building a professional learning in inver grove heights schools november 1, 2012 susan huff...

84
Building a Professional Learning in Inver Grove Heights Schools November 1, 2012 Susan Huff susan.huff@nebo .edu

Upload: linette-hamilton

Post on 11-Jan-2016

213 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Building a Professional Learning in Inver Grove Heights Schools November 1, 2012 Susan Huff susan.huff@nebo.edu

Building a Professional Learning in Inver Grove Heights Schools

November 1, 2012Susan Huff

[email protected]

Page 2: Building a Professional Learning in Inver Grove Heights Schools November 1, 2012 Susan Huff susan.huff@nebo.edu

Transforming a school to a professional learning

community is a journey that takes time and effort.

Page 3: Building a Professional Learning in Inver Grove Heights Schools November 1, 2012 Susan Huff susan.huff@nebo.edu

Three objectives:• Review the big picture of a

professional learning community• Confirm great things happening at

your individual schools• Look for areas of growth

Page 4: Building a Professional Learning in Inver Grove Heights Schools November 1, 2012 Susan Huff susan.huff@nebo.edu

Norms for Us

• Listen to learn and apply• Participate fully• Paraphrase, clarify• Focus--pay attention to signal

Page 5: Building a Professional Learning in Inver Grove Heights Schools November 1, 2012 Susan Huff susan.huff@nebo.edu

What is a PLC? “Educators committed to working

collaboratively in ongoing processes of collective inquiry and action research in order to achieve better results for the students they serve. PLC’s operate under the assumption that the key to improved learning for students is continuous, job-embedded learning for educators.”

(DuFour, DuFour, Eaker, & Many, 2006)

Page 6: Building a Professional Learning in Inver Grove Heights Schools November 1, 2012 Susan Huff susan.huff@nebo.edu

Why PLCs?

“Throughout our ten-year study, whenever we found an effective school or an effective department within a school, without exception that school or department has been a part of a collaborative professional learning community.” (Milbrey McLaughlin)

Page 7: Building a Professional Learning in Inver Grove Heights Schools November 1, 2012 Susan Huff susan.huff@nebo.edu

3 Big Ideas of PLC

• Unwavering focus on student learning

• Collaborative teaming

• A results orientation (DuFour & Eaker, 1998)

Page 8: Building a Professional Learning in Inver Grove Heights Schools November 1, 2012 Susan Huff susan.huff@nebo.edu

Four Crucial Questions: (DuFour, 2006)

• What do we want each student to learn?• How we will know when each student has

learned it?• How will we respond when a student

experiences difficulty in learning? • How can we enrich and extend their learning

when they already know it?

Page 9: Building a Professional Learning in Inver Grove Heights Schools November 1, 2012 Susan Huff susan.huff@nebo.edu

In a professional learning community the focus shifts from ensuring that

students are taught to ensuring that students learn.

(Bryk et al., 1999; Newmann & Wehlage, 1995; Hord 1997; Louis et al., 1996)

Page 10: Building a Professional Learning in Inver Grove Heights Schools November 1, 2012 Susan Huff susan.huff@nebo.edu

A professional learning community is dependent upon a culture of

collaboration, where teachers must have embedded time for frequent, structured

collaboration among teachers on the same grade level or teaching the same content.

(DuFour, 2007)

Page 11: Building a Professional Learning in Inver Grove Heights Schools November 1, 2012 Susan Huff susan.huff@nebo.edu

Focus on results:

• Goal and results orientation• Common assessments that hold all

students to a common standard• Data-based decision making • Formative and summative assessments • Collective reflection on current reality

Page 12: Building a Professional Learning in Inver Grove Heights Schools November 1, 2012 Susan Huff susan.huff@nebo.edu

“There is clear consensus among leading educational researchers as to the best practices for improving schools. When staff work together as a professional learning community–when they work together to clarify purpose and priorities, establish and contribute to collaborative teams, participate in continuous improvement cycles of gathering data on student achievement, identify areas of concern, generate strategies for improving students’ performance . . .

