BUILDING STRUCTURE PROJECT 2: BEAM AND COLUMN 1 School of Architecture, Building and Design Bachelor of Science (Hons) in Architecture Building Structure (ARC 2523/ BLD 61003) Project 2: Beam and Column Analysis Tutor: Ms. Norita Group Members: Student Name: Student ID: Canisius Bong Wei Pheng 0318914 Joyce Wee Yi Qin 0319602 Tan Wing Hoe 0319333

Upload: canisius-bong

Post on 14-Apr-2017

77 views

Category:

Education


4 download

TRANSCRIPT

Page 1: Building Structure Final report

BUILDING STRUCTURE PROJECT 2: BEAM AND COLUMN 1

School of Architecture, Building and Design

Bachelor of Science (Hons) in Architecture

Building Structure (ARC 2523/ BLD 61003)

Project 2: Beam and Column Analysis

Tutor: Ms. Norita

Group Members:

Student Name: Student ID:

Canisius Bong Wei Pheng 0318914

Joyce Wee Yi Qin 0319602

Tan Wing Hoe 0319333

Page 2: Building Structure Final report

BUILDING STRUCTURE PROJECT 2: BEAM AND COLUMN 2

Table of Contents

1.0 Brief Description of Building 3

2.0 Architectural Plan Drawings 4

2.1 Ground Floor Plan

2.2 First Floor Plan

2.3 Roof Plan

3.0 Structural Plan Drawings 7

3.1 Ground Floor Plan

3.2 First Floor Plan

3.3 Roof Plan

4.0 Slab System Analysis (Load Distribution) 10

4.1 Ground Floor Plan

4.2 First Floor Plan

4.3 Roof Plan

4.4 Identification of Types of Slab

5.0 Tributary Area 13

5.1 Ground Floor Plan

5.2 First Floor Plan

5.3 Roof Plan

6.0 Assumption of Life Load and Dead Load 16

6.1 Assumptions on Dead Loads Acting on Structure

6.2 Assumptions on Life Loads Acting on Structure

7.0 Individual Components Distribution 17

7.1 Beams

7.2 Columns

8.0 Beam Analysis Report 20

8.1 Canisius Bong

8.2 Joyce Wee

8.3 Tan Wing Hoe

9.0 Column Analysis Report 78

9.1 Canisius Bong

9.2 Joyce Wee

9.3 Tan Wing Hoe

10.0 Appendix 94

Page 3: Building Structure Final report

BUILDING STRUCTURE PROJECT 2: BEAM AND COLUMN 3

1.0 Brief Description of Building

In this project, we are required to design a double-storey bungalow together, carry out

structural framing and prepare structural drawings for the bungalow. The project is an

integrated component where it involves structural theory, force calculation and basic

structural proposal. This project is designed to allow the demonstration of knowledge and

understanding of building structure.

The bungalow is a 324m2 building which includes spaces such as:

(A) 1 master bedroom with attached study room, wardrobe, and bathroom

(B) 1 bedroom with attached bathroom

(C) 1 bedroom

(D) 1 guest room with attached

bathroom

(E) 1 maid room

(F) 2 bathrooms

(G) 2 living room (ground floor and first

floor)

(H) 1 family theatre

(I) 1 double volume dining room

(J) 1 dry and wet kitchen

(K) 1 laundry area

(L) 1 storeroom

(M) 1 outdoor covered car porch

Page 4: Building Structure Final report

BUILDING STRUCTURE PROJECT 2: BEAM AND COLUMN 4

2.0 Architectural Plan Drawings

2.1 Ground Floor Plan (scale 1:150)

Page 5: Building Structure Final report

BUILDING STRUCTURE PROJECT 2: BEAM AND COLUMN 5

2.2 First Floor Plan (scale 1:150)

Page 6: Building Structure Final report

BUILDING STRUCTURE PROJECT 2: BEAM AND COLUMN 6

2.3 Roof Plan (scale 1:150)

Page 7: Building Structure Final report

BUILDING STRUCTURE PROJECT 2: BEAM AND COLUMN 7

3.0 Structural Plan Drawings

3.1 Ground Floor Plan (scale 1:150)

Page 8: Building Structure Final report

BUILDING STRUCTURE PROJECT 2: BEAM AND COLUMN 8

3.2 First Floor Plan (scale 1:150)

Page 9: Building Structure Final report

BUILDING STRUCTURE PROJECT 2: BEAM AND COLUMN 9

3.3 Roof Plan (scale 1:150)

Page 10: Building Structure Final report

BUILDING STRUCTURE PROJECT 2: BEAM AND COLUMN 10

4.0 Slab System Analysis (Load

Distribution)

4.1 Ground Floor Plan (scale 1:150)

Page 11: Building Structure Final report

BUILDING STRUCTURE PROJECT 2: BEAM AND COLUMN 11

4.2 First Floor Plan (scale 1:150)

Page 12: Building Structure Final report

BUILDING STRUCTURE PROJECT 2: BEAM AND COLUMN 12

4.3 Roof Plan (scale 1:150)

4.4 Identification of Slab System

Formula to determine slab system:

If Ly/Lx >2, one-way slab system;

If Ly/Lx ≤2, two-way slab system.

Page 13: Building Structure Final report

BUILDING STRUCTURE PROJECT 2: BEAM AND COLUMN 13

5.0 Tributary Area

5.1 Ground Floor Plan

Page 14: Building Structure Final report

BUILDING STRUCTURE PROJECT 2: BEAM AND COLUMN 14

5.2 First Floor Plan

Page 15: Building Structure Final report

BUILDING STRUCTURE PROJECT 2: BEAM AND COLUMN 15

5.3 Roof Plan

Page 16: Building Structure Final report

BUILDING STRUCTURE PROJECT 2: BEAM AND COLUMN 16

6.0 Assumption of Dead Load and Live

7.0 Load

6.1 Assumptions on Dead Loads Acting on Structure (A) Slab self-weight

= 0.15 x 24kN/m3

= 3.6kN/m2

(B) Brick wall self-weight

= Wall thickness x Wall height x Density

= 0.1m x 3.0m x 19kN/m3

= 5.7kN/m

(C) Primary Beam self-weight

= Beam size x Concrete density

= 0.2m x 0.3m x 24kN/m3

= 1.44kN/m

(D) Secondary Beam self-weight

= Beam size x Concrete density

= 0.1m x 0.2m x 24kN/m3

= 0.48kN/m

(E) Column self-weight

= Column size x Concrete density

= 0.3m x 0.3m x 3.0m x 24kN/m3

= 6.48kN

*All dead loads (slabs, walls, beams, columns) are assumed to have a standard size.

* Dead load factor: 1.4

6.2 Assumptions on Live Loads Acting on Structure

(A) Bedroom :1.5kN/m2

(B) Living Room :4.0kN/m2

(C) Dining Room :2.0kN/m2

(D) Kitchen :3.0kN/m2

(E) Corridor :4.0kN/m2

(F) Bathroom :2.0kN/m2

(G) Study Room :1.5kN/m2

(H) Car Porch :2.0kN/m2

(I) Stairs :1.5kN/m2

(J) Family Area :2.0kN/m2

(K) Store Room :2.5kN/m2

*All assumptions on live loads are

referred to 4th schedule of UBBL for

live loads per room functions.

* Live load factor: 1.6

Page 17: Building Structure Final report

BUILDING STRUCTURE PROJECT 2: BEAM AND COLUMN 17

8.0 Individual Components Distribution

7.1 Beams

Canisius Bong

Joyce Wee

Tan Wing Hoe

Page 18: Building Structure Final report

BUILDING STRUCTURE PROJECT 2: BEAM AND COLUMN 18

7.2 Columns

Canisius Bong

Joyce Wee

Tan Wing Hoe

Page 19: Building Structure Final report

BUILDING STRUCTURE PROJECT 2: BEAM AND COLUMN 19

Page 20: Building Structure Final report

BUILDING STRUCTURE PROJECT 2: BEAM AND COLUMN 20

9.0 Beam Analysis Report

8.1 Canisius Bong

Beam A/3-6 (Ground Floor | Primary Beam)

Dead Load:

○1 Beam self-weight = 0.2m x 0.3m x 24kN/m3

= 1.44kN/m

○2 Brick wall self-weight = 3m x 0.1m x 19kN/m2

= 5.7kN/m

○3 Slab (A-B/3-4) = 3.6kN/m2 x (1.91m/2) x (2/3)

= 2.29kN/m

○4 Slab (A-B/ 4-6) = 3.6kN/m2 x (3.1m/2)

= 5.58kN/m

Total Dead Load:

Total Dead Load at (A/3-4) = 1.44kN/m + 5.7kN/m + 2.29kN/m

= 9.43kN/m

Total Dead Load at (A/4-6) = 1.44kN/m + 5.7kN/m + 5.58kN/m

= 12.72kN/m

Live Load:

○1 Slab (A-B/ 3-4) = Bathroom x (1.91m/2) x (2/3)

= 2.0kN/m2 x (1.91m/2) x (2/3)

= 1.27kN/m

○2 Slab (A-B/ 4-6) = Bedroom x (3.1m/2)

= 1.5kN/m2 x (3.1m/2)

= 2.33kN/m

○1 Carries self-weight – Dead Load

○2 Sab Dead Load & Live Load

Slab 1 : Slab A-B/3-4 (Two-Way Slab)

Slab 2 : Slab A-B/4-6 (Two-Way Slab)

○3 Brick Wall – Dead Load

Page 21: Building Structure Final report

BUILDING STRUCTURE PROJECT 2: BEAM AND COLUMN 21

Ultimate Load

Apply factor 1.4 and 1.6 to dead load and live load respectively.

Ultimate Load for (A/3-4) = Total Dead Load (1.4) + Total Live Load (1.6)

= 9.43kN/m (1.4) + 1.27kN/m (1.6)

= 13.20kN/m + 2.03kN/m

= 15.23kN/m

Ultimate Load for (A/4-6) = Total Dead Load (1.4) + Total Live Load (1.6)

= 12.72kN/m (1.4) + 2.33kN/m (1.6)

= 17.81kN/m + 3.73kN/m

= 21.54kN/m

Point Load

Referring to Beam A-B/4, point load from the beam is = 39.5KN

Ultimate Load Diagram

Total load for A/3-4 = 15.23kN/m x 1.91m = 29.09kN

Total load for A/4-6 = 21.54kN/m x 5.18m = 111.58kN

Reaction Forces:

∑m = 0

R1(7.09) – (15.23 x 1.91)(6.14) – 39.5 (5.18) – (21.54 x 5.18 )(2.59) = 0

R1(7.09) – 178.61 – 204.61 – 288.98 = 0

R1 = 672.2/7.09

R1 = 94.81kN -----○A

∑fy = 0

R1+R2 – 39.5 – 15.23(1.91) – 21.54(5.18) = 0 -----○B

Substitute ○A into ○B ,

94.81 + R2 – 39.5 – 15.23(1.91) – 21.54(5.18) = 0

94.81 + R2 – 39.5 – 29.09 – 111.58 = 0

R2 – 85.36 = 0

R2 = 85.36kN

Page 22: Building Structure Final report

BUILDING STRUCTURE PROJECT 2: BEAM AND COLUMN 22

Load Diagram

169

0kN 0kN

Positive area – Negative area

+ve = [1/2 x (94.81 + 65.72)(1.91)] +

[1/2 x (26.22 x 1.22)]

= 153.30 + 15.99

= 169.29 ≈ 169

-ve = 1/2 x (- 85.36)(5.18-1.22

= 169.01 ≈ 169

-85.36kN

0kN

0kN 0kN

26.22kN

0kN

65.72kN

94.18kN

(+)

(-)

Shear Force Diagram

Using Triangular Proportion

x/5.18 = 26.22/(26.22 + 85.36)

x = 1.22

x

0kN 85.3

6

x

0kN

0kN

26.22

6

x

0kN

0kN

5.18

6

x

0kN

0kN

Bending Moment Diagram

Page 23: Building Structure Final report

BUILDING STRUCTURE PROJECT 2: BEAM AND COLUMN 23

Beam H/3-5 (First Floor | Primary Beam)

Dead Load at Beam H-I/4:

○1 Beam self-weight = 0.1m x 0.2m x 24kN/m3

= 0.48kN/m

○2 Brick wall self-weight = 3m x 0.1m x 19kN/m2

= 5.7kN/m

○3 Slab (H-I/3-4) = 3.6kN/m2 x (1.91m/2)

= 3.44kN/m

○4 Slab (H-I/ 4-6) = 3.6kN/m2 x (3.1m/2) x (2/3)

= 3.72kN/m

Total Dead Load at Beam H-I/4:

Total Dead Load = 0.48kN/m + 5.7kN/m + 3.44kN/m

+ 3.72kN/m

= 13.34kN/m

Live Load at Beam H-I/4:

○1 Slab (H-I/ 3-4) = Bathroom x (1.91m/2)

= 2.0kN/m2 x (1.91m/2)

= 1.91kN/m

○2 Slab (H-I/ 4-6) = Bedroom x (3.1m/2) x (2/3)

= 1.5kN/m2 x (3.1m/2) x (2/3)

= 1.55kN/m

Total Live Load at Beam H-I/4

Total Live Load = 1.91kN/m + 1.55kN/m

= 3.46kN/m

○1 Carries self-weight – Dead Load

○2 Sab Dead Load & Live Load

Slab 1 : Slab H-I/3-4 (Two-Way Slab)

Slab 2 : Slab H-I/4-6 (Two-Way Slab)

○3 Brick Wall – Dead Load

Page 24: Building Structure Final report

BUILDING STRUCTURE PROJECT 2: BEAM AND COLUMN 24

Ultimate Load

Apply factor 1.4 and 1.6 to dead load and live load respectively.

