Item
No.
Length Width Depth Quantity Unit
6.01)
MCW - A1 - LHS 1 X 1 14.058 7.300 1.125 115.451 Cum OGL=314.425m PCC Bed=313.300m
MCW - A1 - RHS 1 X 1 14.058 7.300 1.125 115.451 Cum OGL=314.425m PCC Bed=313.300m
MCW - A2 - LHS 1 X 1 14.058 7.300 1.773 181.951 Cum OGL=313.773m PCC Bed=312.000m
MCW - A2 - RHS 1 X 1 14.058 7.300 1.773 181.951 Cum OGL=313.773m PCC Bed=312.000m
SR - A1 - LHS 1 X 1 12.067 7.300 1.125 99.100 Cum OGL=314.425m PCC Bed=313.300m
SR - A1 - RHS 1 X 1 12.067 7.300 1.125 99.100 Cum OGL=314.425m PCC Bed=313.300m
SR - A2 - LHS 1 X 1 12.067 7.300 1.773 156.182 Cum OGL=313.773m PCC Bed=312.000m
SR - A2 - RHS 1 X 1 12.067 7.300 1.773 156.182 Cum OGL=313.773m PCC Bed=312.000m
MCW - P1 - LHS 1 X 1 13.013 5.020 1.375 89.822 Cum OGL=314.075m PCC Bed=312.700m
MCW - P1 - RHS 1 X 1 13.013 5.020 1.375 89.822 Cum OGL=314.075m PCC Bed=312.700m
MCW - P2 - LHS 1 X 1 13.013 5.020 1.436 93.807 Cum OGL=313.736m PCC Bed=312.300m
MCW - P2 - RHS 1 X 1 13.013 5.020 1.436 93.807 Cum OGL=313.736m PCC Bed=312.300m
MCW - P3 - LHS 1 X 1 13.013 5.020 1.425 93.088 Cum OGL=313.425m PCC Bed=312.000m
MCW - P3 - RHS 1 X 1 13.013 5.020 1.425 93.088 Cum OGL=313.425m PCC Bed=312.000m
MCW - P4 - LHS 1 X 1 13.013 5.020 1.713 111.902 Cum OGL=313.713m PCC Bed=312.000m
MCW - P4 - RHS 1 X 1 13.013 5.020 1.713 111.902 Cum OGL=313.713m PCC Bed=312.000m
MCW - P5 - LHS 1 X 1 13.013 5.020 1.460 95.375 Cum OGL=313.760m PCC Bed=312.300m
MCW - P5 - RHS 1 X 1 13.013 5.020 1.460 95.375 Cum OGL=313.760m PCC Bed=312.300m
MCW - P6 - LHS 1 X 1 13.013 5.020 1.955 127.711 Cum OGL=313.655m PCC Bed=311.700m
MCW - P6 - RHS 1 X 1 13.013 5.020 1.955 127.711 Cum OGL=313.655m PCC Bed=311.700m
SR - P1 - LHS 1 X 1 13.013 5.020 1.375 89.822 Cum OGL=314.075m PCC Bed=312.700m
SR - P1 - RHS 1 X 1 13.013 5.020 1.375 89.822 Cum OGL=314.075m PCC Bed=312.700m
SR - P2 - LHS 1 X 1 13.013 5.020 1.436 93.807 Cum OGL=313.736m PCC Bed=312.300m
No.
Refer Drawing No.
Description Remark
Earthwork in excavation for structures in all types of soil and marshy soil excluding rock, including all lifts and leads as per dra
Specifications Section 300.
Abutment Wall Raft
Pier Wall Raft
for ITD CEMINDIA (JV)
-
8/2/2019 Bridge Format
2/50
Item
No.
Length Width Depth Quantity UnitNo.
Refer Drawing No.
Description Remark
SR - P2 - RHS 1 X 1 13.013 5.020 1.436 93.807 Cum OGL=313.736m PCC Bed=312.300m
SR - P3 - LHS 1 X 1 13.013 5.020 1.425 93.088 Cum OGL=313.425m PCC Bed=312.000m
SR - P3 - RHS 1 X 1 13.013 5.020 1.425 93.088 Cum OGL=313.425m PCC Bed=312.000m
SR - P4 - LHS 1 X 1 13.013 5.020 1.713 111.902 Cum OGL=313.713m PCC Bed=312.000m
SR - P4 - RHS 1 X 1 13.013 5.020 1.713 111.902 Cum OGL=313.713m PCC Bed=312.000mSR - P5 - LHS 1 X 1 13.013 5.020 1.460 95.375 Cum OGL=313.760m PCC Bed=312.300m
SR - P5 - RHS 1 X 1 13.013 5.020 1.460 95.375 Cum OGL=313.760m PCC Bed=312.300m
SR - P6 - LHS 1 X 1 13.013 5.020 1.955 127.711 Cum OGL=313.655m PCC Bed=311.700m
SR - P6 - RHS 1 X 1 13.013 5.020 1.955 127.711 Cum OGL=313.655m PCC Bed=311.700m
Total Quantity for BOQ Item No. 6.01) 3552.188 Cum
for ITD CEMINDIA (JV)
-
8/2/2019 Bridge Format
3/50
-
8/2/2019 Bridge Format
4/50
Item
No.
Length Width Depth Quantity UnitNo.
Refer Drawing No.
Description Remark
6.03 Earthwork in excavation for structures in hard rock including all lifts and leads as per drawings and Technical Specifications Section
of Additional Technical Specifications.
With Controlled Blasting
for ITD CEMINDIA (JV)
-
8/2/2019 Bridge Format
5/50
Item
No.
Length Width Depth Quantity UnitNo.
Refer Drawing No.
Description Remark
6.04 Providing and laying in position selected imported granular materials of approved quality below structure including compaction in lay
and Technical Specifications Clause 305 and section 1000.
Sand filling
for ITD CEMINDIA (JV)
-
8/2/2019 Bridge Format
6/50
-
8/2/2019 Bridge Format
7/50
Item
No.
Length Width Depth Quantity UnitNo.
Refer Drawing No.
Description Remark
SR - P2 - RHS 1 X 1 13.013 5.020 0.100 6.533 Cum
SR - P3 - LHS 1 X 1 13.013 5.020 0.100 6.533 Cum
SR - P3 - RHS 1 X 1 13.013 5.020 0.100 6.533 Cum
SR - P4 - LHS 1 X 1 13.013 5.020 0.100 6.533 Cum
SR - P4 - RHS 1 X 1 13.013 5.020 0.100 6.533 CumSR - P5 - LHS 1 X 1 13.013 5.020 0.100 6.533 Cum
SR - P5 - RHS 1 X 1 13.013 5.020 0.100 6.533 Cum
SR - P6 - LHS 1 X 1 13.013 5.020 0.100 6.533 Cum
SR - P6 - RHS 1 X 1 13.013 5.020 0.100 6.533 Cum
Approach Slab
MCW - A1 - LHS 1 X 1 6.186 9.650 0.100 5.969 Cum
MCW - A1 - RHS 1 X 1 6.186 9.650 0.100 5.969 Cum
MCW - A2 - LHS 1 X 1 6.186 9.650 0.100 5.969 Cum
MCW - A2 - RHS 1 X 1 6.186 9.650 0.100 5.969 Cum
SR - A1 - LHS 1 X 1 6.013 9.050 0.100 5.441 Cum
SR - A1 - RHS 1 X 1 6.013 9.050 0.100 5.441 Cum
SR - A2 - LHS 1 X 1 6.013 9.050 0.100 5.441 Cum
SR - A2 - RHS 1 X 1 6.013 9.050 0.100 5.441 Cum
Annular Filling
for ITD CEMINDIA (JV)
-
8/2/2019 Bridge Format
8/50
Item
No.
Length Width Depth Quantity UnitNo.
Refer Drawing No.
Description Remark
Total Quantity for BOQ Item No. 6.05a) 278.716 Cum
for ITD CEMINDIA (JV)
-
8/2/2019 Bridge Format
9/50
Item
No.
Length Width Depth Quantity UnitNo.
Refer Drawing No.
Description Remark
6.05a) Providing and laying in position Plain Cement Concrete in levelling course below open foundations, wing walls, curtain walls, toe wa
ladders and annular filling around foundation in rock as per drawings and Technical Specifications Sections 1700, 2100 and 2700.
a) Grade M15
for ITD CEMINDIA (JV)
-
8/2/2019 Bridge Format
10/50
Item
No.
Length Width Depth Quantity UnitNo.
Refer Drawing No.
Description Remark
6.06a)
Abutment Wall
RaftMCW - A1 - LHS 1 X 1 13.828 7.100 0.300 29.454 Cum Raft Width =
MCW - A1 - LHS 1 X 1 13.828 4.100 0.900 51.025 Cum Average Width = ( 7.1 + 1.1) /2
MCW - A1 - RHS 1 X 1 13.828 7.100 0.300 29.454 Cum Raft Width =
MCW - A1 - RHS 1 X 1 13.828 4.100 0.900 51.025 Cum Average Width = ( 7.1 + 1.1) /2
MCW - A2 - LHS 1 X 1 13.828 7.100 0.300 29.454 Cum Raft Width =
MCW - A2 - LHS 1 X 1 13.828 4.100 0.900 51.025 Cum Average Width = ( 7.1 + 1.1) /2
MCW - A2 - RHS 1 X 1 13.828 7.100 0.300 29.454 Cum Raft Width =
MCW - A2 - RHS 1 X 1 13.828 4.100 0.900 51.025 Cum Average Width = ( 7.1 + 1.1) /2
SR - A1 - LHS 1 X 1 11.836 7.100 0.300 25.211 Cum Raft Width =
SR - A1 - LHS 1 X 1 11.836 4.100 0.900 43.675 Cum Average Width = ( 7.1 + 1.1) /2
SR - A1 - RHS 1 X 1 11.836 7.100 0.300 25.211 Cum Raft Width =
SR - A1 - RHS 1 X 1 11.836 4.100 0.900 43.675 Cum Average Width = ( 7.1 + 1.1) /2
SR - A2 - LHS 1 X 1 11.836 7.100 0.300 25.211 Cum Raft Width =
SR - A2 - LHS 1 X 1 11.836 4.100 0.900 43.675 Cum Average Width = ( 7.1 + 1.1) /2
SR - A2 - RHS 1 X 1 11.836 7.100 0.300 25.211 Cum Raft Width =
SR - A2 - RHS 1 X 1 11.836 4.100 0.900 43.675 Cum Average Width = ( 7.1 + 1.1) /2
Pier Wall Raft
MCW - P1 - LHS 1 X 1 12.783 4.820 0.300 18.484 Cum Raft Width =
MCW - P1 - LHS 1 X 1 12.783 2.820 0.900 32.443 Cum Average Width = ( 4.82 + 0.82) /2
MCW - P1 - RHS 1 X 1 12.783 4.820 0.300 18.484 Cum Raft Width =
MCW - P1 - RHS 1 X 1 12.783 2.820 0.900 32.443 Cum Average Width = ( 4.82 + 0.82) /2
MCW - P2 - LHS 1 X 1 12.783 4.820 0.300 18.484 Cum Raft Width =
MCW - P2 - LHS 1 X 1 12.783 2.820 0.900 32.443 Cum Average Width = ( 4.82 + 0.82) /2
Providing and laying in position cement concrete in RCC open foundations excluding reinforcement as per drawings and Tec
Sections 1500, 1700 and 2100.
a) Grade M30
for ITD CEMINDIA (JV)
-
8/2/2019 Bridge Format
11/50
Item
No.
Length Width Depth Quantity UnitNo.
Refer Drawing No.
