budget variance ytd sept. 2011

Upload: raja-ram

Post on 02-Jun-2018

218 views

Category:

Documents


0 download

TRANSCRIPT

  • 8/11/2019 Budget Variance Ytd Sept. 2011

    1/67

    P RTI UL RS

    -

    BE Sep Sep Sep Sep (Q2)

    Gross Generation MU 3204.832 284.751 221.113 -63.638 1569.000

    Aux Consumption in MU 330.516 30.184 26.483 3.701 167.785

    Total Coal Consumption (MT) 2658596 239501 219169 20332 1327760

    Oil Consumption (KL) 1610 110.000 465.481 (355) 805

    Sp Coal Kg/kWh 0.830 0.841 0.991 (0.15) 0.846

    Sp Oil ml/kWh 0.502 0.386 2.105 (2) 0.54

    MCL Coal Cost Rs./MT 802.12 802.12 891.83 (90) 802.12

    Imported Coal Cost Rs./MT 7,385 7385 7,385 7,385

    Blended Coal Cost Rs./MT 953.53 1214.41 1,214 1069.59

    Price of LDO Rs./KL. 51,596 51596 52383 (787) 51,596

    Price of FO Rs/KL. 37,637 37637 41533 (3,896) 37,637

    Price of FO & LDO(with 90:10 ratio)Rs/KL. 39,033 39033 42,618 (3,585) 39033

    Price difference between FO & LDO Rs/KL (13,959) (13,959) (10,850) 3,109 (13,959)

    Physical Performance for the Year 2011-12

    Budget Actual Variance

    YTD

    Budget

  • 8/11/2019 Budget Variance Ytd Sept. 2011

    2/67

    Sep (Q2) Sep (Q2)

    1452.351 -116.649

    153.786 13.999

    1263615 64145

    1,348.12 -543

    0.870 -0.025

    0.928 -0.386

    891.83 -90

    - 7,385

    891.83 178

    53,329 -1,733

    40,315 -2,677

    41616 -2,583

    (13,014) 945

    YTD Actual

    YTD

    Variance

  • 8/11/2019 Budget Variance Ytd Sept. 2011

    3/67

    Sept. Sept. Sept. Sept. Sept.

    INCOMENet PLF (%) 93.02% 73.12% -19.90% 83.83% 78.73%

    Aux Consumption (%) 10.60% 11.98% -1.38% 10.67% 10.59%

    Operating Revenue

    Fixed Charges 1,384 1394.27 10 8,304 8,366

    Variable Charges 2,497 1679.67 (817) 13,746 11,203

    Reim.( I.Tax,ED,Rent,Cess) 459 433.20 (26) 2,011 2,343

    Fuel Price Adjustment 2,566 2223 (343) 2,566 2,223

    Incentive - -

    Rebate (81) (77) 4 (488) (376)

    Sub Total 6,825 5,653 (1,172) 26,139 23,759

    Other Income

    Interest on FD 428 635.00 207 2,999 3,843

    Other Receipt 16 20 4 96 44

    Sub Total 444.32 655.26 211 3,094 3,888

    Total Revenue 7,269 6,308 (961) 29,233 27,646

    EXPENDITURE

    Coal 2,909 1955 954 14,601 11,282

    -

    Oil 57 244 (187) 417 719O&M Exp. (Department wise details

    annexed) 794 423 372 4,493 3,016

    HO Common Exp. 96 164 (68) 491 554

    MMHP Cost 13 11 2 75 48

    Electricity Duty 60 53 7 336 306Operating Expenditure 3,929 2,849 1,080 20,413 15,925

    EBITDA 3,340 3,459 (2,041) 8,820 11,721

    In Million Dollar 68 70 (42) 180 239

    Interest & Fin. Charges 0.64 0.21 0.43 3.92 6.49

    Depreciation 133 143 (10) 800 791

    Total expenses excl. tax 4,063 2,993 1,070 21,217 16,723

    Profit Befor tax 3,206 3,315 (2,032) 8,017 10,923

    Income Tax 478 1,065 (587) 2,613 3,531

    Profit after Tax 2,728 2,250 (1,445) 5,404 7,392

    PROFITABILITY-SUMMARY SHEET 2011-12(Rs.

    Actual VarianceBudget

    YTD

    Budget

    YTD

    Actual

  • 8/11/2019 Budget Variance Ytd Sept. 2011

    4/67

    In Million Dollar 56 46 (29) 110 151

  • 8/11/2019 Budget Variance Ytd Sept. 2011

    5/67

  • 8/11/2019 Budget Variance Ytd Sept. 2011

    6/67

  • 8/11/2019 Budget Variance Ytd Sept. 2011

    7/67

  • 8/11/2019 Budget Variance Ytd Sept. 2011

    8/67

  • 8/11/2019 Budget Variance Ytd Sept. 2011

    9/67

  • 8/11/2019 Budget Variance Ytd Sept. 2011

    10/67

  • 8/11/2019 Budget Variance Ytd Sept. 2011

    11/67

  • 8/11/2019 Budget Variance Ytd Sept. 2011

    12/67

  • 8/11/2019 Budget Variance Ytd Sept. 2011

    13/67

  • 8/11/2019 Budget Variance Ytd Sept. 2011

    14/67

  • 8/11/2019 Budget Variance Ytd Sept. 2011

    15/67

  • 8/11/2019 Budget Variance Ytd Sept. 2011

    16/67

  • 8/11/2019 Budget Variance Ytd Sept. 2011

    17/67

  • 8/11/2019 Budget Variance Ytd Sept. 2011

    18/67

  • 8/11/2019 Budget Variance Ytd Sept. 2011

    19/67

  • 8/11/2019 Budget Variance Ytd Sept. 2011

    20/67

  • 8/11/2019 Budget Variance Ytd Sept. 2011

    21/67

    Sept.