Ultimate Load for (H/3-5) = Total Dead Load (1.4) + Total Live Load (1.6)

= 13.34kN/m (1.4) + 3.46kN/m (1.6)

= 18.68kN/m + 5.54kN/m

= 24.22kN/m

Ultimate Load Diagram

Total load = 3.1m x 24.22kN/m

= 75.08 kN

Reactions (UDL):

Reactions = (3.1 x 24.22)/2

= 37.54kN

Load Diagram

29.09kN

0kN 0kN

0kN

-37.54kN

37.54kN

0kN

(+)

(-)

Shear Force Diagram

Bending Moment Diagram

Point 1 = 37.54kN

Point 2 = 37.54 – (24.22 x 3.1)

= -37.54

Point 3 = -37.54 + 37.54

= 0kN

Area of Triangle

= ½ x 1.55 x 37.54

=29.09

Page 25: Building Structure Final report

BUILDING STRUCTURE PROJECT 2: BEAM AND COLUMN 25

Dead Load at Beam H/3-5:

○1 Beam self-weight = 0.2m x 0.3m x 24kN/m3

= 1.44kN/m

○2 Brick wall self-weight = 3m x 0.1m x 19kN/m2

= 5.7kN/m

○3 Slab (H-I/3-4) = 3.6kN/m2 x (1.91m/2) x (2/3)

= 2.29kN/m

○4 Slab (H-I/5-6) = 3.6kN/m2 x (3.1m/2)

= 5.58kN/m

Total Dead Load at Beam (H/3-5):

Total Dead Load at (H/3-4) = 1.44kN/m + 5.7kN/m + 2.29kN/m

= 9.43kN/m

Total Dead Load at (H/4-5) = 1.44kN/m + 5.7kN/m + 5.58kN/m

= 12.72kN/m

Live Load:

○1 Slab (H-I/3-4) = Bathroom x (1.91m/2) x (2/3)

= 2.0kN/m2 x (1.91m/2) x (2/3)

= 1.27kN/m

○2 Slab (H-I/4-5) = Bedroom x (3.1m/2)

= 1.5kN/m2 x (3.1m/2)

= 2.33kN/m

Ultimate Load

Apply factor 1.4 and 1.6 to dead load and live load respectively.

Ultimate Load for (H/3-4) = Total Dead Load (1.4) + Total Live Load (1.6)

= 9.43kN/m (1.4) + 1.27kN/m (1.6)

= 13.20kN/m + 2.03kN/m

= 15.23kN/m

Ultimate Load for (H/4-5) = Total Dead Load (1.4) + Total Live Load (1.6)

= 12.72kN/m (1.4) + 2.33kN/m (1.6)

= 17.81kN/m + 3.73kN/m

= 21.54kN/m

Point Load

Referring to Beam H-I/4, point load from the beam is = 37.54KN

Page 26: Building Structure Final report

BUILDING STRUCTURE PROJECT 2: BEAM AND COLUMN 26

Ultimate Load Diagram

Total load for H/3-4 = 15.23kN/m x 1.91m = 29.09kN

Total load for H/4-5 = 21.54kN/m x 1.79m = 38.56kN

Reaction Forces:

∑m = 0

R1(3.7) – (15.23 x 1.91)(2.75) – 37.54(1.79) – (21.54 x 1.79 )(0.90) = 0

R1(3.7) – 80 – 67.20 – 34.70 = 0

R1 = 181.97/3.7

R1 = 49.18kN -----○A

∑fy = 0

R1+R2 – 37.54 – 15.23(1.91) – 21.54(1.79) = 0 -----○B

Substitute ○A into ○B ,

49.18 + R2 – 37.54 – 15.23(1.91) – 21.54(1.79) = 0

49.18 + R2 – 37.54 – 29.09 – 38.56 = 0

R2 – 56.01 = 0

R2 = 56.01kN

Page 27: Building Structure Final report

BUILDING STRUCTURE PROJECT 2: BEAM AND COLUMN 27

Load Diagram

-17.41kN

0kN

66

0kN 0kN

Area of Trapezium at (+) area

= (49.18 + 20.09) x 1.91/2

=66.15 ≈ 66

Area of Trapezium at ( - ) area

= (-17.41 – 56.01) x 1.79/2

= -65.71 ≈ 66

Area of ( + ) area + Area of ( - ) area

= 66-66

=0

-56.01kN

0kN

0kN 0kN

20.09kN

49.18kN

(+)

(-)

Shear Force Diagram

Bending Moment Diagram

Page 28: Building Structure Final report

BUILDING STRUCTURE PROJECT 2: BEAM AND COLUMN 28

Beam H-I/6 (First Floor | Secondary Beam)

Dead Load:

○1 Beam self-weight = 0.1m x 0.2m x 24kN/m3

= 0.48kN/m

○2 Brick wall self-weight = 3m x 0.1m x 19kN/m2

= 5.7kN/m

○3 Slab (H-I/4-6) = 3.6kN/m2 x (3.1m/2) x (2/3)

= 3.72kN/m

○4 Slab (H-I/6-7) = 3.6kN/m2 x (2.67m/2)

= 4.81kN/m

Total Dead Load

Total Dead Load = 0.48kN/m + 5.7kN/m + 3.72kN/m

+ 4.81kN/m

= 14.71kN/m

Live Load:

○1 Slab (H-I/4-6) = Bedroom x (3.1m/2) x (2/3)

= 1.5kN/m2 x (3.1m/2) x (2/3)

= 1.55kN/m

○2 Slab (H-I/6-7) = Bedroom x (2.67m/2)

= 1.5kN/m2 x (2.67m/2)

= 2.00kN/m

Total Live Load

Total Live Load = 1.55kN/m + 2.00kN/m

= 3.55kN/m

○1 Carries self-weight – Dead Load

○2 Sab Dead Load & Live Load

Slab 1 : Slab H-I/4-6 (Two-Way Slab)

Slab 2 : Slab H-I/6-7 (Two-Way Slab)

○3 Brick Wall – Dead Load

Page 29: Building Structure Final report

BUILDING STRUCTURE PROJECT 2: BEAM AND COLUMN 29

Ultimate Load

Apply factor 1.4 and 1.6 to dead load and live load respectively.

Ultimate Load for (H-I/6) = Total Dead Load (1.4) + Total Live Load (1.6)

= 14.71kN/m (1.4) + 3.55kN/m (1.6)

= 20.59kN/m + 5.68kN/m

= 26.27kN/m

Ultimate Load Diagram

Total load = 3.1m x 26.27kN/m

= 81.44kN

Reactions (UDL):

Reactions = (3.1 x 26.27)/2

= 40.72kN

Load Diagram

31.56kN

0kN 0kN

0kN

-40.72kN

40.72kN

0kN

(+)

(-)

Shear Force Diagram

Bending Moment Diagram

Point 1 = 40.72 kN

Point 2 = 40.72 – (26.27x 3.1)

= -40.72

Point 3 = -40.72 + 40.72

= 0kN

Area of Triangle

= ½ x 1.55 x 40.72

=31.56

Page 30: Building Structure Final report

BUILDING STRUCTURE PROJECT 2: BEAM AND COLUMN 30

Beam I/5-7 (First Floor | Primary Beam)

Dead Load

at Beam H/3-5:

○1 Beam self-weight = 0.2m x 0.3m x 24kN/m3

= 1.44kN/m

○2 Brick wall self-weight = 3m x 0.1m x 19kN/m2

= 5.7kN/m

○3 Slab (H-I/3-4) = 3.6kN/m2 x (3.1m/2)

= 5.58kN/m

○4 Slab (H-I/5-6) = 3.6kN/m2 x (2.67m/2) x (2/3)

= 3.20kN/m

○5 Slab (I-L/5-7) = 3.6kN/m2 x (5.8 m/2)

= 10.44kN/m

Total Dead Load

Total Dead Load at (I/5-6) = 1.44kN/m + 5.7kN/m + 5.58kN/m

+ 10.44kN/m

= 23.16kN/m

Total Dead Load at (I/6-7) = 1.44kN/m + 5.7kN/m + 3.20kN/m

+ 10.44kN/m

= 20.78kN/m

Live Load:

○1 Slab (H-I/4-6) = Bedroom x (3.1m/2)

= 1.5kN/m2 x (3.1m/2)

= 2.33kN/m

○2 Slab (H-I/6-7) = Bedroom x (2.67m/2) x (2/3)

= 1.5kN/m2 x (2.67m/2) x (2/3)

= 1.34kN/m

○3 Slab (I-L/5-7) = Bedroom x (5.8m/2)

= 1.5kN/m2 x (5.8/2)

=4.35kN/m

○1 Carries self-weight – Dead Load

○2 Sab Dead Load & Live Load

Slab 1 : Slab H-I/4-6 (Two-Way Slab)

Slab 2 : Slab H-I/6-7 (Two-Way Slab)

Slab 3 : Slab I-L/5-7 (Two-Way Slab)

○3 Brick Wall – Dead Load

Page 31: Building Structure Final report

BUILDING STRUCTURE PROJECT 2: BEAM AND COLUMN 31

Total Live Load

Total live load at (I/5-6) = 2.33kN/m + 4.35kN/m

= 6.68kN/m

Total live load at (I/6-7) = 1.34kN/m + 4.35kN/m

= 5.69kN/m

Ultimate Load

Apply factor 1.4 and 1.6 to dead load and live load respectively.

Ultimate Load for (I/5-6) = Total Dead Load (1.4) + Total Live Load (1.6)

= 23.16kN/m (1.4) + 6.68kN/m (1.6)

= 32.42kN/m + 10.69kN/m

= 43.11kN/m

Ultimate Load for (I/6-7) = Total Dead Load (1.4) + Total Live Load (1.6)

= 20.78kN/m (1.4) + 5.69kN/m (1.6)

= 29.09kN/m + 9.10kN/m

= 38.19kN/m

Point Load

Referring to Beam H-I/6 point load from the beam is = 40.72KN

Ultimate Load Diagram

Total load for I/5-6 = 43.11kN/m x 3.39m = 146.14kN

Total load for I/6-7 = 39.19kN/m x 2.67m = 101.97kN

Reaction Forces:

∑m = 0

R1(6.06) – (43.11 x 3.39)(4.37) – 40.72(2.67) – (38.19 x 2.67 )(1.34) = 0

R1(6.06) – 638.64 – 108.72– 138.17 = 0

R1 = 885.53/6.06

R1 = 146.12kN -----○A

Page 32: Building Structure Final report

BUILDING STRUCTURE PROJECT 2: BEAM AND COLUMN 32

∑fy = 0

R1+R2 – 40.72 – 43.11(3.39) – 38.19(2.67) = 0 -----○B

Substitute ○A into ○B ,

146.12 + R2 – 40.72 – 43.11(3.39) – 38.19(2.67) = 0

146.12 + R2 – 40.72 – 146.14 – 101.97 = 0

R2 – 142.71= 0

R2 = 142.71kN

Load Diagram

.

