7150
CSAH 10 over BLUE EARTH RIVER
District 7 Blue Earth VERNON CENTER
12/02/2016
Full Body Harness, A-62, Non-destructive TestingEquipment - Ultasonic Flaw Detector and Search Unit
Forsyth, Roy
Roy Forsyth
County Highway AgencyOwner:
MinnesotaSTATE:
UNDERWATER SUMMARY 3
UNDERWATER INSPECTION 4
UNDERWATER INSPECTION PROCEDURES 6
STRUCTURE INVENTORY 7
ELEMENTS 8
PICTURES 12
DRAWINGS 16
TABLE OF CONTENTS
PAGE NUMBER
Contractor:
(A) Reinspect the submerged substructure units at the normal maximum recommended (NBIS) interval of sixty (60) months.
Collins Engineers, Inc.
9687Contractor Job Number:
RECOMMENDATIONS
REPORT SUMMARY
UNDERWATER INSPECTION
The substructure units inspected at Bridge No. 7150, Piers 1 and 2, were found to be in good condition with no structurally significant defects observed. Both piers exhibited partial footing exposure with up to 1 foot of vertical face exposure. The channel bottom appeared stable with no appreciable changes observed since the previous inspection.
(A) The channel bottom consisted of gravel overlaid with fine silty sand with 2 inches of probe rod penetration.(B) The channel bottom consisted of fine silty sand with 3 inches of probe rod penetration.(C) The top of the footing was exposed from the upstream nose to the upstream quarter point along the south face of Pier 1 with 1 foot of maximum vertical face exposure detected.(D) An area of section loss, 6 inches wide by 1.5 feet high with a penetration of up to 1/4 inch, was observed at 1.5 feet below the waterline on the downstream nose of Pier 1.(E) The footing was exposed along the upstream half of the north face of Pier 2 with 3 inches of maximum vertical face exposure detected.(F) The South Abutment was well protected with heavy riprap and large pieces of concrete.(G) A band of light to moderate scaling was observed across the downstream end from 3 feet to 2 foot below the waterline with penetrations up to 1/2 inch deep.(H) Up to 1.5 foot diameter riprap was protecting the north embankment along the north face of Pier 1.
INSPECTION FINDINGS
Page 3 of 17
WATERLINE DATUM4.
7.1
Water Level Reference:
981.2Waterline Elevation (feet):
Top of diaphram wall at Pier 1.
Substructure(s) Inspected:
SUBSTRUCTURE INSPECTION DATA3.
Piers 1 and 2
Maximum Water Depth at Substructure(s) Inspected (feet):
The piers consist of two elongated hexagonal columns supporting a rectangular pier cap. The pier columns are connected by an 8 foot tall concrete diaphragm that extends up from the top of the footing. The columns are supported by a rectangular footing founded on steel H-piles.
General Shape:
Code:Item 61: Channel and Channel Protection:
7
6
Code:Item 62: Culvert:
5.
The waterline was located 2.7 ft below the reference.Description:
NBIS CODING INFORMATION
Code:Item 60: Substructure:
(Minnesota specific codes are used for 92B and 113)
1
District:
CSAH 10Facility Carried:
District 7
Bridge Description:
007 - Blue EarthCounty:
BRIDGE DATA1.
UNDERWATER INSPECTION
Bridge #:
BLUE EARTH RIVERFeature Intersected:
7150
Weather Conditions:
12/02/2016Date of Underwater Inspection:
Cloudy, 30F
Waterway Velocity (ft/sec):
1Underwater Visibility (feet):
INSPECTION DATA2.
The bridge superstructure consists of three spans of multiple steel beams supporting a reinforced concrete deck. The superstructure is supported by two reinforced concrete abutments and two reinforced concrete piers. The pier footings are founded on steel H-piles, while the abutments are founded on treated timber piles. The piers are numbered 1 and 2 starting from the north end of the bridge.
Professional Engineer/Team Leader:
Marc SternInspection Diver:
Roy Forsyth
Page 4 of 17
885 Scour 11 EA
220
1
2EAReinforced concret pile cap/footing 2
STRUCTURAL ELEMENT CONDITION RATING6.
