bpm understanding template
TRANSCRIPT
8/3/2019 BPM Understanding Template
http://slidepdf.com/reader/full/bpm-understanding-template 1/12
Business Process Requirement
Understanding Template
8/3/2019 BPM Understanding Template
http://slidepdf.com/reader/full/bpm-understanding-template 2/12
ContentsLicense ...................................................................................................................................................... 3
Terms and Conditions ................................................................................................................................ 4
Executive Summary ................................................................................................................................... 5
Introduction .............................................................................................................................................. 6
What is this process about ..................................................................................................................... 6
Current Process ..................................................................................................................................... 6
What do you achieve from this process ................................................................................................. 6
How does this Process Start ................................................................................................................... 6
How does this process end .................................................................................................................... 6
Stakeholders ............................................................................................................................................. 7
Performers ................................................................................................................................................ 8
In Scope .................................................................................................................................................... 8
Out of Scope.............................................................................................................................................. 8
Constraints ................................................................................................................................................ 8
Process Diagram As IS ............................................................................................................................. 9
Process Diagram To Be ........................................................................................................................... 9
Implementation Details ........................................................................................................................... 10
Process Details ........................................................................................................................................ 11
Exceptions ............................................................................................................................................... 11
Integrations ............................................................................................................................................. 11
Process Timelines .................................................................................................................................... 12
Reporting Requirements.......................................................................................................................... 12
User Training Requirements .................................................................................................................... 12
8/3/2019 BPM Understanding Template
http://slidepdf.com/reader/full/bpm-understanding-template 3/12
LicenseCopyright 2011: BPMGeek.com
Licensed under the Apache License, Version 2.0 (the "License");
you may not use this file except in compliance with the License.
You may obtain a copy of the License at
http://www.apache.org/licenses/LICENSE-2.0
Unless required by applicable law or agreed to in writing, software
distributed under the License is distributed on an "AS IS" BASIS,
WITHOUT WARRANTIES OR CONDITIONS OF ANY KIND, either express or implied.
See the License for the specific language governing permissions and
limitations under the License.
8/3/2019 BPM Understanding Template
http://slidepdf.com/reader/full/bpm-understanding-template 4/12
Terms and Condit ions
8/3/2019 BPM Understanding Template
http://slidepdf.com/reader/full/bpm-understanding-template 5/12
Execut ive Summary(This will be probably be the last thing to fill. You should provide an overview in 2-3 paragraphs about
whatever is there in this document. Include description about the process, what does it do, performers,
timelines etc)
8/3/2019 BPM Understanding Template
http://slidepdf.com/reader/full/bpm-understanding-template 6/12
Introduct ion(Give an introduction of your process here. Include the overall vision of the organization and where does
this process fit into it. If this is a highly specialized process interacting with some ERP function (or
sometimes driven by it) include the details of that system here
What is t his process about (Include stuff like This process takes care of managing the leave approval for the organization. Current
organizational landscape has leaves managed manually because of various regional policies. This systems
aims to address the entire system automatically. It is expected to update Organization ERP at the end of
the approval
Current Process
(Absolutely essential to provide the current process, how things are managed. Quite often you will
encounter situations where there is already a process with handoffs and data moving. This is a good place
to document it. Include diagrams, flowcharts etc here)
What do you achieve from t his process(Outcomes and business impact of providing this automation. Try to elaborate on the basis of these items
y Cost Reduction
y Compliance
y Internal Control
y Automation
y S peed
y Audit ability
y Ease of Use
y Standardization
How does t his Process Start
(This is again very important. If you do not know how the process starts you could end up giving wrong
estimates. Always make sure you identify if its going to be a simple start or not. Another important aspect
could be to understand if the start itself has some complexities like multiple instance kickoff or data
lookup from somewhere else and so on ...)
How does t his process end
(Again very important. Some processes end hitting the ERP/ S AP. Some send notification mails ... some end
by itself. Very important as it decides whether the process has achieved what it was meant for)
8/3/2019 BPM Understanding Template
http://slidepdf.com/reader/full/bpm-understanding-template 7/12
Stakeholders(Important people for the project. Include their name, role etc in here. It will be good to have a table like
....)