    -5.10%

    0.08%

    62

    (2,543)

    332

    (343)

    -

    112

    (2,380)

    845 The other income increases to Rs 67.24 lakh due to the cash differentials and difference in rate of interest, the i

    (51) Prior period expenses 21.38 Lakhs deducted from sept. Actual

    793.25

    (1,587)

    3,319

    (302)

    1,477

    -

    (63)

    -

    27

    -

    304,488

    2,900

    59

    (3) Over Budgeted by 1 Lakhs

    -

    9

    4,494

    2,907

    (918) The reimbursement of income tax is budgeted on cash basis whereas under accounts it is provided on accrual ba

    3,825

    in Lakh.)

    YTD

    Variance

  • 8/11/2019 Budget Variance Ytd Sept. 2011

    22/67

    78

  • 8/11/2019 Budget Variance Ytd Sept. 2011

    23/67

  • 8/11/2019 Budget Variance Ytd Sept. 2011

    24/67

  • 8/11/2019 Budget Variance Ytd Sept. 2011

    25/67

  • 8/11/2019 Budget Variance Ytd Sept. 2011

    26/67

  • 8/11/2019 Budget Variance Ytd Sept. 2011

    27/67

  • 8/11/2019 Budget Variance Ytd Sept. 2011

    28/67

  • 8/11/2019 Budget Variance Ytd Sept. 2011

    29/67

  • 8/11/2019 Budget Variance Ytd Sept. 2011

    30/67

  • 8/11/2019 Budget Variance Ytd Sept. 2011

    31/67

  • 8/11/2019 Budget Variance Ytd Sept. 2011

    32/67

  • 8/11/2019 Budget Variance Ytd Sept. 2011

    33/67

  • 8/11/2019 Budget Variance Ytd Sept. 2011

    34/67

  • 8/11/2019 Budget Variance Ytd Sept. 2011

    35/67

  • 8/11/2019 Budget Variance Ytd Sept. 2011

    36/67

  • 8/11/2019 Budget Variance Ytd Sept. 2011

    37/67

  • 8/11/2019 Budget Variance Ytd Sept. 2011

    38/67

  • 8/11/2019 Budget Variance Ytd Sept. 2011

    39/67

    vestment assumed wasRs 668 Crand average rate of interest was 9.69% whereas the actual investment is Rs.755 Cr and av

    sis.Rs 288.17/- lakhs is accounted for on accrual basis taking surcharge @ 5% whereas in budget it is taken as Rs.358 /- lakhs

  • 8/11/2019 Budget Variance Ytd Sept. 2011

    40/67

  • 8/11/2019 Budget Variance Ytd Sept. 2011

    41/67

  • 8/11/2019 Budget Variance Ytd Sept. 2011

    42/67

  • 8/11/2019 Budget Variance Ytd Sept. 2011

    43/67

  • 8/11/2019 Budget Variance Ytd Sept. 2011

    44/67

  • 8/11/2019 Budget Variance Ytd Sept. 2011

    45/67

  • 8/11/2019 Budget Variance Ytd Sept. 2011

    46/67

  • 8/11/2019 Budget Variance Ytd Sept. 2011

    47/67

  • 8/11/2019 Budget Variance Ytd Sept. 2011

    48/67

  • 8/11/2019 Budget Variance Ytd Sept. 2011

    49/67

  • 8/11/2019 Budget Variance Ytd Sept. 2011

    50/67

  • 8/11/2019 Budget Variance Ytd Sept. 2011

    51/67

  • 8/11/2019 Budget Variance Ytd Sept. 2011

    52/67

  • 8/11/2019 Budget Variance Ytd Sept. 2011

    53/67

  • 8/11/2019 Budget Variance Ytd Sept. 2011

    54/67

  • 8/11/2019 Budget Variance Ytd Sept. 2011

    55/67

  • 8/11/2019 Budget Variance Ytd Sept. 2011

    56/67

  • 8/11/2019 Budget Variance Ytd Sept. 2011

    57/67

    erage interest rate is 9.3%

    on cash basis taking 7.5% as surcharge.

  • 8/11/2019 Budget Variance Ytd Sept. 2011

    58/67

    Sep-11 Sep-11 Sep-11 Sep-11 Sep-11 Sep-11

    1 140101 Salary Expenses 173.98 119.20 54.78 884.80 726.48 158.32

    Due to non implementation o

    Pay Salary.

    2 140102 House rent allowance 1.18 1.13 0.05 7.06 6.71 0.35

    3 140103 Overtime Wages 2.90 14.17 -11.28 17.38 38.62 (21.24)

    ver me o prev ous year pa

    this year.

    4 140104 Thermal Allowances 3.84 3.78 0.06 23.06 23.04 0.02

    5 140105 Washing Allowances 0.48 0.46 0.01 2.86 2.77 0.09

    6 140106 Night Shift Allowance 0.77 0.82 -0.05 4.62 4.72 (0.10)

    7 140107 Special Area Allowance / Greencard Al 0.40 0.24 0.17 2.42 1.42 1.00

    8 140108 Technical allowance 0.57 0.57 0.00 3.44 3.43 0.01

    10 140153 Leave encashment - - - 4.49 (4.49)

    Budget Provision is on Q4 of

    9.98Lakhs

    11 140154 LTC - 0.07 (0.07) - 0.64 (0.64)

    Budget Provision is on Q4 of

    7.50Lakhs

    12 VSS for employee 241.33 241.33 724.00 - 724.00

    To be booked at the end of Octo

    2011, Relieve of employees is in

    progress.