No (Mark your selection with an X)
Item 113: Scour Critical Bridge: Code:
Y 48 12/2016Item 92B: Underwater Inspection: Code:
Yes X
R
Bridge is scour critical because abutment or pier foundation is rated as unstable due to observed scour at bridge site.
CS4CS3CS1 CS2
EA 34205 Reinforced concrete columns
Conditions
Quantity UnitElement DescriptionELEM #
Page 5 of 17
The routine underwater inspection of Bridge 7150 (CSAH 10 over the Blue Earth River) was completed on December 2, 2016.The underwater inspection was conducted from shore. The inspection was conducted by a team consisting of a PE-Diverwith a valid MnDOT Team leader certification, a backup diver and a dive tender. The inspection utilized commercial diveequipment and techniques (SSA and/or SCUBA) in accordance with OSHA regulations. Profiles were taken along the upstreamand downstream faces of the bridge and around the periphery of substructure units to determine the presence, location andarea of scour. The bridge elements inspected consisted of 2 concrete piers and 2 concrete footings. According to the bridge inventoryor design drawings, Piers 1 and 2 were founded on piles. Inspection procedures followed FHWA guidance and the MnDOT Bridge and Structure Inspection Program Manual with channel bottom probing to search for bottom foundations. The routine underwater inspection frequency is recommended to remain at a maximum of 60 months based on those findings and risk factors. Also, inspection procedures should continue to follow the above approach and standard guidance with 100% Level I and 10% Level II intensity efforts.
INSPECTION PROCEDURES
UNDERWATER INSPECTION
Page 6 of 17
S - Pin and Hanger Spec. Feat.Pier Foundation (Material/Type)
1 - CONCCantilever ID
+ W A T E R W A Y +Number of Spans Historic Status
3 - FTG PILE
09/26/2012
Underwater 60Culvert Type 3 - FTG PILE
Pinned Asbly. 60
12/02/2016
Barrel Length
234.2 ft. Navigation Control
Waterway Opening (sf.) 4480Structure Length
ft. Year Painted 1956
0 - No nav. control on waterwayDeck Width (Out-to-Out) 26.7
+ P A I N T +
APPR: 0 TOTAL:5 - Not eligible
MAIN: 3
Main Span Length 90.0 ft.Drainage Area (sq. mi.)
B R I D G E D A T A +Main Span Detail
0 - SUBSTANDARD+ M I S C.
Appr. Span Type Structure Flared
GR Termini 0 - SUBSTANDARD
Appr. Guardrail
Main Span Type 4 - Steel Continuous Median Width On Bridge
ft. Bridge Railing 0 - SUBSTANDARD
0 - SUBSTANDARD
Main Span Design 01 - Beam Span
ft. GR Transition
Skew 0
Y/N Freq Date
Abutment Foundation (Material/Type)
1 - CONC Frac. Critical
1 - Pinned
D E P T H I N S P. +Appr. Span Design
0 - No flare+ I N
Appr. Span Detail Field Conn. ID
Parallel Structure N - No parallel structure
Pier Protection
0 - Not Required
Rating Date 10/08/20135619 sq. ft. Traffic
ft. 50B. Rt 0.00Sidewalk Width 50A. Lt 0.00
Roadway Area (Curb-to-Curb)
Posted Load 0 - Not Required
PostingStructure Area (Out-to-Out) 6253 sq. ft.
DBL:VEH: SEMI:
Rt 42 ARail Type Lt 42 C N - N/AN - N/A B N - N/A
N - Not Applicable Overweight Permit CodesCurb Height Lt
ft. Horizontal 1 - Object Markers
0.83 ft. Vertical0.83 ft. Rt
Wear Surf Install Year
sq. ft. Nav. Vert. Lift Bridge Clear. (ft.)