-40.74kN

0kN

-142.71kN

0kN

0kN 0kN

-0.02kN

146.12kN

(+)

(-)

Shear Force Diagram

Bending Moment Diagram

Using Triangular Proportion

x/3.39 = 146.12/146.14

x = 3.39

146.12

6

x

0kN

0kN 146.14

6

x

0kN

0kN

x

0kN

Positive area – Negative area

+ve = 1/2 x (146.12)(3.39)

= 247.67 ≈ 247

-ve = [1/2 x (- 142.71 + -40.74)(2.67)

+[1/2 x (-0.02 x 3.39)

= -246.91 + -0.03

= -246.94 ≈ -247

247-247 = 0

0kN

247

0kN

Page 33: Building Structure Final report

BUILDING STRUCTURE PROJECT 2: BEAM AND COLUMN 33

Beam H-K/7 (First Floor | Primary Beam)

Dead Load:

○1 Beam self-weight = 0.2m x 0.3m x 24kN/m3

= 1.44kN/m

○2 Brick wall self-weight = 3m x 0.1m x 19kN/m2

= 5.7kN/m

○3 Slab (H-I/6-7) = 3.6kN/m2 x (2.67m/2)

= 4.81kN/m

○4 Slab (I-L/5-7) = 3.6kN/m2 x (5.8 m/2)

= 10.44kN/m

Total Dead Load

Total Dead Load at (H-I/7) = 1.44kN/m + 5.7kN/m + 4.81kN/m

= 11.95kN/m

Total Dead Load at (I-K/7) = 1.44kN/m + 5.7kN/m + 10.44kN/m

= 17.58kN/m

Live Load:

○1 Slab (H-I/6-7) = Bedroom x (2.67m/2)

= 1.5kN/m2 x (2.67m/2)

= 2.00kN/m

○2 Slab (I-L/5-7) = Bedroom x (5.8m/2)

= 1.5kN/m2 x (5.8m/2)

= 4.35kN/m

Ultimate Load

○1 Carries self-weight – Dead Load

○2 Sab Dead Load & Live Load

Slab 1 : Slab H-I/6-7 (Two-Way Slab)

Slab 2 : Slab I-L/5-7(Two-Way Slab)

○3 Brick Wall – Dead Load

Page 34: Building Structure Final report

BUILDING STRUCTURE PROJECT 2: BEAM AND COLUMN 34

Apply factor 1.4 and 1.6 to dead load and live load respectively.

Ultimate Load for (H-I/) = Total Dead Load (1.4) + Total Live Load (1.6)

= 11.95kN/m (1.4) + 2.00kN/m (1.6)

= 16.73kN/m + 3.2kN/m

= 19.93kN/m

Ultimate Load for (I-K/7) = Total Dead Load (1.4) + Total Live Load (1.6)

= 17.58kN/m (1.4) + 4.35kN/m (1.6)

= 24.61kN/m + 6.96kN/m

= 31.57kN/m

Point Load

Referring to Beam I/5-7, point load from the beam is = 142.71KN

Ultimate Load Diagram

Total load for H-I/7 = 19.93kN/m x 3.1m = 61.78kN

Total load for I-K/7 = 31.57kN/m x 3.21m = 101.34kN

Reaction Forces:

∑m = 0

R1(6.31) – (19.93 x 3.1)(4.76) – (142.71 X 3.21) – (31.57 x 3.21 )(1.61)= 0

R1(6.31) – 294.09 – 1458.10– 163.16 = 0

R1 = 915.35/6.31

R1 = 145.06kN -----○A

∑fy = 0

R1+R2 – 142.71 – 19.93(3.1) – 31.57(3.21) = 0 -----○B

Substitute ○A into ○B ,

145.06 + R2 – 142.71 – 19.93(3.1) – 31.57(3.21) = 0

145.06 + R2 – 142.71 – 61.78 – 101.34 = 0

R2 – 160.77 = 0

R2 = 160.77kN

Page 35: Building Structure Final report

BUILDING STRUCTURE PROJECT 2: BEAM AND COLUMN 35

Load Diagram

0kN

0kN

0kN

-59.43kN

0kN

353

-160.77kN

0kN

0kN

83.28kN

145.06kN

(+)

(-)

Shear Force Diagram

Bending Moment Diagram

Positive area – Negative area

+ve = 1/2 x (146.12)(3.39)

= 247.67 ≈ 247

-ve = [1/2 x (- 142.71 + -40.74)(2.67)

+[1/2 x (-0.02 x 3.39)

= -246.91 + -0.03

= -246.94 ≈ -247

247-247 = 0

Area of Trapezium at (+) area

= (145.06 + 83.28) x 3.1/2

=353.93 ≈ 353

Area of Trapezium at ( - ) area

= (-59.43 – 160.77) x 3.21/2

= -353.43 ≈ 353

Area of ( + ) area + Area of ( - ) area

= 353-353

=0

Page 36: Building Structure Final report

BUILDING STRUCTURE PROJECT 2: BEAM AND COLUMN 36

Beam H-I/6 (First Floor | Secondary Beam)

Dead Load:

○1 Beam self-weight = 0.2m x 0.3m x 24kN/m3

= 1.44kN/m

○2 Brick wall self-weight = 3m x 0.1m x 19kN/m2

= 5.7kN/m

○3 Slab (I-N/3-5) = 3.6kN/m2 x (3.7m/2)

= 6.66kN/m

○4 Slab (I-L/5-7) = 3.6kN/m2 x (5.8m/2)

= 10.44kN/m

Total Dead Load

Total Dead Load = 1.44kN/m + 5.7kN/m + 6.66kN/m

+ 10.44kN/m

= 24.24kN/m

Live Load:

○1 Slab (I-N/3-5) = Living Room x (3.7m/2)

= 4.0kN/m2 x (3.7m/2)

= 7.4kN/m

○2 Slab (I-L/5-7) = Bedroom x (5.8m/2)

= 1.5kN/m2 x (5.8m/2)

= 4.35kN/m

Total Live Load

Total Live Load = 7.4kN/m + 4.35kN/m

= 11.75kN/m

○1 Carries self-weight – Dead Load

○2 Sab Dead Load & Live Load

Slab 1 : Slab I-N/3-5 (One-Way Slab)

Slab 2 : Slab I-LI/5-7 (Two-Way Slab)

○3 Brick Wall – Dead Load

Page 37: Building Structure Final report

BUILDING STRUCTURE PROJECT 2: BEAM AND COLUMN 37

Ultimate Load

Apply factor 1.4 and 1.6 to dead load and live load respectively.

Ultimate Load for (H-I/6) = Total Dead Load (1.4) + Total Live Load (1.6)

= 24.24kN/m (1.4) + 11.75kN/m (1.6)

= 33.94kN/m + 18.8kN/m

= 52.74kN/m

Ultimate Load Diagram

Total load = 5.8m x 52.74kN/m

= 305.89kN

Reactions (UDL):

Reactions = (5.8 x 52.74)/2

= 152.95kN

Load Diagram

Shear Force Diagram

221.78kN

0kN 0kN

0kN

-152.95kN

152.95kN

0kN

(+)

(-)

Bending Moment Diagram

Point 1 = 152.95kN

Point 2 = 152.95 – (52.74x 5.8)

= -152.95

Point 3 = -152.95 + 152.95

= 0kN

Area of Triangle

= ½ x 2.9 x 152.95

=221.78

Page 38: Building Structure Final report

8.2 Joyce Wee

Beam A-B/4 (Ground Floor | Secondary Beam)

Dead Load:

○1 Slab (A-B/ 3-4) = 3.6kN/m2 x (1.91m/2)

= 3.44kN/m

○2 Slab (A-B/ 4-6) = 3.6kN/m2 x (3.1m/2) 2/3

= 3.72kN/m

○3 Brick wall weight = 3m x 0.1m x 19kN/m3

=5.7kN/m

○4 Beam self-weight = 0.1m x 0.2m x 24kN/m3

= 0.48kN/m

Total Dead Load:

Total Dead Load = 3.44 + 3.72 + 5.7 + 0.48

= 13.34kN/m

Live Load:

○1 Slab (A-B/ 3-4) = Bathroom x (1.91m/2)

= 2.0kN/m2 x (1.91m/2)

= 1.91kN/m

○2 Slab (A-B/ 4-6) = Bedroom x (3.1m/2)

= 1.5kN/m2 x (3.1m/2)

= 2.33kN/m

Total Live Load:

Total Live Load = 1.91kN/m + 2.33kN/m

=4.24kN/m

Page 39: Building Structure Final report

BUILDING STRUCTURE PROJECT 2: BEAM AND COLUMN 39

Ultimate Load:

Ultimate Load = TDL(1.4) + TLL(1.6)

= 13.34(1.4) + 4.24(1.6)

= 25.46kN/m

Load Diagram for Beam (A-B/4)

Reaction Force:

∑m = 0

(RA x 3.1) – (25.46 x 3.1)(1.55) = 0

RA(3.1) – 122.34 = 0

RA = 122.34/3.1

RA = 39.46kN -----○A

∑fy = 0

RA + RB + (-25.46 x 3.1) = 0 -----○B

Substitute ○A into ○B

39.46 + RB – 78.926 = 0

RB = 78.926 – 39.46

RB = 39.5kN

Page 40: Building Structure Final report

BUILDING STRUCTURE PROJECT 2: BEAM AND COLUMN 40

Shear Force Diagram

Point 1 = 39.46kN

Point 2 = 39.46 + (-25.46 x 3.1)

= 39.46 x 78.926

= -39.5K

Point 3 = -39.5 + 39.5

= 0kN

Bending Moment Diagram

Peak = (39.46 x 1.55) x ½

= 30.58

Page 41: Building Structure Final report

BUILDING STRUCTURE PROJECT 2: BEAM AND COLUMN 41

Beam B-D/5 (Ground Floor | Secondary Beam)

Dead Load:

○1 Slab (B-D/3-5) = 3.6kN/m2 x (3.21m/2) 2/3

= 3.85kN/m

○2 Slab (B-D/5-6) = 3.6kN/m2 X (3.21m/2)2/3

= 3.85kN/m

○3 Beam self-weight = 0.1m x 0.2m x 24kN/m3

= 0.48kN/m

Total Dead Load:

Total Dead Load = 3.85 + 3.85 + 0.48

= 8.18kN/m

Live Load:

○1 Slab (B-D/3-5) = Stairs x (3.21m/2)2/3

= 1.5kN/m2 x (3.21m/2)2/3

= 1.605kN/m

At Slab (B-D/3-5),

Slab : Stairs = 3.21m : 1.4m

1.605 : α = 3.21 : 1.4

1.605/a = 3.21/1.4

a = 0.7kN/m

Page 42: Building Structure Final report

BUILDING STRUCTURE PROJECT 2: BEAM AND COLUMN 42

○2 Slab (B-D/3-5) = Corridor x (3.21m/2)2/3

= 4.0kN/m2 x (3.21m/2)2/3

= 4.28kN/m

At Slab (B-D/3-5),

Slab : Corridor = 3.21m : 1.81m

4.28 : α = 3.21 : 1.81

4.28/a = 3.21/1.81

a = 2.41kN/m

○3 Slab (B-D/3-5) = Stairs x (3.21m/2)2/3

= 1.5kN/m2 x (3.21m/2)2/3

= 1.605kN/m

At Slab (B-D/3-5),

Slab : Stairs = 3.21m : 1.4m

1.605 : α = 3.21 : 1.4

1.605/a = 3.21/1.4

a = 0.7kN/m

○4 Slab (B-D/3-5) = Corridor x (3.21/2)2/3

= 4.0kN/m2 x (3.21/2)2/3

= 4.28kN/m

At Slab (B-D/3-5),

Slab : Corridor = 3.21m : 1.81m

4.28 : α = 3.21 : 1.81

4.28/a = 3.21/1.81

a = 2.41kN/m

Total Live Load:

Total Live Load at (B-C) = 0.7 + 0.7

= 1.4kN/m

Total Live Load at (C-D) = 2.41 + 2.41

= 4.82kN/m

Page 43: Building Structure Final report

BUILDING STRUCTURE PROJECT 2: BEAM AND COLUMN 43

Ultimate Load:

Ultimate Load at (B-C) = TDL(1.4) + TLL(1.6)

= 8.18(1.4) + 1.4(1.6)

= 13.69kN/m

Ultimate Load at (C-D) = TDL(1.4) + TLL(1.6)

= 8.18(1.4) + 4.82(1.6)

= 19.16kN/m

Load Diagram of Beam (B-D/5):

Reaction Forces:

∑m = 0

RB(3.21) – (19.16 x 1.81)(0.91) – (13.69)(2.51) = 0

RB(3.21) – 31.56 – 34.36 = 0

RB = 65.92/3.21

RB = 20.54kN/m -----○A

∑fy = 0

RB+RD-(13.69 X 1.4) – (19.16 X 1.81) = 0 -----○B

Substitute ○A into ○B ,

20.54 + RD – 19.17 – 34.68 = 0

RD = 53.85 - 20.54

RD = 33.31kN/m

Page 44: Building Structure Final report

BUILDING STRUCTURE PROJECT 2: BEAM AND COLUMN 44

Shear Force Diagram:

Point 1 = 20.54

Point 2 = 20.54 – (13.69 x 1.4)

= 1.374

Point 3 = 1.374 – (19.16 x 1.81)

= -33.31

Point 4 = -33.31 + 33.31

= 0

Bending Moment Diagram:

Bending Moment 1

= (20.54 + 1.374)/2 x 1.4

= 15.34

Bending Moment 2

= 15.3398 + (1.374 x 0.3)/2

= 15.55

Page 45: Building Structure Final report

BUILDING STRUCTURE PROJECT 2: BEAM AND COLUMN 45

Beam B/3-6 (Ground Floor | Primary Beam)

Dead Load:

○1 Slab (A-B/3-4) = 3.6kN/m2 x (1.91m/2) 2/3

= 2.29kN/m

○2 Slab (A-B/4-6) = 3.6kN/m2 x (3.1m/2)

= 5.58kN/m

○3 Slab (B-D/3-5) = 3.6kN/m2 x (3.21m/2)

= 5.78kN/m

○4 Slab (B-D/5-6) = 3.6kN/m2 x (3.21m/2)

= 5.78kN/m

○5 Brick wall weight = 3m x 0.1m x 19kN/m3

= 5.7kN/m

○6 Beam self-weight = 0.2m x 0.3m x 24kN/m3

= 1.44kN/m

Total Dead Load:

Total Dead Load at (B/3-4) = 2.29 + 5.78 + 5.7 + 1.44

= 15.21kN/m

Total Dead Load at (B/4-5) = 5.58 + 5.78 + 5.7 + 1.44

= 18.5kN/m

Total Dead Load at (B/5-6) = 5.58 + 5.78 + 5.7 + 1.44

= 18.5kN/m

Live Load:

○1 Slab (A-B/ 3-4) = Bathroom x (1.91m/2) 2/3

= 2.0kN/m2 x (1.91m/2) 2/3

= 1.27kN/m

Page 46: Building Structure Final report

BUILDING STRUCTURE PROJECT 2: BEAM AND COLUMN 46

○2 Slab (A-B/ 4-6) = Bedroom x (3.1m/2)

= 1.5kN/m2 x (3.1m/2)

= 2.33kN/m

○3 Slab (B-D/ 3-4) = Stairs x (3.21m/2)

= 1.5kN/m2 x (3.21m/2)

= 2.41kN/m

○4 Slab (D-F/ 5-6) = Stairs x (3.21m/2)

= 1.5kN/m2 x (3.21m/2)

= 2.41kN/m

Total Live Load:

Total Live Load at (B/3-4) = 1.27 + 2.41

= 3.68kN/m

Total Live Load at (B/4-5) = 2.33 + 2.41

= 4.74kN/m

Total Live Load at (B/5-6) = 2.33 + 2.41

= 4.74kN/m

Ultimate Load:

Ultimate Load at (B/3-4) = TDL(1.4) + TLL(1.6)

= 15.21(1.4) + 3.68(1.6)

= 27.18kN/m

Ultimate Load at (B/4-6) = TDL(1.4) + TLL(1.6)

= 18.5(1.4) + 4.74(1.6)

= 33.48kN/m

Load Diagram of Beam (B/3-6):

○1 Referring to Beam (A-B/4), Point Load at B/4 = 39.5kN

○2 Referring to Beam (B-D/5), Point Load at B/5 = 20.76kN

Page 47: Building Structure Final report

BUILDING STRUCTURE PROJECT 2: BEAM AND COLUMN 47

Reaction Force:

∑m = 0

RB3(7.09) – (27.18 x 1.91)(6.14) – (39.5)(5.18) – (20.76)(3.39) – (33.48 x 5.18)(2.59) = 0

RB3(7.09) – 318.75 – 204.61 – 70.38 – 449.17 = 0

RB3 = 1042.91/7.09

RB3 = 147.1kN -----○A

∑fy = 0

RB3 + RB6 – 39.5 – 20.76 – 27.18(1.91) – 33.48(5.18) = 0 -----○B

Substitute ○A into ○B ,

147.1 + RB6 – 39.5 – 20.76 – 51.91 – 173.43 = 0

RB6 = 138.5kN

Page 48: Building Structure Final report

BUILDING STRUCTURE PROJECT 2: BEAM AND COLUMN 48

Shear Force Diagram:

Point 1 = 147.1

Point 2 = 147.1 – (27.18 x 1.91)

= 95.19

Point 3 = 95.19 – 39.5

= 55.69

Point 4 = 55.69 – (33.48 x 1.79)

= -4.24

Point 5 = -4.24 – 20.76

= -25

Point 6 = -25 – (33.48 x 3.39)

= - 138.5

Bending Moment Diagram:

Bending Point 1

= (147.1 + 95.19)/2 x 1.91

= 231.39

Bending Point 2

= 231.39 + (55.69 x 1.662)/2

= 277.67

Bending Point 3

= 277.67 – (4.24 x 0.128)/2

= 277.4

Bending Point 4

= 277.4 – (25 + 138.5)/2 x 3.39

= 0

Page 49: Building Structure Final report

BUILDING STRUCTURE PROJECT 2: BEAM AND COLUMN 49

Beam J/1-3 (First Floor | Secondary Beam)

Dead Load at Beam (J-K/2):

○1 Slab (J-K/1-2) = 3.6kN/m2 x (1.81m/2)2/3

= 2.172kN/m

○2 Slab (J-K/2-3) = 3.6kN/m2 x (1.6m/2)

= 2.88kN/m

○3 Brick Wall Load = 3.0m x 0.1m x 19kN/m3

= 5.7kN/m

○4 Beam Self-Weight = 0.1m x 0.2m x 24kN/m3

= 0.48kN/m

Total Dead Load at Beam (J-K/2):

Total Dead Load = 2.17 + 2.88 + 5.7 + 0.48

= 11.23kN/m

Live Load:

1 Slab (J-K/1-2) = Bathroom x (1.81m/2)2/3

= 2.0kN/m2 x (1.81m/2)2/3

= 1.21kN/m

2 Slab (J-K/2-3) = Bedroom x (1.6m/2)

= 1.5kN/m2 x (1.6m/2)

= 1.2kN/m

Total Live Load at Beam (J-K/2):

Total Live Load = 1.21 + 1.2

= 2.41kN/m

Ultimate Load at Beam (J-K/2):

Page 50: Building Structure Final report

BUILDING STRUCTURE PROJECT 2: BEAM AND COLUMN 50

Ultimate Load = TDL(1.4) + TLL(1.6)

= 11.23(1.4) + 2.41(1.6)

= 19.58kN/m2

Load Diagram of beam (J-K/2):

Reaction Force

∑m = 0

RJ (1.81) – (19.58 x 1.81)(0.91) = 0

RJ (1.81) – 32.35 = 0

RJ = 32.25/1.81

RJ = 17.82kN -----○A

∑fy = 0

RJ + RK – (19.58) (1.81) = 0 -----○B

Substitute ○A into ○B ,

17.82 + RK – 35.44 = 0

RK = 17.62kN

Page 51: Building Structure Final report

BUILDING STRUCTURE PROJECT 2: BEAM AND COLUMN 51

Dead Load at Beam J/1-3

○1 Slab (H-J/1-3) = 3.6kN/m2 x (4.19m/2)2/3

= 5.03kN/m

○2 Slab (J-K/1-2) = 3.6kN/m2 x (1.81m/2)

= 3.26kN/m

○3 Slab (J-K/2-3) = 3.6kN/m2 x (1.6m/2)2/3

= 1.92kN/m

○4 Brick Wall Weight = 3.0m x 0.1m x 19kN/m3

= 5.7kN/m

○5 Beam Self Weight = 0.1m x 0.2m x 24kN/m3

= 0.48kN/m

Total Dead Load at Beam (J/1-3):

Total Dead Load at (J/1-2) = 5.03 + 3.26 + 5.7 + 0.48

= 14.47kN/m

Total Dead Load at (J/2-3) = 5.03 + 1.92 + 5.7 + 0.48

= 13.13kN/m

Live Load at Beam J/1-3

○1 Slab (H-J/1-3) = Bedroom x (4,19m/2)2/3

= 1.5kN/m2 x (4.19m/2)2/3

= 2.095kN/m

○2 Slab (J-K/1-2) = Bathroom x (1.81m/2)

= 2.0kN/m2 x (1.81m/2)

= 1.81kN/m

○3 Slab J-K/2-3) = Bedroom x 1.6m/2)2/3

= 1.5kN/m2 x 1.6m/2)2/3

= 0.8kN/m

Total Live Load at Beam J/1-3:

Total Live Load at (J/1-2) = 2.095 + 1.81

= 3.905kN/m

Total Live Load at (J/2-3) = 2.095 + 0.8

= 2.895kN/m

Ultimate Load at Beam J/1-3

Ultimate Load at (J/1-2) = TDL (1.4) + TLL (1.6)

=14.47(1.4) + 3.905(1.6)

Page 52: Building Structure Final report

BUILDING STRUCTURE PROJECT 2: BEAM AND COLUMN 52

= 26.51kN/m

Ultimate Load at (J/2-3) = TDL (1.4) + TLL (1.6)

= 13.13(1.4) + 2.9(1.6)

= 23.02kN/m

Load Diagram of Beam (J/1-3):

○1 Referring to Beam (J-K/2), Point Load at J/2 = 17.82kN

∑m = 0

RJ1(4.19) – (23.02 x 1.6) (0.8) – (17.82) (1.6) – (26.51 x 2.59) (2.9) = 0

RJ1(4.19) – 29.47 – 28.512 – 199.12 = 0

RJ1 = 257.1/4.19

RJ1 = 61.36kN -----○A

∑fy = 0

RJ1 + RJ2 – 17.82 – (26.51 x 2.59) – (23.02 x 1.6) = 0 -----○B

Substitute ○A into ○B ,

61.36 + RJ2 – 17.82 – 68.66 – 36.83 = 0

RJ2 = 61.95kN

Page 53: Building Structure Final report

BUILDING STRUCTURE PROJECT 2: BEAM AND COLUMN 53

Shear Force Diagram

Point 1 = 61.36

Point 2 = 61.36 – (26.51 x 2.59)

= -7.3

Point 3 = -7.3 – 17.82

= -25.12

Point 4 = -25.12 – (23.02 x 1.6)

= -61.95

Point 5 = -61.95 + 61.95

Bending Moment Diagram

Bending Point 1

= (61.36 x 2.3)/2

= 70.56

Bending Point 2

= 70.56 – (7.3 x 0.29)/2

= 69.5

Page 54: Building Structure Final report

BUILDING STRUCTURE PROJECT 2: BEAM AND COLUMN 54

Beam H-K/1 (First Floor | Primary Beam)

Dead Load:

○1 Slab (H-J/1-3) = 3.6kN/m2 x (4.19m/2)

= 7.542kN/m

○2 Slab (J-K/1-2) = 3.6kN/m2 x (1.81m/2)2/3

= 2.17kN/m

○3 Brick Wall Weight = 3m x 0.1m x 19kN/m3

= 5.7kN/m

○4 Beam Self-Weight = 0.2m x 0.3m x 24kN/m3

= 1.44kN/m

Total Dead Load:

Total Dead Load at (H-J) = 7.542 + 5.7 + 1.44

= 14.68kN/m

Total Dead Load at (J-K) = 2.17 + 5.7 + 1.44

= 9.31kN/m

Live Load:

○1 Slab (H-J/1-3) = Bedroom x (4.19m/2)

= 1.5kN/m2 x (4.19m/2)

= 3.14kN/m

○2 Slab (J-K/1-2) = Bathroom x (1.81m/2)2/3

= 2.0kN/m2 x (1.81/2)2/3

= 1.21kN/m

Total Live Load:

Total Live Load at (H-J) = 3.14kN/m

Total Live Load at (J-K) = 1.21kN/m

Ultimate Load:

Page 55: Building Structure Final report

BUILDING STRUCTURE PROJECT 2: BEAM AND COLUMN 55

Ultimate Load at (H-J) = TDL (1.4) + TLL (1.6)

=14.68(1.4) + 3.14(1.6)

= 25.57kN/m

Ultimate Load at (J-K) = TDL (1.4) + TLL (1.6)