Description Remark
MCW - P2 - RHS 1 X 1 12.783 4.820 0.300 18.484 Cum Raft Width =
MCW - P2 - RHS 1 X 1 12.783 2.820 0.900 32.443 Cum Average Width = ( 4.82 + 0.82) /2
MCW - P3 - LHS 1 X 1 12.783 4.820 0.300 18.484 Cum Raft Width =
MCW - P3 - LHS 1 X 1 12.783 2.820 0.900 32.443 Cum Average Width = ( 4.82 + 0.82) /2
MCW - P3 - RHS 1 X 1 12.783 4.820 0.300 18.484 Cum Raft Width =
MCW - P3 - RHS 1 X 1 12.783 2.820 0.900 32.443 Cum Average Width = ( 4.82 + 0.82) /2
MCW - P4 - LHS 1 X 1 12.783 4.820 0.300 18.484 Cum Raft Width =
MCW - P4 - LHS 1 X 1 12.783 2.820 0.900 32.443 Cum Average Width = ( 4.82 + 0.82) /2
MCW - P4 - RHS 1 X 1 12.783 4.820 0.300 18.484 Cum Raft Width =
MCW - P4 - RHS 1 X 1 12.783 2.820 0.900 32.443 Cum Average Width = ( 4.82 + 0.82) /2
MCW - P5 - LHS 1 X 1 12.783 4.820 0.300 18.484 Cum Raft Width =
MCW - P5 - LHS 1 X 1 12.783 2.820 0.900 32.443 Cum Average Width = ( 4.82 + 0.82) /2
MCW - P5 - RHS 1 X 1 12.783 4.820 0.300 18.484 Cum Raft Width =
MCW - P5 - RHS 1 X 1 12.783 2.820 0.900 32.443 Cum Average Width = ( 4.82 + 0.82) /2
MCW - P6 - LHS 1 X 1 12.783 4.820 0.300 18.484 Cum Raft Width =
MCW - P6 - LHS 1 X 1 12.783 2.820 0.900 32.443 Cum Average Width = ( 4.82 + 0.82) /2
MCW - P6 - RHS 1 X 1 12.783 4.820 0.300 18.484 Cum Raft Width =
MCW - P6 - RHS 1 X 1 12.783 2.820 0.900 32.443 Cum Average Width = ( 4.82 + 0.82) /2
SR - P1 - LHS 1 X 1 12.783 4.820 0.300 18.484 Cum Raft Width =
SR - P1 - LHS 1 X 1 12.783 2.820 0.900 32.443 Cum Average Width = ( 4.82 + 0.82) /2
SR - P1 - RHS 1 X 1 12.783 4.820 0.300 18.484 Cum Raft Width =
SR - P1 - RHS 1 X 1 12.783 2.820 0.900 32.443 Cum Average Width = ( 4.82 + 0.82) /2
SR - P2 - LHS 1 X 1 12.783 4.820 0.300 18.484 Cum Raft Width =
SR - P2 - LHS 1 X 1 12.783 2.820 0.900 32.443 Cum Average Width = ( 4.82 + 0.82) /2
SR - P2 - RHS 1 X 1 12.783 4.820 0.300 18.484 Cum Raft Width =
SR - P2 - RHS 1 X 1 12.783 2.820 0.900 32.443 Cum Average Width = ( 4.82 + 0.82) /2
SR - P3 - LHS 1 X 1 12.783 4.820 0.300 18.484 Cum Raft Width =
for ITD CEMINDIA (JV)
-
8/2/2019 Bridge Format
12/50
Item
No.
Length Width Depth Quantity UnitNo.
Refer Drawing No.
Description Remark
SR - P3 - LHS 1 X 1 12.783 2.820 0.900 32.443 Cum Average Width = ( 4.82 + 0.82) /2
SR - P3 - RHS 1 X 1 12.783 4.820 0.300 18.484 Cum Raft Width =
SR - P3 - RHS 1 X 1 12.783 2.820 0.900 32.443 Cum Average Width = ( 4.82 + 0.82) /2
SR - P4 - LHS 1 X 1 12.783 4.820 0.300 18.484 Cum Raft Width =
SR - P4 - LHS 1 X 1 12.783 2.820 0.900 32.443 Cum Average Width = ( 4.82 + 0.82) /2
SR - P4 - RHS 1 X 1 12.783 4.820 0.300 18.484 Cum Raft Width =
SR - P4 - RHS 1 X 1 12.783 2.820 0.900 32.443 Cum Average Width = ( 4.82 + 0.82) /2
SR - P5 - LHS 1 X 1 12.783 4.820 0.300 18.484 Cum Raft Width =
SR - P5 - LHS 1 X 1 12.783 2.820 0.900 32.443 Cum Average Width = ( 4.82 + 0.82) /2
SR - P5 - RHS 1 X 1 12.783 4.820 0.300 18.484 Cum Raft Width =
SR - P5 - RHS 1 X 1 12.783 2.820 0.900 32.443 Cum Average Width = ( 4.82 + 0.82) /2
SR - P6 - LHS 1 X 1 12.783 4.820 0.300 18.484 Cum Raft Width =
SR - P6 - LHS 1 X 1 12.783 2.820 0.900 32.443 Cum Average Width = ( 4.82 + 0.82) /2
SR - P6 - RHS 1 X 1 12.783 4.820 0.300 18.484 Cum Raft Width =
SR - P6 - RHS 1 X 1 12.783 2.820 0.900 32.443 Cum Average Width = ( 4.82 + 0.82) /2
Total Quantity for BOQ Item No. 6.06a) 1819.708 Cum
for ITD CEMINDIA (JV)
-
8/2/2019 Bridge Format
13/50
Item
No.
Length Width Depth Quantity UnitNo.
Refer Drawing No.
Description Remark
6.10a)
Abutment wall up to bottom of Cap level
MCW - A1 - LHS 1 X 1 13.828 0.910 3.305 41.588 Cum Average Width = ( 1.1 + 0.72) /2MCW - A1 - RHS 1 X 1 13.828 0.910 3.305 41.588 Cum Average Width = ( 1.1 + 0.72) /2
MCW - A2 - LHS 1 X 1 13.828 0.910 4.605 57.947 Cum Average Width = ( 1.1 + 0.72) /2
MCW - A2 - RHS 1 X 1 13.828 0.910 4.605 57.947 Cum Average Width = ( 1.1 + 0.72) /2
SR - A1 - LHS 1 X 1 11.836 0.910 2.950 31.776 Cum Average Width = ( 1.1 + 0.72) /2
SR - A1 - RHS 1 X 1 11.836 0.910 2.950 31.776 Cum Average Width = ( 1.1 + 0.72) /2
SR - A2 - LHS 1 X 1 11.836 0.910 4.250 45.778 Cum Average Width = ( 1.1 + 0.72) /2
SR - A2 - RHS 1 X 1 11.836 0.910 4.250 45.778 Cum Average Width = ( 1.1 + 0.72) /2
Abutment Cap
MCW - A1 - LHS 1 X 1 13.828 0.720 0.300 2.987 Cum
MCW - A1 - RHS 1 X 1 13.828 0.720 0.300 2.987 Cum
MCW - A2 - LHS 1 X 1 13.828 0.720 0.300 2.987 Cum
MCW - A2 - RHS 1 X 1 13.828 0.720 0.300 2.987 Cum
SR - A1 - LHS 1 X 1 11.836 0.720 0.300 2.557 Cum
SR - A1 - RHS 1 X 1 11.836 0.720 0.300 2.557 Cum
SR - A2 - LHS 1 X 1 11.836 0.720 0.300 2.557 Cum
SR - A2 - RHS 1 X 1 11.836 0.720 0.300 2.557 Cum
Return Wall
MCW - A1 - LHS 1 X 1 4.619 0.600 5.150 14.273 Cum Average Width = ( 0.6 + 0.6) /2
MCW - A1 - RHS 1 X 1 4.619 0.600 5.150 14.273 Cum Average Width = ( 0.6 + 0.6) /2
MCW - A2 - LHS 1 X 1 4.619 0.600 6.450 17.876 Cum Average Width = ( 0.6 + 0.6) /2
MCW - A2 - RHS 1 X 1 4.619 0.600 6.450 17.876 Cum Average Width = ( 0.6 + 0.6) /2
SR - A1 - LHS 1 X 2 4.619 0.600 4.844 26.849 Cum Average Width = ( 0.6 + 0.6) /2
Providing and laying in position cement concrete in RCC piers, pier caps, pedestals, cantilever/ counterfort abutments, abutment cap
wing walls, retaining walls, box returns, cantilever returns, screen walls, median walls, inspection ladders, box cell structures f
excluding reinforcment as per drawings and Technical Specifications Sections 1500, 1700, and 2200.
a) grade M 30
for ITD CEMINDIA (JV)
-
8/2/2019 Bridge Format
14/50
Item
No.
Length Width Depth Quantity UnitNo.
Refer Drawing No.
Description Remark
SR - A1 - RHS 1 X 2 4.619 0.600 4.844 26.849 Cum Average Width = ( 0.6 + 0.6) /2
SR - A2 - LHS 1 X 2 4.619 0.600 6.144 34.055 Cum Average Width = ( 0.6 + 0.6) /2
SR - A2 - RHS 1 X 2 4.619 0.600 6.144 34.055 Cum Average Width = ( 0.6 + 0.6) /2
Return Wall Cantilever part
MCW - A1 - LHS 0.5 X 1 2.309 0.600 1.539 1.066 Cum Average Width = ( 0.6 + 0.6) /2
MCW - A1 - RHS 0.5 X 1 2.309 0.600 1.539 1.066 Cum Average Width = ( 0.6 + 0.6) /2
MCW - A2 - LHS 0.5 X 1 2.309 0.600 1.539 1.066 Cum Average Width = ( 0.6 + 0.6) /2
MCW - A2 - RHS 0.5 X 1 2.309 0.600 1.539 1.066 Cum Average Width = ( 0.6 + 0.6) /2
SR - A1 - LHS 0.5 X 2 2.309 0.600 1.539 2.132 Cum Average Width = ( 0.6 + 0.6) /2
SR - A1 - RHS 0.5 X 2 2.309 0.600 1.539 2.132 Cum Average Width = ( 0.6 + 0.6) /2
SR - A2 - LHS 0.5 X 2 2.309 0.600 1.539 2.132 Cum Average Width = ( 0.6 + 0.6) /2
SR - A2 - RHS 0.5 X 2 2.309 0.600 1.539 2.132 Cum Average Width = ( 0.6 + 0.6) /2
Return Wall Top
MCW - A1 - LHS 1 X 1 6.928 0.600 0.300 1.247 Cum Average Width = ( 0.6 + 0.6) /2
MCW - A1 - RHS 1 X 1 6.928 0.600 0.300 1.247 Cum Average Width = ( 0.6 + 0.6) /2
MCW - A2 - LHS 1 X 1 6.928 0.600 0.300 1.247 Cum Average Width = ( 0.6 + 0.6) /2
MCW - A2 - RHS 1 X 1 6.928 0.600 0.300 1.247 Cum Average Width = ( 0.6 + 0.6) /2
SR - A1 - LHS 1 X 2 6.928 0.600 0.300 2.494 Cum Average Width = ( 0.6 + 0.6) /2
SR - A1 - RHS 1 X 2 6.928 0.600 0.300 2.494 Cum Average Width = ( 0.6 + 0.6) /2
SR - A2 - LHS 1 X 2 6.928 0.600 0.300 2.494 Cum Average Width = ( 0.6 + 0.6) /2
SR - A2 - RHS 1 X 2 6.928 0.600 0.300 2.494 Cum Average Width = ( 0.6 + 0.6) /2
Return Wall Haunch
MCW - A1 - LHS 1 X 1 6.689 Cum
MCW - A1 - RHS 1 X 1 6.689 Cum
MCW - A2 - LHS 1 X 1 7.989 Cum
MCW - A2 - RHS 1 X 1 7.989 Cum
SR - A1 - LHS 1 X 2 6.383 Cum
for ITD CEMINDIA (JV)
-
8/2/2019 Bridge Format
15/50
Item
No.
Length Width Depth Quantity UnitNo.
Refer Drawing No.
