METRO BUCAREST: MAGISTRALA 5,TRONSONUL 1: RAUL DOAMNEI – UNIVERSITATE
SECTIUNEA RAUL DOMENEI-HASDEU
FECHA: 04 / 11 / 2011
RFQ TECHNICAL-COMERCIALUNDERGROUND
WORKSDEPARTMENT
WAREHOUSE AND WORKSHOPS TECHNICAL REQUIREMENT Rev.0- Dec 2011 1 de 5
METRO BUCAREST: MAGISTRALA 5,
TRONSONUL 1: RAUL DOAMNEI –
UNIVERSITATE
SECTIUNEA RAUL DOMENEI-HASDEU
TECHNICAL REQUIREMENTSEXTRUCTURAL MODIFICATION
WAREHOUSE AND WORKSHOPS
Rev. 0 . - Dic 2011
8/10/2019 RFQ Buildings
http://slidepdf.com/reader/full/rfq-buildings 2/5
METRO BUCAREST: MAGISTRALA 5,TRONSONUL 1: RAUL DOAMNEI – UNIVERSITATE
SECTIUNEA RAUL DOMENEI-HASDEU
FECHA: 04 / 11 / 2011
RFQ TECHNICAL-COMERCIALUNDERGROUND
WORKSDEPARTMENT
WAREHOUSE AND WORKSHOPS TECHNICAL REQUIREMENT Rev.0- Dec 2011 2 de 5
Project consists of the first part of L5 Bucharest Subway. Consists of two circular
section tunnels 6.075 m length each, and the implementation of all the stations. This
project has been awarded by a joint venture between ASTALDI, FCC CO, DELTA and
BD GROUP.
1.- PROJECT CHARACTERISTICS
1.1.- Geometry
The tunnel is defined due to the next characteristics:
- tunnel length………….…………………………..……… 6.100 m
- Bored length…………..…………………………………..3.782 m
- Ring segment inner diameter……………………….……….5,7 m
- Maximum slope ………………………………………..… 2,10 %
- Mínimum horizontal radius …………………………..….. 200 m
2.- TUNNEL EXCAVATION PROCEDURE
2.1.- Excavation
The excavation of two tunnels will be carried out by EPB shield tunneling
machine suitable for working in soft ground soils due to the bulkhead pressure control
of the tunnel face. When tunnelling in unstable ground, it may be necessary to balance
the pressure inside the cutting head chamber with that of the surrounding soil to provide
a safe environment within the TBM and to minimize surface settlement above the tunnel
8/10/2019 RFQ Buildings
http://slidepdf.com/reader/full/rfq-buildings 3/5
METRO BUCAREST: MAGISTRALA 5,TRONSONUL 1: RAUL DOAMNEI – UNIVERSITATE
SECTIUNEA RAUL DOMENEI-HASDEU
FECHA: 04 / 11 / 2011
RFQ TECHNICAL-COMERCIALUNDERGROUND
WORKSDEPARTMENT
WAREHOUSE AND WORKSHOPS TECHNICAL REQUIREMENT Rev.0- Dec 2011 3 de 5
2.2.- SEGMENT RING DESIGNE
The tunnel line support it is made of concrete precast segment ring, assembled in
TBM due to a segment erector. Concrete ring characteristic are:
- Type ……………………………………………….. Universal ring
- Inner diameter ………………………………………5,70 meters
- Ring thickness..……………………………………………. 300 mm
- Ring length…………..………………………..………… 1,5 meters
- No. of segment per ring…….………………………….…………..6
- Circumferential join system…………………..……………. Inserts
The 270 mm gap between the ring extrados and the boring diameter (6570 mm)
must be filled with grout. The theoretical volume is 2,730 m³ and the TBM is designed
to fill through the tail shield with two component grout, pumped from the grout plant,
outside of the tunnel.
2.3.- EPB excavation
The TBM requires materials and precast concrete ring for lining. All materials
are supplied to the machine by multicar system.
In this project, the muck extraction it is made through conveyor belt system.
During the assembly, excavation and disassembly process, it requires the use of
warehouses and workshops for the stock, maintenance of equipments and develop of
structures and others items to use on site
8/10/2019 RFQ Buildings
http://slidepdf.com/reader/full/rfq-buildings 4/5
METRO BUCAREST: MAGISTRALA 5,TRONSONUL 1: RAUL DOAMNEI – UNIVERSITATE
SECTIUNEA RAUL DOMENEI-HASDEU
FECHA: 04 / 11 / 2011
RFQ TECHNICAL-COMERCIALUNDERGROUND
WORKSDEPARTMENT
WAREHOUSE AND WORKSHOPS TECHNICAL REQUIREMENT Rev.0- Dec 2011 4 de 5
3.- EXTRUCTURAL MODIFICATION WAREHOUSE AND WORKSHOPS
The provider will supply:
1. Calculations and Project signed and approved with the design (Including
calculations for new foundations)
2. New and modified elements to assembly completely the three buildings
3. Assembly and certificates of correct assembly
4. Transport to site of knew and modified elements (Academia Militara Station
Soseaua Pandurilor and Strada progresului, Bucharest)
- Delivery time for the new elements and the assembly of buildings after finish
foundations
8/10/2019 RFQ Buildings
http://slidepdf.com/reader/full/rfq-buildings 5/5
METRO BUCAREST: MAGISTRALA 5,TRONSONUL 1: RAUL DOAMNEI – UNIVERSITATE
SECTIUNEA RAUL DOMENEI-HASDEU
FECHA: 04 / 11 / 2011
RFQ TECHNICAL-COMERCIALUNDERGROUND
WORKSDEPARTMENT
WAREHOUSE AND WORKSHOPS TECHNICAL REQUIREMENT Rev.0- Dec 2011 5 de 5
5.- WARRANTIE
• Term and conditions of warrantie
• Time efective of warrantie
ATTACHED
• Academia militara sections (longitudinal and transversal) covers, roof and 3d
view
• Academia militara new structure list (to close in final quotation)
• Progresului general wharehuose sections (longitudinal and transversal) covers,
roof and 3d view
• Progresului general wharehuose new structure list (to close in final quotation)
• Progresului TBM wharehuose sections (longitudinal and transversal) covers,
roof and 3d view
• Progresului TBM wharehuose new structure list (to close in final quotation)