P & D Barron River Supply Mains 100,000 - - - Total 788,932 488,932 101,159 253,918 B J SMYTH GENERAL MANAGER CAIRNS WATER

Page 54: CAIRNS CITY COUNCIL CAIRNS WATER COMMITTEE 21 …...17/03/2005 House Connection Old Smithfield Rd & LeGrande St. ... 18/03/2005 150mm Sewer 32 Christensen Street 22/03/2005 House Connection

Agenda - Cairns Water Committee 21/4/05 - #980841

53

CAIRNS WATER COMMITTEE

21 APRIL 2005

5

COPPERLODE FALLS DAM - YEARLY INSPECTION Brian Smyth:JEA: 24/13/1-02: #979675

RECOMMENDATION:

It is recommended that this report be noted.

BACKGROUND: The yearly inspection of Copperlode Falls Dam was recently undertaken by a senior dam hydrologist.

REPORT: The purpose of the inspection was to: a. Review the status of the access road drainage at the embankment toe and make

recommendations for any potential improvements. b. Inspect the crest wall and make recommendations after further analysis as to the

best means of raising the wall to allow the spillway to pass the Probable Maximum Flood determined in the GHD report entitled “Copperlode Falls Dam Probable Maximum Flood Revision, Hydrological and Hydraulic Modelling Results”.

c. Evaluate whether any potential safety issues have arisen due to the construction

of the access road and make recommendations for any improvements necessary to ensure the safety of the dam.

The inspection has made certain recommendations in respect of minor works in the outlet tunnel and some minor drainage works on the downstream face of the dam wall. In respect of the existing wave wall, the inspection has resulted in advice being given that the design of the wave wall should be re-assessed to provide a factor of safety of 1.5 under the highest flood level. Present studies of cyclonic conditions at the Ross River Dam in Townsville indicate that high wind speeds may occur coincidentally with high rainfall. This could have consequences given the relatively short critical storm duration at Copperlode falls Dam at the Probable Maximum Flood of six (6) hours.

Page 55: CAIRNS CITY COUNCIL CAIRNS WATER COMMITTEE 21 …...17/03/2005 House Connection Old Smithfield Rd & LeGrande St. ... 18/03/2005 150mm Sewer 32 Christensen Street 22/03/2005 House Connection

Agenda - Cairns Water Committee 21/4/05 - #980841

54

The wave overtopping flows resulting from the combined wind and reservoir level can lead to significant depths and discharges over the embankment crest with the potential for back erosion through the crest and embankment breach. Cognisance of the wave overtopping flow and hydrograph for the critical storm duration should, therefore, be taken in finalising the required wave wall height necessary for safely passing the spillway design flood. It is proposed that: 1. The minor works as required by the inspection proceed. 2. The wave wall re-design be now undertaken with a view to including any

modifications in the 2005/2006 capital works budget. BJ SMYTH GENERAL MANAGER CAIRNS WATER

Page 56: CAIRNS CITY COUNCIL CAIRNS WATER COMMITTEE 21 …...17/03/2005 House Connection Old Smithfield Rd & LeGrande St. ... 18/03/2005 150mm Sewer 32 Christensen Street 22/03/2005 House Connection

Agenda - Cairns Water Committee 21/4/05 - #980841

55

WASTE

SEGMENT

Page 57: CAIRNS CITY COUNCIL CAIRNS WATER COMMITTEE 21 …...17/03/2005 House Connection Old Smithfield Rd & LeGrande St. ... 18/03/2005 150mm Sewer 32 Christensen Street 22/03/2005 House Connection

Agenda - Cairns Water Committee 21/4/05 - #980841

56

CAIRNS WATER COMMITTEE

21 APRIL 2005

6

DOMESTIC WASTE COLLECTION AND RECYCLING COLLECTION CONTRACTS – PERFORMANCE REPORT – MARCH 2005 Fenn Hughes:JEA : 24/19/79-02: #978830

RECOMMENDATION:

It is recommended that this report be noted. The data in the following graphs shows the collected tonnages of the kerbside garbage and recycling collection contracts from 1 July 2004 to date. Garbage Collection Contract

K e r b s id e D o m e s t ic G a r b a g e 2 0 0 4 - 2 0 0 5

01 0 0 02 0 0 03 0 0 04 0 0 05 0 0 0

J u l A u g S e p O c t N o v D e c J a n F e b M a r A p r M a y J u n

M o n t h

To

nn

es

Page 58: CAIRNS CITY COUNCIL CAIRNS WATER COMMITTEE 21 …...17/03/2005 House Connection Old Smithfield Rd & LeGrande St. ... 18/03/2005 150mm Sewer 32 Christensen Street 22/03/2005 House Connection