Description Remark
SR - A1 - RHS 1 X 2 6.383 Cum
SR - A2 - LHS 1 X 2 7.683 Cum
SR - A2 - RHS 1 X 2 7.683 Cum
Pier Wall (Straight part) up to Cap level
MCW - P1 - LHS 1 X 1 11.963 0.820 4.205 41.250 Cum Average Width = ( 0.82 + 0.82) /2
MCW - P1 - RHS 1 X 1 11.963 0.820 4.205 41.250 Cum Average Width = ( 0.82 + 0.82) /2
MCW - P2 - LHS 1 X 1 11.963 0.820 4.605 45.173 Cum Average Width = ( 0.82 + 0.82) /2
MCW - P2 - RHS 1 X 1 11.963 0.820 4.605 45.173 Cum Average Width = ( 0.82 + 0.82) /2
MCW - P3 - LHS 1 X 1 11.963 0.820 4.905 48.116 Cum Average Width = ( 0.82 + 0.82) /2
MCW - P3 - RHS 1 X 1 11.963 0.820 4.905 48.116 Cum Average Width = ( 0.82 + 0.82) /2
MCW - P4 - LHS 1 X 1 11.963 0.820 4.905 48.116 Cum Average Width = ( 0.82 + 0.82) /2
MCW - P4 - RHS 1 X 1 11.963 0.820 4.905 48.116 Cum Average Width = ( 0.82 + 0.82) /2
MCW - P5 - LHS 1 X 1 11.963 0.820 4.605 45.173 Cum Average Width = ( 0.82 + 0.82) /2
MCW - P5 - RHS 1 X 1 11.963 0.820 4.605 45.173 Cum Average Width = ( 0.82 + 0.82) /2
MCW - P6 - LHS 1 X 1 11.963 0.820 5.205 51.059 Cum Average Width = ( 0.82 + 0.82) /2
MCW - P6 - RHS 1 X 1 11.963 0.820 5.205 51.059 Cum Average Width = ( 0.82 + 0.82) /2
SR - P1 - LHS 1 X 1 11.963 0.820 3.850 37.770 Cum Average Width = ( 0.82 + 0.82) /2
SR - P1 - RHS 1 X 1 11.963 0.820 3.850 37.770 Cum Average Width = ( 0.82 + 0.82) /2
SR - P2 - LHS 1 X 1 11.963 0.820 4.250 41.694 Cum Average Width = ( 0.82 + 0.82) /2
SR - P2 - RHS 1 X 1 11.963 0.820 4.250 41.694 Cum Average Width = ( 0.82 + 0.82) /2
SR - P3 - LHS 1 X 1 11.963 0.820 4.550 44.636 Cum Average Width = ( 0.82 + 0.82) /2
SR - P3 - RHS 1 X 1 11.963 0.820 4.550 44.636 Cum Average Width = ( 0.82 + 0.82) /2
SR - P4 - LHS 1 X 1 11.963 0.820 4.550 44.636 Cum Average Width = ( 0.82 + 0.82) /2
SR - P4 - RHS 1 X 1 11.963 0.820 4.550 44.636 Cum Average Width = ( 0.82 + 0.82) /2
SR - P5 - LHS 1 X 1 11.963 0.820 4.250 41.694 Cum Average Width = ( 0.82 + 0.82) /2
SR - P5 - RHS 1 X 1 11.963 0.820 4.250 41.694 Cum Average Width = ( 0.82 + 0.82) /2
SR - P6 - LHS 1 X 1 11.963 0.820 4.850 47.579 Cum Average Width = ( 0.82 + 0.82) /2
for ITD CEMINDIA (JV)
-
8/2/2019 Bridge Format
16/50
Item
No.
Length Width Depth Quantity UnitNo.
Refer Drawing No.
Description Remark
SR - P6 - RHS 1 X 1 11.963 0.820 4.850 47.579 Cum Average Width = ( 0.82 + 0.82) /2
Pier Wall (Round edge) up to Cap level
MCW - P1 - LHS 2 X 0.5 0.528 Area 4.205 2.220 Cum Wall width=0.820
MCW - P1 - RHS 2 X 0.5 0.820 Area 4.205 3.448 Cum Wall width=0.820
MCW - P2 - LHS 2 X 0.5 0.820 Area 4.605 3.776 Cum Wall width=0.820
MCW - P2 - RHS 2 X 0.5 0.820 Area 4.605 3.776 Cum Wall width=0.820
MCW - P3 - LHS 2 X 0.5 0.820 Area 4.905 4.022 Cum Wall width=0.820
MCW - P3 - RHS 2 X 0.5 0.820 Area 4.905 4.022 Cum Wall width=0.820
MCW - P4 - LHS 2 X 0.5 0.820 Area 4.905 4.022 Cum Wall width=0.820
MCW - P4 - RHS 2 X 0.5 0.820 Area 4.905 4.022 Cum Wall width=0.820
MCW - P5 - LHS 2 X 0.5 0.820 Area 4.605 3.776 Cum Wall width=0.820
MCW - P5 - RHS 2 X 0.5 0.820 Area 4.605 3.776 Cum Wall width=0.820
MCW - P6 - LHS 2 X 0.5 0.820 Area 5.205 4.268 Cum Wall width=0.820
MCW - P6 - RHS 2 X 0.5 0.820 Area 5.205 4.268 Cum Wall width=0.820
SR - P1 - LHS 2 X 0.5 0.820 Area 3.850 3.157 Cum Wall width=0.820
SR - P1 - RHS 2 X 0.5 0.820 Area 3.850 3.157 Cum Wall width=0.820
SR - P2 - LHS 2 X 0.5 0.820 Area 4.250 3.485 Cum Wall width=0.820
SR - P2 - RHS 2 X 0.5 0.820 Area 4.250 3.485 Cum Wall width=0.820
SR - P3 - LHS 2 X 0.5 0.820 Area 4.550 3.731 Cum Wall width=0.820
SR - P3 - RHS 2 X 0.5 0.820 Area 4.550 3.731 Cum Wall width=0.820
SR - P4 - LHS 2 X 0.5 0.820 Area 4.550 3.731 Cum Wall width=0.820
SR - P4 - RHS 2 X 0.5 0.820 Area 4.550 3.731 Cum Wall width=0.820
SR - P5 - LHS 2 X 0.5 0.820 Area 4.250 3.485 Cum Wall width=0.820
SR - P5 - RHS 2 X 0.5 0.820 Area 4.250 3.485 Cum Wall width=0.820
SR - P6 - LHS 2 X 0.5 0.820 Area 4.850 3.977 Cum Wall width=0.820
SR - P6 - RHS 2 X 0.5 0.820 Area 4.850 3.977 Cum Wall width=0.820
Dirt Wall
for ITD CEMINDIA (JV)
-
8/2/2019 Bridge Format
17/50
Item
No.
Length Width Depth Quantity UnitNo.
Refer Drawing No.
Description Remark
MCW - A1 - LHS 1 X 1 11.836 0.300 0.968 3.437 Cum
MCW - A1 - RHS 1 X 1 11.836 0.300 0.968 3.437 Cum
MCW - A2 - LHS 1 X 1 11.836 0.300 0.968 3.437 Cum
MCW - A2 - RHS 1 X 1 11.836 0.300 0.968 3.437 Cum
SR - A1 - LHS 1 X 1 11.836 0.300 1.016 3.608 CumSR - A1 - RHS 1 X 1 11.836 0.300 1.016 3.608 Cum
SR - A2 - LHS 1 X 1 11.836 0.300 1.016 3.608 Cum
SR - A2 - RHS 1 X 1 11.836 0.300 1.016 3.608 Cum
Dirt Wall (Bracket)
MCW - A1 - LHS 1 X 1 11.836 0.200 0.240 0.568 Cum
MCW - A1 - RHS 1 X 1 11.836 0.200 0.240 0.568 Cum
MCW - A2 - LHS 1 X 1 11.836 0.200 0.240 0.568 Cum
MCW - A2 - RHS 1 X 1 11.836 0.200 0.240 0.568 Cum
SR - A1 - LHS 1 X 1 11.836 0.200 0.240 0.568 Cum
SR - A1 - RHS 1 X 1 11.836 0.200 0.240 0.568 Cum
SR - A2 - LHS 1 X 1 11.836 0.200 0.240 0.568 Cum
SR - A2 - RHS 1 X 1 11.836 0.200 0.240 0.568 Cum
Total Quantity for BOQ Item No. 6.10a) 1785.260 Cum
for ITD CEMINDIA (JV)
-
8/2/2019 Bridge Format
18/50
Item
No.
Length Width Depth Quantity UnitNo.
Refer Drawing No.
Description Remark
6.11b
Deck Slab
MCW - A1-P1 - LHS 1 X 1 12.009 10.250 0.850 104.628 Cum Bridge Span=10.400 Skewness=30.00Edge Thickning (Both Support) 1 X 2 10.250 0.400 0.153 1.251 Cum
MCW - A1-P1 - RHS 1 X 1 12.009 10.250 0.850 104.628 Cum Bridge Span=10.400 Skewness=30.00
Edge Thickning (Both Support) 1 X 2 10.250 0.400 0.153 1.251 Cum
MCW - P1-P2 - LHS 1 X 1 12.009 10.250 0.850 104.628 Cum Bridge Span=10.400 Skewness=30.00
Edge Thickning (Both Support) 1 X 2 10.250 0.400 0.153 1.251 Cum
MCW - P1-P2 - RHS 1 X 1 12.009 10.250 0.850 104.628 Cum Bridge Span=10.400 Skewness=30.00
Edge Thickning (Both Support) 1 X 2 10.250 0.400 0.153 1.251 Cum
MCW - P2-P3 - LHS 1 X 1 12.009 10.250 0.850 104.628 Cum Bridge Span=10.400 Skewness=30.00
Edge Thickning (Both Support) 1 X 2 10.250 0.400 0.153 1.251 Cum
MCW - P2-P3 - RHS 1 X 1 12.009 10.250 0.850 104.628 Cum Bridge Span=10.400 Skewness=30.00
Edge Thickning (Both Support) 1 X 2 10.250 0.400 0.153 1.251 Cum
MCW - P3-P4 - LHS 1 X 1 12.009 10.250 0.850 104.628 Cum Bridge Span=10.400 Skewness=30.00
Edge Thickning (Both Support) 1 X 2 10.250 0.400 0.153 1.251 Cum
MCW - P3-P4 - RHS 1 X 1 12.009 10.250 0.850 104.628 Cum Bridge Span=10.400 Skewness=30.00
Edge Thickning (Both Support) 1 X 2 10.250 0.400 0.153 1.251 Cum
MCW - P4-P5 - LHS 1 X 1 12.009 10.250 0.850 104.628 Cum Bridge Span=10.400 Skewness=30.00
Edge Thickning (Both Support) 1 X 2 10.250 0.400 0.153 1.251 Cum
MCW - P4-P5 - RHS 1 X 1 12.009 10.250 0.850 104.628 Cum Bridge Span=10.400 Skewness=30.00
Edge Thickning (Both Support) 1 X 2 10.250 0.400 0.153 1.251 Cum
MCW - P5-P6 - LHS 1 X 1 12.009 10.250 0.850 104.628 Cum Bridge Span=10.400 Skewness=30.00
Edge Thickning (Both Support) 1 X 2 10.250 0.400 0.153 1.251 Cum
MCW - P5-P6 - RHS 1 X 1 12.009 10.250 0.850 104.628 Cum Bridge Span=10.400 Skewness=30.00
Providing and laying in position cement concrete in RCC superstructure excluding reinforcment as per drawings and Technical Specif
1500, 1700, 2300.
b) Grade M 30 in solid slab
for ITD CEMINDIA (JV)
-
8/2/2019 Bridge Format
19/50
Item
No.
Length Width Depth Quantity UnitNo.
Refer Drawing No.
