    Item

    No.

    Length Width Depth Quantity Unit

    6.01)

    MCW - A1 - LHS 1 X 1 14.058 7.300 1.125 115.451 Cum OGL=314.425m PCC Bed=313.300m

    MCW - A1 - RHS 1 X 1 14.058 7.300 1.125 115.451 Cum OGL=314.425m PCC Bed=313.300m

    MCW - A2 - LHS 1 X 1 14.058 7.300 1.773 181.951 Cum OGL=313.773m PCC Bed=312.000m

    MCW - A2 - RHS 1 X 1 14.058 7.300 1.773 181.951 Cum OGL=313.773m PCC Bed=312.000m

    SR - A1 - LHS 1 X 1 12.067 7.300 1.125 99.100 Cum OGL=314.425m PCC Bed=313.300m

    SR - A1 - RHS 1 X 1 12.067 7.300 1.125 99.100 Cum OGL=314.425m PCC Bed=313.300m

    SR - A2 - LHS 1 X 1 12.067 7.300 1.773 156.182 Cum OGL=313.773m PCC Bed=312.000m

    SR - A2 - RHS 1 X 1 12.067 7.300 1.773 156.182 Cum OGL=313.773m PCC Bed=312.000m

    MCW - P1 - LHS 1 X 1 13.013 5.020 1.375 89.822 Cum OGL=314.075m PCC Bed=312.700m

    MCW - P1 - RHS 1 X 1 13.013 5.020 1.375 89.822 Cum OGL=314.075m PCC Bed=312.700m

    MCW - P2 - LHS 1 X 1 13.013 5.020 1.436 93.807 Cum OGL=313.736m PCC Bed=312.300m

    MCW - P2 - RHS 1 X 1 13.013 5.020 1.436 93.807 Cum OGL=313.736m PCC Bed=312.300m

    MCW - P3 - LHS 1 X 1 13.013 5.020 1.425 93.088 Cum OGL=313.425m PCC Bed=312.000m

    MCW - P3 - RHS 1 X 1 13.013 5.020 1.425 93.088 Cum OGL=313.425m PCC Bed=312.000m

    MCW - P4 - LHS 1 X 1 13.013 5.020 1.713 111.902 Cum OGL=313.713m PCC Bed=312.000m

    MCW - P4 - RHS 1 X 1 13.013 5.020 1.713 111.902 Cum OGL=313.713m PCC Bed=312.000m

    MCW - P5 - LHS 1 X 1 13.013 5.020 1.460 95.375 Cum OGL=313.760m PCC Bed=312.300m

    MCW - P5 - RHS 1 X 1 13.013 5.020 1.460 95.375 Cum OGL=313.760m PCC Bed=312.300m

    MCW - P6 - LHS 1 X 1 13.013 5.020 1.955 127.711 Cum OGL=313.655m PCC Bed=311.700m

    MCW - P6 - RHS 1 X 1 13.013 5.020 1.955 127.711 Cum OGL=313.655m PCC Bed=311.700m

    SR - P1 - LHS 1 X 1 13.013 5.020 1.375 89.822 Cum OGL=314.075m PCC Bed=312.700m

    SR - P1 - RHS 1 X 1 13.013 5.020 1.375 89.822 Cum OGL=314.075m PCC Bed=312.700m

    SR - P2 - LHS 1 X 1 13.013 5.020 1.436 93.807 Cum OGL=313.736m PCC Bed=312.300m

    No.

    Refer Drawing No.

    Description Remark

    Earthwork in excavation for structures in all types of soil and marshy soil excluding rock, including all lifts and leads as per dra

    Specifications Section 300.

    Abutment Wall Raft

    Pier Wall Raft

    for ITD CEMINDIA (JV)

  • 8/2/2019 Bridge Format

    2/50

    Item

    No.

    Length Width Depth Quantity UnitNo.

    Refer Drawing No.

    Description Remark

    SR - P2 - RHS 1 X 1 13.013 5.020 1.436 93.807 Cum OGL=313.736m PCC Bed=312.300m

    SR - P3 - LHS 1 X 1 13.013 5.020 1.425 93.088 Cum OGL=313.425m PCC Bed=312.000m

    SR - P3 - RHS 1 X 1 13.013 5.020 1.425 93.088 Cum OGL=313.425m PCC Bed=312.000m

    SR - P4 - LHS 1 X 1 13.013 5.020 1.713 111.902 Cum OGL=313.713m PCC Bed=312.000m

    SR - P4 - RHS 1 X 1 13.013 5.020 1.713 111.902 Cum OGL=313.713m PCC Bed=312.000mSR - P5 - LHS 1 X 1 13.013 5.020 1.460 95.375 Cum OGL=313.760m PCC Bed=312.300m

    SR - P5 - RHS 1 X 1 13.013 5.020 1.460 95.375 Cum OGL=313.760m PCC Bed=312.300m

    SR - P6 - LHS 1 X 1 13.013 5.020 1.955 127.711 Cum OGL=313.655m PCC Bed=311.700m

    SR - P6 - RHS 1 X 1 13.013 5.020 1.955 127.711 Cum OGL=313.655m PCC Bed=311.700m

    Total Quantity for BOQ Item No. 6.01) 3552.188 Cum

    for ITD CEMINDIA (JV)

  • 8/2/2019 Bridge Format

    3/50

  • 8/2/2019 Bridge Format

    4/50

    Item

    No.

    Length Width Depth Quantity UnitNo.

    Refer Drawing No.

    Description Remark

    6.03 Earthwork in excavation for structures in hard rock including all lifts and leads as per drawings and Technical Specifications Section

    of Additional Technical Specifications.

    With Controlled Blasting

    for ITD CEMINDIA (JV)

  • 8/2/2019 Bridge Format

    5/50

    Item

    No.

    Length Width Depth Quantity UnitNo.

    Refer Drawing No.

    Description Remark

    6.04 Providing and laying in position selected imported granular materials of approved quality below structure including compaction in lay

    and Technical Specifications Clause 305 and section 1000.

    Sand filling

    for ITD CEMINDIA (JV)

  • 8/2/2019 Bridge Format

    6/50

  • 8/2/2019 Bridge Format

    7/50

    Item

    No.

    Length Width Depth Quantity UnitNo.

    Refer Drawing No.

    Description Remark

    SR - P2 - RHS 1 X 1 13.013 5.020 0.100 6.533 Cum

    SR - P3 - LHS 1 X 1 13.013 5.020 0.100 6.533 Cum

    SR - P3 - RHS 1 X 1 13.013 5.020 0.100 6.533 Cum

    SR - P4 - LHS 1 X 1 13.013 5.020 0.100 6.533 Cum

    SR - P4 - RHS 1 X 1 13.013 5.020 0.100 6.533 CumSR - P5 - LHS 1 X 1 13.013 5.020 0.100 6.533 Cum

    SR - P5 - RHS 1 X 1 13.013 5.020 0.100 6.533 Cum

    SR - P6 - LHS 1 X 1 13.013 5.020 0.100 6.533 Cum

    SR - P6 - RHS 1 X 1 13.013 5.020 0.100 6.533 Cum

    Approach Slab

    MCW - A1 - LHS 1 X 1 6.186 9.650 0.100 5.969 Cum

    MCW - A1 - RHS 1 X 1 6.186 9.650 0.100 5.969 Cum

    MCW - A2 - LHS 1 X 1 6.186 9.650 0.100 5.969 Cum

    MCW - A2 - RHS 1 X 1 6.186 9.650 0.100 5.969 Cum

    SR - A1 - LHS 1 X 1 6.013 9.050 0.100 5.441 Cum

    SR - A1 - RHS 1 X 1 6.013 9.050 0.100 5.441 Cum

    SR - A2 - LHS 1 X 1 6.013 9.050 0.100 5.441 Cum

    SR - A2 - RHS 1 X 1 6.013 9.050 0.100 5.441 Cum

    Annular Filling

    for ITD CEMINDIA (JV)

  • 8/2/2019 Bridge Format

    8/50

    Item

    No.

    Length Width Depth Quantity UnitNo.

    Refer Drawing No.

    Description Remark

    Total Quantity for BOQ Item No. 6.05a) 278.716 Cum

    for ITD CEMINDIA (JV)

  • 8/2/2019 Bridge Format

    9/50

    Item

    No.

    Length Width Depth Quantity UnitNo.

    Refer Drawing No.

    Description Remark

    6.05a) Providing and laying in position Plain Cement Concrete in levelling course below open foundations, wing walls, curtain walls, toe wa

    ladders and annular filling around foundation in rock as per drawings and Technical Specifications Sections 1700, 2100 and 2700.

    a) Grade M15

    for ITD CEMINDIA (JV)

  • 8/2/2019 Bridge Format

    10/50

    Item

    No.

    Length Width Depth Quantity UnitNo.

    Refer Drawing No.

    Description Remark

    6.06a)

    Abutment Wall

    RaftMCW - A1 - LHS 1 X 1 13.828 7.100 0.300 29.454 Cum Raft Width =

    MCW - A1 - LHS 1 X 1 13.828 4.100 0.900 51.025 Cum Average Width = ( 7.1 + 1.1) /2

    MCW - A1 - RHS 1 X 1 13.828 7.100 0.300 29.454 Cum Raft Width =

    MCW - A1 - RHS 1 X 1 13.828 4.100 0.900 51.025 Cum Average Width = ( 7.1 + 1.1) /2

    MCW - A2 - LHS 1 X 1 13.828 7.100 0.300 29.454 Cum Raft Width =

    MCW - A2 - LHS 1 X 1 13.828 4.100 0.900 51.025 Cum Average Width = ( 7.1 + 1.1) /2

    MCW - A2 - RHS 1 X 1 13.828 7.100 0.300 29.454 Cum Raft Width =

    MCW - A2 - RHS 1 X 1 13.828 4.100 0.900 51.025 Cum Average Width = ( 7.1 + 1.1) /2

    SR - A1 - LHS 1 X 1 11.836 7.100 0.300 25.211 Cum Raft Width =

    SR - A1 - LHS 1 X 1 11.836 4.100 0.900 43.675 Cum Average Width = ( 7.1 + 1.1) /2

    SR - A1 - RHS 1 X 1 11.836 7.100 0.300 25.211 Cum Raft Width =

    SR - A1 - RHS 1 X 1 11.836 4.100 0.900 43.675 Cum Average Width = ( 7.1 + 1.1) /2

    SR - A2 - LHS 1 X 1 11.836 7.100 0.300 25.211 Cum Raft Width =

    SR - A2 - LHS 1 X 1 11.836 4.100 0.900 43.675 Cum Average Width = ( 7.1 + 1.1) /2

    SR - A2 - RHS 1 X 1 11.836 7.100 0.300 25.211 Cum Raft Width =

    SR - A2 - RHS 1 X 1 11.836 4.100 0.900 43.675 Cum Average Width = ( 7.1 + 1.1) /2

    Pier Wall Raft

    MCW - P1 - LHS 1 X 1 12.783 4.820 0.300 18.484 Cum Raft Width =

    MCW - P1 - LHS 1 X 1 12.783 2.820 0.900 32.443 Cum Average Width = ( 4.82 + 0.82) /2

    MCW - P1 - RHS 1 X 1 12.783 4.820 0.300 18.484 Cum Raft Width =

    MCW - P1 - RHS 1 X 1 12.783 2.820 0.900 32.443 Cum Average Width = ( 4.82 + 0.82) /2

    MCW - P2 - LHS 1 X 1 12.783 4.820 0.300 18.484 Cum Raft Width =

    MCW - P2 - LHS 1 X 1 12.783 2.820 0.900 32.443 Cum Average Width = ( 4.82 + 0.82) /2

    Providing and laying in position cement concrete in RCC open foundations excluding reinforcement as per drawings and Tec

    Sections 1500, 1700 and 2100.

    a) Grade M30

    for ITD CEMINDIA (JV)

  • 8/2/2019 Bridge Format

    11/50

    Item

    No.

    Length Width Depth Quantity UnitNo.

    Refer Drawing No.

