bombas-turbina diseÑo

Upload: mauricio-de-los-santos

Post on 03-Jun-2018

244 views

Category:

Documents


0 download

TRANSCRIPT

  • 8/12/2019 BOMBAS-TURBINA DISEO

    1/65

    Departem

    Departm

    D

    ent Meganiese en Megatroniese Ingenieurswes

    nt o f Mechanica l and Mechatronic Engineer in

    A

    F

    BH T

    M, 2010

    e

    g

  • 8/12/2019 BOMBAS-TURBINA DISEO

    2/65

    D A

    A

    F

    F R M P 878

    BH T

    S: P W N

    D M M E

    S U

    M, 2010

  • 8/12/2019 BOMBAS-TURBINA DISEO

    3/65

    , ,

    , .

    . .

  • 8/12/2019 BOMBAS-TURBINA DISEO

    4/65

  • 8/12/2019 BOMBAS-TURBINA DISEO

    5/65

    CE

    A ....................................................................................................................

    O ..............................................................................................................

    L F ..........................................................................................................

    L T ............................................................................................................

    L S ........................................................................................................

    L S A .............................................................................

    1. I .................................................................................................... 1

    2. L .............................................................................................. 3

    2.1 M ........................................................................... 3

    2.2 W .................................................................................... 3

    2.3 P ............................................................................................. 42.4 T ................................................................................................ 5

    2.4.1 T .................................................................. 5

    2.4.2 PT (PAT) ...................................................... 7

    2.5 P ................................................................................................ 13

    2.5.1 G ......................................................................... 13

    2.5.2 L PAT ...................................................... 15

    3. C .................................................................................... 18

    4. C R B ..................................... 23

    4.1 P ............................................... 23

    4.2 O ............................................................................................. 244.3 F .............................................................................. 24

    4.4 P ............................................................. 25

    5. C ...................................................................................... 26

    6. S ............................................................................................... 34

    6.1 T .............................................................................. 34

    6.2 D ........................................................................ 37

    6.3 S ........................................... 37

    7. P ................................................................................................. 41

    8. S....................................................................................................... 44

    9. R .................................................................................................... 45A A: F ........................................................... 48

    A B: T ...................................................... 49

    A C: BUTU PAT

    ......................................................................................... 50

    A D: P C .

    (1992) ........................................................................................................... 51

    A F: P T KSB . 54

  • 8/12/2019 BOMBAS-TURBINA DISEO

    6/65

    F FGE

    F 1: S (C & W, 2007)

    L (A, 2008) ................................................................................. 4

    F 2: R ( C

    . 1992) ............................................................................................................... 5

    F 3: T (W N C R E

    I, 2007) ........................................................................................................ 6

    F 4: L H .................................................................................... 6

    F 5: T O . P O C

    (B & G, 2005) .................................................................................. 7

    F 6: C PAT ( C ,

    1992) ........................................................................................................................ 8

    F 7: "C2C" T .................................. 14

    F 8: L PAT/ J, I (B &

    G, 2005) .......................................................................................................... 16

    F 9: A PAT/ I (B &

    G, 2005) .......................................................................................................... 17

    F 10: I ............................................................................ 21

    F 11: S ................................................. 22

    F 12: M R B ...................................... 23

    F 13: O .................................................................................. 24

    F 14: O ............................................................................ 25

    F 15: O ............................................ 28

    F 16: T ...................... 29

    F 17: C ..................................................................... 34F 18: C ................................... 35

    F 19: P .................................... 36

    F 20: R D ................................................................................ 38

    F 21: S ..................................................................... 39

    F 22: S ..................................................................... 40

    F 23: E (E, 2009) ..................................... 42

    F 24: P , ................................................ 51

    F 25: P , ............................................. 51

    F 26: F BEP ........................................ 52

    F 27: F BEP ...................................... 53F 28: O 350510A ....................................................... 54

