Boulder Junction Park+
Boulder Junction Park+
• Boulder Junction Park+ model• Existing condition• Proposed development• Conceptual build-out
• Built to be flexible as area develops• Based on data from downtown parking
assessments, as well as similar TOD communities
Discussion Topics
• Parking Generation Rates• Evaluated Scenarios
• Existing Conditions• Planned Development• Conceptual Build Out• Surrounding Development
• Initial Findings• Next Steps
Parking Generation RatesLand Use
Peak Hour Rate (1PM)
Comparable ULI Rate
Bank 2.64 2.64
City Park 1.17 1.66
General Retail 1.18 2.9
Industrial Retail 0.59 0.61
Office 1.33 3.15
Restaurant 9.41 16.20
Townhouse 0.63 1.23
• Peak hour rates are taken from similar Park+ modeling efforts, for areas with similar mixture of uses and geography.
• Industrial retail land use represents less intense commercial uses whose businesses are based in specialty products and services with a lessened parking demand. The use was compared to the warehouse ULI rate, which best represents arrival and demand patterns.
Evaluated Scenarios
• Existing Conditions• Today’s Conditions
• Planned Development• Hotel, transit, and mixed uses in southeast area
• Conceptual Build-Out • Redevelopment of the remainder of the study
area into a walkable, mixed-use district
• Surrounding Development• Development just south and southwest of the
study area
Existing Land Uses:• Bank – 2,711 sq. ft.• City Park – 1 acre• General Retail – 35,452 sq. ft.• Industrial Retail – 216,179 sq. ft.• Office – 31,515 sq. ft.• Restaurant – 1,534 sq. ft.• Townhouse – 72 units
Existing Conditions
Park+ Results:• Demand: 280 spaces• Supply: 741 spaces• Surplus/Deficit: +461 spaces
Observations:• Existing land use configurations
do not strain associated parking supply
• Steelyard development experiences higher parking demand
Existing Conditions
Planned DevelopmentArea
Total Land Use per Area Parking
General Retail
(sq. ft.)
Office(sq. ft.)
Residential(units)
City Park
(acres)
Restaurant (sq. ft.)
Transit Stop (boardings)
Hotel(rooms)
Parking Spaces
1 - - 69 - - - - 84
2 84,332 64,773 178 1 - - - 295
3 - 3,000 - - - - - 60
4 - 35,412 16 - - - - 67
5 - - 71 - 2,347 1,000 136 391
Planned DevelopmentPark+ Results:
Study Area• Demand: 983 spaces• Supply: 1,556 spaces• Surplus/Deficit: +573 spaces
Southeast corner of Study Area• Demand: 220 spaces• Supply: 391 spaces• Surplus/Deficit: +171 spaces
S’Park and S’Park West area• Demand: 368 spaces• Supply: 457 spaces• Surplus/Deficit: +89 spaces
Planned DevelopmentObservations:• The residential permit removes
overflow spaces on-street provided to the general retail
• The new parking garage is well utilized overall, with user fluctuations throughout the day
• The proposed S’Park development has some demand issues based on reserve spaces
Planned Development
The planned parking garage in the southeast corner of study area has the ability to support the planned development demand as well as future demand because of the shared parking opportunity, as outlined below.
7AM 8AM 9AM 10AM 11AM 12PM 1PM 2PM 3PM 4PM 5PM 6PM 7PM 8PM 9PM 10PM 11PM0
50
100
150
200
250
300
350
400
New Planned Development Demand
Hotel Hotel Parking Residential Residential Parking Transit Stop
Transit Parking Public Spaces Total Spaces Total Demand Public Demand
Time of Day
Spa
ces
of D
eman
d
Surrounding Development
Area
Total Land Use per Area
Parking Supply
Office Residential
1 - 264 units 264 spaces
2300,000
sq. ft.- 500 spaces
Surrounding DevelopmentPark+ Results for Development South of Study Area:• Demand: 587 spaces• Supply: 726 spaces• Surplus/Deficit: +139 spaces
Observations:• The development along Pearl
Parkway, just south of the study area, are able to provide on-site parking for the users during the day, but at night the Solana apartments are unable to meet the demand of residents.
• The new garage public in the southeast corner is able to accommodate the unmet residential demand during the evening hours.
Surrounding Development
Solana apartments provides 226 parking spaces, but is unable to meet the generated demand during evening and morning hours, as shown below.
7AM 8AM 9AM 10AM 11AM 12PM 1PM 2PM 3PM 4PM 5PM 6PM 7PM 8PM 9PM 10PM 11PM0
50
100
150
200
250
300
Demand Generated by Solana Apartments
Time of Day
Spa
ces
of D
eman
d
Surrounding Development
The unmet demand of approximately 70 spaces utilized the New Garage in the southeast corner that has the capability to accept the spillover from the Solana garage as well as additional demand during the morning and evening hours.
7AM 8AM 9AM 10AM 11AM 12PM 1PM 2PM 3PM 4PM 5PM 6PM 7PM 8PM 9PM 10PM 11PM0
50
100
150
200
250
Demand at Solana and New Garages
Solana Parking Garage Demand Solana Garage Spaces
New Garage Public Parking Demand New Garage Spaces
Conceptual Development
AreaTotal Land Use per Area
General Retail
Office Residential
1115,430 sq. ft.
115,430 sq. ft.
154 units
213,542 sq. ft.
13,542 sq. ft.
21 units
3151,550
sq. ft.151,550
sq. ft.202 units
Observations:• Based on the configuration of the
parcels, on-site parking should be able to be provided for all areas.
Conceptual DevelopmentArea Demand
Needed Supply
Supply/ Deficit
1 493 520 +27
2 62 70 +8
3 647 660 +13
Conceptual Development
Based on the Area 3 parcel configuration and shared parking the site will be able to support multiple use development as well as provide on-site parking.
7AM 8AM 9AM 10AM 11AM 12PM 1PM 2PM 3PM 4PM 5PM 6PM 7PM 8PM 9PM 10PM 11PM0
100
200
300
400
500
600
700
Redevelopment of Auto Dealership
Office Demand General Retail Demand Condominium Demand Total Demand
Office Spaces General Retail Spaces Condominium Spaces Total Spaces
Time of Day
Spa
ces
of D
eman
d
Results
• Existing conditions show the parking system being underutilized
• Residential permits in the Steel Yard create a slight parking deficit, that will need to be accommodated by some public parking
• The new parking garage is able to fully accommodate the planned development within the southeast corner of the study area, considering shared parking configuration
• The new garage is able to accommodate the unmet demand of approximately 70 spaces from surrounding development as well as future development
• The redevelopment of the Auto Dealership provides the opportunity to provide general retail, office, and condos as well as on-site public parking