Agenda - Cairns Water Committee 21/4/05 - #980841

57

Kerbside Recycling Collection Cairns Recycling

Cairns New Garbage Services

Cairns New Recycle Services

Cairns Recycling 2004/2005

0

100

200

300

400

500

Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun

Month

To

nn

es

New Garbage Services 2004/2005

050

100150200

1 2 3 4 5 6 7 8 9 10 11 12

Division

Nu

mb

er o

f S

ervi

ces

New Recycle Services 2004/2005

0

50

100

150

200

1 2 3 4 5 6 7 8 9 10 11 12

Division

Nu

mb

er o

f S

ervi

ces

Page 59: CAIRNS CITY COUNCIL CAIRNS WATER COMMITTEE 21 …...17/03/2005 House Connection Old Smithfield Rd & LeGrande St. ... 18/03/2005 150mm Sewer 32 Christensen Street 22/03/2005 House Connection

Agenda - Cairns Water Committee 21/4/05 - #980841

58

Missed Services Garbage Bins

Missed Services Recycle Bins

Repairs Garbage Bins

Missed Services Garbage - 2004/2005

0

20

40

60

80

1 2 3 4 5 6 7 8 9 10 11 12

Division

Nu

mb

er o

f S

ervi

ces

Missed Services Recycling - 2004/2005

0

5

10

15

20

25

1 2 3 4 5 6 7 8 9 10 11 12

Division

Nu

mb

er o

f S

ervi

ces

Bin Repairs Garbage - 2004/2005

0

50

100

150

1 2 3 4 5 6 7 8 9 10 11 12

Division

Nu

mb

er o

f B

ins

Page 60: CAIRNS CITY COUNCIL CAIRNS WATER COMMITTEE 21 …...17/03/2005 House Connection Old Smithfield Rd & LeGrande St. ... 18/03/2005 150mm Sewer 32 Christensen Street 22/03/2005 House Connection

Agenda - Cairns Water Committee 21/4/05 - #980841

59

Repairs Recycle Bins

Replacement Bins Garbage

Replacement Bins Recycle

Bin Repairs Recycling - 2004/2005

0

10

20

30

1 2 3 4 5 6 7 8 9 10 11 12

Division

Nu

mb

er o

f B

ins

Replacement Bins Garbage - 2004/2005

0102030405060

1 2 3 4 5 6 7 8 9 10 11 12

Division

Nu

mb

er o

f B

ins

Replacement Bins Recycling - 2004/2005

0

10

20

30

40

1 2 3 4 5 6 7 8 9 10 11 12Division

Nu

mb

er o

f B

ins

Page 61: CAIRNS CITY COUNCIL CAIRNS WATER COMMITTEE 21 …...17/03/2005 House Connection Old Smithfield Rd & LeGrande St. ... 18/03/2005 150mm Sewer 32 Christensen Street 22/03/2005 House Connection

Agenda - Cairns Water Committee 21/4/05 - #980841

60

A total of seven (7) complaints were logged with the Customer Service Centre. Three (3) complaints related to the operation of Council transfer stations, one (1) to late collection of Clean Up Australia Day waste, one (1) to abuse from garbage truck driver and one (1) to non-collection of recycling bin due to contamination and one (1) to bins being remaining out after collection. All complaints were resolved to the satisfaction of the residents. Brian Smyth GENERAL MANAGER CAIRNS WATER

Page 62: CAIRNS CITY COUNCIL CAIRNS WATER COMMITTEE 21 …...17/03/2005 House Connection Old Smithfield Rd & LeGrande St. ... 18/03/2005 150mm Sewer 32 Christensen Street 22/03/2005 House Connection

Agenda - Cairns Water Committee 21/4/05 - #980841

61

CAIRNS WATER COMMITTEE

21 APRIL 2005

7

WASTE TO SPRINGMOUNT – MARCH 2005 Fenn Hughes:JEA : 13/17/3-03: #979400

RECOMMENDATION:

It is recommended that this report be noted. Graph 1 This graph shows the month-by-month tonnage of waste transported to the Springmount Landfill facility from the Redden Street Temporary Transfer Station and is made up of waste from: 1. Commerce and industry 2. Council facilities 3. Domestic kerbside collection.