R - CRIT - MONITOR
Year 2003Primer Type 1 - Lead - non 3309 MN Scour Code
Painted Area
Unsound Paint % Nav. Clr. (ft.)Deck Material 1 - Concrete Cast-in-Place 0.0Wear Surf Type 6 - Bituminous
Vert. 0.0 Horiz.
S I G N S +Operating Rating 2 - HS TRUCK
0 - None + B R I D G E
Inventory Rating 2 - HS TRUCK 15.4
25.8Deck Rebars Install Year
Deck Rebars
Finish Type F - - Phenolic Resin AlumWear Course/Fill Depth 0.15 ft.
0 - None
Design Load 4 - H 20
+ C A P A C I T Y R A T I N G S +Deck Membrane
43 ° 57
Inspector Name Forsyth, Roy
Latitude Control Section (TH Only) Status' 33.74 ''
2 - 2-way traffic
Routine Inspection Frequency 12
Sect., Twp., Range
1.0 MI SE OF JCT TH 169 Level of Service 1 - MAINLINE
- 28W Roadway Type26 - 106N
Detour Length 5.0 mi.R A T I N G S +
Custodian 02 - County Highway Agency
Owner 02 - County Highway AgencyDeck 6 Unsound
Deck %
C O N D I T I O N° 9 '
A - Open
Longitude 94 012+00.250 + N B I 16.96 '' Reference Point
79 Crew
+ I N S P E C T I O N +
Agency Br. No. 47
District 07
Bridge Match ID (TIS) 0 Userkey
CSAH 10 over BLUE EARTH RIVER
Minnesota Structure Inventory Report
Bridge ID: 7150
+ G E N E R A L + + R O A D W A Y +
Date: 01/31/2017
Sufficiency Rating 79.4Roadway Name or Description
10
City
Routine Inspection Date 10/03/2016
Desc. Loc.
Township 07023 - VERNON CENTER CSAH 10
Number
NRoadway O/U Key Route On StructureMaint. Area Structurally Deficient
NRoute Sys 04 - CSAHCounty 007 - Blue Earth Functionally Obsolete
Lanes
Waterway Adequacy 6Max. Vert. Clear.
ft.Legislative District 24Bft.Potential ABC 2 - N/A ft.
ft.On - Off System Roadway Width 24.00 ft.
Vertical Clearance ft.1 - ON
Underclearances N
Service On 1 - Highway Appr. Surface Width+ S A F E T Y F E A T U R E S +
5 - Waterway Bridge Roadway Width 24.0
26.0 ft.
Service Under
ft.
ft. Approach Alignment 5Horizontal Clear.
ft.
ft.+ S T R U C T U R E + Lateral Clearance
HCADT ADTT7
Year Built 1956
MN Year Reconstructed Functional Class
%Channel 6
Substructure
0Superstructure 6
ON 2 UNDER
311 YEAR 2008BMU Agreement ADT
Structure Evaluation 6If Divided
D I M E N S I O N S +Bridge Plan Location 3 - COUNTY
Deck Geometry 5NB-EB SB-WBDate Opened to Traffic
+ R D W Y
FHWA Year Reconstructed
MN Temporary Status
07 - Rural - Major CollectorCulvert N
A P P R A I S A L R A T I N G S ++ N B I
Page 7 of 17
County:
City:
Township:
Township:Section: Range:
Span Type:
NBI Deck: Super: Sub: Chan: Culv:
Appraisal Ratings - Approach: Waterway:
Required Bridge Signs - Load Posting:
Horizntal:
Traffic:
Vertical:
MN Scour Code:
Open, Posted, Closed:
Location:
Route:
Control Section:
Local Agency Bridge Nbr.:
Ref. Pt.:
Maint. Area:
Length:
Deck Width:
Rdwy. Area/ Pct. Unsnd:
Paint Area/ Pct. Unsnd:
Culvert:
Blue Earth
07023 - VERNONCENTER
106N26 28W
4 - Steel Continuous 2 -Stringer/Multi-beam or Girder
6 6 7 6 N
5 6
0 - Not Required
1 - Object Markers
0 - Not Required
N - Not Applicable
R - CRIT - MONITOR
1.0 MI SE OF JCT TH 169
04 - CSAH 10
79
012+00.250
234.2
26.7
5619 sq. ft. / %
sq. ft. / %
N/A
A - Open
ft.
ft.
