building toward an unmanned aircraft system training strategy

120
For More Information Visit RAND at www.rand.org Explore the RAND National Security Research Division View document details Support RAND Purchase this document Browse Reports & Bookstore Make a charitable contribution Limited Electronic Distribution Rights is document and trademark(s) contained herein are protected by law as indicated in a notice appearing later in this work. is electronic representation of RAND intellectual property is provided for non- commercial use only. Unauthorized posting of RAND electronic documents to a non-RAND website is prohibited. RAND electronic documents are protected under copyright law. Permission is required from RAND to reproduce, or reuse in another form, any of our research documents for commercial use. For information on reprint and linking permissions, please see RAND Permissions. Skip all front matter: Jump to Page 16 e RAND Corporation is a nonprofit institution that helps improve policy and decisionmaking through research and analysis. is electronic document was made available from www.rand.org as a public service of the RAND Corporation. CHILDREN AND FAMILIES EDUCATION AND THE ARTS ENERGY AND ENVIRONMENT HEALTH AND HEALTH CARE INFRASTRUCTURE AND TRANSPORTATION INTERNATIONAL AFFAIRS LAW AND BUSINESS NATIONAL SECURITY POPULATION AND AGING PUBLIC SAFETY SCIENCE AND TECHNOLOGY TERRORISM AND HOMELAND SECURITY

Upload: nguyenhanh

Post on 11-Jan-2017

221 views

Category:

Documents


0 download

TRANSCRIPT

For More InformationVisit RAND at www.rand.org

Explore the RAND National Security Research Division

View document details

Support RANDPurchase this document

Browse Reports & Bookstore

Make a charitable contribution

Limited Electronic Distribution RightsThis document and trademark(s) contained herein are protected by law as indicated in a notice appearing later in this work. This electronic representation of RAND intellectual property is provided for non-commercial use only. Unauthorized posting of RAND electronic documents to a non-RAND website is prohibited. RAND electronic documents are protected under copyright law. Permission is required from RAND to reproduce, or reuse in another form, any of our research documents for commercial use. For information on reprint and linking permissions, please see RAND Permissions.

Skip all front matter: Jump to Page 16

The RAND Corporation is a nonprofit institution that helps improve policy and decisionmaking through research and analysis.

This electronic document was made available from www.rand.org as a public service of the RAND Corporation.

CHILDREN AND FAMILIES

EDUCATION AND THE ARTS

ENERGY AND ENVIRONMENT

HEALTH AND HEALTH CARE

INFRASTRUCTURE AND TRANSPORTATION

INTERNATIONAL AFFAIRS

LAW AND BUSINESS

NATIONAL SECURITY

POPULATION AND AGING

PUBLIC SAFETY

SCIENCE AND TECHNOLOGY

TERRORISM AND HOMELAND SECURITY

This report is part of the RAND Corporation research report series. RAND reports present research findings and objective analysis that address the challenges facing the public and private sectors. All RAND reports undergo rigorous peer review to ensure high standards for research quality and objectivity.

Bernard D. Rostker, Charles Nemfakos, Henry A. Leonard, Elliot Axelband,

Abby Doll, Kimberly N. Hale, Brian McInnis, Richard Mesic, Daniel Tremblay,

Roland J. Yardley, Stephanie Young

Building Toward an Unmanned Aircraft System Training Strategy

C O R P O R A T I O N

NATIONAL SECURITY RESEARCH DIVISION

Building Toward an Unmanned Aircraft System Training Strategy

Bernard D. Rostker, Charles Nemfakos, Henry A. Leonard, Elliot Axelband,

Abby Doll, Kimberly N. Hale, Brian McInnis, Richard Mesic, Daniel Tremblay,

Roland J. Yardley, Stephanie Young

Prepared for OUSD (P&R), Directorate for Training and Readiness Policy and Programs

Approved for public release; distribution unlimited

Limited Print and Electronic Distribution Rights

This document and trademark(s) contained herein are protected by law. This representation of RAND intellectual property is provided for noncommercial use only. Unauthorized posting of this publication online is prohibited. Permission is given to duplicate this document for personal use only, as long as it is unaltered and complete. Permission is required from RAND to reproduce, or reuse in another form, any of its research documents for commercial use. For information on reprint and linking permissions, please visit www.rand.org/pubs/permissions.html.

The RAND Corporation is a research organization that develops solutions to public policy challenges to help make communities throughout the world safer and more secure, healthier and more prosperous. RAND is nonprofit, nonpartisan, and committed to the public interest.

RAND’s publications do not necessarily reflect the opinions of its research clients and sponsors.

Support RANDMake a tax-deductible charitable contribution at

www.rand.org/giving/contribute

www.rand.org

Library of Congress Cataloging-in-Publication Data

Rostker, Bernard.Building toward an unmanned aircraft system training strategy / Bernard D. Rostker [and tenothers].pages cmIncludes bibliographical references.ISBN 978-0-8330-8531-3 (pbk. : alk. paper)1. Drone aircraft—United States. 2. Drone aircraft pilots—Training of—United States. I.Title.UG1242.D7R64 2014358.4'156—dc23 2014025166

For more information on this publication, visit www.rand.org/pubs/research_reports/RR440.html

Published by the RAND Corporation, Santa Monica, Calif.

© Copyright 2014 RAND Corporation

R® is a registered trademark.

iii

Preface

During the most recent rounds of Base Closure and Realignment Commission activities in 2005, a significant number of training bases were closed. In light of the introduction of new technologies and the great expansion of unmanned aircraft systems (UASs) in the force, Department of Defense planners and some in Congress have become concerned that the exist-ing training infrastructure—bases and their training support facilities—may not be adequate to train UAS air and ground components and the ground forces that use such equipment to capitalize fully on their capabilities. Accordingly, the Deputy Director, Readiness and Training Policy and Programs in the Office of the Under Secretary of Defense for Personnel and Readi-ness (OUSD [P&R]) asked the RAND Corporation to assess the adequacy of UAS training to support current and future requirements. In addition, the House Armed Services Commit-tee report accompanying the Fiscal Year 2013 National Defense Appropriations Act raised a number of questions concerning training strategies with particular reference to the use of simulators to facilitate training.1

This report considers three issues: (1)  the development of a general concept for UAS training in the context of current and anticipated future UAS inventories, (2) the development of an appropriate framework based on the general concept to address UAS training require-ments, including the appropriate use of simulators, and (3) the airspace requirements necessary for UAS training. The research reported on here covers UASs in the Army, Navy, Air Force, and Marine Corps as fielded and plans as they existed during 2012. A RAND team carried out extensive field visits to understand the current ability of the services to conduct (1) ser-vice-specific training and (2) joint training at both home station and joint training facilities. The research will be of interest to those concerned with UAS programs and operations; joint training; or more generally, the incorporation of disruptive technologies into Department of Defense programs and operations.

This research was sponsored by the OUSD (P&R) Directorate for Training and Readi-ness Policy and Programs, in coordination with the Joint Forces Command’s Joint Warfight-ing Center and the Joint Unmanned Aircraft Systems Center of Excellence. The research was conducted within the Forces and Resources Policy Center of the RAND National Defense Research Institute (NDRI), a federally funded research and development center sponsored by the Office of the Secretary of Defense, the Joint Staff, the Unified Combatant Commands, the Navy, the Marine Corps, the defense agencies, and the Defense Intelligence Community. For

1 House Armed Services Committee, Conference Report Accompanying the Fiscal Year 2013 National Defense Appropriations Act, 112th Cong., 2nd Sess., December 17, 2012, p. 136.

iv Building Toward an Unmanned Aircraft System Training Strategy

more information on the RAND Forces and Resources Policy Center, see http://www.rand.org/nsrd/ndri/centers/frp.html or contact the director (contact information is provided on the web page).

v

Contents

Preface . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . iiiFigures and Tables . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . viiSummary . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ixAcknowledgments . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . xviiAbbreviations . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . xix

ChAPTer One

Introduction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1UASs Play an Increasing Role on the Battlefield . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1Focus and Approach of this Research . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4Plan for the Report . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6

ChAPTer TwO

The Case for and Implications of Unmanned Aircraft Systems Being a “Disruptive Technology” . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7

The Disruptive Technology Experience in the Business Community . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7Unmanned Aircraft Systems: A Case of Disruptive Technology for the Department of Defense. . . . . . 8

A Challenge to the Traditional Acquisition System . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9Rapid Acquisition Programs Met the Challenge . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9The Use of Fast Track Authorities Can Cause Problems . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13

ChAPTer Three

Training Concept and Framework for Unmanned Aircraft Systems . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 15Training Transformation, Joint Doctrine, Joint Operations, and UASs . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 15The UAS Training Concept: A General Notion for UAS Training . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17

A Concept of Operations for UASs Is a Prerequisite for Training . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 18Summary . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 19

Training Framework for Tactical UASs . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 19The Training Framework for Ground Combat: Army, Marine Corps, and Air Force . . . . . . . . . . . . . . 20The Training Framework for Fleet Operations . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 21Applying the Training Framework . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 23

ChAPTer FOUr

Assessment of the State of UAS Training in 2012: Service and Interoperability Training and the role for Simulators . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 25

Ground Forces . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 26Training for Operators and Support Personnel. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 26

vi Building Toward an Unmanned Aircraft System Training Strategy

Operational Training . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 30Improvements in Facilities and Basing for UASs Will Improve Training Integration . . . . . . . . . . . . . . . . 31Key Areas of Concern . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 34

Air Force . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 35Training for Pilots, Operators, and Support Personnel . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 35Operational Training . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 39Key Areas of Concern . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 40

Navy . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 41Training for Operators and Support Personnel. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 42Operational Training . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 45Key Areas of Concern . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 45

The Need for Interoperability . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 46Simulators . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 47Summary . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 49

ChAPTer FIve

Implications and recommendations . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 51The Guiding Principle: “Train As We Fight” . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 51Elements of a Strategic Training Plan . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 52

Engender Better Appreciation of UAS Capabilities . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 52Address Organizational, Structural, and Training Infrastructure and Support Issues . . . . . . . . . . . . . . . 53

Initiatives with Likely Near-Term Payoffs . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 54Institutionalizing Training for UAS Capabilities over the Longer Term . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 55

Acculturation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 55Professional Development. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 55Integration . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 56Adaptation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 56

Summary of Findings and Recommendations . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 56Path to the Future . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 57

APPenDIxeS

A. Current Major DoD UAS Programs in FY 2012 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 59B. The Department of Defense’s Traditional Acquisition System . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 77C. Military value Analysis of Unmanned Aircraft System Training Bases . . . . . . . . . . . . . . . . . . . . . . . 81

references . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 91

vii

Figures and Tables

Figures

S.1. UAS Training Framework . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . xi 1.1. UAS Budgets from 1988 to 2013 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3 1.2. DoD Inventories for Medium and Large Unmanned Aircraft . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3 2.1. Select Rapid Acquisition Processes, Approaches, Authorities, and Funding

Mechanisms . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10 3.1. UAS Training Framework for Army, Marine Corps/Air Force Joint Combat

Operations . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 20 3.2. UAS Training Framework for Navy Tactical UAS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 22 4.1. Army UAS Air Vehicle Operator and APO Training Pipeline . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 27 4.2. Shadow (top) and Gray Eagle UAVs . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 28 4.3. Raven UAS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 29 4.4. Army UAS Maintainer Pipeline . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 30 4.5. Air Force UAS Pilot and Sensor Operator Pipeline . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 36 4.6. Reaper (top) and Predator UASs . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 37 4.7. Global Hawk UAS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 38 4.8. Scan Eagle (top) and Fire Scout UASs . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 43 B.1. Defense Acquisition System . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 78 C.1. Airspace Surrounding Fort Huachuca . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 82 C.2. Airfield and Maintenance Facilities at Fort Huachuca . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 83 C.3. Location of Fort Huachuca . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 84 C.4. Restricted and Non–Joint Use Class D Airspace near Holloman AFB . . . . . . . . . . . . . . . . . . . . . 85 C.5. MQ-1/MQ-9 Beddown Plan . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 86 C.6. Location of Holloman AFB . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 89

Tables

1.1. DoD UAS Platforms as of 2011 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2 3.1. UAS Tiers by Service . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17 4.1. Select Summary of Army UAS Installation Survey as of November 21, 2012 . . . . . . . . . . . . . 32 C.1. Beddown Plans . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 87 C.2. Facility Requirements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 88

ix

Summary

Unmanned aircraft systems (UASs) have become increasingly prevalent in and important to U.S. military operations. The number of systems has surged, as has the slice of the defense budget allocated to them. Roles have also changed. Initially employed only as reconnaissance or intelligence platforms, they now carry out other missions, including attacking enemy forces. Successful operational tests and demonstrations of the expanded range of UAS capabilities have led to rapid fielding of new systems, often placing unanticipated demands on logistics and training systems and on field commanders to employ new systems effectively. UASs must now be integrated into the training programs of the services. Building a responsive, effective, and efficient UAS training program is a challenge during times of reduced budgets. Any new program must be based on a review of existing training capabilities and new investments across the services.

Focus of this Research

The Deputy Director, Readiness and Training Policy and Programs, in the Office of the Under Secretary of Defense for Personnel and Readiness (OUSD [P&R]) asked the RAND National Defense Research Institute (NDRI) to assess the adequacy of UAS training to support cur-rent and future requirements. Proposals to resolve service and joint UAS training issues must be informed by a clear understanding of current problems, opportunities for correction, and associated costs and benefits of the corrections. In this report, we address a number of issues, including (1) a general concept for UAS training; (2) an appropriate framework to address UAS training requirements, including the use of simulators; and (3) the limitations of the infrastruc-ture to accommodate UAS training, including those due to national airspace restrictions. The research considers UASs in the Army, Navy, Air Force, and Marine Corps, both those that are currently fielded and those that were planned to be fielded as of 2012.

Disruptive Technologies and Acquisition Processes

In 1995, Clayton Christensen introduced the term disruptive technology, distinguishing it from what he termed sustaining technology. In his nomenclature, a sustaining technology improves the performance of an existing system and does not require significant structural adjustments to processes, organizations, or operational paradigms. Disruptive technologies, however, change the way a business operates. The UAS is a disruptive technology.

x Building Toward an Unmanned Aircraft System Training Strategy

UASs found their way into the force by means of rapid acquisition procedures that were designed to deliver new technologies to the warfighter much faster than traditional procedures could, but often at the cost of not having in place the support these new systems required to become a sustained part of the force structure. Because of the rapid acquisition of these sys-tems, the services have had to rely upon contractor support in ways that are inconsistent with the full and sustaining integration of these systems into service inventories. Such integration starts with the development of an appropriate concept for training.

Training Concepts and Frameworks

We will begin by discussing the general ideas that should guide UAS training—the training concept. Then, we will consider how the parts identified in the concept fit together into a con-ceptual structure for that training—a training framework designed to enhance combat power and other operational capabilities.

Joint Operations; Multiservice Tactics, Techniques, and Procedures; and UAS Training

Military operations today are usually referred to as joint operations, emphasizing the inter-dependence of the services. That might lead one to think that joint doctrine; joint concepts of operation; and joint tactics, techniques, and procedures would provide focus for training. Clearly, training does not take place for its own sake; it should be driven by doctrine. In his cover letter to Joint Publication 3-0, 2011, ADM Mike Mullen stated that it established “the framework for our forces’ ability to fight as a joint team,” but nowhere does it discuss the man-agement of UASs. Moreover, nowhere in any other joint publication is there a grand doctrine for the employment or management of UASs on the battlefield. While the services have agreed to a set of multiservice tactics, techniques, and procedures (MTTPs) to be incorporated into their respective training programs, note the use of multiservice rather than joint.

At least for the foreseeable future, each service will continue to field UASs and must bring to the fight forces fully capable of operating them and integrating their capabilities into operations. While grand doctrinal issues remain unresolved, common procedures agreed to and trained by the services will remain the foundation on which American military operations must be built. In this way, rather than being the foundation for UAS training, joint operations are the goal of such training, which must be firmly grounded on the UAS training each service gives both its supported and supporting units.

The general concept we advance for UAS training here rests on the notion that the great-est beneficial effect—that is, an increase in the force’s operational effectiveness—occurs with a synergy among the UAS platforms, those who operate them, and those who integrate them into combat operations. While the report considers training concepts for ground, air, and sea forces, they share a common framework. Figure S.1 depicts our framework for ground and air forces; the one for naval forces is similar.

The concept underpinning the framework calls for increasing integration of its several parts as the level of training moves up the pyramid. Army systems appear on the left, Air Force on the right. At the bottom, training begins with individual training for operators and leaders, grounding each group in the basics of the system. Training then progresses to the small unit level, which, as with individual training, is largely done at home station. Moving up the pyra-mid, training occurs at increasingly higher echelons, battalion and brigade. Moving to joint

Summary xi

operations involves Air Force units, which have gone through a similar process of progressive training. They join together in exercises, many of which are conducted at the large combat training centers (CTCs), to integrate close air support and Air Force UASs into the ground maneuver plan.

Assessment of the State of UAS Training in 2012: Service and Interoperability Training and the Role of Simulators

Service Training

Speaking generally, the services have been relatively effective at training the individual skills required to operate and maintain the UASs, although the services differ in their approaches. The Army, which tends to use enlisted personnel to staff its UAS units, has developed courses that award Military Occupational Specialties for the operators and maintainers for its Shadow and Gray Eagle systems. Training for the Raven UAS, which is about the size of a large model airplane and is used to support lower-echelon units, is a unit responsibility carried out through a “train-the-trainer” concept. The Marines use officers who are qualified aviators or aviation command and control officers as pilots, and enlisted personnel operate the payloads. The Air Force pilots are officers and are either rated pilots who graduated from pilot training or UAS-only pilots who graduated from a program designed specifically for flying UASs. Sensor opera-tors for Reaper and Predator are either trained into a new career field or cross-trained from another Air Force Specialty Code. Those for Global Hawk come from the imagery analyst

Figure S.1UAS Training Framework

RAND RR440-S.1

Army Full capability

Jointoperational:

CTCs, other exercise

Operational: CTCs,larger-scale home

station, MQT

Tactical collective:home station, MQT

Small unit:home station, MQT

Individual training/orientation for operators and leaders:schools, home station, supplemental courses, MQT

Operational experience

Air Force

UAS integratedinto training

UAS integratedinto training

Gray Eagle

Gray Eagle

All: large systems usually simulated for

leader training

All: large systems usually simulated for

leader training

All

Shadow and Raven, possibly

Gray Eagle

Shadow and Raven

Predator,Reaper

Predator,Reaper

Predator,Reaper

if possible

All

xii Building Toward an Unmanned Aircraft System Training Strategy

career field. Maintenance personnel come through the Air Force’s maintenance education and training programs.

The more challenging part of the training comes at the integration level, where UAS personnel must meld their efforts with those of ground combat units. This occurs within and between services. Integration requires substantial practice under realistic conditions that do not occur frequently. Rotations at a CTC are often the only occasions, short of actual opera-tions in theater, in which commanders face the challenge of integrating all battlefield operat-ing systems at once, and the addition of the UASs necessarily complicates synchronization and integration tasks. Thus, it is not surprising that initial assessments of UASs during integrated training are, at best, mixed.

The key concerns of UAS units tend to be similar across services. For ground and Air Force units, the concerns are beddown and support facilities, airspace limitations, and simula-tors. Many of the beddown and support issues can be resolved with relatively minor construc-tion. Some airspace issues, however, are not likely to improve. The Navy has airspace issues at specific installations but generally faces fewer restrictions because it can operate outside the 12-mile coastal limit with relative freedom.

Interoperability Training

To date, interoperability training at the National Training Center (NTC) and the Joint Readi-ness Training Center has been limited. The Government Accountability Office (GAO) has cited two significant challenges for improved interoperability training: (1) “establishing effec-tive partnerships with program stakeholders through comprehensive communication and coordination and (2) developing joint training requirements that meet combatant command-ers’ needs,” with particular emphasis on tactical-level training (GAO, 2005, p. 2).1 To meet this challenge, the Department of Defense (DoD) established an implementation plan that gives the Office of the Under Secretary of Defense for Personnel and Readiness overall responsibility and the Deputy Under Secretary of Defense for Readiness executive agent responsibility for training transformation planning, programming, budgeting, and execution progress.2

While RAND did not assess interoperability training in detail, our discussions with the training community, including trainers at the NTC, suggest that such training opportuni-ties have been limited because Air Force assets, particularly the Predator, have generally been unavailable due to pressing operational requirements in Iraq and Afghanistan. This same gen-eral observation was also reported by the GAO (2010b, p.  26). The problem of transiting Air Force UASs from Creech Air Force Base, Nevada, to the NTC at Fort Irwin, Califor-nia, through Federal Aviation Administration–controlled airspace is often cited. Permanently stationing Air Force UAVs at the NTC, much as the Marine Corps has done by stationing Shadow UAS squadrons at the Marine Corps Air Ground Combat Center at Twentynine Palms, California, to support training there, would of course negate that problem. However, the experience of the Marine Corps suggests that the mere presence of UASs will not ensure

1 GAO, 2005, p. 18, noted that,

[i]n the past, joint training tasks were primarily focused at the command level and were identified through DOD’s authori-tative processes that built requirements by translating combatant commander inputs into training requirements. Train-ing transformation has expanded joint training requirements to include those at the tactical level in addition to joint command-level training.

2 See Director, Readiness and Training Policy and Programs, 2006.

Summary xiii

that the forces are properly trained. The forces must be prepared for such training at their home stations. In addition, given the common MTTP, forces trained to operate with their own ser-vice UASs should find working with UASs from the other services less challenging.

Simulators

Congress has pressed for information on the role simulators might play in a UAS training strategy, seeking an “informed balance between live training and simulated training.”3 But the conditions that make a compelling case for using simulators in the training of fighter pilots are largely absent when it comes to UAS training:

1. UAS flying hours are much less expensive than flying hours for manned aircraft.2. The kinds of operational activities that need more training emphasis, in particular air-

ground coordination, are generally not activities for which simulators per se can substi-tute for live flying.

3. While simulators are an inherent part of the systems used for initial training of pilots and sensor operators,4 they are not well suited (and not designed) for training operating forces on the full spectrum of UAS capabilities.

4. At best, simulators complement rather than substitute for live training. Given the cur-rent state of the fielding of UAS, first priority must be given to building the live flying infrastructure. Then, and only then, might funds be used to undertake the research and development that must precede any consideration of fielding the kind of interactive UAS air-ground simulators that could train both UAS crews and ground troops.

We concluded that, given current budget limitations and the importance of fully devel-oping the opportunities for live training and the relatively low cost of such training, divert-ing funds to develop higher fidelity UAS-ground simulators would be unwise at this time. However, the Army’s air-ground integration ranges provide a good example of judicious use of simulators to do what simulators do best—in this case, scoring target hits without using expensive live munitions and without blowing up fairly expensive targets. In the future, the services should reevaluate the need for virtual training based on a cost and effectiveness analy-sis (COEA) that includes developmental costs for simulators, savings based on the costs of flying UASs, and the critical availability of air space for training.

Implications and Recommendations

The Guiding Principle: “Train As We Fight”

DoD has been under some pressure from the Congress and such organizations as the General Accountability Office for the lack of central control and the lack of the development of joint DoD strategy for training. In reality, the services continue to develop UAS training initiatives primarily to meet their own unique requirements, and the opportunity for joint training is limited. Progress has, however, been made with the development of the MTTP and the recog-nition that interoperability training is a service responsibility. For now, DoD should encourage

3 See, for example, Chairman, House Armed Services Committee, undated.4 See Shawn Johnson, UAS cost per flying hours, personal communication, April 10, 2013.

xiv Building Toward an Unmanned Aircraft System Training Strategy

each service to solve its own UAS training problems, not constrain any one service under the guise of joint training. Given strong service programs, there will be ample opportunity to focus on joint training in the future, when the opportunity presents itself. Today, however, the ser-vices are still struggling with how to incorporate these new systems. The appropriate strategy for UAS training is to insist that the services train as they will fight. Accordingly, to train as we fight in the future, DoD training strategy must

• engender better appreciation of UAS capabilities throughout the chain of command• address organizational, structural, and infrastructure and support issues• enable “train as we fight” in collective unit training• enable “train as we fight” in exercises.

Initiatives with Near-Term Payoff

To accomplish these goals, a number of initiatives should pay off in the near term, including

1. increasing exposure to the capabilities and limitations of UASs2. harnessing the lessons-learned process to guide the development of service and joint

doctrine and tactics, techniques, and procedures3. addressing well-known but underresourced training infrastructure shortfalls.

Institutionalize Training for UAS Capabilities Over the Longer Term

Institutionalization will require more-general efforts, including

1. acculturation (Many end users do not yet have a well-developed appreciation of UAS capabilities.)

2. development of a cadre of UAS professionals with hands-on experience in all echelons of UAS operation

3. integration of UASs into service force structures4. adaptation, including

a. accounting for the evolution of the roles of UASs in the full range of military opera-tions

b. continuous resolution of UAS doctrinal issues.

Summary of Findings and Recommendations

The findings and recommendations are summarized below:

1. The proper strategy for DoD at this time is to encourage each service to solve its own UAS training problems, rather than to constrain any one of them under the guise of joint operations.

2. DoD should support current and future programs to develop ranges and beddown and support facilities similar to those in the Army’s current programs.

3. In spite of the demands of deploying units and sustaining combat operations in Afghan-istan, Army trainers indicate that Army units are better at maintaining qualification for Shadows than for Ravens. Nevertheless, not all units have been able to maintain high

Summary xv

Shadow qualification rates—some units arrive at the NTC with one-half or fewer of their operators qualified.

4. If joint training becomes a priority, the Air Force’s current basing and beddown posture will become a problem. The Air Force could consider the location of Army hubs when choosing where to base its UAS fleet. A location that is near Army maneuver elements might make airspace access less of a restriction or at least make certificates of authori-zation more practical. Proximity might provide more opportunities for training UAS integration throughout the entire mission planning process.

5. Given current budget limitations and the importance of fully developing the opportu-nities for live training and the relatively low cost of such training, diverting funds to a research and development program to develop higher-fidelity simulators would seem to be unwise at this time.

Path to the Future

This report presents and discusses a multitude of means for setting up UAS training strategies for success, including supporting ongoing facilities and basing initiatives; expanding such facil-ities, where possible, to enable wider availability of UASs to support collective training; and increasing the use of UASs—the complete UAS package, including joint tactical air controllers and other coordinating elements—in collective training, both local and in larger exercises. We have noted the need to support continuing efforts to resolve airspace access issues, observing as we did so that there are ways to keep such restrictions from imposing serious limitations on much of the UAS training envisioned here. Similarly, we have discussed the potential for simulators to add value in training, now and perhaps more in the future. But we have also cautioned that simulators in their current state are not a good substitute for live use of UASs in collective training.

The path to the future for UAS strategies starts now, with support for ongoing initiatives that will continue the trends toward better training integration, thus improving the ability of end users to employ the multiple capabilities of UASs in their operations. The path continues, using that foundation, with longer-term efforts to add to acculturation of end users, profes-sionalization of the UAS community, and integration of the two to harmonize the capabilities of UASs as key elements of overall force effectiveness.

xvii

Acknowledgments

The research presented here is the result of numerous field visits and discussions with members of service and department staffs in the Pentagon, commanders and operations staffs in opera-tional arms of all the services, planners and training developers in service training commands, trainers and staffs at the various combat training centers, students in UAS operator schools, and UAS operators. So many shared information and data and providing thoughtful com-ments, advice, and insights that it is impossible to single out anyone without possibly slight-ing someone else. Moreover, the views expressed in this report are our own and should not be attributed to any individual or organization.

We would be remiss, however, if we did not recognize the support we received from Frank DiGiovanni, Director of Training Readiness and Strategy in the Office of the Under Secretary of Defense (Personnel and Readiness), and Joan Vandervort, our project coordinator in Mr. DiGiovanni’s Office. Their commitment to developing an appropriate training strategy for UASs was the driving force behind this study.

xix

Abbreviations

ABSAA airborne sense-and-avoid

ACA airspace control authority

ACO airspace control order

ACTD advanced concept technology demonstration

AECV All-Environment Capable Variant

AFB Air Force base

AFSC Air Force specialty code

ALO air liaison officer

AMB air mission brief

AMPS Aviation Mission Planning System

ARB Air Reserve base

ATO air tasking order

AVO air vehicle operator

BAM broad area maritime

BAMS-D Broad Area Maritime Surveillance–Demonstrator

C2 command and control

CAOC combined air operations center

CAP combat air patrol

CAS close air support

CCDR combatant commander

COA certificate of authorization

COCOM combatant commander

xx Building Toward an Unmanned Aircraft System Training Strategy

CONUS continental United States

CSG carrier strike group

CTC combat training center

DAS Defense Acquisition System

DARPA Defense Advanced Research Projects Agency

DDR&E Director of Defense Research and Engineering

DoD Department of Defense

DSB Defense Science Board

FAA Federal Aviation Administration

FAR Federal Acquisition Regulation

FRS fleet replacement squadron

FTU formal training unit

FY fiscal year

GAO Government Accountability Office

GBSAA ground-based sense-and-avoid

IQT initial qualification training

ISR intelligence, surveillance, and reconnaissance

JBLM Joint Base Lewis-McChord

JFACC joint force air component commander

JFC joint force commander

JFCOM Joint Forces Command

JIEDDO Joint Improvised Explosive Device Defeat Organization

JRAC Joint Rapid Acquisition Cell

JTAC joint tactical air controller

LAA limited acquisition authority

LCS littoral combat ship

LRE launch and recovery element

MCAGCC Marine Corps Air Ground Combat Center

MCS mission control system

Abbreviations xxi

MOS military occupation specialties

MPO mission payload operators

MTTP mulltiservice tactics, techniques, and procedures

MQ-8B Fire Scout

MQT mission qualification training

NAS National Airspace System

NCTE Naval Continuous Training Environment

NDRI RAND National Defense Research Institute

NTC National Training Center

OEF Operation Enduring Freedom

OIF Operation Iraqi Freedom

PACOM U.S. Pacific Command

PPBE Planning, Programming, Budgeting, and Execution

REF Rapid Equipping Force

RSTA reconnaissance, surveillance, and target acquisition

RPA remotely piloted aircraft

SOCOM Special Operations Command

SOF special operations forces

SOUTHCOM U.S. Southern Command

SPINS special instructions

SUAS small unmanned aircraft system

TACP tactical air control party

TEMF tactical equipment maintenance facility

TF task force

TRADOC Training and Doctrine Command

UAS unmanned aircraft system

UAV unmanned aerial vehicle

UGS Unmanned Ground School (Ft. Huachuca)

USD (AT&L) Under Secretary of Defense (Acquisition, Technology, and Logistics)

xxii Building Toward an Unmanned Aircraft System Training Strategy

USMC U.S. Marine Corps

WSMR White Sands Missile Range

YTC Yakima Training Center

1

ChApTer One

Introduction

UASs Play an Increasing Role on the Battlefield

During the last decade, in large part because of the dynamic nature of operations during Operation Enduring Freedom and Operation Iraqi Freedom, recognition of the importance of developing new capabilities to meet the ever-changing threats our military forces face has grown. As a result, the Department of Defense (DoD) has undertaken operational and tech-nology demonstration projects to test new technologies and systems outside the traditional acquisition process. Many of these systems involve unmanned vehicles and some unmanned aircraft systems (UASs). In 2000, the DoD had fewer than 50 unmanned aircraft in its inven-tory; by 2012, it had more than 7,100, as shown in Table 1.1 (Gertler, 2012).1 The size of the Department’s investment in these systems today similarly dwarfs prewar levels. In 2000, the DoD spent $284 million on UASs, while the 2010 budget for UASs has grown to over $6.1 bil-lion (GAO, 2010a, p. 1). Figure 1.1 shows the growth of UASs from 1988 to 2013. Figure 1.2 shows projected growth in UAS programs as of 2012.