Redden St to Springmount

0

2000

4000

6000

8000

Nov-04 Dec-04 Jan-05 Feb-05 Mar-05 Apr-05 May-05 Jun-05

Month

To

nn

es

Page 63: CAIRNS CITY COUNCIL CAIRNS WATER COMMITTEE 21 …...17/03/2005 House Connection Old Smithfield Rd & LeGrande St. ... 18/03/2005 150mm Sewer 32 Christensen Street 22/03/2005 House Connection

Agenda - Cairns Water Committee 21/4/05 - #980841

62

Graph 2 Graph 2 shows the month-by-month tonnage of waste transported to the Springmount Landfill from the Smithfield Transfer Station and is made up of waste from: 1. Domestic kerbside garbage collection 2. Domestic waste brought by residents to the transfer station.

Brian Smyth GENERAL MANAGER CAIRNS WATER

Smithfield Waste to Springmount

0.00500.00

1000.001500.002000.002500.003000.003500.00

Dec-04 Jan-05 Feb-05 Mar-05 Apr-05 May-05 Jun-05

Month

To

nn

es

Page 64: CAIRNS CITY COUNCIL CAIRNS WATER COMMITTEE 21 …...17/03/2005 House Connection Old Smithfield Rd & LeGrande St. ... 18/03/2005 150mm Sewer 32 Christensen Street 22/03/2005 House Connection

Agenda - Cairns Water Committee 21/4/05 - #980841

63

CAIRNS WATER COMMITTEE

21 APRIL 2005

8

MULTI-OCCUPANCY KERBSIDE RECYCLING Michael Marshall:MM: 18/57/1-03: #980591

RECOMMENDATION:

It is recommended that this report be noted

INTRODUCTION: With the imminent completion of the new Materials Recycling Facility (MRF) at the old Portsmith landfill site (completion scheduled for early July), Cairns Water Waste Services is preparing to target multi-occupancy dwellings that currently do not recycle at kerbside.

BACKGROUND: Kerbside recycling at multi-occupancy dwellings is currently limited due to a number of factors. One of the more prominent reasons being that many of these properties were constructed pre kerbside recycling and as such don’t have the storage capacity for additional bins, another major factor has been the reluctance of multi-occupancy owners to participate in kerbside recycling due to high level of contamination experienced when they have previously participated. These issues have never really been addressed fully as Council has not had the required capacity to process recyclables at the volumes which could be expected from fully involving multi-occupancy dwellings.

COMMENT: With Council soon to have the ability to more than double its processing capacity, it is now an opportune time to target multi-occupancy dwellings and provide a full suite of options for service delivery, including flexible collection days, bin sizes which suit each individual premises and a high level of eduction aimed at getting the best possible product with minimal contamination levels.

Page 65: CAIRNS CITY COUNCIL CAIRNS WATER COMMITTEE 21 …...17/03/2005 House Connection Old Smithfield Rd & LeGrande St. ... 18/03/2005 150mm Sewer 32 Christensen Street 22/03/2005 House Connection

Agenda - Cairns Water Committee 21/4/05 - #980841

64

CONSIDERATIONS: Corporate and Operational Plans: There will be no effect on operational plans as this increase in service provision is already within the scope of Waste Services contract management. Waste Services waste strategy is currently being updated to reflect this increase in multi-occupancy recycling and the to include details of the new MRF and its functions. Statutory: The only statutory issues related to this issue is that Council is required to make the service available to all ratepayers which pay the full domestic waste management charge incorporated within their rates. This provision of service achieves that objective. Financial: There are no financial implications, as these services will be covered by the domestic waste management charge on a pure cost for service basis. Sustainability: The increase in recycling volumes generated through multi-occupancy participation offers strong sustainability in the area of the waste hierarchy, which has waste reuse and recycling as a fundamental element of achieving long-term sustainability in the waste generation sector.

CONSULTATION: The consultation process will encompass Council officers making direct contact with strata owners and property managers and developing individual recycling collection systems which best suit each property within the confines of Council’s recycling collection contract. Cairns Water Business Advisory Officer has drafted a Council media release in conjunction with the letter of invitation to take up the recycling service. This media release will be issued in conjunction with Council’s PR Manager.

OPTIONS: 1. Proceed with proposed increase to multi-occupancy recycling volumes as outlined

above. 2. Do not proceed to promote and target multi-occupancy dwellings and continue to

allow these properties to only dispose of waste. This is not preferred as it is not in line with the waste hierarchy, is not conducive to sound sustainable practices by householders and is contrary to Councils aim of waste minimisation.