    F 29: O 350510A ......................................................... 55

    F 30: P KSB LCCM 200610 ............................................ 56

  • 8/12/2019 BOMBAS-TURBINA DISEO

    7/65

    F ABE

    T 1: D PAT ..................................................... 9

    T 2: D ..................... 15

    T 3: V ....................................... 20

    T 4: H ..................................... 21

    T 5: P ....................................................................................... 23

    T 6: C ...................................................... 26

    T 7: A

    ................................................................................................................... 30

    T 8: C ............................................................................. 30

    T 9: E ....................................... 31

    T 10: C .............. 32

    T 11: T ( VAT) ..................................................... 33

    T 12: T ...................................... 33

    T 13: R ................. 41

    T 14: R B S F ( A B

    R B S F) ................................................................................... 42

  • 8/12/2019 BOMBAS-TURBINA DISEO

    8/65

    F B

    C C

    D,d P

    e P

    f F

    g G

    H H

    h R

    k H

    L L

    N S

    P P

    P

    Q F

    Re R

    S S

    T T

    T

    v F

    D

    D

    T

    K D Stress

    F BC AD AC

    Bep,r B E P

    CFD C F D

    GPS G P SGUI G U I

    IPP I P P

    max M

    NERSA N E R S A

    NMHP N M H P

    p P

    PAT P T

  • 8/12/2019 BOMBAS-TURBINA DISEO

    9/65

    REFIT R E F T

    t T

    VAT V A T

  • 8/12/2019 BOMBAS-TURBINA DISEO

    10/65

    1

    1. DC

    R B S F S A

    . T

    , ,

    ,

    . T

    . I

    .

    T S A R B S F

    . T

    C R

    S E S S U (M & V N,

    2008)

    127 W . B R B

    S F

    .

    M V N (2008) (PAT)

    . O

    PAT

    , (S, 2005). A PAT . T

    ,

    .

    T

    . T

    . T

    , R B. T

    :

    . T

    R B S F.

  • 8/12/2019 BOMBAS-TURBINA DISEO

    11/65

    2

    C

    . I

    PT

    .

    . T .

    D

    . T

    . T

    .

    I R B S F

    . I

    PT . S

    . T

    . T

    . T

    .

  • 8/12/2019 BOMBAS-TURBINA DISEO

    12/65

    3

    2. EAE D

    2.1

    M 100 W 500 W (P P, 2009). T

    . T

    , ,

    / ,

    ( ) .

    A ,

    .

    W P T P (G )

    2.2

    A

    . I ,

    . A

    .

    T

    . A

    ,

    C & W (2007). T

    . T

    F 1.

  • 8/12/2019 BOMBAS-TURBINA DISEO

    13/65

    4

    F 1: (C & , 2007)

    (A, 2008)

    A ,

    A (2008)

    . A

    . T

    F 1 .

    2.3

    F

    . D PVC

    . T

    , . T

    .

    T

    . I S (2005)

    ,

    .

    T , UV ,

    . W S A,

    .

  • 8/12/2019 BOMBAS-TURBINA DISEO

    14/65

    2.4

    2.4.1 T

    T

    . T

    W

    . A

    F 2:

    T

    F 3.

    5

    . D

    P T

    C R E I

    F, K C

    F 2.

    (

    C . 1992)

    ,

    . T

    ,

    ,

    (2007). L

  • 8/12/2019 BOMBAS-TURBINA DISEO

    15/65

    6

    F 3: ( C E

    , 2007)

    L

    . T

    ,

    . A

    , .

    S F 4.

    F 4: H

    O V (2009)

    (, )

    , P, F, K K,

    2 MW. T A B,

    4.1.

    = (2.1)

  • 8/12/2019 BOMBAS-TURBINA DISEO

    16/65

    7

    I () (),

    , ,

    . U ,

    . T

    20% .

    2.4.2 PT (PAT)

    I (PAT) .

