c.1.9 - rfq spec final documentation for construction burried pipelines
DESCRIPTION
TEHNICTRANSCRIPT
Buried pipeline construction
services
Technical specification C.1.9 14.09.09
Petrom E&P reserves all rights to this document and will take legal action against anyone who uses or passes it on without authorisation.
Page 1 of 5
“Pipeline Construction Services”
-
C.1.9
Specifications for final documentation
for construction of buried pipelines
Buried pipeline construction
services
Technical specification C.1.9 14.09.09
Petrom E&P reserves all rights to this document and will take legal action against anyone who uses or passes it on without authorisation.
Page 2 of 5
1. Introduction
For all buried pipeline construction projects performed, the final documentation contains
the originals of all documents listed below.
Details about required format of documents including the number of required copies, as
well as the timing for handover of this final documentation will be specified within the
contract for the specific scope of work.
As specified in the framework agreement, Petrom reserves the right to retain parts of the
remuneration and of the performance guarantee for the construction services of a
specific project until all final documentation has been delivered and approved completely
as requested in contents and requested quality.
2. Specification of required documents for final documentation
Deutsch English Română Document key code
Enddokumentation Documentation Documentaţie
Prüf- , Schlußbescheinigung
Final certificate (obtained by independent 3rd body or authorities)
Certificat final (obţinut de la o companie terţă sau de la autorităţi)
HQA 31
Technische Beschreibung Technical description - project
Descrierea tehnică (proiectul)
HEA 03
Konformitätserklärung Declaration of conformity( with Romanian laws given by construction company)
Declaraţia de conformitate (conform legilor din România – dată de compania constructoare)
HQA 10
R&I Schemata PID Drawings (process &
Schiţele DPI (diagrama procesului &
HFB 03
Buried pipeline construction
services
Technical specification C.1.9 14.09.09
Petrom E&P reserves all rights to this document and will take legal action against anyone who uses or passes it on without authorisation.
Page 3 of 5
Deutsch English Română Document key code
Enddokumentation Documentation Documentaţie
instrumentation diagram)
instrumentaţia de măsura şi control)
Isometrien mit zugehörigen Materialstück – und Schweißnahtlisten
Isometric drawing and the belonging bill of materials and welding seam list
Schema izometrica şi lista cu materialele ce trebuie folosite – şi lista sudurilor de efectuat
HFB 02
Verrohrungspläne Piping drawings (for piping in facilities like manifolds)
Schema de aşezare a conductelor (pentru facilităţile conductelor, cum ar fi claviaturiile)
HFB 04
(1) Übersichts-, (2) Trassen-, (3) Detail-, (4) Regel- und (5) Typenpläne
Maps of the (1) general survey (2) pipeline routing, (3) details (for eg. Under-/ overcross, tie-in), (4) process automation/ -control, (5) typicals
Hărţi cu supravegherea generală, traseul conductei, detalii ( de ex. Subtraversări, supratraversări, cuplări) automatizarea/ - controlul procesului, specificaţii
(1) HLA 02 (2) HLD 02 (3) HLD 03 (4) HLD 04 (5) HPD 05
Rohrwanddickenberechnungen
Calculation of the pipe wall thickness
Calculul grosimii peretelui conductei
HQA 26
Isolationsbescheinigung Insulation certificate Certificatul izolatiei HQA 39
Umstempelbescheinigung Material identification certificates
Certificatele de indentificare a materialelor
HQA 37
Druckprüfungbescheinigung
Pressure test certificate
Certificatele probei de presiune
HQA 20
Rohrbuch Pipebook Manualul conductei HQA 33
Buried pipeline construction
services
Technical specification C.1.9 14.09.09
Petrom E&P reserves all rights to this document and will take legal action against anyone who uses or passes it on without authorisation.
Page 4 of 5
Deutsch English Română Document key code
Enddokumentation Documentation Documentaţie
Schweißereinsatzlisten List of Welders (approved and working on this site)
Lista cu sudorii (care sunt aprobaţi tipul de şantier respectiv)
HQA 45
Schweißanweisungen WPS welding procedure specification (approved)
WPS specificaţia procedurii de sudură (aprobată)
HQA 22
Schweißerzeurgnisse Welder certificates Certificatele sudorilor HQA 23
Protokolle über zerstörungsfreie Werkstoffprüfungen
Report of non-destructive material tests (performed like eg. Radiographic tests)
Buletinele controalelor nedestructive al materialului (ex. controlul radiografic)
HQA 16
Prüfbericht über zerstörende Prüfungen an Testnähten
Report of destructive tests for welding joints
Buletinele controalelor distructive pentru legăturile de sudură
HQA 24
Abnahmeprüfzeugnisse Acceptance certificates
Certificate de recepţie HQA 02
The document key code specified shall be used for communication, table of contents
and filing of the above documents required for final documentation. They are
standardized within Petrom and OMV group and can be used to denominate the
documents only by their standard number.
3. Contact person for documentation questions
In case of questions about the contents or details of creating the final documentation,
the QA/QC-department of Petrom E&P will be able to give further information.
Please contact your Petrom site supervisor for further details and contact information.
Buried pipeline construction
services
Technical specification C.1.9 14.09.09
Petrom E&P reserves all rights to this document and will take legal action against anyone who uses or passes it on without authorisation.
Page 5 of 5
4. Change list
Rev Date Type of change Revised by Checked by Released by