Page 13: Building a Professional Learning in Inver Grove Heights Schools November 1, 2012 Susan Huff susan.huff@nebo.edu

. . . support each other as they implement those strategies, and gather new data to assess the impact of their collective efforts–and when they are relentless in their efforts to improve achievement for all students, they increase the likelihood of sustained, substantive school improvement. The research is clear and compelling on this point.”

(DuFour, 2003)

Page 14: Building a Professional Learning in Inver Grove Heights Schools November 1, 2012 Susan Huff susan.huff@nebo.edu

Nebo’s Non-Negotiablesfor all schools . . . all teams

• Team Norms• “I Can” Statements for Student Learning• Common Curriculum Map• Common Formative Assessment for Each

“I Can” Statement• Data Assessment• SMART Goals

Page 15: Building a Professional Learning in Inver Grove Heights Schools November 1, 2012 Susan Huff susan.huff@nebo.edu

Here’s what . . . why . . . how. . .

• Essential concepts / common curriculum• Common assessments• Collaboration• Data analysis• SMART Goals

Page 16: Building a Professional Learning in Inver Grove Heights Schools November 1, 2012 Susan Huff susan.huff@nebo.edu

Module 1

Essential Concepts&

Common Curriculum

Page 17: Building a Professional Learning in Inver Grove Heights Schools November 1, 2012 Susan Huff susan.huff@nebo.edu

Focus onLearningFocus onLearning

Focus on Results

Focus on Results

Collaborative Culture

Collaborative Culture

1.What do students need to learn?

2. How do we know they know it?

3. What are we going to do if they don’t get it?

4. What are we going to do if they already know it?

Page 18: Building a Professional Learning in Inver Grove Heights Schools November 1, 2012 Susan Huff susan.huff@nebo.edu

Here’s what . . .

“What knowledge, skills, and dispositions should each student acquire as a result of this course and each unit of instruction within this course?”

(DuFour, DuFour, Eaker, & Many, 2006, p. 43)

-a guaranteed and viable curriculum-

Page 19: Building a Professional Learning in Inver Grove Heights Schools November 1, 2012 Susan Huff susan.huff@nebo.edu

Here’s why . . .

As teachers assume collective

responsibility for student

learning, what unites them is a

common curriculum.(Lee, Smith, & Croninger,1995)

Page 20: Building a Professional Learning in Inver Grove Heights Schools November 1, 2012 Susan Huff susan.huff@nebo.edu

Here’s why . . .

A common curriculum eliminates the

instructional lottery that results

when teachers are free to teach

whatever they desire.

(McLaughlin & Talbert, 2001)

Page 21: Building a Professional Learning in Inver Grove Heights Schools November 1, 2012 Susan Huff susan.huff@nebo.edu

Here’s why . . .

Without a common curriculum, any individual student’s chance of receiving standards based curriculum depends on which teacher he draws in the lottery of class or teacher assignments.

(McLaughlin & Talbert, 2001)

Page 22: Building a Professional Learning in Inver Grove Heights Schools November 1, 2012 Susan Huff susan.huff@nebo.edu

Here’s how . . . Understanding By Design (UbD)

1. Identify desired results.(What do we want students to know and be able to do? Standards . . . Outcomes)

2. Determine acceptable evidence. (Assessment)

3. Plan learning experiences and instruction. (Design lessons)

(Wiggins & McTighe, 2005)

Page 23: Building a Professional Learning in Inver Grove Heights Schools November 1, 2012 Susan Huff susan.huff@nebo.edu

Marzano:• Intended Curriculum

– State standards– District curriculum adoptions

• Implemented Curriculum– Curriculum taught by teacher

• Attained Curriculum– Curriculum learned by the

student

Page 24: Building a Professional Learning in Inver Grove Heights Schools November 1, 2012 Susan Huff susan.huff@nebo.edu

Criteria for Identifying Essential Common Outcomes

• ENDURANCE – – are students expected to retain the skills/knowledge long

after the test is completed

• LEVERAGE – – is this skill/knowledge applicable to many academic

disciplines

• READINESS FOR THE NEXT LEVEL OF LEARNING – – is this skill/knowledge preparing the student for success

in the next grade/course (Reeves, 2005)

Page 25: Building a Professional Learning in Inver Grove Heights Schools November 1, 2012 Susan Huff susan.huff@nebo.edu

Protocol to Clarify & Address Priority Standards(Erkens, 2012)

1. Examine all of your state standards.2. Deconstruct standards for team clarity.3. Identify your power standards using three

criteria: endurance, leverage, readiness.4. Reach team consensus on power standards.5. Document standards, including recorded

numbers and letters of selected standards.