    - - - - -

    12 140601 Reimbursement of Medical Expenses 3.75 10.83 (7.08) 22.50 19.27 3.23

    13 140602 Medical Allowance 2.81 2.72 0.09 16.88 13.69 3.19

    14 140901 Reimb.of Home Office Assistant Exp 0.26 0.23 0.03 1.56 1.46 0.10

    15 140902 Reimb. of Newspaper/Magazine Exp 0.10 0.10 0.58 0.04 0.54

    16 140903

    Reimb.:Prof Institution membership

    fee 0.01 0.01 0.05 - 0.05

    17 150905 Reimb. of Telephone/Cell Phone Exp 0.75 0.54 0.21 4.50 2.79 1.71

    18 151103

    Re-imbursement of Local Travelling

    Exp 6.56 6.28 0.28 39.34 36.28 3.06

    19140904

    Re-imbursement of Educational Exp-

    Children 1.25 3.30 (2.05) 7.50 9.37 (1.87)

    Due to timing difference year

    budget is 15Lakhs

    140904Re-imbursement of Educational Exp-

    Higher Education of Employee. 0.33 0.33 2.00 - 2.00

    - - - - -

    20 140201 Generation Incentive 3.34 2.63 0.71 20.06 21.86 (1.80)

    21 140202 Bonus and Ex-gratia payment - - - - -

    22 140203 Awards and Recognition Incentive 0.54 0.54 3.24 0.36 2.88

    23 140205 Safety Incentives - - - - -

    - - - - -

    24 140301 Company's Contribution to EPF 15.15 13.98 1.17 88.52 88.49 0.02

    25 Variable Pay 3.33 3.33 20.00 - 20.00

    26 140402 Employee Family Rehab. 0.64 0.66 (0.02) 3.82 3.31 0.51

    27 Group gratuity - - - - -

    - - - - -

    464.28 181.62 282.66 1,900.18 1,009.25 890.92

    MGR - - -

    28

    130101 Mech Spares_MGR 3.75 1.57 2.18 13.50 19.65 (6.15)

    4 nos. Electripanel installation 3

    part payment of wheel turning p

    made in this year related to last

    29 131106 MGR Maintenance 10.39 4.76 5.63 48.88 36.31 12.5730

    MGR Track Renovation-

    ChingudiGuda - - - - -

    32138102

    Fuel & Lub.Locomotives & Inspection

    Trolley 5.83 5.43 0.40 35.00 29.03 5.97

    TOTAL 19.97 11.76 8.22 97.38 84.99 12.38

    CHP - - -

    Variance

    Total people cost

    D.Contribution / PF & Other Funds

    A/c CodeYDT

    VARIANCE

    YTD

    BUDGET

    B. Reimbursable Expenses

    C. Incentive / Bonus / Ex-gratia / Awards

    Budget Heads

    ITPS Revenue Budget Variance (2011-2012)u ge e

    Expenditu

    re

    c ua

    Expenditu

    re

    YTD

    ACTUALl.No

  • 8/11/2019 Budget Variance Ytd Sept. 2011

    59/67

    Sep-11 Sep-11 Sep-11 Sep-11 Sep-11 Sep-11

    1 140101 Salary Expenses 173.98 119.20 54.78 884.80 726.48 158.32

    Due to non implementation o

    Pay Salary.

    VarianceA/c CodeYDT

    VARIANCE

    YTD

    BUDGETBudget Heads

    u ge e

    Expenditu

    re

    c ua

    Expenditu

    re

    YTD

    ACTUALl.No

    33 130101 Mech Spares_CHP 23.33 16.53 6.81 138.58 70.87 67.71

    34 Electrical Spare_CHP 4.33 7.84 (3.51) 26.10 13.25 12.85

    35 131107 CHP Maintenance 8.33 13.03 (4.70) 50.00 60.01 (10.01)

    36 138109 Maintenance of Weigh Bridge 0.42 (0.14) 0.56 2.50 1.82 0.68

    37 151402 Fuel of heavy vehicles 0.83 0.51 0.32 5.00 3.12 1.88

    38 134108 In-motion Weigh bridge 0.08 0.08 0.87 - 0.87

    41 Dust Suppresion Chemical - - 2.25 - 2.25

    42 Walkie Talkie & Its Spare - - 1.25 - 1.25

    TOTAL 37.33 37.78 (0.45) 226.55 149.08 77.47

    WTP - - -

    43 120103 Water Treatment cost- Chemicals 5.00 5.00 30.00 15.53 14.47

    44120101 Water Tax 47.00 36.79 10.21 282.00 228.16 53.84

    The actual expenditure is aroun

    40Lakhs and budget is made o

    basis of 45Lakhs per month.

    45 135102 Calibration of Water meters 0.06 0.06 0.38 - 0.38

    46 135103 Calibration of Instruments 0.17 0.17 1.00 0.10 0.90

    47 135105 Lab chemical consumed 0.16 0.16 0.96 - 0.96

    48 137103 Maintenance of Lab Equipment 0.17 0.17 1.50 - 1.50

    49 134112 Stamping fee of Water flow Meters 0.04 0.04 0.26 0.12 0.14

    TOTAL 52.60 36.79 15.81 316.10 243.91 72.19

    OPERATION - - -

    50130104 Gases 0.73 (0.44) 1.17 4.40 6.25 (1.85)

    Due to at a time purchase ye

    budget is 8.80Lakhs.