UASs have two main advantages over manned aircraft: They eliminate the risk to a pilot’s life, and they provide capabilities not subject to human limitations. They are also cheaper to procure and operate than manned aircraft. While they minimize risk to operational crews, they introduce new complications and hazards not associated with manned aircraft. While some think of UASs simply as a substitute for manned aircraft, UASs increasingly complement manned aircraft, providing new capabilities for the force to utilize. Combined UAS and heli-copter operations are but one example (McLeary, 2012).

Originally, UASs were used to gather intelligence. During the Vietnam War, drones flew strategic reconnaissance missions over denied areas. The Israeli Air Force successfully used UASs during operations in Lebanon in 1982 and for many years led the world in developing UASs and tactics for employment. Subsequently, longer-endurance systems introduced the ability to maintain surveillance on distant and moving targets. More recently, UASs originally designed for reconnaissance have been modified to carry precision-guided weapons to attack ground targets, greatly expanding the role such systems play on the modern battlefield. This also has expanded and complicated the training of UAS crews as full participants in the joint and combined arms battle.

Successful operational tests and demonstrations of the expanded range of UAS capabili-ties have led to rapid fielding of new systems, often placing unanticipated demands on logistics

1 See Appendix A for descriptions of the major systems.

2 Building Toward an Unmanned Aircraft System Training Strategy

Table 1.1DoD UAS Platforms as of 2011

Name Vehicles

Ground Control Stations

Employing Service(s) Capability/Mission

rQ-4A Global hawk/BAMS-D Block 10

9 3 USAF navy

ISr Maritime domain awareness (navy)

rQ-4B Global hawk Block 20/30

15 3 USAF ISr

rQ-4B Global hawk Block 40 1 1 USAF ISr Battle management command and control

MQ-9 reaper 54 61 USAF ISr rSTA eW precision strike Force protection

MQ-1A/B predator 161 61 USAF ISr rSTA precision strike Force protection (MQ-1C Only-C3/LG)

MQ-1 Warrior/MQ-1C Gray eagle

26 24 Army ISr rSTA precision strike /force protection (MQ-1C Only-C3/LG)

UCAS-D 2 0 navy Demonstration Only

MQ-8B Fire Scout vertical takeoff and landing tactical UAV

9 7 navy ISr rSTA Antisubmarine warfare Antisurface warfare Mine warfare Organic mine countermeasures

MQ-5 hunter 25 16 Army ISr rSTA Battle damage assessment

rQ-7 Shadow 364 262 Army USMC SOCOM

ISr rSTA Battle damage assessment

A160T hummingbird 8 3 SOCOM DArpA Army

Demonstration

Small tactical UASs 0 0 navy USMC

ISr explosive ordnance disposal Force protection

Scaneagle 122 39 navy SOCOM

ISr rSTA Force protection

rQ-11 raven 5,346 3,291 Army navy SOCOM

ISr rSTA

Wasp 916 323 USMC SOCOM

ISr rSTA

SUAS AeCV puma 39 26 SOCOM ISr rSTA

Gasoline-powered micro air vehicle (gMAV) T-hawk

377 194 Army (gMAV) navy (T-hawk)

ISr rSTA explosive ordnance disposal

SOUrCe: Gertler, 2012, p. 8.

Introduction 3

and training systems and on field commanders to employ the new systems effectively. UASs must now be integrated into the training programs of the services.

Figure 1.1UAS Budgets from 1988 to 2013

SOURCE: Gertler, 2012, p. 14.RAND RR440-1.1

3.5

3.0

2.5

2.0

1.5

1.0

0.5

0

4.0$

mill

ion

s

20082003199819931988 2013

Figure 1.2DoD Inventories for Medium and Large Unmanned Aircraft

SOURCE: Kempinski, B. (2011, Tables 1-2,1-3,1-4). Policy Options for Unmanned Aircraft Systems,Congressional Budget Of�ce.RAND RR440-1.2

1,600

1,400

1,200

1,000

800

600

400

200

0

1,800

2015 20192014201320122011 2020201820172016

USAF inventory

Army inventory

Navy/USMC inventory

4 Building Toward an Unmanned Aircraft System Training Strategy

Building a responsive, effective, and efficient UAS training program is a challenge in a time of reduced budgets. Any new program must be based on a review of existing training capabilities and new investments across the services.

Integrating UASs into the core operations of the DoD presents the kinds of special prob-lems that are common when new technologies appear and clash with existing ways of doing business. Such clashes happen frequently enough that there is a term for such innovations: disruptive technologies. The rapid introduction of UASs into operations in operations Endur-ing Freedom and Iraqi Freedom and the attendant force structure growth have presented just such challenges (as discussed in Chapter Two). The resulting disruption has contributed to lags in the ability of joint doctrine, tactics, techniques, and procedures (TTP) to keep pace and in the ability of joint training2 and service-specific managers to develop and execute training programs.3

Focus and Approach of this Research

The Deputy Director, Readiness and Training Policy and Programs in the Office of the Under Secretary of Defense for Personnel and Readiness asked RAND to assess the adequacy of UAS training to support current and future requirements. Proposals to resolve service and joint UAS training issues must be informed by a clear understanding of current problems, oppor-tunities for correction, and associated costs and benefits of the corrections. In addition, the current extraordinary pressures on the overall federal budget, including the defense “top line,” and the ongoing review of U.S. strategy will likely have implications for force structure and basing, resulting in a number of yet-unknown factors that could profoundly affect the future of UAS programs. These uncertainties notwithstanding, a number of issues must be addressed: (1) a general concept for UAS training; (2) an appropriate framework for addressing UAS train-ing requirements, including the use of simulators; and (3) the airspace requirements necessary for UAS training.

The research reported on here covers UASs in the Army, Navy, Air Force, and Marine Corps as fielded and plans as they existed in 2012. Because of the increasing use of these unmanned systems to support to ground operations, the RAND effort has more closely exam-ined the interface between UASs and operating elements of ground forces. To this end, a team from RAND carried out extensive field visits to understand the current ability of the services to conduct (1) service-specific training and (2) joint training at both home station and joint train-

2 Department of Defense Directive 1322.18, January 13, 2009, defines joint training as “Training, including mission rehearsals, of individuals, units, and staffs using joint doctrine or tactics, techniques, and procedures to prepare joint forces or joint staffs to respond to strategic, operational, or tactical requirements that the Combatant Commanders (CCDRs) consider necessary to execute their assigned or anticipated missions.” 3 Chairman of the Joint Chiefs of Staff Instruction 3500.01G, March 15, 2012, p. C-2, defines service training as follows:

Service Training: Service Active Component (AC) and RC training (including USSOCOM) is based on joint and Service policy and doctrine. Service training includes basic, technical, operational, and interoperability training to both individu-als and units in response to operational requirements identified by the CCDRs to execute their assigned missions.

Joint Training. Training, including mission rehearsals, of individuals, staffs, and units, using joint doctrine and tactics, techniques, and procedures, to prepare joint forces or joint staffs to respond to strategic, operational, or tactical require-ments considered necessary by the CCDRs to execute their assigned or anticipated missions.

Introduction 5

ing facilities. Members of the team interviewed officials involved with UAS training operations at the following Army, Navy, Air Force, and Marine installations and units:

• Beale Air Force Base (AFB), California – Global Hawk operations and Distributed Common Ground Station 2

• March Air Reserve Base (ARB), California – Air Force National Guard Ground Control Station school

• Holloman AFB, New Mexico – (Air Force Predator and Reaper training)

• Fort Irwin, California – (Air Force training support unit and selected individuals from the operations group)

• Creech AFB, Nevada – (the Joint Unmanned Aircraft Systems Center of Excellence and the operational UAS wing)

• Fort Rucker, Alabama – Training and Doctrine Command (TRADOC) capability manager for UASs

• Fort Huachuca, Arizona – TRADOC Capability Manager for Intelligence Sensors and the UAS Training Bat-talion

• Fort Benning, Georgia – Maneuver Center of Excellence

• Fort Campbell, Kentucky – 101st Airborne Division (Air Assault)

• Marine Corps Base Twentynine Palms, California – Marine Corps Air Ground Combat Center (MCAGCC) and two of three active U.S. Marine Corps (USMC) UAS squadrons

• Naval Air Station Patuxent River, Maryland – Naval Air Systems Command (Navy and Marine Corps)

• Fort Eustis, Virginia – TRADOC Capability Manager for Live Fire Training, Army Capabilities Integration Center, and TRADOC G-3

• North Island Naval Base, San Diego, California – Commander, Naval Air Forces.

In addition, the RAND team had extensive discussions with the strategy and planning staffs at U.S. Pacific Command (PACOM) and U.S. Navy Pacific Command concerning rapid acquisition of new technologies, such as the UASs reported on here. In that process, the RAND team gained important insights into the challenges the services face, first in identifying new or disruptive technologies and then in using operational demonstrations or experiments to under-stand and develop the changes to operational concepts that these technologies would drive.

During these visits, the RAND team talked with operators and support personnel; those who train operators and associated members of the team; those who train and observe the forces that employ UASs in their operations; staff elements concerned with the planning and resourcing of training, both for UAS operators and for the force more generally; and those concerned with the ongoing development of doctrine and concepts of operations for UASs, including their integration into operations.

6 Building Toward an Unmanned Aircraft System Training Strategy

Plan for the Report

Chapter Two starts the report with a discussion of disruptive technologies, rapid acquisition processes, and the challenges the DoD faces in integrating UASs into the operations of the military departments. Chapter Three presents a general concept and a framework for train-ing focused on the integration of UASs into military operations. Using the framework, the assessment in Chapter Four considers the current ability of the services to conduct service-specific training at both home station and joint training facilities. This includes a compilation of observations and insights largely gained during our visits to the bases listed above, with our interpretation of their implications for the specification and resourcing of training strategies. Finally, Chapter Five summarizes our research and looks toward the evolving training strategy for DoD in the future. The appendixes present additional material, including a description of ongoing systems, a further discussion of the Defense Acquisition System (DAS), UAS descrip-tions, and infrastructure considerations and the results of a RAND assessment of training infrastructure.

7

ChApTer TWO

The Case for and Implications of Unmanned Aircraft Systems Being a “Disruptive Technology”

Over decades, DoD has developed a structured and deliberate approach for the way it acquires new systems, which is formalized in the DAS and the 5000 series of DoD instructions. How-ever, the exigencies of recent military operations have led DoD to develop new technology and acquire and field new systems without going through the steps the defense acquisition process generally requires. While near-term requirements drove such acquisition decisions, these deci-sions have long-term consequences. Rapid acquisition without a fully developed plan for how the new systems will be sustained over time may well diminish operational effectiveness. A potent example of such an effect is the extent to which the rapid and large-scale introduction of UASs has outpaced investments in the training infrastructure necessary to support the asso-ciated operation and maintenance. In the future, personnel will not be able to use or maintain the new systems properly. The Defense Science Board (DSB) made this point forcefully in 2003: “(1) military proficiency is as dependent on the warriors who operate weapon systems as it is on the weapon system technology, and (2) a superb way to waste personnel or system acquisition money is to ignore training” (DSB, 2003, p. 2). Despite the inefficiency of poorly coordinated investments, the DSB found that “systems continue to be created and then fielded with little consideration for the costs that must be incurred during the life cycle to train the weapon’s users” (DSB, 2003, p. 44). As it turns out, the difficulty of incorporating new tech-nologies into existing operations and processes is not unusual. It happens frequently enough that there is a term for such innovations: disruptive technologies.

The Disruptive Technology Experience in the Business Community

Clayton Christensen introduced the term disruptive technology in 1995. He distinguished dis-ruptive technology from what he termed sustaining technology. In his nomenclature, a sustain-ing technology improves the performance of an existing system and does not require significant structural adjustments to processes, organizations, or operational paradigms. Disruptive tech-nologies, however, change the way a business operates (Govindarajan, Kapalle, and Daneels, 2011).

Since the concept was first introduced, a number of studies have focused on ways that enable an organization to incorporate disruptive technologies. Christensen found that many organizations fail to meet the challenges disruptive technologies pose because they focus only on costs and not on how the new technologies change business processes and create new values for customers (Christensen and Overdorf, 2000). As Christensen used the term, pro-

8 Building Toward an Unmanned Aircraft System Training Strategy

cesses include the coordination, communication, decisionmaking, and interaction patterns that transform resources into a product. Under normal conditions, processes are stable. They are designed not to be easy to change, and this inertia can impede the adoption and exploitation of emerging disruptive technology (Looy, Martens, and Debackere, 2005). Tellis makes the point that, given limited resources, investments in unfamiliar technologies with unproven returns are opposed because they are seen as “cannibalizing” both resources and customers from estab-lished products (Tellis, 2006). Because it is often difficult to introduce such new technologies into existing business units, much of the literature discusses how “spinout” organizations were created to nurture these new technologies (e.g., Henderson and Clark, 1990). For example, in a study of several game-changing technological developments, te Kulve and Smit, 2010, found that successful new product lines usually had a “champion” with “dedicated change strategies” to further the introduction of disruptive technologies.

Unmanned Aircraft Systems: A Case of Disruptive Technology for the Department of Defense

Although DoD operates in a different environment with different incentive structures from those of the business community, it is not immune to the difficulties disruptive technologies have introduced in the private sector.1 From DoD’s perspective, a technology is disruptive when it has the potential to alter the scope and effectiveness of military operations dramati-cally and is applied in sufficiently large numbers that it can no longer be supported in the same manner as during its initial development (i.e., the military must incorporate its support into its standard logistics and training systems). The UAS qualifies as a disruptive technology on multiple counts. First, as Christensen notes, the advent of the UAS changed the way the U.S. military operated, that is, its “business processes” changed. Second, UASs have broadened the scope of military operations substantially and greatly enhanced the effectiveness of both intel-ligence processes and strike operations. Finally, they have arrived in sufficient numbers that they now need to be integrated into the standard processes.

As the U.S. went to war in Afghanistan and Iraq, concern grew about the lack of speed and responsiveness in the traditional process for getting new systems into the hands of war-fighters.2 Critics complained about bureaucratic processes that make the traditional system too slow and too risk averse to acquire and field effective solutions rapidly.3 As late in the conflicts as 2008, Secretary of Defense Robert Gates expressed frustration with the defense bureau-cracy, arguing “we must not be so preoccupied with preparing for future conventional and

1 There are numerous examples of disruptive technologies and how they displaced formerly dominant technologies in both the private sector and the military: Just a few examples are commercial airlines displacing passenger trains, internal-combustion-engine vehicles replacing horse-drawn vehicles, aircraft carriers replacing battleships as the Navy’s capital ship, and tanks replacing cavalry.2 Appendix B describes DoD’s traditional acquisition system.3 For example, Lt. General Robert P. Lennox, the Army‘s Deputy Chief of Staff for Programs and Resources, explained, “This is one of our most common topics of conversation: How do we rapidly field capabilities when technology advances so quickly?” (quoted in Erwin, 2010).

The Case for and Implications of Unmanned Aircraft Systems Being a “Disruptive Technology” 9

strategic conflicts that we neglect to provide both short-term and long-term all the capabilities necessary to fight and win conflicts such as we are in today.”4

A Challenge to the Traditional Acquisition System

The virtues of the deliberate and structured traditional acquisition system must be weighed against the fact that the system can take years to field new capabilities. From requirements generation through the DAS and the Planning, Programming, Budgeting, and Execution (PPBE) process, the traditional acquisition system generally takes several years to meet materiel warfighter needs; some systems can take decades (GAO, 2010b). While this long time frame makes some sense for large and complex programs of record, it poses a significant challenge when required capabilities are needed more quickly or are focused more narrowly. This lack of responsiveness has led some observers to argue that the traditional system is not optimized for delivering the full spectrum of desired capabilities. While the system should, in theory, be adaptable for both small and large acquisition programs, it works best in practice for major defense acquisition programs. However, much recent acquisition activity has not been in the form of large programs of record that entail the institutional backing necessary for proper sustainment strategies. The fast rate and large volume demanded for unfamiliar technologies, in particular, have strained the system and pressured traditional acquisition relationships to change.

Rapid Acquisition Programs Met the Challenge

To meet an urgent demand to incorporate new technologies, a series of acquisition processes was created outside the traditional acquisition process and was unencumbered by the prior restrictions designed to mitigate cost, capability, and schedule risk. Unfortunately, while these “workarounds” fostered the fielding of numerous systems, they generally neglected to provide for the institutional sustainment—training and logistical support—needed to facilitate intro-ducing these systems into the force on any basis other than as technology demonstrations. Figure 2.1 captures the proliferation of a selection of these rapid acquisition processes. Below, we discuss several of the more important ones.

Advanced Concept Technology Demonstration

In 1994, in response to recommendations from the Packard Commission and the DSB, DoD introduced the advanced concept technology demonstration (ACTD) (Drezner, Sommer, and Leonard, 1999, p. 23). The Global Hawk UAS, which has found broad applicability in the wars in Iraq and Afghanistan, began as an ACTD. This approach to technological develop-ment was intended to improve speed and promote innovation by limiting acquisition hurdles. A system designated as an ACTD could use streamlined management and had reduced over-sight requirements (Drezner, Sommer, and Leonard, 1999, p. xiv). ACTDs were intended to bridge the innovation-adoption gap by existing somewhere beyond demonstration of technical feasibility without quite yet becoming major defense acquisition programs. Toward the same end of nudging innovation and eliminating procedural hurdles, in 1994 the National Defense

4 Gates’ distinction reflects what is often a difficult balance between short- and long-term requirements and planning hori-zons. This creates an institutional tension that has, for example, made the military departments resistant to prioritizing the acquisition of unmanned technology that had near-term applicability but that was not intended to be part of a longer-term vision. See Gates, 2008.

10 Building Toward an Unmanned Aircraft System Training Strategy

Authorization Act introduced an authority that allowed the Defense Advanced Research Proj-ects Agency (DARPA), long seen as a mechanism for moving innovative ideas toward materiel solutions, more flexibility in contracting; facilitated use of commercial practices; and waived certain Federal Acquisition Regulations (FARs) and other laws (Drezner, Sommer, and Leon-ard, 1999, p. 27).

Limited Acquisition Authority

In time of war, new requirements arise that the long and deliberate acquisition system is ill suited to meet. As a result, both Congress and DoD’s civilian leadership put in place ad hoc arrangements to seed the development and fielding of new systems. In fiscal year (FY) 2004, Congress granted the Secretary of Defense the authority to delegate a limited acquisition authority (LAA) to Joint Forces Command (JFCOM) to speed the research and development and limited fielding of new systems (GAO, 2007a). However, LAA is an authority, rather than a program, and does not translate into budgeted funds.5 In the first three years of the authority,

5 JFCOM had to reallocate funding from its own budget or gain funds from another DoD organization. Over one-half the programs JFCOM supported came from its own budget. In addition, after the systems were acquired, funds were not

Figure 2.1Select Rapid Acquisition Processes, Approaches, Authorities, and Funding Mechanisms

SOURCE: Derived from Anderson (1992), AUSA (2003), DSB (2009b), GAO (1998), GAO (2010b),Sullivan (2009a), Thirtle (1997).RAND RR440-2.1

War�ghter RapidAcquisitionPrograms

BiometricsTask Force

Asymmetric Warfare Group

RapidEquipping

Force

RapidFielding

Initiative

Abbreviated Acquisition Programs

CounterRocket,Artillery

and Mortar

Rapid Deployment Capability

RapidDevelopment

andDeployment

BaseExpeditionaryTarget andSurveillanceSensors–CombinedTask Force

Task Force Observe,Detect, Identify,

Neutralize

Advanced ConceptTechnology Demonstration

(ACTD)

Other TransactionAuthority (OTA)“DARPA AgreementsAuthority”

QuickReaction

Fund

Technology TransferInitiative

Limited AcquisitionAuthority

RapidAcquisitionAuthority

JIEDDO

MRAPTaskForce

Intelligence,Surveillance,

ReconnaissanceTask Force

Joint RapidAcquisitionCell

Air ForceArmyNavy

USD (AT&L)DDR&EDARPACOCOMs

200820062004200220001998199619941992198819841980197619721968 2010

The Case for and Implications of Unmanned Aircraft Systems Being a “Disruptive Technology” 11

JFCOM used the LAA to support six projects. After that, LAA activities slowed significantly, a trend GAO suggests may be linked to lack of access to funding (GAO, 2007a, p. 3).

Joint rapid Acquisition Cell

The Joint Rapid Acquisition Cell (JRAC), also established in 2004 by the Deputy Secretary of Defense and organized in the Office of the Under Secretary of Defense for Acquisition, Tech-nology, and Logistics, constituted another rapid acquisition program. The intent of this cell was to meet new requirements that the combatant commanders (COCOMs) identified as opera-tionally critical; the COCOMs’ prominent role in JRAC has led some to tag it the “COCOM’s acquisition process” (Middleton, 2006, p. 19; see GAO, 2010b, p. 1). During its initial three years, JRAC supported 24 programs, at a cost of $335.5 million.6 These funds came primarily from war supplemental appropriations and were not part of the military departments’ pro-grams or budgets. A 2009 DSB report found that this meant that “these programs continue to lack serious institutional commitments; very little is being built into the service or other DOD budgets for these programs” (DSB, 2009, p. 6). While JRAC required a life-cycle plan as part of the acquisition process, the DSB found this planning inadequate. Training relied more “on learning on the job with little emphasis on support, training, and sustainment.” (DSB, 2009, p. 6). The typical institutional support in the services that is needed to fund, for example, investments in the training infrastructure does not exist for every rapidly acquired system.

Rapid Equipping Force

In 2002, the Army established the Rapid Equipping Force (REF), whose mission was to equip operational commanders with technological solutions to urgent war needs in no more than six months (DSB, 2009, p.  12). In 2005, the REF was made permanent (Kennedy, 2006, pp. 43–45). The organization began with a staff of 14 personnel, which expanded to 150 by 2007 (Dietrich, 2007, p. 5). In 2005 alone, it purchased more than 20,000 items, including robots, surveillance systems, digital translators, and weapon accessories (Dietrich, 2007, p. 6).

The REF supported the rapid acquisition and fielding of a widely adopted technology called PackBot, which became a vital tool in the identification and defusing of deadly improvised explosive devices. The REF also supported other unmanned and robotic technology, includ-ing the development of the battery-powered, hand-launched, and camera-equipped Tactical Mini Unmanned Aerial Vehicle (UAV) in 2005. The REF project leader described that UAV as a technology that allowed soldiers to “go into situations knowing what’s in front of them” (Ainsworth, 2005). REF purchased the mini-UAV commercially and, after some software modifications, quickly had it ready for theater operations (Miles, 2005). Yet, insufficient con-sideration for back-end support reportedly plagued early REF efforts, and steps have been taken to ameliorate the difficulties. COL Gregory Tubbs, REF director, conceded that the early ad hoc “wild west” days of REF logistical support were a challenge (Kennedy, 2004).

readily available for long-term sustainment. A 2005 report from the Center for Strategic and International Studies called for providing rapid acquisition approaches with more-secure funding: “Urgent requirements will be met much faster if they can be resourced without taking funds from existing programs” (Murdock and Flournoy, 2005, p. 98).6 The process begins when a COCOM identifies and validates an urgent operational needs statement (or a joint urgent operational needs statement for joint requirements), defined as “urgent, combatant commander-prioritized operational needs that, if left unfilled, could result in loss of life and/or prevent the successful completion of a near term military mis-sion.” Immediate warfighter needs were the urgent operational needs statements certified as requiring a solution in 120 days or less. For a given system, JRAC is authorized to expend $365 million in research, testing, development, and evaluation funds and up to $2.19 billion in procurement. See GAO, 2007a, p. 12.

12 Building Toward an Unmanned Aircraft System Training Strategy

Intelligence, Surveillance, and Reconnaissance Task Force

The high value placed on UASs, specifically in new intelligence, surveillance, and reconnais-sance roles, can be seen in the robustly funded Intelligence, Surveillance, and Reconnais-sance (ISR) Task Force, which supported the fielding of numerous unmanned systems. In spring 2008, Secretary Gates established this task force to expedite the fielding of ISR assets to combat areas (Sherman, 2008). The task force originally had a 120-day charter; two years after the task force’s founding, the secretary announced that it would become a permanent part of the Office of the Under Secretary of Defense for Intelligence (Bennett, 2010). Its mission was to address unmet ISR requirements and to rapidly acquire and field capabilities by coor-dinating activities and pursuing innovative solutions (Loxterkamp, 2010). The ISR Task Force was to recommend ways to maximize the availability of systems in the inventory and to boost acquisition of additional systems (Best, 2010, p. 17). In FY 2008 alone, Congress approved the reprogramming of $1.3 billion based on ISR-TF recommendations (GAO, 2008b). Among the systems the task force supported were the Navy’s unmanned MQ-8 Fire Scout and the fielding and sustainment of 50 unmanned Predators.

Informal Approaches to Rapid Acquisition

The formal approaches highlighted above support rapid acquisition in a variety of ways. Some consist of an acquisition authority but no money (LAA); some consist of funding (REF); some facilitate stronger requirements inputs (JRAC); and some, like Special Operations Command (SOCOM), have everything. Yet importantly, some rapid acquisition has taken place outside even these ad hoc institutional arrangements. For example, in one case, the personal rela-tionships enabled rapid acquisition of command and control (C2) systems. In another, ADM James Stavridis instituted a “culture of innovative thought” into U.S. Southern Command (SOUTHCOM) by developing his own in-house technical capabilities through a process he called Linking Plans to Resources, an approach aiming to associate capabilities with specific solutions (Hicks, 2008, p. 33). He chartered the Joint Innovation and Experimentation Direc-torate, tasking it with improving how the command trains, fights, and does business (Stavridis, 2010, p. 177). This small innovation staff was to “research, explore, and test emerging technol-ogies available commercially or through Federal research centers” (Stavridis, 2010, p. 89). The directorate was to take the lead in identifying new and creative ways of meeting the command missions, and was given the primary responsibility for “developing validated solutions into an initial operational capability,” materiel or nonmateriel (Stavridis, 2010, pp. 178–179). These innovations, looking for better ways to link requirements to resources and developing in-house capabilities for acquiring solutions, reflected new acquisition roles.

PACOM’s version was the Plans to Resources to Outcomes Process, which helped in the development of the command’s integrated priority list. PACOM also developed its own in-house means of meeting requirements (Murdock and Flournoy, 2005, p. 40). PACOM’s Joint Innovation and Experimentation Division uses the integrated priority list to develop rapid, innovative solutions for filling the gap and injecting them into PACOM exercises. Similarly, in 2009, U.S. European Command appointed a special assistant for innovation and technology to field equipment for the war in Afghanistan. Navy Captain Jay Chestnut, special assistant in charge of the project, explained that European Command “knows that ‘big acquisition’ [the traditional system] is trying to do the right thing but sometimes you need someone working on the side, looking innovatively” (Francis, 2009).

The Case for and Implications of Unmanned Aircraft Systems Being a “Disruptive Technology” 13

In addition to the development of in-house approaches, informal rapid acquisition has also involved forging relationships between the COCOMs and technical expertise outside the military departments. As described by Stavridis, SOUTHCOM worked to both build in-house staff and forge relationships with a “technological base” external to the organiza-tion. He highlights, in particular, the partnership with DARPA, in which DARPA pursues “exploration and technology where risk and payoff are both very high, and where success may provide dramatic advances” to the SOUTHCOM mission (Stavridis, 2010, p. 89). Included in Admiral Stavridis’ list of outcomes of this productive symbiotic relationship with DARPA are unmanned aerial craft and unmanned surface vessels.

The Use of Fast Track Authorities Can Cause Problems

For acquisitions to be “rapid,” certain aspects of the traditional acquisition process have been left out. In many cases, it is the training and support planning that have been omitted. In 2008, the GAO reported that the

rapid fielding of new systems and the considerable expansion of existing Air Force and Army programs has [sic] posed challenges for military planners to fully account for UAS support elements, such as developing comprehensive plans that account for personnel and facilities needed to operate and sustain programs.” (GAO, 2010a, p. 37)

Because many of these programs do not pass through the system development and demonstra-tion phase or a logistics supportability analysis, the data needed to generate training and sup-port planning and ultimately guide investment decisions are unavailable. In 2010, the GAO found that the Air Force had not developed a servicewide plan that identified the number of personnel to be trained, the specific training required, and the resources necessary to establish a dedicated UAS training pipeline (GAO, 2010a). The Air Force has reportedly been struggling to staff significant increases in unmanned systems (Baldor, 2010). Going from a handful of drones in 2007 to 45 by 2010, with plans to operate 50 by 2011 and 65 by 2013, had created significant resource challenges for the department. These resource challenges became heavily pronounced with the “surge” in UAS requirements for operations in Libya and Afghanistan beginning in March and extending into summer 2011. The Air Force, to fulfill combat air patrol (CAP) requirements, stood down a portion of its formal training structure to form three CAPs (U.S. Air Force, 2011). As the Air Force’s Deputy Chief of Staff for Operations, Plans, and Requirements explained in 2010, the “number one manning problem in our Air Force is manning our unmanned platforms” (Baldor, 2010).

The GAO similarly found that the Army’s personnel authorizations were insufficient to support UAS operations. The Army has determined on at least three separate occasions since 2006 that Shadow UAS platoons did not have adequate personnel to support the near-term and projected pace of operations (GAO, 2010a). Officials from seven Army Shadow platoons in the United States and Iraq told the GAO that approved personnel levels for these platoons did not provide an adequate number of vehicle operators and maintenance soldiers to support operations (GAO, 2010a). Army officials told the GAO that currently approved personnel levels for the Shadow platoons were based on planning factors that assumed that the Shadow would operate for 12 hours per day with the ability to extend operations to up to 16 hours for a limited time (GAO, 2010a). However, personnel with these platoons told the GAO that UASs in Iraq routinely operated 24 hours per day for extended periods (GAO, 2010a). Army officials

14 Building Toward an Unmanned Aircraft System Training Strategy

also reported that combat brigades and divisions require additional personnel to provide UAS expertise to assist commanders in making effective use of new technological systems (GAO, 2010a).

UASs exemplify the challenges of integrating training and sustainment considerations outside the strictures of the formal acquisition process. Ad hoc rapid acquisition processes were able to field UASs rapidly, but because of the nature of these processes, the fielded UASs lacked sustainable institutional support and funding needed for future investments in the training infrastructure. Frequently, the services try to sustain and support these programs by relying on contractors, just as they did during system development.7 Of course, employing contractors to provide training is not in itself a problem. But it does reflect the extent to which training has been more about expediency than about effective institutionalization, particularly with regard to the imperative to train as we fight and the need to fully appreciate the need to integrate UAS training across the full spectrum of combat units.

7 For example, the Air Force continues to rely on contractors to perform a considerable portion of UAS maintenance. For example, contractors perform approximately 75 percent of organization-level maintenance requirements for the Air Combat Command’s Predator and Reaper UASs. See GAO, 2010a.

15

ChApTer Three

Training Concept and Framework for Unmanned Aircraft Systems

We will begin by discussing the general ideas that should guide UAS training—the training concept. Then, we will consider how the parts identified in the concept fit together into a con-ceptual structure for that training—a training framework designed to enhance combat power and other operational capabilities. Note that the term UAS can be misleading. In fact, there is not a single UAS but rather a family of aircraft that share the common feature that they fly without a pilot on board.1 These aircraft have very different personnel and training require-ments. The vast majority of UASs support ground operations, and that will be our primary focus. As noted in Table 1.1, ground forces—the Army and Marine Corps—own many of these systems themselves, but the Air Force owns some of them and often flies them in support of ground operations. UASs are sometimes flown in support of conventional ground operations and sometimes in support of special operations. Our main focus is on support of conventional forces. UASs are now also being developed that will support maritime forces, and we also con-sider them.

Training Transformation, Joint Doctrine, Joint Operations, and UASs

Large military operations today are usually joint operations requiring and emphasizing the interdependence of the services. It follows naturally that joint doctrine, joint concepts of opera-tion, and joint TTP would provide focus for training. Accordingly, the DoD’s Training Trans-formation Implementation Plan requires that in order to “improve joint force readiness” there be a “unity of effort in training across Services, agencies and organizations.”2 That said, joint training guidance and publications generally provide guidance direction on the coordination and collaboration among elements of different services to optimize the joint employment of their various capabilities, and not on the employment of any one, specific system or even family of systems, such as UASs.