Page 26: Building a Professional Learning in Inver Grove Heights Schools November 1, 2012 Susan Huff susan.huff@nebo.edu

6. Check for vertical alignment and sequence standards.

7. Identify targets within standards.8. Design assessments to align.9. Identify curriculum materials to support

required learning, to address standards, and to help learners be successful on assessments.

10. Identify instructional strategies that will best help you teach the curriculum.

Page 27: Building a Professional Learning in Inver Grove Heights Schools November 1, 2012 Susan Huff susan.huff@nebo.edu

Module 2

Common Assessments

Page 28: Building a Professional Learning in Inver Grove Heights Schools November 1, 2012 Susan Huff susan.huff@nebo.edu

Focus onLearningFocus onLearning

Focus on Results

Focus on Results

Collaborative Culture

Collaborative Culture

1. What do students need to learn?

2.How do we know they know it?

3. What are we going to do if they don’t get it?

4. What are we going to do if they already know it?

Page 29: Building a Professional Learning in Inver Grove Heights Schools November 1, 2012 Susan Huff susan.huff@nebo.edu

Here’s what . . .

Common ongoing formative team-made assessments made from multiple sources given by a team of teachers with the intention of collaboratively examining the results for

• shared learning• instructional planning for individual students• curriculum, instruction, and/or assessment

modifications

Page 30: Building a Professional Learning in Inver Grove Heights Schools November 1, 2012 Susan Huff susan.huff@nebo.edu

Here’s why . . . Team-developed common assessments:

• Are more efficient.

• Promote equity.

• Monitor and improve student learning.

• Inform and improve the practice of individual teachers and teams of teachers.

• Build team capacity to achieve at higher levels.• Are essential to systematic interventions when

students do not learn. (DuFour, DuFour, Eaker, 2008)

Page 31: Building a Professional Learning in Inver Grove Heights Schools November 1, 2012 Susan Huff susan.huff@nebo.edu

Here’s why . . . Team-developed common assessments:• Increase accuracy and reliability.• Promote continued development of

assessment literacy for teachers.• Increase collective efficacy.

(Cassandra Erkens)

Page 32: Building a Professional Learning in Inver Grove Heights Schools November 1, 2012 Susan Huff susan.huff@nebo.edu

Formative vs. Summative

It isn’t the method that determines whether the assessment is summative or formative, it is how the results are used.

Page 33: Building a Professional Learning in Inver Grove Heights Schools November 1, 2012 Susan Huff susan.huff@nebo.edu

Here’s how . . . to write CAs

• Teacher teams write new assessments based on standards.

• Teams use multiple sources for assessment items (parts of textbook assessments, parts of computer test item pools, as appropriate).

• Teams revise assessments for future use as they evaluate their effectiveness.

Page 34: Building a Professional Learning in Inver Grove Heights Schools November 1, 2012 Susan Huff susan.huff@nebo.edu

Sample common assessment – usually about 10 questions.

Name ______________

Write the number sentence you would use to solve the problem.

1. Kelsy went to the store and bought 56 pencils. She broke 20 of them. How many did she have left?

2. In the park there were 7 trees. Each tree had 4 branches. How many branches did the trees have in all?

3. Mr. Fox has 5 tables in his room. 3 students sit at each table. How many students does Mr. Fox have in all?

4. Pete bought 14 mice at the pet store to feed his snake. He went back and bought 9 more. How many mice did Pete buy altogether?

5. We learned 18 cursive letters before Christmas and 22 after. How many cursive letters have we learned in all?

Page 35: Building a Professional Learning in Inver Grove Heights Schools November 1, 2012 Susan Huff susan.huff@nebo.edu

1 1

Identify 8–10 big ideas per semester.

Teamwork before and after common assessments

Examine school data and establish SMART goals.

Create a road map of CAs and targets.

Establish team norms for collaboration.