= 9.31(1.4) + 1.21(1.6)

= 14.97kN/m

Load Diagram of Beam (H-K/1):

○1 Referring to Beam (J/1-3), Point Load at J/1 = 61.36kN

∑m = 0

RH (6.3) – (25.57 X 4.49) (4.06) – (61.36) (1.81) – (14.97 X 1.81) (0.91) = 0

RH (6.3) – 466.13 – 111.06 – 24.66 = 0

RH = 601.85/6.3

RH = 95.53kN/m -----○A

∑fy = 0

RH + RK – 61.36 – (25.57 X 4.49) – (14.97 X 1.81) = 0 -----○B

Substitute ○A into ○B ,

95.53 + RK – 61.36 – 114.81 – 27.1 = 0

RK = 107.34kN

Page 56: Building Structure Final report

BUILDING STRUCTURE PROJECT 2: BEAM AND COLUMN 56

Shear Force Diagram

Point 1 = 95.53

Point 2 = 95.53 – (25.57 x 4.49)

= -19.28

Point 3 = -19.28 – 61.36

= -80.64

Point 4 = -80.64 – (14.97 x 1.81)

= -107.34

Point 5 = -107.34 + 107.34

= 0

Bending Moment Diagram

Bending Point 1

= (95.53 x 3.73)/2

= 178.163

Bending Point 2

= 178.163 - (19.28 x 0.76)/2

= 170.837

Bending Point 3

= 170.837 – (80.64 + 107.34)/2 x 1.81

= 0

Page 57: Building Structure Final report

BUILDING STRUCTURE PROJECT 2: BEAM AND COLUMN 57

Beam I-K/3 (First Floor | Primary Beam)

Dead Load

○1 Slab (H-J/1-3) = 3.6kN/m2 x (4.49m/2)

= 7.54kN/m

○2 Slab (I-N/3-5) = 3.6kN/m2 x (4.71/2)

= 8.48kN/m

○3 Slab (J-K/2-3) = 3.6kN/m2 x (1.6/2)

= 2.88kN/m

○4 Brick Wall Weight = 3m x 0.1m x 19kN/m3

= 5.7kN/m

○5 Beam Self-Weight = 0.2m x 0.3m x 24kN/m3

= 1.44kN/m

Total Dead Load:

Total Dead Load at (I-J) = 7.54 + 8.48 + 5.7 + 1.44

= 23.16kN/m

Total Dead Load at (J-K) = 18.5kN/m

Live Load:

○1 Slab (H-J/1-3) = Bedroom x (4.49m/2)

= 1.5kN/m2 x (4.49m/2)

= 3.37kN/m

○2 Slab (I-N/3-5) = Living Room x (4.71m/2)

= 4.0kN/m2 x (4.71m/2)

= 9.4kN/m

Page 58: Building Structure Final report

BUILDING STRUCTURE PROJECT 2: BEAM AND COLUMN 58

○3 Slab (J-K/2-3) = Bedroom x (1.6m/2)

= 1.5kN/m2 x(1.6m/2)

= 1.2kN/m

Total Live Load:

Total Live Load at (I-J) = 3.37 + 9.4

= 12.77kN/m

Total Live Load at (J-K) = 9.4 + 1.2

= 10.6kN/m

Ultimate Load:

Ultimate Load at (I-J) = TDL (1.4) + TLL (1.6)

= 23.16(1.4) + 12.77(1.6)

= 52.85kN/m

Ultimate Load at (J-K) = TDL(1.4) + TLL(1.6)

= 18.5(1.4) + 10.6(1.6)

= 42.86kN/m

Load Diagram of Beam (I-K/3):

○1 Referring to Beam (J/1-3), Point Load at J/3 = 61.95kN/m

∑m = 0

RI(3.21) – (52.85 x 1.4) (2.51) – (61.95) (1.81) – (42.86 x 1.81) (0.91) = 0

RI(3.21) – 185.71 – 112.13 – 70.59 = 0

RI = 368.43/3.21

RI = 114.76kN -----○A

∑fy = 0

RI + RK – 61.95 – (52.85 X 1.4) – (42.86 X 1.81) = 0 -----○B

Substitute ○A into ○B ,

114.76 + RK – 61.95 – 73.99 – 77.58 = 0

RK = 98.76kN

Page 59: Building Structure Final report

BUILDING STRUCTURE PROJECT 2: BEAM AND COLUMN 59

Shear Force Diagram:

Point 1 = 114.76

Point 2 = 114.76 – (52.85 x 1.4)

=40.77

Point 3 = 40.77 – 61.95

= - 21.18

Point 4 = -21.18 – (42.86 x 1.81)

= -98.76

Point 5 = -98.76 + 98.76

= 0

Bending Moment Diagram

Bending Point 1

= (114.76 + 40.77)/2 x 1.4

= 108.87

Bending Point 2

= 108.87 - (21.18 + 98.76)/2 x 1.81

= 0

1.4 3.21

Page 60: Building Structure Final report

BUILDING STRUCTURE PROJECT 2: BEAM AND COLUMN 60

8.3 Tan Wing Hoe

Beam A-B/4 (Ground Floor | Secondary Beam)

Dead Load:

1. Slab (C-D/ 1-2) = 3.6kN/m2 x (1.81m/2) x 2/3

= 2.17kN/m

2. Slab (C-D/ 2-3) = 3.6kN/m2 x (1.6m/2)

= 2.88kN/m

3. Brick wall weight = 3m x 0.1m x 19kN/m3

=5.7kN/m

4. Beam self-weight = 0.1m x 0.2m x 24kN/m3

= 0.48kN/m

Total Dead Load:

Total Dead Load = 2.17 + 2.88 + 5.7 + 0.48

= 11.23kN/m

Live Load:

○1 Slab (C-D/ 1-2) = Bathroom x (1.81m/2)

= 2.0kN/m2 x (1.81m/2)

= 1.21kN/m

○2 Slab (C-D/ 2-3) = Bedroom x (1.6m/2)

= 1.5kN/m2 x (1.6m/2)

= 1.2kN/m

Total Live Load:

Total Live Load = 1.21kN/m + 1.2kN/m

=2.41kN/m

Page 61: Building Structure Final report

BUILDING STRUCTURE PROJECT 2: BEAM AND COLUMN 61

Ultimate Load:

Ultimate Load = TDL(1.4) + TLL(1.6)

= 11.23(1.4) + 2.41(1.6)

= 19.58kN/m

Load Diagram for Beam (C-D/2)

Reaction Force:

∑m = 0

(RA x 1.81) – (19.58 x 1.81)(0.91) = 0

RA(1.81) – 32.25 = 0

RA = 32.25/1.81

RA = 17.82kN -----○A

∑fy = 0

RA + RB + (-19.58 x 1.81) = 0 -----○B

Substitute ○A into ○B

17.82 + RB – 35.44 = 0

RB = 35.44-17.82

RB = 17.62kN

Page 62: Building Structure Final report

BUILDING STRUCTURE PROJECT 2: BEAM AND COLUMN 62

Shear Force Diagram

Point 1 = 17.82

Point 2 = 17.82 -(19.58 x 1.81)

= 17.82 - 35.68

= -17.62

Point 3 = -17.62+17.62

= 0kN

Bending Moment Diagram

Peak = (17.82 x 1.55) x ½

= 13.81

Page 63: Building Structure Final report

BUILDING STRUCTURE PROJECT 2: BEAM AND COLUMN 63

Beam (F/3-5) (Ground Floor | Secondary Beam)

Dead Load:

1. Slab (D-F/3-5) = 3.6kN/m2 x (3.7m/2) 2/3

= 4.44kN/m

2. Slab (F-G/3-5) = 3.6kN/m2 X (3.55m/2)

= 6.39kN/m

3. Beam self-weight = 0.1m x 0.2m x 24kN/m3

= 0.48kN/m

Total Dead Load:

Total Dead Load = 4.44 + 6.39 + 0.48

= 11.31kN/m

Live Load:

1. Slab (D-F/3-5) = KTICHEN x (3.55m/2)

= 3kN/m2 x (3.55m/2)

= 5.33kN/m

2. Slab (D-F/3-5) = KTICHEN x (3.7m/2) x 2/3

= 3kN/m2 x (3.7m/2) x 2/3

= 3.7kN/m

Page 64: Building Structure Final report

BUILDING STRUCTURE PROJECT 2: BEAM AND COLUMN 64

Total Live Load:

= Slab (D-F/3-5) + Slab (D-F/3-5)

=(5.33+3.7) kN/m

=9.03kN/m

Ultimate Load:

Ultimate Load = TDL(1.4) + TLL(1.6)

= 11.31(1.4) + 9.03(1.6)

= 30.28kN/m

Load Diagram of Beam (B-D/5):

Reaction Forces:

∑m = 0

RB(3.7) – (30.28 x 3.7)(1.85) = 0

RB(3.7) – 207.27 = 0

RB = 207.27/3.7

RB = 56.02kN/m -----1

∑fy = 0

RB+RA-(30.28 X 3.7) = 0 -----2

Substitute 1 into2,

56.02+ RA –(30.28 x 3.7) = 0

- RA = 56.45-112.04

RA = 56.02kN/m

Page 65: Building Structure Final report

BUILDING STRUCTURE PROJECT 2: BEAM AND COLUMN 65

Shear Force Diagram

Point 1 = 56.02

Point 2 = 56.02 -(30.28x 3.7)

= 56.02 - 111.93

= 55.91

Point 3 = 56.02-55.91

= 0.11kN

Bending Moment Diagram

Peak = (56.02x 1.55) x ½

= 43.42

Page 66: Building Structure Final report

BUILDING STRUCTURE PROJECT 2: BEAM AND COLUMN 66

Beam D-E/5 (Ground Floor | Secondary Beam)

Dead Load:

1. Slab (D-E/3-5) = 3.6kN/m2 x (3.7m/2)

= 6.66kN/m

2. Slab (D-E/5-6) = 3.6kN/m2 x (2.59m/2) x 2/3

= 3.11kN/m

3. Brick wall weight = 3m x 0.1m x 19kN/m3

= 5.7kN/m

4. Beam self-weight = 0.1m x 0.2m x 24kN/m3

= 0.48kN/m

Total Dead Load:

Total Dead Load =(6.66+3.11+5.7+0.48)kN/m

=15.95Kn/M

Live Load:

○1 Slab (D-E/3-5) = Kitchen x (3.7m/2)

= 3.0kN/m2 x (3.7m/2)

= 5.55kN/m

○2 Slab (D-E/5-6) = Store x (2.59m/2) x 2/3

= 2.5kN/m2 x (2.59m/2) x 2/3

= 2.16kN/m

Page 67: Building Structure Final report

BUILDING STRUCTURE PROJECT 2: BEAM AND COLUMN 67

Total Live Load:

Total Live Load = Slab (D-E/3-5) + Slab (D-E/5-6)

=(5.55+2.16)Kn/m

=7.71 Kn/M

Ultimate Load:

Ultimate Load = TDL(1.4) + TLL(1.6)

=15.95(1.4)+7.71(1.6)

=34.67 Kn/M

Load Diagram of Beam (D/4-5):

Reaction Force:

∑m = 0

RB(2.59) – (34.67 x 2.59)(1.3) = 0

RB(2.59) –116.73 = 0

RB = 116.73/2.59

RB = 45.06kN -----1

∑fy = 0

RB + RA –(34.67 x 2.59) = 0 -----2

Substitute 1 into2,

45.06 + RA –89.80 = 0

RA = 44.74kN

Page 68: Building Structure Final report

BUILDING STRUCTURE PROJECT 2: BEAM AND COLUMN 68

Shear Force Diagram

Point 1 = 44.74

Point 2 = 44.74 -(34.63 x 2.59)

= 44.74 - 89.69

= -44.95

Point 3 = -44.95+45.06

= 0.11kN

Bending Moment Diagram

Peak = (44.74 x 1.55) x ½

= 34.67kN

Page 69: Building Structure Final report

BUILDING STRUCTURE PROJECT 2: BEAM AND COLUMN 69

Beam D/1-3 (Ground Floor | Primary Beam)

Dead Load:

1. Slab (C-D/1-2) = 3.6kN/m2 x (1.81m/2)

= 3.26kN/m

2. Slab (C-D/2-3) = 3.6kN/m2 x (1.6m/2)2/3

= 1.92kN/m

3. Slab (D-F/1-2) = 3.6kN/m2 x (4.11M/2)

= 7.4kN/m

○3 Brick Wall Weight = 3m x 0.1m x 19kN/m3

= 5.7kN/m

○4 Beam Self-Weight = 0.2m x 0.3m x 24kN/m3

= 1.44kN/m

Total Dead Load:

Total Dead Load at (D/1-2) = (3.26 + 7.4 +1.44+5.7)Kn/M

A-B = 17.8kN/m

Total Dead Load at (D/2-3) = (1.92 + 7.4 + 5.7 + 1.44) kN/m

B-C = 16.48kN/m

Live Load:

1.Slab (C-D/1-2) = Bathroom x (1.81m/2)

= 2kN/m2 x (1.81m/2)

= 1.81kN/m

2. Slab (C-D/2-3) = Bedroom x (1.6m/2)2/3

= 1.5kN/m2 x (1.6/2)2/3

= 0.8kN/m

○2 Slab (C-D/2-3) = Dining x (4.11m/2)

= 2.0kN/m2 x (4.11/2)

=4.11kN/m

Total Live Load:

Page 70: Building Structure Final report

BUILDING STRUCTURE PROJECT 2: BEAM AND COLUMN 70

Total Live Load at (D/1-2)= 5.98kN/m

Total Live Load at (D/2-3)= 4.91kN/m

Ultimate Load:

Ultimate Load at (D/1-2)= TDL (1.4) + TLL (1.6)

=17.8(1.4) + 5.92(1.6)

= 34.39kN/m

Ultimate Load at (D/2-3)= TDL (1.4) + TLL (1.6)

= 16.481(1.4) + 4.91(1.6)

= 30.93kN/m

Load Diagram of Beam (D/1-3):

○1 Referring to Beam (C-D/ 2), Point Load at D1 =17.62 kN

∑m = 0

RC (4.19) – (30.93 X 1.6) (3.39) – (17.62) (2.59) – (34.39 x 2.59) (1.3) = 0

RC (4.19) – 167.76 – 45.64– 115.79 = 0

RC = 329.16/64.19

RC = 78.56kN/m -----1

∑fy = 0

RC + RA – 17.62 – (34.39 X 2.59) – (30.93 X 1.6) = 0 -----2

Substitute 1 into 2,

78.56 + RA – 17.62 – 89.07 – 49.49 = 0

RA = 77.62kN

Page 71: Building Structure Final report

BUILDING STRUCTURE PROJECT 2: BEAM AND COLUMN 71

Shear Force Diagram

Point 1 = 77.62

Point 2 = 77.62-(34.39 x 2.59)

= 77.62 - 89.07

= -11.45

Point 3 =-11.45-17.62

= -29.07

Point 4 = -29.07 - (30.93 x 1.6)

= -79.19

Point 5 = -79.19+78.56

=-0.63kN

Bending Moment Diagram

Peak = (44.74 x 1.55) x ½

= 34.67kN

Page 72: Building Structure Final report

BUILDING STRUCTURE PROJECT 2: BEAM AND COLUMN 72

d

Beam E-G/5 (Ground Floor | Primary Beam)

Dead Load

1. Slab (E-G/5-7) = 3.6kN/m2 x (5.08m/2) x 2/3

= 6.10kN/m

2. Slab (E-G/3-5) = 3.6kN/m2 x (3.55/2) x 2/3

= 4.26kN/m

3. Slab (D-F/3-5)= 3.6kN/m2 x (3.7/2)

= 6.66kN/m

Load involved area =6.66Kn/m x 1.52/2.59

=3.91 kN/m

4. Brick Wall Weight = 3m x 0.1m x 19kN/m3

= 5.7kN/m

5. Beam Self-Weight = 0.2m x 0.3m x 24kN/m3

= 1.44kN/m

Total Dead Load:

Total Dead Load at (A-B) = 6.10 + 6.66 +3.91+ 5.7 + 1.44

= 17.15kN/m

Total Dead Load at (B-C) = 6.1+4.26+5.7+1.44

=17.5 Kn/M

Page 73: Building Structure Final report

BUILDING STRUCTURE PROJECT 2: BEAM AND COLUMN 73

Live Load:

○1 Slab (E-G/5-7) = PORCH x (5.08m/2) x 2/3

= 2.0kN/m2 x (5.08m/2) x 2/3

= 3.38kN/m

○2 Slab (F-G/3-5) = KITCHEN x (3.55/2) x 2/3

= 3.0kN/m2 x (3.55/2) x 2/3

= 3.54kN/m

○3 Slab (D-F/3-5) = KITCHEN x (3.7m/2)

= 3.0kN/m2 x(3.7m/2)

= 3.26kN/m

Total Live Load:

Total Live Load at (A-B) = 6.64kN/m

Total Live Load at (B-C) = 6.92kN/m

Ultimate Load:

Ultimate Load at (A-B) = TDL (1.4) + TLL (1.6)

= 17.15(1.4) + 6.64(1.6)

= 34.63kN/m

Ultimate Load at (B-C) = TDL(1.4) + TLL(1.6)

= 17.5(1.4) + 6.92(1.6)

= 35.57kN/m

Load Diagram of Beam (E-G/5):

1. Referring to Beam (F/3-5), Point Load at D/5 = 56.02kN/m

∑m = 0

RC(5.08) – (35.57 x 3.55) (3.29) – (56.02) (1.52) – (34.63 x 1.52) (0.76) = 0

RC(5.08) – 415.44 – 85.15 – 40 = 0

RC = 540.59/5.08

RC = 106.42kN -----1

∑fy = 0

RC + RA – 56.02 – (34.63 X 1.52) – (35.57 X 3.55) = 0 -----2

Page 74: Building Structure Final report

BUILDING STRUCTURE PROJECT 2: BEAM AND COLUMN 74

Substitute 1 into 2,

106.42 + RA – 56.02 – 52.64 – 126.27 = 0

RA = 128.51kN

Shear Force Diagram

Point 1 =128.51 - 34.63(1.52)

=128.51 - 52.64

= 75.87

Point 2 = 75.87 - 56.02

= 19.85

Point 3 = 19.85 - 35.57(3.55)

= 19.85 -126.27

= -106.42

Point 4 =-106.42+106.42

=0kN

Bending Moment Diagram

Peak = (44.74 x 1.55) x ½

= 34.67kN

Page 75: Building Structure Final report

BUILDING STRUCTURE PROJECT 2: BEAM AND COLUMN 75

Beam D/3-6 (Ground Floor | Primary Beam)

Dead Load

1. Slab (B-C/5-6) = 3.6kN/m2 x (3.21m/2)

= 5.78kN/m

2. Slab (D-E/5-6) = 3.6kN/m2 x (2.59/2)

= 4.66kN/m

3. Slab (B-D/3-5) = 3.6kN/m2 x (3.21/2)

= 5.78kN/m

4. Slab (D-F/3-5) = 3.6kN/m2 x (3.7/2) x 2/3

= 4.44kN/m

Load involved area =6.66Kn/m x 1.52/2.59

=3.91 kN/m

5. Brick Wall Weight = 3m x 0.1m x 19kN/m3

= 5.7kN/m

6. Beam Self-Weight = 0.2m x 0.3m x 24kN/m3

= 1.44kN/m

Total Dead Load:

Total Dead Load at (A-B) = 5.78 + 4.44 + 1.44

= 11.66kN/m

Total Dead Load at (B-C) = 5.78+4.66+5.7+1.44

=17.58 Kn/M

Page 76: Building Structure Final report

BUILDING STRUCTURE PROJECT 2: BEAM AND COLUMN 76

Live Load:

1. Slab (B-C/5-6) = Corridor x (3.21/2)

= 4.0kN/m2 x (3.21/2)

= 6.42kN/m

2. Slab (D-E/5-6) = Store x (2.59/2)

= 2.5kN/m2 x (2.59/2)

= 3.24kN/m

3. Slab (B-D/3-5) = Corridor x (3.21/2)

= 4.0kN/m2 x (3.21/2)

= 6.42kN/m

4. Slab (D-F/3-5) = Kitchen x (3.7/2) x 2/3

= 3.0kN/m2 x(3.7/2) x 2/3

= 3.7kN/m

Total Live Load:

Total Live Load at (A-B) = 6.94kN/m

Total Live Load at (B-C) = 9.66kN/m

Ultimate Load:

Ultimate Load at (A-B) = TDL (1.4) + TLL (1.6)

= 11.66(1.4) + 6.94(1.6)

= 27.43kN/m

Ultimate Load at (B-C) = TDL(1.4) + TLL(1.6)

= 17.58(1.4) + 9.66(1.6)

= 40.07kN/m

Page 77: Building Structure Final report

BUILDING STRUCTURE PROJECT 2: BEAM AND COLUMN 77

Load Diagram of Beam (D/3-6):

1. Referring to Beam (D-E/5), Point Load at B = 14.60kN/m

2. Referring to Beam (B-D/5), Point Load at B = 33.31kN/m

∑m = 0

Rc(7.09) – (40.07 x 3.39) (4.08) – (14.60 x 2.59) - (33.31 x 3.21) - (27.48 x 3.7)(1.85)= 0

Rc(7.09) – 554.22 – 37.81 - 106.93– 188.10 = 0

Rc = 887.06/7.09

Rc = 125.11kN -----1

∑fy = 0

Rc + Ra – 14.60 - 33.31– (27.48 X 3.7) – (40.12 X 3.39) = 0 -----2

Substitute 1 into 2,

125.11+ Ra – 101.68 – 14.60 - 33.31 – 136 = 0

Ra = 160.48kN

Page 78: Building Structure Final report

BUILDING STRUCTURE PROJECT 2: BEAM AND COLUMN 78

Shear Force Diagram

Point 1 = 160.48- 27.43(3.7)

= 58.99

Point 2 = 58.99-47.91

= 11.08

Point 3 =11.08 - 40.07(3.39)

= - 124.76

Point 4 = -124.76 + 125.11

Point 5 = 0.35

Bending Moment Diagram

Peak = (44.74 x 1.55) x ½

= 34.67kN

Page 79: Building Structure Final report

BUILDING STRUCTURE PROJECT 2: BEAM AND COLUMN 79

10.0 Column Analysis Report

9.1 Canisius Bong

Column A/3 (Connected to All Floors)

-Roof Level-

Dead Load:

○1 Roof Slab = (3.05 x 1.55) m2 x 3.6kN/m2

= 4.73m2 x 3.6kN/m2

= 17.03kN

○2 Roof Beam = (0.96 + 2.09 + 1.55) m x 1.44kN/m

= 4.60m x 1.44kN/m

= 6.62kN

Total Dead Load at Roof Level

= 17.03N + 6.62kN

= 23.65kN

-First Floor-

Dead Load: Live Load:

○1 Slab = (3.05 x 1.55) m2 x 3.6kN/m2 ○1 Bedroom

= 4.73m2 x 3.6kN/m2 = (2.09m x 1.55m) x 1.5kN/m2

= 17.03kN = 4.86kN

○2 Wall = (0.96m + 2.09m + 1.55m) x 5.7kN/m ○2 Toilet

= 4.60m x 5.7kN/m = (0.96m x 1.55m) x 2.0kN/m2

= 26.22kN = 2.98kN

○3 Beam = (0.96m + 2.09m + 1.55m) x 1.44kN/m

= 4.60m x 1.44kN/m

= 6.62kN

○4 Column = (0.3m x 0.3m x 3.0m) x 24kN/m3

= 6.48kN

Total Dead Load at First Floor Total Live Load at First Floor

= 17.03kN + 26.22kN + 6.62kN + 6.48kN = 4.86kN + 2.98kN

= 56.35kN = 7.84kN

Page 80: Building Structure Final report

BUILDING STRUCTURE PROJECT 2: BEAM AND COLUMN 80

-Ground Floor-

Dead Load: Live Load:

○1 Slab = (3.05 x 1.55) m2 x 3.6kN/m2 ○1 Bedroom

= 4.73m2 x 3.6kN/m2 = (2.09m x 1.55m) x 1.5kN/m2

= 17.03kN = 4.86kN

○2 Wall = (0.96m + 2.09m + 1.55m) x 5.7kN/m ○2 Toilet

= 4.60m x 5.7kN/m = (0.96m x 1.55m) x 2.0kN/m2

= 26.22kN = 2.98kN

○3 Beam = (0.96m + 2.09m + 1.55m) x 1.44kN/m

= 4.60m x 1.44kN/m

= 6.62kN

○4 Column = (0.3m x 0.3m x 3.0m) x 24kN/m3

= 6.48kN

Total Dead Load at Ground Floor Total Live Load at Ground Floor

= 17.03kN + 26.22kN + 6.62kN + 6.48kN = 4.86kN + 2.98kN

= 56.35kN = 7.84kN

Total Dead Load at Column A/3 Total Live Load at Column A/3

= 23.65kN + 56.35kN + 56.35kN = 7.84kN + 7.84kN

= 136.35kN = 15.68kN

Ultimate Load at Column A/3

= TDL (1.4) + TLL (1.6)