Clearly, training does not take place for the sake of training; it should be driven by doctrine. Thus, in line with the general focus described above, JP 3-0 (2001) “establishes the framework for our forces’ ability to fight as a joint team,” but nowhere does the document dis-cuss the management of UASs or any other specific system. Moreover, nowhere in any other joint publication is there a grand doctrine for the employment or management of UASs on

1 In 2014, the Air Force republished its vision for its system, replacing the term unmanned aircraft systems with the term remotely piloted aircraft (RPA) (U.S. Air Force, 2014, p. iii). 2 See Director, Readiness and Training Policy and Programs, 2006, p. 5.

16 Building Toward an Unmanned Aircraft System Training Strategy

the battlefield. However, the services have agreed to a set of TTP to be incorporated into their respective training programs. They describe these as a “multiservice” rather than a joint TTP, thereby avoiding doctrinal issues on how to deploy and manage UAS even as the services sup-port joint operations.

Air Force Maj David Buchanan explored the difficulty of developing a joint doctrine for UASs in a 2010 Naval War College paper, summing up the difference this way: The Air Force believes in centralized control, and the Army believes in decentralized operations. He noted that the

Air Force’s proposal to assume executive agency for all medium- and high-altitude UASs in March 2007 was an attempt to establish unity of command and increase UAS efficiencies. … The Army’s position … was that a single-service approach to UAS employment would infringe on the effectiveness of UASs in combat.

The Air Force’s centralized approach may result in a more efficient allocation of limited UAS assets, but that efficiency comes at the cost of combat effectiveness. The Army’s answer to regain effectiveness has been to decentralize command and control for its unmanned aircraft systems. Ground commanders rely on UASs to provide timely, relevant, and useful intelligence without the lengthy processing and dissemination associated with the Air Force’s centrally controlled, theater-wide assets. The Army’s Training and Doctrine Com-mand noted that the joint (CAOC [combined air operations center]) solution to meeting the high demand for these low-density assets has been ineffective, arguing against relying on the JFACC [Joint Force Air Component Commander] for UAS coverage. (Buchanan, 2010, p. 7).

JP 3-55.1 reflects a more service-centric notion of jointness.3 When it was written in 1993, UASs were primarily thought of as reconnaissance, surveillance, and target acquisition (RSTA) assets. As envisioned then, mission planning was to be “based on the requirements of the supported unit,” with due consideration for “airspace management conflicts” (JP 3-55.1, 1993, p. II-9).

Over time and with practical experience in Iraq and Afghanistan, the utility of UASs has expanded from consisting primarily of ISR to include armed surveillance and armed over-watch (e.g., for movement support and area security), targeting, communications support, attack, strike, and engagement; in the future, it will further expand to encompass logistical support and casualty evacuation missions. This expanded range of missions presents a chal-lenge that was addressed in 2011 with the publication of a common set of multiservice TTP (MTTP).4 Each of the four services has agreed to incorporate the MTTP into its respective training. The agreed-to MTTP document requires that

3 JP 3-55.1, 1993, p. II-1, states that the

[p]rimary mission of UAS units is to support their respective Service component commands as a tactical RSTA system providing the commander a capability to gather near-real-time data on opposing force position, composition, and state of readiness. However, as is the case with all assets and groupings within the joint force, the joint force commander (JFC) has full authority to assign missions to and task component UAS to conduct operations in support of the overall joint force.

4 Reflecting the multiservice, rather than joint, nature of the document, each service has assigned its own number to it: Army Tactics, Techniques and Procedures 3-04.15, Marine Corps Reference Publication 3-42.1A, Navy Tactics, Tech-niques and Procedures 3-55.14, and Air Force Tactics, Techniques and Procedures 3-2.64. From here onward in this report, we will refer to the document simply as “the MTTP.”

Training Concept and Framework for Unmanned Aircraft Systems 17

group 3-5 UAS operations will be coordinated with the ACA (airspace control authority) and included in the ACO (airspace control order), SPINS (special instructions) and the ATO (air tasking order) in order to separate UASs from manned aircraft and to prevent engagement by friendly air defense systems. (MTTP, 2011, p. 12)

Table 3.1 describes the five UAS groups. The TTP for UASs that the services agreed to rec-ognize that UASs may either be controlled by a centralized or joined C2 node (MTTP, 2011, p. 15) or be operated independently and that the service component commander may retain operational control of UASs (MTTP, 2011, p. 16), thereby avoiding the doctrinal issue that divided the Army and Air Force. In general, UAS control during the execution of an opera-tion should be at the lowest tactical level to streamline the decision time lines and thus opti-mize responsiveness. The MTTP provides vignettes to help supporting and supported units understand how to incorporate and use available UAS assets more effectively. It should also be noted that no distinction is made between organic and nonorganic UAS support (MTTP, 2011, p. 40).

At least for the foreseeable future, each service will continue to field UASs and must bring to the fight forces fully capable of operating these aircraft and integrating their capabilities into joint operations. While some overarching doctrinal issues remain unresolved, the common procedures the services have agreed to and train for will remain the foundation on which UAS operations must be built, just as they are for military operations more generally. In this way, rather than being the foundation for UAS training, joint training is the apex of such training, which must be firmly grounded on the UAS training each service gives both its supported units and the supporting UASs.5 This is the main focus of this report.

The UAS Training Concept: A General Notion for UAS Training

The contribution that UASs make to the modern battlefield results from a synergy among the platforms themselves, those who operate the platforms, and those who incorporate the UASs into the battle. Combat power cannot expand unless all three work together. A platform flown

5 The terms supported unit and the supporting UAS are basic constructs of MTTP, 2011, p. 9.

Table 3.1UAS Tiers by Service

Group Capability Examples

I hand-launched, self-contained, portable systems employed for a small unit or base security.

rQ-11A/B raven

II Small to medium in size and usually support brigade and intelligence, surveillance, reconnaissance, and target acquisition requirements.

Scaneagle

III Operate at medium altitudes with medium to long range and endurance. rQ-7 Shadow

IV relatively large UASs that operate at medium to high altitudes and have extended range and endurance.

MQ-1 predator

V Large, high-altitude, long-endurance UAV platforms rQ-4 Global hawk

SOUrCe: DoD, 2011, pp. D-2 and D-3

18 Building Toward an Unmanned Aircraft System Training Strategy

by a skilled pilot does not add anything to the battle unless those on the ground who are engaged know how to exploit the information and other support the UAS provides. Similarly, if the pilot and payload operator cannot respond to the ground commander, the support they provide will not be what the commander needs. Only when all three work together will UASs be effective as a force multiplier. This can be achieved through training and practice that brings the platform, the operator, and the users together, starting at home station and progressing through ever-more-complicated exercises at the major training centers, such as the National Training Center (NTC) at Fort Irwin, California; the MCAGCC at Twentynine Palms, Cali-fornia; and the Joint Readiness Training Center at Fort Polk, Louisiana. Accordingly, how to achieve this synergy is the fundamental organizing concept for UAS training.

Let us be clear. The organizing concept developed here is not built around the training of a UAS pilot or payload operator per se. Their proficiency is certainly a necessary condition for UAS operations but is not, by itself, sufficient to enhance combat power. Enhanced combat power is achieved through the synergistic process that brings the platforms, the operators, and the users together. It starts at home station with small UASs and builds through the echelons of the ground forces as larger UASs are integrated into the combat operations of higher-echelon formations. Properly done, the maintenance or refinement of proficiency levels for UAS pilots and payload operators will be achieved incidental to the training that should take place with ground forces. But even before training can start, the services must decide how these systems will be used and how they will be incorporated into the force.

A Concept of Operations for UASs Is a Prerequisite for Training

As noted in the previous chapter, UASs are a classic disruptive technology. Integrating them into existing military operations is still a work in progress. This creates a problem for those charged with building training programs because, before training can start, the services must decide how these systems will be used and how they will be incorporated into the force. The services are still learning how best to use these new systems and the capabilities they provide. Each service is doing it differently.

Army

Initially, the UAS was thought of as just another platform for RSTA sensors, and the intelli-gence community was the proponent in the Army. In 2003, proponency for UASs transferred from Army Military Intelligence to the Army Aviation Branch. Since then, the UAS role in the Army has been changing from the relatively passive intelligence-gathering mission to the more active scout-reconnaissance and attack missions. One consequence of this transition is that UAS operators frequently team with manned aircrews to perform the scout-reconnaissance role. However, UAS operators and manned aircraft crews are currently separate communities and undergo separate programs of training.

At another level, the Army is experimenting with how to support the Raven, a small, hand-launched UAV. There is no dedicated military occupational specialty (MOS) for Raven operators. Being a Raven operator is an additional duty that requires additional training. Master Raven Training, a three-week train-the-trainer course, takes place both in the class-room and in the field. Students are taught how to maintain and operate the equipment and how to judge when and when not to fly. The plan calls for the trainer to return to home station and train squad-level personnel to operate the Raven.

Training Concept and Framework for Unmanned Aircraft Systems 19

Navy

The Navy has a different scheme for integrating the Fire Scout UAS and Broad Area Mari-time Surveillance (BAMS) into the fleet. Typically, maintainers and pilots for Fire Scout have already gained technical training on manned helicopters. The Fire Scout–specific training is six weeks long and takes place at the Fire Scout Training Center at Naval Air Station Jackson-ville, Florida (U.S. Army Maneuver Center of Excellence, undated).

The Navy’s version of the Air Force’s Global Hawk is the MQ-4C Triton, developed under the BAMS program. While the Navy continues to fly it to refine TTP for use in a mari-time environment, the concept is for it to be integrated into active Navy maritime patrol units to complement the P-8 Poseidon, Boeing’s 737–based multimission maritime aircraft, a tradi-tional manned aircraft.

Air Force

The Air Force has yet another concept of operations that emphasizes remote split operations and reaches back to the Global Operations Center at Creech AFB, Nevada. Today, six opera-tions centers in the continental United States (CONUS) support five launch-and-recover units in theater. Integration with tactical units is through tactical air control parties (TACPs) at the division, brigade, and battalion levels, and often at lower levels when supporting special opera-tions forces (SOF). The TACPs coordinate directly with the Predator operations center via ultrahigh frequency radios on the aircraft or via satellite communications. As with other Air Force assets (and many air assets of other services), UAS assets are assigned to support ground commanders through the ATO. In the Air Force, the UAS pilots and payload operators are commissioned officers.

Marine Corps

The Marine Corps has dedicated UAV squadrons located at the MCAGCC at Twentynine Palms, California, and recently at Camp Pendleton, California. In the Marine Corps, enlisted Marines are responsible for almost every facet of the mission, from flying the aircraft and oper-ating the payload camera to takeoffs and landings.

Summary

Even as the services are experimenting with the best way to use UASs and to integrate them into their forces, the overall purpose for UAS training should be clear. It is to increase combat power through the synergistic process that brings the platforms, the operators, and the users together. Putting these pieces together is the primary theme of the training framework we present.

Training Framework for Tactical UASs

The focus of the UAS training framework we offer is the enhancement of combat power, which starts with well-trained individuals who learn to work as a unit and ultimately leads to units that coordinate their efforts to produce military force. As we have seen, however, each service uses UASs differently.

Moreover, the great variety of UASs adds to this complexity. UASs are classified into tiers. Military planners designate the various individual aircraft elements in an overall usage plan using a tier system. The tiers do not refer to specific models of aircraft but rather to roles the

20 Building Toward an Unmanned Aircraft System Training Strategy

aircraft typically fill. Table 3.1 shows the UAS groups and their roles and offers the examples of systems assigned to them.

The following discussion of training frameworks refers primarily to tactical UASs and not such Tier V systems as Global Hawk and its naval variant, the BAMS-D Triton.

The Training Framework for Ground Combat: Army, Marine Corps, and Air Force

The pyramid shown in Figure 3.1 represents our idea of the training framework to enhance combat power for the Army and Marine Corps, integrating organic UASs and Air Force UASs, when available, in support of ground forces. It is a graphic representation of the syn-ergy achieved through training and practice that brings the platform, the operator, and the users together, starting at home station and progressing to higher echelons and ever-more- complicated battle exercises. The services have committed to align their training with the agreed-to MTTP. As with any good framework, the UAS framework must have a strong base. The base of this framework, represented by the lowest level of the pyramid, includes the initial and individual skills training of those who operate, maintain, and use the systems. The higher levels of the pyramid roughly align with the echelons of ground forces from the platoon or squad level through the company level and moving up to battalions, then to brigades. Each level incorporates the C2 of subordinate units to create combat power that is more than the sum of its parts. A battalion is more than just a collection of companies, each of which is more than just a collection of platoons and squads. In creating this combat power, the battalion uti-lizes UASs that are not normally available to its subordinate companies. In this way, the bat-talion and its UASs are “combat multipliers.” This increase of combat power is repeated as we move up the pyramid to higher echelons each supported by the UASs that are organic to that

Figure 3.1UAS Training Framework for Army, Marine Corps/Air Force Joint Combat Operations

RAND RR440-3.1

Army Full capability

Jointoperational:

CTCs, other exercise

Operational: CTCs,larger-scale home

station, MQT

Tactical collective:home station, MQT

Small unit:home station, MQT

Individual training/orientation for operators and leaders:schools, home station, supplemental courses, MQT

Operational experience

Air Force

UAS integratedinto training

UAS integratedinto training

Gray Eagle

Gray Eagle

All: large systems usually simulated for

leader training

All: large systems usually simulated for

leader training

All

Shadow and Raven, possibly

Gray Eagle

Shadow and Raven

Predator,Reaper

Predator,Reaper

Predator,Reaper

if possible

All

Training Concept and Framework for Unmanned Aircraft Systems 21

tier. The two different-sized arrows, coming in from the left for the Army and from the right for the Air Force, show the specific UASs and the echelons they support.

In our concept of the training framework for UASs, the ground force systems—those of the Army and Marine Corps—and Air Force systems are “stacked” along the sides and paired with the level of the pyramid they support. The entries at each level of the pyramid identify the type of training that needs to be accomplished and where that training takes place. For example, small-unit training, at the lowest level of the squad and platoon, incorporates the Raven UAV and is accomplished at home station. Company training, which generally entails C2 of four platoons, is also accomplished at home station. The individual platoons may each be using their own Ravens, and the company commander may have access to the information from a Shadow UAS.

This process is repeated at home station with companies being brought together under the C2 of the battalion commander and his staff. During a battalion exercise, the battalion commander will generally be able to task the Shadow UASs either individually or as part of the combat support from assigned Army aviation. In some cases, this may include informa-tion provided by the Gray Eagle UAS. In some instances—these have historically been very rare—available Air Force UASs, such as Reaper or Predator, may support home station bat-talion exercises.

Brigade-level training can be carried out at some home stations, but the maneuver combat training centers (CTCs) generally provide a better venue. All available Army UASs will sup-port these training exercises, from the small Ravens to the larger and higher-flying Gray Eagle, when available. In addition, it is at this level and during these exercises that joint Army–Air Force support is usually integrated to include close air support (CAS) and support from Air Force UASs.

Not shown on the pyramid is the training needed to meet the certification requirements of UAS operators. Such requirements will normally be met incidental to their training with ground forces. For example, Shadow operators need to operate their equipment 4.5 hours per month to maintain their certification. It is expected that they will be spending more than that supporting ground units during home station training. Operators not actively engaged with the training of ground units can achieve the needed proficiency training using the same train-ing equipment as during their initial skill training.

The Training Framework for Fleet Operations

A similar pyramid also represents our framework for Navy UAS training (Figure 3.2). It differs from the previous pyramid in that the Navy does not have a hierarchy of systems introduced at higher echelons of command. At the tactical level, the only UAS the Navy has is Fire Scout, which will be introduced into fleet operations following a similar path as discussed above. As with land forces and the systems that support them, combat proficiency is generated through the synergy of the platform, operators, and staffs that incorporate the UASs into the battle planning. Initial operator training is the base of the pyramid and takes place in the school-house in the vicinity of the homeport. Operational training occurs under way in fleet operating areas. The Navy trains continuously, and the training continues through the operational use of UASs when the units are deployed.

UAS operators and maintainers require initial training to obtain the skills needed for operational effectiveness. As individuals become qualified as UAS operators and maintainers, they undergo team training to achieve mission area certification. For example, UAS operators

22 Building Toward an Unmanned Aircraft System Training Strategy

may be linked to and integrated with an antisurface warfare mission team to support certifica-tion for the surface warfare mission area. For ships, unit-level training occurs both in port and under way and culminates in a final evaluation period. During that evaluation, the immediate superior in command evaluates the ship in all mission areas to determine that it is ready for advanced phase training. The final evaluation period comprises in-port and underway training events geared to assess the unit’s ability to operate independently.

Collective training occurs after the final evaluation period, when the ship begins to operate with other units and staffs. During this time, the ship conducts operations with and becomes an integral part of a carrier strike group (CSG).6 Collective training is a combination of in-port and underway training events and culminates in a combined training unit exercise evaluated at the fleet commander level. The Navy is in the process of developing its UAS tactics and procedures and plans to integrate UAS training into predeployment preparations.

Deployed naval ships and units must also operate in a joint environment. After complet-ing a combined training unit exercise, a deploying CSG conducts a final exercise with elements of other services (e.g., Air Force aircraft) to demonstrate its ability to communicate and operate effectively in joint warfare. Joint training is conducted both in port and under way. An under-way joint task force exercise is the culminating event, with Navy units operating with forces of the other services; on satisfactory completion, units are deemed ready to deploy. Units then continue the operational training and employment of their systems en route to their deployed operational areas.

6 While we address surface units as being part of a CSG, surface units can also deploy independently, with other ships, or with an expeditionary strike group.

Figure 3.2UAS Training Framework for Navy Tactical UAS

Joint training

Collective training

Unit-level training

Team training/certi�cation

Individual(s) training/quali�cation

Operational training and employment

RAND RR440-3.2

Individual quali�cation(s)

Event(s)

Fully mission-capable unit(s)

Joint task force exercise

Combined training unit exercise

Final evaluation period

Mission area certi�cation(s) Homeport

Location(s)

Deployed operations

In-port and underway OPAREA

In-port and underway OPAREA

Homeport—in-port andunderway OPAREA Training

Homeport schools andsupplemental TDY courses

Training Concept and Framework for Unmanned Aircraft Systems 23

Navy units deployed to 5th Fleet do have experience with BAMS–Demonstrator (BAMS-D), the predecessor to the Triton, and a variant of the Air Force’s Global Hawk. Despite being a demonstrator, BAMS-D was deployed to meet surveillance needs in the 5th Fleet. Navy strike groups operating in 5th Fleet were provided with imagery and data feeds from BAMS-D and used these data to build a common operational picture, which increased situational awareness. The BAMS-D was integrated into actual fleet operations and provided near-real-time updates for surface surveillance. Units learned to use BAMS-D “on the fly,” by processing, exploiting, and disseminating imagery and sensor data; building the surface picture; and increasing the positive identification of surface contacts in the area of operations.

As UAS assets are fielded, they will be incorporated to a greater degree into predeploy-ment training and increase opportunities to train and hone the tasking, collection, processing, exploitation, and dissemination of UAS sensor data.

Applying the Training Framework

The training framework presented here focuses on the synergy among three key elements: the platform itself, those who operate the platform, and those who incorporate UASs into the battle. The framework emphasizes using UASs to enhance warfighting proficiency. It provides a useful tool for organizing and evaluating training options and assessing the current state of training and plans for improvement. As discussed in the next chapter, we used the framework to assess the state of UAS training, as it existed in 2012.

25

ChApTer FOUr

Assessment of the State of UAS Training in 2012: Service and Interoperability Training and the Role for Simulators

For more than a decade, UAS training has concentrated on preparing UAS pilots and payload operators to support ongoing operations in Afghanistan and Iraq. This remained true in 2012 and 2013, and the services continue to evolve how best to use these systems and integrate them into ongoing operations. With the operations in Afghanistan winding down, the services must now integrate all facets of UAS training, including the infrastructure for training addressed in Appendix C, into a largely CONUS-based inventory of UASs that continues to grow, even as real-time operations continue for some systems.1 Moreover, operational demands and techni-cal innovations will continue to evolve and affect training and organizational requirements. As a result, UAS training and training support programs must be viewed as works in progress.

In assessing the current state of UAS training, using the UAS training framework dis-cussed in the previous chapter, we view proficiency in flying UASs not as an end in itself but as only a means to an operational end: accomplishment of a military mission. As noted, this is achieved through the synergistic use of UASs with the forces they support, in ways similar to those in which the timely integration of intelligence or the delivery of fire support is accom-plished in combat operations. This convergence requires full integration of UASs into the col-lective training of operational forces, attendant training and education for leaders and staffs, and the integration of lessons learned from previous and ongoing operations into education and training programs.

The preceding should by no means be construed to understate the need for training those directly involved in the operation of UAS—among them pilots, crews, support personnel, and those who maintain the aircraft and communications systems. Such training, both to develop and to maintain proficiency in the operation of UAS, is critical for the overall success of a UAS training strategy. But proficiency in these areas is not in itself sufficient. Full understanding of UAS integration, from the smallest to the largest systems at every echelon, as outlined in the previous chapter, is also necessary.

To be clear, members of the UAS community not only must understand how to operate their systems—a challenge largely being met successfully—but must also be familiar with the fundamentals of the operations they support and how their capabilities contribute to the suc-cessful accomplishment of the mission. Similarly, battle staffs must fully understand the many capabilities of UASs, how these capabilities supplement or complement other capabilities avail-able to the joint force, and how best to integrate the capabilities into their operations.

1 The Air Force UAS community believes high demand for its systems—Predator and Reaper—will persist, with require-ments to support other kinds of demands increasing as demands for support of ground maneuver operations decrease.

26 Building Toward an Unmanned Aircraft System Training Strategy

This chapter assesses the state of training for UASs across the ground, air, and sea forces. It discusses information, observations, and insights gained from a wide variety of sources but mainly through visits to a select number of service bases in 2012. During these visits, the RAND team talked with operators and support personnel; those who train operators and asso-ciated members of the team; those who train and observe the forces who employ UASs; staff elements concerned with the planning and resourcing of training, both for UAS operators and for the force more generally; and those concerned with the ongoing development of doctrine and concepts of operations for UASs, including their integration into operations. What follows is a compilation of the observations and insights from these individuals and our interpretation of the implications for the specification and resourcing of training strategies.

Ground Forces

Ground force operations of the Army and Marine Corps, even at low echelons, can be highly complex, and the complexity increases significantly at higher echelons. Commanders at higher echelons not only have to coordinate and use the information and capabilities subordinate units provide but also have to manage and integrate information and capabilities from a wid-ening variety of other sources available to them. Adding the integration of UAS capabilities into the operational command further increases its complexity and thus the complexity of associated training management processes. Evidence from both training exercises and actual operations in combat theaters shows that, when properly managed, UASs provide significant new capabilities that commanders at every echelon can effectively employ. UASs truly have the potential to be force multipliers—but more so when employed by users fully competent in integrating their capabilities with those of the rest of the force and its supporting elements.

As shown in the training framework presented in Chapter Three, the proper integration of UASs to create combat capability starts with the training of UAS operators and support per-sonnel and progresses through the integration of UAS operations with supported forces.

Training for Operators and Support Personnel

In general, the RAND team found that qualification training in the Army and Marine Corps for designated UAS-specific MOS is well established. In the Army, positions are filled by enlisted soldiers. The ranks of operators typically range from private first class to master ser-geant (E-3 to E-8). The Marine Corps is organized much like the Air Force, with a UA com-mander who is a company grade, qualified aviator or aviation C2 officer on his or her second or third tour (O-3/O-4) and a mission payload operator (MPO) who is typically a corporal through master sergeant (E-3 to E-8).

Army Air Vehicle and Sensor Operators for Hunter, Gray Eagle, and Shadow UASs

Training for Army UAS operators—pilots and payload operators—is carried out in two phases: The first, at Fort Huachuca, consists of a common core course for all operators of UASs not launched by hand.2 This phase lasts nine weeks and two days and has five sections. (See Fig-ures 4.1 and 4.2.)

2 The 2nd Battalion, 13th Aviation Regiment, which was previously called the Unmanned Aircraft Systems Training Bat-talion, conducts the training. See Appendix D for RAND’s “military value analysis of training bases” assessment of training at Fort Huachuca, Arizona.

Assessment of the State of UAS Training in 2012 27

After completing Phase I, the operators continue to Phase II. This section is unique for each airframe and consists of both simulation and flight hours. It typically takes 12.5 weeks for Shadow and Hunter classes to finish and 25 weeks for Gray Eagle classes. After completing Phase II, the UAS operators earn their wings.

Maintenance for Hunter, Gray Eagle, and Shadow UASs

The Army UAS maintainers take the MOS 15E Repairer course from the 2nd Battalion, 13th Aviation Regiment (see Figure 4.3). As shown in Figure 4.4, the course lasts 17 weeks, and a new class of up to 16 students starts every two weeks. After completion, 15E personnel are qualified to maintain the Shadow. Maintainers must take additional training to earn addi-tional skill identifiers and thus qualify to maintain the Hunter and Gray Eagle. The additional training takes ten weeks for Hunter and 18 weeks for Gray Eagle.

Army Raven Operators

Without a dedicated MOS, the development and maintenance of Raven operators is a unit personnel and training management issue. Assignment as a Raven operator is an additional duty. In the past, this has meant that many units did not have the required Raven-qualified personnel to employ the systems properly. The Army is well aware of this problem and, short of creating a dedicated MOS, has recently initiated a program to deal with the Raven training problem. The Army Maneuver Center of Excellence at Fort Benning manages a certification course designed to qualify selected soldiers as small UAS (SUAS) master trainers capable of conducting initial qualification training (IQT) and certification of new operators at home sta-tions throughout the Army. This train-the-trainer course focuses on how to teach and manage an aircrew training program at home base and how to assist small-unit commanders in evaluat-

Figure 4.1Army UAS Air Vehicle Operator and APO Training Pipeline

RAND RR440-4.1

Phase I

Phase II—In go-to-war aircraft

Common core

RSTA-PO2 weeks,2 days

Shadow12 weeks, 3 days22 �ight hours75 sim hours

Hunter12 weeks, 4 days23 �ight hours72 sim hours

Gray Eagle25 weeks

71 �ight hours60 sim hours

RSTA-I2 weeks,2 days

UGS4 weeks

AMPS1 day

Inprocessing1 day

ELSA, AMB,STANDS

1 day

9 weeks, 2 days

97 hours 95 hours 131 hours97–131 hours

28 Building Toward an Unmanned Aircraft System Training Strategy

ing academic and flight instruction and managing SUAS accident prevention.3 It is envisioned that new master trainers returning to their home stations will be able to develop and maintain

3 The 15-day course includes classroom and hands-on training, with instruction on reporting procedures, fundamentals of instruction, semiannual evaluations, and familiarization with Raven A and B and digital downlink systems. At the conclu-sion of the training program, graduates should have the ability to evaluate and certify operators. See U.S. Army Maneuver Center of Excellence, undated.

Figure 4.2Shadow (top) and Gray Eagle UAVs

SOURCE: DoD.

SOURCE: U.S. Army via social media outreach.RAND RR440-4.2

Assessment of the State of UAS Training in 2012 29

a sufficient number of operators within their units and manage a tracking program to ensure that their units have the required number of certified Raven operators.

Marine Corps Unmanned Aircraft Commanders—pilots

Training begins with the Unmanned Aircraft Commander course, which last two weeks and is taught by the U.S. Army at Fort Huachuca. Career-level training takes place at the squadron level. Marine Aviation Weapons and Tactics Squadron 1, at Marine Corps Air Station Yuma, Arizona, provides advanced training (the Weapons and Tactics Instructor course).

Air Vehicle Operators and Mission Payload Operators

Training for air vehicle operators (AVOs) and MPOs is accomplished jointly with the U.S. Army at Fort Huachuca. USMC operators take the nine-week common course and the 12-week Shadow course. Career-level training takes place at the squadron level. Marine Aviation Weap-ons and Tactics Squadron 1 provides advanced training.

Figure 4.3Raven UAS

SOURCE: U.S. Army via social media outreach.RAND RR440-4.3

30 Building Toward an Unmanned Aircraft System Training Strategy

Operational Training4

Larger UASs have dedicated MOS training, so operators and maintenance personnel arrive at home station having completed their IQT. To maintain their proficiency and certification, crews must log a minimum number of flying hours. The Army’s Gray Eagle UAS has its own simulator capability built into the operating hardware. Currently, the Army’s requirement is for 4.5 live flying hours per crew per month for the Shadow UAS. The Army has had dif-ficulty maintaining sufficient numbers of Raven-qualified SUAS operators, in part because units do not always do well in tracking their qualified operators, maintaining their proficiency through hands-on work, and providing for their timely replacement when they move on. Dis-cussions with Army trainers indicate that, despite the demands of deploying units and sustain-ing combat operations in Afghanistan, Army units are doing better at maintaining Shadow qualification. Nevertheless, not all units have been able to maintain high Shadow qualification rates: Some units arrive at the NTC with one-half or fewer of their operators qualified.

For these systems, the critical issue for the future will be securing enough flying time for UAS crews to train with ground forces. Marine Corps experience offers a good illustra-tion of this issue. The Marine Corps has based Shadow squadrons at the MCAGCC, where there is adequate restricted airspace both to maintain crew proficiency and to fly in support of ground forces. However, both the ground trainers and squadron personnel the RAND team interviewed reported having to start what was essentially remedial training because the ground

4 Joint Publication 1-02 defines operational training as “training that develops, maintains, or improves the operational readiness of individuals or units” (JP 1-02, 2013).

Figure 4.4Army UAS Maintainer Pipeline

RAND RR440-4.4

MOS training

ASI training

15E UAS repairer course

Basicelectronics

training144 hours

Army aviation forms and

records21 hours

Shop and �ight line practices

and procedures21 hours

Intro to army aviation

21 hours

Shadow emplacement/ displacement

21 hours

Flight line operations36 hours

Faultisolation72 hours

Flightoperations72 hours

Maintenance

72 hours

Field training exercise

120 hours

Hunter10 weeks

ER/MP (U5)18 weeks

17 weeks

27 weeks 35 weeks

Assessment of the State of UAS Training in 2012 31

forces were not adequately trained at home station to integrate UAS capabilities into their operations. These students generally could not progress to the level of proficiency desired.

The foregoing suggests the biggest challenge in developing and implementing a training strategy for UASs is gaining and maintaining proficiency on the part of end users—the lead-ers and staff members who will integrate UAS capabilities into their operations.5 Ground units that undertake joint training at CTCs are often unprepared to use organic and nonorganic UASs effectively, and thus tend to develop battle plans that underutilize them.6 Further, their intelligence and operations staffs sometimes find themselves at cross purposes over employ-ment of UASs, an issue that could be better dealt with during home-station training.

Despite all this, discussions with operators, users, trainers, and training managers sug-gest that properly employed UASs consistently prove to be valuable combat multipliers. One example was an Army unit training at the NTC, which had successfully employed its UASs as part of a manned-unmanned team. In this instance, the UAS had acted as a scout and observer as manned attack helicopters delivered fires on selected targets, all in support of a ground maneuver unit. Another battalion well versed in the myriad tasks associated with employing Shadows—communication of commander’s intent and concept, priority and time sensitivity of information requirements, targeting priorities, use of the communications relay package, to list just a few—was far more successful in employing the Shadows supporting it than another unit was. In the latter unit, the UAS platoon was simply given “areas to look at,” without spe-cific guidance on what to look for, e.g., named areas of interest and targeted areas of interest. Interviewees told the RAND team that many UAS operators do not get enough opportunity to interact with either crews of manned aircraft or the elements of ground units—commanders and operations and intelligence sections—that they will support.

