Building and Deploying an Early Warning System: Lessons Learned from a Large Scale Pilot. Jared Knowles Research Analyst Wisconsin Department of Public Instruction. STATS-DC July 2013 Washington, D.C. Agenda. Principles for a Dropout Early Warning System Building a Statewide DEWS - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Building and Deploying an Early Warning System: Lessons Learned from a Large Scale Pilot

Building and Deploying an Early Warning System: Lessons Learned from a

Large Scale PilotJared Knowles

Research AnalystWisconsin Department of Public

InstructionSTATS-DC July 2013

Washington, D.C.

Page 2: Building and Deploying an Early Warning System: Lessons Learned from a Large Scale Pilot

Agenda• Principles for a Dropout Early

Warning System• Building a Statewide DEWS• Piloting a DEWS• Learning from the Pilot• Deploying Statewide?

Page 3: Building and Deploying an Early Warning System: Lessons Learned from a Large Scale Pilot

Why DEWS?• Push early warning systems to be earlier• Focus on extracting information from data

already reported by LEAs to the SEA• Statewide scale, leveraging multiple years

of data in the LDS• Built on open-source software that can

adapt to additional data and different contexts

Page 4: Building and Deploying an Early Warning System: Lessons Learned from a Large Scale Pilot

Challenges with DEWS?• Resonance – school principals have to

see this fitting in their work• Ease of Use – minimal barriers to opening

up and using the system• Accuracy – cannot give bad information

to LEAs• Coverage– as many students included as

possible• Transparency – needs to be a system

LEAs trust

Page 5: Building and Deploying an Early Warning System: Lessons Learned from a Large Scale Pilot

DEWS Refresher• DEWS score calculated using a

combination of demographic and student outcome measures to improve accuracy– Attendance, disciplinary events, assessment

scores, and student mobility• Student risk is calculated individually for

each student• Students are classified as at risk if their

score crosses a threshold set by DPI; districts can use this or ignore it

Page 6: Building and Deploying an Early Warning System: Lessons Learned from a Large Scale Pilot

DEWS Refresher• DPI early warning system is called the

Dropout Early Warning System, or DEWS• DEWS provides a score from 0-100 for

current 6th, 7th, and 8th graders• The score represents the rate at which

students similar to the current student in previous cohorts graduated

• A score of 75 means that 75% of prior students with similar characteristics graduated on time

Page 7: Building and Deploying an Early Warning System: Lessons Learned from a Large Scale Pilot

DPI’s System is in Development

• More than 60% of students who eventually do not graduate after 4 years of high school can be identified with current data before the start of 7th grade

• DPI is working to improve this through better techniques to allow students to be identified earlier and with more accuracy

• The system will continually improve with better data, better mathematical models, and more real time results

Page 8: Building and Deploying an Early Warning System: Lessons Learned from a Large Scale Pilot

Classification

Page 9: Building and Deploying an Early Warning System: Lessons Learned from a Large Scale Pilot

Project Plan• DEWS was developed during the 2012-13

school year• Pilot group of 34 schools identified in early

2013• Pilot materials delivered electronically in

mid-April 2013; participation in follow-up survey too – Interpretative guide– Student reports for all current 7th graders– School report– School roster

• Pilot materials mimic WISEdash, final scheduled for September 2013 rollout in WISEdash

Page 10: Building and Deploying an Early Warning System: Lessons Learned from a Large Scale Pilot

Awareness and Communications

• Title I Coordinators• Accountability Trainers• Statewide PBIS

Network• CESA Support Network• SSEDAC• School Administrators

Alliance• School Counselors

Association• WERAC• National Forum on

Education Statistics

• REL Midwest• Partners at WCER• Department of Children

and Families• Members of

WISEexplore

Page 11: Building and Deploying an Early Warning System: Lessons Learned from a Large Scale Pilot

DEWS Process

DemographicsAttendance

Assessments

Disciplinary EventsMobilityLocation

STATE DATA

Student Risk Identification

Teacher / program context

Parent input

Special circumstances

CONTEXT

LOCAL KNOWLEDGE

Intervention Strategies

Page 12: Building and Deploying an Early Warning System: Lessons Learned from a Large Scale Pilot

Pilot Reports

Page 13: Building and Deploying an Early Warning System: Lessons Learned from a Large Scale Pilot

Pilot Reports - Student

Page 14: Building and Deploying an Early Warning System: Lessons Learned from a Large Scale Pilot

Pilot Reports - School

Page 15: Building and Deploying an Early Warning System: Lessons Learned from a Large Scale Pilot

Survey Results• Survey sought to identify the utility of the

DEWS reports in relation to existing Early Warning System / identification measures

Asked about:• usefulness of DEWS report• usefulness of interpretation guides• desire to have DEWS available• WISEdash usage• Likelihood to use WISEdash if DEWS

included

Page 16: Building and Deploying an Early Warning System: Lessons Learned from a Large Scale Pilot

Survey Summary• 18 of the 34 participating pilot schools

have responded to the survey so far (52.9%)

• 15 of the respondents indicated they “fully reviewed” the results

• 6 schools have been interviewed• 5 schools said staff reviewed the reports

individually, 11 said staff reviewed them in a group working together

Page 17: Building and Deploying an Early Warning System: Lessons Learned from a Large Scale Pilot

DEWS Overall Valuable!

