Page 1: Briefing Session

Briefing Session

Temporary Traffic Arrangement at Campus Circuit

For Site Formation Works at Area 39

Page 2: Briefing Session

Location Plan

Area 39

Page 3: Briefing Session

Land Application for Proposed CUHK Development

Site formation to required level of +6.5 mPD.

Page 4: Briefing Session

Preliminary Proposal

Page 5: Briefing Session

Temporary Traffic Arrangement on Campus Circuit

• To allow access for CEDD construction vehicles

• Restricted hours :

– 9:30am to 6:30pm

– Monday to Friday, except Public Holidays and University’s special event dates

• Volume of construction traffic :

– not exceed 21 round trip per hour at peak

– about 14 round trip per hour in average

• Commence on 15 January 2008 tentatively

• Last for about 1.5 years (1/2008 – 7/2009)

Page 6: Briefing Session

Preventive Measures

• Each and every CEDD construction vehicles shall bear a permit.

• No queue up or stay on Campus Circuit or within Campus.

• Access only allowed to the designated haul route area.

• Access to other area such as canteen, washroom is prohibited.

• No black smoke emission vehicle is allowed.

• No construction waste etc. can be disposed in the Campus.

• Daily in/out log sheets shall be submitted to Security and Transport Office.

Page 7: Briefing Session

Preventive Measures

• Dust mitigation measures such as wheel wash, canvas cover to loads.

• Daily cleaning on Campus Circuit.

• Cleaning at open area and watering nearby vegetation if found necessary.

• Noise Control Ordinance and its subsidiary regulations will be strictly complied.

• Junction of Bridge No. 2 and Campus Circuit is being widened.

Page 8: Briefing Session

Monitoring and Communication

• On top of CEDD’s monitoring measures, the University would set up a monitoring

system to carry out regular measurement and inspection.

• For better communication, University will set up a liaison group.

• Duties include

– periodic review and comment the arrangement of fill transportation works,

monitoring system, monitoring results and dust/noise mitigation measures.

– communicate with CEDD and the University community.

Page 9: Briefing Session

Liaison Group

• Convener :

– Professor Michael Hui, APVC

• Members :

– Security and Transport Office - Mr. Philip Wong

– University Steering Committee on Environmental - Mr. Jack Yung

– University Safety and Environment Office - Mr. S K Lam

– Campus Development Office - Mr. Arthur Ma

– Estates Management Office - Mr. Clement Wong

– Quartering Unit - Ms. Amanda Chan

– Representatives from residents, staff, and CEDD.

Page 10: Briefing Session

Enquires

• Enquires Hotline : 9468 8762

• Contact Person : Mr. Jack Yung, University Safety and Environment

Office

• E-mail : [email protected]

• Fax : 2603 6862

Page 11: Briefing Session

Opening hours at Eastern Gate

• The University has reviewed the current traffic using the Eastern Gate and

will extend its opening hour.

• Effective from 10 February 2008, the opening hour is

– from 7:00am to 12:00 mid-night daily, including Sundays and Public Holidays.