The latter problem, ground units’ lack of experience in employing UASs, is all too common. It is also true for the USMC, whose units face considerable limitations on using UASs at their home stations or local training events.7 Marine ground force units are thus typi-cally not well versed in employment of UASs when they arrive at Twentynine Palms. Although they learn while there, many are still not fully capable when they deploy.8

Improvements in Facilities and Basing for UASs Will Improve Training Integration

To date, the Army has had reasonable opportunity to train at home station, and current pro-grams to increase UAS facilities will appreciably add to this. Table 4.1 summarizes responses the U.S. Army Training and Doctrine Command (TRADOC) received from active, National Guard, and reserve bases in November 2012 concerning the availability of restricted airspace and resulting limitations on UAS operations stemming from lack of availability. The responses

5 We refer to anyone who could benefit from the information a UAS provides as an end user. The MTTP calls end users supported units.6 Organic assets are ones owned by a unit, and nonorganic assets are ones that the commander of a unit does not own and thus does not have full control over. 7 Recall that the Marines’ Shadow squadrons are based at Twentynine Palms when not deployed.8 This brings up the question of whether we should expect units to continue learning sound tactics and procedures while they are deployed. They should, of course. The issue is how much; officials we have consulted have given us the sense that many units are still on the steep part of the learning curve when they leave the MCGACC. These units would be more operationally effective sooner in their deployments if they could be better trained to integrate UAS capabilities before they deploy.

32 Building Toward an Unmanned Aircraft System Training Strategy

indicate that, in many cases, relatively minor military construction projects are all that is nec-essary to expand training opportunities at home stations. In most locations, additional bed-down facilities will allow better use of existing restricted airspace to facilitate live training. In a few cases, however, the proximity of training areas to the Federal Aviation Administra-tion (FAA)–controlled National Airspace System (NAS) remains a problem. The summary in Table  4.1 provides a snapshot of the kinds of issues that have already been raised and will have to be revisited at some point because of the ongoing pressure to reduce defense budgets.

Base/Commands

Answer To Question E: Does Available Restricted Airspace Affect/Limit UAS Operations

at Your Installation?

Answer To Question J: What Solutions

Would You Recommend for Unsolved Issues?

Shadow Strips Planned for

FY 2013

Alaska (Forts Wainwright and richardson)

no. We have been able to accommodate all down range requests. however, the hangars are nonstandard and need to be evaluated for suitability as the Shadow and Gray eagle platforms evolve.

Fort A. p. hill During landings the tactical approach landing system orbit is outside the restricted airspace.

Yes

Fort Bliss Our special use airspace is bisected by a major highway which requires a COA.

Yes, a Shadow Strip in the SUA. Yes

Fort Bragg Yes. Yes. primarily commercial power and hardened maintenance facilities. Temporary solutions are power generation equipment and tentage.

Yes

Fort Carson Yes, limited by the volume of manned/unmanned platforms operating within the airspace.

Yes, requests for designatedUAS facilities and airstrip for launches and recovery. Funding established to build a multiple platoon facility for UAS units.

Yes

Fort Drum no. no. We have no unresolved UAS issues.

Yes

Fort hood not currently.

Fort Knox no. Yes; the construction of a tactical UAS field support structure (build it).

hawaii Yes, we have requested to use the Kahuku and east ranges for flights but due to FAA restrictions, we cannot fly UAS/SUAS platforms in these airspaces.

no. We need more airspace to train in. Our current location is becoming less and less amicable to flight conditions due to public demands on land.In 2010, plans were drawn up to provide for a permanent UAS facility at Wheeler Airfield, but they were cancelled due to program funding.

Table 4.1Select Summary of Army UAS Installation Survey as of November 21, 2012

Assessment of the State of UAS Training in 2012 33

Table 4.1—Continued

Base/Commands

Answer To Question E: Does Available Restricted Airspace Affect/Limit UAS Operations

at Your Installation?

Answer To Question J: What Solutions

Would You Recommend for Unsolved Issues?

Shadow Strips Planned for

FY 2013

Fort Lewis (Joint Base Lewis-McChord [JBLM])

1. Yakima Training Center (YTC): no not an issue.2. JBLM: Yes, both the limited restricted airspace and the large number of installation units requiring restricted airspace, challenge UAS/SUAS operations.

1. YTC: Shadow Training Facility2. JBLM: Construction of a second Shadow landing strip.3. JBLM: Construction of any type of permanent, securable facility alongside the existing Shadow landing strip (location is outside JBLM’s guarded area).4. JBLM: Shadow Training Facility or TeMF.

Fort riley not currently. (See response to Q h & i.)

nothing to comment on. Yes

Fort Stewart not significantly. however, reductions in air traffic control manning are a concern. There are currently no significant restricted airspace challenges negatively affecting UAS operations.

Funding, we have a plan and the requisite site approvals, we just need funding support. We need the funding ($701,000) now for our third Shadow platoon hangar; we have the design ready to go and at contracting.

USAreUr Yes. 173rd Shadow out of Italy is currently based in Bamberg due to no restricted airspace to fly in Italy. Currently fly in restricted airspace in Grafenwoehr/Vilseck Training Areas.

Camp Atterbury no, both UAS facilities are within restricted airspace.

Fort Chaffee no restricted airspace limitations to TUAS flight operations.

Yes

Orchard range Yes, UAS operations are limited to using r-3203.

Fixed support facilities UAS operations. Facilities will be in range Complex Management plan.

Fort pickett no, we have one of the largest SUAs in the Midatlantic.

Camp ripley no, the restricted airspace at Camp ripley (r-4301) provides enougharea to conduct training for the current systems.

Yes. The current tactical strip will be removed for the construction of a MpTr.

UAS commanders have requested a tactical strip for replacement that includes hard-stand buildings and electrical power. The Combat readiness Training Center currently has a location selected that has power in close proximity to the existing tactical strip.

Camp ripley is one of the sites to receive $730,000 for construction of a UAS strip in the down-range area in FY 2013.

Yes

Camp roberts no. Funding. Yes

34 Building Toward an Unmanned Aircraft System Training Strategy

Key Areas of Concern

As the war in Afghanistan draws to a close, the services must pay close attention not only to the training of UAS crews and support personnel but also to the routine exercise of these systems as part of combined arms training at home station and at the CTCs. This will require attention to a number of issues.

Beddown and Related Support Facilities

To facilitate the efforts described above, DoD should support current and future programs to develop ranges and beddown and support facilities similar to those in the Army’s current programs. The Army has been implementing a robust program to establish Shadow beddown facilities—runways, shelters, and attendant support structures—on many of its installations, both active and National Guard. This will enable more opportunities both for UAS operators and for end users.

Airspace Considerations

As the responses reported in Table 4.1 suggest, the unique limitations of UASs pertaining to operations in the NAS can make integration into home station training difficult. Currently, UASs can operate only in restricted military airspace or, in the NAS, with certificates of autho-rization (COAs) from the FAA. In some cases, it should be possible to increase UAS training with ground forces (and with collocated manned aircraft units) without impinging in any sig-nificant way on the NAS. Although this will certainly require better coordination of restricted airspace at individual installations, better availability of restricted airspace will make better

Base/Commands

Answer To Question E: Does Available Restricted Airspace Affect/Limit UAS Operations

at Your Installation?

Answer To Question J: What Solutions

Would You Recommend for Unsolved Issues?

Shadow Strips Planned for

FY 2013

Fort Dix Yes. We have accommodated all downrange requests. however, the size restriction of the UAS in r-5001 limits operation of large UAS operations.

Fort hunter-Liggett no, we use r-2513 airspace. none.

Fort McCoy Yes, Current coutilization of Young Air Assault Ship, a 6,250-ft. C-17/C-130 landing strip in r-6901 B. The UAS operations at this landing strip affect Sparta/Fort McCoy airport operations.

Yes. hangers for Shadows and permanent facilities with commercial power, and asphalt. Standard design and funding required.

Fort Campbell Fort Campbell currently has two approved sites for Shadow Flight operation; both are located among numerous field artillery firing points, which requires de-confliction during launches and landings because the firing points have to check fire. As a result, UAS flight training is significantly reduced. however, an additional UAS strip is being constructed to alleviate this problem.

Yes. permanent facilities with commercial power and utilities.

SOUrCe: Installation UAS survey responses from TrADOC Capability Manager—Live, as of november 21, 2012.

Table 4.1—Continued

Assessment of the State of UAS Training in 2012 35

access to the NAS less of a key element in supporting training strategies, at least as they pertain to home-station or local training of ground forces. However, less-cumbersome procedures for NAS access will, among other things, facilitate opportunities for units to employ larger UASs, such as Gray Eagle, Predator, and Reaper, in home-station training events.9

Air Force

The Army and the Air Force have significantly different concepts for employment of UASs. The Air Force uses a remote split operations concept to employ its UASs. Under this approach, the Air Force flies UASs from home station using satellite or other relay links. It maintains only small deployed footprints at consolidated operating locations to launch, recover, and maintain the aircraft.10 This approach enables the deployment of the vast majority of its systems, yet the majority of the personnel who operate Air Force UASs do so from home station and require no reconstitution following deployments. By using remote split operations, 85 percent of the Air Force’s UASs would be forward deployed for combat operations. The remaining 15 percent would support training at each operational base. The Air Force employment concept, however, does not facilitate integrated operations with Army tactical-level units during training at Army home stations. Once deployed, Army brigades, battalions, and SOF must learn to work with Air Force TACPs to coordinate UAS operations.

Training for Pilots, Operators, and Support Personnel

The Air Force uses a crew of one pilot and one sensor operator to man each UAS mission.11 The pilots are officers and are either rated pilots who graduated from undergraduate pilot training or UAS-only pilots who graduated from a new program called undergraduate remotely piloted aircraft training.12 UAS-only pilots have the 18X Air Force Specialty Code (AFSC) and will be discussed in more detail later. Following the structure of the training pipelines for other plat-forms, the training is broken into three phases: IQT, mission qualification training (MQT), and crew mission ready training. Air Education and Training Command conducts IQT and MQT, with the latter taking place in a formal training unit (FTU).

9 In some cases, basing for the larger systems, especially Gray Eagle, will be contiguous with the training areas in which they are needed; Fort Hood, Texas, is an example. But this will not always be possible. The larger systems require longer and better runways and larger and more-sophisticated beddown and support facilities. It may be more cost-effective to move these UASs to support training where they are needed, rather than establishing beddown facilities in a large number of additional locations.10 The 432nd Wing at Creech AFB operates MQ-1 Predators and MQ-9 Reapers from seven forward bases overseas. Main-tainers at forward bases serve four-month rotations in theater.11 Many more people are involved in RPA operations, including the mission intelligence commander. Also, there is a weapon school course for advanced training of RPA operations. For this research, we were primarily interested in the initial training of pilots and sensor operators.12 Some Air Force navigators who had commercial instrument qualifications have been allowed to train as pilots for the RQ-4. This avenue for sourcing RQ-4 pilots closed in spring 2011.

36 Building Toward an Unmanned Aircraft System Training Strategy

Pilotsreaper and predator

In response to the need to reach and sustain the manpower to fulfi ll Reaper and Predator requirements, the Air Force initiated a new program to produce RPA pilots.13 Currently, Reaper training takes place at Hancock Field Air National Guard Base in Syracuse, and Preda-tor training takes place at Holloman AFB. New RPA pilots have attained the foundational skills to conduct RPA missions and are qualifi ed to operate in the NAS or International Civil-ian Aviation Organization airspace. Figure 4.5 outlines the training pipeline. Figure 4.6 shows the UASs.

Global hawk

Currently, most Global Hawk pilots are traditional Air Force pilots who volunteered for a tour in the Global Hawk (see Figure 4.7), a majority of whom are qualifi ed to fl y multiengine transport aircraft. Prior to 2011, navigators who also had commercial pilot licenses and had completed commercial instrument qualifi cations were allowed to become Global Hawk pilots; however, the Air Force has not decided whether to retain navigators who are currently Global Hawk pilots in the community or return them to navigator duties. Th e third source of Global Hawk pilots is the 18X career fi eld, UAS-only pilots who have graduated from undergradu-ate remotely piloted aircraft training. After fi nishing the three preparatory courses, candidate Global Hawk pilots head to the RQ-4 FTU, the 1st Reconnaissance Squadron at Beale AFB.

13 Th e Air Force uses the term RPA to refer to unmanned aircraft systems. Th e accepted joint terminology is UAS.

Figure 4.5Air Force UAS Pilot and Sensor Operator Pipeline

RAND RR440-4.5

SUPT graduates (FYs 2009–2011)

RPA pilots

RPA sensor operators

Traditionalpilots

RPAfundamentals

course(Randolph)

Joint�repower

course(Nellis)

RPA �ightscreening(Pueblo, CO)

RPA instrumentquali�cation course

(Randolph)

Aircrewfundamentals

course(Lackland)

Basic sensor operatorcourse

(Randolph)

MQ-1/9Formal training units

(Creech/Holloman)

Aircrew cultureTrain full-motion video,

sensor basics/analysis

Pilot fundamental skills39 hours �ight time

7 weeks

Simulator only—49 hoursinstrument check ride

2.5 months

Tactical/theatre ops:weapons, threats, sensors, ATO/SPINS, comms, ISR basics110 hours academics4 labs/missions

6 weeks

SOs winged

2–6 months

RPA pilotswinged

2 weeks

2 weeks

ACC/AFSOC

OPSunits

4 weeks

Assessment of the State of UAS Training in 2012 37

Once at the FTU, pilots are trained first on simulators designed for pilots with an instructor pilot. Then, they participate in on-the-job training, flying live missions with an instructor pilot in the mission control element.

Figure 4.6Reaper (top) and Predator UASs

SOURCE: U.S. Air Force.

SOURCE: DoD.RAND RR440-4.6

38 Building Toward an Unmanned Aircraft System Training Strategy

Sensor Operatorsreaper and predator

Enlisted sensor operators for Reaper and Predator are either trained into a new career field or cross-trained from another AFSC (1U00X). After graduating from the Air Force’s basic train-ing or being reclassified, they attend a two-week course at Lackland AFB, Texas, with other aircrew AFSCs. Then they go to Randolph AFB, Texas, for a six-week basic sensor operator course. After completion, they go to the appropriate FTU for the system they will be flying.

Global hawk

Sensor operators for the Global Hawk are trained differently from those for other UASs. Sensor operators for the Global Hawk come from the intelligence imagery analyst career field (1N1XXs). They receive MQT at Beale AFB, where they learn to use the Global Hawk system. After one tour as sensor operators (approximately three years), they move on to other imagery analyst assignments; therefore, it is difficult to maintain expert sensor operators for the Global Hawk.

Maintenance

Training for those who maintain Air Force UASs takes place at three locations.14 The fun-damentals are taught at the maintenance schoolhouse at Sheppard AFB, Texas. Initial skills training and advanced skills training take place at the unit.

14 Contractors provide certain UAS maintenance, for example, depot-level maintenance.

Figure 4.7Global Hawk UAS

SOURCE: DoD.RAND RR440-4.7

Assessment of the State of UAS Training in 2012 39

Operational Training

Given the emphasis on current operations and the Air Force’s remote split operations concept for employing UASs, few opportunities exist to support ground troops either during home-station or CTC training. In general, with a few limited exceptions, Air Force UAS crews do not train in exercises or other training events in CONUS and do not support training in CONUS of Army or Marine Corps units at either their home stations or at the CTCs. Air Force UAS crews do conduct operational missions in theater, and these missions frequently are the chief or even the only way deployed Army and Marine Corps units get an opportunity to work directly with Air Force UAS crews. Thus, most elements of the UAS force in theater often have no experience working together before they have to do so in combat operations.

The result of not working with ground troops either at home station or the CTC is that ground units generally do not integrate Air Force UAS capabilities into their planning. RAND’s conversations with the training community, including trainers at the NTC, as well as what officials told the GAO, confirmed that the

effective integration of UAS in training exercises, like the integration of other types of joint air assets, depends on the priority that ground units place on developing training objectives that require the participation of joint air assets and their ability to plan for the use of these assets in the exercise. … [As a result], Army combat brigades often focus UAS training objectives during exercises on integrating their Shadow UAS and do not emphasize plan-ning for and employing Air Force UAS.15

15 Independent RAND team visits also confirmed what the Air Force told the GAO, that

unmanned aircraft are deployed to support overseas operations except for those that are supporting the initial training of UAS personnel or the testing of aircraft.” These officials [from the 432 Wing] stated that in the event that additional aircraft were made available, the wing’s personnel levels are insufficient to support additional training events because the unit does not have adequate personnel to support projected operational commitments and greater numbers of training exercises. Second, Army and Air Force officials told us that when Air Force UASs are at the training center, these aircraft are not always available to support ground unit training because a considerable portion of the UAS flight time is dedicated to accomplishing Air Force crewmember training tasks. Officials told us that the Army and Air Force have reached an informal agreement to allot about half of the time that an Air Force UAS is flying at the training center to support Army ground unit training objectives and the other half to accomplish Air Force training tasks. Air Force officials pointed out that although they try to align their crewmember training syllabi with ground unit training objectives at the National Training Center, training new personnel to operate these aircraft is their priority. Third, UASs may not be available during certain hours to support ground unit training, which during exercises goes on 24 hours a day. For example, Predator UASs from the California Air National Guard are available to support ground units only during daylight hours. To travel to the training center, these aircraft must pass through segments of national airspace that are not restricted for DOD’s use and therefore must rely on a ground-based observer or on chase aircraft to follow them to and from the training center. Because of this reliance on ground or airborne observers, flights to and from the training center must be accomplished during day-light hours and are necessarily more expensive as well.

As a result of the limited number of unmanned Air Force assets that are available to support ground unit training at the National Training Center and the Joint Readiness Training Center, Army ground units conducting training exercises have frequently relied on manned aircraft to replicate the capabilities of the Air Force’s Predator and Reaper UAS. Officials told us that the use of manned aircraft in this role permits ground units to practice the process to request and integrate the capabilities provided by Air Force UASs in joint operations. However, this practice is not optimal, as the manned aircraft do not replicate all of the capabilities of the Predator and Reaper aircraft, such as longer dwell times.

GAO, 2010a, p. 26.

40 Building Toward an Unmanned Aircraft System Training Strategy

Key Areas of Concern

We note above that, as the war in Afghanistan draws to a close, the services must pay close attention not only to the training of UAS crews and support personnel but also to routinely including these systems in combined arms training at home station and at the CTCs. This will require attention to a number of issues.

Beddown and Related Support Facilities

Discussions with officers of the 432d Wing suggest an Air Force future much like the past: flying in support of COCOM requirements worldwide. If this comes about, there will con-tinue to be limited opportunities for the Air Force to support Army or Marine Corps training at the home station or CTCs. Alternatively, if providing such training becomes a priority, the Air Force’s current basing and beddown posture will become a problem.

Airspace Considerations

The unique limitations of UASs pertaining to operations in the NAS make integration into home-station training difficult. Currently, UASs can operate only in restricted military air-space or, in the NAS, with COAs from the FAA. These COAs can often be prohibitive to participating in joint training. For example, the MQ-1 FTU from March ARB tried to par-ticipate in training with the Marines at Twentynine Palms. Unfortunately, the COA requires a manned chase plane and, given the geography, the contracted chase plane cannot fly the shortest route. The only option is to fly through the restricted airspace between Fort Irwin and Twentynine Palms, which is prohibitively long because the COA permits operations only during daylight hours. These limitations restrict where UASs can be used because an installa-tion must have access to a significant amount of restricted airspace. Other limitations include the basing expense of sprinkling UASs across the country to embed with Army or Marine units at home station.

Several different possibilities could be considered to help increase joint training opportu-nities. The Air Force could consider the location of Army hubs when choosing where to base its UAS fleet. A location that is near Army maneuver elements might make airspace access less of a restriction or at least make COAs more practical. Proximity might provide more opportunities for training UAS integration throughout the entire mission planning process.

Alternatively, the Air Force could permanently leave a small number of UASs at a train-ing location and remotely operate these from Holloman AFB, Creech AFB, or other loca-tions. These systems are designed to employ remote split operations, in which the crew operat-ing the platform need not be colocated with the platform. The various Air Force units could get flying time by cycling through these dedicated aircraft. This option would provide Air Force crews—including launch and recovery crews—practice integrating with ground forces and would simultaneously support the ground forces’ need for integrated training. This plan would also reduce the issue of airspace access because the aircraft would be located within the restricted airspace in which they would be used or at an auxiliary airfield close enough that a COA would be practical.

A promising development that enhances UAS training is the advancement of ground-based sense-and-avoid (GBSAA) and airborne sense-and-avoid (ABSAA) technologies. These may open up regions of civil airspace for properly equipped UASs to operate safely in accor-dance with the FAA’s mandate to “do no harm” without requiring FAA issuance of COAs. In particular, GBSAA has recently completed a series of successful demonstrations, and the

Assessment of the State of UAS Training in 2012 41

Army is planning to GBSAA equip a number of its UAS training bases to extend their current military airspace with adjoining civil airspace to increase UAS training capacity by 2015. The Army is the lead for the development of GBSAA, but GBSAA has been designed for the use of all the services. Each service, like the Army, would use one of its existing ground based radars in implementing GBSAA. ABSAA’s implementation uses UAS-borne sensors and electronics, including those not currently on UASs. Current development of all-weather ABSAA that could operate without FAA COAs is restricted to Global Hawk, with plans to scale down to Reaper. ABSAA availability is not known at this time but will be some years after GBSAA becomes available.

Navy

Relative to the Air Force and Army, the Navy has had limited experience with UASs. To date, Navy ships have employed the Scan Eagle, a non–program of record UAS, fielded through a rapid-acquisition program (see Chapter Two). Scan Eagles are flown from frigates. The Navy has also operated BAMS-D,16 which is scheduled to be replaced by the MQ-4C, Triton.17 The Navy is acquiring the Fire Scout (MQ-8B). While we limited most of our study effort to the period through FY 2012, the Navy’s most recent experience is the best example of the evolu-tion of UASs and their implications for operational capabilities. In early May 2013, the Navy launched an X-47B experimental drone from the nuclear powered aircraft carrier USS George H.W. Bush as it operated off the coast of Virginia (Vergakis, 2013). This launch represented the latest step in introducing a disruptive technology into the operating forces and helped mark a paradigm shift in warfare because this particular UAS is capable of autonomous flight.

The Navy’s approaches to integrating UASs and to training and developing UAS opera-tors differ significantly from those of the Army and Air Force. Generally, Navy UASs are being incorporated into existing fleet aviation units and organizations, and the personnel who will operate them are, to a large extent, the same personnel who will operate traditional aircraft assigned to these organizations. In this way, the Navy is addressing several problems often seen when disruptive technologies are introduced. The Navy approach has emphasized the comple-mentarity of the systems, rather than pitting the new technology and its proponents against the old technology and its proponents. In addition, the Navy will reduce cost by capitalizing

16 While the Air Force has conducted Global Hawk UAS operations since 2001, the Navy has just recently pursued using the system. The Navy purchased Global Hawk airframes from the Air Force and is using them to test operational concepts and technologies. The aim for the Global Hawk maritime demonstration program, BAMS-D, is to better understand mari-time surveillance with UASs that fly at high altitude. The goal is to improve the fleet’s operational understanding of the battlespace, and the Navy deployed BAMS-D in 2009. 17 The Navy’s BAMS UAS (MQ-4C), now called Triton, is a persistent maritime intelligence, surveillance, and reconnais-sance system. As a persistent airborne asset, Triton’s sensors will support increased situational awareness for naval forces. The imagery and data provided by the airframe’s sensors will be directly available within federated networks, allowing Navy, joint, allied, and coalition exploitation centers to use MQ-4C UAS data.

While the Navy is currently operating only BAMS-D (in FY 2012), it plans to purchase a total of 68 Triton MQ-4C UAS airframes from FY 2014 through FY 2026. This acquisition plan will increase deployment of BAMS to operational commanders throughout the world. The current concept of operations includes plans for the Navy to operate Triton UASs in five separate geographic locations. These operations would provide continuous maritime surveillance, with persistent ISR support 24 hours a day, seven days a week, out to ranges of 2,000 nautical miles from the deployed location. (Derived from Department of the Navy, 2010.)

42 Building Toward an Unmanned Aircraft System Training Strategy

on investments already made in personnel aviation training. For example, the Fire Scout UAS will be embedded in Navy H-60 squadrons.18 This enables taking advantage of H-60 pilots’ training and experience, because they will also pilot the Fire Scout. The flying skills of the H-60 pilot are utilized for both airframes and minimize the potentially disruptive effects of this new technology. Similarly, Triton, the follow-on to BAMS-D, is intended to complement Navy P-3/8 aircraft with its long loitering capability and sensors. The Navy plans to have P-3/8 officers both be in tactical command of the UAS and pilot the Triton UAS. These officers will first serve and qualify in the P-3/8 aircraft, rotate to a UAS training unit, then assume duties in a UAS squadron. The Triton UAS capabilities complement the capabilities of the P-8 air-craft. The training construct the Navy is pursuing will capitalize, complement, and exploit the capabilities of both aircraft and the personnel assigned to them.

Training for Operators and Support PersonnelScan Eagle

Qualification training for personnel directly associated with UAS operations is not yet well established for the Navy. Currently, contractors operate the Scan Eagle UAS. (See Figure 4.8.)

Fire Scout

The Navy will have two approaches for Fire Scout operator training—one for littoral combat ship (LCS) employment and another for SOF support. The majority of Fire Scouts will be flown from the LCS. (See Figure 4.8.)

Littoral Combat Ship employment

The aviation detachment that will deploy with the LCS will consist of one H-60R helicopter and two Fire Scouts and will have 23 assigned personnel. The training these personnel will need is similar to that for deploying with H-60 detachments on guided missile destroyers today (normally, two H-60 helicopters deploy with a guided missile destroyer). In the future, ships will deploy with a mix of H-60s, and Fire Scout and aviation detachment personnel will fly both aircraft depending on mission requirements.

The skills needed to operate and maintain the Fire Scout are complementary to those needed for the H-60. The operators and maintainers of Fire Scout will be the same as for the H-60, with some additional training on the Fire Scout. An H-60 fleet replacement squadron’s (FRS’s) Fire Scout fleet introduction team will provide this training to the AVOs and MPOs en route. The AVO course for H-60 pilots lasts five weeks. This initial and all sustainment train-ing for the Fire Scout will be conducted via simulator.

Fire Scout Support for Special Operations Forces

The Navy is establishing dedicated units to support SOF, rather than integrating Fire Scout into existing units. The first of these units, Unmanned Helicopter Reconnaissance Squadron One, will be both a training and an operational squadron. The Navy’s plan is to organize each such squadron to have nine detachments, each consisting of three Fire Scout airframes, seven to eight AVOs, eight MPOs, and 16 maintenance and support personnel. The Fire Scouts that will be flown off LCSs will be piloted by commissioned officers. The Fire Scouts supporting

18 The Fire Scout will greatly contribute to increased mission readiness and response by conducting persistent ISR opera-tions immediately around seaborne task forces, as well as over the horizon. The persistence, range, sensors, and data sharing of UASs extend the ISR reach of Navy ships and increase situational awareness.

Assessment of the State of UAS Training in 2012 43

Figure 4.8Scan Eagle (top) and Fire Scout UASs

SOURCE: DoD.

SOURCE: DoD.RAND RR440-4.8

44 Building Toward an Unmanned Aircraft System Training Strategy

SOF units will be piloted by enlisted AVOs. Initially, these AVOs will be air warfare operators who have completed tours as MPOs with an LCS Fire Scout.

Fire Scout Maintainers

The Fire Scout maintainers consist of four Navy specialties. Enlisted aviation machinist mates and aviation structural mechanics will take the mechanical course for LCS Fire Scout. Enlisted aviation electronics technicians and aviation electrician’s mates will take an electronic technical course for LCS Fire Scout. The maintenance and support skills needed for the Fire Scout are complementary skills for Navy enlisted technicians.

TritonOperator Training

The MQ-4C Triton UAS is composed of several systems: the airframe; a suite of mission pay-loads; communications systems; a mission control system (MCS) used for mission planning, control, and execution; and a support system. The Triton UAS will be deployed as an adjunct system to P-3/8 squadrons. The MCS will be based at a main operating base in CONUS, and BAMS maintenance and launch and recovery operations will take place at a forward location.

The Triton watch organization will consist of a mission commander (P-8 naval flight officer),19 one AVO (officer, P-8 pilot), and two mission payload (enlisted) air warfare operators. Training plans for the Triton watch organization are being developed, and the initial operating capability of Triton will be in FY 2016. The Navy plans to use P-3/8 pilots as tactical coordina-tors and AVOs on the Triton. Future aviators will first go through flight school, earn wings on the P-3/8 aircraft, then perform an initial operational tour on the P-3/8.20 After that, aviators will rotate to the FRS for training on Triton before reporting to their squadrons. Designated FRS for BAMS is Patrol Squadron 30 (VP-30), located at Naval Air Station Jacksonville, Flor-ida. FRS training provides initial and refresher qualification training for personnel who will be assigned to Triton units.

Maintenance personnel and the pilot who launches and recovers the airframe are located at the forward operating base. The Navy plans to rotate personnel through the forward base every several months.

A simulation training capability will be built into the MCS. Initial Navy manning plans indicate that there will be eight to ten crews per squadron. The crews will be flying real mis-sions that will sustain their proficiency. Triton UASs are flown via point and click; there is no stick and rudder. VP-30 is developing the tailored Naval Air Training and Operating Proce-dures Standardization requirements for the Triton; the final training and readiness manual for Triton is due in 2013.

Maintenance Training

The Triton airframe, engines, and associated equipment are different from the P-3/8; one is a UAS and the other a manned aircraft. Separate training will thus be necessary. When the

19 The mission control officer is a naval flight officer who is responsible for the mission planning and the overall tactical employment of the airframe. The AVO is a naval aviator, responsible for flight planning and safety of flight, and is the pilot in command of the airframe. The MPOs are enlisted air warfare operators, responsible for the operation and employment of the sensors and the detection and analysis of targets. 20 The notional pilot training track for P-3/8 pilots is (1) attend and graduate from flight school, (2) attend FRS for P-8 training, and (3) conduct an operational P-8 squadron tour.

Assessment of the State of UAS Training in 2012 45

Triton UAS is introduced into the fleet, the Chief of Naval Air Technical Training will stand up a technical school to train enlisted personnel to perform Triton maintenance.

Operational TrainingBAMS/Triton

The P-8A’s missions overlap with those of Triton. The missions the two have in common include maintaining the maritime common operational picture and the classification, identification, detection, and tracking of surface units. The P-8A, however, has missions that the Triton does not perform (e.g., antisubmarine warfare) and vice versa. However, the increased utilization and cross training of P-8A and Triton crews over time can and is expected to increase under-standing and employment of these systems in support of the warfighter.

While the Navy was operating only BAMS-D in FY 2012,21 the Navy has plans to pur-chase a total of 68 Triton MQ-4Cs UAS airframes from FY 2014 through FY 2026. This acqui-sition plan will increase deployment of Triton UAS to operational commanders throughout the world. The current concept of operations includes plans for the Navy to operate Triton UAS in five geographic locations. These operations would provide continuous maritime surveillance, with persistent ISR support 24 hours a day, seven days a week, out to ranges of 2,000 nauti-cal miles from the deployed location (Department of the Navy, 2010). The LCS does not have the Navy Continuous Training Environment (NCTE) synthetic training capability, and Fire Scouts assigned to the LCS will have no capability to train in the NCTE. Integrated training plans for Fire Scout are being developed.

Integrated Training

Triton’s MCS will be configured so that it can participate in fleet training exercises syntheti-cally via NCTE. Fleet synthetic training events for BAMS-D and Triton are being developed.

Key Areas of ConcernAirspace Considerations

Airspace planning is a critical requirement when conducting UAS operations but is less of a constraint for UASs in naval operations. The FAA controls the airspace up to the 12-mile limit from land. Navy surface ships with Scan Eagle and Fire Scout can embark the UASs, travel 12 nautical miles out to sea to a naval operating area, then conduct UAS training.

BAMS-D and Triton use special use airspace and fly at altitudes higher than commercial airlines do. They file instrument flight rules flight plans. However, BAMS-D and Triton do not incorporate sense-and-avoid technology, and conflicts can exist with visual flight rules aircraft in the airspace. Airspace issues exist at some Navy training installations as well. For example, along the North Carolina coast, the expeditionary readiness group must work with the FAA to route commercial aircraft around the established restricted operating zone units.