0

2

4

6

Not valuable Slightly valuable Somewhat valuable Very valuableScale

Coun

t

Overall, how valuable were the DEWS reports to your school?

Page 18: Building and Deploying an Early Warning System: Lessons Learned from a Large Scale Pilot

DEWS Identifies Students Missed

0.0

2.5

5.0

7.5

10.0

0 25 or less 26 - 100 100 +Number of Students

Res

pond

ents

How many students did the DEWS reports identify... which your school had not previously identified...

Page 19: Building and Deploying an Early Warning System: Lessons Learned from a Large Scale Pilot

DEWS Does Not Miss Many Students

0.0

2.5

5.0

7.5

0 10 or less 10 + NANumber of Students

Resp

onde

nts

How many students has your school identified

which were not identified in the DEWS reports?

Page 20: Building and Deploying an Early Warning System: Lessons Learned from a Large Scale Pilot

Student reports are most positive element

0

2

4

6

8

Slightly Valuable Somewhat Valuable Very ValuableScale

Res

pons

esStudent Reports

Page 21: Building and Deploying an Early Warning System: Lessons Learned from a Large Scale Pilot

The Student Roster is Valuable

0

1

2

3

4

5

Slightly Valuable Somewhat Valuable Very ValuableScale

Res

pons

esStudent Roster

Page 22: Building and Deploying an Early Warning System: Lessons Learned from a Large Scale Pilot

School reports are well liked

0

2

4

6

Slightly Valuable Somewhat Valuable Very ValuableScale

Resp

onse

s

School Report

Page 23: Building and Deploying an Early Warning System: Lessons Learned from a Large Scale Pilot

Most respondents expect DEWS to be used at least

annually

0

3

6

9

No YesScale

Resp

onse

s

Annual Use?

Page 24: Building and Deploying an Early Warning System: Lessons Learned from a Large Scale Pilot

Annual Delivery Before School Year is Strongly Preferred

0.0

2.5

5.0

7.5

- Before school beginsScale

Res

pons

es

Report Timing

Page 25: Building and Deploying an Early Warning System: Lessons Learned from a Large Scale Pilot

DEWS can drive WISEdash usage

0.0

2.5

5.0

7.5

10.0

No YesScale

Resp

onse

s

Use WISEdash Regularly?

0.0

2.5

5.0

7.5

No YesScale

Resp

onse

s

Use WISEdash More?

Page 26: Building and Deploying an Early Warning System: Lessons Learned from a Large Scale Pilot

Principals and Student Services Staff Must Have WISEdash

access

0

5

10

1 NAScale

Resp

onse

s

Principals

0.0

2.5

5.0

7.5

10.0

12.5

1 NAScale

Resp

onse

s

Student Services

0

2

4

6

8

1 NAScale

Resp

onse

s

Teachers

0

5

10

1 NAScale

Resp

onse

s

Other

Page 27: Building and Deploying an Early Warning System: Lessons Learned from a Large Scale Pilot

DEWS Beyond Fall 2013DEWS as it exists is just a start.

Several extensions for DEWS may be desired:

• Deeper WISEdash integration?• Communication and professional

development to raise awareness and use for informing interventions?

• Extend coverage to earlier and later grades

• Increase accuracy?• Add college-enrollment as a secondary

warning?

Page 28: Building and Deploying an Early Warning System: Lessons Learned from a Large Scale Pilot

Interview Quotes• “Great to have a system that doesn’t require

additional reporting or information from us!”• “This would be a fantastic resource to be able to

share with parents in fall teacher conferences.”• “Inclusion of mobility in the system covers a big

blind spot for us as an LEA.”• “Thank you for getting feedback early in the

process from us!”• “Want to use this list as a starting point for our

intervention planning teams.”• “Having an 8th grade score for incoming 9th

graders will be crucial to planning!”

Page 29: Building and Deploying an Early Warning System: Lessons Learned from a Large Scale Pilot

Interview Quotes• “This information is easy to understand and quick

to be processed so we can hit the ground running with ours staff.”

• “Summarizing all this data in one place for us saves us time so we can get to identifying additional data needed to identify interventions.”