borewell recharge project ppt
DESCRIPTION
To increase the yield of the bore well & to decrease the hardness of the water.TRANSCRIPT
BORE WELL RECHARGE THROUGH RAIN WATER
HARVESTING
WEL COME TO
INTEL LEARN PROJECT
TOPIC:
INTRODUCTION
DEVARAHALLI V ILLAGE LOCATED IN CHANNAGIRI .TQ. DAVANGERE DIST. KARNATAKA .STATE .WE INTERACTED WITH THE VILLAGE PEOPLE AND GOT AWARE OF THEIR PROBLEMS . THE MOST SEVERE PROBLEM IS DRINKING WATER.THE REASON FOR IT IS DUE TO HARDNESS .THEIR IS DIFFICULTY IN FETCHING WATER FROM THE TUBE WELL . AS THE WATER TABLE IS VERY LOW HENCE IT BECOMES DIFFICULT TO LIFT WATER FROM SUCH DEPTH.IT ALSO MAKES THE WATER TOO HARD DUE TO SUCH DEPTH. WE ARE GOING TO SOLVE THEIR WATER PROBLEM TO SOME EXTENT.
PROBLEMS OF THE VILLAGE
WATER
EDUCATIONSTREET LIGHT
TRANSPORTATION POOR SANITATION .
VENUE ;
PANCHAYAT OFFICE,
DEVARAHALLI
THERE WILL BE A PROGRAMME ABOUT RAINWATER HARVESTING AND WATER PROBLEMS ON 21/12/2010. ALL ARE CORDIALLY INVITED.
ROAD MAP - 01
Map showing bore wells -02
SurveyFIELD SURVEY AROUND 0.5 KM DISTANCE FROM THE VIDYALAYA OF DEVARAHALLI VILLAGERS
FIELDS/ FARMS.
00.5
11.5
22.5
RAINY SEASONSUMMER SEASON
FIRST HAND EXPERIENCE TO THE FARMERS.
Called the villagers to the vidyalaya on 17-12-2010 to show the demonstration on rain water harvesting which was installed in our vidyalaya . Our project group students
had explained to the villagers about the advantages of recharging of bore well
through rain water harvesting.
TEAM LEADER WITH THE VILLAGERS IN OUR SCHOOL
EXPERIENCE OF FARMERS IN OUR SCHOOL They were also taken to the bore well which is
connecting the rain water harvesting pipes from the roof of our school building in academic block
Villagers were also shown the water report showing how rain water helps to reduce the fluoride content in water.
They were advised to follow the same in their village
We sent a letter to panchayat to take necessary measures to implement this to recharge the ground water to solve the water problem for drinking and for agriculture
VILLAGERS WITNESS THE PLANT
Recharge the bore wells through RAIN WATER HARVESTING.
Encouraging the Farmers to take up Modern methods of irrigation like Drip & Sprinkler irrigation systems in their fields.
Solution
PLEDGEWe the people of
Devarahalli Village solemnly take Oath that
we will take up the project to conserve the water in the form of recharging of Bore well in our fields &
also we will use clean and clear water for drinking &
cooking.
BUDGET FOR MAKING RAIN WATER HARVESTING SYSTEM for BOREWELLS (APPROXIMATELY)
POSTER
SlogansSAVE ONE DROP OF WATER &
SAVE MANY LITRES OF
WATER EVERY YEAR.
ACKNOWLEDGEMENT
First of all we want to thank our Principal Madam C. AMMAL who had given us the opportunity to participate in INTEL LEARN PROGRAM.
Next we LIKE to thank our science sir SHRI.A.RAVI (TGT) who had helped in planning the project .
we want to thank our Computer teacher Shri.C.Balu FCSA , Shri.Royce PGT (IT),who has helped us for using computer.
we also want to thank our village people, who had given all sort of support for collecting information about the project.
Name of the presentation submitted for the contest
BORE WELL RECHARGE THROUGH RAIN WATER HARVESTING
Class and age group of team members (at least 5 member in one team)
8th CLASS , 12 TO 13 YEARS
Goals and Objectives
TO INCREASE THE YIELD OF THE BORE WELL & TO DECREASE THE HARDNESS OF WATER.
Technology areas that helped in achieving the desired goal
DIGITAL CAMERA , LCD PROJECTOR, COMPUTER , INTERNET.
Work undertaken by the Team
REFERENCES
www.nabuur.com
www.practicalaction.org
www.rainwaterharvesting.org
www.tn.gov.in/dtp/rainwater.htm