21 BAMS-D has participated in CSG training events in the Virginia Capes operating area, including combined training unit exercises and joint task force exercises. Navy officials emphasized that Triton is a tactical asset and will respond to the requirements of the task force.

46 Building Toward an Unmanned Aircraft System Training Strategy

The Need for Interoperability

So far, this report has emphasized that home-station training is not as effective as it should be, thus reducing the effectiveness of multiservice, or interoperability, training at CTCs and during joint exercises. The importance of interoperability training is stressed in Chairman of the Joint Chiefs of Staff Guide 3501 (2012, pp. B-2 and B-3), which notes that the

ability of systems, units, or forces to operate in synergy in the execution of assigned tasks is critical to successful operations. This ability to operate effectively together describes interoperability. From a joint training perspective, interoperability is a Service component responsibility. Interoperability training is based on joint doctrine, or where no joint doc-trine exists, on Service or [SOF] doctrine to prepare forces or staffs from more than one Service component to respond to operational and tactical requirements deemed necessary by CCDRs [combatant commanders] to execute their assigned missions. Interoperability training involves forces of two or more Service components (including SOF) with no inter-action with a CCDR or subordinate JFC [joint force commander] or joint staff.

The publication in 2011 of the MTTP for UASs was designed to address the problem of interoperability. As designed, it is

a single source, descriptive reference guide to ensure effective planning, integration, and utilization of multi-service UAS capability. It provides commanders, operational staffs, requestors, and UAS operators with a comprehensive resource for planning and employing unmanned aircraft . . . . US Air Force (USAF) uses the term [RPA] for the air vehicle com-ponent of a UAS. (MTTP, 2011, p. i)

To date, interoperability training at the NTC and the Joint Readiness Training Center has been limited.22 GAO (2005, p. 2) cited two significant challenges for improving interoperabil-ity training: (1) “establishing effective partnerships with program stakeholders through com-prehensive communication and coordination and (2) developing joint training requirements that meet combatant commanders’ needs,” with particular emphasis on tactical level training (GAO, 2005, p. 2).23 To meet this challenge, DoD established the Training Transformation Implementation Plan (Director, Readiness and Training Policy and Programs, 2006), giving the Office of the Under Secretary of Defense for Personnel and Readiness overall responsibility and giving the Deputy Under Secretary of Defense for Readiness executive agent responsibil-ity for training transformation planning, programming, budgeting, and execution progress.

22 GAO, 2005, p. 1, found that

U.S. forces are conducting significantly more complex operations, requiring increased interoperability between and among the military services, combatant commands, and other DOD and non-DOD organizations. In the past, military services experienced some joint operations training during joint exercises, but most service training focused on individual service competencies with limited joint context.

23 GAO, 2005, p. 18, noted that,

in the past, joint training tasks were primarily focused at the command level and were identified through DOD authori-tative processes that built requirements by translating command combat commanders inputs into training requirements. Training transformation has expanded joint training requirements to include those at the tactical level in addition to joint command level training.

Assessment of the State of UAS Training in 2012 47

While RAND did not assess interoperability training in detail, discussions with the Army’s training community, as noted above and as reported in GAO, 2010a, p. 26, suggest that such opportunities have been limited by the lack of Air Force assets, particularly the Pred-ator, due to pressing operational requirements in Iraq and Afghanistan. The problem of tran-siting Air Force UAVs from Creech AFB to the NTC at Fort Irwin through FAA controlled airspace is often cited. Permanently stationing Air Force UAVs at the NTC would, of course, negate that problem, much as the Marine Corps has done by basing UASs at the MCAGCC at Twentynine Palms, California, to support training there. However, the experience of the Marine Corps suggests that the mere presence of UASs will not ensure that the forces are properly trained. The forces must prepare at their home stations for such training. In addition, given the common MTTP, forces trained to operate with their own services’ UASs should find working with UASs from the other services less challenging.

Simulators

Congress has pressed for information on the role that simulators might play in a UAS training strategy, seeking an informed balance between live training and simulated training. In addi-tion, the GAO reported that the

military services lacked simulators that were capable of supporting training that is intended to build proficiency in skills required of UAS vehicle and sensor operators and prepare these personnel to conduct UAS combat missions. … [And] the Air Force and the Army have not fully developed comprehensive plans that address long-term UAS simulator requirements and associated funding needs. (GAO, 2010a, pp. 27–28)

Implicit in the GAO’s comments is an assumption that simulators should play an important role in the future of UAS training. Our review questions that conclusion.

DoD has historically viewed simulator training and joint use of training facilities as an exercise in cost reduction. It is first necessary to understand how simulation better enables the introduction of the technology and, similarly, how joint use of the disruptive technology enables more effective military operations. For the purposes of this report, we have clearly focused on these aspects of simulation and jointness, which must be understood before the more-traditional perspectives of resource allocation can be applied. Currently, the usual sig-nificant savings that the department has garnered from simulators in the past do not appear to obtain in this instance. The danger is that, if the department starts with a savings orientation, it will not fully capitalize on the capabilities UASs represent.

For traditional aircraft systems, one major appeal of using simulators, rather than live flying, is the cost differential. For example, a RAND study of the trade-off between live and simulated training for manned aircraft noted that “the Marines and British are starting to give greater recognition to use of simulators as they seek either to reduce the high costs of live train-ing or conserve the limited life of operational aircraft” (Schank et al., 2002, p. 49). In this case, the cost of flying the strike fighter aircraft they were discussing was many times greater than the cost of using a simulator, and the procurement cost of the aircraft itself was also signifi-cantly greater than that of the simulator. That said, they also noted that,

48 Building Toward an Unmanned Aircraft System Training Strategy

[t]o increase that use, several improvements must happen to integrate simulators more fully into their unit training. The fidelity and availability of simulators must increase to the point that fighter pilots see their benefit in training. This requires additional funding for simula-tors. (Schank et al., 2002, p. 49)

The report further argues that, even given the cost advantage of simulators for strike fighter aircraft training, simulators are a complement to live training, not a substitute for it.

The same point was made to us concerning UAS simulators. Officials of the 432d Wing also noted that simulators were not very good for training on landings. Moreover, a substantial investment in new simulator technology would be necessary to improve the realism of UAS simulators to the point it could prove useful for training UAS crews and ground forces. For example, GAO, 2010a, p. 28, found that currently Air Force and Army simulators did not have the ability

to replicate all UAS procedures and to enable the integration of UAS training with other types of aircraft, [e.g.,] … the Army’s Shadow Institutional Mission Simulator is not cur-rently capable of replicating system upgrades that are being fielded directly to ongoing combat operations, such as a laser target designator and communications relay equipment. … Air Force and Army simulators are also … incapable of providing virtual, integrated training opportunities between manned and unmanned aircraft because of interoperability and information security concerns.

The conditions that make a compelling case for simulators for the training of fighter pilots are largely absent when it comes to UAS training:

• First, UAS flying hours are much less expensive than flying hours for manned aircraft. By one account, the flying hour cost of Shadow was $705; a comparable figure for Gray Eagle was $4,275.24 By comparison, the Air Force told the GAO that “the live training cost of one F-15E flight hour is approximately $17,449” (Pickup, 2012, pp. 15–16). Other sources peg the flying hour costs of manned aircraft much higher.25

• Second, the kinds of operational activities that need more training emphasis, in particu-lar, air-ground coordination, are generally not activities in which simulators per se can substitute for live flying. A good example of both the limitations and the value of simula-tors can be found at the digital air-ground integration ranges the Army operates today. On these ranges, only the weapon system engagement is simulated. Everything else—planning, coordination, UAS operation, ground unit and/or manned aircraft activity, target acquisition—is live.

• Third, while simulators are inherent in the systems used for initial training of pilots and sensor operators,26 they are not well suited (and not designed) for training operating

24 Ron Moring, UAS cost per flying hours, personal communication, April 5, 2013. The cost for the Gray Eagle is similar to the costs the Air Force reported for Predator at $3,679 and Reaper at $4,762, as reported by Mark Thompson, “Costly Flight Hours,” Time, April 2, 2013.25 Recently, the Air Force comptroller’s office told Time that the flying hour cost for the F-15C was $41,921. Other aircraft had considerably higher flying hour costs; e.g., the cost of flying an F-22 for one hour was reported to be $68,362. See Thompson, 2013.26 See Shawn Johnson, DAMO-TRC Army Flying Hour Program, “UAS cost per flying hours,” personal communication, with Joan Vandervort, Office of the Office USDP&R, April 10, 2013.

Assessment of the State of UAS Training in 2012 49

forces on the full spectrum of UAS capabilities. Simulators may be useful as a supplement to live training of pilots and crews but do not replicate the myriad activities and stimuli that a live training environment provides well for maneuver forces.

• Fourth, as noted previously, simulators at best complement rather than substitute for live training. Given the current state of UAS fielding, first priority must be given to building the live-flying infrastructure. Then, and only then, might funds be used to undertake the research and development that must precede any consideration of fielding the kind of interactive UAS air-ground simulators that could train both UAS crews and ground troops.

In the future, the services should reevaluate the need for virtual training using a cost and effectiveness analysis (COEA) including developmental costs for simulators, the savings based on the costs of flying UASs, and the critical availability of air space for training. Given current budget limitations and the importance of fully developing the opportunities for live training and the relatively low cost of such training, diversion of funds to a research and development program to develop higher-fidelity UAS-ground simulators is not appropriate at this time.

Summary

This chapter presented an overview of UAS training in 2012. Our focus was on service-specific and interoperability training. The training framework presented in Chapter Three was our starting point, with an emphasis on preparing forces for joint training and deployment. We looked at ground, air, and sea forces. Insights came from a wide variety of sources but mainly through visits to selected service bases, where we talked with operators and support personnel, those who train operators and associated team members, and those who train and observe the forces who employ UASs. In general, the RAND team found that qualification training in all the services for designated UAS-specific MOSs is well established. The critical issue is being able to train with ground forces at home station. The experience of the Marine Corps illustrates the importance of such opportunities. The Marine Corps has Shadow squadrons based at the MCAGCC at Twentynine Palms, California, where the restricted airspace is adequate both for maintaining crew proficiency and for supporting ground forces. However, both the ground trainers and squadron personnel the RAND team interviewed reported that the ground forces are not adequately trained at home station to integrate UAS capabilities into their operations. This required starting with what amounted to “remedial” training at Twentynine Palms, and trainees thus did not achieve the level of proficiency desired. This suggests that the biggest challenge in developing and implementing a training strategy for UASs is gaining and main-taining proficiency on the part of end users or “supported units”—the leaders and staffs who will integrate UAS capabilities into their operations.

Thus, as the war in Afghanistan draws to a close, the services must pay close attention not only to training UAS crews and support personnel but also to routinely exercising these systems during combined arms training at home station and at the CTCs. We addressed a number of issues for this, including beddown and support facilities and airspace considerations.

We found that home station training is generally not as effective as it should be, thus reducing the potential effectiveness of multiservice or “interoperability” training at CTCs and during joint exercises. We noted that, to date, interoperability training at the CTCs has been

50 Building Toward an Unmanned Aircraft System Training Strategy

limited by the lack of Air Force assets, particularly the Predator, due to pressing operational requirements in Iraq and Afghanistan. However, given the common MTTP, forces trained to operate with their own service UASs should find working with UASs from the other services less challenging.

Finally, we considered the case for UAS simulators. Currently, such simulators do not appear to offer the significant savings that the Department has usually garnered from simula-tion in the past. We concluded that, given current budget limitations and the importance of fully developing the opportunities for live training and the relatively low cost of such training, diversion of funds to a research and development program to develop higher fidelity UAS-ground simulators would be unwise at this time.

51

ChApTer FIVe

Implications and Recommendations

The Guiding Principle: “Train As We Fight”

DoD has been under some pressure from Congress and such organizations as GAO for the lack of central control and the lack of the development of a joint DoD strategy for train-ing. For example, “DOD Lacks a Comprehensive, Results-Oriented Strategy to Resolve UAS Training Challenges,” was the summary title of a section of a recent GAO report (GAO, 2010a, p. 29). The Joint Unmanned Aircraft System Center of Excellence was established to support the joint operator and the services by facilitating the development and integration of common unmanned aircraft system operating standards, capabilities, concepts, technologies, doctrine, tactics, techniques, procedures, and training. The center, however, was disestablished in May 2011, and its UAS oversight function was reassigned to the Joint Staff Force Structure, Resources, and Assessment Directorate (J8), with some responsibilities assigned to the UAS Task Force. However, the 2011 publication of the MTTP for UASs addressed the problem of interoperability, and the services have agreed to incorporate the MTTP in their training.While the services have agreed to a common set of TTP, each service continues to develop its own UASs to meet its own requirements. Moreover, the GAO (2010a, p. 25) has well docu-mented that the opportunity for joint training is limited. While the GAO identified a number of organizations and initiatives addressing UAS training challenges, only one of the eight orga-nizations and initiatives it listed were led by the services. Given the current maturation of UAS platforms, this emphasis is misplaced; the military services employs their UASs in very differ-ent ways. Today, the services are still struggling with how to incorporate these new systems. The appropriate strategy for UAS training is to encourage each service to solve its own UAS training problems, then to coordinate the resulting TTPs by updating the MTTP to achieve a high level of interoperability.

Commanders and operators from the bottom up are discovering and adapting to the revolutionary operational changes that UASs have brought about. The most apparent changes are in the persistence and responsiveness of UASs relative to other platforms in the permissive threat environments in which they are currently operating. These characteristics help develop valuable shared situational awareness between UASs and the supported forces and also make ISR capabilities more responsive and immediately available. Processing, exploitation, and dis-semination concepts for UAS-generated information, however, are still evolving. In addition, armed UASs provide strike capabilities similar in some ways to those of CAS; the evolution of UASs from pure ISR platforms to small, lightly armed ISR platforms, to bigger, more heavily armed, faster, and even stealthier reconnaissance-strike platforms has crossed operational and cultural seams. This has lead to the need for continual resolution of disputes between intelli-

52 Building Toward an Unmanned Aircraft System Training Strategy

gence and operations staffs over priorities for UASs and their implications for mission planning and execution.

To date, the services have, in a variety of important ways, been “training while they fight.” Iraq and Afghanistan have served as de facto training ranges, as well as an active theater of war. For example, Air Force Predator and Reaper pilots and sensor operators have frequently gone straight from flight instruction and certification to flying real-world missions, learning and adapting as they support operations. Army and Marine Corps units have also learned in theater how to capitalize on the robust set of capabilities UASs provide.

The demonstrated ability of the services to learn on the fly should be cause for optimism about continued success in UAS training as operations wind down. But that continued success will depend on preserving training opportunities in an environment in which training is not an incidental by-product of operational requirements. Operational experiences, for example, typically do not suffer from the inherent limitations of CONUS training venues, such as lim-ited area, limited time, and limited fidelity. Because of such limitations, it has been harder to train as we fight in CONUS. Infrastructure and other limitations currently make it difficult or impossible to train at night or in bad weather, to train with live or dummy munitions, or to train in a communications environment that represents the environment and demands of actual operations in theater. Preservation of the current levels of proficiency, improvement where needed, and adaptation to changing circumstances will not come without effort; they will require overcoming or at least alleviating the limitations mentioned here.

Elements of a Strategic Training Plan

To train as we fight, the DoD training strategy must

• engender better appreciation of UAS capabilities throughout the chain of command• address organizational, structural, and infrastructure and support issues• enable training as we fight in collective unit training• enable training as we fight in larger exercises.

Engender Better Appreciation of UAS Capabilities

Many ground force commanders and their battle staffs today do not fully recognize the poten-tial benefits UASs bring to the fight and, as a result, are not in a position to benefit from them in circumstances that would improve units’ warfighting capabilities. This is traceable in part to limited use of UASs in home-station and CTC training but also to other inherent limita-tions, such as a shortage of experienced personnel and UAS assets and airspace and infrastruc-ture limitations. Overcoming these limitations will enable more opportunities to foster better understanding and improve integration. Training guidance should emphasize the value of UASs, using examples of how units have benefited by preparing themselves to use such systems through training and attending familiarization courses. Such vignettes can be inserted into professional education and training materials to share positive experiences working with UASs.

Implications and recommendations 53

Address Organizational, Structural, and Training Infrastructure and Support IssuesOrganization and Structure

UASs are a disruptive technology, and their introduction can create tensions between opera-tions and intelligence staffs on the right balance between using UASs to collect intelligence or launch strikes. In the Army, for example, one could ask, is Gray Eagle an ISR asset or an armed reconnaissance system? Doctrine development efforts should produce a doctrine flexible enough to allow changes in allocation and organizational balances and address the attendant training issues accordingly.

Also, in the Army, the organizational placement of UASs remains a challenge, as illus-trated by the fact that the assignment of responsibilities for the Raven is still being worked out. A more-systematic approach to monitoring and maintaining Raven operator qualifications will better enable integration of the system into maneuver forces and thus improve overall training and help develop better appreciation of the system’s capabilities and limitations. In addition, the Army is currently examining alternatives for placing Shadow platoons in the headquarters company of a brigade combat team or consolidating them in the developing full-spectrum combat aviation brigade. Resolution of these organizational issues will likewise aid in training integration.

Training Infrastructure, Training Support Issues, and Related Factors

Some of the most important ways in which shortfalls can detract from UAS training are

• incompatible or different communications capabilities• airspace restrictions• inability to train at night or in bad weather• inability to use live or dummy munitions• UAS unavailability• insufficient time.

These shortfalls cannot always be fully corrected. Some, such as differences in commu-nications capabilities, are inherent but can be alleviated to some extent. The full correction of others may be unaffordable, but partial correction should still be possible. Inability to train at night or in bad weather, for example, is to some extent a result of FAA restrictions on when Air Force UASs can fly from their bases to the NTC. Basing Air Force UASs at the NTC would significantly reduce the effect of these restrictions and might also make it possible for the UASs to use live or dummy munitions, further improving realism for both customers and operators.

Research suggests that airspace restrictions, while sometimes nettlesome, need not pose a serious obstacle to most UAS training at a unit’s home station, either for operators or end users. Nevertheless, efforts to gain more access to airspace should continue with the research and development of the joint program for GBSAA systems, led by the Army’s program man-ager for UAS. This system uses ground-based radars to provide an extra layer of airspace safety, which could enable the FAA to make the use of civil airspace adjacent to UAS training airspace less restrictive and thus expand the airspace available for UAS training. A promising initial demonstration with Gray Eagle took place in summer 2011, but GBSAA is not expected to be certified for use until 2015.

The insufficient number of UASs for training should be alleviated to some extent as some systems redeploy from overseas theaters and also by the recent decision to increase the number

54 Building Toward an Unmanned Aircraft System Training Strategy

of Predator/Reaper CAPs from 61 available today to 85 in the future. Similarly, the Operation Enduring Freedom drawdown will likely free up more RPA trainers, alleviating the shortfall.

Enable Training as We Fight in Unit Collective Training

To facilitate home station training, the following steps need to be taken:

• Training must make full use of units’ UASs and must use simulation or surrogates, despite their limitations, when live use is not possible.

• Training should include the systems of other services and their associated joint tactical air controllers (JTACs) and air liaison officers (ALOs) to the extent possible.

• Air Force preparation training of JTACs and ALOs should be available for support of unit-level training, as well as for larger exercises.

• After-action reviews and reports should be expanded to reinforce lessons learned; they can also provide a sound basis for continued measurable improvements. Over time, the reports growing out of these documents should become more detailed and should incor-porate measures of performance and effectiveness, so that these metrics can drive future improvements.

Enable Training as We Fight in Larger Exercises

By design, larger exercises like those at maneuver CTCs provide considerable opportunities for more-realistic training. They are thus already better postured to provide training on the use and integration of UAS. However, more can be done to enhance the use of training opportu-nities in such large exercises to further the goal of better UAS integration in the force. Specifi-cally, we recommend

• continued stress on training realism• including live UASs and their associated JTACs and ALOs as much as possible• including the CAS-like and ISR missions that UASs, especially Air Force UASs, will be

performing in theater• providing a small paved air strip to base RPAs, launch and recovery elements (LREs),

and support crews at the maneuver CTCs to avoid the NAS constraints associated with remote operation

• continued efforts to integrate additional Creech AFB–based UASs into CTC training, when needed.

Initiatives with Likely Near-Term Payoffs

Other things can be done that should provide near-term payoffs:

• Increase exposure to the capabilities and limitations of UAS—Continue to expose appropriate commanders to UAS operations through short (one- to two-day) familiariza-tion courses, such as those the Air Force offers at various UAS squadrons’ locations (e.g., Creech AFB, Beale AFB, and March ARB). These also need to be introduced as part of the joint training curriculum in a more formal and standardized fashion across the force. The proliferation of Air Force UAS squadrons geographically within CONUS should provide ready access for ground units whatever their home station.

Implications and recommendations 55

• harness the lessons-learned process to guide the development of service and joint doctrine and TTP—Formalize and standardize these processes as appropriate, and share best practices more extensively across services and regions. Right now, most extended learning is done “on the job,” with lessons learned shared informally among operators and trainers. Different UAS elements tend to focus support on different ground units, each with geographical and other mission differences. Best practices across these geo-graphic and mission boundaries need to be understood to inform joint doctrine and, hence, responsive training requirements.

• Address well-known but underresourced training infrastructure shortfalls— Consider this issue in light of our previous discussions of basing. UASs can be based at maneuver CTCs to minimize the impact of FAA restrictions. If this is done as a part of the drawdown and redeployment of RPA units to CONUS, this should not be too disruptive or expensive; many details remain to be worked out, but military construc-tion and other costs appear to be manageable. Communications infrastructure and C2 organizations and processes at the ranges can be enhanced to better mirror operational capabilities.

Institutionalizing Training for UAS Capabilities over the Longer Term

Institutionalizing UAS training over the longer term will naturally depend on continued sup-port for the specific programs and initiatives and others like them that we outlined earlier. Institutionalization will also require more-general efforts, falling into three broad categories: acculturation, professional development of the UAS force (operators, maintainers, and a UAS chain of command), and integration of the UAS community (a subprofession, if you will) into the aviation profession. These three are somewhat interwoven, and the third depends on the first two. Finally, institutionalization over the longer term will require adaptation: The strate-gies must be designed to be adaptive, and those who develop and implement them must be willing to adapt them.

Acculturation

The RAND team heard from many sources that many end users do not yet have a well-developed appreciation of the capabilities UASs can bring to an operation. In some cases, this lack of appreciation has derived from negative experiences. Some of these experiences resulted from inexperienced operators, some from mechanical failures, some from sheer bad luck (e.g., weather). The need to deconflict airspace and the need to do so, even when using restricted airspace reserved for military use, often led to utilization problems and contributed to negative impressions about the value of UAS. First impressions do count, and avoiding bad ones is much easier than overcoming them later.

Professional Development

All the services need to maintain professional development strategy for the UAS force. The ser-vices are developing a professional force of operators for UASs, both systems and payloads, con-sisting of enlisted soldiers, noncommissioned officers, and warrant and commissioned officers, although the Army currently has no UAS officer specialty. It is important to develop a cadre of UAS professionals with hands-on experience in all echelons of UAS operation; the Army may

56 Building Toward an Unmanned Aircraft System Training Strategy

wish to consider a career pipeline for such officers, perhaps with an additional skill identifier. Such a professional cadre is a key element in full integration of UAS capabilities.

Integration

The services are making significant efforts to integrate UASs into their force structures. Army efforts would be aided by more access during training to the operational and even strategic capabilities of Air Force UASs. These efforts will be aided by better acculturation and an insti-tutionalized UAS career field that, over time, develops professionals with a more-complete understanding of UAS capabilities and limitations and sufficient rank, technical expertise, and operational experience to enable better integration of the capabilities into the overall operations of the end users. Related issues include integration of UAS capabilities with other ISR systems and with the intelligence warfighting function more generally, the tension between those who value the strike capabilities of UASs and those who value the intelligence collection capabili-ties, and the further tensions likely to emerge as UAS capabilities widen further. As UAS capa-bilities grow and broaden, integrating them into other warfighting functions will also present challenges.

Adaptation

The training strategy must adapt to future technical innovations and changes in operational demands. To enable this adaptability, those concerned with overall training strategy develop-ment will need to remain cognizant of and to guide the following, where possible:

• evolution of the roles of UASs in the full range of military operations, and the speed and breadth of the expansion of those roles

• surfacing and resolving UAS doctrinal issues (In particular, how will the requirements of intelligence and operations be integrated and deconflicted? How will both organic and nonorganic systems be better integrated to support ground forces, and which warfighting functions will they support? How will technological advances and changes in expected operational conditions influence decisions regarding these roles and missions?)

• service adjustments of force structures and personnel management processes to accom-modate the disruptive technology effects of UASs

• influence of the above and related issues on the development, promulgation, and adapta-tion of joint and service doctrines so these doctrines can continue to form a solid basis for UAS training.

Summary of Findings and Recommendations

Our findings and recommendations are summarized as follows:

1. The proper strategy for DoD at this time is to encourage each service to solve its own UAS training problems, rather than to constrain any one service under the guise of joint operations.

2. DoD should support current and future programs to develop ranges and beddown and support facilities similar to those in the Army’s current programs.

Implications and recommendations 57

3. In spite of the demands of deploying units and sustaining combat operations in Afghan-istan, Army trainers indicate that Army units are better at maintaining qualification for Shadow qualification than for Raven. Nevertheless, not all units have been able to maintain high Shadow qualification rates—some units arrive at the NTC with one-half or fewer of their operators qualified. Better tracking of operators and their sustainment training is needed, particularly but not exclusively for Ravens.

4. If joint training becomes a priority, the Air Force’s current basing and beddown pos-ture will become more of a problem. The Air Force could consider the location of Army hubs when choosing where to base its UAS fleet. A location that is near Army maneuver elements might make airspace access less of a restriction or at least make COAs more practical. Proximity might provide more opportunities for training UAS integration throughout the entire mission planning process.

5. Given current budget limitations and the importance of fully developing the opportu-nities for live training and the relatively low cost of such training, diversion of funds to a research and development program to develop higher fidelity simulators would seem unwise at this time.

Path to the Future

We have presented and discussed a multitude of means for setting up UAS training strategies for success. These means include support for ongoing facilities and basing initiatives; expan-sion of such facilities, where possible, to enable wider availability of UASs to support collec-tive training; and efforts to increase the use of UASs—the complete UAS package, including JTACs and other coordinating elements—in collective training, both local and in larger exer-cises. We have noted the need to support continuing efforts to resolve airspace access issues, observing as we did so that there are ways to keep such restrictions from imposing serious limitations on much of the UAS training envisioned here. Similarly, we have discussed the potential for simulators to add value in training, now and perhaps more in the future. But we have also cautioned that simulators, in their current state, are not a good substitute for live use of UASs in collective training.

The path to the future for UAS strategies starts now, with support for ongoing initiatives that will continue the trends towards better training integration and thus better ability on the part of end users to employ the multiple capabilities of UASs in their operations. The path continues, using that foundation, with longer-term efforts to add to acculturation of end users, professionalization of the UAS community, and integration of the two to harmonize the capa-bilities of UASs as key elements of overall force effectiveness.

59

AppenDIx A

Current Major DoD UAS Programs in FY 2012

The following pages come directly from a Congressional Research Service report on U.S. UASs (Gertler, 2012, pp.  31–46).

60

U.S. Unmanned Aerial Systems

Congressional Research Service 31

Current Major DOD UAS Programs This section addresses the program status and funding of some of the most prominent UAS programs being pursued by DOD, and most likely to compete for congressional attention. This section does not attempt to provide a comprehensive survey of all UAS programs, nor to develop a classification system for different types of UAS (e.g., operational vs. developmental, single mission vs. multi mission, long range vs. short range). One exception is a short subsection below titled “Small UAVs.” The UAVs described in this section are distinguished from the proceeding UAVs by being man-portable and of short range and loiter time. These smaller UAVs are not currently, and are unlikely to be, weaponized. The services do not provide as detailed cost and budget documentation for these UAVs as they do for major UAS programs. Individually, these UAVs appear very popular with ground forces, yet do not necessarily demand as much congressional attention as larger UAS programs like Predator or Global Hawk. As a whole, however, these small, man-portable UAVs appear likely to increasingly compete with major UAS programs for congressional attention and funding.

Table 6. Characteristics of Selected Tactical and Theater-Level Unmanned Aircraft

System Length (ft) Wingspan

(ft) Gross

weight (lbs)

Payload capacity

(lbs) Endurance

(hours) Maximum

altitude (ft)

Predator 27 55 2,250 450 24+ 25,000

Grey Eagle 28 56 3,200 800 40 25,000

Reaper 36 66 10,500 3,750 24 50,000

Shadow 11 14 375 60 6 15,000

Fire Scout 23 28 3,150 600 6+ 20,000

Global Hawk 48 131 32,250 3,000 28 60,000

BAMS 48 131 32,250 3,200 34+ 60,000

61

U.S. Unmanned Aerial Systems

Congressional Research Service 32

Figure 5. U.S. Medium-Sized and Large Unmanned Aircraft Systems

Source: Congressional Budget Office, Policy Options for Unmanned Aircraft Systems, Publication 4083, Washington, DC, June 2011.

Notes: All aircraft are drawn to the same scale. The silhouette figure is a 6-foot-tall soldier, also drawn to scale.

62

U.S. Unmanned Aerial Systems

Congressional Research Service 33

Table 7. Acquisition Cost of Medium-Sized and Large Unmanned Aircraft Systems Under the Department of Defense’s 2012 Plan

(Millions of 2011 dollars)

2011 2012 2013 2014 2015 2016 2017 2018 2019 2020

Total, 2011-2020

Air Force

RQ-4 Global Hawk

1,200 1,060 890 790 810 710 1,160 530 80 60 7,290

MQ-1 Predator

30 10 10 10 a a a a a a 60

MQ-9 Reaper

1,700 1,550 1,740 1,440 1,350 1,150 1,060b 1,040b 1,030b 1,010b 13,070

Army

MQ-1C Grey Eagle

870 1,060 1,040 740 220 90 a a a a 4,020

RQ-7 Shadow

610 250 270 200 300 280 a a a a 1,910

Navy and Marine Corps

RQ-4 Broad Area Maritime Surveillance

530 560 760 880 900 1,010 1,230 1,260 1,130 1,130 9,390

MQ-8 Fire Scout

60 70 60 80 80 90 130 160 150 150 1,030

RQ-7 Shadow

90 10 10 10 a a a a a a 120

All services

5,090 4,570 4,780 4,150 3,660 3,330 3,580 2,990 2,390 2,350 36,890

Source: Congressional Budget Office based on data from the Department of Defense’s budget request for 2012, Selected Acquisition Reports for December 2010, and Aircraft Procurement Plan: Fiscal Years 2012-2041 (submitted with the 2012 budget, March 2011).

Notes: Acquisition cost includes the cost of procuring air vehicles, sensors, and grounds stations, plus the cost for research. development, test, and evaluation. The services’ cost data have been adjusted using CBO’s projection of inflation and rounded to the nearest $10 million.

a. The Department of Defense has no plans to acquire or modify the specified system in these years.

b. The cost is for the follow-on aircraft the Air Force plans to acquire instead of the Reaper.

MQ-1 Predator Through its high-profile use in Iraq and Afghanistan and its multi-mission capabilities, the MQ-1 Predator has become the Department of Defense’s most recognizable UAS. Developed by General Atomics Aeronautical Systems in San Diego, CA, the Predator has helped to define the modern role of UAS with its integrated surveillance payload and armament capabilities. Consequently, Predator has enjoyed accelerated development schedules as well as increased

63

U.S. Unmanned Aerial Systems

Congressional Research Service 34

procurement funding. The wide employment of the MQ-1 has also facilitated the development of other closely related UAS (described below) designed for a variety of missions.