    Description Remark

    MCW - P2 - RHS 1 X 1 12.783 4.820 0.300 18.484 Cum Raft Width =

    MCW - P2 - RHS 1 X 1 12.783 2.820 0.900 32.443 Cum Average Width = ( 4.82 + 0.82) /2

    MCW - P3 - LHS 1 X 1 12.783 4.820 0.300 18.484 Cum Raft Width =

    MCW - P3 - LHS 1 X 1 12.783 2.820 0.900 32.443 Cum Average Width = ( 4.82 + 0.82) /2

    MCW - P3 - RHS 1 X 1 12.783 4.820 0.300 18.484 Cum Raft Width =

    MCW - P3 - RHS 1 X 1 12.783 2.820 0.900 32.443 Cum Average Width = ( 4.82 + 0.82) /2

    MCW - P4 - LHS 1 X 1 12.783 4.820 0.300 18.484 Cum Raft Width =

    MCW - P4 - LHS 1 X 1 12.783 2.820 0.900 32.443 Cum Average Width = ( 4.82 + 0.82) /2

    MCW - P4 - RHS 1 X 1 12.783 4.820 0.300 18.484 Cum Raft Width =

    MCW - P4 - RHS 1 X 1 12.783 2.820 0.900 32.443 Cum Average Width = ( 4.82 + 0.82) /2

    MCW - P5 - LHS 1 X 1 12.783 4.820 0.300 18.484 Cum Raft Width =

    MCW - P5 - LHS 1 X 1 12.783 2.820 0.900 32.443 Cum Average Width = ( 4.82 + 0.82) /2

    MCW - P5 - RHS 1 X 1 12.783 4.820 0.300 18.484 Cum Raft Width =

    MCW - P5 - RHS 1 X 1 12.783 2.820 0.900 32.443 Cum Average Width = ( 4.82 + 0.82) /2

    MCW - P6 - LHS 1 X 1 12.783 4.820 0.300 18.484 Cum Raft Width =

    MCW - P6 - LHS 1 X 1 12.783 2.820 0.900 32.443 Cum Average Width = ( 4.82 + 0.82) /2

    MCW - P6 - RHS 1 X 1 12.783 4.820 0.300 18.484 Cum Raft Width =

    MCW - P6 - RHS 1 X 1 12.783 2.820 0.900 32.443 Cum Average Width = ( 4.82 + 0.82) /2

    SR - P1 - LHS 1 X 1 12.783 4.820 0.300 18.484 Cum Raft Width =

    SR - P1 - LHS 1 X 1 12.783 2.820 0.900 32.443 Cum Average Width = ( 4.82 + 0.82) /2

    SR - P1 - RHS 1 X 1 12.783 4.820 0.300 18.484 Cum Raft Width =

    SR - P1 - RHS 1 X 1 12.783 2.820 0.900 32.443 Cum Average Width = ( 4.82 + 0.82) /2

    SR - P2 - LHS 1 X 1 12.783 4.820 0.300 18.484 Cum Raft Width =

    SR - P2 - LHS 1 X 1 12.783 2.820 0.900 32.443 Cum Average Width = ( 4.82 + 0.82) /2

    SR - P2 - RHS 1 X 1 12.783 4.820 0.300 18.484 Cum Raft Width =

    SR - P2 - RHS 1 X 1 12.783 2.820 0.900 32.443 Cum Average Width = ( 4.82 + 0.82) /2

    SR - P3 - LHS 1 X 1 12.783 4.820 0.300 18.484 Cum Raft Width =

    for ITD CEMINDIA (JV)

  • 8/2/2019 Bridge Format

    12/50

    Item

    No.

    Length Width Depth Quantity UnitNo.

    Refer Drawing No.

    Description Remark

    SR - P3 - LHS 1 X 1 12.783 2.820 0.900 32.443 Cum Average Width = ( 4.82 + 0.82) /2

    SR - P3 - RHS 1 X 1 12.783 4.820 0.300 18.484 Cum Raft Width =

    SR - P3 - RHS 1 X 1 12.783 2.820 0.900 32.443 Cum Average Width = ( 4.82 + 0.82) /2

    SR - P4 - LHS 1 X 1 12.783 4.820 0.300 18.484 Cum Raft Width =

    SR - P4 - LHS 1 X 1 12.783 2.820 0.900 32.443 Cum Average Width = ( 4.82 + 0.82) /2

    SR - P4 - RHS 1 X 1 12.783 4.820 0.300 18.484 Cum Raft Width =

    SR - P4 - RHS 1 X 1 12.783 2.820 0.900 32.443 Cum Average Width = ( 4.82 + 0.82) /2

    SR - P5 - LHS 1 X 1 12.783 4.820 0.300 18.484 Cum Raft Width =

    SR - P5 - LHS 1 X 1 12.783 2.820 0.900 32.443 Cum Average Width = ( 4.82 + 0.82) /2

    SR - P5 - RHS 1 X 1 12.783 4.820 0.300 18.484 Cum Raft Width =

    SR - P5 - RHS 1 X 1 12.783 2.820 0.900 32.443 Cum Average Width = ( 4.82 + 0.82) /2

    SR - P6 - LHS 1 X 1 12.783 4.820 0.300 18.484 Cum Raft Width =

    SR - P6 - LHS 1 X 1 12.783 2.820 0.900 32.443 Cum Average Width = ( 4.82 + 0.82) /2

    SR - P6 - RHS 1 X 1 12.783 4.820 0.300 18.484 Cum Raft Width =

    SR - P6 - RHS 1 X 1 12.783 2.820 0.900 32.443 Cum Average Width = ( 4.82 + 0.82) /2

    Total Quantity for BOQ Item No. 6.06a) 1819.708 Cum

    for ITD CEMINDIA (JV)

  • 8/2/2019 Bridge Format

    13/50

    Item

    No.

    Length Width Depth Quantity UnitNo.

    Refer Drawing No.

    Description Remark

    6.10a)

    Abutment wall up to bottom of Cap level

    MCW - A1 - LHS 1 X 1 13.828 0.910 3.305 41.588 Cum Average Width = ( 1.1 + 0.72) /2MCW - A1 - RHS 1 X 1 13.828 0.910 3.305 41.588 Cum Average Width = ( 1.1 + 0.72) /2

    MCW - A2 - LHS 1 X 1 13.828 0.910 4.605 57.947 Cum Average Width = ( 1.1 + 0.72) /2

    MCW - A2 - RHS 1 X 1 13.828 0.910 4.605 57.947 Cum Average Width = ( 1.1 + 0.72) /2

    SR - A1 - LHS 1 X 1 11.836 0.910 2.950 31.776 Cum Average Width = ( 1.1 + 0.72) /2

    SR - A1 - RHS 1 X 1 11.836 0.910 2.950 31.776 Cum Average Width = ( 1.1 + 0.72) /2

    SR - A2 - LHS 1 X 1 11.836 0.910 4.250 45.778 Cum Average Width = ( 1.1 + 0.72) /2

    SR - A2 - RHS 1 X 1 11.836 0.910 4.250 45.778 Cum Average Width = ( 1.1 + 0.72) /2

    Abutment Cap

    MCW - A1 - LHS 1 X 1 13.828 0.720 0.300 2.987 Cum

    MCW - A1 - RHS 1 X 1 13.828 0.720 0.300 2.987 Cum

    MCW - A2 - LHS 1 X 1 13.828 0.720 0.300 2.987 Cum

    MCW - A2 - RHS 1 X 1 13.828 0.720 0.300 2.987 Cum

    SR - A1 - LHS 1 X 1 11.836 0.720 0.300 2.557 Cum

    SR - A1 - RHS 1 X 1 11.836 0.720 0.300 2.557 Cum

    SR - A2 - LHS 1 X 1 11.836 0.720 0.300 2.557 Cum

    SR - A2 - RHS 1 X 1 11.836 0.720 0.300 2.557 Cum

    Return Wall

    MCW - A1 - LHS 1 X 1 4.619 0.600 5.150 14.273 Cum Average Width = ( 0.6 + 0.6) /2

    MCW - A1 - RHS 1 X 1 4.619 0.600 5.150 14.273 Cum Average Width = ( 0.6 + 0.6) /2

    MCW - A2 - LHS 1 X 1 4.619 0.600 6.450 17.876 Cum Average Width = ( 0.6 + 0.6) /2

    MCW - A2 - RHS 1 X 1 4.619 0.600 6.450 17.876 Cum Average Width = ( 0.6 + 0.6) /2

    SR - A1 - LHS 1 X 2 4.619 0.600 4.844 26.849 Cum Average Width = ( 0.6 + 0.6) /2

    Providing and laying in position cement concrete in RCC piers, pier caps, pedestals, cantilever/ counterfort abutments, abutment cap

    wing walls, retaining walls, box returns, cantilever returns, screen walls, median walls, inspection ladders, box cell structures f

    excluding reinforcment as per drawings and Technical Specifications Sections 1500, 1700, and 2200.

    a) grade M 30

    for ITD CEMINDIA (JV)

  • 8/2/2019 Bridge Format

    14/50

    Item

    No.

    Length Width Depth Quantity UnitNo.

    Refer Drawing No.

    Description Remark

    SR - A1 - RHS 1 X 2 4.619 0.600 4.844 26.849 Cum Average Width = ( 0.6 + 0.6) /2

    SR - A2 - LHS 1 X 2 4.619 0.600 6.144 34.055 Cum Average Width = ( 0.6 + 0.6) /2

    SR - A2 - RHS 1 X 2 4.619 0.600 6.144 34.055 Cum Average Width = ( 0.6 + 0.6) /2

    Return Wall Cantilever part

    MCW - A1 - LHS 0.5 X 1 2.309 0.600 1.539 1.066 Cum Average Width = ( 0.6 + 0.6) /2

    MCW - A1 - RHS 0.5 X 1 2.309 0.600 1.539 1.066 Cum Average Width = ( 0.6 + 0.6) /2

    MCW - A2 - LHS 0.5 X 1 2.309 0.600 1.539 1.066 Cum Average Width = ( 0.6 + 0.6) /2

    MCW - A2 - RHS 0.5 X 1 2.309 0.600 1.539 1.066 Cum Average Width = ( 0.6 + 0.6) /2

    SR - A1 - LHS 0.5 X 2 2.309 0.600 1.539 2.132 Cum Average Width = ( 0.6 + 0.6) /2

    SR - A1 - RHS 0.5 X 2 2.309 0.600 1.539 2.132 Cum Average Width = ( 0.6 + 0.6) /2

    SR - A2 - LHS 0.5 X 2 2.309 0.600 1.539 2.132 Cum Average Width = ( 0.6 + 0.6) /2

    SR - A2 - RHS 0.5 X 2 2.309 0.600 1.539 2.132 Cum Average Width = ( 0.6 + 0.6) /2

    Return Wall Top

    MCW - A1 - LHS 1 X 1 6.928 0.600 0.300 1.247 Cum Average Width = ( 0.6 + 0.6) /2

    MCW - A1 - RHS 1 X 1 6.928 0.600 0.300 1.247 Cum Average Width = ( 0.6 + 0.6) /2

    MCW - A2 - LHS 1 X 1 6.928 0.600 0.300 1.247 Cum Average Width = ( 0.6 + 0.6) /2

    MCW - A2 - RHS 1 X 1 6.928 0.600 0.300 1.247 Cum Average Width = ( 0.6 + 0.6) /2

    SR - A1 - LHS 1 X 2 6.928 0.600 0.300 2.494 Cum Average Width = ( 0.6 + 0.6) /2

    SR - A1 - RHS 1 X 2 6.928 0.600 0.300 2.494 Cum Average Width = ( 0.6 + 0.6) /2

    SR - A2 - LHS 1 X 2 6.928 0.600 0.300 2.494 Cum Average Width = ( 0.6 + 0.6) /2

    SR - A2 - RHS 1 X 2 6.928 0.600 0.300 2.494 Cum Average Width = ( 0.6 + 0.6) /2

    Return Wall Haunch

    MCW - A1 - LHS 1 X 1 6.689 Cum

    MCW - A1 - RHS 1 X 1 6.689 Cum

    MCW - A2 - LHS 1 X 1 7.989 Cum

    MCW - A2 - RHS 1 X 1 7.989 Cum

    SR - A1 - LHS 1 X 2 6.383 Cum

    for ITD CEMINDIA (JV)

  • 8/2/2019 Bridge Format

    15/50

    Item

    No.

    Length Width Depth Quantity UnitNo.

    Refer Drawing No.

