by: > six sigma workshop. time versus cost your time is more valuable than the cost of your time....

29
By: <<Name>> <<Organization>> <<Date>> Six Sigma Workshop

Upload: shawn-leonard

Post on 13-Jan-2016

214 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: By: > Six Sigma Workshop. Time versus Cost Your time is more valuable than the cost of your time. We can always get more money: we never get more time

By:

<<Name>>

<<Organization>>

<<Date>>

Six Sigma Workshop

Page 2: By: > Six Sigma Workshop. Time versus Cost Your time is more valuable than the cost of your time. We can always get more money: we never get more time

Time versus Cost

Your time is more valuable than the cost of your time.

We can always get more money: we never get more time.

Page 3: By: > Six Sigma Workshop. Time versus Cost Your time is more valuable than the cost of your time. We can always get more money: we never get more time

Overview

• Six Sigma Defined• The Statistical Tools of Six Sigma• The Components of Six Sigma• Corporations practicing Six Sigma and a

specific success story• An exercise• Summary

Page 4: By: > Six Sigma Workshop. Time versus Cost Your time is more valuable than the cost of your time. We can always get more money: we never get more time

What is Six Sigma (6s)?• Originated at

Motorola in the early 80s

• 6s is a methodology for quality improvement

• Doesn’t use “Quality” in the name

• 6s supports a Total Quality Management (TQM)-orientated company

• Recognition of elements from Deming Wheel

Page 5: By: > Six Sigma Workshop. Time versus Cost Your time is more valuable than the cost of your time. We can always get more money: we never get more time

What is Six Sigma Quality?

• The numerical goal is 3.4 defects per million opportunities (99.9997%)

• Six Sigma’s goal is the near elimination of defects from any process, product, or service.

• Juran once concluded that in the western world, around 1/3 of work is redoing what had already been done.

• This cost of low quality could be around 30% of total effort!

Page 6: By: > Six Sigma Workshop. Time versus Cost Your time is more valuable than the cost of your time. We can always get more money: we never get more time

Six Sigma Process Measurement

SIGMA DPMO CAPABILITY

6 sigma 3.4 World Class

5 sigma 230

4 sigma 6200 Industry average

3 sigma 67,000

2 sigma 310,000 Noncompetitive

1 sigma 700,000

Page 7: By: > Six Sigma Workshop. Time versus Cost Your time is more valuable than the cost of your time. We can always get more money: we never get more time

EXERCISE - Six SigmaWe all use Services every day.

Select a Service you use.

List 10 ways that the service provision can be measured with actual numbers, facts, and figures.

Page 8: By: > Six Sigma Workshop. Time versus Cost Your time is more valuable than the cost of your time. We can always get more money: we never get more time

The Statistical Tools of Six Sigma:

http://www.sixsigma.de/english/images/sixsigma/gauss_kurve.gif

Visit http://www.sixsigma.de/english/ to learn where you can purchase more material on Six Sigma.

Page 9: By: > Six Sigma Workshop. Time versus Cost Your time is more valuable than the cost of your time. We can always get more money: we never get more time

The Statistical Tools of Six Sigma

To find your Sigma Level:• Clearly define the customer’s explicit

requirements• Count the number of defects that occur.• Determine the yield—percentage of items

without defects.• Use the conversion chart to determine DPMO

and Sigma Level.

Page 10: By: > Six Sigma Workshop. Time versus Cost Your time is more valuable than the cost of your time. We can always get more money: we never get more time

(Simplified) Sigma Conversion Table

If your yield is: Your DPMO is: Your Sigma is:

30.9% 690,000 1.0

62.9% 308,000 2.0

93.3 66,800 3.0

99.4 6,210 4.0

99.98 320 5.0

99.9997 3.4 6.0

The Six Sigma Way How GE, Motorola, and Other Top Companies are Honing their Performance, pg. 29.

Page 11: By: > Six Sigma Workshop. Time versus Cost Your time is more valuable than the cost of your time. We can always get more money: we never get more time

The Components of Six Sigma:

• People

• Process

• Technology

Page 12: By: > Six Sigma Workshop. Time versus Cost Your time is more valuable than the cost of your time. We can always get more money: we never get more time

People

Business Leader

Champion

Black Belts

Master Black Belt

Green Belts

Page 13: By: > Six Sigma Workshop. Time versus Cost Your time is more valuable than the cost of your time. We can always get more money: we never get more time

Business Leader Roles:

• Executives committed to Six Sigma.

• Conceptually knowledgeable in Six Sigma Process.

• They will determine who will be the Champion.

Page 14: By: > Six Sigma Workshop. Time versus Cost Your time is more valuable than the cost of your time. We can always get more money: we never get more time

Sponsors

• Executive member or senior management.• Helps or Assigns projects to Black Belts.• Supervises the Black Belts.• Provide resources to complete the job.• Helps to establish Benchmarks for

measurement.

Page 15: By: > Six Sigma Workshop. Time versus Cost Your time is more valuable than the cost of your time. We can always get more money: we never get more time

Master Black Belts

• Experts on the statistical methods.

• Experts on the Six Sigma process.

• Helps Champion to select projects.