Postings:List:
MINNESOTA BRIDGE INSPECTION REPORT
02/01/2017
BRIDGE 7150 CSAH 10 OVER BLUE EARTH RIVER
Unofficial Structurally Deficient N
NUnofficial Functionally Obsolete
Unofficial Sufficiency Rating 79.4
ELEMNBR ELEMENT NAME INSP. DATE QUANTITY
QTYCS 1
QTYCS 2
QTYCS 3
QTYCS 4REPORT TYPE
Reinforced Concrete Deck 01/31/2017 6253 SF 6128 0 125 012 Underwater
10/03/2016 6253 SF 6128 0 125 0Routine
Notes: Minor cracking
510 - Wearing Surfaces 5619 SF 5507 0 112 0
Notes: Bituminous Overlay Notes: 2009 - Spalls near expansion joints and gutter lines.2013, 2014, 2015, 2016 - Bituminous surface cracked at end joints and over piers.
Underwater 01/31/2017
5619 SF 5507 0 112 0Routine 10/03/2016
Steel Open Girder/Beam 01/31/2017 935 LF 889 46 0 0107 Underwater
10/03/2016 935 LF 889 46 0 0Routine
Notes: 2008 - Moderate rust, mostly on lower flanges near the cantilevered joints.2013, 2014 - Rust at joints continues to get worse.2015 - MN/DOT snooper truck inspection found rust at ends of center span.
515 - Steel Protective Coating 8415 SF 7812 0 414 189
Notes: 2016 - Beams = 36 WF 150. See computation sheet = 8415 SFD
Underwater 01/31/2017
8415 SF 7812 0 414 189Routine 10/03/2016
Steel Pin and Pin & Hanger Assemblyor both
01/31/2017 8 EA 0 7 1 0161 Underwater
10/03/2016 8 EA 0 7 1 0Routine
Notes: 1999 -MN/DOT crew & snooper truck did ultrasonic examination on pins and top flange cover plates ends. Also mag. particle exam onbottom flange cover plates ends.2004 - MN/DOT did non-destructive examination of pin & hangers. No relevent indications found. See report.04/19/2005 - MN/DOT Bridge crew tightened one of the nuts on one of the pins. The other pin is 1" - 1/12" too short to do anything with. Seee-mail from Larry Cooper, MN/DOT.2008 - See detailed report dated 9/5/20072012 - The pinned assembly at G3S is rated as condition state 4 due to a short pin and missing cotter key (See Photo 2).2015 - MN/DOT snooper truck inspection found that plates above pin hangers have flaking rust.
515 - Steel Protective Coating 34 SF 0 30 4 0
Notes: 2016 - Pins = 8 x 2 sides x 2.13 SF = 34 SF. See MN/DOT report.
Underwater 01/31/2017
34 SF 0 30 4 0Routine 10/03/2016
Reinforced Concrete Column 01/31/2017 4 EA 3 1 0 0205 Underwater
10/03/2016 4 EA 4 0 0 0Routine
Notes: [2016 underwater inspection] - An area of section loss, 6 inches wide by 1.5 feet high with a penetration of up to 1/4 inch, was observedat 1.5 feet below the waterline on the downstream nose of Pier 1.
Page 8 of 17
Reinforced Concrete Abutment 01/31/2017 96 LF 96 0 0 0215 Underwater
10/03/2016 96 LF 96 0 0 0Routine
Notes: 2016 - 56' + 4 x 10' = 96 LF
Reinforced Concrete Pile Cap/Footing 01/31/2017 2 LF 2 0 0 0220 Underwater
Notes: [2016 underwater inspection] - The top of the footing was exposed from the upstream nose to the upstream quarter point along thesouth face of Pier 1 with 1 foot of maximum vertical face exposure detected. The footing was exposed along the upstream half of the north faceof Pier 2 with 3 inches of maximum vertical face exposure detected.