Page 66: CAIRNS CITY COUNCIL CAIRNS WATER COMMITTEE 21 …...17/03/2005 House Connection Old Smithfield Rd & LeGrande St. ... 18/03/2005 150mm Sewer 32 Christensen Street 22/03/2005 House Connection

Agenda - Cairns Water Committee 21/4/05 - #980841

65

CONCLUSION: Option 1 offers a sustainable and viable long-term process for recovering the maximum volume of recyclable material. There is the added incentive of potential revenue from the subsequent sale of the processed product.

ATTACHMENTS: 1. Flow chart indicating timeframe for implementation 2. Copy of letter to residents and body corporate

Mick Marshall Waste Services Coordinator Brian Smyth General manager Cairns Water

Page 67: CAIRNS CITY COUNCIL CAIRNS WATER COMMITTEE 21 …...17/03/2005 House Connection Old Smithfield Rd & LeGrande St. ... 18/03/2005 150mm Sewer 32 Christensen Street 22/03/2005 House Connection

Agenda - Cairns Water Committee 21/4/05 - #980841

66

Implementation of Multi-Occupancy kerbside recycling

hierarchy

Contact multi-occupancy premises

By: 22 April 2005

Conduct onsite assessments By: 27 May

2005

Delivery of bins By: 17 June

2005

Commencement of services By: 4 July

2005

Page 68: CAIRNS CITY COUNCIL CAIRNS WATER COMMITTEE 21 …...17/03/2005 House Connection Old Smithfield Rd & LeGrande St. ... 18/03/2005 150mm Sewer 32 Christensen Street 22/03/2005 House Connection

Agenda - Cairns Water Committee 21/4/05 - #980841

67

ENQUIRIES: Mr F Hughes

PHONE: (07) 4044 8226

FACSIMILE: (07) 4044 8228

OUR REF: FH:#964796 24/19/86-01

{Enter "Date"} {Enter "Company"} {Enter "Address"} {Enter "Suburb"} Dear Sir/Madam

New Recycling Service for Multi-Occupancy Properties Construction has begun on a new recycling Material Recovery Facility (MRF) for the City of Cairns. The new plant will be able to process an increased volume of recyclable material collected from the kerbside. To gain an increase in recycling volumes, Council is targeting multi-occupancy properties, which currently do not recycle at the kerbside. To enable multi-occupancy properties to participate in the kerbside recycling service, Council has developed a special site specific recycling system, this will allow for the opportunity for a Council Officer to meet with a property/body corporate representative on-site to discuss the specific recycling requirements for each individual property. Council is able to offer the following options:

240 litre bin collection 360 litre bin collection Bulk bin collection Multiple weekly recycling collections if bin storage capacity is limited.

Councils recycling system allows for the collection of plastics 1, 2 and 3, glass, steel cans and tins and aluminum cans. For the opportunity to assist in increasing Cairns City Council’s recycling volumes and reduce waste at your premises, please contact Cairns Water Officer Mr Fenn Hughes on 4044 8226 as soon as possible to arrange an on-site meeting to assess your specific recycling requirements. Please note that there is no additional charge for this recycling service. If you are already using the kerbside recycle service at your multi-occupancy property, please disregard this letter. Yours faithfully

B J SMYTH

GENERAL MANAGER – CAIRNS WATER

Page 69: CAIRNS CITY COUNCIL CAIRNS WATER COMMITTEE 21 …...17/03/2005 House Connection Old Smithfield Rd & LeGrande St. ... 18/03/2005 150mm Sewer 32 Christensen Street 22/03/2005 House Connection

Agenda - Cairns Water Committee 21/4/05 - #980841

68

SUPPORTING

INFORMATION

#979556

Page 70: CAIRNS CITY COUNCIL CAIRNS WATER COMMITTEE 21 …...17/03/2005 House Connection Old Smithfield Rd & LeGrande St. ... 18/03/2005 150mm Sewer 32 Christensen Street 22/03/2005 House Connection

Agenda - Cairns Water Committee 21/4/05 - #980841

69

CONSULTANCY PROGRESS REPORT – MARCH 2005 BACKGROUND This report advises current progress with respect to consultancies which have been issued and are underway. All consultancies and their award have been in accordance with the adopted purchasing policy of Cairns City Council. Consultancy CW14/03 Project: Least Cost Planning Study Consultant: MWH Australia Progress: Final Report currently being reviewed Consultancy CW02/04 Project: Campbell St Pump Station Consultant: JWP Progress: Delay due to technical information Consultancy CW06a/04 Project: Wastewater Treatment Plant Upgrades Consultant: Zemek Environmental Progress: Underway - Ongoing Consultancy CW06c/04 Project: Wastewater Treatment Plant Upgrades Consultant: KPMG Cairns Progress: Underway - Ongoing