Description Remark
Edge Thickning (Both Support) 1 X 2 10.250 0.400 0.153 1.251 Cum
MCW - P6-A2 - LHS 1 X 1 12.009 10.250 0.850 104.628 Cum Bridge Span=10.400 Skewness=30.00
Edge Thickning (Both Support) 1 X 2 10.250 0.400 0.153 1.251 Cum
MCW - P6-A2 - RHS 1 X 1 12.009 10.250 0.850 104.628 Cum Bridge Span=10.400 Skewness=30.00
Edge Thickning (Both Support) 1 X 2 10.250 0.400 0.153 1.251 Cum
SR - A1-P1 - LHS 1 X 1 12.009 10.250 0.850 104.628 Cum Bridge Span=10.400 Skewness=30.00
Edge Thickning (Both Support) 1 X 2 10.250 0.400 0.153 1.251 Cum
SR - A1-P1 - RHS 1 X 1 12.009 10.250 0.850 104.628 Cum Bridge Span=10.400 Skewness=30.00
Edge Thickning (Both Support) 1 X 2 10.250 0.400 0.153 1.251 Cum
SR - P1-P2 - LHS 1 X 1 12.009 10.250 0.850 104.628 Cum Bridge Span=10.400 Skewness=30.00
Edge Thickning (Both Support) 1 X 2 10.250 0.400 0.153 1.251 Cum
SR - P1-P2 - RHS 1 X 1 12.009 10.250 0.850 104.628 Cum Bridge Span=10.400 Skewness=30.00
Edge Thickning (Both Support) 1 X 2 10.250 0.400 0.153 1.251 Cum
SR - P2-P3 - LHS 1 X 1 12.009 10.250 0.850 104.628 Cum Bridge Span=10.400 Skewness=30.00
Edge Thickning (Both Support) 1 X 2 10.250 0.400 0.153 1.251 Cum
SR - P2-P3 - RHS 1 X 1 12.009 10.250 0.850 104.628 Cum Bridge Span=10.400 Skewness=30.00
Edge Thickning (Both Support) 1 X 2 10.250 0.400 0.153 1.251 Cum
SR - P3-P4 - LHS 1 X 1 12.009 10.250 0.850 104.628 Cum Bridge Span=10.400 Skewness=30.00
Edge Thickning (Both Support) 1 X 2 10.250 0.400 0.153 1.251 Cum
SR - P3-P4 - RHS 1 X 1 12.009 10.250 0.850 104.628 Cum Bridge Span=10.400 Skewness=30.00
Edge Thickning (Both Support) 1 X 2 10.250 0.400 0.153 1.251 Cum
SR - P4-P5 - LHS 1 X 1 12.009 10.250 0.850 104.628 Cum Bridge Span=10.400 Skewness=30.00
Edge Thickning (Both Support) 1 X 2 10.250 0.400 0.153 1.251 Cum
SR - P4-P5 - RHS 1 X 1 12.009 10.250 0.850 104.628 Cum Bridge Span=10.400 Skewness=30.00
Edge Thickning (Both Support) 1 X 2 10.250 0.400 0.153 1.251 Cum
SR - P5-P6 - LHS 1 X 1 12.009 10.250 0.850 104.628 Cum Bridge Span=10.400 Skewness=30.00
Edge Thickning (Both Support) 1 X 2 10.250 0.400 0.153 1.251 Cum
for ITD CEMINDIA (JV)
-
8/2/2019 Bridge Format
20/50
Item
No.
Length Width Depth Quantity UnitNo.
Refer Drawing No.
Description Remark
SR - P5-P6 - RHS 1 X 1 12.009 10.250 0.850 104.628 Cum Bridge Span=10.400 Skewness=30.00
Edge Thickning (Both Support) 1 X 2 10.250 0.400 0.153 1.251 Cum
SR - P6-A2 - LHS 1 X 1 12.009 10.250 0.850 104.628 Cum Bridge Span=10.400 Skewness=30.00
Edge Thickning (Both Support) 1 X 2 10.250 0.400 0.153 1.251 Cum
SR - P6-A2 - RHS 1 X 1 12.009 10.250 0.850 104.628 Cum Bridge Span=10.400 Skewness=30.00Edge Thickning (Both Support) 1 X 2 10.25 0.400 0.153 1.251 Cum
Total Quantity for BOQ Item No. 6.11b 2964.612 Cum
for ITD CEMINDIA (JV)
-
8/2/2019 Bridge Format
21/50
Item
No.
Length Width Depth Quantity UnitNo.
Refer Drawing No.
Description Remark
6.15
Wearing Coat Over Deck Slab
MCW - A1-P1 - LHS 1 X 1 12.009 8.500 0.065 6.635 Cum Bridge Span=10.400 Skewness=30.00
MCW - A1-P1 - RHS 1 X 1 12.009 8.500 0.065 6.635 Cum
MCW - P1-P2 - LHS 1 X 1 12.009 8.500 0.065 6.635 Cum
MCW - P1-P2 - RHS 1 X 1 12.009 8.500 0.065 6.635 Cum
MCW - P2-P3 - LHS 1 X 1 12.009 8.500 0.065 6.635 Cum
MCW - P2-P3 - RHS 1 X 1 12.009 8.500 0.065 6.635 Cum
MCW - P3-P4 - LHS 1 X 1 12.009 8.500 0.065 6.635 Cum
MCW - P3-P4 - RHS 1 X 1 12.009 8.500 0.065 6.635 Cum
MCW - P4-P5 - LHS 1 X 1 12.009 8.500 0.065 6.635 Cum
MCW - P4-P5 - RHS 1 X 1 12.009 8.500 0.065 6.635 Cum
MCW - P5-P6 - LHS 1 X 1 12.009 8.500 0.065 6.635 Cum
MCW - P5-P6 - RHS 1 X 1 12.009 8.500 0.065 6.635 Cum
MCW - P6-A2 - LHS 1 X 1 12.009 8.500 0.065 6.635 Cum
MCW - P6-A2 - RHS 1 X 1 12.009 8.500 0.065 6.635 Cum
SR - A1-P1 - LHS 1 X 1 12.009 8.500 0.065 6.635 Cum
SR - A1-P1 - RHS 1 X 1 12.009 8.500 0.065 6.635 Cum
SR - P1-P2 - LHS 1 X 1 12.009 8.500 0.065 6.635 Cum
SR - P1-P2 - RHS 1 X 1 12.009 8.500 0.065 6.635 Cum
SR - P2-P3 - LHS 1 X 1 12.009 8.500 0.065 6.635 Cum
SR - P2-P3 - RHS 1 X 1 12.009 8.500 0.065 6.635 Cum
SR - P3-P4 - LHS 1 X 1 12.009 8.500 0.065 6.635 Cum
SR - P3-P4 - RHS 1 X 1 12.009 8.500 0.065 6.635 Cum
SR - P4-P5 - LHS 1 X 1 12.009 8.500 0.065 6.635 Cum
SR - P4-P5 - RHS 1 X 1 12.009 8.500 0.065 6.635 CumSR - P5-P6 - LHS 1 X 1 12.009 8.500 0.065 6.635 Cum
Providing and laying cement concrete wearing coat in M-30 grade as per drawing and Technical Specifications Sections 1500, 1600, 17
for ITD CEMINDIA (JV)
-
8/2/2019 Bridge Format
22/50
-
8/2/2019 Bridge Format
23/50
Item
No.
Length Width Depth Quantity UnitNo.
Refer Drawing No.
Description Remark
6.16A)
MCW - A1-P1 - LHS 1 X 1 10.250 0.400 4.100 Sqm
MCW - A1-P1 - RHS 1 X 1 10.250 0.400 4.100 Sqm
MCW - P1-P2 - LHS 1 X 1 10.250 0.400 4.100 Sqm
MCW - P1-P2 - RHS 1 X 1 10.250 0.400 4.100 Sqm
MCW - P2-P3 - LHS 1 X 1 10.250 0.400 4.100 Sqm
MCW - P2-P3 - RHS 1 X 1 10.250 0.400 4.100 Sqm
MCW - P3-P4 - LHS 1 X 1 10.250 0.400 4.100 Sqm
MCW - P3-P4 - RHS 1 X 1 10.250 0.400 4.100 Sqm
MCW - P4-P5 - LHS 1 X 1 10.250 0.400 4.100 Sqm
MCW - P4-P5 - RHS 1 X 1 10.250 0.400 4.100 Sqm
MCW - P5-P6 - LHS 1 X 1 10.250 0.400 4.100 Sqm
MCW - P5-P6 - RHS 1 X 1 10.250 0.400 4.100 Sqm
MCW - P6-A2 - LHS 1 X 1 10.250 0.400 4.100 Sqm
MCW - P6-A2 - RHS 1 X 1 10.250 0.400 4.100 Sqm
SR - A1-P1 - LHS 1 X 1 10.250 0.400 4.100 Sqm
SR - A1-P1 - RHS 1 X 1 10.250 0.400 4.100 Sqm
SR - P1-P2 - LHS 1 X 1 10.250 0.400 4.100 Sqm
SR - P1-P2 - RHS 1 X 1 10.250 0.400 4.100 Sqm
SR - P2-P3 - LHS 1 X 1 10.250 0.400 4.100 Sqm
SR - P2-P3 - RHS 1 X 1 10.250 0.400 4.100 Sqm
SR - P3-P4 - LHS 1 X 1 10.250 0.400 4.100 Sqm
SR - P3-P4 - RHS 1 X 1 10.250 0.400 4.100 Sqm
SR - P4-P5 - LHS 1 X 1 10.250 0.400 4.100 Sqm
SR - P4-P5 - RHS 1 X 1 10.250 0.400 4.100 Sqm
SR - P5-P6 - LHS 1 X 1 10.250 0.400 4.100 Sqm
Providing and fixing in position bearings true to line and level as per drawings and Technical Specifications Section 2000, IRC : 83 (Par
(Part III) 2002.
A) Tar a er bearings
for ITD CEMINDIA (JV)
-
8/2/2019 Bridge Format
24/50
Item
No.
Length Width Depth Quantity UnitNo.
Refer Drawing No.
Description Remark
SR - P5-P6 - RHS 1 X 1 10.250 0.400 4.100 Sqm
SR - P6-A2 - LHS 1 X 1 10.250 0.400 4.100 Sqm
SR - P6-A2 - RHS 1 X 1 10.250 0.400 4.100 Sqm
Total Quantity for BOQ Item No. 6.16A) 114.800 Cum
for ITD CEMINDIA (JV)
-
8/2/2019 Bridge Format
25/50
Item
No.
Length Width Depth Quantity UnitNo.
Refer Drawing No.
Description Remark
6.18
MCW - A1-P1 - LHS 1 X 2 2.000 Nos
MCW - A1-P1 - RHS 1 X 2 2.000 Nos
MCW - P1-P2 - LHS 1 X 2 2.000 Nos
MCW - P1-P2 - RHS 1 X 2 2.000 Nos
MCW - P2-P3 - LHS 1 X 2 2.000 Nos
MCW - P2-P3 - RHS 1 X 2 2.000 Nos
MCW - P3-P4 - LHS 1 X 2 2.000 Nos
MCW - P3-P4 - RHS 1 X 2 2.000 Nos
MCW - P4-P5 - LHS 1 X 2 2.000 Nos
MCW - P4-P5 - RHS 1 X 2 2.000 Nos
MCW - P5-P6 - LHS 1 X 2 2.000 Nos
MCW - P5-P6 - RHS 1 X 2 2.000 Nos
MCW - P6-A2 - LHS 1 X 2 2.000 Nos
MCW - P6-A2 - RHS 1 X 2 2.000 Nos
SR - A1-P1 - LHS 1 X 2 2.000 Nos
SR - A1-P1 - RHS 1 X 2 2.000 Nos
SR - P1-P2 - LHS 1 X 2 2.000 Nos
SR - P1-P2 - RHS 1 X 2 2.000 Nos
SR - P2-P3 - LHS 1 X 2 2.000 Nos
SR - P2-P3 - RHS 1 X 2 2.000 Nos
SR - P3-P4 - LHS 1 X 2 2.000 Nos
SR - P3-P4 - RHS 1 X 2 2.000 Nos
SR - P4-P5 - LHS 1 X 2 2.000 Nos
SR - P4-P5 - RHS 1 X 2 2.000 Nos
SR - P5-P6 - LHS 1 X 2 2.000 Nos
SR - P5-P6 - RHS 1 X 2 2.000 Nos
Providing and fixing in position drainage spouts as per drawings and Technical Specifications Clause 2705.
for ITD CEMINDIA (JV)
-
8/2/2019 Bridge Format
26/50
Item
No.
Length Width Depth Quantity UnitNo.
Refer Drawing No.
Description Remark
SR - P6-A2 - LHS 1 X 2 2.000 Nos
SR - P6-A2 - RHS 1 X 2 2.000 Nos
Total Quantity for BOQ Item No. 6.18 56.000 Nos
for ITD CEMINDIA (JV)
-
8/2/2019 Bridge Format
27/50
Item
No.