    Description Remark

    SR - A1 - RHS 1 X 2 6.383 Cum

    SR - A2 - LHS 1 X 2 7.683 Cum

    SR - A2 - RHS 1 X 2 7.683 Cum

    Pier Wall (Straight part) up to Cap level

    MCW - P1 - LHS 1 X 1 11.963 0.820 4.205 41.250 Cum Average Width = ( 0.82 + 0.82) /2

    MCW - P1 - RHS 1 X 1 11.963 0.820 4.205 41.250 Cum Average Width = ( 0.82 + 0.82) /2

    MCW - P2 - LHS 1 X 1 11.963 0.820 4.605 45.173 Cum Average Width = ( 0.82 + 0.82) /2

    MCW - P2 - RHS 1 X 1 11.963 0.820 4.605 45.173 Cum Average Width = ( 0.82 + 0.82) /2

    MCW - P3 - LHS 1 X 1 11.963 0.820 4.905 48.116 Cum Average Width = ( 0.82 + 0.82) /2

    MCW - P3 - RHS 1 X 1 11.963 0.820 4.905 48.116 Cum Average Width = ( 0.82 + 0.82) /2

    MCW - P4 - LHS 1 X 1 11.963 0.820 4.905 48.116 Cum Average Width = ( 0.82 + 0.82) /2

    MCW - P4 - RHS 1 X 1 11.963 0.820 4.905 48.116 Cum Average Width = ( 0.82 + 0.82) /2

    MCW - P5 - LHS 1 X 1 11.963 0.820 4.605 45.173 Cum Average Width = ( 0.82 + 0.82) /2

    MCW - P5 - RHS 1 X 1 11.963 0.820 4.605 45.173 Cum Average Width = ( 0.82 + 0.82) /2

    MCW - P6 - LHS 1 X 1 11.963 0.820 5.205 51.059 Cum Average Width = ( 0.82 + 0.82) /2

    MCW - P6 - RHS 1 X 1 11.963 0.820 5.205 51.059 Cum Average Width = ( 0.82 + 0.82) /2

    SR - P1 - LHS 1 X 1 11.963 0.820 3.850 37.770 Cum Average Width = ( 0.82 + 0.82) /2

    SR - P1 - RHS 1 X 1 11.963 0.820 3.850 37.770 Cum Average Width = ( 0.82 + 0.82) /2

    SR - P2 - LHS 1 X 1 11.963 0.820 4.250 41.694 Cum Average Width = ( 0.82 + 0.82) /2

    SR - P2 - RHS 1 X 1 11.963 0.820 4.250 41.694 Cum Average Width = ( 0.82 + 0.82) /2

    SR - P3 - LHS 1 X 1 11.963 0.820 4.550 44.636 Cum Average Width = ( 0.82 + 0.82) /2

    SR - P3 - RHS 1 X 1 11.963 0.820 4.550 44.636 Cum Average Width = ( 0.82 + 0.82) /2

    SR - P4 - LHS 1 X 1 11.963 0.820 4.550 44.636 Cum Average Width = ( 0.82 + 0.82) /2

    SR - P4 - RHS 1 X 1 11.963 0.820 4.550 44.636 Cum Average Width = ( 0.82 + 0.82) /2

    SR - P5 - LHS 1 X 1 11.963 0.820 4.250 41.694 Cum Average Width = ( 0.82 + 0.82) /2

    SR - P5 - RHS 1 X 1 11.963 0.820 4.250 41.694 Cum Average Width = ( 0.82 + 0.82) /2

    SR - P6 - LHS 1 X 1 11.963 0.820 4.850 47.579 Cum Average Width = ( 0.82 + 0.82) /2

    for ITD CEMINDIA (JV)

  • 8/2/2019 Bridge Format

    16/50

    Item

    No.

    Length Width Depth Quantity UnitNo.

    Refer Drawing No.

    Description Remark

    SR - P6 - RHS 1 X 1 11.963 0.820 4.850 47.579 Cum Average Width = ( 0.82 + 0.82) /2

    Pier Wall (Round edge) up to Cap level

    MCW - P1 - LHS 2 X 0.5 0.528 Area 4.205 2.220 Cum Wall width=0.820

    MCW - P1 - RHS 2 X 0.5 0.820 Area 4.205 3.448 Cum Wall width=0.820

    MCW - P2 - LHS 2 X 0.5 0.820 Area 4.605 3.776 Cum Wall width=0.820

    MCW - P2 - RHS 2 X 0.5 0.820 Area 4.605 3.776 Cum Wall width=0.820

    MCW - P3 - LHS 2 X 0.5 0.820 Area 4.905 4.022 Cum Wall width=0.820

    MCW - P3 - RHS 2 X 0.5 0.820 Area 4.905 4.022 Cum Wall width=0.820

    MCW - P4 - LHS 2 X 0.5 0.820 Area 4.905 4.022 Cum Wall width=0.820

    MCW - P4 - RHS 2 X 0.5 0.820 Area 4.905 4.022 Cum Wall width=0.820

    MCW - P5 - LHS 2 X 0.5 0.820 Area 4.605 3.776 Cum Wall width=0.820

    MCW - P5 - RHS 2 X 0.5 0.820 Area 4.605 3.776 Cum Wall width=0.820

    MCW - P6 - LHS 2 X 0.5 0.820 Area 5.205 4.268 Cum Wall width=0.820

    MCW - P6 - RHS 2 X 0.5 0.820 Area 5.205 4.268 Cum Wall width=0.820

    SR - P1 - LHS 2 X 0.5 0.820 Area 3.850 3.157 Cum Wall width=0.820

    SR - P1 - RHS 2 X 0.5 0.820 Area 3.850 3.157 Cum Wall width=0.820

    SR - P2 - LHS 2 X 0.5 0.820 Area 4.250 3.485 Cum Wall width=0.820

    SR - P2 - RHS 2 X 0.5 0.820 Area 4.250 3.485 Cum Wall width=0.820

    SR - P3 - LHS 2 X 0.5 0.820 Area 4.550 3.731 Cum Wall width=0.820

    SR - P3 - RHS 2 X 0.5 0.820 Area 4.550 3.731 Cum Wall width=0.820

    SR - P4 - LHS 2 X 0.5 0.820 Area 4.550 3.731 Cum Wall width=0.820

    SR - P4 - RHS 2 X 0.5 0.820 Area 4.550 3.731 Cum Wall width=0.820

    SR - P5 - LHS 2 X 0.5 0.820 Area 4.250 3.485 Cum Wall width=0.820

    SR - P5 - RHS 2 X 0.5 0.820 Area 4.250 3.485 Cum Wall width=0.820

    SR - P6 - LHS 2 X 0.5 0.820 Area 4.850 3.977 Cum Wall width=0.820

    SR - P6 - RHS 2 X 0.5 0.820 Area 4.850 3.977 Cum Wall width=0.820

    Dirt Wall

    for ITD CEMINDIA (JV)

  • 8/2/2019 Bridge Format

    17/50

    Item

    No.

    Length Width Depth Quantity UnitNo.

    Refer Drawing No.

    Description Remark

    MCW - A1 - LHS 1 X 1 11.836 0.300 0.968 3.437 Cum

    MCW - A1 - RHS 1 X 1 11.836 0.300 0.968 3.437 Cum

    MCW - A2 - LHS 1 X 1 11.836 0.300 0.968 3.437 Cum

    MCW - A2 - RHS 1 X 1 11.836 0.300 0.968 3.437 Cum

    SR - A1 - LHS 1 X 1 11.836 0.300 1.016 3.608 CumSR - A1 - RHS 1 X 1 11.836 0.300 1.016 3.608 Cum

    SR - A2 - LHS 1 X 1 11.836 0.300 1.016 3.608 Cum

    SR - A2 - RHS 1 X 1 11.836 0.300 1.016 3.608 Cum

    Dirt Wall (Bracket)

    MCW - A1 - LHS 1 X 1 11.836 0.200 0.240 0.568 Cum

    MCW - A1 - RHS 1 X 1 11.836 0.200 0.240 0.568 Cum

    MCW - A2 - LHS 1 X 1 11.836 0.200 0.240 0.568 Cum

    MCW - A2 - RHS 1 X 1 11.836 0.200 0.240 0.568 Cum

    SR - A1 - LHS 1 X 1 11.836 0.200 0.240 0.568 Cum

    SR - A1 - RHS 1 X 1 11.836 0.200 0.240 0.568 Cum

    SR - A2 - LHS 1 X 1 11.836 0.200 0.240 0.568 Cum

    SR - A2 - RHS 1 X 1 11.836 0.200 0.240 0.568 Cum

    Total Quantity for BOQ Item No. 6.10a) 1785.260 Cum

    for ITD CEMINDIA (JV)

  • 8/2/2019 Bridge Format

    18/50

    Item

    No.

    Length Width Depth Quantity UnitNo.

    Refer Drawing No.

    Description Remark

    6.11b

    Deck Slab

    MCW - A1-P1 - LHS 1 X 1 12.009 10.250 0.850 104.628 Cum Bridge Span=10.400 Skewness=30.00Edge Thickning (Both Support) 1 X 2 10.250 0.400 0.153 1.251 Cum

    MCW - A1-P1 - RHS 1 X 1 12.009 10.250 0.850 104.628 Cum Bridge Span=10.400 Skewness=30.00

    Edge Thickning (Both Support) 1 X 2 10.250 0.400 0.153 1.251 Cum

    MCW - P1-P2 - LHS 1 X 1 12.009 10.250 0.850 104.628 Cum Bridge Span=10.400 Skewness=30.00

    Edge Thickning (Both Support) 1 X 2 10.250 0.400 0.153 1.251 Cum

    MCW - P1-P2 - RHS 1 X 1 12.009 10.250 0.850 104.628 Cum Bridge Span=10.400 Skewness=30.00

    Edge Thickning (Both Support) 1 X 2 10.250 0.400 0.153 1.251 Cum

    MCW - P2-P3 - LHS 1 X 1 12.009 10.250 0.850 104.628 Cum Bridge Span=10.400 Skewness=30.00

    Edge Thickning (Both Support) 1 X 2 10.250 0.400 0.153 1.251 Cum

    MCW - P2-P3 - RHS 1 X 1 12.009 10.250 0.850 104.628 Cum Bridge Span=10.400 Skewness=30.00

    Edge Thickning (Both Support) 1 X 2 10.250 0.400 0.153 1.251 Cum

    MCW - P3-P4 - LHS 1 X 1 12.009 10.250 0.850 104.628 Cum Bridge Span=10.400 Skewness=30.00

    Edge Thickning (Both Support) 1 X 2 10.250 0.400 0.153 1.251 Cum

    MCW - P3-P4 - RHS 1 X 1 12.009 10.250 0.850 104.628 Cum Bridge Span=10.400 Skewness=30.00

    Edge Thickning (Both Support) 1 X 2 10.250 0.400 0.153 1.251 Cum

    MCW - P4-P5 - LHS 1 X 1 12.009 10.250 0.850 104.628 Cum Bridge Span=10.400 Skewness=30.00

    Edge Thickning (Both Support) 1 X 2 10.250 0.400 0.153 1.251 Cum

    MCW - P4-P5 - RHS 1 X 1 12.009 10.250 0.850 104.628 Cum Bridge Span=10.400 Skewness=30.00

    Edge Thickning (Both Support) 1 X 2 10.250 0.400 0.153 1.251 Cum

    MCW - P5-P6 - LHS 1 X 1 12.009 10.250 0.850 104.628 Cum Bridge Span=10.400 Skewness=30.00

    Edge Thickning (Both Support) 1 X 2 10.250 0.400 0.153 1.251 Cum

    MCW - P5-P6 - RHS 1 X 1 12.009 10.250 0.850 104.628 Cum Bridge Span=10.400 Skewness=30.00

    Providing and laying in position cement concrete in RCC superstructure excluding reinforcment as per drawings and Technical Specif

    1500, 1700, 2300.

    b) Grade M 30 in solid slab

    for ITD CEMINDIA (JV)

  • 8/2/2019 Bridge Format

    19/50

    Item

    No.

    Length Width Depth Quantity UnitNo.

    Refer Drawing No.