Page 71: CAIRNS CITY COUNCIL CAIRNS WATER COMMITTEE 21 …...17/03/2005 House Connection Old Smithfield Rd & LeGrande St. ... 18/03/2005 150mm Sewer 32 Christensen Street 22/03/2005 House Connection

Agenda - Cairns Water Committee 21/4/05 - #980841

70

Consultancy CW13/04 Project: Kamerunga Water Treatment Plant Process Selection Consultant: GHD Progress: Ongoing Consultancy CW14/04 Project: Upgrade of Pump Stations R2, R5, WW and PC1 Consultant: GHD Progress: Draft report expected mid April Consultancy CW02/05 Project: Survey and Design of 375mm Rising Main at Smithfield Consultant: Cardno CCC Progress: Survey commencing Consultancy CW11/05 Project: Reef Cove Water & Sewerage Planning Report Consultant: GHD Progress: Draft report received

Page 72: CAIRNS CITY COUNCIL CAIRNS WATER COMMITTEE 21 …...17/03/2005 House Connection Old Smithfield Rd & LeGrande St. ... 18/03/2005 150mm Sewer 32 Christensen Street 22/03/2005 House Connection

Agenda - Cairns Water Committee 21/4/05 - #980841

71

CONTRACT PROGRESS REPORT – MARCH 2005

BACKGROUND The purpose of this report is to update the Committee on the various Cairns Water contracts that are currently underway. WATER – CURRENT CONTRACTS Contract: 75106 Contract Name: Design, Supply & Install PLC, SCADA

Control Equipment, Switchboard & Switchboard Room to Freshwater Creek Water Treatment Plant

Contractor: JM Switchboards Accepted Contract Value: $421,490.00 Payments to Date: $400,298.00 Variations to Date: $10,360.00 Anticipated Completion Date: March 2005 Comments: Commissioning in progress Contract: 75172 Contract Name: Design and Construction of Service Road

Copperlode Falls Dam Contractor: B J Peach Constructions Pty Ltd Accepted Contract Value: $364,322.00 Payments to Date: $142,644.00 Variations to Date: Nil Anticipated Completion Date: March 2005 Comments: Completed - signage being installed

Page 73: CAIRNS CITY COUNCIL CAIRNS WATER COMMITTEE 21 …...17/03/2005 House Connection Old Smithfield Rd & LeGrande St. ... 18/03/2005 150mm Sewer 32 Christensen Street 22/03/2005 House Connection

Agenda - Cairns Water Committee 21/4/05 - #980841

72

WASTEWATER – CURRENT CONTRACTS Contract: 75145 Contract Name: DSI Switchboards to SWWTP Contractor: JM Switchboards Accepted Contract Value: $372,580.00 Payments to Date: $384,672.50 Variations to Date: $87,145 Anticipated Completion Date: Mid May 2005 Comments: Software installation being completed -

installation works continuing. Contract: 75148 Contract Name: Integration of SCADA System Contractor: Parasyn Controls Accepted Contract Value: $420,489.00 Payments to Date: $372,377.84 Variations to Date: $1,989.39 Anticipated Completion Date: End of April 2005 Comments: Software being installed Contract: 75169 Contract Name: Construction of R8 Pump Station &

Associated Works Contractor: LDI Constructions Accepted Contract Value: $247,576.00 Payments to Date: $265,650.60 Variations to Date: $29,953.00 Anticipated Completion Date: Mid March 2005 Comments: Completed Contract: 75180 Contract Name: Construction of SWWTP Outfall Pump

Station Contractor: LDI Constructions Accepted Contract Value: $897,955.00 Payments to Date: $150,505.20 Variations to Date: Nil Anticipated Completion Date: June 2005 Comments: Progressing.