    51120201 Power purchase--220KVA (Import) 1.00 1.00 6.00 9.76 (3.76)

    The Power Purchase cost incre

    because of two blackouts in 10t

    and 26th August for 22 hrs dura

    52 134107 System operating fee SLDC 3.13 3.01 0.11 18.75 18.47 0.28

    53138107

    Miscellaneous Expenses (incl. ERPC

    fees) - - - 15.00 (15.00)

    Budget Provision is on Q3 o

    15Lakhs

    TOTAL 4.86 2.57 2.29 29.15 49.48 (20.33)

    EFFICIENCY - - -

    54 134106 Explosive license fee - - - 0.54 (0.54)55 134102 Boiler license fees 0.08 1.13 (1.04) 1.00 1.19 (0.19)

    56 135106 Calibration of fuel oil tanks 0.04 0.04 0.11 1.46 (1.36)

    57 Coal storage license - - - - -

    58 Calibration of efficiency equipment 0.01 0.01 0.09 - 0.09

    59 Repair 0.03 0.03 0.20 - 0.20

    60 Procurement of new equipment 0.17 0.17 0.50 - 0.50

    61 Books and Journals 0.03 0.03 0.20 - 0.20

    62 Energy Audit - - 20.00 - 20.00

    Technocommercial bid opened

    bid is going to be open.

    TOTAL 0.36 1.13 (0.77) 22.10 3.19 18.91

    MECH. MAINT.(MAIN PLANT) - - -

    63 130101 Mech Spares_Boiler & TG 33.88 7.53 26.34 343.13 264.01 79.12

    66 131101 Mechanical Maintenance-Main Plant 10.87 8.50 2.37 317.70 271.75 45.9567 134101 Boiler license and inspection fees - - 1.50 1.91 (0.41)

    68 134110 Thermography Test, Debris Analysis 0.07 0.07 0.42 - 0.42

    69 138101 Maintenance of other equipments 0.17 0.01 0.16 1.04 2.21 (1.17)

    TOTAL 44.99 16.04 28.94 663.79 539.88 123.91

    Mech. Maint. (Balance of Plant) - - -

  • 8/11/2019 Budget Variance Ytd Sept. 2011

    60/67

    Sep-11 Sep-11 Sep-11 Sep-11 Sep-11 Sep-11

    1 140101 Salary Expenses 173.98 119.20 54.78 884.80 726.48 158.32

    Due to non implementation o

    Pay Salary.

    VarianceA/c CodeYDT

    VARIANCE

    YTD

    BUDGETBudget Heads

    u ge e

    Expenditu

    re

    c ua

    Expenditu

    re

    YTD

    ACTUALl.No

    70 130101 Mech Spare_BOP 3.03 0.53 2.50 18.85 13.06 5.79

    130107 Tools tackles 0.27 0.27 1.60 - 1.60

    74131102

    Mechanical Maintenance-Balance of

    Plant 2.50 (0.67) 3.17 15.00 11.63 3.37

    75 131109 Workshop Contract Jobs 0.50 0.50 - 3.00 2.40 0.60

    76 137105 Maintenance of workshop equipment 0.25 0.49 (0.24) 1.50 0.99 0.51

    77137101

    Maint. Heavy mobile & construction

    equip. - 0.63 (0.63) - 3.44 (3.44)

    78151306

    (Hydra,Truck & Crane) Maintenance

    and Hiring of Heavy Vehicle during 0.58 0.58 3.50 - 3.50

    TOTAL 7.13 1.50 5.64 43.45 31.54 11.91

    Mech. Maint. (Ash Handling - - -

    79 130101 Mech Spares_AHP 4.33 12.98 (8.64) 26.00 42.20 (16.20)

    82 131108 AHP maintanance 2.33 2.00 0.34 29.00 9.46 19.54

    TOTAL 6.67 14.98 (8.31) 55.00 51.66 3.34

    ELECTRICAL - - -

    83 130102 ELECTRICALS Spares 11.14 2.45 8.69 133.41 48.32 85.09

    84 131103 Electrical Maintenance 2.42 3.47 (1.06) 63.50 86.97 (23.47) Last shut down expenditure paid

    86134105 Electrical Inspection fees 0.17 0.17 1.10 16.91 (15.81)

    Timing Difference Yearly bud20.60Lakhs

    87 135101 Calibration of Energy meters 0.33 0.33 2.00 0.57 1.43

    88137106

    Maintenance of Plant Communication

    System 0.08 0.08 0.50 0.74 (0.24)

    89150806

    Maintenance of EPABX (Intercome

    Telephone) 0.33 0.59 (0.26) 2.00 2.47 (0.47)

    TOTAL 14.47 6.51 7.96 202.51 155.98 46.53

    C & I - - -

    90130103 C&I Spares 4.00 0.36 3.64 27.00 30.80 (3.80)

    Capital spare of 8Lakhs inclu

    be reverses in this month.

    91 131104 C & I Maintenance 1.00 0.78 0.22 11.00 9.55 1.45

    TOTAL 5.00 1.14 3.86 38.00 40.35 (2.35)

    ASH POND - - -92 136521 Maintenance of Ash Pond 0.88 4.07 (3.19) 5.27 4.13 1.14

    93 132101 Engineering (consultancy) - 1.00 (1.00) 10.00 1.00 9.00

    TOTAL 0.88 5.08 (4.20) 15.27 5.14 10.14

    ASH UTILIZATION. - - -

    93 137108 Maintenance of Ash Brick Plant - 0.76 (0.76) 1.00 2.00 (1.00)

    94137109

    Maintenance of Dry Ash collection

    system 0.17 0.17 1.02 0.11 0.91 Work completed & Bil to be s

    95 138122 Ash Utilisation Expenses - - - - -

    96 138122 Ash Brick Production Cost 2.40 2.40 14.40 2.82 11.58

    97137109

    Maintenance of Dry Ash collection

    system of ultratech silo 1.10 1.10 6.60 - 6.60 Pending Permission from D(O

    TOTAL 3.67 0.76 2.91 23.02 4.93 18.09

    Civil - Main Plant - - -

    98 131105 Civil Maintenance 2.67 (3.94) 6.61 16.00 10.65 5.35

    99 131105 Grass cutting inside plant area. - - 3.00 - 3.00

    100136101

    Maintenance of Plant & Service

    Building 3.33 3.50 (0.17) 20.00 18.42 1.58

    101136103

    Maint of Factory Roads ,Bridges &

    Culverts - - 38.00 - 38.00

  • 8/11/2019 Budget Variance Ytd Sept. 2011

    61/67

    Sep-11 Sep-11 Sep-11 Sep-11 Sep-11 Sep-11

    1 140101 Salary Expenses 173.98 119.20 54.78 884.80 726.48 158.32

    Due to non implementation

    Pay Salary.