Length Width Depth Quantity UnitNo.
Refer Drawing No.
Description Remark
6.21
MCW - A1 - LHS 1 X 1 6.286 9.650 0.300 18.197 Cum
MCW - A1 - RHS 1 X 1 6.286 9.650 0.300 18.197 Cum
MCW - A2 - LHS 1 X 1 6.286 9.650 0.300 18.197 Cum
MCW - A2 - RHS 1 X 1 6.286 9.650 0.300 18.197 Cum
SR - A1 - LHS 1 X 1 6.113 9.050 0.300 16.595 Cum
SR - A1 - RHS 1 X 1 6.113 9.050 0.300 16.595 Cum
SR - A2 - LHS 1 X 1 6.113 9.050 0.300 16.595 Cum
SR - A2 - RHS 1 X 1 6.113 9.050 0.300 16.595 Cum
Total Quantity for BOQ Item No. 6.21 231.168 Nos
Providing and laying in position Reinforced Cement Concrete grade M 30 in approach slabs including reinforcement and bituminous jo
sealing compound between approach slabs and dirt walls / concrete pavements as per drawings and Technical Specifications Section
2700.
for ITD CEMINDIA (JV)
-
8/2/2019 Bridge Format
28/50
Item
No.
Length Width Depth Quantity UnitNo.
Refer Drawing No.
Description Remark
6.22
Crash Barrier on Median Side
Typical Cross Section Area of Crash Barrier
1 X 1 0.450 0.165 0.074 Sqm
1 X 1 0.363 0.250 0.091 Sqm Average of (0.450+0.275)=0.363
1 X 1 0.228 0.500 0.114 Sqm Average of (0.275+0.180)=0.228
1 X 1 0.180 0.175 0.032 Sqm
1 X 1 0.155 0.025 0.004 Sqm Average of (0.180+0.130)=0.228
Total Area 0.314 Sqm
MCW - A1-P1 - LHS 1 X 1 12.009 0.314 Area 3.771 Cum Effective Length 12.009
MCW - A1-P1 - RHS 1 X 1 12.009 0.314 Area 3.771 Cum Effective Length 12.009
MCW - P1-P2 - LHS 1 X 1 12.009 0.314 Area 3.771 Cum Effective Length 12.009
MCW - P1-P2 - RHS 1 X 1 12.009 0.314 Area 3.771 Cum Effective Length 12.009
MCW - P2-P3 - LHS 1 X 1 12.009 0.314 Area 3.771 Cum Effective Length 12.009
MCW - P2-P3 - RHS 1 X 1 12.009 0.314 Area 3.771 Cum Effective Length 12.009
MCW - P3-P4 - LHS 1 X 1 12.009 0.314 Area 3.771 Cum Effective Length 12.009
MCW - P3-P4 - RHS 1 X 1 12.009 0.314 Area 3.771 Cum Effective Length 12.009
MCW - P4-P5 - LHS 1 X 1 12.009 0.314 Area 3.771 Cum Effective Length 12.009
MCW - P4-P5 - RHS 1 X 1 12.009 0.314 Area 3.771 Cum Effective Length 12.009
MCW - P5-P6 - LHS 1 X 1 12.009 0.314 Area 3.771 Cum Effective Length 12.009
MCW - P5-P6 - RHS 1 X 1 12.009 0.314 Area 3.771 Cum Effective Length 12.009
MCW - P6-A2 - LHS 1 X 1 12.009 0.314 Area 3.771 Cum Effective Length 12.009
MCW - P6-A2 - RHS 1 X 1 12.009 0.314 Area 3.771 Cum Effective Length 12.009
SR - A1-P1 - LHS 1 X 1 12.009 0.314 Area 3.771 Cum Effective Length 12.009
SR - A1-P1 - RHS 1 X 1 12.009 0.314 Area 3.771 Cum Effective Length 12.009
SR - P1-P2 - LHS 1 X 1 12.009 0.314 Area 3.771 Cum Effective Length 12.009
Providing and laying in position Reinforced Cement Concrete Crash barrier excluding cost of reinforcement but including providing bi
and Polysulphide joint filler at expansion joints/gap locations as per drawings and Technical Specifications Sections 1500, 1700 and 2
(a) Grade M 40
for ITD CEMINDIA (JV)
-
8/2/2019 Bridge Format
29/50
Item
No.
Length Width Depth Quantity UnitNo.
Refer Drawing No.
Description Remark
SR - P1-P2 - RHS 1 X 1 12.009 0.314 Area 3.771 Cum Effective Length 12.009
SR - P2-P3 - LHS 1 X 1 12.009 0.314 Area 3.771 Cum Effective Length 12.009
SR - P2-P3 - RHS 1 X 1 12.009 0.314 Area 3.771 Cum Effective Length 12.009
SR - P3-P4 - LHS 1 X 1 12.009 0.314 Area 3.771 Cum Effective Length 12.009
SR - P3-P4 - RHS 1 X 1 12.009 0.314 Area 3.771 Cum Effective Length 12.009
SR - P4-P5 - LHS 1 X 1 12.009 0.314 Area 3.771 Cum Effective Length 12.009
SR - P4-P5 - RHS 1 X 1 12.009 0.314 Area 3.771 Cum Effective Length 12.009
SR - P5-P6 - LHS 1 X 1 12.009 0.314 Area 3.771 Cum Effective Length 12.009
SR - P5-P6 - RHS 1 X 1 12.009 0.314 Area 3.771 Cum Effective Length 12.009
SR - P6-A2 - LHS 1 X 1 12.009 0.314 Area 3.771 Cum Effective Length 12.009
SR - P6-A2 - RHS 1 X 1 12.009 0.314 Area 3.771 Cum Effective Length 12.009
Crash Barrier on Shoulder Side
Typical Cross Section Area of Crash Barrier
1 X 1 0.450 0.100 0.045 Sqm
1 X 1 0.363 0.250 0.091 Sqm Average of (0.450+0.275)=0.363
1 X 1 0.228 0.500 0.114 Sqm Average of (0.275+0.180)=0.228
1 X 1 0.180 0.175 0.032 Sqm
1 X 1 0.155 0.025 0.004 Sqm Average of (0.180+0.130)=0.228
Total Area 0.285 Sqm
MCW - A1-P1 - LHS 1 X 1 12.009 0.285 Area 3.420 Cum Effective Length 12.009
MCW - A1-P1 - RHS 1 X 1 12.009 0.285 Area 3.420 Cum Effective Length 12.009
MCW - P1-P2 - LHS 1 X 1 12.009 0.285 Area 3.420 Cum Effective Length 12.009
MCW - P1-P2 - RHS 1 X 1 12.009 0.285 Area 3.420 Cum Effective Length 12.009
MCW - P2-P3 - LHS 1 X 1 12.009 0.285 Area 3.420 Cum Effective Length 12.009
MCW - P2-P3 - RHS 1 X 1 12.009 0.285 Area 3.420 Cum Effective Length 12.009
MCW - P3-P4 - LHS 1 X 1 12.009 0.285 Area 3.420 Cum Effective Length 12.009
MCW - P3-P4 - RHS 1 X 1 12.009 0.285 Area 3.420 Cum Effective Length 12.009
for ITD CEMINDIA (JV)
-
8/2/2019 Bridge Format
30/50
Item
No.
Length Width Depth Quantity UnitNo.
Refer Drawing No.
Description Remark
MCW - P4-P5 - LHS 1 X 1 12.009 0.285 Area 3.420 Cum Effective Length 12.009
MCW - P4-P5 - RHS 1 X 1 12.009 0.285 Area 3.420 Cum Effective Length 12.009
MCW - P5-P6 - LHS 1 X 1 12.009 0.285 Area 3.420 Cum Effective Length 12.009
MCW - P5-P6 - RHS 1 X 1 12.009 0.285 Area 3.420 Cum Effective Length 12.009
MCW - P6-A2 - LHS 1 X 1 12.009 0.285 Area 3.420 Cum Effective Length 12.009
MCW - P6-A2 - RHS 1 X 1 12.009 0.285 Area 3.420 Cum Effective Length 12.009
SR - A1-P1 - LHS 1 X 1 12.009 0.285 Area 3.420 Cum Effective Length 12.009
SR - A1-P1 - RHS 1 X 1 12.009 0.285 Area 3.420 Cum Effective Length 12.009
SR - P1-P2 - LHS 1 X 1 12.009 0.285 Area 3.420 Cum Effective Length 12.009
SR - P1-P2 - RHS 1 X 1 12.009 0.285 Area 3.420 Cum Effective Length 12.009
SR - P2-P3 - LHS 1 X 1 12.009 0.285 Area 3.420 Cum Effective Length 12.009
SR - P2-P3 - RHS 1 X 1 12.009 0.285 Area 3.420 Cum Effective Length 12.009
SR - P3-P4 - LHS 1 X 1 12.009 0.285 Area 3.420 Cum Effective Length 12.009
SR - P3-P4 - RHS 1 X 1 12.009 0.285 Area 3.420 Cum Effective Length 12.009
SR - P4-P5 - LHS 1 X 1 12.009 0.285 Area 3.420 Cum Effective Length 12.009
SR - P4-P5 - RHS 1 X 1 12.009 0.285 Area 3.420 Cum Effective Length 12.009
SR - P5-P6 - LHS 1 X 1 12.009 0.285 Area 3.420 Cum Effective Length 12.009
SR - P5-P6 - RHS 1 X 1 12.009 0.285 Area 3.420 Cum Effective Length 12.009
SR - P6-A2 - LHS 1 X 1 12.009 0.285 Area 3.420 Cum Effective Length 12.009
SR - P6-A2 - RHS 1 X 1 12.009 0.285 Area 3.420 Cum Effective Length 12.009
Total Quantity for BOQ Item No. 6.22 201.348 Cum
for ITD CEMINDIA (JV)
-
8/2/2019 Bridge Format
31/50
Item
No.
Length Width Depth Quantity UnitNo.
Refer Drawing No.
Description Remark
6.23a
Typical Cross Section Area of Footpath
1 X 1 0.500 0.353 0.176 Sqm Average of (0.360+0.345)=0.353
1 X 1 0.750 0.323 0.242 Sqm Average of (0.345+0.300)=0.323
Total Area 0.418 Sqm
MCW - A1-P1 - LHS 1 X 1 12.009 0.418 Area 5.021 Cum Effective Length 12.009
MCW - A1-P1 - RHS 1 X 1 12.009 0.418 Area 5.021 Cum Effective Length 12.009
MCW - P1-P2 - LHS 1 X 1 12.009 0.418 Area 5.021 Cum Effective Length 12.009
MCW - P1-P2 - RHS 1 X 1 12.009 0.418 Area 5.021 Cum Effective Length 12.009
MCW - P2-P3 - LHS 1 X 1 12.009 0.418 Area 5.021 Cum Effective Length 12.009
MCW - P2-P3 - RHS 1 X 1 12.009 0.418 Area 5.021 Cum Effective Length 12.009
MCW - P3-P4 - LHS 1 X 1 12.009 0.418 Area 5.021 Cum Effective Length 12.009
MCW - P3-P4 - RHS 1 X 1 12.009 0.418 Area 5.021 Cum Effective Length 12.009
MCW - P4-P5 - LHS 1 X 1 12.009 0.418 Area 5.021 Cum Effective Length 12.009
MCW - P4-P5 - RHS 1 X 1 12.009 0.418 Area 5.021 Cum Effective Length 12.009
MCW - P5-P6 - LHS 1 X 1 12.009 0.418 Area 5.021 Cum Effective Length 12.009
MCW - P5-P6 - RHS 1 X 1 12.009 0.418 Area 5.021 Cum Effective Length 12.009
MCW - P6-A2 - LHS 1 X 1 12.009 0.418 Area 5.021 Cum Effective Length 12.009
MCW - P6-A2 - RHS 1 X 1 12.009 0.418 Area 5.021 Cum Effective Length 12.009
SR - A1-P1 - LHS 1 X 1 12.009 0.418 Area 5.021 Cum Effective Length 12.009
SR - A1-P1 - RHS 1 X 1 12.009 0.418 Area 5.021 Cum Effective Length 12.009
SR - P1-P2 - LHS 1 X 1 12.009 0.418 Area 5.021 Cum Effective Length 12.009
SR - P1-P2 - RHS 1 X 1 12.009 0.418 Area 5.021 Cum Effective Length 12.009
SR - P2-P3 - LHS 1 X 1 12.009 0.418 Area 5.021 Cum Effective Length 12.009
SR - P2-P3 - RHS 1 X 1 12.009 0.418 Area 5.021 Cum Effective Length 12.009
SR - P3-P4 - LHS 1 X 1 12.009 0.418 Area 5.021 Cum Effective Length 12.009
Providing and laying in position Reinforced Cement Concrete in kerbs/railing/median kerbs over bridges, grade separators, ROBs and
excluding cost of reinforcement steel, as per drawings and Technical Specifications Sections 1700 and 2300.
a) grade M30
for ITD CEMINDIA (JV)
-
8/2/2019 Bridge Format
32/50
Item
No.
