  • 8/9/2019 Building Update June 23

    1/35

    DESIGNTEAM OWNERS

    PROJECT

    MANAGER

    Tessier AssociatesArchitects URSCorporation

    MargoJonesArchitects

    Guntlow &Associates

    Tsiang Engineering

    aCaerus SustainableSolutions

    Hesnor EngineeringCompany

    MPRConsulting

  • 8/9/2019 Building Update June 23

    2/35

    Current

    Grade

    Configuration

    for

    ACRSD:

    School: Grades: Size: Student

    population:C.T. PlunkettElementary School K6 88,305gsf 601pupils

    CheshireElementarySchool PK6 *48,850 gsf 273pupils

    AdamsMemorial

    Middle

    School Was

    68 68,000

    gsf Vacant

    since

    2009;

    formerly480pupils

    HoosacValleyRegionalHighSchool 712 158,826 gsf 700pupils

    *CheshireElementarySchool: Sizeexcludesbasementutilityspaceandacommunity

    roomwithoutnaturaldaylightinthe1923sectionofthebuilding.

  • 8/9/2019 Building Update June 23

    3/35

    AdamsMemorialMiddleSchoolisnotaviable

    Optionfor

    amajor

    MSBA

    funded

    project:

    Thebuildingislocatedonasmallsitewithverylimitedspacefor

    expansionanddifficulttopography

  • 8/9/2019 Building Update June 23

    4/35

    AdamsMemorialMiddleSchoolisnotaviable

    Optionfor

    amajor

    MSBA

    funded

    project:

    Amemorialparktotheeastalsolimitsexpansion

    Asteepembankmenttothewestseparatestownplayfields

  • 8/9/2019 Building Update June 23

    5/35

    AdamsMemorialMiddleSchoolisnotaviable

    Optionfor

    amajor

    MSBA

    funded

    project:

    Theexistingbuildingisinpoorcondition

    Majorrenovationswouldberequired

  • 8/9/2019 Building Update June 23

    6/35

  • 8/9/2019 Building Update June 23

    7/35

    C.T.PlunkettElementarySchoolhasbeen

    Eliminatedas

    aFacility

    for

    the

    addition

    of

    6th grade

    Siteis

    too

    restrictive

    for

    even

    a

    minoraddition

    Anadditionwouldrequirecode

    &

    access

    improvements

    which

    wouldbeverycostly

    Consolidatinggrades6through

    12atHVHSreducesoperating

    costs

    Itispedagogicallystrongerto

    haveGrade6inamiddleschool,

    withteam

    teaching

  • 8/9/2019 Building Update June 23

    8/35

    Proposed

    Grade

    Configuration

    for

    ACRSD:

    School: Grades: Size: Student

    population:C.T. PlunkettElementary School PK5 88,305gsf 525+/ Pupils

    CheshireElementarySchool PK5 48,850gsf 250+/ pupils

    Hoosac

    Valley

    Regional

    High

    School 6

    12 158,826

    gsf+small

    addition

    Middle

    School:

    385

    pupilsHighSchool: 420pupils(maybehigher; enrollment

    figuresperMSBA)

    AdamsMemorialMiddleSchool: ReturnedtotheTownofAdams,AdamsPreKreturns

    toPlunkett,and6th gradefrombothtownsgototheMiddle/HighSchool.

  • 8/9/2019 Building Update June 23

    9/35

    HoosacValleyRegionalSchool,builtin1970,isin

    goodcondition

    and

    worthy

    of

    further

    investment

    :

    Sizeisalmostlargeenough:158,826squarefeet

    Durableconstruction

    original

    structure

    holding

    up

    well

    withonlyafewcracks

    ,1970

  • 8/9/2019 Building Update June 23

    10/35

    Hoosac ValleyRegionalSchoolhasbeenwellmaintained:

    Newroofs

    Heating

    system

    upgrade

    $300,000in

    hazmat

    removals

  • 8/9/2019 Building Update June 23

    11/35

    ThisSecondarySchooliswellorganized Library,Cafeteria,

    Gymand

    the

    Auditorium

    are

    located

    either

    centrally

    or

    alongmajoraxisoftravel

  • 8/9/2019 Building Update June 23

    12/35

    AppropriateSite open,beautifulviews,convenient

    location,andlargesize(71acres,57.5Cheshire,13.5Adams)

    allowsavarietyofextracurricularactivities

  • 8/9/2019 Building Update June 23

    13/35

  • 8/9/2019 Building Update June 23

    14/35

    TheHoosac ValleyRegionalSchoolhasastrongcurriculum:

    85%+/ ofgraduatesattendcollege

    ManyAPcourseofferings,

    andtechnicalclasses

    StrongAthletics

    EffectiveSpecialEducationforallstudents

    StrongMusicandTheater

    FamilyTraditions

    ExcellentSchoolSpirit

  • 8/9/2019 Building Update June 23

    15/35

    HowevertheHoosac ValleyRegionalSchooldoesnothave

    enoughspace

    for

    the

    Middle

    School

    program:

    Existing7 8MiddleSchool

    Proposed/Required6 8MiddleSchool

    21,838sf

    40,193sf

  • 8/9/2019 Building Update June 23

    16/35

    NoclearmainentrancetoHoosacValleyRegionalSchool

    approachis

    ambiguous

  • 8/9/2019 Building Update June 23

    17/35

    Thereare28entrancesandexitstoHoosacValleyRegional

    School impossible

    to

    monitor

    and

    energy

    inefficient

  • 8/9/2019 Building Update June 23

    18/35

  • 8/9/2019 Building Update June 23

    19/35

    Finishesandequipmentare40yearsoldand

    wornout

    or

    wearing

    out

  • 8/9/2019 Building Update June 23

    20/35

    Several programspacesareinappropriate Libraryistoo

    large,Science

    labs

    are

    all

    housed

    in

    asingle

    large

    room

    Library ScienceLab

  • 8/9/2019 Building Update June 23

    21/35

    Severalclassroomsarelandlockedwithnowindowsor

    natural

    daylighting

  • 8/9/2019 Building Update June 23

    22/35

    HoosacValleyRegionalSchoolhasapoorenergyenvelope&

    performance

  • 8/9/2019 Building Update June 23

    23/35

    ImprovementstotheSitewillbe

    necessarytocorrectdeficiencies.

    DeterioratingParkingLotsandWalks

    RunningTrackisinPoorCondition

    UnusableTennis

    Courts

  • 8/9/2019 Building Update June 23

    24/35

    CurrentUseofExistingSpaceatHoosacValley:

    HIGH SCHOOLAREA 35,158 gsf

    MIDDLESCHOOLAREA 21,838gsf

    SHARED&ADMINISTRATIONAREAS 91,309gsf

    VACANT POOLAREA 7,360

    gsf

    DISTRICT AREA 3,161gsf

    TOTAL GROSSBUILDINGAREA 158,826 gsf

  • 8/9/2019 Building Update June 23

    25/35

  • 8/9/2019 Building Update June 23

    26/35

    ExistingandProposedSpaceSummary:

    Space Category ExistingConditions Proposed Conditions

    CoreAcademic Spaces 27,639sf 38,040sf

    SpecialEducation 6,306sf 9,945sf

    Art&

    Music 5,353

    sf 4,909

    sf

    Vocations&Technology 8,940sf 10,265sf

    Health&PhysicalEducation 19,271sf 25,096sf

    MediaCenter 6,804

    sf 4,886

    sf

    Auditorium/Drama 7,390sf 7,390sf

    Dining&FoodService 8,648sf 9,538sf

    Medical 597

    sf 910

    sfAdministration&Guidance 4,610sf 4,567sf

    Custodial&Maintenance 3,493sf 3,044sf

    Other 10,219sf 537sf

    TotalBuildingNetFloorArea(NFA) 109,270sf 119,127sf

  • 8/9/2019 Building Update June 23

    27/35

    CONCEPTUALOPTION1

  • 8/9/2019 Building Update June 23

    28/35

    CONCEPTUALOPTION2

  • 8/9/2019 Building Update June 23

    29/35

    CONCEPTUALOPTION3

  • 8/9/2019 Building Update June 23

    30/35

    PREFERREDCONCEPTUALDESIGN2

    MS

    GYMNASIUM

  • 8/9/2019 Building Update June 23

    31/35

  • 8/9/2019 Building Update June 23

    32/35

    CONCEPTUALELEVATIONS

  • 8/9/2019 Building Update June 23

    33/35

    ReasonsforSelectingOption2:

    Efficientlayout: 10,513nsf fromspaceprogramdeliveredin15,561gsf(1.48grossingfactor)

    Utilizestheexistingbuildingtothemaximum: poolconvertedtogym,

    nonew

    corridors

    Providesaclear,safefrontentranceforall students,butthendividesthemtoMSandHS,wheretheyeachhavetheirownseparateschools.

    Upgradesinfrastructureto21st century,booststhermalenvelopeand

    performanceto

    LEED

    standards

    Improvesschoolidentityandprovidessomecollectivespaceatentryforsocialinteractionandschoolexhibits

    Consolidatesadministration,inthemostfunctionallocation

    ImprovesscienceclassroomsandlabsforbothHSandMS

    Decreasesnumberofdark,landlockedclassroomswithnodaylight

    Interspersesspecialeducationclassroomsandspacesthroughoutthe

    school AllowsforteamteachingintheMiddleSchool

  • 8/9/2019 Building Update June 23

    34/35

    Conclusion:

    RenovationoftheAdamsMemorialMiddleSchoolisnotareasonableoption,andconditionsattheHoosac ValleyHighSchoolwouldremainunaddressed

    requiring

    afuture

    separate

    project.

    AddingspaceandrenovatingtheHoosac Valley

    RegionalSchool,

    is

    the

    most

    cost

    effective

    alternativewhichprovidesneedededucationalspacethroughasingle project.

    ThePreferred

    Option

    allows

    the

    District

    to

    retire

    the60yearoldMiddleSchoolandreduceoperatingcosts,aswellastoeliminatethefuturerenovationoftheHoosac ValleyHighSchool.

  • 8/9/2019 Building Update June 23

    35/35

    AdamsCheshireRegionalSchoolBuildingCommittee

    DonaldSommer

    FormerAdamsSelectman

    1Sommer HillRd.,

    Adams,MA01220

    [email protected]

    DanielDeloreyCheshire

    Selectman

    485NStateRd.,

    Cheshire,MA01225

    [email protected]

    JonathanButlerAdamsTownAdministrator

    59Notch

    Rd.,

    Adams,MA01220

    [email protected]

    JohnDuvalSchoolCommittee

    22PowersSt,

    Adams,MA

    01220.

    [email protected]

    LynnClairmontSchoolCommittee

    20Pleasantview Dr.

    Cheshire,MA01225

    [email protected]

    AlfredSkrocki

    Superintendent

    138EastRd.,

    Adams,MA01220

    [email protected]

    TimothyLuczynskiFacilities

    Mgr

    ACRSD

    35MeadowviewDr.,

    Cheshire,MA01225

    [email protected]

    DavidHinkellBusinessAdministrator/

    ChiefProcurement

    Officer

    139ColeAve,

    Pittsfield,MA01201

    [email protected]

    HenryDuval

    Principal175WilshireDr.

    Cheshire,MA01225

    [email protected]

    PaulDemastrieFinanceCommittee

    29Leonard

    St.,

    Adams,MA01220

    [email protected]

    FrancisWaterman

    WatermanConstruction

    97MainSt.,

    Cheshire,MA01225

    [email protected]

    HowardWinebergLocal

    Businessman

    FormermemberofFinance

    Committee/ChairofACEFoundation

    22HighlandAve.

    Adams,MA 01220

    [email protected]

    GaryHerzog

    Longtimeyouthsportscoach/

    FormermemberoffinanceBoard

    612NotchRd.,

    Cheshire,MA 01225

    [email protected]

    ScottNichols

    AthleticDirectoratMCLA/

    AdamsSelectman

    47WallingRd.,

    Adams,MA01220

    [email protected]