    Description Remark

    Edge Thickning (Both Support) 1 X 2 10.250 0.400 0.153 1.251 Cum

    MCW - P6-A2 - LHS 1 X 1 12.009 10.250 0.850 104.628 Cum Bridge Span=10.400 Skewness=30.00

    Edge Thickning (Both Support) 1 X 2 10.250 0.400 0.153 1.251 Cum

    MCW - P6-A2 - RHS 1 X 1 12.009 10.250 0.850 104.628 Cum Bridge Span=10.400 Skewness=30.00

    Edge Thickning (Both Support) 1 X 2 10.250 0.400 0.153 1.251 Cum

    SR - A1-P1 - LHS 1 X 1 12.009 10.250 0.850 104.628 Cum Bridge Span=10.400 Skewness=30.00

    Edge Thickning (Both Support) 1 X 2 10.250 0.400 0.153 1.251 Cum

    SR - A1-P1 - RHS 1 X 1 12.009 10.250 0.850 104.628 Cum Bridge Span=10.400 Skewness=30.00

    Edge Thickning (Both Support) 1 X 2 10.250 0.400 0.153 1.251 Cum

    SR - P1-P2 - LHS 1 X 1 12.009 10.250 0.850 104.628 Cum Bridge Span=10.400 Skewness=30.00

    Edge Thickning (Both Support) 1 X 2 10.250 0.400 0.153 1.251 Cum

    SR - P1-P2 - RHS 1 X 1 12.009 10.250 0.850 104.628 Cum Bridge Span=10.400 Skewness=30.00

    Edge Thickning (Both Support) 1 X 2 10.250 0.400 0.153 1.251 Cum

    SR - P2-P3 - LHS 1 X 1 12.009 10.250 0.850 104.628 Cum Bridge Span=10.400 Skewness=30.00

    Edge Thickning (Both Support) 1 X 2 10.250 0.400 0.153 1.251 Cum

    SR - P2-P3 - RHS 1 X 1 12.009 10.250 0.850 104.628 Cum Bridge Span=10.400 Skewness=30.00

    Edge Thickning (Both Support) 1 X 2 10.250 0.400 0.153 1.251 Cum

    SR - P3-P4 - LHS 1 X 1 12.009 10.250 0.850 104.628 Cum Bridge Span=10.400 Skewness=30.00

    Edge Thickning (Both Support) 1 X 2 10.250 0.400 0.153 1.251 Cum

    SR - P3-P4 - RHS 1 X 1 12.009 10.250 0.850 104.628 Cum Bridge Span=10.400 Skewness=30.00

    Edge Thickning (Both Support) 1 X 2 10.250 0.400 0.153 1.251 Cum

    SR - P4-P5 - LHS 1 X 1 12.009 10.250 0.850 104.628 Cum Bridge Span=10.400 Skewness=30.00

    Edge Thickning (Both Support) 1 X 2 10.250 0.400 0.153 1.251 Cum

    SR - P4-P5 - RHS 1 X 1 12.009 10.250 0.850 104.628 Cum Bridge Span=10.400 Skewness=30.00

    Edge Thickning (Both Support) 1 X 2 10.250 0.400 0.153 1.251 Cum

    SR - P5-P6 - LHS 1 X 1 12.009 10.250 0.850 104.628 Cum Bridge Span=10.400 Skewness=30.00

    Edge Thickning (Both Support) 1 X 2 10.250 0.400 0.153 1.251 Cum

    for ITD CEMINDIA (JV)

  • 8/2/2019 Bridge Format

    20/50

    Item

    No.

    Length Width Depth Quantity UnitNo.

    Refer Drawing No.

    Description Remark

    SR - P5-P6 - RHS 1 X 1 12.009 10.250 0.850 104.628 Cum Bridge Span=10.400 Skewness=30.00

    Edge Thickning (Both Support) 1 X 2 10.250 0.400 0.153 1.251 Cum

    SR - P6-A2 - LHS 1 X 1 12.009 10.250 0.850 104.628 Cum Bridge Span=10.400 Skewness=30.00

    Edge Thickning (Both Support) 1 X 2 10.250 0.400 0.153 1.251 Cum

    SR - P6-A2 - RHS 1 X 1 12.009 10.250 0.850 104.628 Cum Bridge Span=10.400 Skewness=30.00Edge Thickning (Both Support) 1 X 2 10.25 0.400 0.153 1.251 Cum

    Total Quantity for BOQ Item No. 6.11b 2964.612 Cum

    for ITD CEMINDIA (JV)

  • 8/2/2019 Bridge Format

    21/50

    Item

    No.

    Length Width Depth Quantity UnitNo.

    Refer Drawing No.

    Description Remark

    6.15

    Wearing Coat Over Deck Slab

    MCW - A1-P1 - LHS 1 X 1 12.009 8.500 0.065 6.635 Cum Bridge Span=10.400 Skewness=30.00

    MCW - A1-P1 - RHS 1 X 1 12.009 8.500 0.065 6.635 Cum

    MCW - P1-P2 - LHS 1 X 1 12.009 8.500 0.065 6.635 Cum

    MCW - P1-P2 - RHS 1 X 1 12.009 8.500 0.065 6.635 Cum

    MCW - P2-P3 - LHS 1 X 1 12.009 8.500 0.065 6.635 Cum

    MCW - P2-P3 - RHS 1 X 1 12.009 8.500 0.065 6.635 Cum

    MCW - P3-P4 - LHS 1 X 1 12.009 8.500 0.065 6.635 Cum

    MCW - P3-P4 - RHS 1 X 1 12.009 8.500 0.065 6.635 Cum

    MCW - P4-P5 - LHS 1 X 1 12.009 8.500 0.065 6.635 Cum

    MCW - P4-P5 - RHS 1 X 1 12.009 8.500 0.065 6.635 Cum

    MCW - P5-P6 - LHS 1 X 1 12.009 8.500 0.065 6.635 Cum

    MCW - P5-P6 - RHS 1 X 1 12.009 8.500 0.065 6.635 Cum

    MCW - P6-A2 - LHS 1 X 1 12.009 8.500 0.065 6.635 Cum

    MCW - P6-A2 - RHS 1 X 1 12.009 8.500 0.065 6.635 Cum

    SR - A1-P1 - LHS 1 X 1 12.009 8.500 0.065 6.635 Cum

    SR - A1-P1 - RHS 1 X 1 12.009 8.500 0.065 6.635 Cum

    SR - P1-P2 - LHS 1 X 1 12.009 8.500 0.065 6.635 Cum

    SR - P1-P2 - RHS 1 X 1 12.009 8.500 0.065 6.635 Cum

    SR - P2-P3 - LHS 1 X 1 12.009 8.500 0.065 6.635 Cum

    SR - P2-P3 - RHS 1 X 1 12.009 8.500 0.065 6.635 Cum

    SR - P3-P4 - LHS 1 X 1 12.009 8.500 0.065 6.635 Cum

    SR - P3-P4 - RHS 1 X 1 12.009 8.500 0.065 6.635 Cum

    SR - P4-P5 - LHS 1 X 1 12.009 8.500 0.065 6.635 Cum

    SR - P4-P5 - RHS 1 X 1 12.009 8.500 0.065 6.635 CumSR - P5-P6 - LHS 1 X 1 12.009 8.500 0.065 6.635 Cum

    Providing and laying cement concrete wearing coat in M-30 grade as per drawing and Technical Specifications Sections 1500, 1600, 17

    for ITD CEMINDIA (JV)

  • 8/2/2019 Bridge Format

    22/50

  • 8/2/2019 Bridge Format

    23/50

    Item

    No.

    Length Width Depth Quantity UnitNo.

    Refer Drawing No.

    Description Remark

    6.16A)

    MCW - A1-P1 - LHS 1 X 1 10.250 0.400 4.100 Sqm

    MCW - A1-P1 - RHS 1 X 1 10.250 0.400 4.100 Sqm

    MCW - P1-P2 - LHS 1 X 1 10.250 0.400 4.100 Sqm

    MCW - P1-P2 - RHS 1 X 1 10.250 0.400 4.100 Sqm

    MCW - P2-P3 - LHS 1 X 1 10.250 0.400 4.100 Sqm

    MCW - P2-P3 - RHS 1 X 1 10.250 0.400 4.100 Sqm

    MCW - P3-P4 - LHS 1 X 1 10.250 0.400 4.100 Sqm

    MCW - P3-P4 - RHS 1 X 1 10.250 0.400 4.100 Sqm

    MCW - P4-P5 - LHS 1 X 1 10.250 0.400 4.100 Sqm

    MCW - P4-P5 - RHS 1 X 1 10.250 0.400 4.100 Sqm

    MCW - P5-P6 - LHS 1 X 1 10.250 0.400 4.100 Sqm

    MCW - P5-P6 - RHS 1 X 1 10.250 0.400 4.100 Sqm

    MCW - P6-A2 - LHS 1 X 1 10.250 0.400 4.100 Sqm

    MCW - P6-A2 - RHS 1 X 1 10.250 0.400 4.100 Sqm

    SR - A1-P1 - LHS 1 X 1 10.250 0.400 4.100 Sqm

    SR - A1-P1 - RHS 1 X 1 10.250 0.400 4.100 Sqm

    SR - P1-P2 - LHS 1 X 1 10.250 0.400 4.100 Sqm

    SR - P1-P2 - RHS 1 X 1 10.250 0.400 4.100 Sqm

    SR - P2-P3 - LHS 1 X 1 10.250 0.400 4.100 Sqm

    SR - P2-P3 - RHS 1 X 1 10.250 0.400 4.100 Sqm

    SR - P3-P4 - LHS 1 X 1 10.250 0.400 4.100 Sqm

    SR - P3-P4 - RHS 1 X 1 10.250 0.400 4.100 Sqm

    SR - P4-P5 - LHS 1 X 1 10.250 0.400 4.100 Sqm

    SR - P4-P5 - RHS 1 X 1 10.250 0.400 4.100 Sqm

    SR - P5-P6 - LHS 1 X 1 10.250 0.400 4.100 Sqm

    Providing and fixing in position bearings true to line and level as per drawings and Technical Specifications Section 2000, IRC : 83 (Par

    (Part III) 2002.

    A) Tar a er bearings

    for ITD CEMINDIA (JV)

  • 8/2/2019 Bridge Format

    24/50

    Item

    No.

    Length Width Depth Quantity UnitNo.

    Refer Drawing No.

    Description Remark

    SR - P5-P6 - RHS 1 X 1 10.250 0.400 4.100 Sqm

    SR - P6-A2 - LHS 1 X 1 10.250 0.400 4.100 Sqm

    SR - P6-A2 - RHS 1 X 1 10.250 0.400 4.100 Sqm

    Total Quantity for BOQ Item No. 6.16A) 114.800 Cum

    for ITD CEMINDIA (JV)

  • 8/2/2019 Bridge Format

    25/50

    Item

    No.

    Length Width Depth Quantity UnitNo.

    Refer Drawing No.

    Description Remark

    6.18

    MCW - A1-P1 - LHS 1 X 2 2.000 Nos

    MCW - A1-P1 - RHS 1 X 2 2.000 Nos

    MCW - P1-P2 - LHS 1 X 2 2.000 Nos

    MCW - P1-P2 - RHS 1 X 2 2.000 Nos

    MCW - P2-P3 - LHS 1 X 2 2.000 Nos

    MCW - P2-P3 - RHS 1 X 2 2.000 Nos

    MCW - P3-P4 - LHS 1 X 2 2.000 Nos

    MCW - P3-P4 - RHS 1 X 2 2.000 Nos

    MCW - P4-P5 - LHS 1 X 2 2.000 Nos

    MCW - P4-P5 - RHS 1 X 2 2.000 Nos

    MCW - P5-P6 - LHS 1 X 2 2.000 Nos

    MCW - P5-P6 - RHS 1 X 2 2.000 Nos

    MCW - P6-A2 - LHS 1 X 2 2.000 Nos

    MCW - P6-A2 - RHS 1 X 2 2.000 Nos

    SR - A1-P1 - LHS 1 X 2 2.000 Nos

    SR - A1-P1 - RHS 1 X 2 2.000 Nos

    SR - P1-P2 - LHS 1 X 2 2.000 Nos

    SR - P1-P2 - RHS 1 X 2 2.000 Nos

    SR - P2-P3 - LHS 1 X 2 2.000 Nos

    SR - P2-P3 - RHS 1 X 2 2.000 Nos

    SR - P3-P4 - LHS 1 X 2 2.000 Nos

    SR - P3-P4 - RHS 1 X 2 2.000 Nos

    SR - P4-P5 - LHS 1 X 2 2.000 Nos

    SR - P4-P5 - RHS 1 X 2 2.000 Nos

    SR - P5-P6 - LHS 1 X 2 2.000 Nos

    SR - P5-P6 - RHS 1 X 2 2.000 Nos

    Providing and fixing in position drainage spouts as per drawings and Technical Specifications Clause 2705.

    for ITD CEMINDIA (JV)

  • 8/2/2019 Bridge Format

    26/50

    Item

    No.

    Length Width Depth Quantity UnitNo.

    Refer Drawing No.

    Description Remark

    SR - P6-A2 - LHS 1 X 2 2.000 Nos

    SR - P6-A2 - RHS 1 X 2 2.000 Nos

    Total Quantity for BOQ Item No. 6.18 56.000 Nos

    for ITD CEMINDIA (JV)

  • 8/2/2019 Bridge Format

    27/50

    Item

    No.