    I .

    T

    .

    D & N (2008)

    . T . B & G (2005)

    .

    .

    F 5: . C

    (B & G, 2005)

  • 8/12/2019 BOMBAS-TURBINA DISEO

    17/65

    T F 5

    A

    C . (1992)

    M

    F 6: C

    A W (

    T

    .

    T 1

    .

    8

    . T M=0

    = 0

    .

    F 6

    .

    A ( C

    1992)

    1996) PAT

    PAT

    . T

    ,

    .

    ,

    ,

    .

  • 8/12/2019 BOMBAS-TURBINA DISEO

    18/65

    9

    1: D A

    A

    A W C

    B W

    V G

    S

    D E D

    V L

    C

    N

    N

    N M H P (2005) 1.38

    1.25 . H,

    S (2005) PAT

    2 1.65 . T

    ,

    . A

    ,

    .

    A S (1985)

    (Qbep Hbep)

    (Qt Ht) (max)

    . T .

    =

    .

    (2.2)

    = .(2.3)

  • 8/12/2019 BOMBAS-TURBINA DISEO

    19/65

    10

    T S (1957), ,

    .

    =(2.3)

    = (2.4)

    MC L (1976) 2.5 Qt.

    = (2.5)

    A , ,

    BUTU (C, ., 1992). T

    B E P (BEP) .

    T PAT BEP

    . T A C,

    . T 10% .

    W

    , D & N (2007)

    PAT

    . T

    .

    T , Nrp

    2.6.

    = 0.3705+ 5.083 (2.6)

    Nrt Nrp

    , .

  • 8/12/2019 BOMBAS-TURBINA DISEO

    20/65

    11

    T 2.7.

    = .

    (2.7)

    2.8.

    = 0.0233+ 0.6464 (2.8)

    N h( )

    2.9.

    =h.NN (2.9)

    Hpr . I 2.10

    Htr PAT.

    = (2.10)

    Qpr Nrp, Np

    Hpr.

    T PAT Hpr, Qpr Np . T

    . I

    Nst< 150.

    T PAT

    . T

    D & N (2007)

    . A

  • 8/12/2019 BOMBAS-TURBINA DISEO

    21/65

    12

    . T

    S (1985),

    S (1957) AF (1994).

    T C . (1992).

    T ,

    80 . T

    , ,

    .

    D ,

    ,

    . T

    .

    C 2.11

    =

    (2.11)

    T CH CQ F 24

    F 25 A D . N

    PAT.

    = 1.1= 0.9

    = 1.075

    = 0.925 (2.12)

    N

    2.13.

  • 8/12/2019 BOMBAS-TURBINA DISEO

    22/65

    13

    = (2.13)

    T 2.14

    = 0.03 (2.14)

    A

    , .

    I BEP,

    F 26 F 27 A D . T

    . T

    .

    W ,

    . I

    C F D (CFD) ,

    R & K (2007) D & N (2008),

    .

    F

    . T

    , C . (1992)

    .

    I

    , .

    2.5

    2.5.1 G

    T PAT

    . T

    .

  • 8/12/2019 BOMBAS-TURBINA DISEO

    23/65

    14

    I . A

    ,

    . K . (2008)

    70% 96%

    1525% . G

    50%

    92%. T

    . I

    .

    W (1996)

    . T

    . M . T 80%

    C2C F 7.

    F 7: "C2C"

    A

    . S

    W (1996). T

    . T

    .

  • 8/12/2019 BOMBAS-TURBINA DISEO

    24/65

    15

    2.5.2 L PAT

    T

    PAT . T

    PAT , . H,

    PAT

    .

    T

    . A

    PAT

    . T 2

    .

    2: D

    G D D

    A P

    M

    C

    /PAT

    S ,

    T /PAT

    C,

    D E P

    /PAT

    R

    O

    /PAT

    .

