bumi armada new vessel technology...

9
“Knots Ahead of the Rest” Bumi Armada New Vessel Technology Panel Building Trust

Upload: others

Post on 25-May-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

“Knots Ahead of the Rest”

Bumi Armada

New Vessel Technology

Panel

Building Trust

Disclaimer

This presentation may contain statements of future expectations and other forward-looking statements based on

management’s and/or other information providers’ current views and assumptions and involve known and unknown risks

and uncertainties that could cause actual results, performance, or events to differ materially from those in such

statements. Such forward-looking statements are subject to various risks and uncertainties, which may materially and

adversely impact the actual results and performance of the Company’s businesses. Certain such forward-looking

statements can be identified by the use of forward-looking terminology such as “believes”, “may”, “will”, “should”, “would

be”, “expects” or “anticipates” or similar expressions, or the negative thereof, or other variations thereof, or comparable

terminology, or by discussions of strategy, plans, or intentions. Should one or more of these risks or uncertainties

materialise, or should underlying assumptions prove incorrect, actual results may vary materially from those described as

anticipated, believed, or expected in this presentation. The Company does not intend, and does not assume any

obligation, to update any industry information or forward-looking statements set forth in this presentation to reflect

subsequent events or future circumstances.

2

New Vessel Technology Panel

3

a

s

d

f

• Current Vessel Capability/SWOT analysis

• Innovation and New Technology

• Capability vs Cost

Major ProjectsE&TEngineering and

Technology AMOAsset Management

and Operations

OFSOilfield

Services

T&ITransport and

InstallationFPSO

Floating Production,

Storage and OffloadingOSV

Offshore Support

Vessels

BUSINESS

STREAMS

ENABLERS

GDTGas Development

and Technology

Integrated Offshore Oilfield Services Provider

4

Shore base / office

T & I

SOUTH EAST ASIA

FPSO Armada PerdanaFPSO Armada Perkasa

FPSO Armada Sterling FPSO Armada TGT1

FPSO Armada Claire

Armada Installer, DLB

SINGAPORE

BRUNEI

VIETNAM

Miri

Perth

Kemaman

Kuala Lumpur

INDONESIA

ANGOLA

CONGO

NIGERIA

Lagos

Port Harcourt

Port Point - Noire

Ciudad del Carmen

MEXICO

BRAZIL

Turkmenbashi

Ashgabat

Mumbai

Dubai

TURKMENISTAN

UAE

INDIA

GHANA

RUSSIA

Astrakhan

Houston

UNITED STATES

Labuan

Jakarta

Rio de Janeiro

London

UNITED KINGDOM

SAUDI

ARABIA

Al Khobar

MALAYSIA

Kraken Field - FPSO Under

Conversion

FPSO Armada Sterling II-

FPSO Under Conversion

Integrated Offshore Oilfield Services Provider

Global Execution Local Delivery

5

Aberdeen

Vung Tau

SOUTH

AFRICA

AUSTRALIA

FPSO

Armada Hawk

Armada Condor

Oilfield Services - ‘Armada’ Synergy

103.7m long lightweight riserless

drillship.

DP-2, Ice class vessel.

Fully automated riserless drilling

system with 150ton AHC tower.

Halliburton Cement Unit.

7.2m x 7.2m Moonpool.

Adaptable cursor system.

Integrated tree handling and skidding

system FWD of mast.

AHC 25t Deck Crane.

Additional compensated heavy lift

wires (2) 32 tonnes capacity each.

Integrated ROV system.

OFS Subsea Intervention System – Project LIMO

Subsea Equipment:

7

• The image to the

right is a

developing

representation of

what the OFS

Subsea Well

Intervention System

may look like? Still

early days...? Work

continues.

• With research

already confirming

the optimum Supply

Chain.

‘VS 4819’ Light Well Intervention Vessel

120 m long, 23.40 m breadth Light Well

Intervention vessel.

NOV WISE Stimulation Spread, Cement Unit,

Wireline Unit built into vessel capability.

110 POB.

7.2m x 7.2m Moonpool, c/w adaptable

cursor system.

165 T NOV Varco AHC Tower.

AHC 100 T Crane.

Fully integrated ROV system, for two

working class ROVs.

OFS Subsea Intervention System, 7” nominal,

10,000 psi working pressure (FEED

ongoing).

Currently under conceptual study, moving to

detailed Class and Tender design.

“Knots Ahead of the Rest”

Thank You