    VarianceA/c CodeYDT

    VARIANCE

    YTD

    BUDGETBudget Heads

    u ge e

    Expenditu

    re

    c ua

    Expenditu

    re

    YTD

    ACTUALl.N

    102 138108 R/M of Intake Channel - - 2.10 - 2.10

    103 150303

    System 0.09 0.09 0.52 - 0.52

    104 150203

    Fencing 1.67 1.67 10.00 - 10.00

    TOTAL 7.75 (0.44) 8.20 89.62 29.07 60.55

    EHS - - -

    105 151904 Non- Statutory Audit Fees-EHS - - - - -

    106151904

    Water and Air Concent Renewal

    Fees. - - - - -

    107 151904 BBS 0.17 0.17 1.00 - 1.00

    108 137506 Safety apparels-PPE 2.50 3.03 (0.53) 15.00 16.96 (1.96)

    109 137507 EHS awareness expenses 0.25 0.94 (0.69) 1.50 2.91 (1.41)

    110151802

    Enviornmental Monitoring & Maint

    Expenses 0.17 0.17 1.00 - 1.00

    111 120102 Water Cess & Pollution Charges 1.20 1.00 0.20 7.20 5.34 1.86

    112 137505 Safety shoes - - 8.69 - 8.69

    TOTAL 4.28 4.97 (0.69) 34.39 25.21 9.18

    LAN & IT - - -

    113 135501 Communication expenses- Internet 0.83 0.69 0.14 5.00 1.66 3.34

    114 150801 Maintenance of Hardware 0.50 0.60 (0.10) 3.00 2.79 0.21

    115 150802 Upgradation of Software 0.42 0.42 2.50 - 2.50

    116 150803 Consummables for EDP Machines 0.50 0.50 3.00 0.11 2.89

    117 150804 IT Spares 0.08 0.85 (0.77) 0.50 3.74 (3.24)

    118 150805 Software & packages 0.50 0.34 0.16 3.00 1.90 1.10

    TOTAL 2.83 2.49 0.34 17.00 10.21 6.79

    HOSPITAL - - -

    119140603

    Hospital Exp- Maint of Diagnostic

    equipments 0.27 0.27 1.00 - 1.00

    120 140604 Hospital Exp Medicines & Cons 1.13 2.05 (0.92) 4.30 3.44 0.86

    TOTAL 1.40 2.05 (0.65) 5.30 3.44 1.86

    ADMINISTRATION - - -

    121 151601 Watch & Ward Expenses 10.83 14.33 (3.50) 65.00 60.71 4.29

    122 151302 Fuel for Owned vehicles 2.85 2.85 17.10 0.39 16.71

    123 152001 News Paper & Periodicals 0.16 0.04 0.12 0.94 0.24 0.70

    124 152002 Liabrary Expenses 0.12 0.12 0.75 0.01 0.74

    125 152301 ITPS House Expenses 1.83 1.59 0.24 11.00 10.77 0.23

    126 152302 Hospitality Expenses 0.67 0.42 0.24 4.00 2.16 1.84

    127 152303 Entertainment 0.17 0.00 0.16 1.00 0.00 1.00

    128 152501 Office furnishing expenses 0.08 0.08 0.50 0.33 0.17

    129 152502 Office maintenance expenses 0.40 0.18 0.22 2.37 0.62 1.75

    130 150601 Legal Expenses 0.01 0.05 (0.04) 0.17 0.43 (0.26)

    131 150701 Printing & Stationery Expenses 0.63 0.59 0.04 3.76 0.87 2.89

    132150807

    Maintenance of Time Attendnance

    System 0.12 0.12 0.74 - 0.74

    133 150901 Postal Expenses 0.42 0.42 2.50 0.20 2.30

    134150902 Communication expenses- Telephone 2.67 1.37 1.30 16.00 8.32 7.68

    1.5 Lakhs bill pending, Black bPNT has been surrendered du

    reduction in employees.

    135 151001 Publicity Expenses 0.23 0.23 1.50 - 1.50

    136 151002 Advertisement for Tenders - 5.70 (5.70) 4.00 8.89 (4.89)

    137 151003 Advertisement Expenses_Others 0.33 0.33 3.00 - 3.00

    138 140801 Liveries & uniform - - - - -

  • 8/11/2019 Budget Variance Ytd Sept. 2011

    62/67

    Sep-11 Sep-11 Sep-11 Sep-11 Sep-11 Sep-11

    1 140101 Salary Expenses 173.98 119.20 54.78 884.80 726.48 158.32

    Due to non implementati

    Pay Salary.