    M T PAT/

    B & G (2005) PAT/

    J, I. T

    ,

    . T

    (F 8). A PAT

    100 ,

  • 8/12/2019 BOMBAS-TURBINA DISEO

    25/65

    16

    PAT

    .

    F 8: A/ , (B &

    G, 2005)

    T PAT

    . A PAT ,

    PAT (F 9).

    D

    .

    KSB . O

    .

  • 8/12/2019 BOMBAS-TURBINA DISEO

    26/65

    17

    F 9: A A/ (B &

    G, 2005)

    I

    . T

    I P P (IPP) . T

    IPP

    . T

    . T S

    A REFIT 0.94 R/W (NERSA, 2009). T

    .

    M . (1950)

    . T , .

    T

    , . T

    .

  • 8/12/2019 BOMBAS-TURBINA DISEO

    27/65

    18

    3. CE A

    A

    ,

    . T

    , . T

    :

    P U F C M

    I , GUI (G U I) . T C++/CLR

    M V S

    GUI

    .

    T ,

    3.1.

    = (3.1)T ()

    . F

    . F

    PAT

    , .

    G , 9.81 /

    2 . T

    ,

    . T A A.

    A ,

    . E

  • 8/12/2019 BOMBAS-TURBINA DISEO

    28/65

    19

    . T

    ,

    . T

    :

    , . A

    . O

    . T

    ,

    .

    T

    . A

    . T GPS . T

    (W, 2002). T

    3.2

    .

    =

    2 (3.2)

    T . T

    M ,

    . T

    R , 3.3.

    =

    (3.4)

    I R 2100

    , :

    =64 (3.5)

  • 8/12/2019 BOMBAS-TURBINA DISEO

    29/65

    20

    I R

    . I

    :

    = 1.325log

    3.7+ 5.74. (3.6)

    I () . T T 3.

    3:

    ()

    D , , , ,

    0.0015

    C S W I 0.046

    W 0.046

    G I 0.15

    C 0.33

    R S 0.99

    W

    3.7.

    = (3.7)

    T . T

    . S

    F 10.

  • 8/12/2019 BOMBAS-TURBINA DISEO

    30/65

    21

    F 10:

    S . T

    T 4.

    4: H

    F

    G V ( ) 0.19

    G V ( ) 2.06

    L 0.6

    S 0.9T ( ) 1.8

    S 0.05

    T 3.8

    , .

    = + +

    2(3.8)

    T

    3.1.

  • 8/12/2019 BOMBAS-TURBINA DISEO

    31/65

    I

    . T

    1. E 2. P

    3. U 4. T

    T

    . T

    F

    F 1

    22

    . T

    :

    (

    )

    W P

    . T

    . A

    11.

    1:

    W 7

  • 8/12/2019 BOMBAS-TURBINA DISEO

    32/65

    4. CE E

    A R B S

    ,

    S

    F 12:

    4.1

    T

    . T

    T

    B R

    B

    A

    A

    . T

    23

    D FE EA A A BA

    F F 12. T

    .

    B

    110 W ,

    (

    B S F) T 5.

    5:

    F

    (/)

    (/200610 170 1 17

    200400 130 3 39

    56

    F 13.

    .

    440 W.

    A

    )

  • 8/12/2019 BOMBAS-TURBINA DISEO

    33/65

    24

    F 13:

    4.2

    M

    . T

    . A (F 14)

    . I

    .

    S

    . T

    .

    4.3 F

    R B

    . T

    .

  • 8/12/2019 BOMBAS-TURBINA DISEO

    34/65

    25

    F 14:

    T

    . T

    .

    4.4

    I

    ( 90%) 110W , 20. T

    28

    .

  • 8/12/2019 BOMBAS-TURBINA DISEO

    35/65

    26

    5. CCE EAA

    T R B

    S F . T

    . T

    .

    F

    T 6

    .