Monitor progress on SMART goals.

Identify the targets of the assessments

Design formative and summative assessments.

Monitor for learning of individual and collective results.

Tally and review common assessment results.

Create a plan for appropriate interventions.

Assess again—monitoring for results.

Provide instruction and ongoing assessment.

Repeat intervention loop as needed.

Provide instruction and ongoing assessment.

Revise curriculum, instruction, and assessments as needed.

Erkens

Process for Common Assessments

Page 36: Building a Professional Learning in Inver Grove Heights Schools November 1, 2012 Susan Huff susan.huff@nebo.edu

Here’s how . . . to use CAs

Seek evidence of student learning:• What does this student work tell us about

what students know and can do?• What does this student work tell us about

what students are still missing?• What indicators, if any, offer insight into

student misconceptions and highlight potential intervention strategies?

Page 37: Building a Professional Learning in Inver Grove Heights Schools November 1, 2012 Susan Huff susan.huff@nebo.edu

Common Assessments Reflections

1. Discuss the assessment task with team.2. Examine data and identify areas for team

discussion.-As a team: Which learning targets from the

assessment require more attention?-As a team: Which students require additional

support?

Page 38: Building a Professional Learning in Inver Grove Heights Schools November 1, 2012 Susan Huff susan.huff@nebo.edu

-As an individual teacher: Which area was my lowest, and how can I improve?

-As a team or individual: Which students did not master which targets?

3. What is your team’s plan of action to address results?

Page 39: Building a Professional Learning in Inver Grove Heights Schools November 1, 2012 Susan Huff susan.huff@nebo.edu

Module 3

Collaboration

Page 40: Building a Professional Learning in Inver Grove Heights Schools November 1, 2012 Susan Huff susan.huff@nebo.edu

Here’s what . . . Collaboration Defined

A systematic process in which we work together, interdependently, to analyze and impact professional practice in order to improve our individual and collective results. (DuFour, DuFour, & Eaker, 2007)

Page 41: Building a Professional Learning in Inver Grove Heights Schools November 1, 2012 Susan Huff susan.huff@nebo.edu

What is a team?

“A group of people working interdependently toward a common goal for which members are mutually accountable.”

(DuFour, 2007)

Page 42: Building a Professional Learning in Inver Grove Heights Schools November 1, 2012 Susan Huff susan.huff@nebo.edu

Here’s why . . .

Improving schools requires collaborative cultures. Without collaborative skills and relationships, it is not possible to learn and to continue to learn as much as you need to know to improve. (Michael Fullan)

Page 43: Building a Professional Learning in Inver Grove Heights Schools November 1, 2012 Susan Huff susan.huff@nebo.edu

Here’s why . . .

Creating a collaborative culture is the single most important factor for successful school improvement initiatives and the first order of business for those seeking to enhance the effectiveness of their schools. (Eastwood & Lewis)

Page 44: Building a Professional Learning in Inver Grove Heights Schools November 1, 2012 Susan Huff susan.huff@nebo.edu

Here’s why . . .

Enhanced teaching and learning result through

collaboration.(Peterson, McCarthey, & Elmore, 1995; Fullan, 1993; McLaughlin & Talbert, 2001; Kruse, Louis, & Bryk, 1994, Bryk; Camburn, & Louis, 1999; Newmann, 1994; Newmann & Wehlage, 1995; Lee, Smith, & Croninger, 1995; Sebring, Bryk, Easton, Luppescu, Thum, Lopez, & Smith, 1995; Shellard, 2004)

Page 45: Building a Professional Learning in Inver Grove Heights Schools November 1, 2012 Susan Huff susan.huff@nebo.edu

Here’s how: create teams

“The best team structure is simple: a team of teachers who teach the

same course or grade level.” (DuFour, DuFour, Eaker, & Many, 2006, p. 93)

Page 46: Building a Professional Learning in Inver Grove Heights Schools November 1, 2012 Susan Huff susan.huff@nebo.edu

Here’s how . . . Make Teams Effective

• Embed collaboration in routine practices of the school with focus on learning.

• Time for collaboration is built into the school day and school calendar.

• Products of collaboration are made explicit.