Name Role Email Number
Abhishek Mishra Project Manager [email protected] +91-9999999999
Abha Pandey Signing Authority
Project Kickoff
Finance
Client Project manager
Client Business Person
Requirement Signoff
Production Support
Rollout Signoff Documentation Signoff
QA and Testing
(This list is indicative, add as many as you feel important for your project)
8/3/2019 BPM Understanding Template
http://slidepdf.com/reader/full/bpm-understanding-template 8/12
Performers(People who are going to perform the various activities in this process)
Role Responsibility How to Identify This
Performer
Comments
Requestor Request Initiation Any User of Purchase
Department Purchase department members can be found
from the ERP module
PO Release
Reviewer Review the Request and
Approve Reject
Users Immediate
Manager
Picked up from the
group mappings in Firm
wide LDAP
In Scope(Mention what is in scope for this implementation. Things you can add here are Process Design,
Integration, Emailing, Warranty etc
Out of Scope(Very important. This will save you when things go out of hand. Be very comprehensive while writing this
section. Things like task completion by email reply, cell phone integration, Data migration, User Training
etc could kill you)
Constraints(Mention any time, budget, resource or technology constraints here. This will drive the timelines, budget,
resource requirement as well as prioratization)
8/3/2019 BPM Understanding Template
http://slidepdf.com/reader/full/bpm-understanding-template 9/12
Process Diagram As IS(Draw the current implementation diagram here. It could be a simple flowchart from power point, visio
etc)
Process Diagram To Be(Draw the wanted implementation diagram here. It could be a simple flowchart from power point, visio
etc)
Request for LeaveApproval using the
Approval Sheet avaiableon front Desk
Manager approves therequest based on the
project workload bysiigning the document
HR Reviews the requestand crooss referefences
with old applied leaves,
calendar and employeebehaviour
HR Updates the leavedetails in Register and
ERP
Employee gets signedleave approval form
8/3/2019 BPM Understanding Template
http://slidepdf.com/reader/full/bpm-understanding-template 10/12
Implementat ion Details(Provide details about the solution you are planning to build. Do not be technical, just in terms of basic
business and usability. Be functional)
8/3/2019 BPM Understanding Template
http://slidepdf.com/reader/full/bpm-understanding-template 11/12
Process Details(This will be the dirty part. Include the details about each step as follows for each workstep
Workstep Name
Brief Description
Business ImpactPerformer
Fields Name Type Details Constraints/Validations
Requestor Readonly Picked up from
logged in User
Trade Date Date User Enters
Settlement
Date
Date Calculated
automatically
T+1 day
Data Lookups Manager lookup from Active Directory
Trading Account Lookup from Mainframe
Validations Business Level validations. You can include field level validations in the Field Section
Timelines When this happens ... Typically useful for start steps
Associated SLAs
Any Other Information
Except ions(Mention any exceptional conditions like New Joinee or a Contract Employee. How would this process
change in case of exceptions. Which all exceptions wil be handled and which will not be)
Integrat ions(Which systems are we integrating with)
System Mainframe System
What would this integration do This will tell us details about an existing Account so
that It can be used to open the new account as a
template
Business Impact This will make sure that account opening process is
fast and homogeneous
Input or Output Input. Existing Account Data will come in
Stage
Request submission screen
System Details Mainframe interfaced with a front end database.
Since direct integration is difficult, the system will
8/3/2019 BPM Understanding Template
http://slidepdf.com/reader/full/bpm-understanding-template 12/12
restrict to accessing the wrapper database
Authorization and Security Will use Kerberos Authentication. Will need to get
System ID Setup for this
Contact Person/Group Piyush Kumar
Any Changes required on the Other System None
Additional Comments Will need to check the index relationships so that
our lookup does not crash this system
Process Timelines(Mention what are the timelines for implementing as well as running this process. You can have Gnatt
Chart also)
Report ing Requirements
(What reports are required for this application)
y Service Level Adherance
y Workload Analysis
y System Inputs and Outputs
User Training Requirements(What would be our role in training the users. Would we do train the trainer or train everyone)