brac update
DESCRIPTION
BRAC Update. Colonel Jim Balocki Chief, Base Realignment and Closure Division Assistant Chief of Staff for Installation Management. Strategic Context. Our Army is undergoing the largest organizational change since World War II Transform to a Brigade-centric, modular force - PowerPoint PPT PresentationTRANSCRIPT
Assistant Chief of Staff for Installation Management
BRAC Division / (703) 601-2418 / [email protected] 1
BRAC Update
Colonel Jim BalockiChief, Base Realignment and Closure Division
Assistant Chief of Staff for Installation Management
Assistant Chief of Staff for Installation Management
BRAC Division / (703) 601-2418 / [email protected] 2
Strategic Context
• Our Army is undergoing the largest organizational change since World War II–Transform to a Brigade-centric,
modular force
–Restations ~1/3 of the Army by end of FY 2011
– Impacts 380K Soldiers and Families members
–Affects 304 installations/locations
–Grow by 74.2K
–Constructing 743 projects from FY06-13 - - $66.4B
• Constructing 20 Brigade Complexes; 69,000 Barracks spaces; 4,100 Family Housing Units; 66 Child Development Centers
+74K+74K
Assistant Chief of Staff for Installation Management
BRAC Division / (703) 601-2418 / [email protected] 3
Italy
X X X
XXX X
Legend
HBCT converted to GTA IBCT
GTA Unit
X
X
MPX
MEDX XE
Germany
XX
Ft BenningFt Gordon
Ft Bliss Ft Hood
X
Ft Polk
SUSTX
X
XXX X
X
X
Ft Lewis
SUST
X
X
X
SUST
X
X
III
SUST
X
Ft Carson
Ft Bragg
SUST
X
X
X
Ft Knox
Ft Campbell
Ft Riley
Ft Sill
Ft Stewart/HAAF
II
XXX XX
X X X X
X X
SUST
X
X
MPX
MEDX XE
SUSTX
Ft Irwin
X
MPX
MED
X
EOD
X
EOD
Ft Drum
XXX
SUST
X
X
XX
(-)
Ft Eustis SUST
X
X
Aberdeen Proving Grounds
20th SPT CMD
NTC
JRTC
Corps/Divisions/ Maneuver BCTs
& Multi / Functional BDES (Active Force)
X
TSC
MIMI SUST MP
XE
KoreaX
X
SUSTSUSTSUST
X X
MIMIMIX
X
MED
Ft Lee
Schofield BK/ Shafter/ Wheeler
Ft WainrightFt RichardsonX
SUST
X
X
X
MP
XE X
X
MI
SUST
X X
XX X
X
AAMDC
ESC
ESC
XE
X
X X X
MFMF
AVN TF
ESC
X
Ft Leonard Wood
SFIII
R
III
X
SFIII
ESC
++
TSC
++
TSC
X X X
X
X
X
CABX
CAB
X
CAB
X
CAB
X
CAB
X
CAB
X
CAB
X
CAB
X
CAB
X
CAB
X
CAB
X
X
XX
X X
X X
SUST
X
Ft Myer
Ft Story49th QM
Active Component Operational Units BRAC and GTA Endstate- FY13
AAMDC
XX ++
XX
X
XWSMR
X
IBCT (ABN)
LEGEND:
Corps
Division Fires BDEX
Sustain BDESUST
X
CAB BDE
X
X
BfSB
X
CHEM BDEXE
ENG BDE
X
ADA BDE
Signal BDE MP BDEMP
X
EOD GRPEOD
X
MED BDEMED
X
CAB
X
MED
X
MED
Theater Airfield Ops GRP
X
TAOG
Expeditionary SustainmentCMD
ESC
XX
IBCT (ABN)
LEGEND:HBCT
X
HBCTXX
Division Fires BDEX
X
Sustain BDESUST
X
CAB BDE
XX
MEB
XX
BfSB
IBCT
X
IBCT
XX XX
CHEM BDEXE
ENG BDE
XX
ADA BDE
Signal BDE MP BDEMP
X
MP
X
EOD GRPEOD
X
EOD
X
MEDMED
XX
MED
X
MED
X
MED
Theater Airfield Ops GRP
X
TAOG
X
TAOG
Expeditionary SustainmentCMD
ESCESCX
SBCT
X
TSC Theater Support Command
(T)
(T)
(T)
SFIII
SFIII
Eglin AFB
SFIII
Assistant Chief of Staff for Installation Management
BRAC Division / (703) 601-2418 / [email protected] 4
857
34
242
1133 Total Army Actions
Where Are We in BRAC?
