boulder junction park+. boulder junction park+ model existing condition proposed development...

19
Boulder Junction Park+

Upload: elaine-horton

Post on 11-Jan-2016

215 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: Boulder Junction Park+. Boulder Junction Park+ model Existing condition Proposed development Conceptual build-out Built to be flexible as area develops

Boulder Junction Park+

Page 2: Boulder Junction Park+. Boulder Junction Park+ model Existing condition Proposed development Conceptual build-out Built to be flexible as area develops

Boulder Junction Park+

• Boulder Junction Park+ model• Existing condition• Proposed development• Conceptual build-out

• Built to be flexible as area develops• Based on data from downtown parking

assessments, as well as similar TOD communities

Page 3: Boulder Junction Park+. Boulder Junction Park+ model Existing condition Proposed development Conceptual build-out Built to be flexible as area develops

Discussion Topics

• Parking Generation Rates• Evaluated Scenarios

• Existing Conditions• Planned Development• Conceptual Build Out• Surrounding Development

• Initial Findings• Next Steps

Page 4: Boulder Junction Park+. Boulder Junction Park+ model Existing condition Proposed development Conceptual build-out Built to be flexible as area develops

Parking Generation RatesLand Use

Peak Hour Rate (1PM)

Comparable ULI Rate

Bank 2.64 2.64

City Park 1.17 1.66

General Retail 1.18 2.9

Industrial Retail 0.59 0.61

Office 1.33 3.15

Restaurant 9.41 16.20

Townhouse 0.63 1.23

• Peak hour rates are taken from similar Park+ modeling efforts, for areas with similar mixture of uses and geography.

• Industrial retail land use represents less intense commercial uses whose businesses are based in specialty products and services with a lessened parking demand. The use was compared to the warehouse ULI rate, which best represents arrival and demand patterns.

Page 5: Boulder Junction Park+. Boulder Junction Park+ model Existing condition Proposed development Conceptual build-out Built to be flexible as area develops

Evaluated Scenarios

• Existing Conditions• Today’s Conditions

• Planned Development• Hotel, transit, and mixed uses in southeast area

• Conceptual Build-Out • Redevelopment of the remainder of the study

area into a walkable, mixed-use district

• Surrounding Development• Development just south and southwest of the

study area

Page 6: Boulder Junction Park+. Boulder Junction Park+ model Existing condition Proposed development Conceptual build-out Built to be flexible as area develops

Existing Land Uses:• Bank – 2,711 sq. ft.• City Park – 1 acre• General Retail – 35,452 sq. ft.• Industrial Retail – 216,179 sq. ft.• Office – 31,515 sq. ft.• Restaurant – 1,534 sq. ft.• Townhouse – 72 units

Existing Conditions

Page 7: Boulder Junction Park+. Boulder Junction Park+ model Existing condition Proposed development Conceptual build-out Built to be flexible as area develops

Park+ Results:• Demand: 280 spaces• Supply: 741 spaces• Surplus/Deficit: +461 spaces

Observations:• Existing land use configurations

do not strain associated parking supply

• Steelyard development experiences higher parking demand

Existing Conditions

Page 8: Boulder Junction Park+. Boulder Junction Park+ model Existing condition Proposed development Conceptual build-out Built to be flexible as area develops

Planned DevelopmentArea

Total Land Use per Area Parking

General Retail

(sq. ft.)

Office(sq. ft.)

Residential(units)

City Park

(acres)

Restaurant (sq. ft.)

Transit Stop (boardings)

Hotel(rooms)

Parking Spaces

1 - - 69 - - - - 84

2 84,332 64,773 178 1 - - - 295

3 - 3,000 - - - - - 60

4 - 35,412 16 - - - - 67

5 - - 71 - 2,347 1,000 136 391

Page 9: Boulder Junction Park+. Boulder Junction Park+ model Existing condition Proposed development Conceptual build-out Built to be flexible as area develops

Planned DevelopmentPark+ Results:

Study Area• Demand: 983 spaces• Supply: 1,556 spaces• Surplus/Deficit: +573 spaces

Southeast corner of Study Area• Demand: 220 spaces• Supply: 391 spaces• Surplus/Deficit: +171 spaces

S’Park and S’Park West area• Demand: 368 spaces• Supply: 457 spaces• Surplus/Deficit: +89 spaces

Page 10: Boulder Junction Park+. Boulder Junction Park+ model Existing condition Proposed development Conceptual build-out Built to be flexible as area develops

Planned DevelopmentObservations:• The residential permit removes

overflow spaces on-street provided to the general retail

• The new parking garage is well utilized overall, with user fluctuations throughout the day

• The proposed S’Park development has some demand issues based on reserve spaces

Page 11: Boulder Junction Park+. Boulder Junction Park+ model Existing condition Proposed development Conceptual build-out Built to be flexible as area develops

Planned Development

The planned parking garage in the southeast corner of study area has the ability to support the planned development demand as well as future demand because of the shared parking opportunity, as outlined below.