System Characteristics. Predator is a medium-altitude, long-endurance UAS. At 27 feet long, 7 feet high and with a 48-foot wingspan, it has long, thin wings and a tail like an inverted “V.” The Predator typically operates at 10,000 to 15,000 feet to get the best imagery from its video cameras, although it has the ability to reach a maximum altitude of 25,000 feet. Each vehicle can remain on station, over 500 nautical miles away from its base, for 24 hours before returning home. The Air Force’s Predator fleet is operated by the 15th and 17th Reconnaissance Squadrons out of Creech Air Force Base, NV; the 11th Reconnaissance Squadron provides training. A second control station has been established at Whiteman AFB, MO.104 Further, “[t]here are plans to set up Predator operations at bases in Arizona, California, New York, North Dakota, and Texas.”105 The Air Force has about 175 Predators;106 the CIA reportedly owns and operates several Predators as well.

Mission and Payload. The Predator’s primary function is reconnaissance and target acquisition of potential ground targets. To accomplish this mission, the Predator is outfitted with a 450-lb surveillance payload, which includes two electro-optical (E-O) cameras and one infrared (IR) camera for use at night. These cameras are housed in a ball-shaped turret that can be easily seen underneath the vehicle’s nose. The Predator is also equipped with a Multi-Spectral Targeting System (MTS) sensor ball which adds a laser designator to the E-O/IR payload that allows the Predator to track moving targets. Additionally, the Predator’s payload includes a synthetic aperture radar (SAR), which enables the UAS to “see” through inclement weather. The Predator’s satellite communications provide for beyond line-of-sight operations. In 2001, as a secondary function, the Predator was outfitted with the ability to carry two Hellfire missiles. Previously, the Predator identified a target and relayed the coordinates to a manned aircraft, which then engaged the target. The addition of this anti-tank ordnance enables the UAS to launch a precision attack on a time sensitive target with a minimized “sensor-to-shoot” time cycle. Consequently, the Air Force changed the Predator’s military designation from RQ-1B (reconnaissance unmanned) to the MQ-1 (multi-mission unmanned).107 The air vehicle launches and lands like a regular aircraft, but is controlled by a pilot on the ground using a joystick.

MQ-1C Grey Eagle A slightly larger, longer-endurance version of the Predator, the Army’s MQ-1C Grey Eagle entered low-rate initial production on March 29, 2010.108 The Grey Eagle can remain aloft for 36 hours, 12 hours longer than its Air Force sibling.

An Army platoon operates four aircraft with electro-optical/infrared and/or laser rangefinder/designator payloads, communications relay equipment, and up to four Hellfire

104 Phillip O'Connor, “Drones seeking terrorists guided from Missouri air base,” St. Louis Post-Dispatch, May 10, 2011. 105 P.W. Singer, Wired for War (New York: The Penguin Press, 2009), p. 33. 106 Congressional Budget Office, Policy Options for Unmanned Aircraft Systems, Pub. No. 4083, June 2011, p. 5. 107 Glenn W. Goodman, Jr., “UAVs Come of Age,” The ISR Journal, July 2002, p. 24. 108 Department of Defense, Selected Acquisition Report (SAR), MQ-1C UAS Gray (sic) Eagle, DD-A&T(Q&A)823-420, Washington, DC, December 31, 2010.

64

U.S. Unmanned Aerial Systems

Congressional Research Service 35

missiles. Each platoon includes two ground control stations, two ground data terminals, one satellite communication ground data terminal, one portable ground control station, one portable ground data terminal, an automated takeoff and landing system, two tactical automatic landing systems, and ground support equipment. In total, the program will be 124 aircraft, plus 21 attrition aircraft and 7 schoolhouse aircraft, for a total of 152 aircraft. The average procurement unit cost of a Grey Eagle system is $114.1 million.109

MQ-9 Reaper The MQ-9 Reaper, formerly the “Predator B,” is General Atomics’ follow-on to the MQ-1. The Reaper is a medium- to high-altitude, long-endurance Predator optimized for surveillance, target acquisition, and armed engagement. While the Reaper borrows from the overall design of the Predator, the Reaper is 13 feet longer and carries a 16-foot-longer wingspan. It also features a 900 hp turboprop engine, which is significantly more powerful than the Predator’s 115 hp engine. These upgrades allow the Reaper to reach a maximum altitude of 50,000 feet, a maximum speed of 225 knots, a maximum endurance of 32 hours, and a maximum range of 2,000 nautical miles.110 However, the feature that most differentiates Reaper from its predecessor is its ordnance capacity. While the Predator is outfitted to carry 2 100-pound Hellfire missiles, the Reaper now can carry as many as 16 Hellfires, equivalent to the Army’s Apache helicopter, or a mix of 500-pound weapons and Small Diameter Bombs.

As of February 4, 2011, General Atomics Aeronautical Systems had delivered 65 of 399 planned Reapers, 43 of which are operationally active.111

The MQ-9 is operated by the 17th Reconnaissance Squadron and the 42nd Attack Squadron, both at Creech Air Force Base, NV, and the 29th Attack Squadron at Holloman AFB, NM.112

Program Status. Predator–family UAS are operated as part of a system, which consists of four air vehicles, a ground control station, and a primary satellite link. The unit cost in FY2009 for one Predator system was approximately $20 million,113 while the average procurement unit cost for a Reaper system was $26.8 million.114

109 Ibid. 110 OSD, UAS Roadmap 2005-2030, August 2005, p. 10. 111 Department of Defense, Selected Acquisition Report (SAR), MQ-9 UAS Reaper, DD-A&T(Q&A)823-424, Washington, DC, December 31, 2010. 112 U.S. Air Force, Fact Sheet: MQ-9 Reaper, August 18, 2010. 113 U.S. Air Force, Fact Sheet: MQ-1 Predator, July 20, 2010. 114 Department of Defense, Selected Acquisition Report (SAR), MQ-9 UAS Reaper, DD-A&T(Q&A)823-424, Washington, DC, December 31, 2010.

65

U.S. Unmanned Aerial Systems

Congressional Research Service 36

Table 8. Predator and Reaper Combined Funding ($ in Millions)

Procurement RDT&E

FY11

Request 62 air vehicles 1600.0

Mods 31.8

Appropriations Conference

12 air vehicles 176.6 83.2

Mods 31.8

FY12

Request 9 air vehicles 125.5 61

Mods 30.2

RQ-4 Global Hawk Northrop Grumman’s RQ-4 Global Hawk has gained distinction as the largest and most expensive UAS currently in operation for the Department of Defense. Global Hawk incorporates a diverse surveillance payload with performance capabilities that rival or exceed most manned spy planes. However, Pentagon officials and Members of Congress have become increasingly concerned with the program’s burgeoning cost, which resulted in Nunn-McCurdy breaches in April 2005 and April 2011.115 Also, the RQ-4B Block 30 was deemed “not operationally suitable” due to “low air vehicle reliability” by the office of Operational Test and Evaluation in May 2011.116

System Characteristics. At 44 feet long and weighing 26,750 lbs, Global Hawk is about as large as a medium sized corporate jet. Global Hawk flies at nearly twice the altitude of commercial airliners and can stay aloft at 65,000 feet for as long as 35 hours. It can fly to a target area 5,400 nautical miles away, loiter at 60,000 feet while monitoring an area the size of the state of Illinois for 24 hours, and then return. Global Hawk was originally designed to be an autonomous drone capable of taking off, flying, and landing on pre-programmed inputs to the UAV’s flight computer. Air Force operators have found, however, that the UAS requires frequent intervention by remote operators.117 The RQ-4B resembles the RQ-4A, yet features a significantly larger airframe. In designing the B-model, Northrop Grumman increased the Global Hawk’s length from 44 feet to 48 feet and its wingspan from 116 feet to 132 feet. The expanded size enables the RQ-4B to carry an extra 1000 pounds of surveillance payload.

115 Amy Butler, "USAF Declares Second Major Global Hawk Cost Breach," Aerospace Daily, April 13, 2011. The 2005 breach stemmed from costs in transitioning from the Block 10 Global Hawk to the larger Block 30; the 2011 breach was attributed primarily to reduced procurement quantities rather than issues with the program. 116 J. Michael Gilmore, RQ-4B Global Hawk Block 30 , OSD Director, Operational Test and Evaluation, Operational Test and Evaluation Report, May 2011. John T. Bennett, “Pentagon testers slam aerial spy drone as unfit for operations,” The Hill, June 7, 2011. 117 Jeff Morrison, “USAF No Longer Viewing Global Hawk As An Autonomous System, Official Says,” Aerospace Daily, December 3rd, 2005.

66

U.S. Unmanned Aerial Systems

Congressional Research Service 37

Mission and Payload. The Global Hawk UAS has been called “the theater commander’s around-the-clock, low-hanging (surveillance) satellite.”118 The UAS provides a long-dwell presence over the battlespace, giving military commanders a persistent source of high-quality imagery that has proven valuable in surveillance and interdiction operations. The RQ-4A’s current imagery payload consists of a 2,000-lb integrated suite of sensors much larger than those found on the Predator. These sensors include an all-weather SAR with Moving Target Indicator (MTI) capability, an E-O digital camera and an IR sensor. As the result of a January 2002 Air Force requirements summit, Northrop Grumman expanded its payload to make it a multi-intelligence air vehicle. The subsequent incarnation, the RQ-4B, is outfitted with an open-system architecture that enables the vehicle to carry multiple payloads, such as signals intelligence (SIGINT) and electronic intelligence (ELINT) sensors. Furthermore, the classified Multi-Platform Radar Technology Insertion Program (MP-RTIP) payload will be added in order to increase radar capabilities. These new sensor packages will enable operators to eavesdrop on radio transmissions or to identify enemy radar from extremely high altitudes. Future plans include adding hyper-spectral sensors for increased imagery precision and incorporating laser communications to expand information transfer capabilities.119 The end goal is to field a UAS that will work with space-based sensors to create a “staring net” that will prevent enemies from establishing a tactical surprise.120 In August 2003, the Federal Aviation Administration granted the Global Hawk authorization to fly in U.S. civilian airspace, which further expanded the system’s mission potential.121 This distinction, in combination with the diverse surveillance capabilities, has led many officials outside the Pentagon to consider the Global Hawk an attractive candidate for anti-drug smuggling and Coast Guard operations.122

Program Status. Developed by Northrop Grumman Corporation of Palmdale, CA, Global Hawk entered low-rate initial production in February 2002. The Air Force has stated that it intends to acquire 51 Global Hawks, at an expected cost of $6.6 billion for development and procurement costs. As of November 2009, the Air Force possessed 7 RQ-4As and 3 RQ-4Bs.123 Another 32 Global Hawks had been authorized and appropriated through FY2011.124 According to the most recent Selected Acquisition Report, the current average procurement unit cost for the Global Hawk has reached $140.9 million in current dollars.125

In April 2005, the Air Force reported to Congress that the program had overrun by 18% as a result of an “increasing aircraft capacity to accommodate requirements for a more sophisticated, integrated imagery and signals intelligence senor suite.”126 A Government Accountability Office report in December 2004 noted that the program had increased by nearly $900 million since 2001 and recommended delaying the purchase of future Global Hawks until an appropriate

118 Glenn W. Goodman, Jr., “UAVs Come Of Age,” The ISR Journal, July 2002. 119 David A. Fulghum, “Global Hawk Shows Off Updated Package of Sensors,” Aviation Week & Space Technology, September 08, 2003. 120 Ibid. 121 Sue Baker, “FAA Authorizes Global Hawk Flights,” Aeronautical Systems Center Public Affairs, August 21, 2003. 122 Ron Laurenzo, “Global Hawk Scouts Ahead for Other UAVs,” Defense Week, September 2, 2003. 123 U.S. Air Force, Fact Sheet: RQ-4 Global Hawk, November 19, 2009. 124 Department of Defense, Department of Defense Fiscal Year 2012 Budget Estimates, Aircraft Procurement, Air Force, February 2011. 125 OSD, Selected Acquisition Report, December 31, 2010, p. 29. 126 James R. Asker, “Global Hawk 18% Over Budget,” Aviation Week & Space Technology, April 25, 2005.

67

U.S. Unmanned Aerial Systems

Congressional Research Service 38

development strategy could be implemented.127 The rising costs of the UAV and accusations of Air Force mismanagement have caused concern among many in Congress and in the Pentagon as well as facilitating an overall debate on the Air Force’s development strategy.128

Following a 2010 Defense Acquisition Board review of the Global Hawk program,

Air Force acquisition executive David Van Buren told reporters that he is “not happy” with the pace of the program, both on the government and the contractor side. Chief Pentagon arms buyer Ashton Carter also criticized the program, saying that it was “on a path to being unaffordable.”129

In April 2011, a reduction in the number of Global Hawk Block 40 aircraft requested in the FY2012 budget from 22 to 11 caused overall Global Hawk unit prices to increase by 11%, again triggering Nunn-McCurdy.130

In its markup of the FY2011 defense authorization bill, the House Armed Services Committee expressed concern “that differing, evolving service unique requirements, coupled with Global Hawk UAS vanishing vendor issues, are resulting in a divergence in each service’s basic goal of maximum system commonality and interoperability, particularly with regard to the communications systems.” The bill report directs the Under Secretary of Defense for Acquisition, Technology, and Logistics to certify and provide written notification to the congressional defense committees by March 31, 2011, that he has reviewed the communications requirements and acquisition strategies for both Global Hawk and BAMS. The subcommittee wants assurance that the requirements for each service’s communications systems have been validated and that the acquisition strategy for each system “achieves the greatest possible commonality and represents the most cost effective option” for each program.131

A May 20, 2011, report from the Air Force Operational Test and Evaluation Center found the Global Hawk Block 20/30 to be “effective with significant limitations ... not suitable and partially mission capable.” The report cited “lackluster performance of the EISS imagery collector and ASIP sigint collectors at range” rather than issues with the Global Hawk airframe itself.132

127 United States Government Accountability Office, GAO-05-6 Unmanned Aerial Vehicles[:] Changes in Global Hawk’s Acquisition Strategy Are Needed to Reduce Program Risks, November 2004, p. 3-4. 128 See H.Rept. 109-89. House Armed Service Committee “National Defense Authorization Act for the Fiscal Year 2006.” May 20, 2005, p. 91. 129 Marina Malenic, “Air Force, Navy Pledge Greater Global Hawk-BAMS Cooperation,” Defense Daily, July 2, 2010. 130 The Nunn-McCurdy provision requires DOD to notify Congress when cost growth on a major acquisition program reaches 15%. If the cost growth hits 25%, Nunn-McCurdy requires DOD to justify continuing the program based on three main criteria: its importance to U.S. national security; the lack of a viable alternative; and evidence that the problems that led to the cost growth are under control. For more information, see CRS Report R41293, The Nunn-McCurdy Act: Background, Analysis, and Issues for Congress , by Moshe Schwartz. 131 U.S. Congress, House Committee on Armed Services, National Defense Authorization Act for Fiscal Year 2011, Report to accompany H.R. 5136, 111th Cong., May 21, 2010, H.Rept. 111-491, p. 178. 132 Amy Butler, “Poor Testing Results Latest Hurdle for Global Hawk,” Aviation Week/Ares blog, June 3, 2011.

68

U.S. Unmanned Aerial Systems

Congressional Research Service 39

Table 9. Global Hawk Funding ($ in Millions)

Quantity Procurement RDT&E Advance

Procurement

FY11

Request 4 649.6 251.3 90.2

Authorization Conferencea

N/A N/A N/A N/A

Appropriations Conference

4 503.0 220.3 72.3

FY12

Request 3 323.9 71.5

a. As passed, H.R. 6523, the Ike Skelton National Defense Authorization Act For Fiscal Year 2011, did not include program-level detail, so no amounts were specified for these program elements.

BAMS The Navy’s Broad Area Maritime Surveillance system is based on the Global Hawk Block 20 airframe but with significantly different sensors from its Air Force kin. This, coupled with a smaller fleet size, results in a higher unit cost. “The air service’s drone costs $27.6 million per copy, compared to an expected $55 million per BAMS UAV, including its sensors and communications suite…. At 68 aircraft, the BAMS fleet will be the world’s largest purchase of long-endurance marinized UAVs.”133

System Characteristics and Mission. “BAMS ... provides persistent maritime intelligence, surveillance, and reconnaissance data collection and dissemination capability to the Maritime Patrol and Reconnaissance Force. The MQ-4C BAMS UAS is a multi-mission system to support strike, signals intelligence, and communications relay as an adjunct to the MMA/P-3 community to enhance manpower, training and maintenance efficiencies worldwide.”134

“The RQ-4 ... features sensors designed to provide near worldwide coverage through a network of five orbits inside and outside continental United States, with sufficient air vehicles to remain airborne for 24 hours a day, 7 days a week, out to ranges of 2000 nautical miles. Onboard sensors will provide detection, classification, tracking and identification of maritime targets and include maritime radar, electro-optical/infra-red and Electronic Support Measures systems. Additionally, the RQ-4 will have a communications relay capability designed to link dispersed forces in the theater of operations and serve as a node in the Navy’s FORCEnet strategy.”135

133 Gayle S. Putrich, “Northrop selected to build BAMS drone,” Navy Times, April 22, 2008. 134 Northrop Grumman, “MQ-4C BAMS UAS,” press release, http://www.as.northropgrumman.com/products/bams/index.html. 135 Department of Defense, Department of Defense Fiscal Year 2012 Budget Estimates, Research, Development, Test & Evaluation, Navy, Budget Activity 7, February 2011.

69

U.S. Unmanned Aerial Systems

Congressional Research Service 40

“The drones ... will collect information on enemies, do battle-damage assessments, conduct port surveillance and provide support to Navy forces at sea. Each aircraft is expected to serve for 20 years.”136

Program Status. The Administration’s FY2012 budget request documents place Milestone C for BAMS in the third quarter of FY2013, with initial operational capability in the first quarter of 2016. “Since Milestone B for the Navy BAMS UAS program, identifying opportunities for the RQ-4-based BAMS and Global-Hawk programs has been a significant interest item for the UAS TF and has been well documented within the Department.”137 In one effort to integrate development, on June 12, 2010, the Navy and Air Force concluded a Memorandum of Agreement (MOA) regarding their Global Hawk and BAMS programs, which use a common airframe. “Shared basing, maintenance, command and control, training, logistics and data exploitation are areas that could be ripe for efficiencies, says Lt. Gen David Deptula, Air Force deputy chief of staff for intelligence, surveillance and reconnaissance…. Also, a single pilot and maintenance training program is being established at Beale AFB, Calif., for both fleets.”138 However, issues still exist over common control stations and whether one service’s pilots should be able to operate the other service’s aircraft.

MQ-8B Fire Scout Now in deployment, the Fire Scout was initially designed as the Navy’s choice for an unmanned helicopter capable of reconnaissance, situational awareness, and precise targeting.139 Although the Navy canceled production of the Fire Scout in 2001, Northrop Grumman’s vertical take-off UAV was rejuvenated by the Army in 2003, when the Army designated the Fire Scout as the interim Class IV UAV for the future combat system. The Army’s interest spurred renewed Navy funding for the MQ-8, making the Fire Scout DOD’s first joint UAS helicopter.

System Characteristics and Mission. Northrop Grumman based the design of the Fire Scout on a commercial helicopter. The RQ-8B model added a four-blade rotor to reduce the aircraft’s acoustic signature.140 With a basic 127-pound payload, the Fire Scout can stay aloft for up to 9.5 hours; with the full-capacity sensor payload, endurance diminishes to roughly 6 hours. Fire Scout possesses autonomous flight capabilities. The surveillance payload consists of a laser designator and range finder, an IR camera and a multi-color EO camera, which when adjusted with specific filters could provide mine-detection capabilities.141 Fire Scout also currently possesses line-of-sight communication data links. Initial tests of an armed Fire Scout were conducted in 2005, and the Navy expects to add “either Raytheon’s Griffin or BAE’s Advanced Precision Kill Weapon System” small missiles to currently deployed Fire Scouts soon.142 Discussions of future missions 136 Gayle S. Putrich, “Northrop selected to build BAMS drone,” Navy Times, April 22, 2008. 137 Under Secretary of Defense (Acquisition, Technology and Logistics), Department of Defense Report to Congress on Addressing Challenges for Unmanned Aircraft Systems, September 2010. 138 Amy Butler, “U.S. Navy/Air Force UAV Agreement Raises Questions,” Aerospace Daily, July 6, 2010. 139 “RQ-8A Fire Scout, Vertical Take Off and Landing Tactical Unmanned Aerial Vehicle (VTUAV),” GlobalSecurity.org, http://www.globalsecurity.org/intell/systems/vtuav.htm, April 26th, 2004. 140 David A. Fulghum, “Army Adopts Northrop Grumman’s Helicopter UAV,” Aviation Week & Space Technology, October 20th, 2003. 141 Northrop Grumman Corp. Press Release, “Northrop Grumman’s Next-Generation Fire Scout UAV on Track,” June 23rd, 2005. 142 Joshua Stewart, “Navy plans to arm Fire Scout UAV with missiles,” Navy Times, August 18, 2011.

70

U.S. Unmanned Aerial Systems

Congressional Research Service 41

have also covered border patrol, search and rescue operations, medical resupply, and submarine spotting operations.

Program Status. Six production MQ-8 air vehicles have been delivered to date.143 The Pentagon’s 2009 UAS Roadmap estimates a future inventory of 131 RQ-8Bs for the Navy to support the Littoral Combat Ship class of surface vessels.144 The Army had intended to use the Fire Scout as the interim brigade-level UAV for its Future Combat System program,145 but canceled its participation in January, 2010.146

A Fire Scout attracted media attention in August 2010, when it flew through Washington, DC, airspace after losing its control link. “A half-hour later, Navy spokesmen said, operators re-established control and the drone landed safely.”147

FIRE-X/MQ-8C

The FIRE-X project, recently designated MQ-8C but continuing the Fire Scout name, is a developmental effort to adapt the Fire Scout software and navigation systems to a full-size standard helicopter. The Navy “is to award Northrop Grumman a contract to supply 28 MQ-8C Fire Scout ... to be fielded by the first quarter of 2014 to meet an urgent operational requirement.”148

Fire Scout can fly for 8 hours with a maximum range of 618 nautical miles? Well, Fire-X will fly for 15, with a max range of 1227. Fire Scout tops out at 100 knots? Fire-X can speed by at 140. Fire-X will carry a load of 3200 lbs. to Fire Scout’s 1242. All this talk from a drone helicopter that just took its first flight in December.... Fire-X isn’t going to be a big departure from Fire Scout, though. The BRITE STAR II and other radars will remain on board, as will its software for relaying information to a ship.149

RQ-170 Sentinel Although publicly acknowledged to exist, most information about the Lockheed Martin RQ-170 Sentinel is classified. First photographed in the skies over Afghanistan, but also reportedly in operation from South Korea,150 the RQ-170 is a tailless “flying wing” stealthier than other current

143 Department of the Navy, Fiscal Year (FY) 2012 Budget Estimates, MQ-8 UAV, February 2011. 144 Northrop Grumman Corp. Press Release, “Northrop Grumman’s Next-Generation Fire Scout UAV on Track,” June 23rd, 2005. FY2009–2034 Unmanned Systems Integrated Roadmap, p. 66. 145 The Army intended to field four different classes of UAVs as part of its Future Combat System (FCS): Class I for platoons, Class II for companies, Class III for battalions, and Class IV for brigades. See CRS Report RL32888, Army Future Combat System (FCS) “Spin-Outs” and Ground Combat Vehicle (GCV): Background and Issues for Congress, by Andrew Feickert and Nathan J. Lucas, for more information. 146 April M. Havens, “U.S. Army wants to cancel Fire Scouts (sic) program,” The Mississippi Press, January 15, 2010, As presented on http://www.gulflive.com. 147 Elisabeth Bumiller, “Navy Drone Violated Washington Airspace,” The New York Times, August 26, 2010. 148 Graham Warwick, “U.S. Navy Goes Ahead With Bell 407-Based Fire Scout UAV,” Aerospace Daily, September 8, 2011. 149 Spencer Ackerman, “Navy Upgrades Its Spying, Drug-Sniffing Robot Copter,” Wired.com/Danger Room blog, April 11, 2011. 150 Bill Sweetman, “Beast Sighted In Korea,” Aviation Week/Ares blog, February 16, 2010.

71

U.S. Unmanned Aerial Systems

Congressional Research Service 42

U.S. UAS. An RQ-170 was reported to have performed surveillance and data relay related to the operation against Osama bin Laden’s compound on May 1, 2011. The government of Iran claimed on December 2, 2011, to be in possession of an intact RQ-170 following its incursion into Iranian airspace.

System Characteristics. Built by Lockheed Martin, the RQ-170 has a wingspan of about 65 feet and is powered by a single jet engine. It appears to have two sensor bays (or satellite dish enclosures) on the upper wing surface. Although an inherently low-observable blended wing/fuselage design like the B-2, the RQ-170’s conventional inlet, exhaust, and landing gear doors suggest a design not fully optimized for stealth.151

Potential Mission and Payload. “The RQ-170 will directly support combatant commander needs for intelligence, surveillance and reconnaissance to locate targets.”152

Program Status. “The RQ-170 is a low observable unmanned aircraft system (UAS) being developed, tested and fielded by the Air Force.”153 No further official status is available.

Other Current UAS Programs

RQ-5A Hunter/MQ-5B Hunter II Originally co-developed by Israel Aircraft Industries and TRW (now owned by Northrop Grumman) for a joint U.S. Army/Navy/Marine Corps short-range UAS, the Hunter system found a home as one of the Army’s principal unmanned platforms. The service has deployed the RQ-5A for tactical ISR in support of numerous ground operations around the world. At one time, the Army planned to acquire 52 Hunter integrated systems of eight air vehicles apiece, but the Hunter program experienced some turbulence. The Army canceled full-rate production of the RQ-5A in 1996, but continued to use the seven systems already produced. It acquired 18 MQ-5B Hunter IIs through low-rate initial production in FY2004 and FY2005. The MQ-5B’s design includes longer endurance and the capability to be outfitted with anti-tank munitions. Both variants are currently operated by the 224th Military Intelligence Battalion out of Fort Stewart, GA; by the 15th Military Intelligence Battalion out of Ft. Hood, TX; and by 1st Military Intelligence Battalion out of Hohenfels, Germany.

System Characteristics. The RQ-5A can fly at altitudes up to 15,000 feet, reach speeds of 106 knots, and spend up to 12 hours in the air. Weighing 1,600 pounds, it has an operating radius of 144 nautical miles. The MQ-5B includes an elongated wingspan of 34.3 feet up from 29.2 feet of the RQ-5A and a more powerful engine, which allows the Hunter II to stay airborne for three extra hours and to reach altitudes of 18,000 feet.154 The Hunter system consists of eight aircraft, ground control systems and support devices, and launch/recovery equipment. In FY2004, the final year of Hunter procurement, a Hunter system cost $26.5 million.

151 U.S. Air Force, Fact Sheet: RQ-170 Sentinel, December 2, 2010. and CRS analysis of available RQ-170 photography. 152 U.S. Air Force, Fact Sheet: RQ-170 Sentinel, December 2, 2010. 153 Ibid. 154 OSD, UAS Roadmap 2005-2030, August 2005, p. 7

72

U.S. Unmanned Aerial Systems

Congressional Research Service 43

Mission and Payload. The Army has mostly used the Hunter system for short- and medium-range surveillance and reconnaissance. More recently, however, the Army expanded the Hunter’s missions, including weaponization for tactical reconnaissance/strike operations with the GBU-44/B Viper Strike precision guided munition, which can designate targets either from the munition’s laser, from another aerial platform, or from a ground system. This weapon makes the Hunter the Army’s first armed UAS. “Also, in 2004, the Department of Homeland Security, Customs and Border Protection Bureau, and Office of Air and Marine utilized Hunter under a trial program for border patrol duties. During this program, the Hunter flew 329 flight hours, resulting in 556 detections.”155

Program Status. The Army halted Hunter production in 2005. As of May 2011, 45 Hunter UAVs were still in operation and periodically receiving upgrades and modifications. In August 2005, the Army awarded General Atomics’ Warrior UAS (which later became Grey Eagle) the contract for the Extended Range-Multi Purpose UAS program over the Hunter II.156

RQ-7 Shadow The RQ-7 Shadow found a home when the Army, after a two-decade search for a suitable system, selected AAI’s close range surveillance platform for its tactical unmanned aerial vehicle (TUAV) program. Originally, the Army, in conjunction with the Navy explored several different UAVs for the TUAV program, including the now-cancelled RQ-6 Outrider system. However, in 1997, after the Navy pursued other alternatives, the Army opted for the low-cost, simple design of the RQ-7 Shadow 200. Having reached full production capacity and an IOC in 2002, the Shadow has become the primary airborne ISR tool of numerous Army units around the world and is expected to remain in service through the decade.

The Administration’s FY2011 budget request did not include funding for Shadow aircraft, although it did include continued RDT&E funding for Shadow.157

System Characteristics. Built by AAI Corporation (now owned by Textron), the Shadow is 11 feet long with a wingspan of 13 feet. It has a range of 68 nautical miles, a distance picked to match typical Army brigade operations, and average flight duration of five hours. Although the Shadow can reach a maximum altitude of 14,000 feet, its optimum level is 8,000 feet. The Shadow is catapulted from a rail-launcher, and recovered with the aid of arresting gear. The UAS also possesses automatic takeoff and landing capabilities. The upgraded version, the RQ-7B Shadow, features a 16-inch greater wingspan and larger fuel capacity, allowing for an extra two hours of flight endurance.

Mission and Payload. The Shadow provides real-time reconnaissance, surveillance, and target acquisition information to the Army at the brigade level. A potential mission for the Shadow is the perilous job of medical resupply. The Army is considering expanding the UAS’s traditional missions to include a medical role, where several crucial items such as blood, vaccines, and fluid

155 Kari Hawkins, “Pioneer platform soars to battlefield success,” www.army.mil, May 19, 2011. 156 Jefferson Morris, “Army More Than Doubles Expected Order for ERMP with General Atomics Win,” Aerospace Daily & Defense Report, August 10th, 2005. 157 Todd Harrison, Analysis of the FY 2011 Defense Budget (Washington, DC: Center for Strategic & Budgetary Assessments, 2010), p. 38.

73

U.S. Unmanned Aerial Systems

Congressional Research Service 44

infusion systems could be delivered to troops via parachute.158 For surveillance purposes, the Shadow’s 60-pound payload consists of an E-O/IR sensor turret, which produces day or night video and can relay data to a ground station in real-time via a line-of-sight data link. As part of the Army’s Future Combat System plans, the Shadow will be outfitted with the Tactical Common Data Link currently in development to network the UAS with battalion commanders, ground units, and other air vehicles.159 The Marine Corps is considering how to arm Shadow.160

Program Status. The Army and Marine Corps currently maintain an inventory of 364 Shadow UAVs.161 The program cost for a Shadow UAV system—which includes four vehicles, ground control equipment, launch and recovery devices, remote video terminals, and High Mobility Multipurpose Wheeled Vehicles for transportation—reached $11.1 million in current year dollars for FY2008.162 The Army procured 102 systems through 2009.163 In FY2012, the Army requested $25 million for 20 Shadow aircraft to replace combat losses, and approximately $200 million for payload upgrades.

“Small UAVs”

RQ-14 Dragon Eye

AeroVironment’s Dragon Eye is a backpack-carried, battery-operated UAV employed by the Marines at the company level and below for reconnaissance, surveillance, and target acquisition. Dragon Eye features a 3.8-foot rectangular wing, twin propellers, and two camera ports each capable of supporting day-light electro-optical cameras, low-light TV cameras, and infrared cameras. The compact and lightweight design of the UAV allows an operational endurance of 45 minutes and can travel as far as 2.5 nautical miles from the operator. Low-rate-initial-production of 40 aircraft began in 2001. After a 2003 operational assessment, the Marine Corps awarded AeroVironment a contract to deliver approximately 300 systems of full-rate-production Dragon Eyes.164 However, that contract was later revised to acquire Raven UAS instead. One Dragon Eye system consists of three air vehicles and one ground station. The final Marine Corps procurement budget request in FY2006 anticipated the current unit cost per Dragon Eye system as $154,000.165

FQM-151 Pointer

Although procurement of this early UAS began in 1990, the electric-powered Pointer has seen service in Operation Enduring Freedom (OEF) and Operation Iraqi Freedom (OIF). Pointer is a 158 Erin Q. Winograd, “Army Eyes Shadow UAVs Potential For Medical Resupply Missions,” InsideDefense.com, December 20, 2002, p.14. 159 “Upgraded Shadow UAV Rolls Off Production Line,” Defense Today, August 5, 2004. 160 Paul McCleary, “Marines Want a Big Bang From a Small Package,” Aviation Week/Ares blog, October 26, 2010. 161 OSD, UAS Roadmap 2005-2030, August 2005, p. 8. 162 Department of the Army, Army Procurement OPA 02: Communications and Electronics FY2009, February 2008, TUAS (B00301), Item No. 61, p. 18 of 23. 163 Department of the Army, Committee Staff Procurement Backup Book, Fiscal Year 2012 Budget Estimate, Aircraft Procurement, Army, RQ-7 UAV MODS, Washington, DC, February 2011, p. 1 of 10. 164 Peter La Franchi, “Directory: Unmanned Air Vehicles,” Flight International, June 21st, 2005, p. 56. 165 Department of the Navy, FY2006-FY2007 Budget Estimate - Marine Corps Procurement, February 2005, BLI No. 474700, Item 44, p. 20 of 22.