Page 16: By: > Six Sigma Workshop. Time versus Cost Your time is more valuable than the cost of your time. We can always get more money: we never get more time

Black Belts

• Six Sigma process leaders.• Convert “Vision” to “Reality.”• Dedicated to Six Sigma Program.• Management and technical skills.• Supervisors of the Green Belts.

Page 17: By: > Six Sigma Workshop. Time versus Cost Your time is more valuable than the cost of your time. We can always get more money: we never get more time

Green Belts

• Engine Room for activity• Six Sigma aware and trained

• Critical role• Process improvers

Page 18: By: > Six Sigma Workshop. Time versus Cost Your time is more valuable than the cost of your time. We can always get more money: we never get more time

Process Element - DMAIC

Define

Measure

AnalyzeImprove

Control

Page 19: By: > Six Sigma Workshop. Time versus Cost Your time is more valuable than the cost of your time. We can always get more money: we never get more time

Define• Clearly identify the problem.

• Can it be measured?

• Don’t jump to conclusions.

• No assumptions.

Page 20: By: > Six Sigma Workshop. Time versus Cost Your time is more valuable than the cost of your time. We can always get more money: we never get more time

Measure

• Numbers, not feelings.

• Capability of a given process.

• Focus on Customer issues/measurements.

Page 21: By: > Six Sigma Workshop. Time versus Cost Your time is more valuable than the cost of your time. We can always get more money: we never get more time

Analyze• Review the data collected.

• Current process results• Statistical measurements

• Can we learn anything from a SWOT analysis?

Page 22: By: > Six Sigma Workshop. Time versus Cost Your time is more valuable than the cost of your time. We can always get more money: we never get more time

Improve

• Now the hard part!!!

• Generate ideas for improvement.

• Be creative• better ways• faster ways• safer ways• faster ways• other ways!

Page 23: By: > Six Sigma Workshop. Time versus Cost Your time is more valuable than the cost of your time. We can always get more money: we never get more time

Control

• Embed• Measure• Support

• Start again !!

Page 24: By: > Six Sigma Workshop. Time versus Cost Your time is more valuable than the cost of your time. We can always get more money: we never get more time

Is anyone else doing it?• Motorola• General Electric• Allied Signal

• (Merged With Honeywell in 1999)• Polaroid

Page 25: By: > Six Sigma Workshop. Time versus Cost Your time is more valuable than the cost of your time. We can always get more money: we never get more time

Some Results…• General Electric – began in 1995

• 1998: $1.2 Billion minus $450 Million in costs… = $750 Million benefits

• Annual Report in 1999: more than $2 Billion measurable benefits

• 2001: 6,000 projects finished; reported $3 Billion in savings

• Motorola – 10 years; $11 Billion Return• Allied Signal – Approx. $1.5 Billion savings

Page 26: By: > Six Sigma Workshop. Time versus Cost Your time is more valuable than the cost of your time. We can always get more money: we never get more time

Six Sigma according to GE

• “Six Sigma is a highly disciplined process that helps us focus on developing and delivering near-perfect products and services to our customers. ‘Six Sigma’, a statistical term, describes a process that results in less than 3.4 defects per million operations, a process that is very near perfection. The central idea behind GE's Six Sigma Quality initiative is that customers define quality: a defect is defined as not meeting a customer's requirements.

Therefore, the focus of Six Sigma Quality methodology is measuring the number of times a product or service of ours fails to meet our customers' needs and then using that information to systematically eliminate those shortcomings, getting as close to 100% customer satisfaction as possible.”

Page 27: By: > Six Sigma Workshop. Time versus Cost Your time is more valuable than the cost of your time. We can always get more money: we never get more time

An Example

• Six Sigma Project: Retail DisplayDefine: Marketing has designed a "fancy" display unit that they think will outperform the "standard" display unit and they want to put one in every store. "Fancy" display is 10X the cost of a "standard" display and all stores already have "standard" units. Should the new displays be purchased?Measures: Have data for each store on sales of this product for every day. Analyze: The stores identified at least three other factors besides display type that could impact sales. Range for each factor was identified. Design of Experiments was conducted.Improve: "Fancy" display had no significant impact on sales. The "fancy" displays were not ordered for any more stores, with considerable cost savings.Control: Future changes will be tested and evaluated using statistical techniques.

From: www.adamssixsigma.com/Sample_Projects/six_sigma_projects.htm

Page 28: By: > Six Sigma Workshop. Time versus Cost Your time is more valuable than the cost of your time. We can always get more money: we never get more time

Exercise

You have just completed all your training sessions for the Black Belt role. Currently, your organization is operating at a 2 sigma level and your Champion wants this to improve using the Six Sigma process. It seems that although production is high, the defect levels are too high for the production of your Pizzas. This has significantly cut into profits almost to the point of putting us out of business. There is a strong demand for Pizzas so you are handed the daunting task of improving this process using the Six Sigma (DMAIC) approach.

Page 29: By: > Six Sigma Workshop. Time versus Cost Your time is more valuable than the cost of your time. We can always get more money: we never get more time

Summary:• It’s a philosophy of quality improvement.• Six sigma is 3.4 defects in one million

opportunities (DPMO)• Components of Six Sigma are people, process,

and technology• Business Leader, Champion, Master Black Belt,

Black Belt, and Green Belt• Define, Measure, Analyze, Improve, Control

• Customer focus, Customer focus, Customer focus