[c1] khan shakeel_turmenistan railway project
TRANSCRIPT
1
(Loan 2737-TKM)�
Presented by: Shakeel Khan
Lead Portfolio Management Specialist Central and West Asia Department
TURKMENISTAN
North South Railway Project
2
Content
Development Context Government’s strategic directions ADB’s strategic directions - The Project Next Steps
2
3
Turkmenistan Railway System
Railway Lines 2,268 kilometers (1991) 3,110 kilometers (2010)
Principal Routes • Multiple connections with Afghanistan, Azerbaijan,
Iran, Uzbekistan
Operator • Ministry of Railway Transport
4
Needs
Network Expansion with addition to Locomotive, Coach, and Freight Wagon Fleet
Track Maintenance and Safety Equipment for New Track Development
Skills for Modern Scheduling of Routine and Periodic Maintenance
Training in Implementing Externally-funded Projects
3
5
THE PROJECT
Outputs:
Signaling, power supply, and telecommunications systems for 288 km of the completed railway line
Track maintenance and safety Equipment.
Improvements in MRT’s Institutional Capacity
Project Management Support
6
4
7
8
5
9
10
6
11
12
7
13
14
COMPONENT CONTRACTOR/CONSULTANTS AMOUNT (US$,
MILLION)
TCP1: TURNKEY DESIGN, SUPPLY, INSTALLATION AND COMMISSIONING OF POWER SUPPLY, TELECOM, SIGNALING SYSTEMS
CONSORTIUM OF ASPMK 519 LLP (KAZ) AND KEC INTERNATIONAL LTD. (IND)
104.783
TCP2: SUPPLY OF TRACK MAINTENANCE MACHINERY
PLASSER & THEURER (AUSTRIA) 9.455
TCP3: PROJECT MANAGEMENT AND CAPACITY DEVELOPMENT
TERA INTERNATIONAL GROUP, INC. (U.S.A.)
2.584
TOTAL FUNDED BY ADB LOAN 116.822
NORTH-SOUTH RAILWAY PROJECT
(1) ADB-FUNDED COMPONENTS
8
15
Impact and Outcome
Increased trade between Turkmenistan and other countries in the region
An efficient, safe, and reliable railway transport network developed and operated in Turkmenistan with better connectivity with neighboring countries
16
Impact and Outcome
By 2015 Turkmenistan’s External Trade increased from $11.9 billion
(2008) to $17.9 billion
Total national transit tonnage increased from 3 million tons to 6 million tons
About 1.6 million tons of minerals transported on the project railway
Performance tracking system developed for periodic inspection,
supervision, and testing CO2 emissions reduced from the existing estimated level of
37,000 tons to 26,800 tons by 2020
9
17
Thank you