Reinforced Concrete Pier Cap 01/31/2017 52 LF 52 0 0 0234 Underwater
10/03/2016 52 LF 52 0 0 0Routine
Assembly Joint without Seal 01/31/2017 79 LF 25 54 0 0305 Underwater
10/03/2016 79 LF 25 54 0 0Routine
Notes: Rust is dropping onto bridge seats.
Movable Bearing 01/31/2017 12 EA 0 12 0 0311 Underwater
10/03/2016 12 EA 0 12 0 0Routine
Notes: Some exterior bearings are partialy covered with gravel from washing along the wings.2008 - Very rusted.2015 - MN/DOT snooper truck inspection found pack rust on south bearing plates and beam sole plates. West pier bearing rocked slightly north.
Fixed Bearing 01/31/2017 4 EA 0 4 0 0313 Underwater
10/03/2016 4 EA 0 4 0 0Routine
Notes: 2007 - Bearings showing rust and corrosion.2012 - 2013 - South abutment bearings are rusted and frozen. See photo.
Metal Bridge Railing 01/31/2017 469 LF 0 469 0 0330 Underwater
10/03/2016 469 LF 0 469 0 0Routine
Notes: 2008 - Heavy surface rust.2010 - Heavy surface rust, should be sand blasted and painted.2012 - 2013 -Rust continues to increased.2015 - Coating on railing is approximately 90% failed.
515 - Steel Protective Coating 976 SF 0 0 49 927
Notes: 2016 - 2'-1" Railing; 469' x 2.08 SF = 976 SF
Underwater 01/31/2017
976 SF 0 0 49 927Routine 10/03/2016
Critical Deficiencies or Safety Hazards 01/31/2017 1 EA 1 0 0 0800 Underwater
10/03/2016 1 EA 1 0 0 0Routine
Notes: No critical findings observed during 2016 inspection.
Bituminous Approach Roadway 01/31/2017 2 EA 2 0 0 0822 Underwater
10/03/2016 2 EA 2 0 0 0Routine
Notes: 2011 - Roadway seal coated
Secondary Members (Superstructure) 01/31/2017 1 EA 1 0 0 0855 Underwater
10/03/2016 1 EA 1 0 0 0Routine
Notes: Steel diaphragms
Concrete Shear Cracking 01/31/2017 1 EA 1 0 0 0883 Underwater
10/03/2016 1 EA 1 0 0 0Routine
Notes: Use this element to monitor the presence of shear cracking on concrete elements. Pay particular attention to the concrete pier caps.
ELEMNBR ELEMENT NAME INSP. DATE QUANTITY
QTYCS 1
QTYCS 2
QTYCS 3
QTYCS 4
BRIDGE 7150 CSAH 10 OVER BLUE EARTH RIVER
REPORT TYPE
Page 9 of 17
Scour 01/31/2017 1 EA 0 1 0 0885 Underwater
10/03/2016 1 EA 0 1 0 0Routine
Notes: R - Scour critical. Monitoring required.2008 - See underwater report dated Nov. 2007 - Minor scour in local areas.2012 Collins Engineers, Inc. has rated bridge scour critical. See Underwater Report dated 9-11-2012.
Other Bridge Signing 01/31/2017 1 EA 1 0 0 0891 Underwater
10/03/2016 1 EA 1 0 0 0Routine
Slopes & Slope Protection 01/31/2017 1 EA 0 1 0 0892 Underwater
10/03/2016 1 EA 0 1 0 0Routine
Notes: 2003 - Heavy erosion on both slopes.2009 - BEC Maintenance placed rip rap on lower area of the north abutment. Removed some of the deadfall trees from the area.2015 - Slope at north abutment not protected.
Guardrail 01/31/2017 1 EA 1 0 0 0893 Underwater
10/03/2016 1 EA 1 0 0 0Routine
Deck & Approach Drainage 01/31/2017 1 EA 0 1 0 0894 Underwater
10/03/2016 1 EA 0 1 0 0Routine
Notes: 2007 - Drainage near ends of bridge carries sand and debris onto bridge seat area.2009 - BEC Maintenance removed some to the excess fill adjacent to the ends of the abutment seats.