    Length Width Depth Quantity UnitNo.

    Refer Drawing No.

    Description Remark

    6.21

    MCW - A1 - LHS 1 X 1 6.286 9.650 0.300 18.197 Cum

    MCW - A1 - RHS 1 X 1 6.286 9.650 0.300 18.197 Cum

    MCW - A2 - LHS 1 X 1 6.286 9.650 0.300 18.197 Cum

    MCW - A2 - RHS 1 X 1 6.286 9.650 0.300 18.197 Cum

    SR - A1 - LHS 1 X 1 6.113 9.050 0.300 16.595 Cum

    SR - A1 - RHS 1 X 1 6.113 9.050 0.300 16.595 Cum

    SR - A2 - LHS 1 X 1 6.113 9.050 0.300 16.595 Cum

    SR - A2 - RHS 1 X 1 6.113 9.050 0.300 16.595 Cum

    Total Quantity for BOQ Item No. 6.21 231.168 Nos

    Providing and laying in position Reinforced Cement Concrete grade M 30 in approach slabs including reinforcement and bituminous jo

    sealing compound between approach slabs and dirt walls / concrete pavements as per drawings and Technical Specifications Section

    2700.

    for ITD CEMINDIA (JV)

  • 8/2/2019 Bridge Format

    28/50

    Item

    No.

    Length Width Depth Quantity UnitNo.

    Refer Drawing No.

    Description Remark

    6.22

    Crash Barrier on Median Side

    Typical Cross Section Area of Crash Barrier

    1 X 1 0.450 0.165 0.074 Sqm

    1 X 1 0.363 0.250 0.091 Sqm Average of (0.450+0.275)=0.363

    1 X 1 0.228 0.500 0.114 Sqm Average of (0.275+0.180)=0.228

    1 X 1 0.180 0.175 0.032 Sqm

    1 X 1 0.155 0.025 0.004 Sqm Average of (0.180+0.130)=0.228

    Total Area 0.314 Sqm

    MCW - A1-P1 - LHS 1 X 1 12.009 0.314 Area 3.771 Cum Effective Length 12.009

    MCW - A1-P1 - RHS 1 X 1 12.009 0.314 Area 3.771 Cum Effective Length 12.009

    MCW - P1-P2 - LHS 1 X 1 12.009 0.314 Area 3.771 Cum Effective Length 12.009

    MCW - P1-P2 - RHS 1 X 1 12.009 0.314 Area 3.771 Cum Effective Length 12.009

    MCW - P2-P3 - LHS 1 X 1 12.009 0.314 Area 3.771 Cum Effective Length 12.009

    MCW - P2-P3 - RHS 1 X 1 12.009 0.314 Area 3.771 Cum Effective Length 12.009

    MCW - P3-P4 - LHS 1 X 1 12.009 0.314 Area 3.771 Cum Effective Length 12.009

    MCW - P3-P4 - RHS 1 X 1 12.009 0.314 Area 3.771 Cum Effective Length 12.009

    MCW - P4-P5 - LHS 1 X 1 12.009 0.314 Area 3.771 Cum Effective Length 12.009

    MCW - P4-P5 - RHS 1 X 1 12.009 0.314 Area 3.771 Cum Effective Length 12.009

    MCW - P5-P6 - LHS 1 X 1 12.009 0.314 Area 3.771 Cum Effective Length 12.009

    MCW - P5-P6 - RHS 1 X 1 12.009 0.314 Area 3.771 Cum Effective Length 12.009

    MCW - P6-A2 - LHS 1 X 1 12.009 0.314 Area 3.771 Cum Effective Length 12.009

    MCW - P6-A2 - RHS 1 X 1 12.009 0.314 Area 3.771 Cum Effective Length 12.009

    SR - A1-P1 - LHS 1 X 1 12.009 0.314 Area 3.771 Cum Effective Length 12.009

    SR - A1-P1 - RHS 1 X 1 12.009 0.314 Area 3.771 Cum Effective Length 12.009

    SR - P1-P2 - LHS 1 X 1 12.009 0.314 Area 3.771 Cum Effective Length 12.009

    Providing and laying in position Reinforced Cement Concrete Crash barrier excluding cost of reinforcement but including providing bi

    and Polysulphide joint filler at expansion joints/gap locations as per drawings and Technical Specifications Sections 1500, 1700 and 2

    (a) Grade M 40

    for ITD CEMINDIA (JV)

  • 8/2/2019 Bridge Format

    29/50

    Item

    No.

    Length Width Depth Quantity UnitNo.

    Refer Drawing No.

    Description Remark

    SR - P1-P2 - RHS 1 X 1 12.009 0.314 Area 3.771 Cum Effective Length 12.009

    SR - P2-P3 - LHS 1 X 1 12.009 0.314 Area 3.771 Cum Effective Length 12.009

    SR - P2-P3 - RHS 1 X 1 12.009 0.314 Area 3.771 Cum Effective Length 12.009

    SR - P3-P4 - LHS 1 X 1 12.009 0.314 Area 3.771 Cum Effective Length 12.009

    SR - P3-P4 - RHS 1 X 1 12.009 0.314 Area 3.771 Cum Effective Length 12.009

    SR - P4-P5 - LHS 1 X 1 12.009 0.314 Area 3.771 Cum Effective Length 12.009

    SR - P4-P5 - RHS 1 X 1 12.009 0.314 Area 3.771 Cum Effective Length 12.009

    SR - P5-P6 - LHS 1 X 1 12.009 0.314 Area 3.771 Cum Effective Length 12.009

    SR - P5-P6 - RHS 1 X 1 12.009 0.314 Area 3.771 Cum Effective Length 12.009

    SR - P6-A2 - LHS 1 X 1 12.009 0.314 Area 3.771 Cum Effective Length 12.009

    SR - P6-A2 - RHS 1 X 1 12.009 0.314 Area 3.771 Cum Effective Length 12.009

    Crash Barrier on Shoulder Side

    Typical Cross Section Area of Crash Barrier

    1 X 1 0.450 0.100 0.045 Sqm

    1 X 1 0.363 0.250 0.091 Sqm Average of (0.450+0.275)=0.363

    1 X 1 0.228 0.500 0.114 Sqm Average of (0.275+0.180)=0.228

    1 X 1 0.180 0.175 0.032 Sqm

    1 X 1 0.155 0.025 0.004 Sqm Average of (0.180+0.130)=0.228

    Total Area 0.285 Sqm

    MCW - A1-P1 - LHS 1 X 1 12.009 0.285 Area 3.420 Cum Effective Length 12.009

    MCW - A1-P1 - RHS 1 X 1 12.009 0.285 Area 3.420 Cum Effective Length 12.009

    MCW - P1-P2 - LHS 1 X 1 12.009 0.285 Area 3.420 Cum Effective Length 12.009

    MCW - P1-P2 - RHS 1 X 1 12.009 0.285 Area 3.420 Cum Effective Length 12.009

    MCW - P2-P3 - LHS 1 X 1 12.009 0.285 Area 3.420 Cum Effective Length 12.009

    MCW - P2-P3 - RHS 1 X 1 12.009 0.285 Area 3.420 Cum Effective Length 12.009

    MCW - P3-P4 - LHS 1 X 1 12.009 0.285 Area 3.420 Cum Effective Length 12.009

    MCW - P3-P4 - RHS 1 X 1 12.009 0.285 Area 3.420 Cum Effective Length 12.009

    for ITD CEMINDIA (JV)

  • 8/2/2019 Bridge Format

    30/50

    Item

    No.

    Length Width Depth Quantity UnitNo.

    Refer Drawing No.

    Description Remark

    MCW - P4-P5 - LHS 1 X 1 12.009 0.285 Area 3.420 Cum Effective Length 12.009

    MCW - P4-P5 - RHS 1 X 1 12.009 0.285 Area 3.420 Cum Effective Length 12.009

    MCW - P5-P6 - LHS 1 X 1 12.009 0.285 Area 3.420 Cum Effective Length 12.009

    MCW - P5-P6 - RHS 1 X 1 12.009 0.285 Area 3.420 Cum Effective Length 12.009

    MCW - P6-A2 - LHS 1 X 1 12.009 0.285 Area 3.420 Cum Effective Length 12.009

    MCW - P6-A2 - RHS 1 X 1 12.009 0.285 Area 3.420 Cum Effective Length 12.009

    SR - A1-P1 - LHS 1 X 1 12.009 0.285 Area 3.420 Cum Effective Length 12.009

    SR - A1-P1 - RHS 1 X 1 12.009 0.285 Area 3.420 Cum Effective Length 12.009

    SR - P1-P2 - LHS 1 X 1 12.009 0.285 Area 3.420 Cum Effective Length 12.009

    SR - P1-P2 - RHS 1 X 1 12.009 0.285 Area 3.420 Cum Effective Length 12.009

    SR - P2-P3 - LHS 1 X 1 12.009 0.285 Area 3.420 Cum Effective Length 12.009

    SR - P2-P3 - RHS 1 X 1 12.009 0.285 Area 3.420 Cum Effective Length 12.009

    SR - P3-P4 - LHS 1 X 1 12.009 0.285 Area 3.420 Cum Effective Length 12.009

    SR - P3-P4 - RHS 1 X 1 12.009 0.285 Area 3.420 Cum Effective Length 12.009

    SR - P4-P5 - LHS 1 X 1 12.009 0.285 Area 3.420 Cum Effective Length 12.009

    SR - P4-P5 - RHS 1 X 1 12.009 0.285 Area 3.420 Cum Effective Length 12.009

    SR - P5-P6 - LHS 1 X 1 12.009 0.285 Area 3.420 Cum Effective Length 12.009

    SR - P5-P6 - RHS 1 X 1 12.009 0.285 Area 3.420 Cum Effective Length 12.009

    SR - P6-A2 - LHS 1 X 1 12.009 0.285 Area 3.420 Cum Effective Length 12.009

    SR - P6-A2 - RHS 1 X 1 12.009 0.285 Area 3.420 Cum Effective Length 12.009

    Total Quantity for BOQ Item No. 6.22 201.348 Cum

    for ITD CEMINDIA (JV)

  • 8/2/2019 Bridge Format

    31/50

    Item

    No.

    Length Width Depth Quantity UnitNo.

    Refer Drawing No.

    Description Remark

    6.23a

    Typical Cross Section Area of Footpath

    1 X 1 0.500 0.353 0.176 Sqm Average of (0.360+0.345)=0.353

    1 X 1 0.750 0.323 0.242 Sqm Average of (0.345+0.300)=0.323

    Total Area 0.418 Sqm

    MCW - A1-P1 - LHS 1 X 1 12.009 0.418 Area 5.021 Cum Effective Length 12.009

    MCW - A1-P1 - RHS 1 X 1 12.009 0.418 Area 5.021 Cum Effective Length 12.009

    MCW - P1-P2 - LHS 1 X 1 12.009 0.418 Area 5.021 Cum Effective Length 12.009

    MCW - P1-P2 - RHS 1 X 1 12.009 0.418 Area 5.021 Cum Effective Length 12.009

    MCW - P2-P3 - LHS 1 X 1 12.009 0.418 Area 5.021 Cum Effective Length 12.009

    MCW - P2-P3 - RHS 1 X 1 12.009 0.418 Area 5.021 Cum Effective Length 12.009

    MCW - P3-P4 - LHS 1 X 1 12.009 0.418 Area 5.021 Cum Effective Length 12.009

    MCW - P3-P4 - RHS 1 X 1 12.009 0.418 Area 5.021 Cum Effective Length 12.009

    MCW - P4-P5 - LHS 1 X 1 12.009 0.418 Area 5.021 Cum Effective Length 12.009

    MCW - P4-P5 - RHS 1 X 1 12.009 0.418 Area 5.021 Cum Effective Length 12.009

    MCW - P5-P6 - LHS 1 X 1 12.009 0.418 Area 5.021 Cum Effective Length 12.009

    MCW - P5-P6 - RHS 1 X 1 12.009 0.418 Area 5.021 Cum Effective Length 12.009

    MCW - P6-A2 - LHS 1 X 1 12.009 0.418 Area 5.021 Cum Effective Length 12.009

    MCW - P6-A2 - RHS 1 X 1 12.009 0.418 Area 5.021 Cum Effective Length 12.009

    SR - A1-P1 - LHS 1 X 1 12.009 0.418 Area 5.021 Cum Effective Length 12.009

    SR - A1-P1 - RHS 1 X 1 12.009 0.418 Area 5.021 Cum Effective Length 12.009

    SR - P1-P2 - LHS 1 X 1 12.009 0.418 Area 5.021 Cum Effective Length 12.009

    SR - P1-P2 - RHS 1 X 1 12.009 0.418 Area 5.021 Cum Effective Length 12.009

    SR - P2-P3 - LHS 1 X 1 12.009 0.418 Area 5.021 Cum Effective Length 12.009

    SR - P2-P3 - RHS 1 X 1 12.009 0.418 Area 5.021 Cum Effective Length 12.009

    SR - P3-P4 - LHS 1 X 1 12.009 0.418 Area 5.021 Cum Effective Length 12.009

    Providing and laying in position Reinforced Cement Concrete in kerbs/railing/median kerbs over bridges, grade separators, ROBs and

    excluding cost of reinforcement steel, as per drawings and Technical Specifications Sections 1700 and 2300.

    a) grade M30

    for ITD CEMINDIA (JV)

  • 8/2/2019 Bridge Format

    32/50

    Item

    No.