Page 74: CAIRNS CITY COUNCIL CAIRNS WATER COMMITTEE 21 …...17/03/2005 House Connection Old Smithfield Rd & LeGrande St. ... 18/03/2005 150mm Sewer 32 Christensen Street 22/03/2005 House Connection

Agenda - Cairns Water Committee 21/4/05 - #980841

73

WASTE – CURRENT CONTRACTS Contract: 75155 Contract Name: Construction of Waste Recycling &

Reprocessing Faciltiy Contractor: Theiss / FGF Developments Accepted Contract Value: $4,706,876.00 Payments to Date: Nil Variations to Date: Nil Anticipated Completion Date: July 2005 Comments: Delays due to wet weather

Page 75: CAIRNS CITY COUNCIL CAIRNS WATER COMMITTEE 21 …...17/03/2005 House Connection Old Smithfield Rd & LeGrande St. ... 18/03/2005 150mm Sewer 32 Christensen Street 22/03/2005 House Connection

Agenda - Cairns Water Committee 21/4/05 - #980841

74

CAIRNS WATER LABORATORY SERVICES

PROGRESS REPORT – MARCH 2005

BUDGET PERFORMANCE

Income and expenditure figures for laboratory services are included in figures 1, 2 and 3. Completed Works

This Month % of total Last Month Value ($) of completed work $119,769.97 $113,619.51 External $71,689.91 $57,618.15 YTD Average (external) $44,671.79 Internal $48,080.06 $56,001.36 YTD Average (internal) $64,654.28

Budgeted value of completed works for 2004/2005 is $ 83,778 per month. Comparative average monthly external works for 2003/2004 was $ 38,785. Comparative average monthly internal works for 2003/2004 was $ 49,283. Revenue and Expenses YTD Variance (%) Operating Revenue ($) 369,215.00 (Compared to budget) 364,919.00 + 1.18 Operating Expenses ($) 345,360.00 (Compared to budget) 322,788.00 + 6.99 Revenue and Expenditure figures for the month of March are derived from Oracle records. LABORATORY ACTIVITIES Customer Satisfaction An indication of the satisfaction of our customers can be obtained from the number of samples and analysis requests received, and also from a measure of the laboratory’s ability to produce a timely result for the customer to use.

Page 76: CAIRNS CITY COUNCIL CAIRNS WATER COMMITTEE 21 …...17/03/2005 House Connection Old Smithfield Rd & LeGrande St. ... 18/03/2005 150mm Sewer 32 Christensen Street 22/03/2005 House Connection

Agenda - Cairns Water Committee 21/4/05 - #980841

75

This month saw 11 new external clients.

This Month

Last Month

12 month moving average

Target

# samples received 1029 1221 930 # analyses performed 7058 7304 5672 % samples finished in less than 14 days 87.3 89.1 90.7 98 % samples finished in less than 5 days 54.8 52.9 58.0 75

From Figure 4, 5, 6 and 7.

Page 77: CAIRNS CITY COUNCIL CAIRNS WATER COMMITTEE 21 …...17/03/2005 House Connection Old Smithfield Rd & LeGrande St. ... 18/03/2005 150mm Sewer 32 Christensen Street 22/03/2005 House Connection

Agenda - Cairns Water Committee 21/4/05 - #980841

76

Figure1

Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun

Actuals

Internal 51,248.31$ 48,630.50$ 40,957.73$ 100,738.18$ 96,455.45$ 92,349.90$ 47,427.04$ 56,001.36$ 48,080.06$ -$ -$ -$

External 31,278.77$ 41,692.00$ 37,533.28$ 47,728.89$ 39,031.36$ 41,669.18$ 33,804.55$ 57,618.15$ 71,689.91$ -$ -$ -$

Total 82,527.08$ 90,322.50$ 78,491.01$ 148,467.07$ 135,486.81$ 134,019.08$ 81,231.59$ 113,619.51$ 119,769.97$ -$ -$ -$

% Internal 62.1% 53.8% 52.2% 67.9% 71.2% 68.9% 58.4% 49.3% 40.1% 0.0% 0.0% 0.0%

% External 37.9% 46.2% 47.8% 32.1% 28.8% 31.1% 41.6% 50.7% 59.9% 0.0% 0.0% 0.0%

Cumulatives

Internal 51,248.31$ 99,878.81$ 140,836.54$ 241,574.72$ 338,030.17$ 430,380.07$ 477,807.11$ 533,808.47$ 581,888.53$ ####### ####### #######

External 31,278.77$ 72,970.77$ 110,504.05$ 158,232.95$ 197,264.30$ 238,933.48$ 272,738.04$ 330,356.19$ 402,046.10$ ####### ####### #######

Total 82,527.08$ 172,849.58$ 251,340.59$ 399,807.67$ 535,294.47$ 669,313.55$ 750,545.15$ 864,164.66$ 983,934.63$ ####### ####### #######

% Internal 62% 58% 56% 60% 63% 64% 64% 62% 59% 59% 59% 59%

% External 38% 42% 44% 40% 37% 36% 36% 38% 41% 41% 41% 41%

Projections

Internal (av mth) 51,248.31$ 49,939.41$ 46,945.51$ 60,393.68$ 67,606.03$ 71,730.01$ 68,258.16$ 66,726.06$ 64,654.28$ ####### ####### #######