Sidewalk, Curb, & Median 01/31/2017 1 EA 0 1 0 0895 Underwater
10/03/2016 1 EA 0 1 0 0Routine
Notes: Some cracking and spalling of the curb.No sidewalk.
Miscellaneous Items 01/31/2017 1 EA 1 0 0 0899 Underwater
10/03/2016 1 EA 1 0 0 0Routine
Notes: 2012 - Telephone conduit attached to west side of bridge.
Protected Species 01/31/2017 1 EA 1 0 0 0900 Underwater
10/03/2016 1 EA 1 0 0 0Routine
Notes: 2016 - The presence of protected species living on this structure was observed.
General Notes: 2004 - Same conditions exist.2005 - Bridge seats at east end need to be cleaned. Also trees in channel and slopes need to be removed. See Element 161for MN/DOT repair work.2006 - No changes.2007 - On November 19, 2007, Collins Engineers, Inc. completed an underwater inspection. See bridge file for completereport.10-16-08 Snooper inspected, cantilevered hinges and hangers, all bolted connections and cover plates, bearing assemblies atpiers and underside of the deck. P. Madden, A. Fritz.2010 - Debris hung up on piers.2011 - Trees hung up on both piers.2012 - Trees hung up on south pier.2012 - Collins Engineers, Inc. Underwater inspection 9-11-2012. See report.2013 - Small trees hung up on both piers.2013 - HDR completed revised load rating after inspection on 04-29-2013. See report.2014, 2015, 2016 - Rusting of metal surfaces continues. River clear of debris.2015 - MN/DOT snooper truck on site for an inspection 09-08-2015.
58. Deck NBI:
36A. Brdg Railings NBI:
36B. Transitions NBI:
36C. Appr Guardrail NBI:
ELEMNBR ELEMENT NAME INSP. DATE QUANTITY
QTYCS 1
QTYCS 2
QTYCS 3
QTYCS 4
BRIDGE 7150 CSAH 10 OVER BLUE EARTH RIVER
REPORT TYPE
Page 10 of 17
ELEMNBR ELEMENT NAME INSP. DATE QUANTITY
QTYCS 1
QTYCS 2
QTYCS 3
QTYCS 4
BRIDGE 7150 CSAH 10 OVER BLUE EARTH RIVER
REPORT TYPE
Inspector's Signature Reviewer's Signature
36C. Appr Guardrail NBI:
36D. Appr GuardrailTerminal NBI:
59. Superstructure NBI:
60. Substructure NBI:
61. Channel NBI:
62. Culvert NBI:
71. Waterway Adeq NBI:
72. Appr RoadwayAlignment NBI:
Rating revised in accordance with Collins Engineers, Inc. underwater report.
2016 - Bridge is on a curve and a hill to the north.
Page 11 of 17
Photo 1 - Overall looking west.
Photo 2 - North Abutment looking north.
Pictures
Page 12 of 17
Pictures
Photo 3 - Pier 1 looking south.
Photo 4 - Pier 2 looking north.
Page 13 of 17
Pictures
Photo 5 - South Abutment looking south.
Photo 6 - Overall looking east.
Page 14 of 17
Pictures
Photo 7 - Typical concrete at waterline near the downstream nose of Pier 1 looking south.
Page 15 of 17
N
Flo
w
River
Blue Earth
72'-1"
To Bk. North Abut.
90'-0" 72'-1"
To Bk. South Abut.
2
Pier 1 Pier 2
-3.8
-5.1
-6.2
-6.6
-6.7
-5.4
-5.2
-4.8
-6.7
-4.7-5.5
-7.2
3
-5.1
T/Footing
-7.1
T/Footing
6
7
5
4
(Typ.)