    Length Width Depth Quantity UnitNo.

    Refer Drawing No.

    Description Remark

    SR - P3-P4 - RHS 1 X 1 12.009 0.418 Area 5.021 Cum Effective Length 12.009

    SR - P4-P5 - LHS 1 X 1 12.009 0.418 Area 5.021 Cum Effective Length 12.009

    SR - P4-P5 - RHS 1 X 1 12.009 0.418 Area 5.021 Cum Effective Length 12.009

    SR - P5-P6 - LHS 1 X 1 12.009 0.418 Area 5.021 Cum Effective Length 12.009

    SR - P5-P6 - RHS 1 X 1 12.009 0.418 Area 5.021 Cum Effective Length 12.009SR - P6-A2 - LHS 1 X 1 12.009 0.418 Area 5.021 Cum Effective Length 12.009

    SR - P6-A2 - RHS 1 X 1 12.009 0.418 Area 5.021 Cum Effective Length 12.009

    Total Quantity for BOQ Item No. 6.23a 140.588 Cum

    for ITD CEMINDIA (JV)

  • 8/2/2019 Bridge Format

    33/50

    Item

    No.

    Length Width Depth Quantity UnitNo.

    Refer Drawing No.

    Description Remark

    6.24 Providing weep holes in abutments, splayed wing wall, median wall,retaining wall or any other earth retaining structure as per drawings

    Specifications Clause 2706.

    for ITD CEMINDIA (JV)

  • 8/2/2019 Bridge Format

    34/50

    Item

    No.

    Length Width Depth Quantity UnitNo.

    Refer Drawing No.

    Description Remark

    6.25 Painting of structure number span arrangement and flow directions as per drawings and Technical Specifications Section 800.

    for ITD CEMINDIA (JV)

  • 8/2/2019 Bridge Format

    35/50

    Item

    No.

    Length Width Depth Quantity UnitNo.

    Refer Drawing No.

    Description Remark

    6.26

    MCW - A1 - LHS 1 X 0.5 13.135 1.971 4.228 54.730 Cum

    MCW - A1 - RHS 1 X 0.5 13.135 1.967 4.218 54.489 Cum

    MCW - A2 - LHS 1 X 0.5 13.135 2.257 4.839 71.728 Cum

    MCW - A2 - RHS 1 X 0.5 13.135 2.252 4.830 71.436 Cum

    SR - A1 - LHS 1 X 0.5 10.450 1.796 3.851 36.138 Cum

    SR - A1 - RHS 1 X 0.5 10.450 1.790 3.838 35.896 Cum

    SR - A2 - LHS 1 X 0.5 10.450 2.076 4.453 48.302 Cum

    SR - A2 - RHS 1 X 0.5 10.450 2.071 4.440 48.045 Cum

    Total Quantity for BOQ Item No. 6.26 420.764 Cum

    Providing and laying back filling behind abutments, splayed wing walls, return wall or any other area with selected imported granular m

    approved quality as per drawings and Technical Specifications Clause 305 and Appendix-6, IRC:78-2000 having following minimum pro

    (a) c+0, (b) > = 30o, (c ) g = 1.8t/m3

    for ITD CEMINDIA (JV)

  • 8/2/2019 Bridge Format

    36/50

    Item

    No.

    Length Width Depth Quantity UnitNo.

    Refer Drawing No.

    Description Remark

    6.27

    MCW - A1 - LHS 1 X 1 13.135 0.600 4.228 33.321 Cum

    MCW - A1 - RHS 1 X 1 13.135 0.600 4.218 33.242 Cum

    MCW - A2 - LHS 1 X 1 13.135 0.600 4.839 38.136 Cum

    MCW - A2 - RHS 1 X 1 13.135 0.600 4.830 38.065 Cum

    SR - A1 - LHS 1 X 1 10.450 0.600 3.851 24.146 Cum

    SR - A1 - RHS 1 X 1 10.450 0.600 3.838 24.064 Cum

    SR - A2 - LHS 1 X 1 10.450 0.600 4.453 27.920 Cum

    SR - A2 - RHS 1 X 1 10.450 0.600 4.440 27.839 Cum

    Total Quantity for BOQ Item No. 6.27 246.733 Cum

    Providing and laying filter media behind abutment, splayed wing wall, median wall, retaining wall and return wall as per drawings and T

    Specifications Section 2500.

    for ITD CEMINDIA (JV)

  • 8/2/2019 Bridge Format

    37/50

    Item

    No.

    Length Width Depth Quantity UnitNo.

    Refer Drawing No.

    Description Remark

    6.28 Providing and laying stone apron as per drawing and Technical Specifications Clause 2500

    for ITD CEMINDIA (JV)

  • 8/2/2019 Bridge Format

    38/50

    Item

    No.

    Length Width Depth Quantity UnitNo.

    Refer Drawing No.

    Description Remark

    6.29 Providing and laying in position hand packed boulder pitching on slopes of embankment, in front of abutments as per drawings and Te

    Specifications Section 2500.

    for ITD CEMINDIA (JV)

  • 8/2/2019 Bridge Format

    39/50

  • 8/2/2019 Bridge Format

    40/50

    1

    2 A1 A1 A1 A1 A2 A23 MCW MCW SR SR MCW MCW

    4 LHS RHS LHS RHS LHS RHS

    5 30 30 30 30 30 30

    6 2% 2% 2.5% 2.5% 2% 2%

    7 319.365 319.365 319.059 319.059 319.365 319.3658 314.425 314.425 314.425 314.425 313.773 313.773

    9 313.400 313.400 313.400 313.400 312.1 312.1

    10 0.100 0.100 0.100 0.100 0.100 0.100

    11 0.100 0.100 0.100 0.100 0.100 0.100

    12 0.065 0.065 0.065 0.065 0.065 0.065

    13 319.300 319.300 318.994 318.994 319.3 319.3

    14 0.850 0.850 0.850 0.850 0.850 0.850

    15 Wall Top Level 318.205 318.205 317.850 317.850 318.205 318.205

    16 Cap Depth 0.300 0.300 0.300 0.300 0.300 0.300

    17 No No No No No No

    18 11.975 11.975 10.25 10.25 11.975 11.975

    19 13.828 13.828 11.836 11.836 13.828 13.82820 Return Wall Length 4.000 4.000 4.000 4.000 4.000 4.000

    21 Cantilever Return Wall Length 2.000 2.000 2.000 2.000 2.000 2.000

    22 Slab Span 10.400 10.400 10.400 10.400 10.400 10.400

    23 Slab Width 10.250 10.250 10.250 10.250 10.250 10.250

    24 1 Exc Length 14.058 14.058 12.067 12.067 14.058 14.058

    25 2 Exc Width 7.300 7.300 7.300 7.300 7.300 7.300

    26 3 Exc Depth 314.425 314.425 314.425 314.425 313.773 313.773

    27 4 Exc Depth 2 313.300 313.300 313.300 313.300 312.000 312.000

    28 5 Exc Depth1 1.125 1.125 1.125 1.125 1.773 1.773

    29 6 PCC Length 14.058 14.058 12.067 12.067 14.058 14.058

    30 7 PCC Width 7.300 7.300 7.300 7.300 7.300 7.300

    31 8 PCC Depth 0.100 0.100 0.100 0.100 0.100 0.100

    32 9 Raft Length 13.828 13.828 11.836 11.836 13.828 13.82833 10 Raft Width 7.100 7.100 7.100 7.100 7.1 7.1

    34 11 Raft Width 2 1.100 1.100 1.100 1.100 1.1 1.1

    35 12 Raft Depth 0.300 0.300 0.300 0.300 0.300 0.300

    36 13 Raft Depth 2 0.900 0.900 0.900 0.900 0.900 0.900

    37 14 Wall Length 13.828 13.828 11.836 11.836 13.828 13.828

    38 15 Wall Width 1.100 1.100 1.100 1.100 1.100 1.100

    39 16 Wall Width 2 0.720 0.720 0.720 0.720 0.720 0.720

    40 17 Wall Depth 3.305 3.305 2.950 2.950 4.605 4.605

    41 18 Cap Length 13.828 13.828 11.836 11.836 13.828 13.828

    42 19 Cap Width 0.720 0.720 0.720 0.720 0.720 0.720

    43 20 Cap Depth 0.300 0.300 0.300 0.300 0.300 0.300

    44 21 Return wall BottoLength 4.619 4.619 4.619 4.619 4.619 4.61945 22 Return wall BottoWidth 0.600 0.600 0.600 0.600 0.600 0.600

    46 23 Return wall BottoDepth 5.150 5.150 4.844 4.844 6.450 6.450

    47 24 Cant Return wall Length 2.309 2.309 2.309 2.309 2.309 2.309

    48 25 Cant Return wall Width 0.600 0.600 0.600 0.600 0.600 0.600

    49 26 Cant Return wall Depth 1.539 1.539 1.539 1.539 1.539 1.539

    50 27 Return wall Top Length 6.928 6.928 6.928 6.928 6.928 6.928

    51 28 Return wall Top Width 0.600 0.600 0.600 0.600 0.600 0.600

    52 29 Return wall Top Depth 0.300 0.300 0.300 0.300 0.300 0.300

    Abutment A1 Abutm

    Effective Length

    Length

    Round edge of wall

    Depth of Slab

    Deck slab Top Level

    Wearing Coat Thickness

    PCC Projection

    PCC Thickness

    Bridge Skewness

    PCC Top level

    OGLFRL

    Camber

  • 8/2/2019 Bridge Format

    41/50

    53 30 Dirt Wall Length 11.836 11.836 11.836 11.836 11.836 11.836

    54 31 Dirt Wall Width 0.300 0.300 0.300 0.300 0.300 0.300

    55 32 Dirt Wall Depth 0.968 0.968 1.016 1.016 0.968 0.968

    56 33 Approach Slab Length 6.286 6.286 6.113 6.113 6.286 6.286

    57 34 Approach Slab Width 9.650 9.650 9.050 9.050 9.650 9.650

    58 35 Approach Slab Depth 0.300 0.300 0.300 0.300 0.300 0.300

    59 36 Back Filling Length 13.135 13.135 10.450 10.450 13.135 13.13560 37 Back Filling Width 1.971 1.967 1.796 1.790 2.257 2.252