    6: C

    C E

    G

    S: 520 /

    23

    U

    D: 170 /

    40

    G T 80%

    L 2

    Q D 20

    S P 3

    F 3

    E

    N

    F 100 2

    R N

  • 8/12/2019 BOMBAS-TURBINA DISEO

    36/65

  • 8/12/2019 BOMBAS-TURBINA DISEO

    37/65

    T

    ,

    T

    A

    .

    F 15

    T

    /PAT. T F 16.

    C A

    . T

    .

    C B

    I

    28

    . T

    . I

    . T

    :

    P

    .

    .

    T

    .

  • 8/12/2019 BOMBAS-TURBINA DISEO

    38/65

    . T

    C C

    C B,

    F 16:

    T

    T

    29

    .

    A,

    . C D

    PAT.

    . T

    .

    . E

    . T

    T 7.

    /PAT, . T

    ,

  • 8/12/2019 BOMBAS-TURBINA DISEO

    39/65

    30

    7: A

    E

    A C P

    BEP

    C

    N

    D P

    BEP

    M

    M

    R

    PAT

    T

    .

    I ,

    . T

    . T R

    .

    F . F F 2

    . T O V (2009)

    . U 23 100 W

    T 8.

    8: C

    C C

    (E/)

    E

    (081009)

    P 1.42 R 15.50

    F 1.33 R 14.40

    K 1.61 R 17.40

    SK 0.94 R 10.20

  • 8/12/2019 BOMBAS-TURBINA DISEO

    40/65

    31

    W

    S A ,

    K PAT .

    N

    . KSB S A

    . T BEP 520 / 23

    , .

    T . T

    :

    9: E

    D

    E

    (081009)

    B PAT O 350

    510A

    B

    S

    R 210 000 R 210 000

    . VAT

    C & C T U W

    149 000 R 1.62

    VAT

    G F 425 G150 N/A C

    N/A

    E

    E

    P U W

    50 000 R 591 559

    . VAT

    G

    ( B) E

    E UK

    . T

    ,

    R 165 000, R426 000. T C A.

    C C KSB PAT ,

    C D (

    G E I) R 165 500.

  • 8/12/2019 BOMBAS-TURBINA DISEO

    41/65

  • 8/12/2019 BOMBAS-TURBINA DISEO

    42/65

    33

    11: ( A)

    T

    . I 95%

    , V (..) . T

    E .

    12:

    C T C T

    P

    (W)

    T E (W) C W

    A R 1 494 727 95.5 15 895 020 R 0.09

    B R 1 895 246 67.9 11 301 276 R 0.17

    C R 972 181 100 16 644 000 R 0.06

    D R 1 372 557 71.3 11 867 172 R 0.12

    T, C ,

    . A, E.

    I

    L . A ,

    KSB ,

    .

    E

    M

    (R)

    C (R) O & M

    (R)

    I

    (R)

    T C

    C

    (R)

    T C

    A 426 000 191 862 43 250 72 573 1 451 476 R 1 494 727

    B 591 559 191 862 54 839 92 020 1 840 406 R 1 895 246

    C 210 000 191 862 28 130 47 202 944 051 R 972 181

    D 375 500 191 862 39 715 66 642 1 332 842 R 1 372 557

  • 8/12/2019 BOMBAS-TURBINA DISEO

    43/65

    6. E DEG

    T

    PAT

    F

    6.1

    KSB

    T C 2.

    T

    MATLAB B

    BEP

    ) BEP. T

    34

    F 17. I

    ,

    .

    17: C

    . A PAT

    E P (BEP)

    BEP

    (

    F 18.

    KSB,

    (A F).

    . T

  • 8/12/2019 BOMBAS-TURBINA DISEO

    44/65

    F 18: C

    M

    BEP. T

    . 1992)

    I

    19. I

    . T

    35

    ,

    B

    .

    ,

    N M H P (2005)

    . B

    ,

    S (2005) .