Shoreline
-5.2
8 1
-4.2
-4.9
-4.9
-5.3
-5.8
-7.1
-5.9
-4.4
-4.7 -6.4
-6.0
-5.0-5.3
SOUNDING PLAN
TYPICAL END VIEW OF PIERS
Legend
-2.0
-5.2
Timber Debris
Sounding Depth (12/2/16)
Sounding Depth (9/11/12)
DISTRICT 7, BLUE EARTH COUNTY
OVER THE BLUE EARTH RIVER
STRUCTURE NO. 7150
INSPECTION AND SOUNDING PLAN
MJS
RAF
12/2/2016
1"=20'
9687
substructure units.
4. Soundings were taken parallel to the bridge at 1/4 point intervals between the
in feet. All soundings based on 2016 waterline location.
3. Soundings indicate the water depth at the time of inspection and are measured
corresponds to a waterline elevation of 981.2.
approximately 2.7 feet below the top of the diaphragm wall at Pier 1. This
2. At the time of inspection on December 2, 2016, the waterline was located
1. Piers 1 and 2 were inspected underwater.
GENERAL NOTES:
of Pier 1.
8 Up to 1.5 foot diameter riprap was protecting the north embankment along the north face
3 feet to 2 foot below the waterline with penetrations up to 1/2 inch deep.
7 A band of light to moderate scaling was observed across the downstream end from
6 The South Abutment was well protected with heavy riprap and large pieces of concrete.
3 inches of maximum vertical face exposure detected.
5 The footing was exposed along the upstream half of the north face of Pier 2 with
1/4 inch, was observed at 1.5 feet below the waterline on the downstream nose of Pier 1.
4 An area of section loss, 6 inches wide by 1.5 feet high with a penetration of up to
exposure detected.
quarter point along the south face of Pier 1 with 1 foot of maximum vertical face
3 The top of the footing was exposed from the upstream nose to the upstream
2 The channel bottom consisted of fine silty sand with 3 inches of probe rod penetration.
2 inches of probe rod penetration.
1 The channel bottom consisted of gravel overlaid with fine silty sand with
INSPECTION NOTES:
-3.1
-0.3
-2.0
-1.6
Figure No.: 1
UNDERWATER BRIDGE INSPECTION
DEPARTMENT OF TRANSPORTATION
MINNESOTA
Checked By: Scale:
Drawn By: Date:
www.collinsengr.com
(651) 646-8502
St. Paul, MN. 55104
Suite 206
1599 Selby Ave.
Project: Page 16 of 17
UPSTREAM FASCIA PROFILE
To Bk. North Abut. To Bk. South Abut.
72'-1"
~ Pier 1
90'-0"
~ Pier 2
72'-1"
Shoreline
B/Ftg.
El. 973.36B/Ftg.
El. 971.94
B/Ftg.
El. 973.36B/Ftg.
El. 971.94
To Bk. North Abut. To Bk. South Abut.
72'-1"
~ Pier 1
90'-0"
~ Pier 2
72'-1"
W.L. El. 981.2
1000
980
960
1000
980
960
1000
980
960
1000
980
960
on 9/11/12
Channel Bottom
on 9/11/12
Channel Bottom
DOWNSTREAM FASCIA PROFILE
Refer to Figure 1 for General Notes.
Note:
UPSTREAM AND DOWNSTREAMFASCIA PROFILES
DISTRICT 7, BLUE EARTH COUNTY
OVER THE BLUE EARTH RIVER
STRUCTURE NO. 7150
MJS
RAF
9687
12/2/2016
1"=20'
Legend
Channel Bottom per 2012 Inspection
Channel Bottom per 2016 Inspection
Shoreline
on 12/2/16
Channel Bottom
Shoreline
W.L. El. 981.2
Shoreline
on 12/2/16
Channel Bottom
UNDERWATER BRIDGE INSPECTION
DEPARTMENT OF TRANSPORTATION
MINNESOTA
Checked By: Scale:
Figure No.: 2
Drawn By: Date:
www.collinsengr.com
(651) 646-8502
St. Paul, MN. 55104
Suite 206
1599 Selby Ave.
Project: Page 17 of 17