Length Width Depth Quantity UnitNo.
Refer Drawing No.
Description Remark
SR - P3-P4 - RHS 1 X 1 12.009 0.418 Area 5.021 Cum Effective Length 12.009
SR - P4-P5 - LHS 1 X 1 12.009 0.418 Area 5.021 Cum Effective Length 12.009
SR - P4-P5 - RHS 1 X 1 12.009 0.418 Area 5.021 Cum Effective Length 12.009
SR - P5-P6 - LHS 1 X 1 12.009 0.418 Area 5.021 Cum Effective Length 12.009
SR - P5-P6 - RHS 1 X 1 12.009 0.418 Area 5.021 Cum Effective Length 12.009SR - P6-A2 - LHS 1 X 1 12.009 0.418 Area 5.021 Cum Effective Length 12.009
SR - P6-A2 - RHS 1 X 1 12.009 0.418 Area 5.021 Cum Effective Length 12.009
Total Quantity for BOQ Item No. 6.23a 140.588 Cum
for ITD CEMINDIA (JV)
-
8/2/2019 Bridge Format
33/50
Item
No.
Length Width Depth Quantity UnitNo.
Refer Drawing No.
Description Remark
6.24 Providing weep holes in abutments, splayed wing wall, median wall,retaining wall or any other earth retaining structure as per drawings
Specifications Clause 2706.
for ITD CEMINDIA (JV)
-
8/2/2019 Bridge Format
34/50
Item
No.
Length Width Depth Quantity UnitNo.
Refer Drawing No.
Description Remark
6.25 Painting of structure number span arrangement and flow directions as per drawings and Technical Specifications Section 800.
for ITD CEMINDIA (JV)
-
8/2/2019 Bridge Format
35/50
Item
No.
Length Width Depth Quantity UnitNo.
Refer Drawing No.
Description Remark
6.26
MCW - A1 - LHS 1 X 0.5 13.135 1.971 4.228 54.730 Cum
MCW - A1 - RHS 1 X 0.5 13.135 1.967 4.218 54.489 Cum
MCW - A2 - LHS 1 X 0.5 13.135 2.257 4.839 71.728 Cum
MCW - A2 - RHS 1 X 0.5 13.135 2.252 4.830 71.436 Cum
SR - A1 - LHS 1 X 0.5 10.450 1.796 3.851 36.138 Cum
SR - A1 - RHS 1 X 0.5 10.450 1.790 3.838 35.896 Cum
SR - A2 - LHS 1 X 0.5 10.450 2.076 4.453 48.302 Cum
SR - A2 - RHS 1 X 0.5 10.450 2.071 4.440 48.045 Cum
Total Quantity for BOQ Item No. 6.26 420.764 Cum
Providing and laying back filling behind abutments, splayed wing walls, return wall or any other area with selected imported granular m
approved quality as per drawings and Technical Specifications Clause 305 and Appendix-6, IRC:78-2000 having following minimum pro
(a) c+0, (b) > = 30o, (c ) g = 1.8t/m3
for ITD CEMINDIA (JV)
-
8/2/2019 Bridge Format
36/50
Item
No.
Length Width Depth Quantity UnitNo.
Refer Drawing No.
Description Remark
6.27
MCW - A1 - LHS 1 X 1 13.135 0.600 4.228 33.321 Cum
MCW - A1 - RHS 1 X 1 13.135 0.600 4.218 33.242 Cum
MCW - A2 - LHS 1 X 1 13.135 0.600 4.839 38.136 Cum
MCW - A2 - RHS 1 X 1 13.135 0.600 4.830 38.065 Cum
SR - A1 - LHS 1 X 1 10.450 0.600 3.851 24.146 Cum
SR - A1 - RHS 1 X 1 10.450 0.600 3.838 24.064 Cum
SR - A2 - LHS 1 X 1 10.450 0.600 4.453 27.920 Cum
SR - A2 - RHS 1 X 1 10.450 0.600 4.440 27.839 Cum
Total Quantity for BOQ Item No. 6.27 246.733 Cum
Providing and laying filter media behind abutment, splayed wing wall, median wall, retaining wall and return wall as per drawings and T
Specifications Section 2500.
for ITD CEMINDIA (JV)
-
8/2/2019 Bridge Format
37/50
Item
No.
Length Width Depth Quantity UnitNo.
Refer Drawing No.
Description Remark
6.28 Providing and laying stone apron as per drawing and Technical Specifications Clause 2500
for ITD CEMINDIA (JV)
-
8/2/2019 Bridge Format
38/50
Item
No.
Length Width Depth Quantity UnitNo.
Refer Drawing No.
Description Remark
6.29 Providing and laying in position hand packed boulder pitching on slopes of embankment, in front of abutments as per drawings and Te
Specifications Section 2500.
for ITD CEMINDIA (JV)
-
8/2/2019 Bridge Format
39/50
-
8/2/2019 Bridge Format
40/50
1
2 A1 A1 A1 A1 A2 A23 MCW MCW SR SR MCW MCW
4 LHS RHS LHS RHS LHS RHS
5 30 30 30 30 30 30
6 2% 2% 2.5% 2.5% 2% 2%
7 319.365 319.365 319.059 319.059 319.365 319.3658 314.425 314.425 314.425 314.425 313.773 313.773
9 313.400 313.400 313.400 313.400 312.1 312.1
10 0.100 0.100 0.100 0.100 0.100 0.100
11 0.100 0.100 0.100 0.100 0.100 0.100
12 0.065 0.065 0.065 0.065 0.065 0.065
13 319.300 319.300 318.994 318.994 319.3 319.3
14 0.850 0.850 0.850 0.850 0.850 0.850
15 Wall Top Level 318.205 318.205 317.850 317.850 318.205 318.205
16 Cap Depth 0.300 0.300 0.300 0.300 0.300 0.300
17 No No No No No No
18 11.975 11.975 10.25 10.25 11.975 11.975
19 13.828 13.828 11.836 11.836 13.828 13.82820 Return Wall Length 4.000 4.000 4.000 4.000 4.000 4.000
21 Cantilever Return Wall Length 2.000 2.000 2.000 2.000 2.000 2.000
22 Slab Span 10.400 10.400 10.400 10.400 10.400 10.400
23 Slab Width 10.250 10.250 10.250 10.250 10.250 10.250
24 1 Exc Length 14.058 14.058 12.067 12.067 14.058 14.058
25 2 Exc Width 7.300 7.300 7.300 7.300 7.300 7.300
26 3 Exc Depth 314.425 314.425 314.425 314.425 313.773 313.773
27 4 Exc Depth 2 313.300 313.300 313.300 313.300 312.000 312.000
28 5 Exc Depth1 1.125 1.125 1.125 1.125 1.773 1.773
29 6 PCC Length 14.058 14.058 12.067 12.067 14.058 14.058
30 7 PCC Width 7.300 7.300 7.300 7.300 7.300 7.300
31 8 PCC Depth 0.100 0.100 0.100 0.100 0.100 0.100
32 9 Raft Length 13.828 13.828 11.836 11.836 13.828 13.82833 10 Raft Width 7.100 7.100 7.100 7.100 7.1 7.1
34 11 Raft Width 2 1.100 1.100 1.100 1.100 1.1 1.1
35 12 Raft Depth 0.300 0.300 0.300 0.300 0.300 0.300
36 13 Raft Depth 2 0.900 0.900 0.900 0.900 0.900 0.900
37 14 Wall Length 13.828 13.828 11.836 11.836 13.828 13.828
38 15 Wall Width 1.100 1.100 1.100 1.100 1.100 1.100
39 16 Wall Width 2 0.720 0.720 0.720 0.720 0.720 0.720
40 17 Wall Depth 3.305 3.305 2.950 2.950 4.605 4.605
41 18 Cap Length 13.828 13.828 11.836 11.836 13.828 13.828
42 19 Cap Width 0.720 0.720 0.720 0.720 0.720 0.720
43 20 Cap Depth 0.300 0.300 0.300 0.300 0.300 0.300
44 21 Return wall BottoLength 4.619 4.619 4.619 4.619 4.619 4.61945 22 Return wall BottoWidth 0.600 0.600 0.600 0.600 0.600 0.600
46 23 Return wall BottoDepth 5.150 5.150 4.844 4.844 6.450 6.450
47 24 Cant Return wall Length 2.309 2.309 2.309 2.309 2.309 2.309
48 25 Cant Return wall Width 0.600 0.600 0.600 0.600 0.600 0.600
49 26 Cant Return wall Depth 1.539 1.539 1.539 1.539 1.539 1.539
50 27 Return wall Top Length 6.928 6.928 6.928 6.928 6.928 6.928
51 28 Return wall Top Width 0.600 0.600 0.600 0.600 0.600 0.600
52 29 Return wall Top Depth 0.300 0.300 0.300 0.300 0.300 0.300
Abutment A1 Abutm
Effective Length
Length
Round edge of wall
Depth of Slab
Deck slab Top Level
Wearing Coat Thickness
PCC Projection
PCC Thickness
Bridge Skewness
PCC Top level
OGLFRL
Camber
-
8/2/2019 Bridge Format
41/50
53 30 Dirt Wall Length 11.836 11.836 11.836 11.836 11.836 11.836
54 31 Dirt Wall Width 0.300 0.300 0.300 0.300 0.300 0.300
55 32 Dirt Wall Depth 0.968 0.968 1.016 1.016 0.968 0.968
56 33 Approach Slab Length 6.286 6.286 6.113 6.113 6.286 6.286
57 34 Approach Slab Width 9.650 9.650 9.050 9.050 9.650 9.650
58 35 Approach Slab Depth 0.300 0.300 0.300 0.300 0.300 0.300
59 36 Back Filling Length 13.135 13.135 10.450 10.450 13.135 13.13560 37 Back Filling Width 1.971 1.967 1.796 1.790 2.257 2.252
61 38 Back Filling Width 2 0.000 0.000 0.000 0.000 0.000 0.000
62 39 Back Filling Depth 4.228 4.218 3.851 3.838 4.839 4.830
63
64
65
66
67
68
69 1 A1MCWL A1MCWR A1SRLHSA1SRRH A2MCWL A2MCWR