    P (C,

    ,

    F

  • 8/12/2019 BOMBAS-TURBINA DISEO

    45/65

  • 8/12/2019 BOMBAS-TURBINA DISEO

    46/65

    37

    PAT BEP

    . T ( )

    KSB PAT .

    T PAT ( KSB) :

    M P: 97 W

    R V: 741

    T: 1250 N

    6.2 D

    T R B S F 110 W ,

    KSB. T 93 W 105 W,

    . T PAT . T

    .

    T KSB 200610 R B S

    F F 30 A F. I PAT 97

    W 740 82% , BEP

    84%. U (

    170 / 40 ) ,

    .

    T PAT KSB 200610

    ,

    .

    6.3

    T , , . T

    .

    T . A

    ,

    . H, 5

    25% . A ,

  • 8/12/2019 BOMBAS-TURBINA DISEO

    47/65

    38

    PAT

    T

    . T 1

    . I ,

    . T

    . F 20

    .

    F 20: D

    T G I SA (P) L

    315 PN05 SDR33 PE100 HDPE P P E. I 315

    HDPE 5 . D

    200 . T

    ,

    .

    T 12.1 . T

    6.1 .

    = 6.1

  • 8/12/2019 BOMBAS-TURBINA DISEO

    48/65

    U

    22

    T

    5.6,

    .

    T

    L,

    . T 300. W

    . T

    A

    F

    39

    3 (

    3.9 MP. T

    MP C

    . T

    .

    KSB

    .

    F 21

    .

    21:

    ),

    HDPE ,

    (2002).

    S

  • 8/12/2019 BOMBAS-TURBINA DISEO

    49/65

    40

    T F 22.

    F 22:

    T

    . T PAT

    . T PAT

    (

    ) . T

    . I

    .

  • 8/12/2019 BOMBAS-TURBINA DISEO

    50/65

    41

    7. EC C

    T ,

    . T

    PAT .

    T KSB . T

    , . T

    T 13.

    13:

    C

    O 350510A PAT

    S G KSB R 210 000R 10 000S 300 G V KSB R 8 950315 PN05 SDR33 PE100 HDPE

    P P E

    S RG I SA

    (P) L

    R 36 450

    R 4 000

    400 3R R 80 000

    I (2 5

    10 )

    R 52 500

    ( A) R 402 000

    I ,

    . T

    . T N

    P V (NPV)

    . T NPV

    NPV

    . T NPV .

    R B S F . T

    ,

    , F 23.

  • 8/12/2019 BOMBAS-TURBINA DISEO

    51/65

    42

    F 23: E (E, 2009)

    T R B S F T 14.

    14: B F ( A

    B B F)

    (/)P 55.45

    S 34.34

    O 24.32

    U 97 W

    PAT 110 W ,

    . I

    , .

    F , ,

    R 19 600. A

    , , 24

    . A ( ,

    ) E 35%

  • 8/12/2019 BOMBAS-TURBINA DISEO

    52/65

    43

    (W, 2009). T

    . I

    . T

    ,

    . A ,

    .

    T

    . T

    . T,

    , .

  • 8/12/2019 BOMBAS-TURBINA DISEO

    53/65

    44

    8. A

    T R

    B S F G. I

    PT PAT

    .

    S PAT

    . I

    E . A

    .

    T . A

    . W

    . I

    .

    I ,

    . T

    R B S F

    .

  • 8/12/2019 BOMBAS-TURBINA DISEO

    54/65

    45

    9. EFEECE

    AF, C. 1994.

    ., P.D.M.E. T. U W

    A, J. 2008. : . H P 122.

    (O). A: .. (150909)

    B, S. G, W. 2005. . T N. 11.

    KSB A

    C, J. M., E, P. F, G. 1992.

    . V 11. D E GATE

    C, R. 2002. : (). (O)A: ..(091209)

    C, P. W, I. 2007. .

