brian smith february 2013 erosion and sediment control, landscape design criteria 1

12
Brian Smith February 2013 Erosion and Sediment Control, Landscape Design Criteria 1

Upload: myron-joseph

Post on 12-Jan-2016

216 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Brian Smith February 2013 Erosion and Sediment Control, Landscape Design Criteria 1

Brian Smith February 2013

Erosion and Sediment Control, Landscape Design Criteria

1

Page 2: Brian Smith February 2013 Erosion and Sediment Control, Landscape Design Criteria 1

Hierarchy of the Contract Documents

2

Special Provisions

Plans

Tollway Supplemental Specifications

IDOT Recurring Special Provisions

IDOT Supplemental Specifications

Standard Specifications

Page 3: Brian Smith February 2013 Erosion and Sediment Control, Landscape Design Criteria 1

Drainage Calculations

The soil erosion and sediment control plan cannot be reviewed until all of the following information is submitted for each upcoming active construction phase:

Calculations- Detailed calculations for the design of temporary sediment basins, permanent stormwater detention basins, diversions, channels, etc.. Include pre and post development runoff.

3

Page 4: Brian Smith February 2013 Erosion and Sediment Control, Landscape Design Criteria 1

Temporary Pipe Slope Drains

4

Page 5: Brian Smith February 2013 Erosion and Sediment Control, Landscape Design Criteria 1

Stone Outlet Structure Sediment Trap Design.

5

• Base Sheets Show Typical Construction Details.• It Is Not A Standard Drawing. • Design is Required.• Summary Table of Design Elements Provided.

Page 6: Brian Smith February 2013 Erosion and Sediment Control, Landscape Design Criteria 1

Super Silt Fence

6

Page 7: Brian Smith February 2013 Erosion and Sediment Control, Landscape Design Criteria 1

7

Silt Fence Used For Super Silt Fence

Page 8: Brian Smith February 2013 Erosion and Sediment Control, Landscape Design Criteria 1

8

Regulatory Agencies

Page 9: Brian Smith February 2013 Erosion and Sediment Control, Landscape Design Criteria 1

5.1.2.2.9 Erosion and Sediment Control Site Representative Shall have verification of attending an approved certification seminar on Erosion and Sediment Control or equivalent acceptable to the Tollway. Below are three resources available: • Joliet Junior College • Erosion Management Consultants • Red Vector Online Professional Training• Lake County Stormwater Management Commission

Erosion and Sediment Control Site Representative Training

Page 10: Brian Smith February 2013 Erosion and Sediment Control, Landscape Design Criteria 1

Clean Construction or Demolition Debris (CCDD)

Design Bulletin No. 13-01

Guidelines for management of clean construction demolition debris (CCDD), Uncontaminated Soil used as offsite fill and Contaminated Soil.

10

Page 11: Brian Smith February 2013 Erosion and Sediment Control, Landscape Design Criteria 1

Approved Materials and CCDD Facilities Lists

Page 12: Brian Smith February 2013 Erosion and Sediment Control, Landscape Design Criteria 1

Questions ?

E-Mail: [email protected]

12