    VarianceA/c CodeYDT

    VARIANCE

    YTD

    BUDGETBudget Heads

    u ge e

    Expenditu

    re

    c ua

    Expenditu

    re

    YTD

    ACTUALl.N

    139 140501/502School Exp- Salary of Teaching staff 17.00 13.78 3.22 101.50 79.99 21.51

    140 140502 School Exp- Other Expenses - - - 0.02 (0.02)

    141140701 Canteen exp-Equip maintenance & Cons. 1.25 1.25 7.50 0.04 7.46 To be dropped.

    142140702 Canteen expenses-Fuel Cost 0.63 0.43 0.21 3.80 2.59 1.21

    consumption decreased

    enhancement..143 140703 Canteen expenses-Contract Cost 2.14 1.67 0.47 15.99 13.46 2.53 bill for Sept. not yes subm

    144 140803 Games,sports & cultural activity - 0.30 (0.30) - 0.30 (0.30)

    145151501

    Community Socio cultural activity

    Expenses 0.33 0.09 0.24 2.00 0.09 1.91

    146 151504 Foundation & National day Celebration 0.50 0.76 (0.26) 1.50 0.76 0.74

    147 151505 Other Festival Expenses 0.43 1.13 (0.69) 2.60 3.13 (0.53)

    148 150304 Maintenance of office furniture 0.08 0.08 0.50 - 0.50

    149 150305 Maintenance of office equipments 0.28 0.28 1.69 - 1.69

    150 150306 Maintenance of Miscellaneous Equipment 0.09 0.09 0.55 - 0.55

    151 151306 Maintenance of Owned Vehicles 0.71 0.59 0.12 4.25 0.70 3.55

    152 151401 Hire charges of Vehicle 2.17 2.54 (0.37) 13.00 9.95 3.05

    153 151303 Fuel charges of hired vehicles 2.18 2.18 13.10 - 13.10

    154 151403 Fuel & Lubricant for Hired Vehicles 0.63 1.49 (0.86) 3.75 6.08 (2.33)155 151304/404Insurance of vehicles 0.15 0.34 (0.20) 0.88 0.79 0.09

    156 151305/405 Rates & taxes 0.08 0.08 0.50 - 0.50

    157 150507 Training Hostel Maintenance Expenses 0.30 0.30 1.82 - 1.82

    158 152507 Miscellaneous Expenses 0.13 0.04 0.09 0.76 1.06 (0.30)

    159 151701 Land Rent ,Cess and Taxes - - - - -

    160 140802 Revenue Grant to Employee's Club 0.67 0.70 (0.03) 4.00 1.40 2.60

    108 140804 Staff welfare Expenses - - - - -

    TOTAL 51.28 48.12 3.16 314.02 214.29 99.73

    COLONY MAINTENANCE - - -

    161 150201/202Maintenance of Aux Building 0.33 0.33 2.00 0.02 1.98

    162150205/204

    Maintenance of Roads Bridges

    Culvert(Others) 0.83 0.83 5.00 - 5.00

    163150202/201Maintenance of Township building 5.67 0.31 5.36 34.75 38.52 (3.77)

    Due to increase in painting

    price.

    164 150204/205Maintenance of Township Roads 1.67 1.67 10.00 - 10.00 Tender floated 30Lakhs

    1650301/1381 Maintenance of Township Power supply 1.50 0.52 0.98 9.00 12.14 (3.14)

    Central park path way light

    security road gate near pum

    gate0.35 Lakhs

    166150302

    Maint of water supply ,sewarage system &

    colony 0.67 5.26 (4.59) 4.00 9.48 (5.48) 4 Lakhs reversed in This m

    167151502

    Plantation,park & playground maintenance

    exp 3.00 7.08 (4.08) 18.00 17.31 0.69

    168 151503 Township cleaning expenses 2.67 2.88 (0.21) 16.00 15.09 0.91

    1698107/1503 Maintenance of 33 KV line 0.67 0.67 4.00 - 4.00

    Work awarded 1.60Lakhs f

    painting. Work not execute

    season to be done in this q

    170120202 Power purchase--33KVA 2.38 1.26 1.13 14.30 10.84 3.46

    Expenditure will be done asconsumption.

    171 120203 Power purchase--Ubuda 0.28 0.16 0.12 1.70 1.11 0.59

    TOTAL 19.67 17.47 2.20 118.75 104.51 14.24

    CSR - - -

    172 152505 Periphery Dev. expenses 4.53 1.75 2.79 39.00 43.49 (4.49)

    173 Public Relation and Media - - - - -

    WAREHOUSE - - -

  • 8/11/2019 Budget Variance Ytd Sept. 2011

    63/67

    Sep-11 Sep-11 Sep-11 Sep-11 Sep-11 Sep-11

    1 140101 Salary Expenses 173.98 119.20 54.78 884.80 726.48 158.32

    Due to non implementatio

    Pay Salary.

    VarianceA/c CodeYDT

    VARIANCE

    YTD

    BUDGETBudget Heads

    u ge e

    Expenditu

    re

    c ua

    Expenditu

    re

    YTD

    ACTUALl.No

    174137107

    Maintenance of Material Transportation

    Vehicles 0.25 0.11 0.14 1.50 0.94 0.56

    175137102

    Maintenance of Material Handling

    Equipment 0.07 0.07 0.40 0.15 0.25

    176138105

    Freight & Material Handling Expenses

    (contract) 0.33 (0.09) 0.43 2.32 0.26 2.06

    177138106

    Freight & Material Handling Expenses

    (transp) 0.14 0.14 0.84 - 0.84

    178 138110 Development of Store Yard 0.35 0.35 2.10 - 2.10

    179 131110 Matl Handling Contract Jobs 0.25 0.25 1.50 - 1.50

    180 133102 Transit Insurance Expenses 0.17 0.17 1.00 - 1.00

    181 134103 VHF license fees - - - 1.52 (1.52)

    182 Reparement of Walky Talky 0.08 0.08 0.50 - 0.50

    183Painting of BHEL equipment lying in the

    yard. - - - - -

    TOTAL 1.64 0.02 1.62 10.16 2.87 7.29

    HR - - -

    184150501 Employees Training-Fees 2.77 0.07 2.70 16.61 1.44 15.17

    Advance taken for foreign tr

    Sept. amount 12.20Lakhs. N

    accounted.