74

U.S. Unmanned Aerial Systems

Congressional Research Service 45

short-range reconnaissance and battlefield surveillance UAV developed by AeroVironment. Its flight endurance (two hours) is greater than most similar small UAVs, in part due to its relatively large, 9-foot wingspan. That wingspan decreases portability of the 8.5-pound Pointer, and as a result, transportation of a Pointer system (two air vehicles and a ground control unit) requires two personnel. Although superseded by the Raven (below), Pointer remains a valued short-range ISR asset for the Air Force and Special Operations Command.

RQ-11 Raven

Engineered from the basic design of the Pointer, the Raven is two-thirds the size and weight of its predecessor, with a much smaller control station, making the system man-portable.166 “The RQ-11A is essentially a down-sized FQM-151 Pointer, but thanks to improved technology can carry the same navigation system, control equipment, and payload.”167 The Raven provides Army and SOCOM personnel with “over-the-hill” reconnaissance, sniper spotting, and surveillance scouting of intended convoy routes. The electric motor initiates flight once hand-launched by a running start from the ground operator. The vehicle is powered by an electric battery that needs to be recharged after 90 minutes, but deployed soldiers are equipped with four auxiliary batteries that can be easily charged using the 28 volt DC outlet in a Humvee. The vehicle lands via a controlled crash in which the camera separates from the body, which is composed of Kevlar plating for extra protection. Like the Pointer, the Raven can carry either an IR or an E-O camera and transmits real-time images to its ground operators. The relatively simple system allows soldiers to be trained in-theater in a matter of days. Raven systems can either be deployed in three-aircraft or two-aircraft configurations. “Raven was adopted as the US Army’s standardised short range UAV system in 2004 with a total of 2469 air vehicles (including older RQ-11A series models) in operational service by mid 2007.”168 “The US Army has an ongoing acquisition objective for about 2,200 Raven systems and has taken delivery of more than 1,300 to date.”169 A three-aircraft system costs approximately $167,000.170

ScanEagle

Developed by the Insitu Group (owned by Boeing) as a “launch-and-forget” UAV, the ScanEagle autonomously flies to points of interest selected by a ground operator.171 The ScanEagle has gained notice for its long endurance capabilities and relative low cost. The gasoline-powered UAV features narrow 10 foot wings that allow the 40-pound vehicle to reach altitudes as high as 19,000 feet, distances of more than 60 nautical miles, and a flight endurance of almost 20 hours. Using an inertially stabilized camera turret carrying both electro-optical and infrared sensors, ScanEagle currently provides Marine Corps units in Iraq with force-protection ISR and is also used by Special Operations Command. ScanEagle operations began in 2004,172 and continue

166 Peter La Franchi, “Directory: Unmanned Air Vehicles,” Flight International, June 21st, 2005, p. 57. 167 Andreas Parsch, “AeroVironment RQ-11 Raven,” Directory of U.S. Military Rockets and Missiles, September 12, 2006. 168 “UAV Directory - Aircraft Specification AeroVironment - RQ-11A Raven,” FlightGlobal.com, (2011). 169 “UAV Directory - Aircraft Specification AeroVironment - RQ-11B Raven,” FlightGlobal.com, (2011). 170 The FY2012 budget request includes $70.8 million for 424 systems and supporting equipment. Department of Defense, Department of Defense Fiscal Year 2012 Budget Estimates, Aircraft Procurement, Army, February 2011. 171 Jim Garamone, “ScanEagle Proves Worth in Fallujah Fight,” American Forces Press Service, January 11th, 2005. 172 Insitu, “Backgrounder: ScanEagle® Unmanned Aircraft System,” press release, September 22, 2011, (continued...)

75

U.S. Unmanned Aerial Systems

Congressional Research Service 46

today. Although ScanEagle was expected to cost about $100,000 per copy, the Navy and SOCOM have contracted for operations instead of procurement, with Boeing providing ISR services utilizing ScanEagle under a fee-for-service arrangement.173

ScanEagle is also in use by non-military organizations for surveillance purposes, including tracking whale migrations.174

Small Tactical Unmanned Aerial System (STUAS)

In July 2010, the Department of the Navy awarded Insitu a two-year, $43.7 million contract for the design, development, integration, and test of the Small Tactical Unmanned Aircraft System (STUAS) for use by the Navy and Marine Corps to provide persistent maritime and land-based tactical reconnaissance, surveillance, and target acquisition (RSTA) data collection and dissemination. “For the USMC, STUAS will provide the Marine Expeditionary Force and subordinate commands (divisions and regiments) a dedicated ISR system capable of delivering intelligence products directly to the tactical commander in real time. For the Navy, STUAS will provide persistent RSTA support for tactical maneuver decisions and unit-level force defense/force protection for Navy ships, Marine Corps land forces, and Navy Special Warfare Units.”175

Payloads include day/night video cameras, an infrared marker, and a laser range finder, among others. STUAS can be launched and recovered from an unimproved expeditionary/urban environment, as well as from the deck of Navy ships.176

STUAS uses Insitu’s Integrator airframe, which uses common launch, control, and recovery equipment with ScanEagle. STUAS has a takeoff weight of up to 125 pounds with a range of 50 nautical miles. However, STUAS will be procured and operated by the services rather than operated on a fee-for-service basis because “the Scan Eagle’s current fee-for-service contract limits the way the UAS is deployed ... with Boeing/Insitu employees usually operating the aircraft in the field due to liability issues.” Procuring the system will allow the services to train their own operators. Initial operating capability is expected in the fourth quarter of FY2013.177

(...continued) http://www.boeing.com/bds/mediakit/2011/ausa/pdf/bkgd_scaneagle.pdf. 173 See, inter alia, Boeing, “Boeing Awarded Navy Contract for ScanEagle Services,” press release, June 6, 2008, http://www.boeing.com/news/releases/2008/q2/080606a_nr.html and Insitu, “Boeing Wins $250M Special Ops Contract for ScanEagle ISR Services,” press release, May 22, 2009, http://www.insitu.com/print.cfm?cid=3774. 174 Boeing, “ From saving soldiers to saving whales,” undated press release, http://www.boeing.com.au/ViewContent.do?id=61784&aContent=ScanEagle. 175 Naval Air Systems Command, Aircraft and Weapons: Small Tactical Unmanned Aircraft System, http://www.navair.navy.mil/index.cfm?fuseaction=home.display&key=4043B5FA-7056-4A3A-B038-C60B21641288. 176 Ibid. 177 Gayle Putrich, “Insitu wins long-awaited US Navy STUAS deal,” FlightGlobal.com, July 30, 2010.

77

AppenDIx B

The Department of Defense’s Traditional Acquisition System

Overview

The DAS is a structured and deliberate process for establishing requirements and planning and resourcing the procurement of new capabilities. The need for accountability and oversight in the allocation of national resources has led to the buildup over decades of a large bureaucratic apparatus around the DAS. The complexity of the process can be seen in Figure B.1.

This bureaucracy has many virtues. It provides for a structured process governed by regu-lations and accountable authorities and includes provisions for relatively stable funding over system life cycles. Such provisions are far from perfect. For example, observers have long noted that the process can be slow and unresponsive to the immediate needs of warfighters. Such concerns have led, as will be discussed below, to evolving roles for the combatant commanders in resource allocation processes. Another concern is that provision of training and sustainment considerations, while formally required, is an afterthought to the acquisition and fielding of new equipment. Both concerns will be discussed below.

Role of Combatant Commanders in Traditional Acquisition

To meet current warfighter needs, the DoD has in recent years advanced changes to some existing acquisition processes and relationships. As a result, the roles of the COCOMs in the traditional system have evolved. For example, the Secretary of Defense approved a “stream-lined and refocused” integrated priority list process to better support the development of ser-vice program objective memorandums (Hicks et al., 2008, p. 59). In November 2005, the Vice Chairman of the Joint Chiefs of Staff launched a process by which the Joint Requirements Oversight Council, in consultation with the COCOMs, identified a list of “most pressing” military issues to support resourcing and planning decisions (Hicks et al., 2008, p. 59). In 2006 the Senior Warfighters Forum, consisting of COCOM deputies, began meeting every four to six weeks to discuss coordination issues, and the Vice Chairman of the Joint Chiefs of Staff began coordinating regular trips to the COCOMs with critical PPBE decision points to better represent the COCOM position in resourcing decisions (Hicks et al., 2008, p. 60). Fur-thermore, SOCOM’s traditional acquisition activities have increased, and its budget has grown significantly (GAO, 2007b, p. 1).

The COCOMS do not lead the process, but their ability to participate in acquisition, particularly in identifying requirements, has expanded. An emphasis on warfighting in recent years has given new weight to the capabilities and solutions that the COCOMs identify as

78 Bu

ildin

g To

ward

an U

nm

ann

ed A

ircraft System Train

ing

Strategy

Figure B.1Defense Acquisition System

SOURCE: Defense Acquisition University, June 2010.RAND RR440-B.1

4

A

Integrated System Design

System Capability & Manufacturing Process Demonstration Low-Rate Initial Production

DefenseAcquisition

System(event-driven)

Planning,Programming,

Budgeting& Execution

Process

MilitaryDepartments andDefense Agencies

FinancialManagement

Integrated Defense Acquisition, Technology, and Logistics Life Cycle Management System

Full-Rate Production/Deployment

Engineering & Manufacturing Development Phase Operations & Support Phase

DoD DecisionSupport SystemsEffective Interaction

is Essential

Life Cycle Sustainment

Decisions

Actual CostsEngineering

Cost EstimationMethods

ParametricAnalogy

Technology Development PhaseMateriel Solution Analysis Phase

WhiteHouse

Office of theSecretary of Defense

and Joint Staff

PMO Budget Estimate

PMO POM Input

Oversight&

Review

ExitCriteria

ExitCriteria

ADMExit

CriteriaMet Exit

Criteria

ADMExit

Criteria

ADM

MBI Apportionment

Contracting

Production & Deployment Phase

B C

Purpose of LRIP:•Complete manufacturing development•Establish initial production base•Ramp to production rate•Produce systems for IOT&E

Low-Rate Initial Production

Systems

FCA

Prototypes

Version 5.4 15 June 2010

StudyContracts

Complete Analysis of Alternatives to assess potential materiel solutions to capability need, identify key technologies and estimate life cycle costs.

Consider commercial-off-the-shelf and solutions from both large andsmall business. Identify materiel solution to capability need.

Complete Technology Development Strategy.

Reduce technology risk, determine and mature appropriate set of technologies to integrate into full system, demonstrate critical technology elements on prototypes, and complete preliminary design. Identify an

affordable program or increment of militarily useful capability, demonstrate technology in relevant environment, and identify and assess manufacturing risks. Provide for two or more competing teams

producing prototypes of system and/or key system elements prior to or through Milestone B.

Develop a system or increment of capability; complete full system integration, develop affordable and executable manufacturing process; ensure operational supportability; reduce logistics footprint; implement human systems integration; design for producibility; ensure

affordability; protect critical program information; and demonstrate system integration, interoperability, safety, and utility.

Achieve operational capability that satisfies mission needs. Low-rate initial production (limited deployment for software intensive systems with no development hardware) and full-rate production (full deployment for software intensive systems). Deliver

fully funded quantity of systems and supporting material and services for program or increment to users.

Execute support program that meets materiel readiness and operational support performance requirements and

sustains system in most cost-effective manner. Overlaps Production and Deployment Phase.

July

August - November November December

January February (1st Monday)

Disposal

SystemPerformance

Spec

ProductionRepresentative

Articles

CARD – Cost Analysis Requirements DescriptionCCE – Component Cost EstimateCCP – Component Cost PositionICE – Independent Cost EstimateMDAP – Major Defense Acquisition ProgramMAIS – Major Automated Information SystemPMO – Program Management OfficeRDT&E – Research, Development, Test & Evaluation

Cost Acronyms

FYDP – Future Years Defense ProgramMBI – Major Budget IssuesOMB – Office of Management and Budget

PMO – Program Management OfficePOM – Program Objectives Memorandum

Planning, Programming, Budgeting, and Execution Acronyms

JointCapabilities Integration & Development

System(need-driven)

AoAupdated as necessary

Full-RateProduction

Systems

MajorProducts

Operations andMaintenance

Types ofFunds RDT&E – Management & Support RDT&E – Management & SupportRDT&E – Management & Support

RDT&E – Advanced Component Development and Prototypes RDT&E – Systems Development & Demonstration

FinalProductBaseline

RDT&E – Advanced Technology Development

FOT&E

TechnicalSystems EngineeringTest and EvaluationSupportability

Analyze/Assess Concepts Versus

Defined User Needs &Environmental Constraints

Decompose Concept Functional Definition into Component Concepts &Assessment Objectives

Develop Component Concepts, i.e., Enabling/Critical

Technologies, Constraints, & Cost/Risk Drivers

Design/Develop System Concepts,i.e., Enabling/Critical Technologies,

Update Constraints, & Cost/Risk Drivers

•ICD•AoA Study Plan•Exit Criteria•Alternative Maintenance & Sustainment Concepts

OUTPUTS

Trades Trades

Implement andField

• Process Change - Operations/Maintenance Support• Materiel Change- Hardware/Product Support Package

INPUTS•Service Use Data•User Feedback •Failure Reports•Discrepancy Reports•SEP•System Safety Analysis•Product Support Element

Requirements

OUTPUTSIntegrated DT&E/OT&E/LFT&E

Demonstrate System toSpecified User Needs andEnvironmental Constraints

•ICD & Draft CDD•Approved Materiel Solution•Exit Criteria •Support & Maintenance Concepts& Technologies•Systems Engineering Plan•AoA Report •T&E Strategy•Technology Development Strategy•System Safety Analysis

Analyze DeficienciesTo Determine Corrective

Actions

OUTPUTS

Modify Configuration(Hardware/Software/Specs)

To Correct Deficiencies

LeastAcceptable

MostAcceptable

Recycle/Reuse

Reprocessing

DisposalLandfill

Disposal

Logistics/Sustainment

•Test Results •Exit Criteria•APB •CPD •SEP •TEMP•Product Support Element

Requirements•PESHE•System Safety Analysis

INPUTS

Evaluate ProductSupport Capabilities

Performance-Based Agreements

Product Support Integrator/Product Support Provider

LFTEReport to Congress

BLRIPReport to Congress

Post-CDR AFRPDRB

Demonstrate Product Support Capability•Footprint Reduction •Supply Chain Management•Product Support Elements•Finalize Product Support BCA

Verify and ValidateProduction

Configuration

•Preliminary System Spec•Systems Engineering Plan•T&E Strategy•System Safety Analysis•Support & Maintenance Concepts& Technologies•Inputs to:

-draft CDD -AoA -TDS -IBR-Cost/Manpower Est.-Product Support Strategy

ASR

•System Allocated Baseline•PDR Report •Test Reports•SEP •TEMP •PESHE •PPP •TRA•NEPA Compliance Schedule•Risk Assessment •LCSP•Validated Systems Support & MaintObjectives & Requirements•System Safety Analysis•Inputs to: -CDD -ISP -STA -IBR

-Acq Strategy-Affordability Assessment-Cost/Manpower Est.

SVR PRR

•Initial Product Baseline•Test Reports•SEP •TRA •PESHE •TEMP•NEPA Compliance Schedule•Elements of Product Support •Risk Assessment•Life Cycle Sustainment Plan•System Safety Analysis•Inputs to: -CPD -STA -ISP

-IBR -Cost/Manpower Est.

•Data for In-Service Review•Input to CDD for next increment•Modifications/upgrades to fielded

systems•SEP •Test Reports•System Safety Analysis•Product Support Package

•Product Baseline•Test Reports•SEP •PESHE •TEMP •System Safety Analysis •Inputs to: -IBR

- Cost/Manpower Est.- Product Support Package

JITC Joint Interoperability Test Certification

PCA

Develop Initial Product Support StrategyInitiate Product Support BCA

(Define Ground Rules & Assumptions)

Performance-Based Logistics (PBL) Strategy (Preferred Product Support Approach)

Refine Supportability

Objectives/Constraints

Pre-IOC and Post IOC Supportability Assessments

Post-DeploymentReview

In-ServiceReview

Fabricate, Assemble,Code to “Build-to”

Documentation

TLCSMTLCSM TLCSMTotal Life

Cycle SystemsManagement

INPUTSINPUTSINPUTS OUTPUTS OUTPUTS

(annual-calendar-driven)

Congressional Budget Process

AppropriationCommittees

AuthorizationCommittees

Authorization/AppropriationActs Passed

Joint Operations ConceptsConcept of Operations

Operations Plans

Strategic Guidance

Initiate Evolutionary Acquisition Strategy Evolutionary Acquisition Strategy

MDA

DoD Testimony DoD Appeals

C

DAB/ITAB MDA

ExitCriteria

ADM

OMB

Joint Operations ConceptsConcept of Operations

Technology Development StrategyAoA Report

DoD Enterprise Architecture &Solution Architecture

Technical Standards Profile

Threshold/objective tradeoffs –Revised Performance Attributes

Appropriated Funds To Support Contracts

Business CaseAnalysis

Component/JROCValidation &

ApprovalKPPs

CDDDraftCDD

KPPs

CPD

ExitCriteria

MS BCert

Cost-TypeContract

Determination(if applicable)

ADM

FRP

B C

FRP

ExitCriteria

MetAPBPSR

Monitor & CollectService Use & Supply

Chain Performance Data

Analyze Data to:Validate Failures &

Determine Root Causes

DetermineSystem Risk/

Hazard Severity

DevelopCorrective

Action

Integrate and TestCorrective Action

Assess Risk of Improved System

Interpret User Needs,Analyze Operational

Capabilities &Environmental Constraints

VerificationLinkage

ValidationLinkage

VerificationLinkage

VerificationLinkage

VerificationLinkage

ValidationLinkage

VerificationLinkage

VerificationLinkage

VerificationLinkage

Verification/ValidationLinkage

VerificationLinkage

VerificationLinkage

ITR

Verification/ValidationLinkage

MS ACert

ADM

AoA

Fiscal Guidance

InitialProductBaseline

(verified)

Non-materiel solutions

JROC/Component

Validation andApproval

DCR

AoA Study Guidance

AoA Study Plan

Define Supportability

Objectives

ExitCriteria

MetAPB

MTA

FMECAFTA

LORA

RCM

MSB

Threshold/objective tradeoffs –Revised Performance Attributes

MSC

MSA

Joint Capabilities Integration& Development System

VCJCS OversightCJCSI 3170.01 series

DefenseAcquisition

SystemUSD(AT&L) Oversight

DoDD 5000.01

Planning,Programming,

Budgeting & ExecutionProcess

DEPSECDEF OversightDoD 7000.14-R

Threshold/objective tradeoffs –Revised Performance Attributes

Prototypes

Product Support Plan•Statutory/Regulatory•Source of Support•Legacy Considerations•Conduct Product Support BCA

-Supply Support -Training-Maintenance -Support Data

-Manpower & personnel

•Product Support ElementsSet Product Support

Strategy

Technical & Logistics AcronymsASR – Alternative Systems ReviewAOTR – Assessment of Operational Test ReadinessBCA – Business Case AnalysisBLRIP – Beyond Low Rate Initial ProductionCDR – Critical Design ReviewCI – Configuration ItemDT&E – Developmental Test & EvaluationEOA – Early Operational AssessmentESOH – Environment, Safety & Occupational HealthFCA – Functional Configuration AuditFMECA – Failure Mode Effects & Criticality AnalysisFOT&E – Follow-On Test & EvaluationFTA – Failure Tree AnalysisIOT&E – Initial Operational Test & EvaluationISR – In-Service ReviewISP – Information Support PlanITR – Initial Technical ReviewJITC – Joint Interoperability Test CommandLFT&E – Live Fire Test & EvaluationLORA – Level of Repair AnalysisMTA – Maintenance Task AnalysisNEPA – National Environmental Policy Act

OA – Operational AssessmentOTRR – Operational Test Readiness ReviewPBA – Performance-Based AgreementPESHE – Programmatic Environment,

Safety & Occupational Health EvaluationPDR – Preliminary Design ReviewPCA – Physical Configuration AuditPRR – Production Readiness ReviewPPP – Program Protection PlanPSI – Product Support IntegratorPSP – Product Support ProviderRCM – Reliability Centered MaintenanceRMS – Reliability, Maintainability & SupportabilitySEP – Systems Engineering PlanSFR – System Functional ReviewSRR – System Requirements ReviewSTA – System Threat AssessmentSVR – System Verification ReviewTEMP – Test & Evaluation Master PlanTDS – Technology Development StrategyTRA – Technology Readiness AssessmentTRR – Test Readiness Review

LFT&EWaiver

(if appropriate)

Final RFP cannot be released until TDS is approved

(with alternate LFT&E Plan)

Post-CDR Report

A

P-CDRA Increment 3

Increment 2P-CDRA

Procurement

Capabilities-BasedAssessment

Final RFP cannot be released until Acq Strategy is approved

Final RFP cannot be released until Acq Strategy is approved

Final RFP cannot be released until Acq Strategy is approved

AoAupdated asnecessary AoAMAIS

only

Following the Materiel Development Decision, the Milestone Decision Authority may authorize entry into the acquisition process at any point, consistent with phase-specific entrance criteria and statutory requirements

Joint Capabilities Integration and Development System - AcronymsCDD – Capability Development DocumentCPD – Capability Production DocumentDCR – DOTMLPF Change RecommendationDOTMLPF – Doctrine, Organization, Training, Materiel,

Leadership and Education, Personnel, & FacilitiesFOC – Full Operational CapabilityICD – Initial Capabilities Document

IOC – Initial Operational CapabilityIT – Information TechnologyJP 3-0 – Joint Publication 3-0, “Joint Operations”JROC – Joint Requirements Oversight CouncilMUA – Military Utility AssessmentKPP – Key Performance ParameterKSA – Key System Attribute

Decompose FunctionalDefinitions into CriticalComponent Definition &

Technologies Verification PlanCDR

•Sys Performance Spec•Acquisition Strategy•Exit Criteria•APB •CDD •STA •ISP •SEP •TEMP •PESHE •PPP •NEPA Compliance Schedule•Risk Assessment•Validated Sys Support & MaintObjectives & Requirements•Product Support Strategy•System Safety Analysis

Validated and approved CDD & CPD for each increment of

evolutionary acquisition

AMDD

ADM – Acquisition Decision MemorandumAoA – Analysis of AlternativesAPB – Acquisition Program BaselineCDR – Critical Design ReviewCBRN – Chemical, Biological, Radiological & NuclearDAB – Defense Acquisition BoardECP – Engineering Change ProposalESOH – Environment, Safety, and Occupational HealthEVM – Earned Value ManagementFRPDR – Full Rate Production Decision ReviewFDDR – Full Deployment Decision ReviewIBR – Integrated Baseline ReviewITAB – Information Technology Acquisition BoardLRIP – Low Rate Initial Production

MAIS – Major Automated Information SystemMDA – Milestone Decision AuthorityMDD – Materiel Development DecisionNSS – National Security SystemsPDR – Preliminary Design ReviewP-CDRA – Post Critical Design Review AssessmentP-PDRA – Post PDR AssessmentPSR – Program Support ReviewRAM-C – Reliability, Availability, Maintainability & Cost

Rationale ReportRFP – Request for ProposalsRFI – Request for InformationTRA – Technology Readiness AssessmentTLCSM – Total Life Cycle Systems Management

Oversight & Review and Contracting Acronyms

Selectively AppliedSystemTraining

KPP

EnergyEfficiency

KPPJoint Staff Review

J-1 – Joint manpower. J-2 – Intelligence/threat. J-3 – Operational suitability, sufficiency, &

supportability. J-4 – Facilities, sustainment, & energy efficiency. J-5 – Alignment with strategy & priorities.

J-6 – IT/NSS interoperability & supportability.J-7 – Systems training. J-8 – Weapons safety.

System Threat AssessmentForce

ProtectionKPP

SurvivabilityKPP

Selectively AppliedSystemTraining

KPP

EnergyEfficiency

KPPJoint Staff Review

J-1 – Joint manpower. J-2 – Intelligence/threat. J-3 – Operational suitability, sufficiency, &

supportability. J-4 – Facilities, sustainment, & energy efficiency. J-5 – Alignment with strategy & priorities.

J-6 – IT/NSS interoperability & supportability.J-7 – Systems training. J-8 – Weapons safety.

Joint Staff ReviewJ-1 – Joint manpower. J-2 – Intelligence/threat.

J-3 – Operational suitability, sufficiency, & supportability. J-4 – Facilities, sustainment, & energy efficiency. J-5 – Alignment with strategy & priorities.

J-6 – IT/NSS interoperability & supportability.J-7 – Systems training. J-8 – Weapons safety.

KPPsTraceable To ICD &

JP 3-0

System Threat AssessmentForce

ProtectionKPP

SurvivabilityKPP

System Threat AssessmentForce

ProtectionKPP

SurvivabilityKPP

Selectively AppliedSystemTraining

KPP

EnergyEfficiency

KPP

ADMPost-

PDR A

Required if PDR is after Milestone B

ExitCriteria

MetPSR

Demo & Validate System& Tech Maturity Versus Defined User Needs &

Environmental Constraints

(If program initiation, or if equiv to FDDR)

Clinger-Cohen Act (IT incl NSS)- Compliance- CIO Confirmation of Compliance

Post-CDR ADecision Points/Milestones MDD FRP

DR IOC FOC

SRR

This chart is a classroom aid for Defense Acquisition University students. It provides a notional illustration of interfaces among three major decision support systems used to develop, produce and field a weapon system for national defense. Defense acquisition is a complex process with many more activities than shown here and many concurrent activities that cannot be displayed on a two-dimensional chart. Supporting information is on back of this chart. For more information, see the Defense Acquisition Portal (http://dap.dau.mil).

PSRTRA Exit

CriteriaMet

APBPSR

TRA

PDR Report

Clinger-Cohen Act (IT incl NSS)- Compliance- CIO Confirmation of Compliance

Clinger-Cohen Act (IT incl NSS)- Compliance- CIO Confirmation of Compliance

Clinger-Cohen Act (IT incl NSS)- Compliance- CIO Confirmation of Compliance

Component/JROCValidation &

Approval

Component/JROCValidation &

Approval

FDDRFor software intensive systems

DAB/ITAB MDA DAB/

ITAB MDA DAB/ITAB MDA DAB/

ITAB MDA

Compliant Solution

Architectures

SupportabilityRequirements

InformationAssurance

Net Centric Data & Services

Strategy

TechnicalStandards & interfacesNet-Ready

KPP

Compliant Solution

Architectures

SupportabilityRequirements

InformationAssurance

Net Centric Data & Services

Strategy

TechnicalStandards & interfacesNet-Ready

KPP

Compliant Solution

Architectures

SupportabilityRequirements

InformationAssurance

Net Centric Data & Services

Strategy

TechnicalStandards & interfacesNet-Ready

KPP

AlternativeMateriel

Solutions

InitialProductBaseline

InformationSupport

Plan

MUA/Final Demo Report for

Joint Capability Technology Demonstrations & other

prototype projects

InformationSupport

Plan

MUA/Final Demo Report for

Joint Capability Technology Demonstrations & other

prototype projects

InformationSupport

Plan

MUA/Final Demo Report for

Joint Capability Technology Demonstrations & other

prototype projects

KPPsTraceable To ICD &

JP 3-0

KPPsTraceable To ICD &

JP 3-0

Materiel Availability &Operational Availability

ReliabilityKSA

OwnershipCostKSA

AvailabilityKPP

Materiel Availability &Operational Availability

ReliabilityKSA

OwnershipCostKSA

AvailabilityKPP

Materiel Availability &Operational Availability

ReliabilityKSA

OwnershipCostKSA

AvailabilityKPP

ICD

Joint Operations ConceptsConcept of Operations

System Threat AssessmentAoA (if updated)

DoD Enterprise Architecture &Solution Architecture

Information Support PlanTechnical Standards Profile

Joint Operations ConceptsConcept of Operations

System Threat AssessmentAoA (if updated)

DoD Enterprise Architecture &Solution Architecture

Information Support PlanTechnical Standards Profile

CCE CCPMDAP

CARDMDAP/MAIS

ICEMDAP

CCEMDAP

CCP AffordabilityAssessment CARD

MDAP/MAIS

ICEMDAP

CCE CCPCARDMDAP/MAIS

CARDMDAP/MAIS

ICEMDAP

CCE CCP AffordabilityAssessment

Economic Analysis (MAIS)Manpower Estimate (MDAP) Manpower Estimate (MDAP)

Lighter blocks reflect technical efforts required if PDR is

required after Milestone B.