70 2 A1MCWL A1MCWR A1SRLHSA1SRRH A2MCWL A2MCWR
71 3 A1MCWL A1MCWR A1SRLHSA1SRRH A2MCWL A2MCWR72 4 A1MCWL A1MCWR A1SRLHSA1SRRH A2MCWL A2MCWR
68 5 A1MCWL A1MCWR A1SRLHSA1SRRH A2MCWL A2MCWR
69 6 A1MCWL A1MCWR A1SRLHSA1SRRH A2MCWL A2MCWR
70 7 A1MCWL A1MCWR A1SRLHSA1SRRH A2MCWL A2MCWR
71 8 A1MCWL A1MCWR A1SRLHSA1SRRH A2MCWL A2MCWR
72 9 A1MCWL A1MCWR A1SRLHSA1SRRH A2MCWL A2MCWR
73 10 A1MCWL A1MCWR A1SRLHSA1SRRH A2MCWL A2MCWR
74 11 A1MCWL A1MCWR A1SRLHSA1SRRH A2MCWL A2MCWR
75 12 A1MCWL A1MCWR A1SRLHSA1SRRH A2MCWL A2MCWR
76 13 A1MCWL A1MCWR A1SRLHSA1SRRH A2MCWL A2MCWR
77 14 A1MCWL A1MCWR A1SRLHSA1SRRH A2MCWL A2MCWR
78 15 A1MCWL A1MCWR A1SRLHSA1SRRH A2MCWL A2MCWR
79 16 A1MCWL A1MCWR A1SRLHSA1SRRH A2MCWL A2MCWR80 17 A1MCWL A1MCWR A1SRLHSA1SRRH A2MCWL A2MCWR
81 18 A1MCWL A1MCWR A1SRLHSA1SRRH A2MCWL A2MCWR
82 19 A1MCWL A1MCWR A1SRLHSA1SRRH A2MCWL A2MCWR
83 20 A1MCWL A1MCWR A1SRLHSA1SRRH A2MCWL A2MCWR
84 21 A1MCWL A1MCWR A1SRLHSA1SRRH A2MCWL A2MCWR
85 22 A1MCWL A1MCWR A1SRLHSA1SRRH A2MCWL A2MCWR
86 23 A1MCWL A1MCWR A1SRLHSA1SRRH A2MCWL A2MCWR
87 24 A1MCWL A1MCWR A1SRLHSA1SRRH A2MCWL A2MCWR
88 25 A1MCWL A1MCWR A1SRLHSA1SRRH A2MCWL A2MCWR
89 26 A1MCWL A1MCWR A1SRLHSA1SRRH A2MCWL A2MCWR
90 27 A1MCWL A1MCWR A1SRLHSA1SRRH A2MCWL A2MCWR
91 28 A1MCWL A1MCWR A1SRLHSA1SRRH A2MCWL A2MCWR92 29 A1MCWL A1MCWR A1SRLHSA1SRRH A2MCWL A2MCWR
93 30 A1MCWL A1MCWR A1SRLHSA1SRRH A2MCWL A2MCWR
94 31 A1MCWL A1MCWR A1SRLHSA1SRRH A2MCWL A2MCWR
95 32 A1MCWL A1MCWR A1SRLHSA1SRRH A2MCWL A2MCWR
96 33 A1MCWL A1MCWR A1SRLHSA1SRRH A2MCWL A2MCWR
97 34 A1MCWL A1MCWR A1SRLHSA1SRRH A2MCWL A2MCWR
98 35 A1MCWL A1MCWR A1SRLHSA1SRRH A2MCWL A2MCWR
99 36 A1MCWL A1MCWR A1SRLHSA1SRRH A2MCWL A2MCWR
-
8/2/2019 Bridge Format
42/50
100 37 A1MCWL A1MCWR A1SRLHSA1SRRH A2MCWL A2MCWR
101 38 A1MCWL A1MCWR A1SRLHSA1SRRH A2MCWL A2MCWR
102 39 A1MCWL A1MCWR A1SRLHSA1SRRH A2MCWL A2MCWR
99
100 Back Filling Calculation
101 FRL (Center) 319.365 319.365 319.059 319.059 319.365 319.365
102 Camber 2% 2% 2.5% 2.5% 2% 2%103 Width 10.250 11.250 12.250 13.250 14.250 15.250
104 FRL (End) 319.160 319.140 318.753 318.728 319.080 319.060
105 Average FRL 319.263 319.253 318.906 318.893 319.223 319.213
106 PQC / (BC-DBM) 0.310 0.310 0.150 0.150 0.310 0.310
107 DLC / WMM 0.150 0.150 0.250 0.250 0.150 0.150
108 GSB 0.150 0.150 0.230 0.230 0.150 0.150
109 BF Top Level 318.653 318.643 318.276 318.263 318.613 318.603
110 Ground Level 314.425 314.425 314.425 314.425 313.773 313.773
111 Depth 4.228 4.218 3.851 3.838 4.839 4.830
112 Back filling Angle from horizontal 65.000 65.000 65.000 65.000 65.000 65.000
113 Top Width 1.971 1.967 1.796 1.790 2.257 2.252
-
8/2/2019 Bridge Format
43/50
A2 A2 P1 P1 P1 P1 P2 P2 P2 P2SR SR MCW MCW SR SR MCW MCW SR SR
LHS RHS LHS RHS LHS RHS LHS RHS LHS RHS
30 30 30 30 30 30 30 30 30 30
2.5% 2.5% 2.0% 2.0% 2.5% 2.5% 2.0% 2.0% 2.5% 2.5%
319.059 319.059 319.365 319.365 319.059 319.059 319.365 319.365 319.059 319.059313.773 313.773 314.075 314.075 314.075 314.075 313.736 313.736 313.736 313.736
312.1 312.1 312.8 312.8 312.8 312.8 312.4 312.4 312.4 312.4
0.100 0.100 0.100 0.100 0.100 0.100 0.100 0.100 0.100 0.100
0.100 0.100 0.100 0.100 0.100 0.100 0.100 0.100 0.100 0.100
0.065 0.065 0.065 0.065 0.065 0.065 0.065 0.065 0.065 0.065
318.994 318.994 319.3 319.3 318.994 318.994 319.3 319.3 318.994 318.994
0.850 0.850 0.850 0.850 0.850 0.850 0.850 0.850 0.850 0.850
317.850 317.850 318.205 318.205 317.850 317.850 318.205 318.205 317.850 317.850
0.300 0.300
No No Yes Yes Yes Yes Yes Yes Yes Yes
10.25 10.25 11.07 11.07 11.07 11.07 11.07 11.07 11.07 11.07
11.836 11.836 12.783 12.783 12.783 12.783 12.783 12.783 12.783 12.7834.000 4.000
2.000 2.000
10.400 10.400 10.400 10.400 10.400 10.400 10.400 10.400 10.400 10.400
10.250 10.250 10.250 10.250 10.250 10.250 10.250 10.250 10.250 10.250
12.067 12.067 13.013 13.013 13.013 13.013 13.013 13.013 13.013 13.013
7.300 7.300 5.020 5.020 5.020 5.020 5.020 5.020 5.020 5.020
313.773 313.773 314.075 314.075 314.075 314.075 313.736 313.736 313.736 313.736
312.000 312.000 312.700 312.700 312.700 312.700 312.300 312.300 312.300 312.300
1.773 1.773 1.375 1.375 1.375 1.375 1.436 1.436 1.436 1.436
12.067 12.067 13.013 13.013 13.013 13.013 13.013 13.013 13.013 13.013
7.300 7.300 5.020 5.020 5.020 5.020 5.020 5.020 5.020 5.020
0.100 0.100 0.100 0.100 0.100 0.100 0.100 0.100 0.100 0.100
11.836 11.836 12.783 12.783 12.783 12.783 12.783 12.783 12.783 12.7837.1 7.1 4.82 4.82 4.82 4.82 4.82 4.82 4.82 4.82
1.1 1.1 0.82 0.82 0.82 0.82 0.82 0.82 0.82 0.82
0.300 0.300 0.300 0.300 0.300 0.300 0.300 0.300 0.300 0.300
0.900 0.900 0.900 0.900 0.900 0.900 0.900 0.900 0.900 0.900
11.836 11.836 11.963 11.963 11.963 11.963 11.963 11.963 11.963 11.963
1.100 1.100 0.820 0.820 0.820 0.820 0.820 0.820 0.820 0.820
0.720 0.720 0.820 0.820 0.820 0.820 0.820 0.820 0.820 0.820
4.250 4.250 4.205 4.205 3.850 3.850 4.605 4.605 4.250 4.250
11.836 11.836 11.963 11.963 11.963 11.963 11.963 11.963 11.963 11.963
0.720 0.720 0.820 0.820 0.820 0.820 0.820 0.820 0.820 0.820
0.300 0.300 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
4.619 4.6190.600 0.600
6.144 6.144
2.309 2.309
0.600 0.600
1.539 1.539
6.928 6.928
0.600 0.600
0.300 0.300
Pier P1 Pier P2ent A2
-
8/2/2019 Bridge Format
44/50
11.836 11.836
0.300 0.300
1.016 1.016
6.113 6.113
9.050 9.050
0.300 0.300
10.450 10.4502.076 2.071
0.000 0.000
4.453 4.440
A2SRLHSA2SRRH P1MCWL P1MCWR P1SRLHSP1SRRH P2MCWL P2MCWR P2SRLHSP2SRRH
A2SRLHSA2SRRH P1MCWL P1MCWR P1SRLHSP1SRRH P2MCWL P2MCWR P2SRLHSP2SRRH
A2SRLHSA2SRRH P1MCWL P1MCWR P1SRLHSP1SRRH P2MCWL P2MCWR P2SRLHSP2SRRHA2SRLHSA2SRRH P1MCWL P1MCWR P1SRLHSP1SRRH P2MCWL P2MCWR P2SRLHSP2SRRH
A2SRLHSA2SRRH P1MCWL P1MCWR P1SRLHSP1SRRH P2MCWL P2MCWR P2SRLHSP2SRRH
A2SRLHSA2SRRH P1MCWL P1MCWR P1SRLHSP1SRRH P2MCWL P2MCWR P2SRLHSP2SRRH
A2SRLHSA2SRRH P1MCWL P1MCWR P1SRLHSP1SRRH P2MCWL P2MCWR P2SRLHSP2SRRH
A2SRLHSA2SRRH P1MCWL P1MCWR P1SRLHSP1SRRH P2MCWL P2MCWR P2SRLHSP2SRRH
A2SRLHSA2SRRH P1MCWL P1MCWR P1SRLHSP1SRRH P2MCWL P2MCWR P2SRLHSP2SRRH
A2SRLHSA2SRRH P1MCWL P1MCWR P1SRLHSP1SRRH P2MCWL P2MCWR P2SRLHSP2SRRH
A2SRLHSA2SRRH P1MCWL P1MCWR P1SRLHSP1SRRH P2MCWL P2MCWR P2SRLHSP2SRRH
A2SRLHSA2SRRH P1MCWL P1MCWR P1SRLHSP1SRRH P2MCWL P2MCWR P2SRLHSP2SRRH
A2SRLHSA2SRRH P1MCWL P1MCWR P1SRLHSP1SRRH P2MCWL P2MCWR P2SRLHSP2SRRH
A2SRLHSA2SRRH P1MCWL P1MCWR P1SRLHSP1SRRH P2MCWL P2MCWR P2SRLHSP2SRRH
A2SRLHSA2SRRH P1MCWL P1MCWR P1SRLHSP1SRRH P2MCWL P2MCWR P2SRLHSP2SRRH
A2SRLHSA2SRRH P1MCWL P1MCWR P1SRLHSP1SRRH P2MCWL P2MCWR P2SRLHSP2SRRHA2SRLHSA2SRRH P1MCWL P1MCWR P1SRLHSP1SRRH P2MCWL P2MCWR P2SRLHSP2SRRH
A2SRLHSA2SRRH P1MCWL P1MCWR P1SRLHSP1SRRH P2MCWL P2MCWR P2SRLHSP2SRRH
A2SRLHSA2SRRH P1MCWL P1MCWR P1SRLHSP1SRRH P2MCWL P2MCWR P2SRLHSP2SRRH
A2SRLHSA2SRRH P1MCWL P1MCWR P1SRLHSP1SRRH P2MCWL P2MCWR P2SRLHSP2SRRH
A2SRLHSA2SRRHSReturn wall BottomLength
A2SRLHSA2SRRHSReturn wall BottomWidth
A2SRLHSA2SRRHSReturn wall BottomDepth
A2SRLHSA2SRRHSCant Return wallLength
A2SRLHSA2SRRHSCant Return wallWidth
A2SRLHSA2SRRHSCant Return wallDepth
A2SRLHSA2SRRHSReturn wall TopLength