= 136.35kN (1.4) + 15.68kN (1.6)

= 190.89kN + 25.09kN

= 215.98kN

Page 81: Building Structure Final report

BUILDING STRUCTURE PROJECT 2: BEAM AND COLUMN 81

Column E/5 (Connected to All Floors)

-Roof Level-

Dead Load:

○1 Roof Slab = (2.06 x 3.55) m2 x 3.6kN/m2

= 7.31m2 x 3.6kN/m2

= 26.32kN

○2 Roof Beam = (1.3 + 1.7 + 0.76) m x 1.44kN/m

= 3.76m x 1.44kN/m

= 5.41kN

Total Dead Load at Roof Level

= 26.32kN + 5.41kN

= 31.73kN

-First Floor-

Dead Load: Live Load:

○1 Slab = (2.06 x 3.55) m2 x 3.6kN/m2 ○1 Living Room

= 7.31m2 x 3.6kN/m2 = (1.85m x 2.06m) x 4.0kN/m2

= 26.32kN = 15.24kN

○2 Wall = (1.3m + 1.7m + 0.76m) x 5.7kN/m ○2 Bedrrom

= 3.76m x 5.7kN/m = (1.3m x 1.7m) x 1.5kN/m2

= 21.43kN = 3.32kN

○3 Beam = (1.3m + 1.7m + 0.76m) x 1.44kN/m ○3 Bedroom

= 3.76m x 1.44kN/m = (0.76m x 1.7m) x 1.5kN/m2

= 5.41kN = 1.94kN

○4 Column = (0.3m x 0.3m x 3.0m) x 24kN/m3

= 6.48kN

Total Dead Load at First Floor Total Live Load at First Floor

= 26.32kN + 21.43kN + 5.41kN + 6.48kN = 15.24kN + 3.32kN + 1.94kN

= 59.64KN = 20.5kN

Page 82: Building Structure Final report

BUILDING STRUCTURE PROJECT 2: BEAM AND COLUMN 82

-Ground Floor-

Dead Load: Live Load:

○1 Slab = (2.06 x 3.55) m2 x 3.6kN/m2 ○1 Dining Room

= 7.31m2 x 3.6kN/m2 = (1.85m x 2.06m) x 2.0kN/m2

= 26.32kN = 7.62kN

○2 Wall = (1.3m + 1.7m + 0.76m) x 5.7kN/m ○2 Family Area

= 3.76m x 5.7kN/m = (1.3m x 1.7m) x 2.0kN/m2

= 21.43kN = 4.42kN

○3 Beam = (1.3m + 1.7m + 0.76m) x 1.44kN/m ○3 Car Porch

= 3.76m x 1.44kN/m = (0.76m x 1.7m) x 2.0kN/m2

= 5.41kN = 2.58kN

○4 Column = (0.3m x 0.3m x 3.0m) x 24kN/m3

= 6.48kN

Total Dead Load at First Floor Total Live Load at First Floor

= 26.32kN + 21.43kN + 5.41kN + 6.48kN = 7.62kN + 4.42kN + 2.58kN

= 59.64kN = 14.62kN

Total Dead Load at Column E/5 Total Live Load at Column E/5

= 31.73kN + 59.64kN + 59.64kN = 14.62kN + 20.5kN

= 151.01kN = 35.12kN

Ultimate Load at Column E/5

= TDL (1.4) + TLL (1.6)

= 151.01kN (1.4) + 35.12kN (1.6)

= 211.41kN + 56.19kN

= 267.6kN

Page 83: Building Structure Final report

BUILDING STRUCTURE PROJECT 2: BEAM AND COLUMN 83

Column E/7 (Connected to All Floors)

-Roof Level-

Dead Load:

○1 Roof Slab = (2.06 x 3.31) m2 x 3.6kN/m2

= 6.82m2 x 3.6kN/m2

= 24.55kN

○2 Roof Beam = (1.3 + 1.34 + 0.76 + 1.97) m x 1.44kN/m

= 5.37m x 1.44kN/m

=3.41kN

Total Dead Load at Roof Level

= 24.55kN + 3.41kN

= 27.96kN

-First Floor-

Dead Load: Live Load:

○1 Slab = (3.83 x 3) m2 x 3.6kN/m2 ○1 Bedrrom

= 11.49m2 x 3.6kN/m2 = (1.3m x 3m) x 1.5kN/m2

= 41.36kN = 5.85kN

○2 Wall = (1.3m + 2.53m + 3m) x 5.7kN/m ○2 Bedroom

= 6.83m x 5.7kN/m = (2.53m x 3m) x 1.5kN/m2

= 38.93kN = 11.39kN

○3 Beam = (1.3m + 2.53m + 3m) x 1.44kN/m

= 6.83m x 1.44kN/m

= 9.84kN

○4 Column = (0.3m x 0.3m x 3.0m) x 24kN/m3

= 6.48kN

Total Dead Load at First Floor Total Live Load at First Floor

= 41.36kN + 38.93kN + 9.84kN + 6.48kN = 5.85kN + 11.39kN

= 96.61kN = 17.24kN

Page 84: Building Structure Final report

BUILDING STRUCTURE PROJECT 2: BEAM AND COLUMN 84

-Ground Floor-

Dead Load: Live Load:

○1 Slab = (2.06 x 3.31) m2 x 3.6kN/m2 ○1 Living Area

= 6.82m2 x 3.6kN/m2 = (1.3m x 1.34m) x 4.0kN/m2

= 24.55kN = 6.97kN

○2 Wall = (1.3m + 1.34m + 0.76m + 1.97m) x 5.7kN/m ○2 Living Area

= 5.37m x 5.7kN/m = (1.3m x 1.97m) x 4.0kN/m2

= 30.61kN = 10.24kN

○3 Beam = (1.3m + 1.3m + 0.76m + 1.97m) x 1.44kN/m ○3 Car Porch

= 5.37m x 1.44kN/m = (0.76m x 1.34m) x 2.0kN/m2

= 7.73kN = 2.04kN

○4 Column = (0.3m x 0.3m x 3.0m) x 24kN/m3 ○4 Car Porch

= 6.48kN = (0.76m x 1.97m) x 2.0kN/m2

= 2.99kN

Total Dead Load at Ground Floor Total Live Load at Ground Floor

= 24.55kN + 30.61kN + 5.37kN + 6.48kN = 6.97kN + 10.24kN + 2.04kN + 2.99kN

= 67.01kN = 22.24kN

Total Dead Load at Column E/7 Total Live Load at Column E/7

= 27.96kN + 96.61kN + 67.01kN = 17.24kN + 22.24kN

= 191.58kN = 39.48kN

Ultimate Load at Column E/7

= TDL (1.4) + TLL (1.6)

= 191.58kN (1.4) + 39.48N (1.6)

= 268.21kN + 63.17kN

= 331.38N

Page 85: Building Structure Final report

BUILDING STRUCTURE PROJECT 2: BEAM AND COLUMN 85

9.2 Joyce Wee

Column A/1 (Connected to All Floors)

-Roof Level-

Dead Load:

○1 Roof Slab = (3.155 x 2.09) m2 x 3.6kN/m2

= 6.59m2 x 3.6kN/m2

= 23.72kN

○2 Roof Beam = (3.155 + 2.09) m x 1.44kN/m

= 5.245m x 1.44kN/m

= 7.55kN

Total Dead Load at Roof Level

= 23.72kN + 7.55kN

= 31.27kN

-First Floor-

Dead Load: Live Load:

○1 Slab = (3.155 x 2.09)m2 x 3.6kN/m2 ○1 Bedroom

= 6.59m2 x 3.6kN/m2 = (2.09m x 3.155m) x 1.5kN/m2

= 23.72kN = 9.89kN

○2 Wall = (3.155m + 2.09m) x 5.7kN/m

= 5.245m x 5.7kN/m

= 29.9kN

○3 Beam = (3.155m + 2.09m) x 1.44kN/m

= 5.75m x 1.44kN/m

= 7.55kN

○4 Column = (0.3m x 0.3m x 3.0m) x 24kN/m3

= 6.48kN

Total Dead Load at First Floor Total Live Load at First Floor

= 23.72kN + 29.9kN + 7.55kN + 6.48kN = 9.89kN

= 67.65kN

Page 86: Building Structure Final report

BUILDING STRUCTURE PROJECT 2: BEAM AND COLUMN 86

-Ground Floor-

Dead Load: Live Load:

○1 Slab = (3.155 + 2.09) m2 x 3.6kN/m2 ○1 Bedroom

= 6.59m2 x 3.6kN/m2 = (3.155m x 2.09m) x 1.5kN/m2

= 23.72kN = 9.89kN

○2 Wall = (3.155m + 2.09m) x 5.7kN/m

= 5.245m x 5.7kN/m

= 29.9kN

○3 Beam = (3.155 + 2.09) m x 1.44kN/m

= 5.245m x 1.44kN/m

= 7.55kN

○4 Column = 0.3m x 0.3m x 3.0m x 24kN/m3

= 6.48kN

Total Dead Load at Ground Floor Total Live Load at Ground Floor

= 23.72kN + 29.9kN + 7.55kN + 6.48kN = 9.89kN

= 67.65kN

Total Dead Load at Column A/1 Total Live Load at Column A/1

= 31.27kN + 67.65kN + 67.65kN = 9.89kN + 9.89kN

= 166.57kN = 19.78kN

Ultimate Load at Column A/1

= TDL (1.4) + TLL (1.6)

= 166.57kN (1.4) + 19.78kN (1.6)

= 233.198kN + 31.648kN

= 264.85kN

Page 87: Building Structure Final report

BUILDING STRUCTURE PROJECT 2: BEAM AND COLUMN 87

Column D/3 (Connected to All Floors)

-Roof Level-

Dead Load: Live Load:

○1 Roof Slab = (3.66 x 3.94) m2 x 3.6kN/m2

= 14.42m2 x 3.6kN/m2

= 51.91kN

○2 Roof Beam = (2.09 + 1.61 + 2.05) m x 1.44kN/m

= 5.75m x 1.44kN/m

= 8.28kN

Total Dead Load at Roof Level

= 51.91kN + 8.28kN

= 60.19kN

-First Floor-

Dead Load: Live Load:

○1 Slab = (3.36m2 + 2.98m2 + 3.79m2) x 3.6kN/m2 ○1 Bedroom

= 10.13m2 x 3.6kN/m2 = (2.09m x 1.61m) x 1.5kN/m2

= 36.468kN = 5.05kN

○2 Wall = (2.09m + 1.61m) x 5.7kN/m ○2 Corridor

= 3.7m x 5.7kN/m = (3.66m x 1.85m) x 4.0kN/m2

= 21.09kN = 27.08kN

○3 Beam = (2.09m + 1.61m + 2.05m) x 1.44kN/m

= 5.75m x 1.44kN/m

= 8.28kN

○4 Column = (0.3m x 0.3m x 3.0m) x 24kN/m3

= 6.48kN

Total Dead Load at First Floor Total Live Load at First Floor

= 36.47kN + 21.09kN + 8.28kN + 6.48kN = 5.05kN + 27.08kN

= 72.32kN = 32.13kN

Page 88: Building Structure Final report

BUILDING STRUCTURE PROJECT 2: BEAM AND COLUMN 88

-Ground Floor-

Dead Load: Live Load:

○1 Slab = (1.61 + 2.05)m x (2.09 + 1.85)m x 3.6kN/m2 ○1 Bedroom

= (3.66m x 3.94m) x 3.6kN/m2 = (2.09m x 1.61m) x 1.5kN/m2

= 51.91kN = 5.05kN

○2 Wall = (2.05m + 2.09m + 1.61m) x 5.7kN/m ○2 Corridor

= 5.75m x 5.7kN/m = (1.85m x 1.61m) x 4.0kN/m2

= 32.78kN = 11.91kN

○3 Beam = (2.05 + 2.09 + 1.61 + 1.85) m x 1.44kN/m ○3 Kitchen

= 7.6m x 1.44kN/m = (3.94m x 2.05m) x 3.0kN/m2

= 10.944kN = 24.231kN

○4 Column = 0.3m x 0.3m x 3.0m x 24kN/m3

= 6.48kN

Total Dead Load at Ground Floor Total Live Load at Ground Floor

= 51.91kN + 32.78kN + 10.944kN + 6.48kN = 5.05kN + 11.91kN + 24.23kN

= 234.62kN = 41.19kN

Total Dead Load at Column D/3 Total Live Load at Column D/3

= 60.19kN + 72.32kN + 102.11kN = 32.13kN + 41.19kN

= 234.62kN = 73.32kN

Ultimate Load at Column D/3

= TDL (1.4) + TLL (1.6)