TD PhaseFully Funded

Full FundingIn FYDP Full Funding

In FYDPFull FundingIn FYDP

Acquisition Strategy• Acquisition Approach• Source & Related Documents• Capability Needs• Top-Level Integrated Schedule• Program Interdependency &

Interoperability Summary• International Cooperation• Risk & Risk Management• Technology Maturation• Industrial Capability &

Manufacturing Readiness• Business Strategy

• Resource Management• Program Security Considerations• Test & Evaluation• Data Management • Life-Cycle Sustainment Planning• Life-Cycle Signature Support Plan• CBRN Survivability• Human Systems Integration• ESOH• Military Equipment Valuation &

Accountability• Corrosion Prevention & Control

March

Fiscal GuidanceApril

POM/Budget Formulation

SECDEF Option

Assess/AnalyzeConcept & Verify System Concept’s

Performance

Develop Concept Performance (& Constraints)

Definition & VerificationObjectives

Decompose ConceptPerformance into

Functional Definition &Verification Objectives

Assess/AnalyzeSystem Concept

Versus FunctionalCapabilities

Assess/AnalyzeEnabling/Critical

Components VersusCapabilities

Interpret User Needs.Analyze Operational

Capabilities & Environmental Constraints

Develop System Performance(& Constraints) Spec &

Enabling/Critical Tech &Prototypes Verification Plan

Demo System & PrototypeFunctionalityVersus Plan

Develop FunctionalDefinitions for Enabling/

Critical Tech/Prototypes &Associated Verification Plan

Demo Enabling/Critical Technology Components

Versus Plan

Demo/ModelIntegrated System Versus

Performance Spec

Interpret User Needs, Refine System

Performance Specs &Environmental Constraints

Interpret User Needs, Refine System

Performance Specs &Environmental Constraints

Evolve FunctionalPerformance Specs into

System Allocated Baseline

PDR

Develop System Functional Specs & Verification Plan toEvolve System Functional

Baseline

Evolve FunctionalPerformance Specs into

System Allocated Baseline

SFR

PDR

System DT&E, OT&E, LFT&E& OAs Verify System

Functionality & ConstraintsCompliance to Specs

Integrated DT&E, LFT&E & EOAs Verify Performance

Compliance to Specs

Individual CIVerification

DT&E

TRR

SFR

Develop System Functional Specs & Verification Plan toEvolve System Functional

Baseline

Contract Management ECPs/ChangesContractCloseout

Acq Plan

Draft RFP

RFP &Proposals

Source Selection

PlanSource

Selection

Draft RFP

RFP &Proposals

Source Selection

PlanSource

Selection

• Acquisition Approach• Source & Related Documents• Capability Needs• Top-Level Integrated Schedule• Program Interdependency &

Interoperability Summary• International Cooperation• Risk & Risk Management• Technology Maturation &

Competitive Prototyping• Industrial Capability &

Manufacturing Capabilities

• Business Strategy• Resource Management• Program Security

Considerations• Test Planning• Data Management &

Technical Data Rights• Life-Cycle Sustainment

Planning• Life-Cycle Signature

Support Plan• CBRN Survivability

Technology Development Strategy (TDS) Acquisition Strategy• Acquisition Approach• Source & Related Documents• Capability Needs• Top-Level Integrated Schedule• Program Interdependency &

Interoperability Summary• International Cooperation• Risk & Risk Management• Technology Maturation• Industrial Capability &

Manufacturing Readiness• Business Strategy

• Resource Management• Program Security Considerations• Test & Evaluation• Data Management • Life-Cycle Sustainment Planning• Life-Cycle Signature Support Plan• CBRN Survivability• Human Systems Integration• ESOH• Military Equipment Valuation &

Accountability• Corrosion Prevention & Control

Acquisition Strategy• Acquisition Approach• Source & Related Documents• Capability Needs• Top-Level Integrated Schedule• Program Interdependency &

Interoperability Summary• International Cooperation• Risk & Risk Management• Technology Maturation• Industrial Capability &

Manufacturing Readiness• Business Strategy

• Resource Management• Program Security

Considerations• Test & Evaluation• Data Management • Life-Cycle Sustainment Planning• Life-Cycle Signature Support

Plan• CBRN Survivability• Human Systems Integration• ESOH• Corrosion Prevention & Control

EVMSurveillance

TechnologyDevelopment

ContractIBR

Draft RFP

RFP &Proposals

Source Selection

PlanSource

Selection

MaterielSolution

PDR Report

POM/Budget Submit

Draft RFPAcq Plan

RFP &Proposals

Source Selection

PlanSource

Selection

Contract Management ECPs/ChangesContractCloseout

EVMSurveillance

Engineering & Manufacturing

Development ContractIBR

Acq Plan

Acq Plan

Contract Management ECPs/ChangesContractCloseout

EVMSurveillance

LRIPContract

IBR

Contract Management ECPs/ChangesContractCloseout

EVMSurveillance

ProductionContract

IBR

Production Qualification Testing

Joint Interoperability Certification Testing

Full-Up System Level LFT&E

IOT&E

AOTR OTRR

Post-Production Software Support Contracts

ICEMDAP MDAP

Economic Analysis (MAIS)Manpower Estimate (MDAP)

MSA PhaseFully Funded

as required

MDAP

Economic Analysis (MAIS)

Evolve CI FunctionalSpecs into Product

(Build to) Documentation& Verification Plan

Initial RAM-CReport

Sustainment Contracts

Product Support Package/PBL Implementation•Product Support Elements •Support and Cost Baseline•Contract for Sustainment (organic & Commercial)

•Supply Chain Management•Revalidate BCA•Refine Life Cycle Sustainment Plan

•Continuous Tech Refreshment•Obsolescence Management•Configuration Control•Data Management•Monitor Performance & Adjust Product Support

Product Support/PBL Management•Public-Private Partnering•Supply Chain Management•PBA Modifications•Assessment of PSI/PSPs•Revalidate PBA/BCA

Operations and Sustainment•Peacetime•Training•Revalidate BCA

•Joint Operations •Crises•Refine LCSP

DoD BudgetIntegrated Program/Budget Review

President’s Budget toCongress

Allocation

FYDPupdated

FYDPupdated

February – September

BudgetCommittees

Defense Planning & Programming Guidance

Issue Nominations/Disposition

National Strategy Documents (updated as necessary)

National Security Strategy

National Defense Strategy

National Military Strategy

The Department of Defense’s Traditional Acquisition System 79

required. Beyond the current fight, however, observers argue that the nature of future chal-lenges and the technology necessary to meet them are so dynamic that fundamental acquisi-tion relationships need to be rethought. As the commander of SOUTHCOM recently wrote:

We are living in an age of rapid change facilitated by advancing technologies and increas-ingly networked systems, societies, and economies. In order for security agencies to be successful in this complex environment, those organizations must be flexible, open and forward-thinking. (Stavridis, 2010, p. xxii)

Leadership of traditional acquisition processes is vested in the military departments (the force providers) rather than the combatant commanders (the force users). The DAS consists of the interrelationship between the establishment of requirements (Joint Capabilities Integration and Development), the process of providing solutions, and the allocation of resources (PPBE). All processes are primarily driven by the military departments, with some inputs from the COCOMs. The logic behind the vesting of acquisition authority in the military departments reflects both Title 10 responsibilities and unique competencies for acquisition. The division of labor has traditionally been that the COCOMs provide inputs to the determination of requirements, and the services lead on providing solutions. A recent RAND assessment con-cluded that it “is the job of those in Washington, D.C., to reach out to the COCOMs and demonstrate that their needs are being addressed, rather than turn the process over to them” (Blickstein and Nemfakos, 2009, p. 7). Traditionally, the COCOMs are viewed as best suited to fighting wars, while the military departments are best suited to balancing other priorities and managing resource decisionmaking.

81

AppenDIx C

Military Value Analysis of Unmanned Aircraft System Training Bases

Training Locations

The information on specific training locations included in this appendix is drawn from RAND interviews, service presentations to congressional oversight committees, and Army surveys and consolidated snapshots of selected Army bases compiled in November 2012.

Initial training for UAS operators and sensor operators is concentrated at a few locations. The Air Force uses Beale AFB for training its Global Hawk crews and primarily Holloman AFB for its Predator crews.1 The Navy plans to leverage the similarities between the Global Hawk and BAMS by having some joint training at Beale AFB. The Army conducts all its ini-tial UAS training at Fort Huachuca, Arizona. The Marine Corps trains its Shadow crews with the Army.2 Current and continuing pressures on the defense budget are likely to result in fur-ther changes. We limited our efforts to analyze military value in depth to activities that any training base would more certainly include, regardless of budget reductions. After we gain a fuller understanding of the results of Secretary of Defense decisions on the content of the FY 2014 and FY 2015 programs, we will renew our efforts to complete this military value analysis.

The approach to the military value analysis of training bases presented here is based on the Department of the Navy’s 1995 Base Realignment and Closure documents. These categories and a brief description are listed below:

• flight training areas and airspace—covers access to special use airspace, availability of training areas, etc.

• airfield and maintenance facilities—includes facilities available for housing and main-taining the aircraft

• expansion potential—any comments on future plans for expansion or capacity for expan-sion

• training and training facilities—includes classrooms or other similar infrastructure and equipment required for training

• military and general support mission—any impacts of the other military missions housed at the same installation

1 The training for the LRE is separate from the FTU and takes place at Creech AFB, Nevada.2 The Marines will also operate the RQ-20A Puma. We do not discuss the training for that SUAS.

82 Building Toward an Unmanned Aircraft System Training Strategy

• weather—any impacts of weather on training capacity• location—description of the where the installation is located• base loading—comments on consolidation of training.

Army RQ-7 and MQ-1C Training IQT Fort Huachuca, Arizona

Fort Huachuca, Arizona, is home to the 2-13th Aviation Regiment (formally the Unmanned Aircraft Systems Training Battalion). The 2-13th trains operators and maintainers for the RQ-7 Shadow, the Warrior Alpha, and the MQ-1C Gray Eagle. The training pipeline for each of these was described in the body of this report.

Flight Training Areas and Airspace

See Figure C.1. R-2303 is a major operational area used for airspace manned and unmanned operations, Army and joint service training along with Department of Homeland Security border security operations. Fort Huachuca is the controlling authority and so can activate this restricted use airspace on demand, at any time. It covers 850 mi2 of land outside Fort Hua-chuca and encompasses 4,600 mi3 of airspace from the surface to 30,000 feet, much of it over private land. The FAA has issued several waivers to ensure the safe operations of manned and unmanned traffic. The area also has unencumbered radio frequency spectrum for the foresee-able future.

Figure C.1Airspace Surrounding Fort Huachuca

RAND RR440-C.1

Military Value Analysis of Unmanned Aircraft System Training Bases 83

Airfield and Maintenance Facilities

See Figure  C.2. UAS operations split between the Libby Army Airfield and Black Tower. Shadow and Hunter training takes place at Black Tower. There are dedicated maintenance facilities as well as hangers and airstrips. Gray Eagle training takes place at Libby Army Airfield.

Expansion Potential

The IQT common core and the course for Shadow are currently running 24-hour operations. It would be difficult to expand the student capacity without committing more resources. The Gray Eagle course is just beginning, and the Hunter course is winding down. There is enough infrastructure for the planned capacity. Any expansion would require more resources.

Training and Training Facilities

Most UAS training operations take place at the Black Tower complex. Gray Eagle and Warrior Alpha vehicles are flown out of Libby Army Airfield.

Military and General Support Mission

Fort Huachuca is home to the military intelligence schoolhouse. This proximity could provide a unique opportunity for collective training between the two schoolhouses. Huachuca is also home to the Buffalo Soldier Electronic Testing Range.

Weather

Fort Huachuca has excellent weather for UAS operations. It has approximately 270 training days a year.

Location

See Figure C.3. Fort Huachuca is situated in southeastern Arizona, near the town of Sierra Vista. There are approximately 60,000 people at Fort Huachuca.

Figure C.2Airfield and Maintenance Facilities at Fort Huachuca

RAND RR440-C.2

Libby Army Black Tower

84 Building Toward an Unmanned Aircraft System Training Strategy

Base Loading

Fort Huachuca is the hub for Army UAS training. This consolidation could be both good and bad. The lack of redundancy elsewhere limits the ability to expand operations when needed. For example, if one of the runways were damaged, the entire Army UAS training capability could be severely affected.

Air Force Active Duty MQ-1/9 Formal Training Unit—Holloman AFB, New Mexico

Flight Training Areas and Airspace

See Figure C.4. Holloman AFB has access to the restricted airspace areas within the White Sands Missile Range (WSMR) and McGregor airspace. It is possible to reach both ranges with-out leaving restricted airspace. While competition for airspace is fierce, WSMR supports flying RPA operations out of Holloman AFB. The current plan is for MQ1/MQ9 to depart Hollo-man AFB northbound for WSMR airspace and to remain totally within R-5107 B/C/D/H. An alternative is to depart Holloman AFB southbound and climb to FL-180 in R-5107D. There is a three-way memorandum of understanding in place, but the testing mission at WSMR occa-sionally conflicts with RPA training. A few other areas near Holloman AFB have potential for RPA operations, although they require COAs from the FAA.

The MQ-1/9 FTU completed the transition from Creech AFB to Holloman AFB. Plans call for an additional FTU, bringing a total of five MQ-1/9 training squadrons, including one maintenance squadron, to Holloman AFB. These squadrons will fall under the 49th Wing and bring in an additional 200 officers, 250 enlisted, and 150 contractors. Two hundred students are expected to cycle through in three-month training periods. Holloman AFB would have 28 MQ-1s and 10 MQ-9s. To operate the aircraft, they would have 12 common ground stations, four Predator Primary Satellite Links, two LREs, and five mission control elements. They expect to fly approximately 2,800 sorties a year, 540 at night.

Figure C.3Location of Fort Huachuca

RAND RR440-C.3

Military Value Analysis of Unmanned Aircraft System Training Bases 85

Airfield and Maintenance Facilities

These are included with the training facilities.

Expansion Potential

The second MQ-9 FTU is scheduled to open in FY 2013, making Holloman home to three MQ-1/MQ-9 FTUs. There is currently a year lag in infrastructure to be able to support a third FTU. The new facilities were supposed to have been finished prior to the standup of the new FTU; however, construction is running approximately a year behind schedule. It is difficult to comment on the ability to meet the required capacity as the capacity requirement is in flux.

Training and Training Facilities

See Figure C.5. Holloman AFB has 200,000 ft2 of existing and open facilities, including office space and hangars that could accommodate the FTUs with minor renovations. The map in Figure C.5 shows where new facilities would be located and identifies existing facilities.

Table C.1 shows the space required to start up the unit, as well as the required final bed-down space, as defined by military construction. Table C.2 shows the facility plan for each functional requirement.

Figure C.4Restricted and Non–Joint Use Class D Airspace near Holloman AFB

RAND RR440-C.4

86

Military and General Support Mission

Other aircraft flown at Holloman currently include the T-38, MQ-1, MQ-9, the QF-4, and the German Tornado.3 There are plans to move at least a portion of the F-16 FTUs from Luke AFB, Arizona, to Holloman AFB. This could affect the availability of airspace access.

Location

Holloman AFB is located in southern New Mexico, near the town of Alamogordo. The base encompasses about 59,600 acres and has a population of about 21,000 military, civilian, and families.

Base Loading

Moving the FTUs from Creech AFB to Holloman AFB freed up some capacity at the former and allowed the latter to focus purely on training.4 There is some redundancy with the Air National Guard FTU at March ARB; however, that FTU is much smaller and primarily trains

3 A German training unit is stationed at Holloman AFB. The F-22s will be transitioning from the base. Air Combat Com-mand and the Air Staff are deciding what to put in place of the F-22 squadron.4 The LRE training is a separate course from the FTU and still taught at Creech.

Figure C.5MQ-1/MQ-9 Beddown Plan

RAND RR440-C.5

87

Air National Guard operators. March ARB currently has adequate infrastructure and capacity for its training mission.

Air Force RQ-4 Formal Training Unit—Beale AFB, California

Flight Training Areas and Airspace

Because of the altitude at which RQ-4s conduct their primary mission, airspace access is man-ageable at Beale AFB. A cylinder is used to access Class A airspace. The FAA provides a stand-ing window for flights into this cylinder of 10 hours a day, every weekday. Requests outside this window are handled individually and have not been a limitation.

Airfield and Maintenance Facilities

Beale AFB has dedicated airfield and maintenance facilities.

Expansion Potential

There is enough capacity for expanding the training mission of RQ-4s at Beale AFB. There are plans to include some portion of the operator or maintenance training for the Navy’s MQ-4 BAMS at Beale, but this would be several years from now.

Table C.1Beddown Plans

Function/Activity

Space Required for

Initial Startup Final Beddown

parking apron (000 ft2) 30 60

Squadron operations facility (000 ft2) 16 48

FTU schoolhouse 20 50

(classrooms and simulators) (000 ft2) 11 11

MCe facility (000 ft2) 12 24

Aircraft maintenance unit (000 ft2) 30 70

Munitions pGM shop (000 ft2) 2 Unknown

Munitions storage (000 ft2) 3 Unknown

Aircraft parts store (000 ft2) 10 10

Weapon load trainer (bays) 1 bay 1 baya

Casket storage (000 ft2) 8 16

Bulk fuel storage (gal) 32 32

Lodging (rooms) 60 200

All backshops (000 ft2) 24 24

a Use maintenance bay.

88

Training and Training Facilities

Beale AFB has adequate training space. There are several different aspects of training: class-room, simulation, and live flights. There is enough classroom space available for both the sensor operator training and the pilot training. The pilots use a pilot simulator to cover emer-gency procedures and aircraft operation. This simulator is very limited in its ability to mimic real-life contingencies. The sensor operators train on Data Analysis Workstations. These two simulators are not compatible, so there is no true crew simulator. Such a simulator has been

Table C.2Facility Requirements

Function Description Remarks

Flightline pavement Use main ramp.

Live ordnance load area Construct new LOLA on taxiway echo.

Maintenance hangar (new FTU) Use building 500.

Maintenance hangar (3 FTU squadrons) Use building 301.

FTU squadron operations (new FTU) For initial capability, use building 513 and a portion of building 302; when project is complete, transition from building 513 into building 318.

FTU squadron operations (Creech UAS) If there are two FTU squadrons, use building 318; a third FTY squadron can occupy all of building 302 after F-22A transition is complete.

Aircraft maintenance unit (new FTU) Initially locate leadership team in building 303 and operate flightline crews out of building 301 until completion of building 500 new construction (10,000 ft2).

Aircraft maintenance unit (3 FTU squadrons) If two units, locate both leadership teams in building 303 and flightline crews of the second unit in building 301. If three units, locate third leadership team in building 302 and locate flightline crew in building 302. new construction for building 301 can also be considered for the third crew.

Fuel system maintenance Use building 315.

precision guided munitions facility Construct two maintenance bays and administration.

Munitions storage Construct 26-by-120-ft hayman igloo (possibly two 60-ft sections).

Aircraft parts store (new FTU) Use existing contract support or shared building 292 (T-38 parts store).

Aircraft parts store (3 FTU squadrons) If T-38 mission relocates, use building 292. If no relocation, add space to building 292.

Weapon release shop Use each respective maintenance bay (building 500 for one and building 302 for two).

Casket storage Construct 50-by-800-ft covered storage pad in logistics readiness squadron yard. requirement may grow, depending on quantity of MQ-9 caskets on hand.

Bulk fuel storage Construct two 8,000-gallon tanks adjacent to hangars 301 and 500 (for aviation gas) for MQ-1 and use existing Jp-8 capacity for MQ-9.

Various backshops Construct 5,000-ft2 addition on building 500. Building 301 may require new additional space.

89

programmed but is still eight to ten years away.5 Crew training takes place on live missions, with instructors flying the mission with students.

Military and General Support Mission

Beale AFB is home to several other aircraft, including the MC-12, the U-2, and the T-38. The RQ-4 fits well with the mission of other aircraft at Beale since it was designed to eventually replace the U-2. RQ-4 pilots are also doing tours in the MC-12. There was some talk of main-taining dual currency in the two platforms, but the status of that plan is unknown.

Location

Beale AFB is located in northern California, approximately one hour outside Sacramento. The nearest town is Marysville, California.

Base Loading

Beale AFB is the hub for high-altitude surveillance. The installation is extremely large, with plenty of room for growth.

5 We understand this decision to be based on resources since on-the-job training on live missions is available.

Figure C.6Location of Holloman AFB

RAND RR440-C.6

91

References

Ainsworth, Bernadette L., “Mini-Plane Newest Addition to Unmanned Family,” Transformation website, U.S. Department of Defense, October 17, 2005.

Anderson, Michael G., “The Air Force Rapid Response Process: Streamlined Acquisition During Operations Desert Shield and Desert Storm,” Santa Monica, Calif.: RAND Corporation, N-3610/3-AF, 1992. As of March 3, 2014: http://www.rand.org/pubs/notes/N3610z3.html

Association of the United States Army, Rapid Equipping Force: Innovative Materiel Solutions to Operational Requirements, 2003.

Army Tactics, Techniques and Procedures (ATTP) 3-04.15 (Field Manual 3-04.15), Marine Corps Reference Publication (MCRP) 3-42.1A, Navy Tactics, Techniques and Procedures (NTTP) 3-55.14, and Air Force Tactics, Techniques and Procedures (AFTTP) 3-2.64, Multi-Service Tactics, Techniques, and Procedures for Unmanned Aircraft Systems, Joint Base Langley-Eustis, Va.: Air Land Seal Application Center, September 2011.

Baldor, Lolita C., “Military to Develop More Sophisticated Drones,” Fayetteville Observer, November 5, 2010.

Bennett, John T., “Gates’ ISR Task Force to Join Top DoD Intel Office,” Defense News, October 7, 2010.

Best, Jr., Richard A., “Intelligence, Surveillance, and Reconnaissance (ISR) Acquisition: Issues for Congress,” Washington, D.C.: Congressional Research Service, 2010.

Blickstein, Irv, and Charles Nemfakos, “Improving Acquisition Outcomes: Organizational and Management Issues,” Santa Monica, Calif.: RAND Corporation, OP-262-OSD, 2009. As of March 3, 2014: http://www.rand.org/pubs/occasional_papers/OP262.html

Buchanan, David R., Joint Doctrine for Unmanned Aircraft Systems: The Air Force and the Army Hold the Key to Success, Newport, R.I.: Naval War College, 2010.

Chairman, House Armed Services Committee, “H.R. 4310—FY13 National Defense Authorization Bill Chairman’s Mark,” undated. As of May 2, 2014: http://armedservices.house.gov/index.cfm/files/serve?File_id=e7c34102-53e4-455a-b345-358f3e99e8cc

Chairman of the Joint Chiefs of Staff Guide 3501, “The Joint Training System: A Guide for Senior Leaders,” June 8, 2012.

Chairman of the Joint Chiefs of Staff Instruction 3500.01G, “Joint Training Policy and Guidance for the Armed Forces of the United States,” March 15, 2012.

Chairman of the Joint Chiefs Instruction 8501.01A, Chairman of the Joint Chiefs of Staff, Combatant Commanders, and Joint Staff Participation in the Planning, Programming, Budgeting, and Execution System, December 3, 2004, current as of February 12, 2008.

Christensen, Clayton M., and Michael Overdorf, “Meeting the Challenge of Disruptive Change,” Harvard Business Review, March 2000.

Congressional Budget Office, Policy Options for Unmanned Aircraft Systems, Washington, D.C., Pub. No. 4083, June 9, 2011.

Defense Science Board, Report of the Task Force on Training Superiority and Training Surprise, Washington, D.C.: Office of the Under Secretary of Defense for Acquisition, Technology, and Logistics, January 2001.

92 Building Toward an Unmanned Aircraft System Training Strategy

———, Report of the Task Force on Training for Future Conflicts: Final Report, Washington, D.C.: Office of the Under Secretary of Defense for Acquisition, Technology, and Logistics, June 2003.

———, Report of the Task Force on Fulfillment of Urgent Operational Needs, Washington D.C.: Office of the Under Secretary of Defense for Acquisition, Technology, and Logistics, 2009.

Department of the Navy, Navy Planning Guide 2010, 2010. As of May 1, 2014: http://www.navy.mil/navydata/policy/seapower/sne10/sne10-all.pdf

Dietrich, Shane, Wartime Test and Evaluation: Initiatives Lead to Cultural Change, Carlisle Barracks, Pa.: U.S. Army War College, 2007.

Director, Readiness and Training Policy and Programs, Department of Defense Training Transformation Implementation Plan FY2006–FY2011, Washington, D.C.: Office of the Under Secretary of Defense for Personnel and Readiness, February 23, 2006

Drezner, Jeffrey A., Geoffrey Sommer, and Robert S. Leonard, Innovative Management in the DARPA High Altitude Endurance Unmanned Aerial Vehicle Program: Phase II Experience, Santa Monica, Calif.: RAND Corporation, MR-1054-DARPA, 1999. As of March 3, 2014: http://www.rand.org/pubs/monographs/MG350.html

DSB—See Defense Science Board.

Erwin, Sandra I., “To Meet Urgent Needs, Commanders Bypass Pentagon Acquisition System,” National Defense, July 2010.

Francis, Paul, “Defense Acquisitions: Charting a Course for Lasting Reform,” Testimony Before the Committee on Armed Services, U.S. House of Representatives, Washington, D.C.: Government Accountability Office, GAO-09-663T, April 30, 2009.

GAO—See Government Accountability Office.

Gates, Robert, Secretary Gates’ Speech at National Defense University, September 29, 2008.

Gertler, Jeremiah, U.S. Unmanned Aerial Systems, Washington, D.C.: Congressional Research Service, R42136, January 3, 2012.

Government Accountability Office, Army Modernization: The Warfighting Rapid Acquisition Program Needs More Specific Guidance,” Washington, D.C., GAO/NSIAD-99-11, November 1998.

———, “Military Training: Actions Needed to Enhance DOD’s Program to Transform Joint Training,” Washington, D.C., GAO-05-548, June 2005.

———, “Defense Acquisitions: Status and Challenges of Joint Forces Command’s Limited Acquisition Authority,” Washington, D.C., GAO-07-546, April 2007a.

———, “Defense Acquisitions: An Analysis of the Special Operations Command’s Management of Weapon System Programs,” Washington, D.C., GAO-07-620, June 2007b.

———, “Unmanned Aircraft Systems: Federal Actions Needed to Ensure Safety and Expand Their Potential Uses within the National Airspace System,” Washington, D.C., GAO-08-511, May 2008a.

———, “Unmanned Aircraft Systems: Additional Actions Needed to Improve Management and Integration of DOD Efforts to Support Warfighter Needs,” Washington, D.C., GAO-09-175, November 2008b.

———, “Unmanned Aircraft Systems: Comprehensive Planning and a Results-Oriented Training Strategy Are Needed to Support Growing Inventories,” Washington, D.C., GAO-10-331, March 2010a.

———, “Warfighter Support: Improvements to DOD’s Urgent Needs Processes Would Enhance Oversight and Expedite Efforts to Meet Critical Warfighter Needs,” Washington, D.C., GAO-10-460, April 2010b.

Govindarajan, Vijay, Praveen K. Kapalle, and Erwin Daneels, “The Effects of Mainstream and Emerging Customer Orientations on Radical and Disruptive Innovations,” Journal of Product Innovation Management, Vol. 28, No. 1, November 2011.

Henderson, Rebecca M., and Kim B. Clark, “Architectural Innovation: The Reconfiguration of Existing Product Technologies and the Failure of Existing Firms,” Administrative Science Quarterly, Vol. 35, No. 1, March 1990.

references 93

Hicks, Kathleen H., Invigorating Defense Governance: a Beyond Goldwater-Nichols Phase 4 Report, Washington, D.C.: Center for Strategic and International Studies, 2008.

Hicks, Kathleen H., David Berteau, Samuel J. Brannen, Eleanore Douglas, Nathan Freier, Clark A. Murdock, and Christine E. Wormuth, Transitioning Defense Organizational Initiatives: An Assessment of Key 2001–2008 Defense Reforms, Washington, D.C.: Center for Strategic and International Studies, December 2008.

House Armed Services Committee, Conference Report Accompanying the Fiscal Year 2013 National Defense Appropriations Act, 112th Cong., 2nd Sess., December 17, 2012. As of March 28, 2014: http://docs.house.gov/billsthisweek/20121217/CRPT-112HRPT-705.pdf

Joint Publication 1-02, Department of Defense Dictionary of Military and Associated Terms, Washington, D.C.: Joint Chiefs of Staff, 2013.

——— 3-0, Doctrine for Joint Operations, Washington, D.C.: Joint Chiefs of Staff, 2011.

——— 3-55.1, Joint Tactics, Techniques, and Procedures for Unmanned Aerial Vehicles, Washington, D.C.: Joint Chiefs of Staff, 1993.

Kennedy, Harold, “Army ‘Rapid Equipping Force’ Taking Root,” National Defense, Vol. XCI, No. 635, October 2006.

Kennedy, Tim, “TRADOC Seeks Wartime Solutions from Rapid Equipping Force,” Army, Vol. 54, No. 8, August 2004.

te Kulve, Haico, and Wim A. Smit, “Novel Naval Technologies: Sustaining or Disrupting Naval Doctrine,” Technological Forecasting and Social Change, Vol. 77, No. 7, September 2010.

Looy, Bart Van, Thierry Martens, and Koenraad Debackere, “Organizing for Continuous Innovation: On the Sustainability of Ambidexterous Organization,” Creativity and Innovation Management, Vol. 14, No. 3, August 31, 2005.

Loxterkamp, Ed, “ISR Task Force Areas of Interest to EUCOM and AFRICOM: ISR Task Force Rapid Acquisition IPT,” briefing, U.S. European Command and U.S. Africa Command Science Technology Conference, 14–18 June, 2010.

McLeary, Paul, “Industry, U.S. Army Pushing for More Helicopter Teaming,” Defense News, December 15, 2012.

Middleton, Michael W., Assessing the Value of the Joint Rapid Acquisition Cell, master’s thesis, Monterey, Calif.: Naval Postgraduate School, 2006.

Miles, Donna, “Rapid Equipping Force Speeds New Technology to Front Lines,” American Forces Press Service, August 12, 2005.

MTTP—See Army Tactics, Techniques and Procedures . . . .

Murdock, Clark A., and Michele A. Flournoy, Beyond Goldwater-Nichols: U.S. Government and Defense Reform for a New Strategic Era: Phase 2 Report, Washington, D.C.: Center for Strategic and International Studies, 2005.

Pickup, Sharon, Air Force Training: Actions Needed to Better Manage and Determine Costs of Virtual Training Efforts, Washington, D.C.: Government Accountability Office, July 19, 2012.

Schank, John F., Harry J. Thie, Clifford M. Graf II, Joseph Beel, and Jerry M. Sollinger, Finding the Right Balance: Simulator and Live Training for Navy Units, Santa Monica, Calif.: RAND Corporation, MR-1441-NAVY, 2002. March 3, 2014: http://www.rand.org/pubs/monograph_reports/MR1441.html

Sherman, Jason, “DoD Approves ‘Surge’ of ISR Personnel, Seeks $1 Billion More in FY-09,” Inside the Air Force, 2008.

Stavridis, James G., Partnership for the Americas: Western Hemisphere Strategy and U.S. Southern Command, Washington, D.C.: National Defense University Press, 2010.

Sullivan, Michael J., “Rapid Acquisition of Mine Resistant Ambush Protected Vehicles,” letter, GAO-08-884R, Washington, D.C., July 2008.

94 Building Toward an Unmanned Aircraft System Training Strategy

———, “Defense Acquisitions: Perspectives on Potential Changes to Department of Defense Acquisition Management Framework,” letter to congressional committees, Washington, D.C., GAO-09-295R, February 27, 2009a.

———, “Defense Acquisitions: Rapid Acquisition of MRAP Vehicles,” Testimony Before the House Armed Services Committee, Defense Acquisition Reform Panel, Washington, D.C.: Government Accountability Office, GAO-10-155T, October 2009b.

Tellis, Gerard J., “Disruptive Technology or Visionary Leadership?” Journal of Product Innovation Management, Vol. 23, No. 1, January 2006.

Thompson, Mark, “Costly Flight Hours,” Time, April 2, 2013. As of March 26, 2014: http://nation.time.com/2013/04/02/costly-flight-hours/print/

UAS Task Force Airspace Integration Product Team, “Unmanned Air Craft Systems Airspace Integration Plan,” Washington, D.C.: U.S. Department of Defense, March 2011.

U.S. Army Maneuver Center of Excellence, “Small UAS (Raven) Master Trainer /4D-F8/600-F20,” course description, undated. As of May 6, 2013: http://www.benning.army.mil/infantry/197th/229/SUASMT/

U.S. Air Force, “Report on Future Unmanned Aerial Systems Training, Operations, and Sustainability,” 2011.

———, RPA Vector: Vision and Enabling Concepts, 2013–2038, Washington, D.C., Headquarters, United States Air Force, February 17, 2014.

Vergakis, Brock, “Navy Completes 1st Unmanned Carrier Landing,” Associated Press, July 10, 2013. As of May 1, 2013: http://bigstory.ap.org/article/navy-attempt-1st-unmanned-carrier-landing

NATIONAL SECURITY RESEARCH DIVISION

www.rand.org

RR-440-OSD 9 7 8 0 8 3 3 0 8 5 3 1 3

ISBN-13 978-0-8330-8531-3ISBN-10 0-8330-8531-X

53295

$32.95

Unmanned aircraft systems (UASs) have become increasingly prevalent in and important to U.S. military operations. Initially serving only as reconnaissance or intelligence platforms, they now carry out such other missions as attacking enemy forces. The swift expansion in their numbers and in the demand for their employment has, however, significantly increased demands on logistics and training systems. The challenge is not simply training system operators but also training operational forces and their commanders to integrate the systems into combat operations. Much of that aspect of training has thus far happened as units employ the systems in actual operations—essentially, on-the-job training. UAS training, particularly for the employment of UASs, now needs to be integrated more formally and cost-effectively into service and joint training programs. This report develops a general concept for training military forces in employment of UASs and a framework for addressing the training requirements and discusses the limits of existing infrastructure in supporting UAS training. Interoperability among services is another issue, because services have thus far mainly developed training suitable for their own needs. But the services have established a set of multiservice tactics, techniques, and procedures for UASs, which should facilitate interoperability training. At present, units are not always ready for joint training, so the focus should be on improving training at the unit level in the employment of UAS capabilities, with the overall guiding principle being to “train as we fight.”