Page 47: Building a Professional Learning in Inver Grove Heights Schools November 1, 2012 Susan Huff susan.huff@nebo.edu

(More Keys to Effective Teams)

• Team norms guide collaboration.

• Teams focus on key questions.

• Teams pursue specific and measurable performance goals.

• Teams have access to relevant information. (DuFour, DuFour, & Eaker)

Page 48: Building a Professional Learning in Inver Grove Heights Schools November 1, 2012 Susan Huff susan.huff@nebo.edu

Here’s how . . .

Structure time for the work of collaborative teams.

(see Simple Ways Schools Find Time to Work Together)

Page 49: Building a Professional Learning in Inver Grove Heights Schools November 1, 2012 Susan Huff susan.huff@nebo.edu

Here’s how . . . Focus on the right things

“The fact that teachers collaborate will do nothing to improve a school. The pertinent question is not, ‘Are they collaborating?’ but rather, ‘What are they collaborating about?’”

(DuFour, DuFour, Eaker, & Many, 2006, p. 91)

Page 50: Building a Professional Learning in Inver Grove Heights Schools November 1, 2012 Susan Huff susan.huff@nebo.edu

Unfocused Collaboration . . .

• May be instruments for preserving the status quo, inhibiting analysis and innovation.

• May mutually reinforce poorly formed habits.• May force teachers to consider beliefs and

practices based on bad practice.• May be about storytelling—mostly complaint.

(Little, 1990)

Page 51: Building a Professional Learning in Inver Grove Heights Schools November 1, 2012 Susan Huff susan.huff@nebo.edu

The 4 Crucial Questions focus collaboration on the right things:

• What is it we want our students to learn?• How will we know if each student has learned

it?• How will we respond when some students do

not learn it?• How can we extend and enrich the learning

for students who have demonstrated proficiency?

(DuFour, DuFour, Eaker, & Many, 2006)

Page 52: Building a Professional Learning in Inver Grove Heights Schools November 1, 2012 Susan Huff susan.huff@nebo.edu

Structural Conditions

• Time to Meet• Team Norms• Team Focus• Team Accountability

(see Collaboration Agenda and Leader/Scribe Assignments)

Page 53: Building a Professional Learning in Inver Grove Heights Schools November 1, 2012 Susan Huff susan.huff@nebo.edu
Page 54: Building a Professional Learning in Inver Grove Heights Schools November 1, 2012 Susan Huff susan.huff@nebo.edu

Team collaboration binder

• Team Norms• Facilitator/Scribe Assignments• Team’s Daily Schedule• Collaboration Agenda (one for each week’s

collaboration)• Curriculum Maps• Essential Learning Outcomes (or Power

Standards)• Copy of Core Curriculum• Copies of Team’s Common Assessments

Page 55: Building a Professional Learning in Inver Grove Heights Schools November 1, 2012 Susan Huff susan.huff@nebo.edu

A focus on learningWith collaborative teams.Results orientationThey’re our school’s dreams.

We intervene earlyWith more time and support.There’s curriculum mappingOn which we consort.

Page 56: Building a Professional Learning in Inver Grove Heights Schools November 1, 2012 Susan Huff susan.huff@nebo.edu

Teams’ common assessmentsEvery student will take.We analyze data,Then decisions we make.

A focus on learning.You’re on a great team.Results orientation—It’s not just a dream!

Page 57: Building a Professional Learning in Inver Grove Heights Schools November 1, 2012 Susan Huff susan.huff@nebo.edu

Module 4

Collaborative Data Analysis

Page 58: Building a Professional Learning in Inver Grove Heights Schools November 1, 2012 Susan Huff susan.huff@nebo.edu

Here’s what . . . • To change data to information, we

need a basis of comparison.• Data must be easily accessible.• Data must be openly shared. (DuFour, Dufour, & Eaker)

Page 59: Building a Professional Learning in Inver Grove Heights Schools November 1, 2012 Susan Huff susan.huff@nebo.edu

Here’s what . . .