External (av mth) 31,278.77$ 36,485.39$ 36,834.68$ 39,558.24$ 39,452.86$ 39,822.25$ 38,962.58$ 41,294.52$ 44,671.79$ ####### ####### #######

Internal (est final) 614,979.72$ 599,272.86$ 563,346.16$ 724,724.16$ 811,272.41$ 860,760.14$ 819,097.90$ 800,712.71$ 775,851.37$ ####### ####### #######

External (est final) 375,345.27$ 437,824.64$ 442,016.22$ 474,698.84$ 473,434.32$ 477,866.97$ 467,550.92$ 495,534.29$ 536,061.47$ ####### ####### #######

Total (est final) 990,324.99$ 1,037,097.50$ 1,005,362.38$ 1,199,423.00$ 1,284,706.73$ 1,338,627.11$ 1,286,648.82$ 1,296,246.99$ 1,311,912.84$ ####### ####### #######

These figures are EXCLUDING GST

Page 78: CAIRNS CITY COUNCIL CAIRNS WATER COMMITTEE 21 …...17/03/2005 House Connection Old Smithfield Rd & LeGrande St. ... 18/03/2005 150mm Sewer 32 Christensen Street 22/03/2005 House Connection

Agenda - Cairns Water Committee 21/4/05 - #980841

77

Figure 2

Cumulative Budget vs Actual

0.00

100,000.00

200,000.00

300,000.00

400,000.00

500,000.00

600,000.00

1-J

ul-0

4

1-O

ct-0

4

1-J

an

-05

3-A

pr-0

5

TOTAL OPERATING REVENUE (budget) TOTAL OPERATING REVENUE (actual) TOTAL OPERATING EXPENSES (budget) TOTAL OPERATING EXPENSES (actual)

Page 79: CAIRNS CITY COUNCIL CAIRNS WATER COMMITTEE 21 …...17/03/2005 House Connection Old Smithfield Rd & LeGrande St. ... 18/03/2005 150mm Sewer 32 Christensen Street 22/03/2005 House Connection

Agenda - Cairns Water Committee 21/4/05 - #980841

78

Figure 3

Aged Trial Balance - Laboratory Testing Fees

-10,000

-

10,000

20,000

30,000

40,000

50,000

60,000

70,000

80,000

90,000

Current < 30 days > 30 days > 60 days > 90 days

Age of Accounts (days)

$ V

alu

e o

f A

cco

un

ts

Oct-04

Dec-04

Jan-05

Feb-05

Mar-05

Page 80: CAIRNS CITY COUNCIL CAIRNS WATER COMMITTEE 21 …...17/03/2005 House Connection Old Smithfield Rd & LeGrande St. ... 18/03/2005 150mm Sewer 32 Christensen Street 22/03/2005 House Connection

Agenda - Cairns Water Committee 21/4/05 - #980841

79

Figure 4

Sample Completion Time

0%

10%

20%

30%

40%

50%

60%

70%

80%

90%

100%

Jan-

95

Jul-

95

Jan-

96

Jul-

96

Jan-

97

Jul-

97

Jan-

98

Jul-

98

Jan-

99

Jul-

99

Jan-

00

Jul-

00

Jan-

01

Jul-

01

Jan-

02

Jul-

02

Jan-

03

Jul-

03

Jan-

04

Jul-

04

Jan-

05

Jul-

05

Jan-

06

End of Month

% o

f S

amp

les

Co

mp

lete

d

0

200

400

600

800

1000

1200

1400

1600

To

tal N

um

ber

bo

ttle

s

>30 days >14 days>5 days <5 daystotal <14 days 98% target for <14 days75% target for <5 days Total bottles (secondary axis)12 months Mov. Avg (total <14 days) 12 month Moving average (<5 days)

Page 81: CAIRNS CITY COUNCIL CAIRNS WATER COMMITTEE 21 …...17/03/2005 House Connection Old Smithfield Rd & LeGrande St. ... 18/03/2005 150mm Sewer 32 Christensen Street 22/03/2005 House Connection