The BRAC 2005 Commission made 182 Recommendations; the Army is impacted by 113 and is the lead for 102.
Note: Multiple MILCON projects may support a single action or a single project may support multiple actions .
Completed Initiated Remaining
70
10
237
Remaining Awarded FY08 Under Construction
317 BRAC MILCON Projects1
FY10
72
FY09
83FY08
82
Assistant Chief of Staff for Installation Management
BRAC Division / (703) 601-2418 / [email protected] 5
How We’re Doing It
• $0.8B Awarded in FY06 (11 Projects)• $3.4B Awarded in FY07 (61 Projects)
Ft. Carson Brigade / Battalion HQ Facilities
• $3.3B is planned for FY08 (90 Projects)• $3.8B is planned for FY09 (83 Projects)• $1.8B is programmed in FY 10 (72 Projects)
October 2007November 2006
Assistant Chief of Staff for Installation Management
BRAC Division / (703) 601-2418 / [email protected] 6
Where We Are Doing It
• El Paso, Texas / Fort Bliss– 54 BRAC MILCON Projects - $2.0 Billion
• Manhattan, Kansas / Fort Riley– 10 BRAC MILCON Projects - $540 Million
• Petersburg, Virginia / Fort Lee– 8 BRAC MILCON Projects - $1.2 Billion
• Louisville, Kentucky / Fort Knox– 9 BRAC MILCON Projects - $430 Million
Examples
Assistant Chief of Staff for Installation Management
BRAC Division / (703) 601-2418 / [email protected] 7
Ft Bliss Barracks Complex 1
August 28, 2007
January 28, 2008
Assistant Chief of Staff for Installation Management
BRAC Division / (703) 601-2418 / [email protected] 8
Fort Bliss BCT Complex 1Barracks29 Jan 07
Assistant Chief of Staff for Installation Management
BRAC Division / (703) 601-2418 / [email protected] 9
Division Headquarters FacilityFort RileyFort Riley
Assistant Chief of Staff for Installation Management
BRAC Division / (703) 601-2418 / [email protected] 10
DFAC
BARRACKS
Bde and Bn HQs
Medical/DentalRoute 36Overpass
Armament, Wheel, Track
TSEDEOD/Munitions
EOD InertTraining Area
Gym/Rec CtrAnd Chapel
WarriorTraining
AAFES
North Range Access
Ordnance School Site Plan – Fort Lee
UNCLASSIFIED
Assistant Chief of Staff for Installation Management
BRAC Division / (703) 601-2418 / [email protected] 11
Fort KnoxCompany Operations Facility
December 2007
Ft Knox Company Operations Facilities
September 4, 2007
BOD: Fall of 2008
Assistant Chief of Staff for Installation Management
BRAC Division / (703) 601-2418 / [email protected] 12
Total BRAC 2005 Funding
0
500
1000
1500
2000
2500
3000
3500
4000
4500
5000
2006 2007 2008 2009 2010 2011Year
Dol
lars
in M
illio
ns
MILCON
O&M
Other (OPA)
Environmental
Homeowners Asst Prog
$872.9M
$3,604.9M
$4,015.7M
$4,486.2M
$3,173.6M
$1,182.1M
FY06-11: $3,228.3M
FY06-11: $652.3M
FY06-11: $383.8M
FY06-11: $2.7M
= $17.3B
BRAC 2005 Funding Overview
FY06-11: $13,068.3M
BRAC 2005 = 3X All 4 Prior Rounds …Combined!
MILCON accounts for 75% of the total BRAC Funding Requirement - 317 new construction/ renovation projects
Assistant Chief of Staff for Installation Management
BRAC Division / (703) 601-2418 / [email protected] 13
Future Years Planning
• Realignment of Missions– Most HQs and Schools Move late FY10 or FY11
– BRAC Moving and Outfitting Costs Peak as MILCON Ends
– Tight Synchronization to Maintain Operational Capability
• Installation Closures– Minimal Time from Mission Drawdown to Base Closure
– Cleanup Sites by FY11;LTM/LTO Budgeted for Out Years
– Immediate Reuse is Goal, Caretaker Ops s/b Exception
• Army/LRA Collaboration = Successful Reuse
• Legacy BRAC - Continue Funding Cleanup While Exploring New Ways to Transfer Property
Assistant Chief of Staff for Installation Management
BRAC Division / (703) 601-2418 / [email protected] 14
Assistant Chief of Staff for Installation Management
BRAC Division / (703) 601-2418 / [email protected] 15
QUESTIONS?