brt and system integration: issues and challenges - · pdf fileagenda • contents of...
TRANSCRIPT
Symposium on Public
Transportation in Indian Cities with Special focus on
Bus Rapid Transit (BRT) System
New Delhi
20-21 Jan 2010
BRT and System Integration: Issues and Challenges
S.K. Jason Chang, Ph.D.Professor
National Taiwan [email protected]
Agenda
• Contents of Integration
• Integration of Land Use and Transport Development: BRTOD
• Integration of Network, Operation, Ticketing, and Information: Case Studies
• Key Success Factors and Challenges
Integration…
• Integration of Land Use and Transport Development
• Integrated Public Transport Network
• Integrated Operation
• Integrated Pricing/Ticketing System
• Information Integration
• Institutional Integration
Integration of Land Use and Transport Development: BRTOD
• From Car-Oriented Development to Transit-Oriented Development and/or Re-Development
• TOD/TORD Based on: Alternatives of (1) Mass Rapid Transit, (2) Light Rail Transit, and (3) Bus Rapid Transit
• Rationale of Bus Rapid Transit Oriented Development (BRTOD) for Developing Regions/Countries
Principles of TOD (TORD) Policy
Density: High and Compact
Diversity: Mixed use
Design: BBMW Integration: Bike+ Bus+ Metro+ Walk
Source: zol.com.cn
• Rail-based TOD and TORD Approach
Various Modes in TOD Model
Light Rail TOD: LRTOD
Land Use Model in BRT Corridor in Curitiba: BRTOD
ZR 48-12F200%
ZR 33~5F130%
ZR 21~2F100%
Lane-use integration
BRTOD in Brisbane
BRT and Public Transport Network
• BRT Network
• BRT integrated with Urban Rail
• BRT as an Extension of Rail
BRT Network: Trunk + Feeder
BRT Network in Changzhou
Beijing BRT integrated with Rail Network
13
• Urban Rail 300 km + BRT 60 km
• Future Network Total BRT Length: 360km 22 Routes:
Rail Extension: 2Radial Line: 11Branch Line: 2Inner City: 5 City Center: 2
MRT/ operation MRT/ planning/construction High Speed Rail Bus Lane/Network
Taipei Bus Lane/Network Integrated with Rail Systems
MRT Network : 90.5kmDaily Trips :1.32million (2009/11)
BRT Network : 60kmDaily Trips : 1.24million
Guangzhou BRT
• BRT Corridor: 22.86 km
• 26 BRT Stations:• 6 Stations integrated with Subway and internal access and connection
Los Angeles BRT: Metro Orange Line
Orange Line
Operation Integration of BRT and Bus Services in Changzhou
Integrated Fare and Ticketing Systems
• Smart Card Ticketing System
• Free Transfer
• Discount for Feeder Line
• Pricing/Ticketing Intermodal Integration
Dynamic Information
• Real Time Passenger Information
• Dynamic Fleet Management
• Transfer Information Services
• Emergency Management
Passenger Access
Green BRT CorridorIntegrated Planning/Design
• Development of BRT Corridor with a Green Environment for Walking and Cycling
• Coordination Scheme is Crucial and Challenge for Achieving the Goal of Green Corridor
Key Factors for Success Integration• Strong and Continuous Support from Mayor(s) and
City Council
• Coordination Scheme/ Institutional Arrangement of Transport Commission and City Government
• Teamwork of Various Departments and Bureaus, i.e., Planning, Development, Environment, Design, Construction, Operation, Enforcement, ......
• Comprehensive Planning/Design Works
• Operation-oriented and People-centered Approach