A2SRLHSA2SRRHSReturn wall TopWidthA2SRLHSA2SRRHSReturn wall TopDepth
A2SRLHSA2SRRHSDirt WallLength
A2SRLHSA2SRRHSDirt WallWidth
A2SRLHSA2SRRHSDirt WallDepth
A2SRLHSA2SRRHSApproach SlabLength
A2SRLHSA2SRRHSApproach SlabWidth
A2SRLHSA2SRRHSApproach SlabDepth
A2SRLHSA2SRRHSBack FillingLength
-
8/2/2019 Bridge Format
45/50
A2SRLHSA2SRRHSBack FillingWidth
A2SRLHSA2SRRHSBack FillingWidth 2
A2SRLHSA2SRRHSBack FillingDepth
319.059 319.059
2.5% 2.5%16.250 17.250
318.653 318.628
318.856 318.843
0.150 0.150
0.250 0.250
0.230 0.230
318.226 318.213
313.773 313.773
4.453 4.440
65.000 65.000
2.076 2.071
-
8/2/2019 Bridge Format
46/50
P3 P3 P3 P3 P4 P4 P4 P4 P5 P5MCW MCW SR SR MCW MCW SR SR MCW MCW
LHS RHS LHS RHS LHS RHS LHS RHS LHS RHS
30 30 30 30 30 30 30 30 30 30
2.0% 2.0% 2.5% 2.5% 2.0% 2.0% 2.5% 2.5% 2.0% 2.0%
319.365 319.365 319.059 319.059 319.365 319.365 319.059 319.059 319.365 319.365313.425 313.425 313.425 313.425 313.713 313.713 313.713 313.713 313.76 313.76
312.1 312.1 312.1 312.1 312.1 312.1 312.1 312.1 312.4 312.4
0.100 0.100 0.100 0.100 0.100 0.100 0.100 0.100 0.100 0.100
0.100 0.100 0.100 0.100 0.100 0.100 0.100 0.100 0.100 0.100
0.065 0.065 0.065 0.065 0.065 0.065 0.065 0.065 0.065 0.065
319.3 319.3 318.994 318.994 319.3 319.3 318.994 318.994 319.3 319.3
0.850 0.850 0.850 0.850 0.850 0.850 0.850 0.850 0.850 0.850
318.205 318.205 317.850 317.850 318.205 318.205 317.850 317.850 318.205 318.205
Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes
11.07 11.07 11.07 11.07 11.070 11.070 11.070 11.070 11.070 11.070
12.783 12.783 12.783 12.783 12.783 12.783 12.783 12.783 12.783 12.783
10.400 10.400 10.400 10.400 10.400 10.400 10.400 10.400 10.400 10.400
10.250 10.250 10.250 10.250 10.250 10.250 10.250 10.250 10.250 10.250
13.013 13.013 13.013 13.013 13.013 13.013 13.013 13.013 13.013 13.013
5.020 5.020 5.020 5.020 5.020 5.020 5.020 5.020 5.020 5.020
313.425 313.425 313.425 313.425 313.713 313.713 313.713 313.713 313.760 313.760
312.000 312.000 312.000 312.000 312.000 312.000 312.000 312.000 312.300 312.300
1.425 1.425 1.425 1.425 1.713 1.713 1.713 1.713 1.460 1.460
13.013 13.013 13.013 13.013 13.013 13.013 13.013 13.013 13.013 13.013
5.020 5.020 5.020 5.020 5.020 5.020 5.020 5.020 5.020 5.020
0.100 0.100 0.100 0.100 0.100 0.100 0.100 0.100 0.100 0.100
12.783 12.783 12.783 12.783 12.783 12.783 12.783 12.783 12.783 12.7834.82 4.82 4.82 4.82 4.82 4.82 4.82 4.82 4.82 4.82
0.82 0.82 0.82 0.82 0.82 0.82 0.82 0.82 0.82 0.82
0.300 0.300 0.300 0.300 0.300 0.300 0.300 0.300 0.300 0.300
0.900 0.900 0.900 0.900 0.900 0.900 0.900 0.900 0.900 0.900
11.963 11.963 11.963 11.963 11.963 11.963 11.963 11.963 11.963 11.963
0.820 0.820 0.820 0.820 0.820 0.820 0.820 0.820 0.820 0.820
0.820 0.820 0.820 0.820 0.820 0.820 0.820 0.820 0.820 0.820
4.905 4.905 4.550 4.550 4.905 4.905 4.550 4.550 4.605 4.605
11.963 11.963 11.963 11.963 11.963 11.963 11.963 11.963 11.963 11.963
0.820 0.820 0.820 0.820 0.820 0.820 0.820 0.820 0.820 0.820
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
Pier P3 Pier P4 Pie
-
8/2/2019 Bridge Format
47/50
P3MCWL P3MCWR P3SRLHSP3SRRH P4MCWL P4MCWR P4SRLHSP4SRRH P5MCWL P5MCWR
P3MCWL P3MCWR P3SRLHSP3SRRH P4MCWL P4MCWR P4SRLHSP4SRRH P5MCWL P5MCWR
P3MCWL P3MCWR P3SRLHSP3SRRH P4MCWL P4MCWR P4SRLHSP4SRRH P5MCWL P5MCWRP3MCWL P3MCWR P3SRLHSP3SRRH P4MCWL P4MCWR P4SRLHSP4SRRH P5MCWL P5MCWR
P3MCWL P3MCWR P3SRLHSP3SRRH P4MCWL P4MCWR P4SRLHSP4SRRH P5MCWL P5MCWR
P3MCWL P3MCWR P3SRLHSP3SRRH P4MCWL P4MCWR P4SRLHSP4SRRH P5MCWL P5MCWR
P3MCWL P3MCWR P3SRLHSP3SRRH P4MCWL P4MCWR P4SRLHSP4SRRH P5MCWL P5MCWR
P3MCWL P3MCWR P3SRLHSP3SRRH P4MCWL P4MCWR P4SRLHSP4SRRH P5MCWL P5MCWR
P3MCWL P3MCWR P3SRLHSP3SRRH P4MCWL P4MCWR P4SRLHSP4SRRH P5MCWL P5MCWR
P3MCWL P3MCWR P3SRLHSP3SRRH P4MCWL P4MCWR P4SRLHSP4SRRH P5MCWL P5MCWR
P3MCWL P3MCWR P3SRLHSP3SRRH P4MCWL P4MCWR P4SRLHSP4SRRH P5MCWL P5MCWR
P3MCWL P3MCWR P3SRLHSP3SRRH P4MCWL P4MCWR P4SRLHSP4SRRH P5MCWL P5MCWR
P3MCWL P3MCWR P3SRLHSP3SRRH P4MCWL P4MCWR P4SRLHSP4SRRH P5MCWL P5MCWR
P3MCWL P3MCWR P3SRLHSP3SRRH P4MCWL P4MCWR P4SRLHSP4SRRH P5MCWL P5MCWR
P3MCWL P3MCWR P3SRLHSP3SRRH P4MCWL P4MCWR P4SRLHSP4SRRH P5MCWL P5MCWR
P3MCWL P3MCWR P3SRLHSP3SRRH P4MCWL P4MCWR P4SRLHSP4SRRH P5MCWL P5MCWRP3MCWL P3MCWR P3SRLHSP3SRRH P4MCWL P4MCWR P4SRLHSP4SRRH P5MCWL P5MCWR
P3MCWL P3MCWR P3SRLHSP3SRRH P4MCWL P4MCWR P4SRLHSP4SRRH P5MCWL P5MCWR
P3MCWL P3MCWR P3SRLHSP3SRRH P4MCWL P4MCWR P4SRLHSP4SRRH P5MCWL P5MCWR
P3MCWL P3MCWR P3SRLHSP3SRRH P4MCWL P4MCWR P4SRLHSP4SRRH P5MCWL P5MCWR
-
8/2/2019 Bridge Format
48/50
-
8/2/2019 Bridge Format
49/50
P5 P5 P6 P6 P6 P6SR SR MCW MCW SR SR
LHS RHS LHS RHS LHS RHS
30 30 30 30 30 30
2.5% 2.5% 2.0% 2.0% 2.5% 2.5%
319.059 319.059 319.365 319.365 319.059 319.059313.76 313.76 313.655 313.655 313.655 313.655
312.4 312.4 311.8 311.8 311.8 311.8
0.100 0.100 0.100 0.100 0.100 0.100
0.100 0.100 0.100 0.100 0.100 0.100
0.065 0.065 0.065 0.065 0.065 0.065
318.994 318.994 319.3 319.3 318.994 318.994
0.850 0.850 0.850 0.850 0.850 0.850
317.850 317.850 318.205 318.205 317.850 317.850
Yes Yes Yes Yes Yes Yes
11.070 11.070 11.070 11.070 11.070 11.070
12.783 12.783 12.783 12.783 12.783 12.783
10.400 10.400 10.400 10.400 10.400 10.400
10.250 10.250 10.250 10.250 10.250 10.250
13.013 13.013 13.013 13.013 13.013 13.013
5.020 5.020 5.020 5.020 5.020 5.020
313.760 313.760 313.655 313.655 313.655 313.655
312.300 312.300 311.700 311.700 311.700 311.700
1.460 1.460 1.955 1.955 1.955 1.955
13.013 13.013 13.013 13.013 13.013 13.013
5.020 5.020 5.020 5.020 5.020 5.020
0.100 0.100 0.100 0.100 0.100 0.100
12.783 12.783 12.783 12.783 12.783 12.7834.82 4.82 4.82 4.82 4.82 4.82
0.82 0.82 0.82 0.82 0.82 0.82
0.300 0.300 0.300 0.300 0.300 0.300
0.900 0.900 0.900 0.900 0.900 0.900
11.963 11.963 11.963 11.963 11.963 11.963
0.820 0.820 0.820 0.820 0.820 0.820
0.820 0.820 0.820 0.820 0.820 0.820
4.250 4.250 5.205 5.205 4.850 4.850
11.963 11.963 11.963 11.963 11.963 11.963
0.820 0.820 0.820 0.820 0.820 0.820
0.000 0.000 0.000 0.000 0.000 0.000
P5 Pier P6
-
8/2/2019 Bridge Format
50/50
P5SRLHSP5SRRH P6MCWL P6MCWR P6SRLHSP6SRRHSExcLength
P5SRLHSP5SRRH P6MCWL P6MCWR P6SRLHSP6SRRHSExcWidth
P5SRLHSP5SRRH P6MCWL P6MCWR P6SRLHSP6SRRHSExcDepthP5SRLHSP5SRRH P6MCWL P6MCWR P6SRLHSP6SRRHSExcDepth 2
P5SRLHSP5SRRH P6MCWL P6MCWR P6SRLHSP6SRRHSExcDepth1
P5SRLHSP5SRRH P6MCWL P6MCWR P6SRLHSP6SRRHSPCCLength
P5SRLHSP5SRRH P6MCWL P6MCWR P6SRLHSP6SRRHSPCCWidth
P5SRLHSP5SRRH P6MCWL P6MCWR P6SRLHSP6SRRHSPCCDepth
P5SRLHSP5SRRH P6MCWL P6MCWR P6SRLHSP6SRRHSRaftLength
P5SRLHSP5SRRH P6MCWL P6MCWR P6SRLHSP6SRRHSRaftWidth
P5SRLHSP5SRRH P6MCWL P6MCWR P6SRLHSP6SRRHSRaftWidth 2
P5SRLHSP5SRRH P6MCWL P6MCWR P6SRLHSP6SRRHSRaftDepth
P5SRLHSP5SRRH P6MCWL P6MCWR P6SRLHSP6SRRHSRaftDepth 2
P5SRLHSP5SRRH P6MCWL P6MCWR P6SRLHSP6SRRHSWallLength
P5SRLHSP5SRRH P6MCWL P6MCWR P6SRLHSP6SRRHSWallWidth
P5SRLHSP5SRRH P6MCWL P6MCWR P6SRLHSP6SRRHSWallWidth 2P5SRLHSP5SRRH P6MCWL P6MCWR P6SRLHSP6SRRHSWallDepth
P5SRLHSP5SRRH P6MCWL P6MCWR P6SRLHSP6SRRHSCapLength
P5SRLHSP5SRRH P6MCWL P6MCWR P6SRLHSP6SRRHSCapWidth
P5SRLHSP5SRRH P6MCWL P6MCWR P6SRLHSP6SRRHSCapDepth