c d e v f o project r p net zero teesside project a r a d

1
Scale @ A3 1:40,000 Project Management Initials: RL Designer: LC Checked: AR Approved: CC F Site Boundary Power, Capture and Compressor Site Water Connection Corridors CO2 Export Pipeline BGS Superficial Aquifer Secondary Aquifer - A Secondary Aquifer - Undifferentiated Unproductive Strata REFERENCE 0 2.5 5 km SHEET NUMBER TITLE FIGURE 10-18 SUPERFICIAL AQUIFER Contains Ordnance Survey Data © Crown copyright and database rights 2021 Ordnance Survey 0100031673. © and database right Crown Copyright and Landmark Information Group Ltd (All rights reserved 2020) NZT_210505_ES_10-18_v1 1 of 1 DATE This drawing has been produced for the use of AECOMs client. It may not be used, modified or relied uon by third parties, except as agreed by AECOM or as required by law. AECOM accepts no responsibility, and denies any liability whatsoever, to any party that uses or relies upon this drawing without AECOMs express written consent. All dimensions are indicative and in metres unless otherwise noted. Do not scale this document. 05/05/2021 KEY PROJECT APPLICANTS NZT POWER LTD. AND NZNS STORAGE LTD. NET ZERO TEESSIDE PROJECT

Upload: others

Post on 28-Dec-2021

1 views

Category:

Documents


0 download

TRANSCRIPT

Scale

@ A3

1:40

,000

Proje

ct Ma

nage

ment

Initia

ls: R

L D

esign

er: LC

Che

cked

: AR

Appro

ved:

CC

F

Site BoundaryPower, Capture and Compressor SiteWater Connection CorridorsCO2 Export Pipeline

BGS Superficial AquiferSecondary Aquifer - ASecondary Aquifer - UndifferentiatedUnproductive Strata

REFERENCE

0 2.5 5 km SHEET NUMBER

TITLEFIGURE 10-18SUPERFICIAL AQUIFER

Contains Ordnance Survey Data © Crown copyright and database rights 2021 Ordnance Survey 0100031673. © and database right Crown Copyright and Landmark Information Group Ltd (All rights reserved 2020)

NZT_210505_ES_10-18_v1

1 of 1DATE

This

drawi

ng ha

s bee

n prod

uced

for th

e use

of AE

COMs

clien

t. It m

ay no

t be u

sed,

modif

ied or

relie

d uon

by th

ird pa

rties,

exce

pt as

agre

ed by

AECO

M or

as re

quire

d by l

aw. A

ECOM

acce

pts no

resp

onsib

ility,

and d

enies

any l

iabilit

y wha

tsoev

er, to

any p

arty t

hat u

ses o

r reli

es up

on th

is dra

wing

with

out A

ECOM

s exp

ress w

ritten

cons

ent.

All di

mens

ions a

re ind

icativ

e and

in m

etres

unles

s othe

rwise

noted

. Do n

ot sc

ale th

is do

cume

nt.

05/05/2021

KEY

PROJECT

APPLICANTSNZT POWER LTD. AND NZNS STORAGE LTD.

NET ZERO TEESSIDE PROJECT