Agenda - Cairns Water Committee 21/4/05 - #980841

80

Figure 5

Number of Samples Received Per Month

0

200

400

600

800

1000

1200

1400

Jan-

93

Jan-

94

Jan-

95

Jan-

96

Jan-

97

Jan-

98

Jan-

99

Jan-

00

Jan-

01

Jan-

02

Jan-

03

Jan-

04

Jan-

05

Jan-

06

Nu

mb

er S

amp

les

Monthly Total 12-month moving average

Page 82: CAIRNS CITY COUNCIL CAIRNS WATER COMMITTEE 21 …...17/03/2005 House Connection Old Smithfield Rd & LeGrande St. ... 18/03/2005 150mm Sewer 32 Christensen Street 22/03/2005 House Connection

Agenda - Cairns Water Committee 21/4/05 - #980841

81

Figure 6

0

50

100

150

200

250

Jan-

00

Jul-0

0

Jan-

01

Jul-0

1

Jan-

02

Jul-0

2

Jan-

03

Jul-0

3

Jan-

04

Jul-0

4

Jan-

05

Nu

mb

er o

f A

nal

yses

Anions 12 month moving average

800

1000

1200

1400

1600

1800

Jan-

00

Jul-0

0

Jan-

01

Jul-0

1

Jan-

02

Jul-0

2

Jan-

03

Jul-0

3

Jan-

04

Jul-0

4

Jan-

05

Nu

mb

er o

f A

nal

yses

Bactos 12 month moving average

600

1100

1600

2100

2600

3100

Jan-

00

Jul-0

0

Jan-

01

Jul-0

1

Jan-

02

Jul-0

2

Jan-

03

Jul-0

3

Jan-

04

Jul-0

4

Jan-

05

Nu

mb

er o

f A

nal

yses

Physical Properties 12 month moving average

200

400

600

800

1000

1200

1400

1600

Jan-

00

Jul-0

0

Jan-

01

Jul-0

1

Jan-

02

Jul-0

2

Jan-

03

Jul-0

3

Jan-

04

Jul-0

4

Jan-

05

Nu

mb

er o

f A

nal

yses

Nutrients 12 month moving average

0100200300400500600700800900

Jan-

00

Jul-0

0

Jan-

01

Jul-0

1

Jan-

02

Jul-0

2

Jan-

03

Jul-0

3

Jan-

04

Jul-0

4

Jan-

05

Nu

mb

er o

f A

nal

yses

Metals 12 month moving average

50

150

250

350

450

550

Jan-

00

Jul-0

0

Jan-

01

Jul-0

1

Jan-

02

Jul-0

2

Jan-

03

Jul-0

3

Jan-

04

Jul-0

4

Jan-

05

Nu

mb

er o

f A

nal

yses

Solids 12 month moving average

100

300

500

700

900

1100

Jan-

00

Jul-0

0

Jan-

01

Jul-0

1

Jan-

02

Jul-0

2

Jan-

03

Jul-0

3

Jan-

04

Jul-0

4

Jan-

05

Nu

mb

er o

f A

nal

yses

Other 12 month moving average

0100200300400500600700800

Jan-

00A

pr-0

0Ju

l-00

Oct

-00

Jan-

01A

pr-0

1Ju

l-01

Oct

-01

Jan-

02A

pr-0

2Ju

l-02

Oct

-02

Jan-

03A

pr-0

3Ju

l-03

Oct

-03

Jan-

04A

pr-0

4Ju

l-04

Oct

-04

Jan-

05

Nu

mb

er o

f A

nal

yses

Subcontracted 12 month moving average

Page 83: CAIRNS CITY COUNCIL CAIRNS WATER COMMITTEE 21 …...17/03/2005 House Connection Old Smithfield Rd & LeGrande St. ... 18/03/2005 150mm Sewer 32 Christensen Street 22/03/2005 House Connection

Agenda - Cairns Water Committee 21/4/05 - #980841

82

Figure 7

Total Number of Analyses - Summary Per Month

3000

3500

4000

4500

5000

5500

6000

6500

7000

7500

8000Ja

n-00

Apr

-00

Jul-0

0

Oct

-00

Jan-

01

Apr

-01

Jul-0

1

Oct

-01

Jan-

02

Apr

-02

Jul-0

2

Oct

-02

Jan-

03

Apr

-03

Jul-0

3

Oct

-03

Jan-

04

Apr

-04

Jul-0

4

Oct

-04

Jan-

05

Month

Nu

mb

er o

f A

nal

yses

(B

AR

)

Totals 12 monthly moving average

Page 84: CAIRNS CITY COUNCIL CAIRNS WATER COMMITTEE 21 …...17/03/2005 House Connection Old Smithfield Rd & LeGrande St. ... 18/03/2005 150mm Sewer 32 Christensen Street 22/03/2005 House Connection