    61 38 Back Filling Width 2 0.000 0.000 0.000 0.000 0.000 0.000

    62 39 Back Filling Depth 4.228 4.218 3.851 3.838 4.839 4.830

    63

    64

    65

    66

    67

    68

    69 1 A1MCWL A1MCWR A1SRLHSA1SRRH A2MCWL A2MCWR

    70 2 A1MCWL A1MCWR A1SRLHSA1SRRH A2MCWL A2MCWR

    71 3 A1MCWL A1MCWR A1SRLHSA1SRRH A2MCWL A2MCWR72 4 A1MCWL A1MCWR A1SRLHSA1SRRH A2MCWL A2MCWR

    68 5 A1MCWL A1MCWR A1SRLHSA1SRRH A2MCWL A2MCWR

    69 6 A1MCWL A1MCWR A1SRLHSA1SRRH A2MCWL A2MCWR

    70 7 A1MCWL A1MCWR A1SRLHSA1SRRH A2MCWL A2MCWR

    71 8 A1MCWL A1MCWR A1SRLHSA1SRRH A2MCWL A2MCWR

    72 9 A1MCWL A1MCWR A1SRLHSA1SRRH A2MCWL A2MCWR

    73 10 A1MCWL A1MCWR A1SRLHSA1SRRH A2MCWL A2MCWR

    74 11 A1MCWL A1MCWR A1SRLHSA1SRRH A2MCWL A2MCWR

    75 12 A1MCWL A1MCWR A1SRLHSA1SRRH A2MCWL A2MCWR

    76 13 A1MCWL A1MCWR A1SRLHSA1SRRH A2MCWL A2MCWR

    77 14 A1MCWL A1MCWR A1SRLHSA1SRRH A2MCWL A2MCWR

    78 15 A1MCWL A1MCWR A1SRLHSA1SRRH A2MCWL A2MCWR

    79 16 A1MCWL A1MCWR A1SRLHSA1SRRH A2MCWL A2MCWR80 17 A1MCWL A1MCWR A1SRLHSA1SRRH A2MCWL A2MCWR

    81 18 A1MCWL A1MCWR A1SRLHSA1SRRH A2MCWL A2MCWR

    82 19 A1MCWL A1MCWR A1SRLHSA1SRRH A2MCWL A2MCWR

    83 20 A1MCWL A1MCWR A1SRLHSA1SRRH A2MCWL A2MCWR

    84 21 A1MCWL A1MCWR A1SRLHSA1SRRH A2MCWL A2MCWR

    85 22 A1MCWL A1MCWR A1SRLHSA1SRRH A2MCWL A2MCWR

    86 23 A1MCWL A1MCWR A1SRLHSA1SRRH A2MCWL A2MCWR

    87 24 A1MCWL A1MCWR A1SRLHSA1SRRH A2MCWL A2MCWR

    88 25 A1MCWL A1MCWR A1SRLHSA1SRRH A2MCWL A2MCWR

    89 26 A1MCWL A1MCWR A1SRLHSA1SRRH A2MCWL A2MCWR

    90 27 A1MCWL A1MCWR A1SRLHSA1SRRH A2MCWL A2MCWR

    91 28 A1MCWL A1MCWR A1SRLHSA1SRRH A2MCWL A2MCWR92 29 A1MCWL A1MCWR A1SRLHSA1SRRH A2MCWL A2MCWR

    93 30 A1MCWL A1MCWR A1SRLHSA1SRRH A2MCWL A2MCWR

    94 31 A1MCWL A1MCWR A1SRLHSA1SRRH A2MCWL A2MCWR

    95 32 A1MCWL A1MCWR A1SRLHSA1SRRH A2MCWL A2MCWR

    96 33 A1MCWL A1MCWR A1SRLHSA1SRRH A2MCWL A2MCWR

    97 34 A1MCWL A1MCWR A1SRLHSA1SRRH A2MCWL A2MCWR

    98 35 A1MCWL A1MCWR A1SRLHSA1SRRH A2MCWL A2MCWR

    99 36 A1MCWL A1MCWR A1SRLHSA1SRRH A2MCWL A2MCWR

  • 8/2/2019 Bridge Format

    42/50

    100 37 A1MCWL A1MCWR A1SRLHSA1SRRH A2MCWL A2MCWR

    101 38 A1MCWL A1MCWR A1SRLHSA1SRRH A2MCWL A2MCWR

    102 39 A1MCWL A1MCWR A1SRLHSA1SRRH A2MCWL A2MCWR

    99

    100 Back Filling Calculation

    101 FRL (Center) 319.365 319.365 319.059 319.059 319.365 319.365

    102 Camber 2% 2% 2.5% 2.5% 2% 2%103 Width 10.250 11.250 12.250 13.250 14.250 15.250

    104 FRL (End) 319.160 319.140 318.753 318.728 319.080 319.060

    105 Average FRL 319.263 319.253 318.906 318.893 319.223 319.213

    106 PQC / (BC-DBM) 0.310 0.310 0.150 0.150 0.310 0.310

    107 DLC / WMM 0.150 0.150 0.250 0.250 0.150 0.150

    108 GSB 0.150 0.150 0.230 0.230 0.150 0.150

    109 BF Top Level 318.653 318.643 318.276 318.263 318.613 318.603

    110 Ground Level 314.425 314.425 314.425 314.425 313.773 313.773

    111 Depth 4.228 4.218 3.851 3.838 4.839 4.830

    112 Back filling Angle from horizontal 65.000 65.000 65.000 65.000 65.000 65.000

    113 Top Width 1.971 1.967 1.796 1.790 2.257 2.252

  • 8/2/2019 Bridge Format

    43/50

    A2 A2 P1 P1 P1 P1 P2 P2 P2 P2SR SR MCW MCW SR SR MCW MCW SR SR

    LHS RHS LHS RHS LHS RHS LHS RHS LHS RHS

    30 30 30 30 30 30 30 30 30 30

    2.5% 2.5% 2.0% 2.0% 2.5% 2.5% 2.0% 2.0% 2.5% 2.5%

    319.059 319.059 319.365 319.365 319.059 319.059 319.365 319.365 319.059 319.059313.773 313.773 314.075 314.075 314.075 314.075 313.736 313.736 313.736 313.736

    312.1 312.1 312.8 312.8 312.8 312.8 312.4 312.4 312.4 312.4

    0.100 0.100 0.100 0.100 0.100 0.100 0.100 0.100 0.100 0.100

    0.100 0.100 0.100 0.100 0.100 0.100 0.100 0.100 0.100 0.100

    0.065 0.065 0.065 0.065 0.065 0.065 0.065 0.065 0.065 0.065

    318.994 318.994 319.3 319.3 318.994 318.994 319.3 319.3 318.994 318.994

    0.850 0.850 0.850 0.850 0.850 0.850 0.850 0.850 0.850 0.850

    317.850 317.850 318.205 318.205 317.850 317.850 318.205 318.205 317.850 317.850

    0.300 0.300

    No No Yes Yes Yes Yes Yes Yes Yes Yes

    10.25 10.25 11.07 11.07 11.07 11.07 11.07 11.07 11.07 11.07

    11.836 11.836 12.783 12.783 12.783 12.783 12.783 12.783 12.783 12.7834.000 4.000

    2.000 2.000

    10.400 10.400 10.400 10.400 10.400 10.400 10.400 10.400 10.400 10.400

    10.250 10.250 10.250 10.250 10.250 10.250 10.250 10.250 10.250 10.250

    12.067 12.067 13.013 13.013 13.013 13.013 13.013 13.013 13.013 13.013

    7.300 7.300 5.020 5.020 5.020 5.020 5.020 5.020 5.020 5.020

    313.773 313.773 314.075 314.075 314.075 314.075 313.736 313.736 313.736 313.736

    312.000 312.000 312.700 312.700 312.700 312.700 312.300 312.300 312.300 312.300

    1.773 1.773 1.375 1.375 1.375 1.375 1.436 1.436 1.436 1.436

    12.067 12.067 13.013 13.013 13.013 13.013 13.013 13.013 13.013 13.013

    7.300 7.300 5.020 5.020 5.020 5.020 5.020 5.020 5.020 5.020

    0.100 0.100 0.100 0.100 0.100 0.100 0.100 0.100 0.100 0.100

    11.836 11.836 12.783 12.783 12.783 12.783 12.783 12.783 12.783 12.7837.1 7.1 4.82 4.82 4.82 4.82 4.82 4.82 4.82 4.82

    1.1 1.1 0.82 0.82 0.82 0.82 0.82 0.82 0.82 0.82

    0.300 0.300 0.300 0.300 0.300 0.300 0.300 0.300 0.300 0.300

    0.900 0.900 0.900 0.900 0.900 0.900 0.900 0.900 0.900 0.900

    11.836 11.836 11.963 11.963 11.963 11.963 11.963 11.963 11.963 11.963

    1.100 1.100 0.820 0.820 0.820 0.820 0.820 0.820 0.820 0.820

    0.720 0.720 0.820 0.820 0.820 0.820 0.820 0.820 0.820 0.820

    4.250 4.250 4.205 4.205 3.850 3.850 4.605 4.605 4.250 4.250

    11.836 11.836 11.963 11.963 11.963 11.963 11.963 11.963 11.963 11.963

    0.720 0.720 0.820 0.820 0.820 0.820 0.820 0.820 0.820 0.820

    0.300 0.300 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000

    4.619 4.6190.600 0.600

    6.144 6.144

    2.309 2.309

    0.600 0.600

    1.539 1.539

    6.928 6.928

    0.600 0.600

    0.300 0.300

    Pier P1 Pier P2ent A2

  • 8/2/2019 Bridge Format

    44/50

    11.836 11.836

    0.300 0.300

    1.016 1.016

    6.113 6.113

    9.050 9.050

    0.300 0.300

    10.450 10.4502.076 2.071

    0.000 0.000

    4.453 4.440

    A2SRLHSA2SRRH P1MCWL P1MCWR P1SRLHSP1SRRH P2MCWL P2MCWR P2SRLHSP2SRRH

    A2SRLHSA2SRRH P1MCWL P1MCWR P1SRLHSP1SRRH P2MCWL P2MCWR P2SRLHSP2SRRH

    A2SRLHSA2SRRH P1MCWL P1MCWR P1SRLHSP1SRRH P2MCWL P2MCWR P2SRLHSP2SRRHA2SRLHSA2SRRH P1MCWL P1MCWR P1SRLHSP1SRRH P2MCWL P2MCWR P2SRLHSP2SRRH

    A2SRLHSA2SRRH P1MCWL P1MCWR P1SRLHSP1SRRH P2MCWL P2MCWR P2SRLHSP2SRRH

    A2SRLHSA2SRRH P1MCWL P1MCWR P1SRLHSP1SRRH P2MCWL P2MCWR P2SRLHSP2SRRH

    A2SRLHSA2SRRH P1MCWL P1MCWR P1SRLHSP1SRRH P2MCWL P2MCWR P2SRLHSP2SRRH

    A2SRLHSA2SRRH P1MCWL P1MCWR P1SRLHSP1SRRH P2MCWL P2MCWR P2SRLHSP2SRRH

    A2SRLHSA2SRRH P1MCWL P1MCWR P1SRLHSP1SRRH P2MCWL P2MCWR P2SRLHSP2SRRH

    A2SRLHSA2SRRH P1MCWL P1MCWR P1SRLHSP1SRRH P2MCWL P2MCWR P2SRLHSP2SRRH

    A2SRLHSA2SRRH P1MCWL P1MCWR P1SRLHSP1SRRH P2MCWL P2MCWR P2SRLHSP2SRRH

    A2SRLHSA2SRRH P1MCWL P1MCWR P1SRLHSP1SRRH P2MCWL P2MCWR P2SRLHSP2SRRH

    A2SRLHSA2SRRH P1MCWL P1MCWR P1SRLHSP1SRRH P2MCWL P2MCWR P2SRLHSP2SRRH

    A2SRLHSA2SRRH P1MCWL P1MCWR P1SRLHSP1SRRH P2MCWL P2MCWR P2SRLHSP2SRRH

    A2SRLHSA2SRRH P1MCWL P1MCWR P1SRLHSP1SRRH P2MCWL P2MCWR P2SRLHSP2SRRH

    A2SRLHSA2SRRH P1MCWL P1MCWR P1SRLHSP1SRRH P2MCWL P2MCWR P2SRLHSP2SRRHA2SRLHSA2SRRH P1MCWL P1MCWR P1SRLHSP1SRRH P2MCWL P2MCWR P2SRLHSP2SRRH