7AM 8AM 9AM 10AM 11AM 12PM 1PM 2PM 3PM 4PM 5PM 6PM 7PM 8PM 9PM 10PM 11PM0

50

100

150

200

250

300

350

400

New Planned Development Demand

Hotel Hotel Parking Residential Residential Parking Transit Stop

Transit Parking Public Spaces Total Spaces Total Demand Public Demand

Time of Day

Spa

ces

of D

eman

d

Page 12: Boulder Junction Park+. Boulder Junction Park+ model Existing condition Proposed development Conceptual build-out Built to be flexible as area develops

Surrounding Development

Area

Total Land Use per Area

Parking Supply

Office Residential

1 - 264 units 264 spaces

2300,000

sq. ft.- 500 spaces

Page 13: Boulder Junction Park+. Boulder Junction Park+ model Existing condition Proposed development Conceptual build-out Built to be flexible as area develops

Surrounding DevelopmentPark+ Results for Development South of Study Area:• Demand: 587 spaces• Supply: 726 spaces• Surplus/Deficit: +139 spaces

Observations:• The development along Pearl

Parkway, just south of the study area, are able to provide on-site parking for the users during the day, but at night the Solana apartments are unable to meet the demand of residents.

• The new garage public in the southeast corner is able to accommodate the unmet residential demand during the evening hours.

Page 14: Boulder Junction Park+. Boulder Junction Park+ model Existing condition Proposed development Conceptual build-out Built to be flexible as area develops

Surrounding Development

Solana apartments provides 226 parking spaces, but is unable to meet the generated demand during evening and morning hours, as shown below.

7AM 8AM 9AM 10AM 11AM 12PM 1PM 2PM 3PM 4PM 5PM 6PM 7PM 8PM 9PM 10PM 11PM0

50

100

150

200

250

300

Demand Generated by Solana Apartments

Time of Day

Spa

ces

of D

eman

d

Page 15: Boulder Junction Park+. Boulder Junction Park+ model Existing condition Proposed development Conceptual build-out Built to be flexible as area develops

Surrounding Development

The unmet demand of approximately 70 spaces utilized the New Garage in the southeast corner that has the capability to accept the spillover from the Solana garage as well as additional demand during the morning and evening hours.

7AM 8AM 9AM 10AM 11AM 12PM 1PM 2PM 3PM 4PM 5PM 6PM 7PM 8PM 9PM 10PM 11PM0

50

100

150

200

250

Demand at Solana and New Garages

Solana Parking Garage Demand Solana Garage Spaces

New Garage Public Parking Demand New Garage Spaces

Page 16: Boulder Junction Park+. Boulder Junction Park+ model Existing condition Proposed development Conceptual build-out Built to be flexible as area develops

Conceptual Development

AreaTotal Land Use per Area

General Retail

Office Residential

1115,430 sq. ft.

115,430 sq. ft.

154 units

213,542 sq. ft.

13,542 sq. ft.

21 units

3151,550

sq. ft.151,550

sq. ft.202 units

Page 17: Boulder Junction Park+. Boulder Junction Park+ model Existing condition Proposed development Conceptual build-out Built to be flexible as area develops

Observations:• Based on the configuration of the

parcels, on-site parking should be able to be provided for all areas.

Conceptual DevelopmentArea Demand

Needed Supply

Supply/ Deficit

1 493 520 +27

2 62 70 +8

3 647 660 +13

Page 18: Boulder Junction Park+. Boulder Junction Park+ model Existing condition Proposed development Conceptual build-out Built to be flexible as area develops

Conceptual Development

Based on the Area 3 parcel configuration and shared parking the site will be able to support multiple use development as well as provide on-site parking.

7AM 8AM 9AM 10AM 11AM 12PM 1PM 2PM 3PM 4PM 5PM 6PM 7PM 8PM 9PM 10PM 11PM0

100

200

300

400

500

600

700

Redevelopment of Auto Dealership

Office Demand General Retail Demand Condominium Demand Total Demand

Office Spaces General Retail Spaces Condominium Spaces Total Spaces

Time of Day

Spa

ces

of D

eman

d

Page 19: Boulder Junction Park+. Boulder Junction Park+ model Existing condition Proposed development Conceptual build-out Built to be flexible as area develops

Results

• Existing conditions show the parking system being underutilized

• Residential permits in the Steel Yard create a slight parking deficit, that will need to be accommodated by some public parking

• The new parking garage is able to fully accommodate the planned development within the southeast corner of the study area, considering shared parking configuration

• The new garage is able to accommodate the unmet demand of approximately 70 spaces from surrounding development as well as future development

• The redevelopment of the Auto Dealership provides the opportunity to provide general retail, office, and condos as well as on-site public parking