    H P 117. (O). A: .. (150909)

    D, S. N, A. 2007.

    .

    E T F S 32 800807

    D, S. N, A. 2008. , .

    E T F S 32 16201627

    E. 2009. 2009/10. (O). A:

    ://...//.?CID=26

    K, D., A , E., S , K., K, F.C., S E, A.

    C, C. 2008. . E C M

    49 16621673

    M, P., S, N.P.A. W, A.A. 2003.

    . R E 28 13571369

    MC, S.C., M, J.L, B, T.O. J. 1993.

    . H H, MGH, N , N (. 11.3 )

  • 8/12/2019 BOMBAS-TURBINA DISEO

    55/65

    46

    M, A.J., V N, J.L. 2008.

    : . C R S E S,

    S U

    M, A.F. 1999. . P H I. U S R, NJ.

    N M H P. 2005. . I

    T D G. S 29

    NERSA. 2009. ():

    26 2009. P: NERSA

    O, B. V, P.G. 2009.

    . R E 34 613

    P, M. P, R.J. 2009. . E P (2009)

    R, S. K, J.T. 2007.

    . P TT I P U

    S

    S, K. 1985.

    , . K E C. B, I

    S, E.N. 2005. . F P R.F E, S U

    S, A.J. 1957. , .

    J W S, I. N

    V. .. .

    (O). A: ..//. (0412

    09)

    W, R. 2009. . (O).A: ... (091209)

    W N C R E I. 2007. :

    . A S U

    W, F.M. 2002. : . MGH, N , N

  • 8/12/2019 BOMBAS-TURBINA DISEO

    56/65

    47

    W, A.A. 1996. . W

    R E C, J 1996. D, USA

  • 8/12/2019 BOMBAS-TURBINA DISEO

    57/65

    48

    AED A: FD E DEEA

    I S 6,

    . T

    () . MC . (1993)

    . T

    A1.

    = 1000 1 + 288.9414508929.2 +68.12963 3.9863 A1

    T A2.

    , = + + + 4.8314 10 A2

    W

    = 0.824493 0.0040899T + 7.6438 10T 8.2467 10T +5.3675 10T = 5.724 10 + 1.0227 10T 1.6546 10T

    K R

    M

    (1999). T

    A3.

    = 3.946 10

    T

    + 1.311 10

    T

    1.7698 10

    T

    + 1.294 10T0.05898T +1.7855/1000A3

  • 8/12/2019 BOMBAS-TURBINA DISEO

    58/65

  • 8/12/2019 BOMBAS-TURBINA DISEO

    59/65

    50

    AED C: B EHD F EDCG A EFACE F

    EFACE DAA

    T BUTU ( P T S)

    M G B. I

    10%.

    F BEP :

    = 2.+ 0.205C1

    = 0.85

    + 0.385

    C2

    = 0.03 C3

    N C4

    C5 C6, C7.

    =1

    +

    C4

    = 10.96 0.2.+ 0.13C5

    =2

    60C6

    =

    . 10.37 + 1

    C7

    D ,

    .

  • 8/12/2019 BOMBAS-TURBINA DISEO

    60/65

    AED D: EF

    CHAAA E A. (199

    F 2

    F 2

    51

    ACE FAC DAGA F HE

    2)

    4: ,

    : ,

    EHD F

  • 8/12/2019 BOMBAS-TURBINA DISEO

    61/65

    F 26:

    52

    F BE

  • 8/12/2019 BOMBAS-TURBINA DISEO

    62/65

  • 8/12/2019 BOMBAS-TURBINA DISEO

    63/65

    AED F:

    CEFGA

    F

    54

    AD BE DE CE F

    28: 350510A

    B

  • 8/12/2019 BOMBAS-TURBINA DISEO

    64/65

    F

    55

    29: 350510A

  • 8/12/2019 BOMBAS-TURBINA DISEO

    65/65

    F 30: B CC 200610