= 234.62kN (1.4) + 73.32kN (1.6)

= 328.47kN + 117.312kN

= 445.78kN

Page 89: Building Structure Final report

BUILDING STRUCTURE PROJECT 2: BEAM AND COLUMN 89

Column D/6 (Acting on Ground Floor Only)

-Ground Floor-

Dead Load: Live Load:

○1 Slab = (1.7 + 1.34)m (1.61 + 3.83)m x 3.6kN/m2 ○1 Corridor

= (3.04m x 5.444m) x 3.6kN/m2 = (1.61m x 1.7) x 4.0kN/m2

= 59.54kN = 10.95kN

○2 Wall = (1.7m + 3.83m) x 5.7kN/m ○2 Living Room

= 5.53m x 5.7kN/m = (1.61m + 3.83m) x 1.34m x 4.0kN/m2

= 31.52kN = 29.16kN

○3 Beam = (1.7 + 3.83 + 1.34 + 1.61) m x 1.44kN/m ○3 Storeroom

= 8.48m x 1.44kN/m = (1.7m x 3.83m) x 2.5kN/m2

= 12.214kN = 16.28kN

○4 Column = 0.3m x 0.3m x 3.0m x 24kN/m3

= 6.48kN

Total Dead Load at Ground Floor Total Live Load at Ground Floor

= 51.54kN + 31.52kN + 12.21kN + 6.48kN = 10.95kN + 29.16kN + 16.28kN

= 109.75kN = 56.39kN

Total Dead Load at Column D/6 Total Live Load at Column D/6

= 109.75kN = 56.39kN

Ultimate Load at Column D/6

= TDL (1.4) + TLL (1.6)

= 109.75kN (1.4) + 56.39kN (1.6)

= 153.65kN + 90.22kN

= 243.87kN

Page 90: Building Structure Final report

BUILDING STRUCTURE PROJECT 2: BEAM AND COLUMN 90

9.3 Tan Wing Hoe

Column B/3 (Connected to All Floors)

-Roof Level-

Dead Load:

○1 Roof Slab = (2.95 x 3.505) m2 x 3.6kN/m2

= 37.22 kN

○2 Roof Beam = (2.95 + 3.505) m x 1.44kN/m

= 14.89 kN

Total Dead Load at Roof Level

= 37.22kN + 14.89kN

= 52.11kN

-First Floor-

Dead Load: Live Load:

○1 Slab = (2.95 x 3.505)m2 x 3.6kN/m2 ○1 Bedroom

= 10.16m2 x 3.6kN/m2 = (2.95 x 3.505m) x 1.5kN/m2

= 36.58kN = 15.51kN

○2 Wall = (2.95 + 1.55 + 1.91m) x 5.7kN/m ○2 Bathroom

= 6.41m x 5.7kN/m =(1.91 x 1.55)m x2.0kN/m2

= 36.54kN =5.92kn

○3 Beam = (3.155m + 2.09m) x 1.44kN/m ○3 Stairs

= (2.95 + 3.505) m x 1.44kN/m =(1.4 x 1.91) x 1.5kN/m2

= 14.89 kN =4.01

○4 Column = (0.3m x 0.3m x 3.0m) x 24kN/m3

= 6.48kN

Total Dead Load at First Floor Total Live Load at First Floor

= 36.58kN + 36.54kN + 14.89kN + 6.48kN = 15.51kN + 5.92kN + 4.01kN

= 94.49kN =25.44 kN

Page 91: Building Structure Final report

BUILDING STRUCTURE PROJECT 2: BEAM AND COLUMN 91

-Ground Floor-

Dead Load: Live Load:

○1 Slab = (2.95 x 3.505)m2 x 3.6kN/m2 ○1 Bedroom

= 10.16m2 x 3.6kN/m2 = (2.95 x 3.505m) x 1.5kN/m2

= 36.58kN = 15.51kN

○2 Wall = (2.95 + 1.55 + 1.91m) x 5.7kN/m ○2 Bathroom

= 6.41m x 5.7kN/m =(1.91 x 1.55)m x2.0kN/m2

= 36.54kN =5.92kn

○3 Beam = (3.155m + 2.09m) x 1.44kN/m ○3 Stairs

= (2.95 + 3.505) m x 1.44kN/m =(1.4 x 1.91) x 1.5kN/m2

= 14.89 kN =4.01

○4 Column = (0.3m x 0.3m x 3.0m) x 24kN/m3

= 6.48kN

Total Dead Load at First Floor Total Live Load at First Floor

= 36.58kN + 36.54kN + 14.89kN + 6.48kN = 15.51kN + 5.92kN + 4.01kN

= 94.49kN =25.44 kN

Total Dead Load at Column B/3 Total Live Load at Column B/3

= 52.11kN + 94.49kN + 94.49kN = 25.44kN + 25.44kN

= 241.09kN = 50.88kN

Ultimate Load at Column B/3

= TDL (1.4) + TLL (1.6)

= 241.09(1.4) + 50.88kN (1.6)

= 337.53kN + 81.41kN

= 418.94kN

Page 92: Building Structure Final report

BUILDING STRUCTURE PROJECT 2: BEAM AND COLUMN 92

Column G/5 (Connected to All Floors)

-Roof Level-

Dead Load: Live Load:

○1 Roof Slab = (2.53 x 3.58) m2 x 3.6kN/m2

= 32.61kN

○2 Roof Beam = (2.53 x 3.58) m x 1.44kN/m

= 13.04kN

Total Dead Load at Roof Level

= 51.91kN + 8.28kN

= 60.19kN

-First Floor-

Dead Load: Live Load:

○1 Slab = (4.03m2 + 4.82m2) x 3.6kN/m2 1.Bedroom

= 31.86kN - (2.97x1.5)m x 3,6kN/m = (2.015 x 1.85m) x 1.5kN/m2

= 30.96kN - 16.04

= 14.92kN = 3.73kN

○2 Wall = (2.53m + 2.015m + 1.85m + 1.79m) x 5.7kN/m 2. Corridor

= 8.19m x 5.7kN/m = (2.53m x 1.85m) x 4.0kN/m2

= 46.69kN = 18.72kN

○3 Beam = (2.53m + 2.015m + 1.85m + 1.79m) x 1.44kN/m 3. Bedroom

= 8.19m x 1.44kN/m =(3.03 x 2.53m) x 1.5kN/m2

= 11.79kN = 11.50kN

○4 Column = (0.3m x 0.3m x 3.0m) x 24kN/m3

= 6.48kN

Total Dead Load at First Floor Total Live Load at First Floor

= 14.92kN + 46.69kN + 11.79kN + 6.48kN = 3.73kN + 18.72kN + 11.50kN

= 79.88kN = 33.95kN

Page 93: Building Structure Final report

BUILDING STRUCTURE PROJECT 2: BEAM AND COLUMN 93

-Ground Floor-

Dead Load: Live Load:

○1 Slab = (3.49 + 2.53)m x 3.6kN/m2 1. Porch =(2.53 + 1.695)m x 2.0kN/m

= (6.02) x 1.5kN/m2

= 21.67kN = 8.45kN

○2 Wall = (2.53m) x 5.7kN/m 2. Kitchen

= 2.53m x 5.7kN/m = (1.79m x 2.53m) x 3.0kN/m2

= 14.42kN =12.96kN

○3 Beam = (2.53) m x 1.44kN/m

= 2.53m x 1.44kN/m

= 3.64kN

○4 Column = 0.3m x 0.3m x 3.0m x 24kN/m3

= 6.48kN

Total Dead Load at Ground Floor Total Live Load at Ground Floor

= 21.67kN + 14.42kN + 3.64kN + 6.48kN = 8.45kN + 12.96kN

= 46.21kN = 21.41kN

Total Dead Load at Column G/5 Total Live Load at Column G/5

= 60.19kN + 79.88kN + 46.21kN = 33.95kN + 21.41kN

= 186.28kN = 55.36kN

Ultimate Load at Column G/5

= TDL (1.4) + TLL (1.6)

= 186.28kN (1.4) + 55.36kN (1.6)

= 260.79kN + 88.58kN

= 349.37kN

Page 94: Building Structure Final report

BUILDING STRUCTURE PROJECT 2: BEAM AND COLUMN 94

Column E/8 (Acting on Ground Floor Only)

-Ground Floor-

Dead Load: Live Load:

1. Slab = (1.94 +1.295)m (1.94 + 2.53)m x 3.6kN/m2 1. Porch

= (3.235m x 4.47m) x 3.6kN/m2 = (1.94m x 2.53) x 2.0kN/m2

= 52.06kN = 9.82kN

2. Wall = 1.94 x 5.7kN/m 2. Living Room

= (1.94x 1.295m) x 4.0kN/m2

= 11.06kN = 10.05kN

3. Beam = (1.94 + 1.295 + 2.53) m x 1.44kN/m

= 5.765m x 1.44kN/m

= 8.3kN

4. Column = 0.3m x 0.3m x 3.0m x 24kN/m3

= 6.48kN

Total Dead Load at Ground Floor Total Live Load at Ground Floor

= 52.06kN + 11.06kN + 8.3kN + 6.48kN = 10.05kN + 9.82kN

= 77.9kN = 19.87kN

Total Dead Load at Column E/8 Total Live Load at Column E/8

= 77.9kN = 19.87kN

Ultimate Load at Column E/8

= TDL (1.4) + TLL (1.6)

= 77.9kN (1.4) + 19.87kN (1.6)

= 109.06kN + 31.79kN

= 140.85kN

Page 95: Building Structure Final report

BUILDING STRUCTURE PROJECT 2: BEAM AND COLUMN 95

11.0 Appendix

Slab System

If Ly/Lx > 2, one-way slab system

If Ly/Lx ≤ 2, two-way slab system

Beam Calculation

Beam self-weight = beam size x density of reinforced concrete

Slab dead load = thickness x density of reinforced concrete x Lx/2 (Trapezoid)

= thickness x density of reinforced concrete x Lx/2 x 2/3 (Triangular)

Slab live load = live load (UBBL) x Lx/2 (Trapezoid)

= live load (UBBL) x Lx/2 x 2/3 (Triangular)

Brick wall dead load = wall height x thickness x density of bricks

Column Calculation

Beam self-weight = beam size x density of reinforced concrete x length

Slab dead load = thickness x density of reinforced concrete x tributary area

Slab live load = live load (UBBL) x tributary area

Brick wall self-weight = thickness x wall height x density of bricks x length

Column self-weight = width x length x height x density of reinforced concrete

Page 96: Building Structure Final report

BUILDING STRUCTURE PROJECT 2: BEAM AND COLUMN 96

Assumption of Dead Load and Live Load

Assumptions on Dead Loads Acting on Structure

(F) Slab self-weight

= 0.15 x 24kN/m3

= 3.6kN/m2

(G) Brick wall self-weight

= Wall thickness x Wall height x Density

= 0.1m x 3.0m x 19kN/m3

= 5.7kN/m

(H) Primary Beam self-weight

= Beam size x Concrete density

= 0.2m x 0.3m x 24kN/m3

= 1.44kN/m

(I) Secondary Beam self-weight

= Beam size x Concrete density

= 0.1m x 0.2m x 24kN/m3

= 0.48kN/m

(J) Column self-weight

= Column size x Concrete density

= 0.3m x 0.3m x 3.0m x 24kN/m3

= 6.48kN

*All dead loads (slabs, walls, beams, columns) are assumed to have a standard size.

* Dead load factor: 1.4

Assumptions on Live Loads Acting on Structure

(L) Bedroom :1.5kN/m2

(M) Living Room :4.0kN/m2

(N) Dining Room :2.0kN/m2

(O) Kitchen :3.0kN/m2

(P) Corridor :4.0kN/m2

(Q) Bathroom :2.0kN/m2

(R) Study Room :1.5kN/m2

(S) Car Porch :2.0kN/m2

(T) Stairs :1.5kN/m2

(U) Family Area :2.0kN/m2

(V) Store Room :2.5kN/m2

*All assumptions on live loads are referred to 4th schedule of UBBL for live loads per

room functions.

* Live load factor: 1.6