Sources of data PLCs use:• Assessment dataStandardized tests (knowledge check-up, G/T

identification; compare to other schools in the nation)

Criterion-referenced testsUnit tests / quizzes / assignmentsOngoing assessments / running recordsRubrics tied to student work or product

Page 60: Building a Professional Learning in Inver Grove Heights Schools November 1, 2012 Susan Huff susan.huff@nebo.edu

• Perception dataOpinion surveys, needs surveys; indicators of school quality survey

• Statistical dataSES, ESL, mobility, ethnicity, attendance & punctuality, office referrals & discipline, graduation rates

Page 61: Building a Professional Learning in Inver Grove Heights Schools November 1, 2012 Susan Huff susan.huff@nebo.edu

Here’s why . . .

Collaboratively examining student work

promotes collective responsibility for

student learning. (Langer, Colton, & Goff, 2003; Dearman & Alber, 2005)

Page 62: Building a Professional Learning in Inver Grove Heights Schools November 1, 2012 Susan Huff susan.huff@nebo.edu

Here’s why . . .

When teachers engage in this collaborative

activity, they must agree on common

proficiency standards for student work. This

reduces variation among teachers about

whether student work meets the standard.

(Langer, Colton, & Goff, 2003)

Page 63: Building a Professional Learning in Inver Grove Heights Schools November 1, 2012 Susan Huff susan.huff@nebo.edu

Here’s how . . . we do it at Spanish Oaks

1. Teachers identify a target learning area.2. Teachers determine standards that will be

taught.3. Teachers select or design a common

assessment to measure mastery of that standard and a pre-assessment.

4. Teachers give pre-assessment and group students for more time and support.

Page 64: Building a Professional Learning in Inver Grove Heights Schools November 1, 2012 Susan Huff susan.huff@nebo.edu

5. Teachers then share instructional materials and collaborate on best practices to teach the concept.

6. At the end of the agreed upon instructional period, each teacher gives the common assessment within the same window of time.

7. The assessment results are then brought to the team for analysis.

8. The group makes a plan to help each student improve who has not yet met the standard.

Page 65: Building a Professional Learning in Inver Grove Heights Schools November 1, 2012 Susan Huff susan.huff@nebo.edu

Concept: 2-digit Multiplication with a 2-digit Multiplier

Student Class1 Class 2 Class 3 Class 41 10 10 10 102 10 10 10 103 9 10 9 94 8 8 8 65 10 10 7 96 10 10 7 77 10 10 9 108 9 10 9 109 10 10 8 610 10 10 7 911 9 10 7 1012 10 10 10 713 10 10 10 814 10 10 10 1015 10 10 9 1016 10 10 9 17 9 9 9

Ave 9.7 9.8 8.7 8.7

Page 66: Building a Professional Learning in Inver Grove Heights Schools November 1, 2012 Susan Huff susan.huff@nebo.edu

Concept: 2-digit Multiplication with a 2-digit Multiplier

Page 67: Building a Professional Learning in Inver Grove Heights Schools November 1, 2012 Susan Huff susan.huff@nebo.edu
Page 68: Building a Professional Learning in Inver Grove Heights Schools November 1, 2012 Susan Huff susan.huff@nebo.edu

Power Standards / ELOs

1. Endurance2. Leverage3. Essential for the next level of instruction.

(Reeves, 2005)

Page 69: Building a Professional Learning in Inver Grove Heights Schools November 1, 2012 Susan Huff susan.huff@nebo.edu

Keys to Formative Assessment• “Is it used to identify students who are

experiencing difficulty in their learning?• Are students who are having difficulty

provided with additional time and support for learning?

• Are students given an additional opportunity to demonstrate their learning?”

(DuFour keynote at PLC Institutes 2007, p. 80)

Page 70: Building a Professional Learning in Inver Grove Heights Schools November 1, 2012 Susan Huff susan.huff@nebo.edu

Module 5

SMART Goals

Page 71: Building a Professional Learning in Inver Grove Heights Schools November 1, 2012 Susan Huff susan.huff@nebo.edu

SMART Goals contribute to a results orientation.

• Strategic and specific

• Measurable

• Attainable

• Results-oriented• Time-bound (O’Neill & Conzemius, 2006)

Page 72: Building a Professional Learning in Inver Grove Heights Schools November 1, 2012 Susan Huff susan.huff@nebo.edu

Here’s what . . . “Strategic goals are linked to strategic priorities

that are part of a larger vision of success for the entire school district.