    185 150502 Employees Training-Expenses 0.33 0.33 2.00 0.19 1.81

    186 150503 Conference & Seminar- Fees 0.06 0.06 0.35 - 0.35

    187 150504 Conference & Seminar- Expenses 0.17 0.17 1.00 0.15 0.85

    188 150505 Inhouse Training Exp 0.56 0.48 0.08 3.37 0.71 2.66

    189150506 Traveling expenses (training) 1.52 0.05 1.47 9.14 1.03 8.11

    Advance taken for foreign tr

    Sept. amount 12.20Lakhs. N

    accounted.

    190 151101 Travelling Exp-Fares & Conveyace 0.33 1.79 (1.46) 2.00 5.04 (3.04)

    191151102

    Travelling Expenses-DA, Hotel & Misc

    Exp 1.66 1.76 (0.10) 9.93 4.35 5.58

    192 152504 Stipend to Trainee- Diploma & ITI 0.65 0.38 0.27 3.91 1.69 2.22

    193152504

    Stipend to Trainee- Cost & Management

    Trainee 0.20 0.40 (0.20) 1.20 1.40 (0.20)

    TOTAL8.26 4.93 3.32 49.51 16.00 33.51

    FIRE & SAFETY - - -

    194 137501 Fire Brigade Expenses 2.20 2.82 (0.62) 13.20 15.15 (1.95)

    195 137502 Maintenance of Fire Tender 0.07 0.07 0.40 - 0.40

    196 137503 Fuel & Lubricants of Fire Tender 0.20 0.19 0.01 1.20 0.63 0.57

    197137504

    Fire Fighting System maintenance

    Expenses 0.52 0.99 (0.47) 2.50 2.70 (0.20)

    198 137504 Refilling of fire exstinguishers 0.17 0.17 1.25 0.35 0.90

    199 137508 Factory Safety Expenses 2.50 0.36 2.14 15.00 4.26 10.74

    TOTAL 5.65 4.37 1.28 33.55 23.10 10.45

    MISCELLANEOUS - - -

    200 130106 Lubricants 4.09 5.17 (1.08) 24.86 45.92 (21.06)

    201 130105 Consumables 5.52 3.54 1.98 33.60 44.47 (10.87)

    202 132101 Hire of Engineering Personnel 3.33 2.93 0.40 20.00 19.01 0.99203 152503 Meeting expenses-PRM,TRM & others 1.03 0.98 0.05 6.18 3.72 2.46

    204 132102 Supervision/HR 0.20 0.20 0.60 - 0.60

    205 151903 Statutory Audit Expenses 0.08 0.08 0.50 - 0.50

    206 151909 Non- Statutory Audit Expenses 0.10 0.10 0.60 - 0.60

    207152201

    Insurance for cash in transit,chest &

    fidelity - - - 0.06 (0.06)

    208 133101 Plant Fire Insurance Expenses 10.33 5.91 4.42 61.00 36.45 24.55

  • 8/11/2019 Budget Variance Ytd Sept. 2011

    64/67

    Sep-11 Sep-11 Sep-11 Sep-11 Sep-11 Sep-11

    1 140101 Salary Expenses 173.98 119.20 54.78 884.80 726.48 158.32

    Due to non implementation of M

    Pay Salary.

    VarianceA/c CodeYDT

    VARIANCE

    YTD

    BUDGETBudget Heads

    Expenditu

    re

    Expenditu

    re

    YTD

    ACTUALl.No

    209 160403 Bank Transaction Charge 0.11 0.11 (0.01) 0.65 0.79 (0.14)

    210 135104 Calibration of weighing equipments 0.17 0.59 (0.42) 1.00 2.05 (1.05)

    211150801 SAP Implementation - - - 12.93 (12.93)

    SAP license fees paid. No budget

    provision.

    TOTAL 24.97 19.23 5.74 148.99 165.39 (16.40)

    GRAND TOTAL 794.47 422.61 371.86 4,492.78 3,006.97 1,485.8253.19%

  • 8/11/2019 Budget Variance Ytd Sept. 2011

    65/67

    PROJECT

    OWNER

    Sep-11 Sep-11 Sep-11 YTD Sep YTD Sep

    1

    Filling Of Ash in low-lying areas. Ash 12 Suresh Behera 60.00 5.00 (0.67) 5.67 30.00 8.35

    2

    Capacity increase of Ash Pond (

    increase in pond height in Ash pond-

    A)

    Ash 12 Anajan kr. Sahu 800.00 33.33 33.33 300.00 16.20

    3

    Capacity increase of Ash Pond

    (Construction of Ash mound in Ash

    Bund B)

