Page 1: Burbank, CA 5/25/2004

04-0525CAtechnical archives

TRIC Training Log: 05-25-04

Client: Midtown Rooter, Burbank, CA

Job: Residence, under front lawn to property line

Pull: 45’ / 4” / SDR17

Page 2: Burbank, CA 5/25/2004

04-0525CAtechnical archives

The site: A Hollywood bungalow, just blocks from the big studios.

Page 3: Burbank, CA 5/25/2004

04-0525CAtechnical archives

The path: roughly 40’ under the sloping front lawn. Though relatively short, a trench here would still produce a lot of dirt.

Page 4: Burbank, CA 5/25/2004

04-0525CAtechnical archives

The pulling hole: Breaking out the old pipe up to the property line connection.

Page 5: Burbank, CA 5/25/2004

04-0525CAtechnical archives

Clearing the way.

Page 6: Burbank, CA 5/25/2004

04-0525CAtechnical archives

Preparation: Remove all protruding pipe from the pulling wall, and make that wall as vertical as possible. Plug the downstream connection if necessary.

Page 7: Burbank, CA 5/25/2004

04-0525CAtechnical archives

Resistance plate: Sizing up the fit.

Page 8: Burbank, CA 5/25/2004

04-0525CAtechnical archives

First things first: The heating element takes about 30 minutes to warm up. New owners, be sure to remove the plastic packaging!

Page 9: Burbank, CA 5/25/2004

04-0525CAtechnical archives

Temperature: The factory setting is usually 450º (between 450º and 500º is optimal).

Page 10: Burbank, CA 5/25/2004

04-0525CAtechnical archives

Tricks of the trade: Get an old tire to store each cable.

Page 11: Burbank, CA 5/25/2004

04-0525CAtechnical archives

Shiny and new: 4” bursting head with band cutting blade, and clevis head with PE end cap.

Page 12: Burbank, CA 5/25/2004

04-0525CAtechnical archives

Fusing area: Find some place as open and level as possible. Here the carport would be useful in bad weather; in good weather it provides shade.

Page 13: Burbank, CA 5/25/2004

04-0525CAtechnical archives

Connecting the clevis head: A short piece of pipe is cut to fuse to the PE end cap.

Page 14: Burbank, CA 5/25/2004

04-0525CAtechnical archives

First weld: The end cap is fused to the short piece, allowing access to the cap bolt.

Page 15: Burbank, CA 5/25/2004

04-0525CAtechnical archives

Clevis head: Use a socket wrench or large basin wrench to tighten the cap bolt.

Page 16: Burbank, CA 5/25/2004

04-0525CAtechnical archives

Tightening up.

Page 17: Burbank, CA 5/25/2004

04-0525CAtechnical archives

Facing: Shown here is the shaver and 4” fusing unit.

Page 18: Burbank, CA 5/25/2004

04-0525CAtechnical archives

Cooling: Generally, about 10 minutes per joint, or until just slightly warm to the touch.

Page 19: Burbank, CA 5/25/2004

04-0525CAtechnical archives

Heating: Watching the melt. After contact, pressure is neutral.

Page 20: Burbank, CA 5/25/2004

04-0525CAtechnical archives

Getting in position: Moving the fused pipe up to the entry point.

Page 21: Burbank, CA 5/25/2004

04-0525CAtechnical archives

Band cutting blade: The “dorsal fin” is used to split bands and couplings underground. This sewer is 4” bell-and-spigot VCP; therefore the blade is not needed.

Page 22: Burbank, CA 5/25/2004

04-0525CAtechnical archives

Blade screw: When not using the blade, replace the allen screw to keep threads clean.

Page 23: Burbank, CA 5/25/2004

04-0525CAtechnical archives

Attaching the clevis: Arrange the clevis and head so that they “hinge” or bend along with the pull upon entry.

Page 24: Burbank, CA 5/25/2004

04-0525CAtechnical archives

Monitor the entry: A good start is important.

Page 25: Burbank, CA 5/25/2004

04-0525CAtechnical archives

An unrestricted approach.

Page 26: Burbank, CA 5/25/2004

04-0525CAtechnical archives

Keep resistance wall vertical: Here the resistance plate is inset (roughly 8”) due to burrowing at base of resistance wall. Uneven digging brings the pulley and ram closer to the dirt, restricting access to ram and inviting dirt in jaws. Cribbing can be used to alleviate this.

Page 27: Burbank, CA 5/25/2004

04-0525CAtechnical archives

Underway: Collecting cable and watching the pressure gauge.

Page 28: Burbank, CA 5/25/2004

04-0525CAtechnical archives

The pull: Keep track of the pipe in the ground, and be ready for the clevis to appear.

Page 29: Burbank, CA 5/25/2004

04-0525CAtechnical archives

Keeping tidy: The cable can be reeled into a tire during the pull.

Page 30: Burbank, CA 5/25/2004

04-0525CAtechnical archives

Arrival: The clevis sheath is almost at the threshold of the pulley housing.

Page 31: Burbank, CA 5/25/2004

04-0525CAtechnical archives

Watching the cable: When the clevis sheath (cable terminator) reaches the threshold of the pulley assembly, it’s time to stop. The clevis should never be wrapped under the pulley.

Page 32: Burbank, CA 5/25/2004

04-0525CAtechnical archives

Disconnecting the bursting head.

Page 33: Burbank, CA 5/25/2004

04-0525CAtechnical archives

Bumping down the hill.

Page 34: Burbank, CA 5/25/2004

04-0525CAtechnical archives

Connecting the top end.

Page 35: Burbank, CA 5/25/2004

04-0525CAtechnical archives

Mission accomplished: Ready to backfill.