Strategic and specific means that these goals will have both broad-based and long-term impact because they are focused on the specific needs of the students for whom the goal is intended.”

(Conzemius & O’Neill, 2002, p. 4)

Page 73: Building a Professional Learning in Inver Grove Heights Schools November 1, 2012 Susan Huff susan.huff@nebo.edu

Here’s what . . .

“Measurable means being able to know whether actions made the kind of difference we wanted: being able to measure a change in results because of those actions.”

(Conzemius & O’Neill, 2002, p. 5)

Page 74: Building a Professional Learning in Inver Grove Heights Schools November 1, 2012 Susan Huff susan.huff@nebo.edu

Here’s what . . .

Attainable means a goal is within the realm of our influence of control, and doable given current resources.

(Conzemius & O’Neill, 2002)

Page 75: Building a Professional Learning in Inver Grove Heights Schools November 1, 2012 Susan Huff susan.huff@nebo.edu

Here’s what . . .

Results-oriented means goals are aimed at specific outcomes that can be measured or observed. They define what is expected and a desired end point.

• student achievement• % of students who improve• learning that can be defined and measured

(Conzemius & O’Neill, 2002)

Page 76: Building a Professional Learning in Inver Grove Heights Schools November 1, 2012 Susan Huff susan.huff@nebo.edu

Here’s what . . .

Time-bound means agreeing on a time frame for achieving the goal to keep it a priority and give it some urgency.

(Conzemius & O’Neill, 2002)

Page 77: Building a Professional Learning in Inver Grove Heights Schools November 1, 2012 Susan Huff susan.huff@nebo.edu

Here’s why . . .

Goals represent measurable commitments that can be used to assess progress toward the vision.

(DuFour & Eaker, 1998)

Page 78: Building a Professional Learning in Inver Grove Heights Schools November 1, 2012 Susan Huff susan.huff@nebo.edu

Here’s why . . .

“SMART goals help us monitor which of our efforts are making a difference and by how much.”

(Conzemius & O’Neill, 2002, p. 5)

Page 79: Building a Professional Learning in Inver Grove Heights Schools November 1, 2012 Susan Huff susan.huff@nebo.edu

Here’s why . . .

When we establish clear learning goals, the effect on student achievement can be as much as a 41 percentile gain.

(Marzano, What Works in Schools, 2003)

Page 80: Building a Professional Learning in Inver Grove Heights Schools November 1, 2012 Susan Huff susan.huff@nebo.edu

Here’s how . . .

Tips for Writing Goals

• Goals should be clearly linked to the vision.• Goals should be limited in number (five or

fewer) to ensure focus.• Goals should focus on the desired outcome

rather than on the means to achieve the outcome. (DuFour & Eaker, 2007)

Page 81: Building a Professional Learning in Inver Grove Heights Schools November 1, 2012 Susan Huff susan.huff@nebo.edu

Here’s how . . . Ask broad questions . . .

• In which areas of our tests were our students weakest?

• What patterns do we see in the data?• What does disaggregated data tell us about

our subpopulations (ethnicity, poverty, special education)?

Page 82: Building a Professional Learning in Inver Grove Heights Schools November 1, 2012 Susan Huff susan.huff@nebo.edu

Is this a SMART goal?

All the students in our grade level will All the students in our grade level will demonstrate mastery of math facts.demonstrate mastery of math facts.

Students will leave first grade with a love Students will leave first grade with a love of learning and a desire to become a of learning and a desire to become a productive citizen.productive citizen.

Ninety-five percent of the students within Ninety-five percent of the students within our team will read on grade level as our team will read on grade level as measured by our district benchmark measured by our district benchmark reading assessment by May 2013.reading assessment by May 2013.

Page 83: Building a Professional Learning in Inver Grove Heights Schools November 1, 2012 Susan Huff susan.huff@nebo.edu

allthingsplc.info

Page 84: Building a Professional Learning in Inver Grove Heights Schools November 1, 2012 Susan Huff susan.huff@nebo.edu

Check out my Google Site

https://sites.google.com/a/nebo.edu/susan-huff