    Ash 12 Anajan kr. Sahu 517.29 50.00 118.36 (68.36) 150.00 242.18

    Sub Total 1377.29 88.33 117.69 (29.36) 480.00 266.73

    3 Excitation system in Generator(DAVR) Electrical 3 P.K.Sathpathy 58.00 - - 58.00 -

    58.00 - - - 58.00 -

    3 Modification in CHP Conveyor

    systemCHP 6 Ajaya Majhi 40.00

    13.33 13.3340.00 -

    40.00 13.33 - 13.33 40.00 -

    2 Replacement of static relay to

    numeric relay (Gen-2, BFP motor

    protection)Electrical 3 P.K.Sathpathy 19.55

    6.52 6.52

    19.55 -

    19.55 6.52 - 6.52 19.55 -

    1 furnitures of schools Personal 8 C.R.Swain 2.50 - - 2.50 -

    3 canteen equipments Personal 8 C.R.Swain 4.00 - - - -

    4

    Transit house equipments/Trainees

    hostel expenses. Personal 8 C.R.Swain 4.00 - - - -

    5 furnitures,equipments for different

    departmentsPersonal 8 C.R.Swain 15.49 5.16 1.90 3.26 15.49 4.80

    7 Security / Time Office / Club

    EquipmentsPersonal 9 C.R.Swain 10.00 3.33 3.33 10.00 -

    35.99 8.50 1.90 6.60 27.99 4.80

    3 Fire protection system in CHP

    Fire 17 J.K.Pattnaik 20.00 - - 20.00 -

    4 Revival of ISD & PSD sensors and

    control panel C & I 17 S P Bal 22.00 - - 22.00 -

    Sub Total 42.00 - - - 42.00 -

    Actual

    Sub Total

    Total Capex

    for 2011-12SL DESCRIPTION

    Package 2 - Land Developmemt

    Expenses

    Package 4

    Package 12

    Budget VarianceActual

    OPGC CAPEX BUDGET PROPOSAL 2010-11 & 2011-12

    Rs.in lakh

    DEPARTMEN

    T

    PROJE

    CT NO.Budget

    Package 13 - Other Capex

    Package 8- CHP Equipment Supplier

    Sub Total

    Package 9

    Sub Total

    Package 11

    Sub Total

  • 8/11/2019 Budget Variance Ytd Sept. 2011

    66/67

    PROJECT

    OWNER

    Sep-11 Sep-11 Sep-11 YTD Sep YTD Sep

    ActualTotal Capex

    for 2011-12SL DESCRIPTION

    Budget VarianceActual

    OPGC CAPEX BUDGET PROPOSAL 2010-11 & 2011-12

    Rs.in lakh

    DEPARTMEN

    T

    PROJE

    CT NO.Budget

    1 Replacement of 220V, 2000AH

    battery system in Stn. Board, UnitBoards./ 24V, 1500AH C&I DCS

    Battery replacement/Replacement of

    UPS battery of both units

    Electrical 3 D.N.Guru 180.00 33.33 33.33 180.00 -

    2 Replacement of 220KV S/Y line

    equipments( CT's, Lightning

    Arrestors ) & renovation of Earth

    Switches in colony bay

    Electrical 3 D.N.Guru 2.73 0.91 0.91 2.73 -

    3 PRDS & HPBYPASS Valve Mechanical 1 M.Pradhan 20.00 - - - -

    6 ABT Managementoperation 15 Sudhakar Swain 30.00 - - - -

    Sub Total 232.73 34.24 - 34.24 182.73 -

    Approved Proposals

    1

    Renovation of Ib Club colony

    maintenanceMangal Buda 5.51 - - 5.51 -

    2

    Renovation of Ib Thermal Club colony

    maintenanceMangal Buda 14.33 - - 14.33 -

    3

    Installation and commissioning of

    Generator online Partial Discharge

    Sensors and Analyzer

    Electrical Tushar Mahakul 12.00 - - 12.00 -

    Sub Total 31.84 - - - 31.84 -

    New Proposals

    1 Ash Brick plant Ash 12Shri Suresh

    Behera22.00 - - 22.00 -

    2 Development of approach road to

    ash pondsAsh 12 Anajan kr. Sahu 12.00 - - 12.00 4.38

    3 Purchase of Roter of HT Motors (2

    nos) CHP Sanjay Mishra 16.00 - - 16.00 -

    4

    Purchase of HT breakers (6 nos)

    CHP Sanjay Mishra 33.00 - - 22.00 -

    6 DE, DS system modification

    CHP Sanjay Mishra 60.00 10.00 10.00 30.00 -

    7

    ITPS HOUSE Equipment

    Personal C.R.Swain 20.00 1.67 1.67 10.00 -

  • 8/11/2019 Budget Variance Ytd Sept. 2011

    67/67

    PROJECT

    OWNER

    Sep-11 Sep-11 Sep-11 YTD Sep YTD Sep Y

    ActualTotal Capex

    for 2011-12SL DESCRIPTION

    Budget VarianceActual

    OPGC CAPEX BUDGET PROPOSAL 2010-11 & 2011-12

    Rs.in lakh

    DEPARTMEN

    T

    PROJE

    CT NO.Budget

    Canteen Equipment

    Personal C.R.Swain 4.00 - - - -

    8

    Black Berry SetPersonal C.R.Swain 4.00 - - 4.00 -

    9 Automatic Fire detection &

    Suppression system for TG under

    deck equipments. Fire J.K.Pattnaik 30.00 1.33 1.33 30.00 -

    10

    purchase of new fire tender.

    Fire 17 J.K.Pattnaik 35.00 - - 35.00 -

    11 Phasing out of Halon.

    Fire 17 J.K.Pattnaik 24.00 - - 24.00 -

    15 Procurement of AcColony

    MaintenanceShri Mangal Buda 2.00 0.67 0.67 2.00 4.26

    16

    ceilling fan for colony/Ex. Fan/GyserColony

    MaintenanceShri Mangal Buda 2.50 0.83 0.83 2.50 1.14

    17 Recessed wiring Colony

    MaintenanceShri Mangal Buda 5.00 - - - -

    18 Procurement of Energy Meters Colony

    MaintenanceShri Mangal Buda 2.50 0.17 0.17 2.50 -

    19Isolation ward in hospital

    Colony

    MaintenanceShri Mangal Buda 10.00 - - - -

    20 Renovation of Drainage system

    with STP connection in market

    complex

    Colony

    MaintenanceShri Mangal Buda 2.00 - 0.18 (0.18) - 4.85

    21 Constructon of open shed at Ib

    Thermal club.

    New

    Construction

    Anupam

    Mohapatra10.50 - - 10.50 -

    22 Electro Hydraulic Truck Mounted

    High Access Platform for

    Electrical Overhead Work forElectrical Safety.

    Electrical

    Prafulla

    Satapathy 15.00 - - 15.00 -

    23Purchase of Material Handeling

    Equipment.warehouse Shri R.N.Panda 5.00 1.67 1.67 5.00 -

    24 Equipment Procurement Mechanical

    MaintenanceP.K.Mishra 39.00 6.33 6.33 39.00 -