    A2SRLHSA2SRRH P1MCWL P1MCWR P1SRLHSP1SRRH P2MCWL P2MCWR P2SRLHSP2SRRH

    A2SRLHSA2SRRH P1MCWL P1MCWR P1SRLHSP1SRRH P2MCWL P2MCWR P2SRLHSP2SRRH

    A2SRLHSA2SRRH P1MCWL P1MCWR P1SRLHSP1SRRH P2MCWL P2MCWR P2SRLHSP2SRRH

    A2SRLHSA2SRRHSReturn wall BottomLength

    A2SRLHSA2SRRHSReturn wall BottomWidth

    A2SRLHSA2SRRHSReturn wall BottomDepth

    A2SRLHSA2SRRHSCant Return wallLength

    A2SRLHSA2SRRHSCant Return wallWidth

    A2SRLHSA2SRRHSCant Return wallDepth

    A2SRLHSA2SRRHSReturn wall TopLength

    A2SRLHSA2SRRHSReturn wall TopWidthA2SRLHSA2SRRHSReturn wall TopDepth

    A2SRLHSA2SRRHSDirt WallLength

    A2SRLHSA2SRRHSDirt WallWidth

    A2SRLHSA2SRRHSDirt WallDepth

    A2SRLHSA2SRRHSApproach SlabLength

    A2SRLHSA2SRRHSApproach SlabWidth

    A2SRLHSA2SRRHSApproach SlabDepth

    A2SRLHSA2SRRHSBack FillingLength

  • 8/2/2019 Bridge Format

    45/50

    A2SRLHSA2SRRHSBack FillingWidth

    A2SRLHSA2SRRHSBack FillingWidth 2

    A2SRLHSA2SRRHSBack FillingDepth

    319.059 319.059

    2.5% 2.5%16.250 17.250

    318.653 318.628

    318.856 318.843

    0.150 0.150

    0.250 0.250

    0.230 0.230

    318.226 318.213

    313.773 313.773

    4.453 4.440

    65.000 65.000

    2.076 2.071

  • 8/2/2019 Bridge Format

    46/50

    P3 P3 P3 P3 P4 P4 P4 P4 P5 P5MCW MCW SR SR MCW MCW SR SR MCW MCW

    LHS RHS LHS RHS LHS RHS LHS RHS LHS RHS

    30 30 30 30 30 30 30 30 30 30

    2.0% 2.0% 2.5% 2.5% 2.0% 2.0% 2.5% 2.5% 2.0% 2.0%

    319.365 319.365 319.059 319.059 319.365 319.365 319.059 319.059 319.365 319.365313.425 313.425 313.425 313.425 313.713 313.713 313.713 313.713 313.76 313.76

    312.1 312.1 312.1 312.1 312.1 312.1 312.1 312.1 312.4 312.4

    0.100 0.100 0.100 0.100 0.100 0.100 0.100 0.100 0.100 0.100

    0.100 0.100 0.100 0.100 0.100 0.100 0.100 0.100 0.100 0.100

    0.065 0.065 0.065 0.065 0.065 0.065 0.065 0.065 0.065 0.065

    319.3 319.3 318.994 318.994 319.3 319.3 318.994 318.994 319.3 319.3

    0.850 0.850 0.850 0.850 0.850 0.850 0.850 0.850 0.850 0.850

    318.205 318.205 317.850 317.850 318.205 318.205 317.850 317.850 318.205 318.205

    Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes

    11.07 11.07 11.07 11.07 11.070 11.070 11.070 11.070 11.070 11.070

    12.783 12.783 12.783 12.783 12.783 12.783 12.783 12.783 12.783 12.783

    10.400 10.400 10.400 10.400 10.400 10.400 10.400 10.400 10.400 10.400

    10.250 10.250 10.250 10.250 10.250 10.250 10.250 10.250 10.250 10.250

    13.013 13.013 13.013 13.013 13.013 13.013 13.013 13.013 13.013 13.013

    5.020 5.020 5.020 5.020 5.020 5.020 5.020 5.020 5.020 5.020

    313.425 313.425 313.425 313.425 313.713 313.713 313.713 313.713 313.760 313.760

    312.000 312.000 312.000 312.000 312.000 312.000 312.000 312.000 312.300 312.300

    1.425 1.425 1.425 1.425 1.713 1.713 1.713 1.713 1.460 1.460

    13.013 13.013 13.013 13.013 13.013 13.013 13.013 13.013 13.013 13.013

    5.020 5.020 5.020 5.020 5.020 5.020 5.020 5.020 5.020 5.020

    0.100 0.100 0.100 0.100 0.100 0.100 0.100 0.100 0.100 0.100

    12.783 12.783 12.783 12.783 12.783 12.783 12.783 12.783 12.783 12.7834.82 4.82 4.82 4.82 4.82 4.82 4.82 4.82 4.82 4.82

    0.82 0.82 0.82 0.82 0.82 0.82 0.82 0.82 0.82 0.82

    0.300 0.300 0.300 0.300 0.300 0.300 0.300 0.300 0.300 0.300

    0.900 0.900 0.900 0.900 0.900 0.900 0.900 0.900 0.900 0.900

    11.963 11.963 11.963 11.963 11.963 11.963 11.963 11.963 11.963 11.963

    0.820 0.820 0.820 0.820 0.820 0.820 0.820 0.820 0.820 0.820

    0.820 0.820 0.820 0.820 0.820 0.820 0.820 0.820 0.820 0.820

    4.905 4.905 4.550 4.550 4.905 4.905 4.550 4.550 4.605 4.605

    11.963 11.963 11.963 11.963 11.963 11.963 11.963 11.963 11.963 11.963

    0.820 0.820 0.820 0.820 0.820 0.820 0.820 0.820 0.820 0.820

    0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000

    Pier P3 Pier P4 Pie

  • 8/2/2019 Bridge Format

    47/50

    P3MCWL P3MCWR P3SRLHSP3SRRH P4MCWL P4MCWR P4SRLHSP4SRRH P5MCWL P5MCWR

    P3MCWL P3MCWR P3SRLHSP3SRRH P4MCWL P4MCWR P4SRLHSP4SRRH P5MCWL P5MCWR

    P3MCWL P3MCWR P3SRLHSP3SRRH P4MCWL P4MCWR P4SRLHSP4SRRH P5MCWL P5MCWRP3MCWL P3MCWR P3SRLHSP3SRRH P4MCWL P4MCWR P4SRLHSP4SRRH P5MCWL P5MCWR

    P3MCWL P3MCWR P3SRLHSP3SRRH P4MCWL P4MCWR P4SRLHSP4SRRH P5MCWL P5MCWR

    P3MCWL P3MCWR P3SRLHSP3SRRH P4MCWL P4MCWR P4SRLHSP4SRRH P5MCWL P5MCWR

    P3MCWL P3MCWR P3SRLHSP3SRRH P4MCWL P4MCWR P4SRLHSP4SRRH P5MCWL P5MCWR

    P3MCWL P3MCWR P3SRLHSP3SRRH P4MCWL P4MCWR P4SRLHSP4SRRH P5MCWL P5MCWR

    P3MCWL P3MCWR P3SRLHSP3SRRH P4MCWL P4MCWR P4SRLHSP4SRRH P5MCWL P5MCWR

    P3MCWL P3MCWR P3SRLHSP3SRRH P4MCWL P4MCWR P4SRLHSP4SRRH P5MCWL P5MCWR

    P3MCWL P3MCWR P3SRLHSP3SRRH P4MCWL P4MCWR P4SRLHSP4SRRH P5MCWL P5MCWR

    P3MCWL P3MCWR P3SRLHSP3SRRH P4MCWL P4MCWR P4SRLHSP4SRRH P5MCWL P5MCWR

    P3MCWL P3MCWR P3SRLHSP3SRRH P4MCWL P4MCWR P4SRLHSP4SRRH P5MCWL P5MCWR

    P3MCWL P3MCWR P3SRLHSP3SRRH P4MCWL P4MCWR P4SRLHSP4SRRH P5MCWL P5MCWR

    P3MCWL P3MCWR P3SRLHSP3SRRH P4MCWL P4MCWR P4SRLHSP4SRRH P5MCWL P5MCWR

    P3MCWL P3MCWR P3SRLHSP3SRRH P4MCWL P4MCWR P4SRLHSP4SRRH P5MCWL P5MCWRP3MCWL P3MCWR P3SRLHSP3SRRH P4MCWL P4MCWR P4SRLHSP4SRRH P5MCWL P5MCWR

    P3MCWL P3MCWR P3SRLHSP3SRRH P4MCWL P4MCWR P4SRLHSP4SRRH P5MCWL P5MCWR

    P3MCWL P3MCWR P3SRLHSP3SRRH P4MCWL P4MCWR P4SRLHSP4SRRH P5MCWL P5MCWR

    P3MCWL P3MCWR P3SRLHSP3SRRH P4MCWL P4MCWR P4SRLHSP4SRRH P5MCWL P5MCWR

  • 8/2/2019 Bridge Format

    48/50

  • 8/2/2019 Bridge Format

    49/50

    P5 P5 P6 P6 P6 P6SR SR MCW MCW SR SR

    LHS RHS LHS RHS LHS RHS

    30 30 30 30 30 30

    2.5% 2.5% 2.0% 2.0% 2.5% 2.5%

    319.059 319.059 319.365 319.365 319.059 319.059313.76 313.76 313.655 313.655 313.655 313.655

    312.4 312.4 311.8 311.8 311.8 311.8

    0.100 0.100 0.100 0.100 0.100 0.100

    0.100 0.100 0.100 0.100 0.100 0.100

    0.065 0.065 0.065 0.065 0.065 0.065

    318.994 318.994 319.3 319.3 318.994 318.994

    0.850 0.850 0.850 0.850 0.850 0.850

    317.850 317.850 318.205 318.205 317.850 317.850

    Yes Yes Yes Yes Yes Yes

    11.070 11.070 11.070 11.070 11.070 11.070

    12.783 12.783 12.783 12.783 12.783 12.783

    10.400 10.400 10.400 10.400 10.400 10.400

    10.250 10.250 10.250 10.250 10.250 10.250

    13.013 13.013 13.013 13.013 13.013 13.013

    5.020 5.020 5.020 5.020 5.020 5.020

    313.760 313.760 313.655 313.655 313.655 313.655

    312.300 312.300 311.700 311.700 311.700 311.700

    1.460 1.460 1.955 1.955 1.955 1.955

    13.013 13.013 13.013 13.013 13.013 13.013

    5.020 5.020 5.020 5.020 5.020 5.020

    0.100 0.100 0.100 0.100 0.100 0.100

    12.783 12.783 12.783 12.783 12.783 12.7834.82 4.82 4.82 4.82 4.82 4.82

    0.82 0.82 0.82 0.82 0.82 0.82

    0.300 0.300 0.300 0.300 0.300 0.300

    0.900 0.900 0.900 0.900 0.900 0.900

    11.963 11.963 11.963 11.963 11.963 11.963

    0.820 0.820 0.820 0.820 0.820 0.820

    0.820 0.820 0.820 0.820 0.820 0.820

    4.250 4.250 5.205 5.205 4.850 4.850

    11.963 11.963 11.963 11.963 11.963 11.963

    0.820 0.820 0.820 0.820 0.820 0.820

    0.000 0.000 0.000 0.000 0.000 0.000

    P5 Pier P6

  • 8/2/2019 Bridge Format

    50/50

    P5SRLHSP5SRRH P6MCWL P6MCWR P6SRLHSP6SRRHSExcLength

    P5SRLHSP5SRRH P6MCWL P6MCWR P6SRLHSP6SRRHSExcWidth

    P5SRLHSP5SRRH P6MCWL P6MCWR P6SRLHSP6SRRHSExcDepthP5SRLHSP5SRRH P6MCWL P6MCWR P6SRLHSP6SRRHSExcDepth 2

    P5SRLHSP5SRRH P6MCWL P6MCWR P6SRLHSP6SRRHSExcDepth1

    P5SRLHSP5SRRH P6MCWL P6MCWR P6SRLHSP6SRRHSPCCLength

    P5SRLHSP5SRRH P6MCWL P6MCWR P6SRLHSP6SRRHSPCCWidth

    P5SRLHSP5SRRH P6MCWL P6MCWR P6SRLHSP6SRRHSPCCDepth

    P5SRLHSP5SRRH P6MCWL P6MCWR P6SRLHSP6SRRHSRaftLength

    P5SRLHSP5SRRH P6MCWL P6MCWR P6SRLHSP6SRRHSRaftWidth

    P5SRLHSP5SRRH P6MCWL P6MCWR P6SRLHSP6SRRHSRaftWidth 2

    P5SRLHSP5SRRH P6MCWL P6MCWR P6SRLHSP6SRRHSRaftDepth

    P5SRLHSP5SRRH P6MCWL P6MCWR P6SRLHSP6SRRHSRaftDepth 2

    P5SRLHSP5SRRH P6MCWL P6MCWR P6SRLHSP6SRRHSWallLength

    P5SRLHSP5SRRH P6MCWL P6MCWR P6SRLHSP6SRRHSWallWidth

    P5SRLHSP5SRRH P6MCWL P6MCWR P6SRLHSP6SRRHSWallWidth 2P5SRLHSP5SRRH P6MCWL P6MCWR P6SRLHSP6SRRHSWallDepth

    P5SRLHSP5SRRH P6MCWL P6MCWR P6SRLHSP6SRRHSCapLength

    P5SRLHSP5SRRH P6MCWL P6MCWR P6SRLHSP6SRRHSCapWidth

    P5SRLHSP5SRRH P6MCWL P6MCWR P6SRLHSP6SRRHSCapDepth